WORK SAMPLE
Xitong (Luna) Zeng | Portfolio
[CONTENT] • RESUME • SUTTON PARK HOUSE Residential, 2020
• IFF HEADQUATERS Office, 2018-2019
• THE LIBERTY PLACE Office, 2018-2019
• LUND HOUSE GREEN Residential, 2018-2019
• MATERIAL ARCHITECTURE LAB
Bartlett BPro Research Cluster 5+6 -Laminar Grosteque Pavilion Deisgn, 2018
• ART MUSEUM DESIGN
Transition Between the Mountain and Lake ,2014
• ARCHITECTURE SCHOOL DESIGN Interweave, 2015
• LANDSCAPE ARCHITECTURE
Mirror Lake Residental Development, Shaoxing, 2018
• YUEMIAO WEST COMMERCIAL DESIGN
Design of Yuemiao West Cultural And Commercial Pedestrain, 2015-16
[RESUME]
EXPERIENCE
LANGUAGE
Architectural Assistant | MSMR Architects, LONDON| 11/2019 - Present
ENGLISH: Professional working proficiency MANDARIN: Native CANTONESE: Limited working proficiency
Architectural Assistant | Studio Kyson, LONDON| 10/2018 - 10/2019
SKILLS AutoCAD: Advanced Grasshopper: Advanced Rhino 3d: Advanced SketchUp: Advanced Keyshot: Advanced Maya: Intermediate V-ray: Advanced Adobe Photoshop: Advanced Adobe InDesign: Advanced Adobe Premiere pro: Intermediate Houdini: Intermediate Revit: Intermediate
- Assisted with CD, SD, DD and interior design for a variety of Mixed-Use and Residential Developments - Produced design drawings, DAS, 3d models, CGIs, physical models - Coordinated with conferences with clients, planner, and consultants
- Contributed to deliver Concept Design, Planning Application, Technical Design to As build drawings through award-winning Residential, Commercial Projects - Weekly conferences with client, project manager, consultants
Intern Architect | LANDmark Studio, LONDON| 07/2018 - 10/2018 - Participated in all phases of design as well as landscape design - Assisted weekly conference with clients, interpretation, translation - Produced 3d models, rendering,CGIs
Junior Architect | Tsinghua Tongheng Planning and Design Limited, BEIJING| 02/2016-09/2016 - Conducted AutoCad drawing, model building, sketches, facade construction drawing, master planning - Projects include: YueMiao Commercial Pedestrian Streets, Tangshan nursing home, YiMa stadium, etc.
EDUCATION
Architectural Design, MArch | 09/2018 | The Bartlett School of Architecture, UCL
- A comprehensive understanding of parametric design, material research - Assembled small to large scale models, produced using various techniques such as: laser cutting, 3d printing, in-person tools, slip casting
Architecture, Bachelor | 07/2017 | School of Architecture, South China University of Technology - 5 years of Architecture design learning including hand drawing, computer aid, historical knowledge as well as engineering technique. - Skilled in design theory, technical drawing and construction knowledge.
Xitong (Luna) Zeng
MAIL: luna_zeng@gmx.com TEL: 07594364833 PROFILE: www.linkedin.com/in/ xitong-zeng
HONORS First Prize of the 2015 National Excellent Urban and Rural Planning and Design | honour date: Jul 2015 Award Issuer: China Urban Planning Association As an junior architect, I contributed with all phase of design and renderings for this project which has been honored with First Prize of the 2015 National Excellent Urban and Rural Planning and Design Award by China Urban Planning Association. Outstanding student leaders | honour date: Sep 2016 honor issuer: South China University of Technology
Outstanding student leaders of Women’s Federation of from South China University of Technology, 2014-2016 | honour date: 2014 honor issuer: South China University of Technology University Scholarship | honor date: Sep 2011 honor issuer: South China University of Technology Top 1 grades from the student’s region (Beijing) entranced South China University of Technology
[SUTTON PARK HOUSE] Residential MSMR ArchitectsďźŒLondon, 2020 Directed by:
Simon Robinson, David Baggaley Team Members:
Xitong Zeng, Elena Licci Site: 15 Carshalton Rd, Sutton, Greater London SM1 4LD Time: Current Status:
View from Sutton Park
Stage 3 Planning Application Submitted
Proposed Residential Entrance 2
Street view from Carshalton Road
[About the Design] Converting this red-brick office building, typical of the 1970’s, into residential use. The proposed design adds three floors to the building height, a lower ground and lower ground-mezzanine commercial space. Externally, it will transform the appearance of the building, with a re-cladding concept influenced by the horizontal aesthetic of the existing building. Comprising 149 apartments with a mix of one, two and three-bed units, the design also includes two new roof terraces and a landscaped courtyard garden for residents. At ground level, there is an opportunity to improve the surrounding public realm.
Illustrative Steet View
Detailed Balconies
Brickwork
Precast Stone
Illustrative Entrance View
Perforated Metal Balustrade
Paving
Recessed Balcony Illustrative View
Plan Extract: Angled Balustrade
Juliet Balcony Illustrative View
Illustrative Interior View
Detailed Elevation
1
[ITF HEADQUATERS]
EX-01
Match Existing Floor Finish : Stair 01 See Finish schedule for specifications / work scope
EX-02
Match Existing Floor Finish : Stair 02 See Finish schedule for specifications / work scope
RAF
Raised Access Floor system See Finish schedule for specifications / work scope
WD-01
Timber Flooring See Finish schedule for specifications / work scope
TL-01
Floor Tile See Finish schedule for specifications / work scope
Headquarters of the International Transport Workers Federation
ASV
Anti Static Vinyl Floor Finish See Finish schedule for specifications / work scope
EX-11
Existing brickwork See Finish schedule for specifications / work scope
EX-12
Existing Timber cladding at Lift Lobby See Finish schedule for specifications / work scope
PL-01
Clay paint over existing brickwork / brickslip See Finish schedule for specifications / work scope
PL-06
PL-02
5
6
Match Existing Floor Finish : Stair 01 See Finish schedule for specifications / work scope
EX-02
Match Existing Floor Finish : Stair 02 See Finish schedule for specifications / work scope
RAF
Raised Access Floor system See Finish schedule for specifications / work scope
WD-01
Timber Flooring See Finish schedule for specifications / work scope
TL-01
Floor Tile See Finish schedule for specifications / work scope
TL-01
PL-02
PL-05
ASV
Anti Static Vinyl Floor Finish See Finish schedule for specifications / work scope
EX-11
CGP Existing brickwork See Finish schedule for specifications / work scope
PL-06
IT HUB
PL-06
PL-02
PL-02
Directed by:
PL-02
Clay Plaster See Finish schedule for specifications / work scope
PL-03
Clay Plaster Partition See Finish schedule for specifications / work scope
PL-04
Clay Plaster with Liquitex Glaze - Bathroom See Finish schedule for specifications / work scope
PL-05
Notice Board / FCU Acess panel. See Finish schedule / Interior elevations for specifications / work scope
PL-06
Plaster Board See Finish schedule for specifications / work scope
WD-11
Timber Cladding for lift wall See Finish schedule for specifications / work scope
PT-01
Intumescent Paint Finish for exposed structures See Finish schedule for specifications / work scope
EX-11 MT-01
PL-05
EX-12
Existing Timber cladding at Lift Lobby See Finish schedule for specifications / work scope
PL-01
Clay paint over existing brickwork / brickslip See Finish schedule for specifications / work scope PT-01
PL-03
Clay Plaster Partition See Finish schedule for specifications / work scope
PL-04
Clay Plaster with Liquitex Glaze - Bathroom See Finish schedule for specifications / work scope
Philip Hall, Scott Kyson Team Members:
MT-01
Bronze Reveal - Along Openings See Finish schedule for specifications / work scope
BR-01
Recalimed Yellow London Stock Brick See Finish schedule for specifications / work scope
PL-04
PL-05
Notice Board / FCU Acess panel. See Finish schedule / Interior elevations for specifications / work scope
PL-06
Plaster Board See Finish schedule for specifications / work scope
WD-11
Timber Cladding for lift wall See Finish schedule for specifications / work scope
Raised Access Floor system See Finish schedule for specifications / work scope
WD-01
Timber Flooring See Finish schedule for specifications / work scope
TL-01
Floor Tile See Finish schedule for specifications / work scope Anti Static Vinyl Floor Finish See Finish schedule for specifications / work scope
EX-11
Existing brickwork See Finish schedule for specifications / work scope
TL-01
EX-12
Existing Timber cladding at Lift Lobby See Finish schedule for specifications / work scope
PL-01
Clay paint over existing brickwork / brickslip See Finish schedule for specifications / work scope
PL-02
Clay Plaster See Finish schedule for specifications / work scope
TL-01 CORRIDOR_01
SHOWER
MEETING ROOM 02
WC ACCESSIBLE
RAF
RAF
RAF
WD-01
WD-01
WD-01
STAIR_02
EX-02 Secondary Beam - Indicative only
PL-02
PL-02
PL-02
PL-05
PL-05
LIFT_02
LIFT_01
RISER
PL-04
Clay Plaster with Liquitex Glaze - Bathroom See Finish schedule for specifications / work scope
PL-05
Notice Board / FCU Acess panel. See Finish schedule / Interior elevations for specifications / work scope
PL-06
Plaster Board See Finish schedule for specifications / work scope
WD-11
Timber Cladding for lift wall See Finish schedule for specifications / work scope
Crittall Glazed Partition Refer to Crittall As Built information
GP
Glazed Partition Refer to D + C as built information
Air conditioning supply plenum linear LIFT LOBBY diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
WD-11
BR-01
PL-02 MT-01
PL-02
MT-01
Bronze Reveal - Along Openings See Finish schedule for specifications / work scope
EX-11
BR-01
Recalimed Yellow London Stock Brick See Finish schedule for specifications / work scope
CGP
Crittall Glazed Partition Refer to Crittall As Built information
GP
Glazed Partition Refer to D + C as built information
PL-02
PL-02
PL-05
WG-04
Blind control switch to MEP design and specification.
PL-05
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
Secondary Beam with intumescent paint
A BAY
-
-
B
C
D
E
Secondary beam with intumescent paint.
Comments: -
-
Refer to Detail 559-18 5005.
THIRD FLOOR
A
B
C
D
E
By:
Date:
Client:
-
-
ITF HOUSE
FCL
A
B 0
C 0.5
D 1
1.5
E
SECOND FLOOR
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance A Bwith MEP C design.
PL-02
Project Title:
2.5 m
SCALE - 1:50
SCALE - 1:50
PL-02
D
E
SECOND FLOOR
Do not scale this drawing All dimensions must be checked on site All reserved.1No reproduction in any 2.5 material 0 rights0.5 1.5 m form is permitted without consent.
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
Secondary beam with intumescentCWX-XX paint.
Studio
THIRD FLOOR ITF HOUSE, 49-60 BOROUGH ROAD, LONDON, SE1 1DR
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
WD-01
STAIR_01
PL-02
Blind control switch to MEP design and specification.
28 Scrutton Street London UK EC2A 4RP
EX-11
T: +44(0) 20 7247 2462 E: enquiries@kyson.co.uk W: www.kyson.co.uk
Drawing Title: Proposed Plans Second Floor - AB Scale:
Date:
Drawn:
Checked:
Project No.:
Drawing No.:
Revision:
1:50@A1
APR 19
-
-
483-16
2200
AB1
PL-02
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
A Survey required after stripping out None of the structural components or historic fabric shall be altered or removed unless instructed otherwise. Contractor must verify all dimensions on site before commencing PL-05 work or preparing workshop drawings. This drawing is to be read in conjunction with all relevant drawings, OFFICE specifications and02other documents.
C1
Ceiling Height / Service Void Indicative Only. To be confirmed on Stripping Out. CGP PL-02 Refer to MEP Engineer's drawings for service unit details within service walls. Refer to Structural Engineer's drawings for new openings / new door lintel details. PL-02 Intumescent Paint Finish for all exposed structures. See Finish schedule for specifications / work scope.
EX-01
SECONDARY GLAZING Fixed pane secondary glazing channel. Any secondary glazing below 800mm from FFL to conform with part K4 of approved document K of the current Building Regulations. Specification from specialist PL-02 sub-contractor. Refer to detail 559-18 5003.
WG-05
PL-02
19mmx69mm Fire rated Euro Class B Light Oak slats full height to lift shaft wall with 18mm equal spacings CGP fixed over black class 0 spread of flame fabric to SW substrate.
-
RAF
PL-02
PL-02
WG-06
PL-05
PL-02
Existing Wall Service Void
Second Floor Plan - Bay D&E
Refer to Detail 559-18 5001.
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
C
Secondary glazing reference See Window schedule for specifications
D BAY
KEYPLAN
Bespoke Slimline metal framed glazing system: Detailed design drawings to be produced by specialist manufacturer for approval by Kyson prior to order being placed.
PL-02
Clay Plaster See Finish schedule for specifications / work scope
PL-06
Plaster Board See Finish schedule for specifications / work scope
Rev: -
PARTITION WALL A B C 2 Layers of 12.5 Gyproc SoundBloc F fixed with British Gypsum Jack-Point Screws to Gypframe 70 S 50 'C' studs at 600mm centres & Isover APR1200 acoustic insulation.. Taped and Skimmed.
A
Lintel position to nearest brick course. To be 19mmx69mm confirmed Fire rated Euro Class B Light Oak slats following measuredfull survey, heighttoto lift shaft wall with 18mm equal spacings WD-11out post strip-out. be carried fixed over black class 0 spread of flame fabric to SW Lintel to be intumescently substrate. treated for fire.
E BAY
AS BUILT
AS BUILT
Primary beam with intumescent paint.
Existing brickwork See Finish schedule for specifications / work scope EX-11
D
Ceiling height to be confirmed following measured survey post strip-out.
C BAY
WX-XX
AS BUILT
-
OFFICE 01
B
Key
B BAY
Rev:
A
PL-02 NOTE:
Maintenance access behind Notice Board. Refer to Detail 559-18 5004.
Ceiling height to be confirmed following measured survey post strip-out. Secondary Beam - Indicative Dooronly reference DX-XX See Door schedule for specifications
KEYPLAN
PL-06
MT-01
WD-11
Refer to Detail 559-18 5001.
Secondary Beam - Indicative only
Clay Plaster See Finish schedule for specifications / work scope Plaster Board See Finish schedule for specifications / work scope
CGP
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
B1
Existing brickwork See Finish schedule for specifications / work scope
PL-02
PT-01
EX-11
Second Floor Plan - Bay C
FCL
CGP
16mm Allowance for floor finish inc. magnetic backing. 29mm thick raised access floor panel on Kingspan Alpha V pedestals. Raised access floor overall depth varies due to site conditions (185mm minimum clear void). Floor tile 4.5kN over 300mm square 3.0kN over 25mm square & 8.0kN/m² Uniformly distributed load. For general office use with heavy equipment. Class 5/3A/2. Loadings TBC by SE.
A
Bespoke Slimline metal framed glazing system: Detailed design drawings to be produced by specialist manufacturer for approval by Kyson prior to order being placed.
PL-02
MT-01
PL-02
Elevation 5 5
4
KEYPLAN
PL-02
EX-11
OPEN PLAN OFFICE
Service Void
3
OPEN PLAN OFFICE Secondary glazing reference See Window schedule for specifications
CWX-XX
PL-02
Blind control switch to MEP design and specification.
Existing Wall
Second Floor Plan - Bay A&B
PL-05 Door reference See Door schedule for specifications
DX-XX
WX-XX
EX-11
NOT IN SCOPE
SECONDARY GLAZING EX-11 Fixed pane secondary glazing channel. Any secondary glazing below 800mm from FFL to conform with part K4 of approved document K of the current Building Regulations. Specification from PL-02 PL-02specialist sub-contractor. Refer to detail 559-18 5003.
EX-11
PL-02
D
2016-2018
Key
EX-11
Maintenance access behind Notice Board. Refer to Detail 559-18 5004.
PL-02
Time:
RAF
PL-05
Secondary beam with intumescent paint.
BR-01
BREAK AREA
BR-01
PL-02
WD-01
RAF OPEN PLAN OFFICE
PL-02
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
NOT IN SCOPE PL-05
RAF
PL-02
WD-01
5
PL-05
Intumescent Paint Finish for exposed structures See Finish schedule for specifications / work scope
PT-01
GP
EX-11
PL-02
MT-01
WD-01
PT-01
BR-01
CGP
Site:
A1
MT-01
EX-11
EX-11
EX-11 MT-01
MT-01
PT-01
4
RAF
PL-02
CGP
WD-01
PL-02
MT-01
GP
WD-01 Secondary Beam intumescent Claywith Plaster Partition paint PL-03 See Finish schedule for specifications / work scope
RAF
PL-05
MT-01
Bronze Reveal - Along Openings See Finish schedule for specifications / work scope
MT-01
PL-02
PL-01 Refer to Detail 559-18 5005.
Recalimed Yellow London Stock Brick See Finish schedule for specifications / work scope
RAF
PL-02 PL-05
EX-11
3 CGP
RISER
MT-01
WD-01
PL-02
PL-02
PL-02
PL-01
PL-01 FCL
BR-01
PL-02
PL-02
PL-05 ASV
RAF
NOT IN SCOPE
Borough, Southwark, London SE1 1DR
RAF
RAF
RAF PL-02
Intumescent Paint Finish for exposed structures See Finish schedule for specifications / work scope OPEN PLAN OFFICE
PT-01
TL-01
WD-01
PT-01
Glazed Partition Refer to D + C as built information
GP
RAF
EX-11
MEETING ROOM 01
Crittall Glazed Partition Refer to Crittall As Built information
CGP
Xitong Zeng, Philip Hall, Andrew Tabner,
MT-01 OPEN PLAN OFFICE PT-01
Match Existing Floor Finish : Stair 02 See Finish schedule for specifications / work scope
PL-04
EX-11
C
10
KITCHEN
PL-02 WD-01
Match Existing Floor Finish : Stair 01 See Finish schedule for specifications / work scope
EX-02
EX-11
RAF
Clay Plaster See Finish schedule for specifications / work scope
PL-02
STAIR_03
9
PL-05
RAF
EX-11
B
8
WC FEMALE
PL-04
PL-02
WD-01
PL-05
EX-01
PL-04
PL-06
PL-02
7
7
Key
EX-01
PL-02
PT-01
Studio Kyson,London, 2018
Phase 2 ongoing
5
Key
A
ASV
Phase 1 completed (in use)
4
Key
RAF
Status:
3
2
B 0
C 0.5
D
NOTE:
New steel lintel. 2x203UC. With in-situ Concrete Pad Stone. A Survey required after stripping out Subject to confirmation following None of the structural components or historic fabric shall be altered measured survey post strip-out. or removed unless instructed otherwise. See structural engineers drawings Contractor must verify all dimensions on site before commencing for details. SECONDARY GLAZING work or preparing workshop drawings. Fixed pane secondary glazing channel. - Any This drawing is to be read in conjunction with all relevant drawings, secondary glazing below 800mm from FFL specifications and other documents. to conform with part K4 of approved document K of the current Building Bronze anodised Regulations. Specification from specialist Ceiling Height / Service Void aluminium reveal. sub-contractor. Refer to detail 559-18 5003.Indicative Only.
By:
Date:
-
-
-
E
THIRD FLOOR
Client:
Primary beam with intumescent Studio paint.
ITF HOUSE
Plasterboard MF ceiling.
E
28 Scrutton Street London UK EC2A 4RP
Project Title: ITF HOUSE, 49-60 BOROUGH ROAD, LONDON, SE1 1DR
D 1
SCALE - 1:50
Comments:
Drawing Title:
SECOND FLOOR
aluminum to match ironmongery. Specification in accordance with MEP design.
Comments:
By:
Date:
Client:
-
-
-
-
ITF HOUSE
Proposed Plans Second Floor - DE
EX-11
Date:
APR 19
Drawn:
Checked:
Project No.:
Drawing No.:
Revision:
-
-
483-16
2201
AB1
PL-02
Do not scale this drawing All dimensions must be checked on site All rights reserved. No reproduction in any material form is permitted without consent.
28 Scrutton Street London UK EC2A 4RP T: +44(0) 20 7247 2462 E: enquiries@kyson.co.uk W: www.kyson.co.uk
Drawing Title:
E: enquiries@kyson.co.uk W: www.kyson.co.uk
Scale:
1:50@A1
Studio
Project Title: ITF HOUSE, 49-60 BOROUGH ROAD, LONDON, SE1 1DR
Wall mounted FIRE 'Fire Exit' sign.T: +44(0) 20 7247 EXIT 2462
Proposed Plans Second Floor - C
Do not scale this drawing All dimensions must be checked on site 1.5 reserved.Air m conditioning plenum All rights No2.5 reproduction insupply any material formlinear is permitted without consent. diffuser finished in bronze anodized
Rev:
Scale:
Date:
Drawn:
Checked:
Project No.:
Drawing No.:
Revision:
1:50@A1
APR 19
-
-
483-16
2202
AB1
-
Maintenance access behind Notice Board. Refer to Detail 559-18 5004.
WG-04
Maintenance access behind Notice Board. Refer to Detail 559-18 5004.
SECONDARY GLAZING Fixed pane secondary glazing channel. Any secondary glazing below 800mm from FFL to conform with part K4 of approved document K of the current Building Regulations. Specification from specialist sub-contractor. Refer to detail 559-18 5003.
Blind control switch to MEP design and specification.
SECONDARY GLAZING Fixed pane secondary glazing channel. Any secondary glazing below 800mm from FFL to conform with part K4 of approved document K of the current Building Regulations. Specification from specialist sub-contractor. Refer to detail 559-18 5003.
OPEN PLAN OFFICE
Blind control switch to MEP design and specification.
Existing Wall
WG-05
WG-06
Service Void Air conditioning supply plenum linear diffuser finished in bronze anodized aluminium ironmongery. Specification in accordance with MEP design.
Refer to Detail 559-18 5001.
Service penetrations beneath separating fire rated lobby walls
Typical Internal Elevation 2 KEYPLAN
C
B
Ceiling height to be confirmed following measured survey post strip-out.
Ceiling height to be confirmed following measured survey post strip-out.
A
B
FCL
C
D
E
EX-11
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminium ironmongery. Specification in accordance with MEP design.
Refer to Detail 559-18 5001.
TENDER
GROUND FLOOR A
Wall mounted 'Fire Exit' sign.
Plasterboard MF ceiling.
0
FIRE EXIT
B
0.2
C
D
0.5
Lintel to be intumescently treated for fire.
PL-02
New door to fit existing opening. Subject to change following measured survey post strip-out.
Bronze anodised aluminium reveal.
Maintenance access behind Notice Board. Refer to Detail 559-18 5004. FIRST AID/FAITH ROOM
16mm Allowance for floor finish inc. magnetic backing. 29mm thick raised access floor panel on Kingspan Alpha V pedestals. Raised access floor overall depth varies due to site conditions (185mm minimum clear void). Floor tile 4.5kN over 300mm square 3.0kN over 25mm square & 8.0kN/m² Uniformly distributed load. For general office use with heavy equipment. Class 5/3A/2. Loadings TBC by SE.
Proximity Reader
RECEPTION
Emergency door release
No works to be carried out in this area.
Call point.
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
2no. 1 gang switched socket, refer to M&E drawings for more information.
Service penetrations beneath separating fire rated lobby walls
DG-07
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
TENDER C
D
E
FIRST FLOOR
Rev:
Comments:
By:
Date:
T1
Draft Tender
AJT
10/08/18
T2
Tender Issue
AJT
21/09/18
GROUND FLOOR A
0
0.2
Studio 28 Scrutton Street London UK EC2A 4RP
ITF HOUSE PHASE 2 49-50 BOROUGH ROAD, LONDON, SE1 1DR
6
SCALE - 1:20
Client: ITF HOUSE Project Title:
5
B
C
0.5
D
T: +44(0) 20 7247 2462 E: enquiries@kyson.co.uk W: www.kyson.co.uk
Drawing Title:
E
1m
Proposed Interior Elevations Ground Floor - B Do not scale this drawing All dimensions must be checked on site All rights reserved. No reproduction in any material form is permitted without consent.
By:
Date:
Draft Tender
AJT
10/08/18
T2
Tender Issue
AJT
21/09/18
Client:
Studio
ITF HOUSE
28 Scrutton Street London UK EC2A 4RP
T: +44(0) 20 7247 2462 E: enquiries@kyson.co.uk W: www.kyson.co.uk
Proposed Interior Elevations Ground Floor - B
New steel lintel. 2x203UC. With in-situ Concrete Pad Stone. Subject to confirmation following measured survey post strip-out. See structural engineers drawings for details.
Existing brickwork to be made good.
Comments:
T1
Do not scale this drawing All dimensions must be checked on site All rights reserved. No reproduction in any material form is permitted without consent.
1m
SCALE - 1:20
EX-11 Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
Rev:
Drawing Title:
E
KEYPLAN
B
DG-07
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
ITF HOUSE PHASE 2 49-50 BOROUGH ROAD, LONDON, SE1 1DR
Elevation 6
A
Air conditioning supply plenum linear diffuser finished in bronze anodized aluminum to match ironmongery. Specification in accordance with MEP design.
Project Title:
Primary beam with intumescent paint.
PARTITION WALL 2 Layers of 12.5 Gyproc SoundBloc F fixed with British Gypsum Jack-Point Screws to Gypframe 70 S 50 'C' studs at 600mm centres & Isover APR1200 acoustic insulation.. Taped and Skimmed.
Lintel position to nearest brick course. To be confirmed following measured survey, to be carried out post strip-out.
WINDOW CILL Refer to Detail 559-18 5003.
RECEPTION
No works to be carried out in this area.
Call point.
[About the Design] The former Hanover House is an imposing Grade II listed Victorian factory with a well-presented primary façade. Behind this grandiose exterior a feverish workforce manufactured ‘blacking’ (shoe polish) for ‘Day & Martin’ throughout the late 1800’s.
6
Primary beam with intumescent paint.
EXISTING WINDOWS All existing timber windows to be stripped and prepared for new paint finish.
Proximity Reader Emergency door release
D
FIRST FLOOR
5
Secondary beam with intumescent paint.
SECONDARY GLAZING Fixed pane secondary glazing channel. Any secondary glazing below 800mm from FFL to conform with part K4 of approved document K of the current Building Regulations. Specification from specialist sub-contractor. Refer to detail 559-18 5003.
FIRST AID/FAITH ROOM
Elevation 6
Typical Internal Elevation 1
PL-02
Maintenance access behind Notice Board. Refer to Detail 559-18 5004.
2no. 1 gang switched socket, refer to M&E drawings for more information.
Refer to Detail 559-18 5001.
Refer to Detail 559-18 5001.
Specialist Clay Plaster to be agreed with main contractor to be installed with the manufacturer’s written recommendations.
Secondary Beam - Indicative only
minimum clear void). Floor tile 4.5kN over 300mm square 3.0kN over 25mm square & 8.0kN/m² Uniformly distributed load. For general office use with heavy equipment. Class 5/3A/2. Loadings TBC by SE.
Existing Wall
Elevation 5 A
Blind control switch to MEP design and specification.
16mm Allowance for floor finish inc. magnetic backing. 29mm thick raised access floor panel on Kingspan Alpha V pedestals. Raised access floor overall depth varies due to site conditions (185mm minimum clear void). Floor tile 4.5kN over 300mm square 3.0kN over 25mm square & 8.0kN/m² Uniformly distributed load. For general office use with heavy equipment. Class 5/3A/2. Loadings TBC by SE.
Service Void
New door to fit existing opening. Subject to change following measured survey post strip-out.
To be confirmed on Stripping Out. EXISTING WINDOWS Existing brickwork to be made All existing timber windows to be stripped good. Refer to MEP Engineer's drawings for service unit details within and prepared for new paint finish. service walls. Refer to Structural Engineer's drawings for new openings / new 16mm Allowance for floor finish inc. magnetic door lintel details. WINDOW CILL backing. 29mm thick raised access floor panel on Intumescent Paint Finish for all exposed structures. Refer to Detail 559-18 5003. Kingspan Alpha V pedestals. Raised access floor See Finish schedule for specifications / work scope. overall depth varies due to site conditions (185mm
Scale:
Date:
Drawn:
Checked:
Project No.:
Drawing No.:
Revision:
1:20@A1
Sept 18
AJT
PH
559-18
3212
T2
Scale:
Date:
Drawn:
Checked:
Project No.:
Drawing No.:
Revision:
1:20@A1
Sept 18
AJT
PH
559-18
3212
T2
Currently the headquarters of the International Transport Workers Federation (ITF House) the building has undergone a phased interior refurbishment. The works have re-instated the historic open work-floors whilst celebrating the Victorian craftsmanship of riveted ironwork, brickwork and vaulted ceilings. The new material palette pays homage to the building’s heritage utilising a natural palette of clay plaster, timber and steel-framed glazed screens, whilst new services are restricted to run parallel with primary walls and access floors thus not detracting from the delicate overhead ironwork.
[THE LIBERTY PLACE] The New Landmark Bishopsgate Court Studio KysonďźŒLondon, 2018-2019 Directed by:
Scott Kyson, Richard Bayliss Team Members:
Xitong Zeng, Stephanie Stern, Matthew St Leger, Daniel Wilkinson Site: 4-12 Norton Folgate, Hackney, London E1 6DB Time: 2016-2018 Status: Stage 4 Demolition starts in spring 2020
Existing Building Along Norton Folgate
Proposed Building Along Norton Folgate
[About the Design] The Bishopsgate Court development sees the dramatic refurbishment of an existing building positioned in a prime location, straddling The City of London and Tower Hamlets. Through its use of material and form, the building mediates between these two distinctive character areas. When the existing building was originally built in the early 1900’s there were far fewer large scale city buildings in the near vicinity and it would have at that time been one of the taller buildings in the area. Now, with the recent construction of many large-scale buildings to the immediate surroundings (including the recently consented Blossom Street development), the proposed building with its increased height, acts as a transition between the historic Folgate Street and the larger scale city buildings. This increase is substantial enough to mediate between the two scales whilst retaining a massing appropriate for its immediate setting as part of the Elder Street Conservation Area.
Basement Plan
DETAIL 1 - Brickwork around 900mm columns
Ground Floor Plan
TYPICAL BRICK COLUMNS BRICK SIZING AND BONDING FOR TYPICAL AREAS Where brickwork forms the facade finish, typically two column sizes are used; circa 900mm wide columns - Detail 1 - and circa 600mm wide columns - Detail 2. Typically 294mm oversized bricks are specified, with 10mm mortar gaps. For the 900mm columns a brick pattern across two courses comprises 3no. full bricks (course 1) and 2no. full and 2no. half bricks (course 2). For the 600mm columns a brick pattern across two courses comprises 2no. full bricks (course 1) and 1no. full and 2no. half bricks (course 2). At each floor-slab level above ground floor is a band of double brick soldier coursing. To the lower levels this banding is 600mm total (2no. 294 soldier bricks with 12mm mortar) - See Detail 1. At the upper levels the banding reduces to 400mm total (2no. 195mm soldier bricks with 10mm mortar) See Detail 2.`
DETAIL 2 - Brickwork around 600mm columns First Floor Plan
[LUND HOUSE GREEN] Private Residential Studio Kyson,London, 2018-2019 Directed by:
Scott Kyson, Richard Bayliss Team Members:
Xitong Zeng, Mari Shirly Site: Leckhampton House, Harrogate HG3 1QG Time: 2017-2018 Status: Stage 2
[About the Design] Located within an area of Special Landscape is a 2.5 acre green field site adjacent to Leckhampton House, Top Hill Lane in Lund House Green. The concept is informed by the characteristics and properties of the existing site; its topography, orientation and setting and considers the local vernacular and modern architectural typologies along with historical layout and material precedents.
15
15 10
12
22
20
14
14 11
18
13
23 19
14 15
16
17
8
21
9
3
4
7
6
1 5
Given the rural setting within large expanses of natural landscaping it is proposed that the design encourages the landscape to continue its flow in and around the building. To aid this the following sustainable landscaping features have been deemed suitable for inclusion on the project. Green roofing Earth sheltering Locally sourced flowers On-site food production Edible planting Natural swimming pond
GROUND FLOOR PLAN 1 Foyer 2 Snug 3 Cloak Room/ WC 4 Study/ Library 5 TV Area 6 Dining Area 7 Formal Living 8 Kitchen/ Dining 9 Play Room 10 Master Suite 11 Bedrooms 12 Pantry 13 Laundry 14 Gymnasium 15 Sauna/ Shower 16 Utility 17 Boot Room 18 Garage
5 2
Facade Buildup Study 79
1. Opening in north elevation 2. Central courtyard 3. Foyer 4. Snug 5. Fireplace with hearth seating 6. Vaulted ceiling 7. v Vaulted timber soffit
1. Opening in north elevation 2. Central courtyard 3. Foyer 4. Snug 5. Fireplace with hearth seating 6. Vaulted ceiling 7. Vaulted timber soffit
The building ascends from its elevated site in the form of two distinct, extruded, geometric linear modules sitting low within the landscape. The apex of each module takes on a strong sculptural presence against the sky backdrop on approach to the site.
Two glazed links connect the two modules, creating a central courtyard around which the building revolves. Access to the courtyard is through a punched opening in the north facade.
The glazed nature of the links allows the courtyard to mediate the house’s relationship with the landscape beyond, creating a ‘corridor’ across the length of the site, at all times taking in the panoramic vista to the west. The addition of the garden pavilion and swimming pond continue the corridor, creating further areas of exploration.
53
4 1
1
2 3
6
7
3
FIRST FLOOR PLAN 1 Guest bedrooms 2 Guest lounge 3 Kitchenette 1 4 3 5
Facade Buildup Study
81
North Perspective Elevation
Perspective Section
92
2
[MATERIAL ARCHITECTURE LAB] Bartlett BPro Research Cluster 5+6 2018 Laminar Grosteque Pavilion Deisgn Directed by:
Daniel Widrig, Guan Lee, Igor Pantic, Stefan Bassing and Adam Holloway Team Members:
Xitong Zeng, Jacqueline Leung, Kornlada Tansutiraphong , Qinran Li Site: Black rock city, Nevada, USA Duration: 12 months Time: 2017-2018
Bartlett BPro Research Cluster 5+6 2018 Laminar Grosteque Pavilion Deisgn
[MATERIAL ARCHITECTURE LAB] Bartlett BPro Research Cluster 5+6 2018 Laminar Grosteque Table Deisgn
GUIDING LINE
PATCHING SURFACE
TOP VIEW
SIDE VIEW
[MATERIAL ARCHITECTURE LAB] Bartlett BPro Research Cluster 5+6 2018 Laminar Grosteque Architectural Chunk Deisgn
[ART MUSEUM DESIGN] Project of Deisgn of Art Museum Transition Between Mountain and Lake Site:
Guangzhou, Guangdong province, China Team Members:
Xitong Zeng, Mengen Ying Duration: 8 weeksDate: 2014
[ART MUSEUM DESIGN] Project of Deisgn of Art Museum
Transition Between the Mountain and Lake
[About the Design] This Design is located in the Baiyun Lake Park, in order to maintain the open space and nature in the public environment, the design is based on the fluctuant terrain which is extended to form the basic of the public nature.Building on the stills could maintain the open space in the site. At the same time, various touring routes and leisure function are provided for visitors. The inner space is the contention of the shape and texture of the ups and downs to form the space facing the water and touch it gradually. Finally, the architecture become the transition between the mountain and the lake to connect the terrain and lake of the site.
[ART MUSEUM DESIGN] Project of Deisgn of Art Museum
Transition Between the Mountain and Lake
[ARCHITECTURE SCHOOL DESIGN] Project of Deisgn of Architecture Department Interweave Site:
Beijing, China
Team Members:
Xitong Zeng, Yi Zhang, Wei Wu Duration: 8 weeksDate: 2015
[About the Design] This Design is located in Daxing campus of Beijing University of Civil Engineering and Architecture. The site is flat and square, while the surroundings are solemn, the projection is designed according to the characteristics of the site and the discipline itself. The exterior environment is rigorous, and the interior space is lively and dynamic. The internal space is designed in the reflection of the cross and communication between disciplines and aim to promote the environment of the public communication among students. At the same time, the design is also taking the specifications and requirements of green building into consideration. The perforated aluminum plates are designed to keep the sun off and constitute the architectural facade. This design reflects the consideration of teachers and students and the hope for the future development of architecture.
[ARCHITECTURE SCHOOL DESIGN] Bartlett BPro Research Cluster 5+6 2018 Laminar Grosteque Chandelier Deisgn
B-B Section
[ARCHITECTURE SCHOOL DESIGN]
[LANDSCAPE ARCHITECTURE] Mirror Lake Residental Development, Shaoxing LANDmark Studio, London Site:
Shaoxing, China
Duration: 12 months Date:
The hedge garden
2018
The arboretum and water garden
The island garden
The wave plaza
Private garden in sample house area
The central water garden
The folly garden
The specimen plaza
The secret courtyard
[LANDSCAPE ARCHITECTURE]
[YUEMIAO WEST COMMERCIAL DESIGN] Design of Yuemiao West Cultural And Commercial Pedestrain THUPDI, Beijing, 2015-16
Site: Tangyin County, Henan province , China Duration: 8 months Date: 2015 First Prize of the 2015 National Excellent Urban and Rural Planning and Design Award
07594364833 luna_zeng@gmx.com