Plan B: Growing Infrastructure

Page 1

Plan B: Growing Infrastructure South Brooklyn Bicycle Paths Master Plan

Year:

2008

Location: Brooklyn, NY Site: Red Hook Client:

Forum for Urban Design

Program: I) Bicycle Paths Master Plan II) Bicycle “Loft” 6000 ft2 -Storage space

-Connection to MTA Smith St. station -Retail Space

III) Funding Strategy

Project Type: Urban Design and Architecture Status:

Open Competition Conceptual Design

Award:

Honorable Mention

M a n u e l Áv i l a Architecture + Urban Design manuelavilaprojects.com

01


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Plan B: Growing Infrastructure by Manuel Avila - Issuu