MAARTEN SCHENKVERBRUGGEN LANDSCHAPSARCHITECTUUR PORTFOLIO JUNI 2021
1
Maarten Schenk-Verbruggen Masterstudent landschapsarchitectuur Wageningen University & Research (WUR)
schenk-maarten@hotmail.com +31 (0)6 342 231 70
2
PORTFOLIO JUNI 2021
3
4
INHOUDSOPGAVE 1: LANDSCAPE FLUSH PRODUCT: REGIONAAL ONTWERP LOCATIE: SALLAND SCHAAL: REGIONAAL DATUM: APRIL 2019 - MEI 2019
P. 6
2: HIGHWAYS AND BYWAYS PRODUCT: PARK ONTWERP LOCATIE: FLEVOPOLDER, ALMERE SCHAAL: GROOT PARK DATUM: SEPTEMBER 2018 - OKTOBER 2018
P. 26
3: THE GROWING SEED PRODUCT: 2 POSTERS MET MINIMALE UITLEG LOCATIE: HOVENBYEN, OSLO SCHAAL: PLEIN DATUM: APRIL 2019 - MEI 2019 PROJECT IN TEAMVERBAND VOOR: IFLA STUDENTEN DESIGN COMPETITIE 2019
P. 50
4: THE BLUE VEIN OF EINDHOVEN PRODUCT: INSPIRATIE BOEK EN VIDEO LOCATIE: KLEINE DOMMEL, OMGEVING EINDHOVEN SCHAAL: REGIONAAL DATUM: JUNI 2019 - JULI 2019 PROJECT IN TEAMVERBAND OPDRACHTGEVER: MSC. J. JANSE, STAATSBOSBEHEER
P. 58
5: EIGEN ACHTERTUIN PRODUCT: TUINONTWERP LOCATIE: BOEKEL SCHAAL: KLEINE TUIN DATUM: MEI 2018
P. 70
6: BEPLANTINGDPLAN TUIN PRODUCT: BEPLANTINGDPLAN LOCATIE: EDE SCHAAL: KLEINE TUIN DATUM: FEBRUARI 2018
P. 82
5
LANDSCAPE FLUSH PRODUCT: REGIONAAL ONTWERP LOCATIE: SALLAND SCHAAL: REGIONAAL DATUM: APRIL 2019 - MEI 2019
6
1
SALLAND IS EEN GEBIED DAT LIGT IN OVERIJSSEL. SALLAND STAAT BEKEND OM ZIJN MELKVEEHOUDERIJ DIE HET GROOTSTE DEEL VAN HET LANDGEBRUIK IN BESLAG NEEMT, EN DE KANALEN DIE HET GEBIED DOORSNIJDEN. BOEREN
IN
HET
SALLAND-GEBIED
ZITTEN
MOMENTEEL
IN
EEN
FINANCIËLE CRISIS. HET GROOTSTE DEEL VAN HUN INKOMEN KOMT UIT ZUIVELPRODUCTEN. DE MELKVEEBEDRIJVEN WORDEN ECHTER BEDREIGD DOOR DE CONCURRENTIE OP DE WERELDMARKT. HIERDOOR INVESTEREN BOEREN IN HET INTENSIVEREN VAN HUN BEDRIJF. MET DE INTENSIVERING VAN DE LANDBOUW GEBRUIKEN BOEREN STEEDS MEER (KUNST)MEST EN PESTICIDEN DIE DE WATERKWALITEIT EN DE ECOLOGIE VAN HET GEBIED VERSLECHTEREN. BOVENDIEN ZIJN ER WATERBEHEERPROBLEMEN DIE RESULTEREN IN DROOGTES IN DE ZOMER EN OVERSTROMINGEN IN DE WINTER. ALS GEVOLG VINDT ER VEEL WATERIMPORT EN -EXPORT VAN EN NAAR HET IJSSELMEER PLAATS MET EEN LAGE WATERKWALITEIT ALS GEVOLG.
7
<
CONCEPT
+
IN HET GEBIED WORDT EEN NIEUWE GROENE INFRASTRUCTUUR ONTWERPEN DIE BESTAAT UIT OEVERSTROKEN. DEZE STROKEN KUNNEN WORDEN GEZIEN ALS BUFFERZONES MET VERSCHILLENDE FUNCTIES. DE STROKEN BEVINDEN ZICH TUSSEN LANDBOUWGRONDEN EN DE BESTAANDE WATERINFRASTRUCTUUR, WAARDOOR GRONDWATER VANUIT DE LANDBOUWGRONDEN DOOR DE STROKEN UITSTROOMT. DOOR HET TOEPASSEN VAN SPECIFIEKE SOORTEN KAN TOT 70% VAN DE UITSTROMENDE VOEDINGSSTOFFEN EN PESTICIDEN UIT DE WATEREN FILTEREN DIE UIT DE LANDBOUWGRONDEN UITSTROMEN.
8
AFBEELDINGEN VAN HET INTERNET, WORDEN GEBRUIKT TER ILLUSTRATIE EN BEELDVORMING VAN DE NIEUWE VORMEN VAN DE NIEUWE GROENE INFRASTRUCTUUR GENOEMD IN DE BESCHRIJVENDE TEKST VAN HET CONCEPT.
9
RAALTE
RUIMTELIJK CONCEPT > BESTAANDE GROENE INFRASTRUCTUUR NIEUWE GROENE INFRASTRUCTUUR VERANDERING VAN AGRICULTUUR NATUURLIJKE SNELWEG STEDELIJK GEBIED BESTAAND INDUSTRIE GEBIED NIEUW INDUSTRIE GEBIED KANAAL UPGRADE GEEN KANAAL UPGRADE LANDGOED FIETS SNELWEG FIETSPAD DOOR LANDELIJK GEBIED HOOFDWEG 2X2 RIJBANEN WEG 1X1 RIJBAAN SPOOR LOCATIE A ZOOM IN
10
DEVENTER
LEMELERVELD
A
SALLANDSE HEUVELRUG
SALLANDSE HEUVELRUG
11
WATER REINIGINGSSYSTEEM > HET
WATERSYSTEEM
IN
DIT
ONTWERP
MAAKT
GEBRUIK
VAN
MEERDERE LANDGOEDEREN DIE WATER REINIGEN EN OPSLAAN. HET WATERREINIGINGSPROCES IS VERDEELD IN DRIE FASES. DE EERSTE FASE BEVINDT ZICH IN HET LANDSCHAP EN MAAKT GEBRUIK VAN DE OEVERSTROKEN. HIER WORDT WATER GEFILTERD MET BEHULP VAN PLANTEN EN BOMEN. ER IS NOG STEEDS EEN UITSTROOM VAN VERVUILENDE STOFFEN, MAAR DEZE IS AL GROTENDEELS VERMINDERD. IN DE TWEEDE FASE BEGINT HET LANDGOED EN VINDT DE BELANGRIJKSTE WATERZUIVERING PLAATS. WATER WORDT VERVOLGENS IN DE DERDE FASE, HET NA-FILTER, VAN HET WATERZUIVERINGSSYSTEEM GEPOMPT. HIER WORDT WATER ZO LANG MOGELIJK VAST GEHOUDEN VOORDAT HET IN HET AANLIGGENDE KANAAL WORDT GELOOSD.
LANDGOED
12
I.
VOOR-FILTER DICHT BIJ DE BRON VAN VERVUILDING
II.
LANDGOED: HOOFD-FILTER
III.
LANDGOED: NA-FILTER EN WATEROPSLAG
13
LOCATIE A ZOOM IN
B
14
250m
500m
1km
OP DEZE KAART IS EEN VAN DE LANDGOEDEREN TE ZIEN WAARBIJ HET NIEUWE SYSTEEM GETOONT WORDT. DE FIETSSNELWEG IS VERBONDEN MET HET TRAGE NETWERK OP HET LANDGOED. HET TRAGE NETWERK VOLGT EN WORDT ONDERSTEUND DOOR DE OEVERZONES EN DE NIEUWE GROENE INFRASTRUCTUUR. DEZE ZONES VERTALEN ZICH IN ALLERLEI SOORTEN LANDGEBRUIK EN LANDSCHAPSELEMENTEN. DE N348 WORDT VERSTERKT DOOR EEN RIJ VAN TWEE BOMEN AAN BEIDE ZIJDEN. TIJDENS HET FIETSEN LANGS DE OEVERSTROKEN OPENT EN SLUIT HET LANDSCHAP. LANDBOUW WORDT TERUGGEDUWD DOOR DE STROKEN.
15
16
LANDSCHAPPELIJKE TYPOLOGIEN NIEUWE GROENE INFRASTRUCTUUR
17
LOCATIE B ZOOM IN LANDGOED
100m
18
300m
500m
19
OMDIJKT GEBIED DIJK
UITLAAT IN HET KANAAL DIJK
KANAAL FIETS SNELWEG
GROENE HOOFDSTRUCTUUR
GROOT RIET VELD
HOOFD-FILTER RECREATIEVE ROUTE
20
W
RECREATIEVE ROUTE
ZWEMSTRANDJE
DIJK
NA-FILTER
OMDIJKT GEBIED
HOOFD ENTREE LANDGOED
INLAAT OMDIJKT GEBIED
WIND TURBINE MET UITKIJK PUNT
PARKEREN LANDGOED GEBOUW TERRAS
VLONDER
ONTMOETINGSRUIMTE RESTAURANT WORKSHOP RUIMTE MARKTEN
FIETSBRUG OVER GROTE WEG
VOOR-FILTER >
N348
21
A
A”
DOORSNEDE N348
POPULUS
GEMENGD BOS
6.5 A 22
1
4.5
2
1
2
4.5
2.5
7
POPULUS
3
3.25
3.25
2
3.25
3.25
3
7 A” 23
B
B”
C” C
GROTE WINDMOLEN MET UITKIJK PUNT > C 2.5
QUERCUS PALUSTRIS
QUERC
2,5 1:3 B
LAAN 7.5
24
2,5 1:3
ENTREE 2,5
7,5
1,5
5
1,5
2,5
C
WINDMOLEN 15
RIETVELD 2.5
2.5
CUS PALUSTRIS
< HOOFD ENTREE LANDGOED LAAN
B”
7.5 25
HIGHWAYS AND BYWAYS PRODUCT: PARK ONTWERP LOCATIE: FLEVOPOLDER SCHAAL: GROOT PARK DATUM: SEPTEMBER 2018 - OKTOBER 2018
26
2
HET PARK HIGHWAYS AND BYWAYS IS GEINSPIREERD OP DE EXPERIMENTELE STROKENTEELT, PAUL KLEE’S SCHILDERIJ EN DE HEDENDAAGSE SNELHEID WAARIN DE MAATSCHAPPIJ DRAAIT. HIGHWAYS AND BYWAYS LIGT IN DE OKSEL VAN DE A6 EN A27 TEN OOSTEN VAN ALMERE. HET PARK MOET EEN TEGENGEWICHT BIEDEN TEGEN DE STEDELIJKE UITBREIDING VAN DE STAD, DE VRAAG NAAR NIEUWE VORMEN VAN LANDBOUW EN DE VRAAG NAAR DUURZAME ENERGIE.
27
PAUL KLEE HIGHWAYS AND BYWAYS
28
CONCEPT PARK HOOFDWEGEN EN ZIJSTRATEN
SLOW TRAFFIC AS MAIN TRAFFIC
29
CONCEPTKAART
N
30
0
250
500 0 750 2501000 500
7501500 10
000
PARK IN EXPERIMENTELE LANDBOUW
1500
N
31
AANSLUITINGEN MET DE OMGEVING A6
LAGE VAART
ALMERE-BUITEN A27
WULPWEG
NOBELHORST
WULPWEG
VOGELHORST
32
ZICHTLIJNEN
33
MASTERPLAN PARKONTWERP
34
35
PROGRAMMERING
STRIP AGRIC
SPORT FIELD GRASSFIELD
STRIP AGRICULTURE
WOOD PRO PARKING GRASSFIELD PICKNICK AREA
PLAY AREA WORKSHOPS
CANAL
EDUCATION PROGRAM
MEADOW
MEETING FACILITIES BAR
SHOP HARBOR
MEADOW
WOOD PRODUCTION
GRASSFIELD
CA PICKNICK AREA
GRASSFIEL
WOOD PRODUCTION
ORGANIZED
MEADOW
WOOD PRODUCTION
STRIP AGRICULTURE
36
STRIP AGRIC
STRIP AGRICULTURE
CULTURE
MEADOW
INTIMATE SPACE
ODUCTION
CANAL
STRIP AGRICULTURE
MEADOW
FESTIVAL TERRAIN GRASSFIELD DITCH
ANAL MEADOW
WOOD PRODUCTION
LD MEADOW
STRIP AGRICULTURE
D ACTIVITIES
CULTURE
WOOD PRODUCTION
WOOD PRODUCTION 37
BOTANISCH BOMENPLAN
38
Juglans nigra Acer campestre Prunus avium Salix alba titris Tilia cordata Salix alba Quercus Palustris Mix of Populus, Fraxinus excelsior, Acer, Fagus sylvatica, Carpinus betulus, Quercus, Ulmus en Alnus (N16.04).
39
STROKENTEELT
A’’ < HOOFDAS >
A’
PARK
STROKENTEELT 1.40 GROND WATER NIVEAU
A’ 40
1.65 GROND WATER NIVEAU 0.75 3
2
DOORSNEDE HOOFDAS
PARK
8 18 TOTALE BREEDTE HOOFDAS
2
3
0.75
A’’ IN METER 41
B”
B’
STROKENTEELT
PARK
WILDE BLOEMEN
B’
42
12
12
6
12
6
12
ZIJAANZICHT HOOFDAS
1.40 GROND WATER NIVEAU WILDE BLOEMEN 12
12
12
6
12
6
B” IN METER 43
HAVEN MIDDEN IN HET PARK
C
C
D’ 44
KANAAL
2 18 DIEP
13.50
2 18 DIEP
0.60
23.50
D”
D’ 1.40 GROND WATER NIVEAU
D” IN METER 45
VERBINDING TUSSEN PARK EN BOER
D’ 46
ZIJPAD STROKENTEELT
1.50
4.50
4
D”
D’
0
250
500
750
1000
1.40 GROND WATER NIVEAU 10
3
BOEREN ERF
D” IN METER
47
E’
E”
BRUG OVER KANAAL MET ORNAMENTALE RAILING
1:3
1:3 1:3
E’
1:3 2.40 DIEP 4.20
48
4,2
1.50 1.50 1,5
1,5
5.70 5,7
19.20 19,2
1:3
1:3
1.40 GROND WATER NIVEAU
1:3
1:3
5.70 5,7
E” 1.50 1.50 1,5
1,5
4.20 4,2
49
THE GROWING SEED PRODUCT: 2 POSTERS MET MINIMALE UITLEG VOOR: IFLA STUDENTEN DESIGN COMPETITIE 2019 LOCATIE: HOVENBYEN, OSLO SCHAAL: PLEIN DATUM: APRIL 2019 - MEI 2019 TEAM: MAN DU SHIYI LI RUNA GJERLAND DIRCO KOK MAARTEN SCHENK-VERBRUGGEN
DESIGN FASE 1 >
50
GEMAAKT DOOR SHIYI LI
3
TEKST VAN POSTER 1: MINIMALE PROGRAMMERING WORDT GEBRUIKT ALS EEN ACTIEF HULPMIDDEL OM HOVINBYEN TE TRANSFORMEREN NAAR DE ‘HOVINCOMMON’; EEN RESPONSIEVE RUIMTE VOOR ALLE BURGERS MET EEN ONTWERP GEMAAKT DOOR ELKE GEBRUIKER. BURGERPARTICIPATIE VORMT HET PARK GELEIDELIJK OVER DRIE FASEN: 1 - TABULA RASA. DE LEGE RUIMTE IS UITGERUST OM HET GEBRUIK TE ANALYSEREN. 2 - SERIES. DE EERSTE ESSENTIËLE INTERVENTIES BEGINNEN TE ONTKIEMEN OP BASIS VAN HET GEBRUIK VANAF FASE 1. 3 - CONSILIO. DE INTERVENTIES BLIJVEN GROEIEN, GEBASEERD OP HET GEBRUIK VAN FASE TWEE EN ONTWERP OP BASIS VAN NIETESSENTIËLE INTERVENTIES WORDEN BESLISSINGEN GENOMEN. GPS-TRACKERS IN DE VERPLAATSBARE MEUBELS EN OPEN WIFI MET ANONIEME LOCATIETRACERING ALS ENIGE VOORWAARDE, REGISTREERT HET GEBRUIK VAN DE RUIMTE, GEGEVENS DIE OP HUN BEURT WORDEN GEANALYSEERD EN OMGEZET IN EEN ONTWERP VOOR DE VOLGENDE FASE. SEIZOENSGEBONDEN EVENEMENTEN ZORGEN ERVOOR DAT HET PARK AL VANAF HET EERSTE JAAR IN GEBRUIK IS EN HET JAARLIJKS HERHALEN VAN DE EVENEMENTEN CREËERT EEN SOCIALE IDENTITEIT MET RUIMTELIJKE WORTELS. ALLEEN DE MEEST ELEMENTAIRE INTERVENTIES WORDEN TOEGEVOEGD, WAARDOOR DE MENSEN DE ECHTE KLEUR VAN HET PARK WORDEN. AAN HET EINDE VAN HET PROCES VAN 3 FASES, ALS NIEUWE ONTWIKKELINGEN HET GEBRUIK BLIJVEN BEÏNVLOEDEN, START DE OPERATIE OPNIEUW IN DE 2E FASE, WAARDOOR HET MOGELIJK WORDT DE RUIMTE OPNIEUW TE ONTWERPEN. DOOR DEZE CYCLUS TUSSEN FASE TWEE EN DRIE IDENTIFICEERT HET PROJECT VOORTDUREND DE EISEN VAN DE GEBRUIKERS EN PAST HET PLEIN ZICH DAARAAN AAN. DOOR DE FOCUS TE VERLEGGEN VAN DE BESTEMMING NAAR DE REIS, WORDT RAAKVLAK GEVONDEN EN BLIJFT DIT GEVONDEN WORDEN IN EEN INTERACTIEVE LEEFRUIMTE.
51
THE GROWING SEED
Minimal programming is used as an active tool to transform Hovinbyen to the Hovin common; a responsive space for all citizens with a design created by each user. Citizen participation shapes the park gradually over three phases:
1 - TABULA RASA. The blank space is equipped to analyse the use. 2 - SERIES. The first essential interventions start sprouting based on the use from phase one. 3 - CONSILIO. The interventions continue growing, based on the use from phase two, and design based decisions are made regarding non-essential interventions. GPS tracking in the moveable furniture and open WiFi with anonymous location tracking as the only condition, registers the use of the space, data that in turn is analysed and converted into a design for the next phase. Seasonal events ensures that the park is in use already from year one, and repeating the events annually creates a social identity with spatial roots. Only the most basic interventions will be added, making the people the true colour of the park. At the end of the process, if new developments continue to influence the use, the operation restarts at the second phase, making it possible to design the space again. Through this cyclus between phases two and three the project continually identifies the demands of the space and adapts to them. By shifting the focus from the destination to the journey, common ground is found and will continue to be found in an interactive, living space.
OFFICES NEW HOUSING BAR OFFICES
N Average wind direction. Uncomfortable spots near entrances of the site.
Slope south-east to north-east. Steep slope south side of the site.
Sun-shadow analysis. Middle of the site is very sunny.
TERRACE RESTAURANT PRIMARY SCHOOL GARDEN CITY HIGH SCHOOL
TIMELINE // DESIGN INPUT Moveable furniture analysing where people like to sit
1100
VIKING FARMS
1300
AGRICULTURE Refurbished IBC as moveable planters
1800
CITY EXPANSION
Pavement in orange gravel
1850
INDUSTRY
1950
URBAN AND SOCIAL STRUCTURES
Multifunctional stairs in steep slope
2019 TODAY
PHASE 1
2020 PHASE 1
0% PAVED 100% GRAVEL 0% PLANTING
Logs for playing and meeting Native trees mark site entrance
Permanent furniture in popular spots together with moveable furniture WiFi generates routing map Pavement inspired by coastal structure
2030s PHASE 2
Solitary street lights with solar panels and battery
PHASE 2
2021 PHASE 2
FUTURE POSSIBILITIES 20% 80% 0%
PAVED GRAVEL PLANTING
STARTING FAMILIES ELDERLY CLIMATE CHANGE
Native species in planting
2040s
PHASE 3
Pavement inspired by coastal structure
Planting shape inspired by farmlands Skedsmo
Markets and festivals form identity More permanent furniture Solitary street lights with solar panels and battery
2022 PHASE 3
FUTURE
52
PHASE 3
40% 30% 30%
PAVED GRAVEL PLANTING
After phase 3, developments continue. To include new residents and users, the cycle goes back to phase 2 to update information.
01/02
Phase 1
Phase 3
Phase 3 *
Wind blocking
Bicycle parking
Permanent sitting Water infiltration
Outdoor café
Moveable chairs
Event space
Growing vegetation First planting Stage Bicycle parking Playground
Vegetation Gravel
Infiltriation
0 2.5 5
10 m
N
* hypothetical extrapolation in time
Planting based on local species and spontaneous vegetation e.g. Stairs
Betula pendula Glechoma hederacea Carum carvi Leucanthemum vulgare
Gravel
Infiltration
Service road
Tribune stairs
Outdoor café
Square
Playground
School 02/02
53
DESIGN FASE 1 ^
54
GEMAAKT DOOR DIRCO KOK
DESIGN FASE 3 ^ GEMAAKT DOOR DIRCO KOK
55
DOORSNEDE PLEIN IN SAMENWERKING GEMAAKT DOOR MAARTEN SCHENK, RUNA GJERLAND, MAN DU
Stairs
Gravel
Infiltration
Service road
56
Tribune stairs
Outdoor café
Vegetation Gravel
Infiltriation
Planting based on local species and spontaneous vegetation e.g. Betula pendula Glechoma hederacea Carum carvi Leucanthemum vulgare
Square
Playground
School
57
THE BLUE VEIN OF EINDHOVEN PRODUCT: INSPIRATIE BOEK EN VIDEO LOCATIE: KLEINE DOMMEL, OMGEVING EINDHOVEN SCHAAL: REGIONAAL DATUM: JUNI 2019 - JULI 2019 TEAM: ANNA LEIKNES NAHID AGHAIE TABRIZI JAKUB KYSELOVIC KOEN VAN NIEKERK MAARTEN SCHENK-VERBRUGGEN OPDRACHTGEVER: MSC. JAN JANSE, STAATSBOSBEHEER
58
4
DE STROOMVALLEI VAN DE DOMMEL WORDT GETIJSTERD DOOR KLIMAATVERANDERING. PARTICIPANTEN VAN DEZE VALLEI HEBBEN NIEUWE INSPIRATIE NODIG OM TOEKOMSTIGE PROBLEMEN AAN TE PAKKEN. VOOR DIT PROJECT HEEFT HET TEAM EEN VIDEO GEMAAKT DIE DE DOMMEL IN EEN NIEUW DAGLICHT BRENGT. IN DEZE VIDEO KOMEN ZOWEL DE KWALITEITEN EN DE PROBLEMATIEK NAAR VOREN, EVENALS MOGELIJKE OPLOSSINGEN VOOR DEZE PROBLEMATIEK. DE VALLEI KENT EEN RIJKE CULTUURHISTORIE MET DE OUDE WATERMOLENS DIE AANWEZIG ZIJN, EN HET FEIT DAT REMBRANT HIER VEEL VAN DEZE MOLENS HEEFT GESCHILDERD. DAARNAAST KENT DE RIVIER EEN CENTRALE LIGGING, DICHT BIJ DE STEDEN EINDHOVEN, NUENEN EN GELDROP. ECHTER IS DE RIVIER NIET OF NAUWELIJKS TOEGANGKELIJK VANUIT DEZE GENOEMDE STEDEN VANWEGE HET ONTBREKEN VAN EEN RECREATIEF NETWERK. DAARNAAST SPEELT KLIMAATVERANDERING EEN GROTE ROL IN DE REGIO. PERIODES VAN DROOGTES DROGEN DE VALLEI COMPLEET UIT EN TIJDENS PERIODES VAN VEEL NEERSLAG EN OVERTOLLIG WATER DREIGEN STEDEN EN AGRARISCH GEBIED TE OVERSTROMEN. TIJDENS DIT PROJECT ZIJN ER VEEL IDEEN GEOPPERD, EN DEZE ZIJN OPGENOMEN IN EEN VIDEO DIE ALS DOEL HEEFT DE BETROKKEN PARTIJEN OPNIEUW CREATIEF BEZIG TE LATEN ZIJN MET DE VALLEI EN DE VELE KWALITEITEN EN POTENTIES DIE ZIJ TE BIEDEN HEEFT. MET HET TEAM HEBBEN WE VERDER EEN DRIETAL VAN SCENARIO’S GENOMEN EN DAAR ONZE IDEEN OP LOS GELATEN OM TE ZIEN HOE DEZE IN DE RUIMTELIJKE WERELD TOT HUN RECHT ZOUDEN KOMEN.
59
VIA ONDERSTAANDE QR-CODE IS DE GEMAAKTE VIDEO OVER DIT PROJECT TE VINDEN. IN DEZE VIDEO WORDT HET GEHELE PROJECT BEHANDELD EN DE RESOLUTATEN GETOONT. DE MEESTE
BEELDEN IN DE VIDEO ZIJN DOOR HET TEAM
OPGENOMEN. GEBRUIKTE BEELDEN DIE DOOR EEN ANDERE PARTIJ GENOMEN ZIJN WORDT VERMELD AAN DE ONDERKANT VAN HET BEELD.
VIDEO ^
60
(MEESTE) BEELDEN GESCHOTEN DOOR TEAM, ILLUSTRATIES DOOR TEAM, BEWERKT DOOR ANNA LEIKNES
VOOR DIT PROJECT IS EEN IDEEN SCHATKIST ONTWIKKELD. VOOR AL DEZE IDEEN ZIJN ISOMETRIEN GEMAAKT OM DIT LANDSCHAPPELIJK WEER TE GEVEN. OP DE VOLGENDE PAGINA’ S ZIJN DEZE ISOMETRIEN AFGEBEELD. DAARNA ZULLEN DE 3 SCENARIOS MET SFEERCOLLAGES KOMEN.
EEN NIEUWE WATERMOLEN RIVIER VOLGEND PAD
EEN NIEUWE ZIJARM VAN DE RIVIER
WATER SPEELPLAATS
THEMATISCHE ROUTING
SUCCESSIE BOS ‘LANDSCAPE LIVING LAB’
LANDSCHAPSPARK
DIJK OM NEDERWETTEN
KANAAL BOOT VERBINDING
VISSENTRAP BREKEN VAN BARRIERES
IDEEN SCHATKIST ^ GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
61
Heathland under power lines
Current power line pylons
Pergola construction reusing materials from old power line pylons
Path following power lines
Heathland under power lines
Elevated path above power lines
Path following power lines
Point of power lines entering dike
Landmark watchtower Joining of the Kleine Dommel with the Dommel Salix tree lane, stay lower and block sound
Populus tree lane, grow high and form landmark
Road
Power line pylons
Slow traffic, in between Salix and Populus tree lanes
Ecoduct
Fauna area
Recreational routing
Barrier, highway
ISOMETRIEN ^
62
GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
Water mill Path following river
Fish pond, in between stairs
Water mill pond
Fish stairs
Oldest trees, final phase of succession
Recreational path
First growing trees, second phase of succession
Grasses and pioneer species, first phase of succession
Third phase of succession
Slope up the dike of the Eindhovens canal north side
Path following river
New water mill
Bridge connecting north and south of the canal breaking the barrier Eindhoven canal
River of Dommel and/or Kleine Dommel
Boat stop, transit hub to bike
Retaining pond
River following path
Tourist boat connecting the cities ofEindhoven and Geldrop with the valley of the Dommel Rowers over the canal
Kleine Dommel going underneath the Eindhovens canal Slope up the dike of the Eindhoven canal south side
Constructed wetland and nature area
Town of Nederwetten River Dommel
Guiding lanes toward Nederwetten Recreational side arm following the new side arm of the Dommel New side arm of the Dommel
Retaining pond
Dike going around Nederwetten with recreational routing on top Existing watertables, dry land
Dike protecting the agricultural land from the wetlands Constructed wetlands
ISOMETRIEN ^ GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
63
64
< KAART SCENARIO 1 GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
SCENARIO 1: MODERATE LEGENDA
VISUAL SCENARIO 1 ^ GEMAAKT DOOR NAHID AGHAIE TABRIZI
65
66
< KAART SCENARIO 2 GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
SCENARIO 2: INTERMEDIATE LEGENDA
VISUAL SCENARIO 2 ^ GEMAAKT DOOR NAHID AGHAIE TABRIZI
67
68
< KAART SCENARIO 3 GEMAAKT DOOR MAARTEN SCHENK-VERBRUGGEN
SCENARIO 3: PROGRESSIVE LEGENDA
VISUAL SCENARIO 3 ^ GEMAAKT DOOR NAHID AGHAIE TABRIZI
69
EIGEN ACHTERTUIN PRODUCT: TUINONTWERP LOCATIE: BOEKEL SCHAAL: KLEINE TUIN DATUM: MEI 2018
70
5
IN DE TUIN IS DOOR DE JAREN HEEN VEEL GEBOUWD EN WEER AFGEBROKEN. HET RESULTAAT HIERVAN IS DAT OP VEEL PLEKKEN IN DE TUIN BETON IS GESTORD. OP SOMMIGE PLEKKEN IS DIT ± 30CM DIEP IN DE VORM VAN RANDEN, OP ANDERE PLEKKEN IS DIT TOT OP HET OPPERVLAKTE ALS FUNDERING VOOR EEN SCHUUR OF DUIVENKOOI. VANWEGE EEN KLEIN BUDGET ZIJN ENKEL DE FUNDERINGEN VERWIJDERD, EN ZIJN DE BETONNEN RANDEN DIE ONDERGRONDS ZITTEN GEBLEVEN. OM TOCH DE NODIGE WORTELRUIMTE VOOR DE BEPLANTING TE REALISEREN ZIJN DE BEPLANTINGSBAKKEN OMHOOG GEHAALD. IN DE TUIN ZIT VERDER EEN HOOGTEVERSCHIL. DIT VERSCHIL WORDT AANGEZET DOOR DE VERHOOGDE PLANTENBAKKEN EN CREEERT TWEE VERSCHILLENDE PLEKJES IN DE TUIN. DE HOGE KANT VAN DE TUIN, AAN HET HUIS GELEGEN, HEEFT EEN RUIM TERRAS MET GROTE EETTAFEL EN GENOEG PLEK VOOR EEN BARBECUE. HET TERRAS BENEDEN IS DE LOUNGE HOEK MET GRASVELD VOOR ONZE HOND. GRENZEND AAN HET ZUID-OOSTEN IS EEN AANBOUW VAN ONZE BUREN, WAAR EEN HOGE BAMBOE IS GEBRUIKT OM DEZE TE MASKEREN. IN LAGERE GEDEELTE IS IN HET ZUIDEN VAN DE TUIN EEN KIPPENREN MET ZUID-WEST EEN KIPPENHOK. HELEMAAL WESTELIJK VAN DE TUIN VIND ZICH IN HET NOORDWESTEN EEN NIEUWE SCHUUR MET OVERKAPPING WAAR DE AUTO GEPARKEERD KAN WORDEN. DIT WAS EEN VAN DE WENSEN VANWEGE DE EXTREME GEBREKKIGE PARKEERGELEGENHEDEN AAN DE VOORKANT VAN HET HUIS.
71
MASTERPLAN
72
DE AANLEG VAN DE TUIN HEBBEN WE ZELF GEDAAN, DIT OM DE KOSTEN TE DRUKKEN. TIJDENS DIT PROCES HEB IK VEEL GELEERD OVER WAT ER BIJ EEN AANLEG KOMT KIJKEN EN WAAR TIJDENS HET ONTWERPEN AL REKENING GEHOUDEN MEE MOET WORDEN ZOALS
LICHTPLAN,
WATERAFVOER,
BEPLANTINGSDICHTHEID,
WOEKERENDE SOORTEN EN NIET WOEKERENDE SOORTEN.
73
HOOGTEVERSCHILLEN
74
BENEDEN TERRAS, GRASVELD EN KIPPENREN 0M EERSTE TRAPTREDEN OMHOOG, PLANTENBAK VERHOGING BENEDEN 0,15 M TWEEDE TRAPTREDEN OMHOOG 0,30 M DERDE TRAPTREDEN OMHOOG, HOOGTE TERRAS BOVEN AAN HET HUIS, WATERSTAND VIJVERTJE 0,45 M VERHOGING TUSSEN VIJVER EN TERRAS 0,60 M HOOGTE PLANTENBAK TUSSEN TERRASSEN BENEDEN EN BOVEN 0,75 M
75
MATERIALEN
1
BETONNEN TEGELS 60*60*5
2
GEBAKKEN KLINKERS
3
KEIFORMAAT
OPSLUITBAND 100*15*5
HALFSTEENS VERBAND
3
2
3
36
76
4
MUURTJES GECEMENTEERD
5
GROF
BETONNEN STAPELBLOK
6
60*15*15
35
KASTANJE HEK 120 HOOG
5
5
5
5 1
1 4
3 5
4
5 2
4
6 3 2
4
5
1 5
6
77
BEPLANTING SFEER
AMELANCHIER LAMARCKII KRENTENBOOMPJE MEERSTAMMIG
ACER PALMATUM JAPANSE ESDOORN MEERSTAMMIG
MALUS DOMESTICA APPEL
PYRUS COMMUNIS PEER
PHYLLOSTACHYS AUREOSULCATA BAMBOE
78
LIQUIDAMBAR STYRACIFLUA WORPLESDON AMBERBOOM LEIVORM
NEPETA ‘SIX HILLS GIANT’ KATTENKRUID
PENNISETUM ‘LITTLE BUNNY’ LAMPENPOETSERGRAS
PANICUM VIRGATUM NORTHWIND VINGERGRAS
MISCANTHUS SINENSIS ZEBRINUS ZEBRAGRAS
ECHINACEA PURPUREA ZONNEHOED
RUDBECKIA FULGIDA GOLDSTURM ZONNEHOED
AGASTACHE BLUE FORTUNE DROPPLANT
CALAMINTHA NEPETA SUBSP. NEPETA BERGSTEENTIJM
VERBENA BONARIENSIS IJZERHARD
79
80
81
BEPLANTINGSPLAN TUIN PRODUCT: BEPLANTINGDPLAN LOCATIE: EDE SCHAAL: KLEINE TUIN DATUM: FEBRUARI 2018
^ BEPLANTING AANGEPLANT BEGIN MAART 2018 FOTO’S GENOMEN EIND JUNI DOOR OPDRACHTGEVER.
82
6
VOOR DEZE ZONNIGE TUIN WAS ENKEL EEN BEPLANTINGSPLAN NOG NODIG. HIERBIJ WAREN EEN AANTAL WENSEN: HET MOEST EEN ZOMERSE UITSTRALING HEBBEN, MET VEEL BLOEIENDE SOORTEN. DAARNAAST WAS ER DE WENS DAT ER MINIMAAL 3 PALMEN IN ZOUDEN WORDEN OPGENOMEN, EVENALS EEN OF MEERDERE YUKAS. DE OPDRACHTGEVER VIND HET LEUK OM IN DE TUIN TE WERKEN DUS DE TUIN HOEFT NIET ONDERHOUDSVRIENDELIJK TE ZIJN. HET RESULTAAT IS HIERONDER TE VINDEN. IK HEB VOOR DEZE TUIN EEN KOSTENOVERZICHT GEMAAKT, AAN DE HAND VAN PRIJZEN DIE ONLINE TE VINDEN WAREN. DE OPDRACHTGEVER IS HIERMEE NAAR EEN HOVENIER GEGAAN MET OP VOORHAND EEN IDEE WAT DE KOSTEN ONGEVEER ZOUDEN GAAN WORDEN. HIERDOOR HEEFT DE OPDRACHTGEVER OVER DE PRIJS KUNNEN ONDERHANDELEN. UITEINDELIJK ZIJN ER TIJDENS HET PLANTEN OOK NOG BOLLEN EN ANDERE SOORTEN TUSSEN GEZET, VANDAA R DAT HET EINDBEELD ANDERS IS GEWORDEN TOV HET BEPLANTINGSPLAN
83
Beplantingsplan
Veranda
84
Huis
As
Sv
As
Pb
Sc
Sv
Tf
Ph
Pb
Sc
Sv Rf
Ef
Sv
Dc
Ph
Vb
Soorten indicatie
Tf
Pb
Pb
Tf
Ef
Rf
Ph
Dc
Vb
As
Ph
Pb
Ef
Sv
Hm Ha
Ha
Dc
Am
Sc
Rf
Pb
Sv
Yf
Sc
Yf
Ef
Rf
Pb
Pb
Ph
Dc
Ef
Sv
As
As
Sv
Veranda
Huis
85
SOORTENLIJST + KOSTEN OVERZICHT PLANTEN
Soortenlijst
Soortenlijst Soortenlijst Allium ‘Mount Everest’
Aster ‘Schneekissen’
Deschampsia cespitosa ‘Goldtau’
Echinacea ‘purpurea’
ium ‘Mount Everest’ Aster ‘Schneekissen’ Echinacea ‘purpurea’ Deschampsia cespitosa Helianthus mollis Pennisetum Pennisetum alopecuroides Rudbeckia fulgida ‘Goldtau’ alopecuroides ‘Hameln’ ‘Little Bunny’ var. Deamii ium ‘Mount Everest’ Aster ‘Schneekissen’ Echinacea ‘purpurea’ Deschampsia cespitosa ‘Goldtau’
Trachycarpus fortunei
lianthusSalvia mollisverticillata Pennisetum alopecuroides fulgida Stipa calamagrostis Pennisetum Verbena bonariensis Rudbeckia Yucca filamentosa alopecuroides ‘Hameln’ ‘Little Bunny’ var. Deamii ‘Purple Rain’
Trachycarpus fortunei
lianthus mollis
Trachycarpus fortunei
86
Pennisetum alopecuroides ‘Hameln’
Pennisetum alopecuroides ‘Little Bunny’
Rudbeckia fulgida var. Deamii
Hoeveelheden en kosten Latijnse naam:
Nederlandse naam:
Afkorting
Plant/m2
Oppervlak in m2
Nodige planten
Prijs / plant
Prijs totaal
Allium 'Mount Everest'
Sierui
Am
15
0,75
11
€ 1,60
€ 17,60
Aster 'Schneekissen'
Aster
As
7
4,87
34
€ 1,95
€ 66,30
Deschampsia cespitosa 'Goldtau'
Smele
Dc
7
4,52
32
€ 1,75
€ 56,00
Echinacea 'purpurea'
Zonnehoed
Ef
9
3,67
33
€ 1,29
€ 42,57
Helianthus mollis
Zonnebloem
Hm
7
0,72
5
€ 4,00
€ 20,00
Pennisetum alopecuroides 'Hameln'
Lampepoetsersgras
Ph
5
2,57
13
€ 2,05
€ 26,65
Pennisetum alopecuroides 'Little Bunny'
Lampepoetsersgras
Pb
7
4,07
28
€ 2,30
€ 64,40
Rudbeckia fulgida 'Goldsturm'
Zonnehoed
Rf
7
2,59
18
€ 1,40
€ 25,20
Salvia verticillata 'Purple Rain'
Salie
Sv
9
4,96
45
€ 1,75
€ 78,75
Stipa calamagrostis
Diamantgras
Sc
7
5,36
38
€ 2,09
€ 79,42
Trachycarpus fortunei
Chinese Hennep palm
Tf
-
-
3
€ 24,50
€ 73,50
Verbena bonariensis
Ijzerhard
Vb
7
1,15
8
€ 1,86
€ 14,88
Yucca filamentosa
Palmlelie
Yf
-
-
2
€ 12,50
€ 25,00 + € 590,27
Soorten specificaties Latijnse naam:
Nederlandse Afkorting Hoogte: naam: Bloeitijd
Plant/m2 Oppervlak in m2 Bloeimaanden Bloeikleur
Allium 'Mount Everest'
Sierui M
L Vo V Am Zo
Aster 'Schneekissen'
Aster XS
M NaAs
Deschampsia cespitosa 'Goldtau'
Smele M
Dc
Echinacea 'purpurea'
Zonnehoed M
Ef M Zo-Na
Helianthus mollis
Zonnebloem L-XL
Hm L Zo-Na
Pennisetum alopecuroides 'Hameln'
Lampepoetsersgras S-M
Ph
Pennisetum alopecuroides 'Little Bunny'
Lampepoetsersgras S
Pb
Rudbeckia fulgida 'Goldsturm'
Zonnehoed S
L Zo-NaRf
Salvia verticillata 'Purple Rain'
SSalie
M ZoSv
Stipa calamagrostis
Diamantgras S-M
Sc
7
Trachycarpus fortunei
ChineseS-XL Hennep palm
Tf
-
Verbena bonariensis
Ijzerhard M
M ZoVb
7 Juli-September
Yucca filamentosa
Palmlelie M-L
M Zo Yf
Juli-Augustus
Nodige planten Bijen/vlinders
Prijs /Winterbeeld plant Prijs totaal
15 Mei-Juni
0,75 Wit
11Ja
€ 1,60+ zwart € 17,60
7 Augustus-Oktober
4,87 Wit
34Ja
€ 1,95
-
€ 66,30
4,52
32 Nee
€ 1,75
+
€ 56,00
9 Juli-September
3,67 Roze, paars
33Ja
€ 1,29+ zwart € 42,57
7 Juli-September
0,72Geel
5 Ja
€ 4,00
-
€ 20,00
5
2,57
13 Nee
€ 2,05
+
€ 26,65
7
4,07
28 Nee
€ 2,30
+
€ 64,40
7 Juli-Augustus
2,59Geel
18Ja
€ 1,40
±
€ 25,20
9 Juni-Augustus
4,96Paars
45Ja
€ 1,75 ± / -
€ 78,75
5,36Goud
38 Nee
€ 2,09
€ 79,42
3
€ 24,50 € 73,50 Wintergroen
1,15Paars
8 Ja
€ 1,86
- Wit
2 Matig
7
-
+ +
€ 14,88
€ 12,50 € 25,00 Wintergroen € 590,27
XS >30cm
V Vroeg
S 30-80 cm
M Midden
M 80-140cm
L Laat
L 140-200cm
Vo Voorjaar
XL <200cm
Zo Zomer Na Najaar Wi Winter
87
88
MAARTEN SCHENKVERBRUGGEN LANDSCHAPSARCHITECTUUR PORTFOLIO JANUARI 2020