Mohamed Elgohary BIM Portfolio Selected works
1. BIM FOR STUDY. 2. BIM FOR DESIGN. 3. BIM FOR VISUALIZATION. 4. BIM FOR DOCUMENTATION.
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
2
Jawaharlal Nehru Stadium.
E8
E10
E9
E11
E13
E12
E14
//JNS// Jawaharlal Nehru Tensile stadium Steel Wires -r 3'Ne 20% Opaque Teflon .003 India Table of Contents :E106
No .
Sheet No
0 104
E8
103 E9
1
Sheet Name
Scale
A000
Project Cover Steel Plate Transtional Revolving Steel Revit r.075
A100
Table Of Contents
No .
A101
2
E11
Site Plan
E12
A112
21
A113
22
1:1000 E13
104
Sheet No
20
E10
E10
A114 E14
3
A102
UG Plan a
1:200
4
A103
UG Plan b
1:200
7
A104
Ground Floor a
1:200
25
A117
8
A105
Ground Floor b
1:200
26
A118
9
A106
First Floor Plan a
1:200
10
A107
First Floor Plan b
1:200
28
A120
11
A108
2nd Floor Plan a
1:200
29
A121
12
A109
2nd Floor Plan b
1:200
13
A110
3rd Floor a
1:200
14
M106
3rd Floor Plan b
15
M107
Section A-A
16
P108
UP
A35
23
24
27
A115 A116
A119
A34
103
17 18
Elevation Part A
A104
Elevation Part B
M105
Elevation Part C
M106
Elevation Part D
1:200
Primary Steel Wires 1:100 r .003 Sec Steel Wires r.001 1:100 Elastic Steel Wires .001
1
1:100 Inclined column UBUniversal Beam 1:100
A35
2
Tent Detail 1 : 100
19
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
1:100
A34
3
Pa
1:1
2 A121
87
86
85
84
87
86
85
84
1 A121
1
0.50 1.18 0.400.13 0.86
A121
2.25°
1.00
Exterior 0.73 Wall 0.80 0.80 0.80 0.80 0.75
Aliuminum Profile
0.86
0.86
1.11
0.14 0.86 0.86
7.27
Shaft 1.04
0.14
0.15 Aluminum Connection
0.86
0.14
0.06
4.23
1.90
0.27
1.00 * 0.40 RC Column 0.40 2.33°
2.25°
0.95
0
0.86
261
4
2
0.06
87
1
1.50
Shaft
0.26 0.14
5
D2
84
0.86 0.14 0.86 0.14
1:5
1.50
2.72 1.0
0
5.00
0.14
2
0.86
A120
0.14 0.86 0.09
261
1.0 0
1.67
0.90
5.04 Display Box
Composed False Celling
2.70 0.9 1.00
0.90
0
lamp
1.33
2015_2016 "
75mm Nail Washer Forth year
Rough Wood
88 .9 7°
3.40 0.82
0°
0.82
0.82
0.82
89 .2 9°
2.10
5
P1 1.33
P1
Changing Room Isometric
P1
0.97
Exteior Wall
1.00
5.35
0.82
Grading :
0.60 0.08
1.00
0.08
1.00
0.15
0.08
1.00
0.08
1.00
0.08
0.64
P1 0.80
P1 0.80
P1
Lock Steel Profile 1.00
0.08
1.00
0.08
1.00
0.08
1.00
0.60
0.15
0.76
L Channel
174
0.601.00
0.08
1.00
0.08
0.60
1.00
0.07
1 : 50
0.07
Rubber Stop
Washer Nail
0.15
0.80
7.11
88 .9 7°
---
3.95
.7 1°
0.08
2.38
-
P1
Section Of DisplayP1Box A 3 Detail 1:2 88
1.00 0.60
P1
0.56
Chang
6
Dryline Steel Screw Steel Profile Fixed To The Wall
0.15
5.24
P1
12/19/2015 9:24:49 AM
Student No : High Density Plastic 02 Two Mohamed Ashraf El Sound GoharyInsulation Panels 5.05 Thickness .002m
Author
0.19
0.60
P1
1.67
2
Date :
1 : 50
Dryline Steel Screw
Drawing No :
Washer Nail
Scale :
Plasteic Plates
0.82
A107
5.05
1 : 10
Steel Z Channel
0.19
Pathroom Floor
02 Two
91 .2 9°
1.50
P1
P1
Drawing Name: Section Throgh False Celling
4
Rough Wood
1.50
D4 0.86
203
203
0.86
90 .0 0°
Duct
Jawaharlal Nehru Stadium
Rubber
0.48
2.36
87 Opaque Teflon Thickness .003m Project
1.23
Key Plan
Aluminum Duc
Rough Wood Circular Profile
Oak Wood
6.16
284
0.08
1.00
0.08
1.00
0.08
0.56 5.05
02 Two
0.07
5.05 0.45
0.45
174
7.11
1
1
Callout of Changing Zone 1 : 50 94
0.86 0.11 0.86 5.35 0.14
Section OF Acoustaic Panels 1:5
01 One 1.65
Changing Room Interior 4 Cladding 1 : 25 ---
02 Two 0.21
0.86
0.79
Showe Device
0.25
5.05
Elbow M
RC Beam
0.14
3.20
1.60
1.00
0.48
0.14
4.23
1.60
0.310.30 0.39
Faculty of Fine Arts
1.67
203
0.02 0.86
2.32°2.68
312
Alexandria Uni
Website : www.alex.edu.eg 108 Abdelsalam Aref St. Gleem , Alexandria
1.50
D2
5.85
2.70
84
279
Shaft
0.86
85
Pentandt Lamp
-
3.40
0.75 7.00
1.50
1.10
Hange Wire 312
---
90 .7 1°
0.51
3 A107
RC Beam
C Steel Channel Department Of Architecture
0.48
2.30 2.33°
0.90
Expantion Blots
6.03
2.25°
Detail Of Curtain wall
4.78
0.86
0.76
D4
5.20
A307 Blot
86
0.76
1.00
1.70
1 : 50
Pathroom Floor
0.07 0.13 0.45 1.11 0.83 0.80 0.80 0.80 0.75 0.73 0.60 0.81 0.81 0.81 0.80 0.80 0.80 0.75 0.86 Aluminum Channel 0.86 0.70 0.14 0.70*1.00 RC Column 0.14 2.33° 2.25° 0.86 0.86 0.11 5.05 Rubber Stop 0.14 F25 0.86 0.06 0.86 4.83 5.07 0.14 4.37 6.78 0.01 0.14 0.86 0.86 0.99 0.14 0.14 0.86 Display Box 4.86 0.86 5.04 0.14 4.37 0.14 1.34 2.81 0.86 0.70 2.33° 0.70*1.50 RC Column 2.42° 0.15
279
4.73
Mirrior wall
2.10
Double Glass Thickness .003 2.33°
1
8
0.76
D4
A120
0.01
0.86
0.60
0.76
Shim Space
284
Trophy room
1°
84
91 0.05 .0 1°
0.76
85
0.05 0.06
03 Th
0.76
A121
0.10
0.04 0.06
0.86
0
2.32°
Revit
D4
0.60
86
0.06
0.17
4.78
Aluminum Fixed Head Profile
1
0.04 0.06
0.86
0.60
Aluminum Channel
A121
0.01 0.06 0.27
0.17
Black Carpet Sheet 2.25° Thickness .03
A107
312
87
0.86
4.23
Steel L Connection
0.01 0.06 0.27
94
90 .0
1 : 50
0.40
Aluminum Fixed Head Profile
2.33°
91 .3
2
2.70
0.38
0.31
261
1.00 2.33°
85
Wood Joist I Section
0.14
1.00*0.40 RC Coluomn
3
86
87
0.02 0.86
5.93 0.06
0.9
6.25
Trophy room Looking Up
Carpet
1.50
Composed False Celling
A107
Double Fixed Glass Panel
1.37
279
0.86 0.11 0.86 5.35 0.14
1.00
0.90
1.00
2.28
1.61
0.14
3.20
1.0 0
0.86 0.09
1 : 10
Display Box
Composed False Celling
1.67
1.61
1.34
0.04 2.32°2.68 0.04
0.17 5.04
.10*.10 Mullions
1.67
0.14
4.37
D2
0.90
0.04 0.065.85
2.70
2.25°
2.33°
1.10
0.27
0.90
0.86
0.75 7.00
1.50
Light Wires
.10*.10 Mullions
0.14
2.42°
0.01 0.06
5.00
0.14
Section Of Display Box
2.03
1.90
2.01
0.14
A120
2
1.30 1.301.00
2.01
1.50
0.04 0.06
0.86 2
1.0
0.17
A122
0.14
0.11
C Channel .305*.089
0.59 2.33
5.20
0.01 0.06
0.86 3
0.18
3.31
0.14
1.70
0.70
0.06
Light Wires
0.86
1.59
Display Box
D2
Display Box Double Glass Thickness .003Composited False Celling
0.86
2.81 2.33° 0.70*1.50 RC Column
0.86 Panels .003 Fixed Glass 1.50
1.61
5.04
0.14
1.47
6.55
0.14
1.67
4.86
AluminumShaft Lock Shaft U Channel 0.26 0.14 Screw Fitting 2.30Rectangular Oak Wood 2.72 2.33° Revit 0.86
5.21
1.11
1.61
0.29
Fixed Glass Panels
0.14
4.37
.10*.10 Mullions 1.57
1.00
4.83
0.86 2
0.14
0.86
279
0.14 0.86
5.07 6.78
0.08
Fixed Glass Panels
0.86 0.11 0.86
Light Wires
F25
0.99 Mullions .10*.10
0.86
1.67 L Steel Channel
2.18 0.70
0.86
5.05
0.14
1 A120
1.50 Shaft
1.50
Light Wires
0.86 Sheets 4.83 .003 Fixed Glass
0.48
0.58
0.08
0.07
2.25°
Light Wire
0.14
0.14
7.00
D4
2.33°
0.86 Aluminum Connection
0.86
1.00
0.08
0.14
0.86
Aluminum Channel
0.14
A120
0.08
D4
0.14
2.42°
0.18
Expansion Plot 0.13 0.45 1.11 0.83 0.80 0.80 0.80 0.75 0.73 0.60 0.81 0.81 0.81 0.80 0.80 0.80 0.75 0.86 0.86 0.70 0.70*1.00 RC Column Fixed Glass Panels Fixed Glass0.14 Panels L Steel Channel
0.06
0.86 4.37
2.78° 2.81 2.86 1.50 * 0.70 RC Column
0.15 0.72
284
0.19
0.14
Double 9.90 Glass Thickness1.00 .003
03 Th
0.10
2.25° 284
0.86 0.11 0.86
Display Box
0.14
0.01
0.14
0.01 0.06
0.86 0.14
1 A120
0.40 0.07 0.86
2.25° 0.22 0.22
0.14
2.33°
0.19
6.17
2.33° Rupper0.70 Stop 1.00 * 0.70 RC Column 3.45 3.56
0.14
Key Plan
8.16
2
RC Beam.20*.40
2.33°
A121
1.00
4
Jawaharlal Nehru Stadium.
Shower
0.60 0.91
Showe Cabinet
0.86
Clothes Exchange Cabinatin
Door
0.07
1.86
Composed False Celling 261
1.00*0.40 RC Coluomn
1.00
1.00 2.33°
Tap Bathroom
1.07
.002 Marbel
0.40
Sink
Sitting Bench
1.39
Traingled Metal Profile 0.02
2.32°
2.03 0.02 0.11
0.42
0.60
Basment Fixture
2.33°
0.35
0.09
2.25°
0.43 0.15
2
0.44
01 One 1.65
Alexandria Uni 87
1
Trophy room 1 : 50
86
85
84
3
Faculty of Fine Arts Pathroom Section Department Of Architecture
1 : 25
Website : www.alex.edu.eg 108 Abdelsalam Aref St. Gleem , Alexandria
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio. 2015_2016 " Forth year
4
1. BIM FOR STUDY. 2. BIM FOR DESIGN. 3. BIM FOR VISUALIZATION. 4. BIM FOR DOCUMENTATION.
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
5
: 100
round Floor
Elmasiiaf compound.
+- 0
WC 2.43X1.67
+- 0
WC 2.43X1.73
Kitchen 4.08X3.57
Bed 6 4.56X3.45
+- 0
+- 0
+ 0.30
B-B
A113
Lobby 2.02X2.84
Bed 5 4.15X3.50
WC 2.71X1.38
Nanny's Room 2.71X1.70
Entrance Lobby 3.84X5.51
+ 0.30
+- 0
Reception 8.66X4.82
+- 0
Guest WC 2.71X1.10
Laundry room 1.67X1.20
+ 0.30
+- 0
+- 0
WC 1.80X2.20
A113
Project Name
Drawing Name
Drawings Scale
Date
Sheet Number
B'C-SV-05-A'B
Ground Floor Plan
Scale 1 : 100
07/12/18
A102
Section B-B 1 : 50
NOTES:
1 A109
NOTES:
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio. 1
Project Name
Drawing Name
Drawings Scale
Date
Sheet Number
B'C-SV-05-A'B
Section B-B
Scale 1 : 50
07/12/18
A113
ENCODE DESIGN STUDIO
10/1/2018 1:33:56 PM
B-B
A-A
A112
NOTES:
North 1 : 50
Project Name
Drawing Name
Drawings Scale
Date
Sheet Number
B'C-SV-05-A'B
North Elevation
Scale 1 : 50
07/12/18
A109
South
ENC
6
1. BIM FOR STUDY. 2. BIM FOR DESIGN. 3. BIM FOR VISUALIZATION. 4. BIM FOR DOCUMENTATION.
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
7
1 Palace Viz. Revit + Lumion*.
1 : 50
2 1
2 1
Gallary Floor Plan
2
1 : 50
Elevation 2 - a 3/1/2019 7:14:10 PM
1
1 : 50
LIGHTING PANEL
Leather- coverd PANEL
Leather- coverd PANEL LIGHTING PANEL
Leather- coverd PANEL
2 1
Leather- coverd PANEL
2
LIGHTING PANEL
Leather- coverd PANEL
1
Leather- coverd PANEL
LIGHTING PANEL
Leather- coverd PANEL
Leather- coverd PANEL
LIGHTING PANEL
Leather- coverd PANEL
LIGHTING PANEL
Gallary Looking up 1 : 50
1
2
Elevation 2 - d 3/1/2019 7:14:34 PM
1
1 : 50
Elevation 1 - b 1 : 50
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
Renders: Mahmoud El-Sayed kassem 8
Palace Viz. Revit + Lumion*.
1 2
2 1
1 A104
1
Level 1 1 : 50
1
Elevation 1 - a 1 : 50
Section 2 1 : 35
Level 1 1 : 50
2/28/2019 2:21:58 AM
1
2/28/2019 2:21:52 AM
1
2
Elevation 1 - b 1 : 50
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
Renders: Mahmoud El-Sayed kassem 9
1. BIM FOR STUDY. 2. BIM FOR DESIGN. 3. BIM FOR VISUALIZATION. 4. BIM FOR DOCUMENTATION.
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
10
2
3
A102
A102
1
1 A102
A103
A103 3
A103
A103
3
3
A103 3
3
2
4
A103
2
UP
3 A102
A102
A103
2
3
A102
3 A102
East 2
A103
A103
4
A103
4
2
A103
A102
2
A103
A103
4
2
A103
UP
1 : 150
A103
2
1 : 100
3 3 A102
A102
A103
South
UP
2 2
2 A102
A102
A102
2
1
1 : 165
1
A102
A103
Level 23 Level 2
1
1
3
1 A102
A101
1 : 165 A101
1 : 165
A103
1 1A103
1
A102
A102
A103
3
South Level 3
3
1
1 : 165
A101
A102 1
A103
1 : 100
A102
3 A103
2 A102
East 2 North 1 : 100
1 : 150
A103
2 A102
3
3
A102
4 A103
West
1 A102
2
1 : 150
A102
Section 1
A102
A102
Section 1 1 : 150
1
1
1
A102
A102
A102
North
A103 : 100 Mohamed Ashraf Mini BIM Portfolio. Section 1 Fahmi Elgohary Mohamed I1 1 Section 2 2
1 : 150
1
1 : 150
3
3
A102
A102
4 A103
2
Section 2
5/13/2019 3:10:17 AM
1
5/13/2019 3:10:01 AM
l 2Level 1 A103
5/13/2019 3:10:01 AM
A102
West 1 : 150
3
Section 3
11
Bel Air House.
Bel Air House
BIM Modeling: Mohamed ElGohary
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
12
A108 1
1 A106
1
A107
2
Level 1
1
A108
6/23/2019 7:59:14 PM
2
A107
1 : 300
A108 1
1 A106
1
A107
2
2
Level 2
1
6/23/2019 7:59:20 PM
A107
1 : 300
A108
A108 1
1 A106
1
A107
2
1
2
6/23/2019 7:59:26 PM
A107
Level 3 1 : 300
A108
A108 1
1 A106
1
A107
2
1 2
Level 4
6/23/2019 7:59:31 PM
A107
1 : 300
A108
A108 1
1 A106
1
A107
2
2
1
A108
Site 1 : 300
6/23/2019 7:59:37 PM
A107
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.
Renders using: ENSCAPE for REVIT
13
Thank You!
Mohamed Ashraf Fahmi Elgohary Mohamed I Mini BIM Portfolio.