PGA HEADQUARTERS
Frisco, Texas | Summer 2022
Corporate
Firm: Page/
Role: Senior Designer
LEED Silver
This new 106,622sf headquarters sits on 6.2 acres of the new 660-acre PGA Frisco campus, which will also include two new championship golf courses, a 500-room Omni PGA Frisco Resort and a golf entertainment district. The new building will promote the PGA’s mission to bring state-of-the-art education facilities and workplace together.
The ground floor was designed to serve staff, PGA Members and guests as a destination for the future of golf, including a video studio and education center. The lobby design features a wood wall sculpted to mimic the contours of the on-site golf course, terrazzo flooring and an open social stair to facilitate casual collisions between employees and PGA Members. Other floors are designed for workplace, consolidating the core to the center of the building to allow for 360 degree views out towards the golf course and neighboring developments.
Wellness played an important role in the design of the interior spaces, providing ample access to daylight, amenities such as quiet rooms, wellness rooms, and fitness, as well as delight with the inclusion of color and artful display of materials. The architecture of the building also incorporates outdoor terraces on each level facilitating an outdoor-indoor work environment.
As designer on this project, my responsibilities included planning of the building, consultation on WELL certification opportunities, design of various amenity spaces, renderings for client presentation, client presentation, construction drawings, construction administration, as well as consultation on FFE.
2
GRAHAM Portfolio
MAGGIE
Professional Work 3
4 MAGGIE GRAHAM Portfolio
Professional Work 5
6 MAGGIE GRAHAM Portfolio
Professional Work 7
22 CDT Overall Design Review June 16 + 17, 2020 Project PGA of America Headquarters Client PGA Project Number 319027 Day 2 Workstation Layout UP STOR. STOR. STOR. IDF MECH. ELEC. STOR. Project Client Project Number PGA Headquarters PGA of America 319027 24 CDT Overall Design Review June 16 + 17, 2020 Project PGA of America Headquarters Client PGA Project Number 319027 Day 2 Workstation Layout Project Client Project Number PGA Headquarters PGA of America 319027 6" C2 A-421 PAINT AS SCHEDULED PAINT AS SCHEDULED DMR-5 A-544 A5 LEVEL 01 0' - 0" LEVEL 02 18' - 0" LEVEL 03 32' - 0" 27'6" COMPANY LOGO, REFER TO BRANDING PACKAGE. 5/8" GWB ON 3-5/8" MTL STUDS CEILING AS SCHEDULED GUARDRAIL AS SCHEDULED CONC. DECK,
STRUCT.
SCHED. WOOD BLOCKING TIGHT BETWEEN PANELS 1/4" STEEL PLATE 1/2" STEEL PLATE AT 48" SPACING STEEL BEAM, SEE STRUCT. DWGS 4" CEILING AS SCHEDULED A-544 C7 A-544 A7 A-532 11 3'0" 2" 3'4" TYP. 1" MTL-3 WDW-5 3'6" 4"3'0" 2" A3 A-704 SCALE: 3/8" = 1'-0" C2 SECTION -WOOD WALL SCALE: 3/8" = 1'-0" E6 RECEPTION
SCALE: 3/8" = 1'-0" E4
2 2 2 2 3 8 MAGGIE GRAHAM Portfolio
SEE
DWGS FLOORING AS
DESK
RECEPTION DESK FRONT -LEFT
20'-0" SOCIAL PLATFORM 2' 0" 1' 6" 1" 1' 6" FLOORING AS SCHED. CONC. DECK, SEE STRUCT. DWGS 3/4" PLYWOOD 1/4" -CLIP 5/8" VENEER WOOD PANEL SOLID HARDWOOD EDGE 3' 6" 1/4" REVEAL, TYP. BATT INSULATION -5/8" MTL STUDS -1/2" SEAT CUSHION FASTENED WITH COMMERCIAL GRADE VELCRO, UPHOLSTERY AS SCHEDULED 1' 2" 4" 3" 1' 7 3/8" 2' 0" LEVEL 02 18' - 0" FLOORING AS SCHED. CONC. DECK, SEE STRUCT. DWGS 3/4" PLYWOOD 1/4" -CLIP 5/8" VENEER WOOD PANEL SOLID HARDWOOD EDGE 1/4" REVEAL, TYP. FLOORING AS SCHED. STEEL BEAM, SEE STRUCT. DWGS GWB ON MTL STUDS, SEE PLANS FOR WALL TYPE, TYP. CONC. DECK, SEE STRUCT. DWGS STEEL BEAM, SEE STRUCT. DWGS 1' 2" 4" WOOD BLOCKING 20'-0" SOCIAL PLATFORM 3' 6" 2' 0" 1' 6" 2' 0" 1/2" 11" 1/2" 1/2" FIBER CEMENT BOARD LIQUID APPLIED WATER PROOFING -SIDED SHEET METAL BOX W/ WELDED SEAMS 3" 1' 7 3/8" 1/4" -CLIP POUR STOP 5/8" VENEER FLOORING AS CONC. DECK, DWGS CONC. DECK, DWGS CEILING AS SCHEDULED CORE DRILL STRUCT. DWGS 5/8" VENEER WOOD 1/4" Z-CLIP 11 3' 0" STEEL BEAM, SEE STRUCT. DWGS CONC. DECK, SEE STRUCT. DWGS EQ RISERS @ 7" MAX 2' 0 5/8" 20'-0" SOCIAL PLATFORM 2' 0" 1' 0" TYP. 1' 0" 3' 0" 1' 0" CORE DRILL GROUT, SEE STRUCT. DWGS FLOORING AS SCHED. STEEL POST, REF. SPECS -1/2" DIA. WOOD HANDRAIL, REF. SPECS STEEL POST, REF. SPECS -1/2" SOLID HARDWOOD NOSING 5/8" VENEER WOOD PANEL COLD FORM METAL FRAMING CORE DRILL GROUT, SEE 3/4" PLYWOOD FLOORING AS SCHED. WOOD PLANK AS SCHEDULED 3' 1 3/8" 3/8" 3 H G F E D C 5 6 7 B SCALE: 1 1/2" = 1'-0" D4 SECT. DTL @ PLANTER, TYP. SCALE: D7 SECT. Professional Work 9
10 MAGGIE GRAHAM Portfolio
LEVEL 01 0' - 0" 3 1 1/2" 5' 8" 3'8" STRUCTURAL TUBE, SEE STRUCT. DWGS. PAINTED PNT-19 2X4 WOOD FRAMING MEMBER. GC TO COORDINATE LOCATION WITH SLIDING MONITOR RAIL. PAINTED PNT-19 STRUCTURAL TUBE, SEE STRUCT. DWGS. PAINTED PNT-19 2X6 WOOD FRAMING MEMBER. GC TO COORDINATE LOCATION WITH SLIDING MONITOR RAIL. PAINTED PNT-19 SLIDING MONITOR RAIL PROVIDED BY OTHERS SLIDING MONITOR RAIL PROVIDED BY OTHERS STRUCTURAL TUBE, SEE STRUCT. DWGS. PAINTED PNT-19 STACKED TV MONITORS PROVIDED BY OTHERS METAL BALL STOP, PNT-19 7 1/2" FLOORING BY OTHERS EQEQ PERFORATED METAL AS SCHEDULED LEVEL 02 18' - 0" 9 1 1/2" 1' - 4 1/4" METAL PANEL 3/4" PLYWOOD FASTEN SUBSTRATE INTO MTL STUDS 5/8" GWB ON 3-5/8" MTL STUDS BATT INSULATION 6 1/2" 1 1/2" 8" MILLWORK 'F' 1/2" REVEAL, POWDER COAT DARK BRONZE MILLWORK 1/4" POST OUTSIDE CORNER, POWDER COAT DARK BRONZE MILLWORK 'F' 1/2" REVEAL, POWDER COAT DARK BRONZE HANGER RODS BY MANUF. OPERABLE HORIZONTAL WALL AS SCHEDULED CAULK TRACK AT GWB, TYP. 2-LAYERS 5/8" GWB ON 3-5/8" MTL STUDS GC TO PACK TRACK WITH MINERAL WOOL CORNER BEAD, TYP. CEILING AS SCHEDULED 5/8" GWB ON 3-5/8" MTL STUDS LIGHTING AS SCHEDULED 11 1/4" STEEL BEAM, SEE STRUCT. DWGS CONC. DECK, SEE STRUCT. DWGS FLOORING AS SCHED. GUARDRAIL AS SCHEDULED GC TO PROVIDE DESIGN AND INSTALLATION OF STRUCTURAL STEEL WITH A MAXIMUM DEFLECTION OF 1/360. GC TO COORD. STRUCTURAL STEEL ELEMENTS WITH MEP ABOVE. DIAGONAL BRACE LEVEL - 8" 5/8" MTL AND STRUCTURAL TO STEEL ABOVE. H.1 H.1 STAT TEX E OF AS M L AB R EGISTERED ARCHITEC T A I F A TT IANO I I I 10900 PROFESSIONAL SEALS DESCRIPTION REVISION DATE PROJECT CHECKED DRAWN BY PROJECT NUMBER ORIGINAL ISSUE SHEET NUMBER REVISION HISTORY 07/10/2020 4 5 6 7 8 9 F E D C B A A-542 10 IFC 319027 Author ARCHITECTURAL - INTERIOR SECTION DETAILS PGA OF AMERICA HEADQUARTERS FRISCO, TEXAS PGA OF AMERICA SCALE: 1 1/2" = 1'-0" A7 SECT DTL. -HITTING BAY SCREEN SCALE: 1 1/2" = 1'-0" A4 LVL 01 OPERABLE HORIZ. WALL -HEAD DETAIL, TYP. SCALE: 1 1/2" = 1'-0" F4 OPERABLE VERT. WALL -GUIDE RAIL SCALE: 1 1/2" = 1'-0" F7 OPERABLE VERT. WALL -GUIDE RAIL @ METAL Professional Work 11
GREYSTAR AT SYMPHONY SQUARE
Austin, Texas | Under Construction
Corporate / Hospitality
Firm: Page/
Role: Senior Designer
LEED Gold (Anticipated)
Launching their venture into mixed-use development, Greystar’s project includes two separate towers connecting multi-family residential with corporate/commercial by outdoor rooftop amenity spaces. The scope awarded was to develop interior amenity spaces for the corporate/commercial tower, including the main entrance lobby, elevator lobbies, restrooms, bike room, and outdoor terrace.
Sited adjacent to historic Symphony Square Amphitheater along the Waterloo Greenway in downtown Austin, the context significantly shaped the conversation around materiality, form, and rhythm. The intent was to create a hospitality level front lobby comparable to competitive downtown corporate offices, inviting guests and building users to collaborate and work remotely.
Providing a unique challenge, the site drops17’-0” along its northern elevation. Due to this significant change in slope, the lobby space presented remained mostly underground. Our team worked closely with the core and shell architect to revisit the space reserved for the main lobby in efforts to modify the parking garage above and increase the lobby volume. In our success, the modifications allowed for more access to natural light, improving the overall quality of the space. Additionally, this modification created a better pedestrian presence to the street-scape.
Inspired by the rhythm of music, the walls are lined with a staccato of Texas pecan wood slats, bringing warmth and scale to the space. Interrupting the rhythm are carefully placed interior landscaped pillars delineating programmatic elements and bringing nature further into the building. Contrasting the natural warmth of the wood is a glossed venetian plastered ceiling with layers of washed light to illuminate the space while keeping a soft, comfortable hospitality environment. Because of the long and narrow constraints of the space, various millwork elements were crafted to create varied intimate enclaves for diverse user needs. Amenity spaces beyond the lobby were designed maintain a consistent design language using sleek white finishes and layered forms.
12 MAGGIE GRAHAM Portfolio
Professional Work 13
14 MAGGIE GRAHAM Portfolio
Professional Work 15
16 MAGGIE GRAHAM Portfolio
17 5 5/8" 3" GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE EXTERIOR WALL CONSTRUCTION, REF. ARCHITECTURAL DWGS METAL T GRID GYPSUM SUSPENSION SYSTEM. REF MANUF REQUIREMENTS FOR CONNECTION DETAILS HANGER WIRE STONE FLOORING AS SCHEDULED SPECIALTY PLASTER FINISH OVER 5/8" GYP BD. REF FINISH SCHEDULE FOR PLASTER CHARCOAL GRAY METAL BASE AS SCHEDULED ALUM. COMPOSITE MATERIAL WALL PANEL. REF. ARCH FOR SPEC. HORIZONTAL JOINTS TO ALIGN WITH EXTERIOR JOINTS SPECIALTY PLASTER FINISH AS SCHEDULED SCALE: 7 3D VIEW -ENTRY COLUMN 3 3' 0" 3" 6" 3" 3"4" 1" 1' 3" VARIES 1/4" 10" B2 PARKING LEVEL 488' - 0" B3 PARKING LEVEL 479' - 0" 17 RECESSED LED TAPE LIGHT, REF. LIGHTING SCHEDULE PROVIDE MINERAL BATT INSULATION AT ALL WALL CAVITIES GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE EXTERIOR WALL CONSTRUCTION, REF. ARCHITECTURAL DWGS FABRIC BACK AS SCHEDULED OVER 2" FIRM UPHOLSTERY FOAM, REF. ELEVATION FABRIC SEAT AS SCHEDULED OVER 3"- FIRM UPHOLSTERY FOAM, REF. ELEVATION BLOCKING AS REQ. 3/4" FIRE RETARDANT PLYWOOD STONE FLOORING AS SCHEDULED 0 1/4" ACOUSTICAL WOOD PANEL (AWC-1) METAL GRID GYPSUM SUSPENSION SYSTEM. REF MANUF REQUIREMENTS FOR CONNECTION DETAILS GYP BD 10 7/8" TERRAZZO FLOORING ACCENT SLOPED WOOD VENEERED MDF MITER FOLD HORIZONTAL SILL. CLASS A/FIRE RETARDANT PANEL CORE -1/2"X2" WOOD VENEERED MDF MITER FOLD VERTICAL WOOD SLAT. CLASS A/FIRE RETARDANT PANEL CORE 5/8" BARRILITE MESH, REF. ELEC COORD. W/ LIGHTING 8" BLOCKING AS REQ'D FOR BARRISOL LIGHT SYSTEM, REF. ELEC. TERRAZZO BASE AS SCHEDULED MISC. STEEL – STRU STL SUPPORT – RE: STRU B2 PARKING LEVEL 488' - 0" B3 PARKING LEVEL 479' - 0" 17 PROVIDE MINERAL BATT INSULATION AT ALL WALL CAVITIES RECESSED LED TAPE LIGHT, REF. LIGHTING SCHEDULE EXTERIOR WALL CONSTRUCTION, REF. ARCHITECTURAL DWGS RECESSED LED TAPE LIGHT, REF. LIGHTING SCHEDULE CONCRETE SLAB, REF. STRUCTURAL DRAWINGS GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE TERRAZZO BASE AS SCHEDULED STONE FLOORING AS SCHEDULED 1' 3" 3" 6" 3" 3' 10 5/8" 2" 3"4"1" ACOUSTICAL WOOD PANEL (AWC-1) 2" 1" 1/2" 1" METAL GRID GYPSUM SUSPENSION SYSTEM. REF MANUF REQUIREMENTS FOR CONNECTION DETAILS VARIES 3/4" PLY WOOD - FIRE RETARDANT TREATED METAL CLIP MOUNTING SYSTEM SLOPED WOOD VENEERED MDF MITER FOLD HORIZONTAL SILL. CLASS A/FIRE RETARDANT PANEL CORE -1/2"X2" WOOD VENEERED MDF MITER FOLD VERTICAL WOOD SLAT. CLASS A/FIRE RETARDANT PANEL CORE 3"X9" WOOD VENEERED MDF MITER FOLD HORIZONTAL SLAT. CLASS A/FIRE RETARDANT PANEL CORE -1/2"X4" WOOD VENEERED MDF MITER FOLD VERTICAL WOOD SLAT. CLASS A/FIRE RETARDANT PANEL CORE PAINTED MDF BACKER PANEL. CLASS A/FIRE RETARDANT PANEL CORE 10" 5/8" 3" GYP BD BARRILITE MESH, REF. ELEC BLOCKING AS REQ'D FOR BARRISOL LIGHT SYSTEM, REF. ELEC. 8" B2 PARKING LEVEL 488' - 0" B3 PARKING LEVEL 479' - 0" GYP BD PROVIDE MINERAL BATT INSULATION AT ALL WALL CAVITIES CFM STUD METAL GRID GYPSUM SUSPENSION SYSTEM. REF MANUF REQUIREMENTS FOR CONNECTION DETAILS GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE EXTERIOR WALL CONSTRUCTION, REF. ARCHITECTURAL DWGS HANGER WIRE STONE FLOORING AS SCHEDULED CONCRETE SLAB, REF. STRUCTURAL DRAWINGS SPECIALTY PLASTER FINISH OVER 5/8" GYP BD. REF FINISH SCHEDULE FOR PLASTER FRY REGLET GRAPH WALL CLADDING ALUMINUM COMPONENT WITH STANDARD DUAL LOCK CLIP AND SINGLE FIN RETAINER FRY REGLET GRAPH WALL CLADDING ALUMINUM COMPONENT WITH STANDARD DUAL LOCK CLIP FRY REGLET GRAPH WALL CLADDING ALUMINUM COMPONENT WITH STANDARD DUAL LOCK CLIP CHARCOAL GRAY METAL BASE AS SCHEDULED B3 PARKING LEVEL 479' - 0" GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE EXTERIOR WALL CONSTRUCTION, REF. ARCHITECTURAL DWGS METAL GRID GYPSUM SUSPENSION SYSTEM. REF MANUF REQUIREMENTS FOR CONNECTION DETAILS HANGER WIRE STONE FLOORING AS SCHEDULED CONCRETE SLAB, REF. STRUCTURAL DRAWINGS SPECIALTY PLASTER FINISH OVER 5/8" GYP BD. REF FINISH SCHEDULE FOR PLASTER CHARCOAL GRAY METAL BASE AS SCHEDULED B2 PARKING LEVEL 488' - 0" B3 PARKING LEVEL 479' - 0" 3" 3" 6" 3" 1' 3" 10" LIVING WALL TRAYS ON GRID SYSTEM WITH 6" PLANTS, TERRAZZO BASE AS SCHEDULED 1" PROVIDE MINERAL BATT INSULATION AT ALL WALL CAVITIES 2" GWB ON MTL STUD, REF. ARCHITECTURAL FLOOR PLAN FOR PARTITION TYPE ACOUSTICAL WOOD PANEL (AWC-1/2"X2" WOOD VENEERED MDF MITER FOLD VERTICAL WOOD SLAT. CLASS A/FIRE RETARDANT PANEL CORE 3"X9" WOOD VENEERED MDF MITER FOLD HORIZONTAL SLAT. CLASS A/FIRE RETARDANT PANEL CORE 3/4" PLY WOOD - FIRE RETARDANT TREATED - PAINT BLACK STONE FLOORING AS SCHEDULED RECESSED LED TAPE LIGHT. REF. LIGHTING SCHEDULE 1/2" RECESSED LED TAPE LIGHT. REF. LIGHTING SCHEDULE RECESSED LED TAPE LIGHT. ALUM. COMPOSITE MATERIAL WALL PANEL. REF. ARCH FOR SPEC. HORIZONTAL JOINTS TO ALIGN WITH EXTERIOR JOINTS SPECIALTY PLASTER FINISH AS SCHEDULED SCALE: 1/2" 1'-0" 1 SECTION DTL -TYP. LOBBY SCALE: 1 1/2" = 1'-0" 3 SECTION DTL -BANQUETTE SEATING SCALE: 1/2" = 1'-0" 2 SECTION DTL -WALL @ BENCHES SCALE: 1/2" 1'-0" 5 SECTION DTL -RECEPTION GLASS WALL SCALE: 1/2" 1'-0" 6 SECTION DTL -RECEPTION WALL SCALE: 1/2" = 1'-0" 4 SECTION DTL -GREEN WALL SCALE: 7 3D VIEW -ENTRY COLUMN Professional Work 17
18 MAGGIE GRAHAM Portfolio
Professional Work 19
CONCENTRA HEADQUARTERS
Addison, Texas | 2020
Corporate
Firm: Page/
Role: Designer
“Because your Employees Matter” is Concentra’s motivations for providing comprehensive healthcare services - urgent care, physical and occupational therapy, and wellness -- to America’s workforce. When executive leadership realized the design of the company’s current headquarters was no longer in line with their mission, they approached Page.
Moving oversized offices from the perimeter of the building to the core of the floor plate allowed maximization of daylighting to the open office. Adding glass to office storefronts let natural light travel through to the offices while allowing full transparency and a modernized look to the offices. Reducing the footprint of workstations provided a more efficient layout and increased available space for amenities and collaborative work spaces.
Individual places for quiet heads-down work and relaxation were introduced as well as open collaborative areas with of eye-catching rich color for alternative work environments. Scattered small interior breakrooms on each floor were replaced with a large social hub centrally located on each floor, encouraging employee socialization. These breakrooms incorporated healthy food options and ample plug-and-play power integrated into furniture choices.
As designer on this project, my responsibilities included test fit studies, the development of material palette, renderings for client presentation, construction drawings, construction administration, as well as consultation on FFE. At 117,000sf with a modest budget, mindful material selections and design decisions were executed to make the most impact on the users experience.
20 MAGGIE GRAHAM Portfolio
Professional Work 21
1. PAINT - ALL NEW THROUGHOUT.
2. FLOORING - CARPET TILE AND RUBBER BASE THROUGHOUT.
3. CEILING - NEW CEIING GRID AND TILE THROUGHOUT, NEW 2X4 LED FIXTURES.
4. CONF. ROOMS & OFFICES FULL HEIGHT, FULL WIDTH STOREFRONT ('RACO' OR SIMILAR)
5. COLUMNS - REMOVE GYP BOARD FROM ALL SIDES OF COLUMNS TO EXPOSE CONCRETE
6. CASEWORK HPL ON VERTICAL SURFACES AND CAST PLASTIC ('CORIAN' OR SIMILAR) SURFACING WITH FULL-HEIGHT TILE BACKSPLASH.
7. WALLS TO GRID, INCLUDE PRICING FOR AIR BOOTS AT EACH ENCLOSED ROOM
8. COLLABORATION ROOMS CONCRETE FLOOR, OPEN CEILING WITH SUSPENDED ACOUSTIC TREATMENTS/BAFFLES. INCLUDE LINEAR LIGHT FIXTURES AND PAINTED EXPOSED DECK AND DUCTWORK. MAGNETIC BP GLASS FULL-HEIGHT PANELS (APPROX. 85 LF/LEVEL).
9. BREAK ROOM - CONCRETE FLOOR, OPEN CEILING WITH SUSPENDED ACOUSTIC TREATMENTS/BAFFLES. INCLUDE LINEAR LIGHT FIXTURES AND PAINTED EXPOSED DECK AND DUCTWORK. APPLIANCES TO INCLUDE: (2) REF.; (2) MICRO.; (1) COUNTER ICE/WATER MACHINE.
10. VINYL WALLCOVERING WITH CUSTOM GRAPIC AT SUITE ENTRIES
11. ACOUSTICAL WALL PANELS FULL HEIGHT/WIDTH AT FOCUS/PHONE ROOMS ('FILZFELT' OR SIMILAR)
12. ELEVATOR LOBBY - NEW FIRE-RATED STOREFRONT SYSTEM TO MATCH OTHER LEVELS ADD/ALT:
1. RESTROOMS REPLACE EXISTING CAN LIGHTS WITH NEW LED RECESSED FIXTURES.
2. ELEVATOR LOBBY - NEW TILE FLOORING AND WALLCOVERING. REMOVE EXISTING CAN LIGHTS AND REPLACE WITH LINEAR LED FIXTURES.
3. WINDOWS - REPLACE EXISTING METAL MINI-BLINDS WITH MANUAL VINYL SHADES ('MECHOSHADE MECHO/5' OR SIMILAR)
4. WALLS ALL WALLS TO DECK. COMPARE PRICE WITH AIR BOOTS
DEVICE (PRINTER, COPIER, SCANNER)
FILING CABINET
WHITE BOARD
Design 06 August 2019
UP UP LAMAR LEBLANC ESS WALKOVER TALALAI DEPARTMENT LEGEND ALLSCRIPTS INFO SECURITY INFO SYSTEMS (LAMAR) INFO TECH (ESS) IS APPS (LEBLANC) IS-OTHER OPEN OPS TECH/BUSINESS (WALKOVER) PROJECT MANAGEMENT SELECT RUSSELL MCDONALD FELISMINO KIYABU SAIZ COVER KOSKER OPEN POSITION MILLER OPEN POSITION WITTEKIND WOLFF OPEN POSITION MURRAY STOR/PRINT SERVER OPEN HUERTAS TELE. ELEC. OPEN POSITION 12 4 3 6 5 78 9 1011 13 15 17 19 14 16 18 2021 23 22 24 26 25 27 28 12 291 23 4 1 5 2 3 3 1245 67 2 1 4 3 5 67 9 8 1011 12 1 1314 1516 2 1 17 18 1 19 2 4 3 9101112 78 6 5 1314 19 18 16 17 22 21 6 5 23 26 2425 2829 27 33343536 41 40 38 3739 30321 4 2 31 3 56 79 8 4243444546 51 50 48 4749 52535455 60 59 57 5658 1 2 15 20 4 BENCH SEATING WITH
STACKABLE CHAIRS TOASTER REFRIGERATOR TRASH ICE/WATER MACHINE PRINTER COFFEE MAKER FAX MACHINE SHREDDER LATERAL
MICROWAVE COFFEE CARAFES SINGLE FREEZER MULTI-FUNCTIONAL
MOBILE
SYMBOL DESCRIPTION SYMBOL DESCRIPTION LEGEND BINDING KITCHEN SINK Project Client Project Number
FLOOR PLAN CONCENTRA - SPECTRUM RENOVATION LEVEL
CONCENTRA 319010 Schematic
SCOPE OF WORK ARCHITECTURAL BASE
LAPTOP TABLES
PROPOSED
07
BID:
MEP PRELIMINARY BUDGETING ZINA IDF STOR. VENHAUS NELSON LITTLEJOHN TONSI OLINGER ROLDAN LEONARD WILLIAMS KALKA BANNISTER NEW HIRE MOSKAU MOROSYUK CANCIENNE BUSH CUNNINGHAM PINA DEPARTMENT LEGEND ACCOUNTING EXECUTIVE ADMIN FINANCIAL PLANNING & ANALYSIS INCENTIVES OPEN PROCUREMENT REPORTING SPECIALTY TELE. WOLF 1012 15 14 13 11 46 9 8 7 5 1 23 12 3 4 17 16 10 8 61 4 12 2 3 11 5 7 9 8 1 6 1 14 1 13 2 2 1 34 56 8 7 910 1112 1314 16 15 1 3 15 2 9 7 5 TABLES (PRINTER, COPIER, SCANNER) Project Client Project Number CONCENTRA - SPECTRUM RENOVATION CONCENTRA 319010 August 2019 22
MAGGIE GRAHAM Portfolio
PROPOSED FLOOR PLAN
1. PAINT ALL NEW THROUGHOUT.
2. FLOORING CARPET TILE AND RUBBER BASE THROUGHOUT.
3. CEILING NEW CEIING GRID AND TILE THROUGHOUT, NEW 2X4 LED FIXTURES.
4. CONF. ROOMS & OFFICES FULL HEIGHT, FULL WIDTH STOREFRONT ('RACO' OR SIMILAR)
5. COLUMNS REMOVE GYP BOARD FROM ALL SIDES OF COLUMNS TO EXPOSE CONCRETE
6. CASEWORK HPL ON VERTICAL SURFACES AND CAST PLASTIC ('CORIAN' OR SIMILAR) SURFACING WITH FULL-HEIGHT TILE BACKSPLASH.
7. WALLS - TO GRID, INCLUDE PRICING FOR AIR BOOTS AT EACH ENCLOSED ROOM
8. COLLABORATION ROOMS - CONCRETE FLOOR, OPEN CEILING WITH SUSPENDED ACOUSTIC TREATMENTS/BAFFLES. INCLUDE LINEAR LIGHT FIXTURES AND PAINTED EXPOSED DECK AND DUCTWORK. MAGNETIC BP GLASS FULL-HEIGHT PANELS (APPROX. 85 LF/LEVEL).
9. BREAK ROOM - CONCRETE FLOOR, OPEN CEILING WITH SUSPENDED ACOUSTIC TREATMENTS/BAFFLES. INCLUDE LINEAR LIGHT FIXTURES AND PAINTED EXPOSED DECK AND DUCTWORK. APPLIANCES TO INCLUDE: (2) REF.; (2) MICRO.; (1) COUNTER ICE/WATER MACHINE.
10. VINYL WALLCOVERING WITH CUSTOM GRAPIC AT SUITE ENTRIES
11. ACOUSTICAL WALL PANELS FULL HEIGHT/WIDTH AT FOCUS/PHONE ROOMS ('FILZFELT' OR SIMILAR)
ADD/ALT:
1. RESTROOMS REPLACE EXISTING CAN LIGHTS WITH NEW LED RECESSED FIXTURES.
2. ELEVATOR LOBBY - NEW TILE FLOORING AND WALLCOVERING. REMOVE EXISTING CAN LIGHTS AND REPLACE WITH LINEAR LED FIXTURES.
3. WINDOWS - REPLACE EXISTING METAL MINI-BLINDS WITH MANUAL VINYL SHADES ('MECHOSHADE MECHO/5' OR SIMILAR)
4. WALLS - ALL WALLS TO DECK. COMPARE PRICE WITH AIR BOOTS
MEP PRELIMINARY BUDGETING
MULTI-FUNCTIONAL DEVICE (PRINTER, COPIER, SCANNER)
FILING CABINET
WHITE BOARD
SINK
Schematic Design 06 August 2019
FOGARTY CC ROOM 3 EXIST. LOUNGE EXIST. FOGARTY CC ROOM 2 FOGARTY CC ROOM 1 IDF GIANG HALL BARTOLETTI GRAY BLACK MOTIL KINZEL BIRKES VANOMMEREN NEW HIRE STOKES BARBOUR KIDDER OPEN POSITION CRAIG MCMULLEN PROCTOR SIMPSON/ REMPFER-HILL JERNIGAN MCCASLIN SOUTHWICK WILSON GUTIERREZ LAROCCA SLACK TELE. ELEC. FIGUEROA RECORDING 12 4 3 5 78 9 6 1011 13 12 1415 17 16 1819 2021 23 22 25 27 26 28 24 2930 32 31 33 352 363 34 1011 4 12 12 4 3 38 5 6 39 40 37 1 2 5 3 7 4 7 9 8 6 12 11 78 10 9 34 6 5 9 2 8 1 67 89 5 4 23 1 31 4 12 DEPARTMENT LEGEND ANALYTICS CLINICAL ANALYTICS HUMAN RESOURCES MEDICAL REVIEW OPEN REIMBURSEMENT SALES & MARKETING SALES OPS TABLES (PRINTER, COPIER, SCANNER) Project Client Project Number CONCENTRA - SPECTRUM RENOVATION CONCENTRA 319010 August 2019 NEWTON DEPARTMENT LEGEND CBOC DEVELOPMENT EXECUTIVE ADMIN HUMAN RESOURCES LEGAL MEDICAL OPEN REIMBURSEMENT SALES & MARKETING THERAPY/SPECIALTY EXIST. BOARD RM EXIST. RECEPTION PHONE RM PHONE RM DICANIO ALLEN CHAPMAN MOORE DEBRUIN SHELTON KENDALL GLAZER WISE GRIFFIN TERRYARELLANO SMITH CHIOULYLESTHOMASDIAZ BANKS EINHORN CONSERPERLSTEINKING DELORIMIER DEVASIA DEMAS DOOLITTLE GOEBEL LEWIS ANDERSON NEW HIRE WALL KLEINER GALLARA GILBERT TELE. IDF ELEC. STOR. HAY BERCAW OPEN POSITION STOR. PRINT 2 34 5 5 4 3 12 3 2 4 3 1 7 9 8 1011 3 12 11 1 6 23 4 5 4 6 2 6 7 5 BENCH SEATING WITH LAPTOP TABLES STACKABLE CHAIRS TOASTER REFRIGERATOR TRASH ICE/WATER MACHINE PRINTER COFFEE MAKER FAX MACHINE SHREDDER LATERAL
MICROWAVE COFFEE
SINGLE
MOBILE
SYMBOL DESCRIPTION SYMBOL DESCRIPTION LEGEND BINDING KITCHEN
Project Client Project Number
CARAFES
FREEZER
CONCENTRA - SPECTRUM RENOVATION LEVEL
CONCENTRA 319010
12
ARCHITECTURAL
SCOPE OF WORK
BASE BID:
Professional Work 23
24
MAGGIE GRAHAM Portfolio
OFFICE BOOTH -B
-A
SCALE: 3/8" = 1'-0" 3B 702 BREAK ROOM -A
ELEVATOR LOBBY -A TYP. LOBBY -B TYP.
SCALE: 3/8" = 1'-0"
621 CONF. ROOM
SCALE: 3/8" = 1'-0"
V.I.F. ELEV.
WDV-1 MTL-1 PNT-4 PNT-9 4 4'6" 2 -541 6 4 -601 V.I.F. 8'8" EQ WDV-1 PNT-4 6 4'5" 2'2" 4 I-541 PNT-10 EXTENTS OF LOGO 16' - 6" H E I G H T O F L O G O 2'10" MAX. 5 4'5" 1" PNT-10 5 -541 1' - 6" 155° 8'5" 4" (3) EQ PANELS 1'8" 4'2" MKB-1 TV (O.S.C.I.) WWB-1
DOOR & FRAME
1C
SCALE: 3/8" 2A ELEVATOR SCALE: 3/8"
1'-0" 2B OPEN
2C
=
OFFICE BOOTH
SCALE: 3/8" = 1'-0"
OPEN
ROOM -B OFFICE -
Professional Work 25
1B
COLLIN COLLEGE WYLIE CAMPUS
Wylie, Texas | 2020
Higher Education
Firm: Page/
Role: Designer
IIDA Texas/Oklahoma Design Excellence Award
After experiencing double digit population growth over the past couple of decades, Collin College found itself needing to add educational programs to serve the residences of Wylie. Collin College embarked on a massive bond program to build a new campus on the land adjacent to the City of Wylie government center. Page was commissioned to guide the College’s vision from a strategic master plan to site development to building design.
This Phase I development of 350,000sf will provide the backbone for the campus life including the Welcome Center, Resource Center, and the Student Center with educational and faculty spaces located in each building for an integrated learning and social environment. The interior finishes compliment the timeless exterior, a Texas Regional style using limestone, multi-tone buff brick, painted steel trellis and clear glass. Color is introduced into the exterior and interior details to provide visual interest and an intuitive wayfinding between buildings within a unified concept for the campus. With the goal of inviting students to stay on campus for individual study and collaboration, open spaces prioritizing natural light and varied furniture solutions was at the forefront of planning efforts.
As designer on this project, my responsibilities included producing planning studies for all campus buildings, interior finish scheme, interior design of millwork, renderings for client presentation, and construction drawings.
26 MAGGIE GRAHAM Portfolio
Professional Work 27
LIBRARY
CAMPUS COMMONS
STUDENT CENTER
Concept
Carpet and Paints 28 MAGGIE GRAHAM Portfolio
(PHASE II) LAB
Color
Accent
Professional Work 29
30 MAGGIE GRAHAM Portfolio
Interior Design Development Campus Design CONFERENCE CENTER Conference Room | Axon View | Option B Seat Count Depicted 168 CONFERENCE CENTER Conference Room | Axon View | Option C Interior Design Development Campus Design Date October 9 2018 Project Collin College Wylie Campus Client Collin College Project Number 317042 STUDENT CENTER Dining Student Lounge | Axon View 26 Professional Work 31
HARLEM HEBREW LANGUAGE ACADEMY CHARTER SCHOOL
Harlem, New York | 2017
Educational K-8
Firm: BL Companies
Role: Senior Project Designer
Harlem Hebrew Language Academy Charter School contained grades K-2 and could not support the expansion of further grades. We developed a solution to expand the existing building an additional 20,000sf on a vacant portion of its lot to the North to provide an additional 6 grades. The renovation of the existing structure also includes space for a new cafeteria, rooftop play space, administrative spaces and installation of new mechanical and life safety systems. In addition, the building will be upgraded to meet current building codes. The new addition will include additional classrooms, elevator and restrooms to support the building expansion.
The school shares the site with a former church, converted to a community center, and future residential building. BL Companies performed a careful analysis of the site and worked closely with our client and the developer/landlord to establish the best use of the property available and maximize the available lot coverage. Sensitive to the historic context of the Harlem community, we designed the building to fit in with its neighbors through the use of color, proportion, scale, and material selection. Our design is respectful to surrounding buildings, especially the original school and neo-Gothic church; however, it maintains its identity as a modern building.
As designer on this project, my responsibilities included producing feasibility planning studies for the addition, developing schematic drawings and facade studies, and executing construction documents. During the production of construction documents, my role included extensive work and research developing and detailing the exterior rainscreen wall system, which includes the use of fiber cement panels.
118TH STREET ST.NICHOLAS AVENUE 117TH STREET ST. THOMAS CHURCH FUTURE RESIDENTIAL (NEW ADDITION) HHLA SCHOOL (EXISTING) CARRIE MCCRAKEN TRUCE COMMUNITY GARDEN LOT LINE 32 MAGGIE GRAHAM Portfolio
Professional Work 33
MAGGIE G R A H A M WELL AP maggie_graham@me.com (214) 208 3551