Architectural Portfolio 2021

Page 1

Magnus Glennie

Fall 2021 Architecture Portfolio

Hi, my name is Magnus,

(647) 763-0997 phone e-mail Insta

mhaglennie@gmail.com @magnus.glennie

I am a 4th-year B. Architectural Studies student at the University of Waterloo in Cambridge, Ontario. I’m interested in architectural design work that challenges our ideas of sustainability, affordability, and the user experience. Outside of work and school, I love to sculpt 3D models, write and record music, and cook with different foods from around the world.

My co-workers have called me insightful, creative, and hard-working. I’m thrilled by the chance to learn something new, and I’m at my best when working with a diverse team of passionate people. If you like creative solutions and beautiful details the way I do, let’s explore them together!

Previously, I have been...

Senior Treasurer - Waterloo Architecture Students Association (WASA)

Finance / Marketing Staff - “galt. Publications” Architecture Magazine

Mentor to 4 First-year students - Mentorship for Architecture Peers (MAP)

IBI ARCHITECTS

TORONTO ACCESSIBILITY UPGRADES

Revit CAD + 3D / AutoCAD / Autodesk ReCap

Construction Documents:

Design Development:

IBI ARCHITECTS

8 MONTH CO-OP

OBC-compliant details and schedules per TADG and City Ergonomics guidelines using team-wide Revit templates across a 75-sheet submission set

Worked daily with mechanical, structural engineers, furniture, product manufacturers, and technologists referncing ReCap, sketch, and photographs

4 MONTH CO-OP

TORONTO HIGHRISE DIVISION

AutoCAD / Photoshop / Sketch-Up / InDesign

Interfaced bi-weekly with Owner, Planner, Project manager, and AoR to design 3D models, CAD drawings, and renders for mid-rise condo SPA.

Client Engagement:

Drafted stakeholder presentations for multiple mid and high-rise proposals using Photoshop, AutoCAD templates, and InDesign

GEC ARCHITECTURE

EDMONTON OFFICE

AutoCAD / Illustrator / Photoshop / Sketch-Up / Excel

Design Development

Design revisions, render models and clean-up for Edmonton Transit 100% municipal submission. Created concept drawings for urban masterplan.

Marketing Media Graphic clean-up and plan diagramming in submissions for Canadian Architect and Governor General’s Award (AutoCAD, Illustrator).

MINTO COMMUNITIES LTD.

TORONTO BRANCH

Schematic Design: Photoshop / Bluebeam Revu / Excel

Schematic Design

Policy Analysis

4 MONTH CO-OP 4 MONTH CO-OP

Entitlement studies, floorplate analyses, and Pro Forma scenarios in Excel with presentation graphics for executive team, consultants, and stakeholders.

Created and developed Permit applications, SPAs, MSAs. Minor Variance applications, Re-Zoning, and monitored Council meetings and LPAT hearings.

experience
LEED GREEN ASSOCIATE CERTIFIED
2021 awards+ CISC STEEL DESIGN COMPETITION 2018 NATIONAL TOP 10 ENTRIES skills Autodesk Revit 2020 Autodesk ReCap 2020 AutoCAD 2021 Rhino 6 / 7 V-Ray Lumion 9 Adobe Suite Photoshop Illustrator InDesign Comfen 5 Blender U OF W PRESIDENT’S SCHOLARSHIP 92% ENTRY AVERAGE
AUGUST

IBI GROUP

100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com

August 25, 2021

To whom it may concern,

My name is Elizabeth Fenuta, an architect with the Toronto Accessibility Upgrades division of IBI Group’s Toronto West office, and full time lecturer for Humber College’s architectural technologist course. I am writing this letter to recognize Magnus Glennie for his exceptional contributions to our projects and the work environment at IBI during his eight month co op work term. During his time in our office, he has:

Coordinated independently with the PM, technologists, engineers and subconsultants to create detail drawings for 50%, 90%, Permit and Tender submissions, hosting meetings over Teams to further demonstrate our design intent.

Communicated via email and verbally with external subconsultants and stakeholders in a professional, concise manner which reflected IBI’s values.

Upgraded families, schedules, and templates in Revit models in 3D and 2D capacities based on ReCap scans, photographs, sketches, and the incoming demands of our client across a 76 sheet Revit model

Showed adaptability to time constraints, delivering effective graphics and revisions for stakeholder meetings, sometimes under less than a half hour’s notice.

Proved his research skills and knowledge of the OBC and Toronto Accessibility Design Guidelines, researching precedents and proposing new design changes to solve urgent conflicts in wheelchair accessibility, accommodation for the elderly, safety standards and more.

Contributed to a friendly work from home team environment by working enthusiastically with other designers and seeking further help where necessary.

Showed initiative when taking on new challenges, balancing long term and short term tasks by seeking out tasks and offering help to other designers on our team.

Magnus has shown continued dedication to architecture as a profession and a personal passion for design during the time I have known him. I speak for the team here at IBI Toronto West when I say that we wish he could have stayed longer than eight months, but we wish him luck with his future career. I would recommend Magnus to any office looking for a self motivated, focused designer to deliver creative solutions and effective results to their projects

Sincerely, Elizabeth Fenuta OAA, M.ARCH, MRAIC, HONS. BAS (she/her/hers)

Architect

IBI GROUP 100 175 Galaxy Blvd Toronto ON M9W 0C9 Canada

tel +1 416 679 1930 ext 65130

IBI Group Architects (Canada) Inc. is a member of the IBI Group of companies.

For a list of licensed architects, please see www.ibigroup.com/registered architects

4
4

contents

5
03 04
5
01 02

01 corner club

ADVISORS ADRIAN BLACKWELL, DERECK REVINGTON STUDIO: Our House is on Fire

The demand for social housing in Toronto’s Sherbourne Corridor has never been greater, but gentrification of this historically low-income neighborhood has limited the land inventory available for possible relief. Enter Corner Club, not just a tower, but an urban intervention which inverts the “tower in the park” model; the building runs along the property line, leaving a hollow core for daylighting and visibility. A minimized footprint opens up the neighborhood access between three streets, and the building is expanded to make use of any gaps or negative space lost in a typical tower-podium model. Joined with Diamond & Myers’ famous “Sherbourne Lanes” complex next door, this building becomes a gateway to the community and a moment of relief in a high-pressure neighborhood.

6
7
8
Ground Floor Site Plan

Level 9+

Level 7-8

Level 5-6

Level 3-4

9
INDOOR PROGRAM SPACE TWO BEDROOM SUITE ONE BEDROOM SUITE COMMON AREA CLINIC EXAM ROOMS WAITING ROOM ADMIN OFFICES

Heat Load Parti

10 Outer sealant on backer rod drained at vertical joints, Vertical joints at 17% slope lined with additional layer of sealant (Air Vapour Control) Pre-cast Concrete SIP panel provides Air Water Control (with line outer sealant at panel joints) Cast-in-place Inner edge of (SUPERSTRUCTURE) #1: WALL TO FLOOR DETAIL (TYPICAL) Vapour Control ARCH 364 2020 FINAL PROJECT 1:5 backer rod (continuous) Thermal Control Continuity Air Control Vapour Control Water Control Thermal Control Continuity Outer sealant on drainage plane to prevent erosion 200 mm 76.2 mm Air Space Concrete Layer "Stonitex" Concrete Exterior Panel System (FINISH) 100 mm 200 mm 20 mm 619.5mm Air Space (Services Allowance) Concrete beam system (between columns) Ceramic Tile Floor Finish TOTAL Floor Assembly attached directly to cast-in plates Inner edge of concrete column (SUPERSTRUCTURE) (Thermally broken alum. frame) Water control membrane as drainage plane protected by preformed metal flashing Metal angle backdam Sealant or glazing Plywood buck or shims Edge of load-bearing wall at the end of the #2: BALCONY DETAIL (TYPICAL) MAGNUS GLENNIE ID #20658391 1:10 200 mm 76.2 mm (SUPPORT, AIR+WATER+VAPOUR CONTROL) Concrete Layer 3" Rigid Insulation (THERMAL CONTROL) Exterior Concrete Layer Drainage Plane (WATER CONTROL) "Stonitex" Concrete Exterior Panel System (FINISH) windows with Low-E Coating Water control membrane as drainage plane Plywood buck Metal angle backdam continuity #3: WINDOW DETAIL (LEVEL 5) MAGNUS GLENNIE ARCH 364 2020 FINAL PROJECT 1:5 Air Control Vapour Control Water Control Thermal Control Continuity 10 C 15 C 20 C KITCHENHALLBATHDORMDORM
Typical Suites and Hallway
Balcony Edge Detail Glazing Connection Detail Wall Detail

Lighting Diagram

reinforced concrete slab 200 mm

terra cotta tile flooring 20 mm 50.8 mm 76.2 mm 200 mm 19.5 mm

ONE-WAY AIR EXHAUST

TRIPLE-PANE GLAZING

11
balconies reject high solar angles during summer dense thermal sink (concrete floors absorb solar energy) east-facing windows in common areas allow daylighting in morning hours

02 the locus

ADVISORS MARIE-PAULE MACDONALD STUDIO: Our House is on Fire

With a burgeoning punk rock scene spearheaded by garage bands from rural communities along the coast uploading music through Souncloud and YouTube, Australia is experiencing a music revival through “Aussie Pub Rock”. Though many rise to popularity with their first albums, the only professional recording studios available are in major cities such as Melbourne and Brisbane, an 8+ hour drive for many artists. The Locus provides the solution: a rural multiplex music studio in the Lockyer Valley where artists can record by day and perform by night. The building itself operates as a full-service studio complete with a large atrium, acoustically isolated small studios for 1-5 musicians, and large studios for 6-10 musicians. The site is landscaped with staff parking, drive-in parking and amphitheatre seating, and an on-site reservoir for filtering road runoff before it enters Lockyer Creek. Indoors and outdoors, the Locus is ready to get loud.

12
13
14 DRAINAGE BASIN basin vegetation Brisbane River lily Tufting plant with strappy leaves up to two metres. Common rush Very hardy vigorous, upright, clumping grass that grows to one metre. Bangalow/ piccabeen palm Medium-tall, fast growing palm to 20+ metres. Lilac flowers followed by bright red fruits December to May. Ivory Curl tree Fast-growing evergreen tree that grows to eight metres. Striking, long, creamy-fragranced flowers Knobby club rush Tough, fast-growing, spreading, tufting grass with upright, dark green foliage up to one metre. Bottlebrush Fast growing, hardy, woody shrub that grows up to two metres that produces beautiful blooms in a variety of single colours. hillside vegetation VEHICLE ENTRY STUDIO drainage parti Interior View - Common Area
Interior
Interior
WARREGOHWY GATTONCLIFTONRD TOOWOOMBARD INDIGENOUS TERRITORIES BY SHARED LANGUAGE SETTLER ECOLOGY: TOWNSHIPS AND HIGHWAYS NATURAL ECOLOGY PRESERVED SITES AND RIVERS AERIAL MAP SITE LOCATION NORTH: CROWS NEST WEST: BRISBANE SOUTH: WARWICK EAST: TOOWOOMBA THE SITE TENTHILL CONSERVATION PARK DWYERS SCRUB CONSERVATION PARK UPPER LOCKYER YUGGERA BARUNGGAM BUNDJALUNG EAST HALDON RINGWOOD PLACID HILLS LOWER TENTHILL WOODLEA GRANTHAM KENSINGTON GROVE REGENCY DOWNS CHURCHABLE MURPHY’S CREEK MT. BERRYMAN GLEN ROCK STATE FOREST LOCKYER NATIONAL PARK 14
Regional Study - Layering
View - Console Area
View - Small Studio Exploded Isometric

shade vegetation barrier vegetation

15 14000 6000 5300 Common Sedge Tall sedge growing to 80 centimetres. Attractive large, yellow seed heads in spring. Native Iasiandra Hardy bushy shrub to two metres. Showy large pink/purple flower in summer. Purple Pea bush A small to medium fast-growing shrub which is stunning in flower. Mat rush Deep green, glossy, narrow strap leaves to one metre. Grevillea Showy, evergreen plants that grow to two metres with nectar-rich flowers. Tea tree A bushy rounded shrub that grows to five metres.White flowers cover the shrub in spring. Banksia Hardy evergreen shrubs with attractive foliage with bold single colour flowering spikes.
STUDIO PEDESTRIAN AUDIANCE VEHICLE “DRIVE-IN” VEHICLE ACCESS LANDSCAPE BARRIER HIGHWAY semi-permeable HOMOSOTE SHEATHING ROCKWOOL ACOUSTIC BAFFLE ROCKWOOL INSULATION BETWEEN 2"X8" STUDS @ 800MM O.C. EPS RIGID INSULATION DEEP-STAIN EXTERIOR SHEATHING AIRSPACE L.E.D. DISPLAY ANCHORING @1600MM O.C MOUNTED L.E.D. DISPLAY SCREEN SURFACE 20mm 185mm 145mm 50mm 20mm 50mm VARIABLE COMBINED AIR + VAPOUR BARRIER N/A TOTAL WALL DEPTH 470mm ALUMINIUM FLASHING HIDDEN DRAINAGE SCUPPER FLEXIBLE STEEL JOINT CONNECTION FROM TIMBER POST TO BEAM 200mm 50mm 1000 5000 2000 10000 10m 5m 2m 1m B A B A
Program Section AA Full Plan Section BB SERVICE BASEMENT SMALL RECORDING STUDIO LIVE PERFORMANCE STAGE AUDIENCE SEATING 1000 2000 5000 SCREEN SLIDES AWAY, CORRIDOR BECOMES STAGE LEFT AND RIGHT WINGS CONCRETE BARRIER DIVIDES SEATING AND PARKING TO PREVENT ROLLING COLLISIONS CONCRETE BARRIER DIVIDES SEATING AND PARKING TO PREVENT ROLLING COLLISIONS STUDIOS ARE ISOLATED AND INSULATED WITHIN THE BUILDING FABRIC 15
Studio Wall Detail

03 malaysia

ADVISORS

STUDIO: Aquatic Architectures

Though not typically fatal, seasonal flooding in the Kuantan region of Malaysia is devastating to local economies and lifestyles. Working under Elizabeth English, head of the Buoyant Foundation Project, we proposed an alternative to moving the house: build it to float. Using an underside chassis connected to vertical guidance posts and connected to site infrastructure via umbilical cables for water, sewage, and electric, the retrofitted structure can now comfortably endure long periods of flooding up to 1.7m high. A powerful solution with a simple mechanism, this buoyant housing retrofit hopes to inspire flood-impacted regions to adopt long-term solutions, and prove that great design solutions do not need to sacrifice affordability.

Context Map 16
17

systems diagram

ORIGINAL STRUCTURE
18

V.G.P. Attachment

BuoyancyConnection

19

A space-efficient transitional duplex housing concept based on the surplus of abandoned brownfield parcels in Galt, paired with Cambridge’s high demand for effective transitional housing. The question we asked ourselves as designers was “How do you live a creative life?” Mazlowe’s Hierarchy teaches us that after survival and social needs are met, we desire self-actualization, and our goal was to provide the maximum freedom in a limited space. Residents can choose to share only the kitchen, or even the entire house with pullaway walls and expansive double-height studio suites where bedrooms mezzanines provide a perch to observe the inside and outside world. Salvage means rehabilitation of the land and community, a tactical insertion of compassion into an industrial landscape and a space for people to recover on their own terms by defining their own way of life.

20
04 salvage
Exploded Isometric

Furniture Explorations

21
22 Level Two Level One CLT Assembly Form Parti 22
23 23
24 Minto Communities Ltd. PERMIT APPLICATIONS FLOORPLATE ANALYSIS (SD) RE-ZONING PROPOSALS MASTER SITE AGREEMENTS 05 previous contributions 295 Jarvis Street Condominiums, Toronto CONTRIBUTION: FLOORPLATE ANALYSIS, RE-ZONING PROPOSALS, SITE PLAN APPROVAL
25
inc. SITE STRATEGY ANALYSIS LEED CERTIFICATION REFERENCE MODEL DESIGN CLIENT PROPOSAL PRESENTATIONS (SD) 90%-100% SITE PLAN APPROVAL (DD) Edmonton Transit
CONTRIBUTION: 3D DESIGN, RENDER PREPARATION, SCHEMATIC DESIGN
gec architecture
Service: Northwest Extension
26 IBI Group Architects - High Rise 3D REFERENCE MODELS ORTHOGRAPHIC DRAWINGS CLIENT PRESENTATIONS (SD) LANDSCAPE AND PARKING STUDIES 743 Warden Avenue Condominiums CONTRIBUTION: 3D MODEL, PRELIMINARY RENDERS, PLAN/SECTION/ELEVATION ORTHOGRAPHICS, CLIENT PRESENTATIONS. Vaughan Metropolitan Centre CONTRIBUTION: PARKING DESIGN, ELEVATION GRAPHICS
27 2795 Bathurst St. Condominiums CONTRIBUTION: 3D MODEL DESIGN, SECTION/ELEVATION ORTHOGRAPHICS
Let’s start a conversation (647) 763-0997 mhaglennie@gmail.com