Magnus Glennie's 2019 Architectural Portfolio

Page 1

MAGNUS GLENNIE PORTFOLIO 2019


contact

MAGNUS GLENNIE phone

(647) 763-0997

e-mail

mhaglennie@gmail.com

web instagram

www.mglennie.com @magnus.glennie

experience Jan - May, 2019

skill set DEVELOPMENT COORDINATOR

MINTO COMMUNITIES LTD.

- Worked on legal applications, entitlement studies, and site investigations across six

Rhino 5

Sketch-Up

major high-rise projects

- Prepared contracts and diagrams for municipality, executive team,

Maxwell 12

V-Ray 2018

consultants, and stakeholders

- Designed floorplate proposals for real estate and architectural teams - Checked and corrected architectural plans for MSA proposals - Couriered sensitive documents to the city, lawyers, and stakeholders

May - September, 2018

Bluebeam Revu

already-construdcted high-rise residence, presented to executive team

DESIGN-BUILD TEAM

BUILD / dowlingarchitects

InDesign

- Worked from fabricator drawings, architectural plans, and the Architect’s instructions

Illustrator

- Laid basement sub-floor of sealant, insulation, radiant heating, and smooth concrete.

Photoshop

Honours B. Architectural Studies (pre-professional), University of Waterloo

FABRICATION Hand Modeling CNC Routing 3D Printing

2018

CISC Steel Design Competition: Finalist

2017

President’s Scholarship (90%+ Avg.)

2012

Chief Scout of Canada Award

extras

1

ADOBE

- Project: New private library out-building and a rear home extension renovation

honours

September 2018 - Present

2D AutoCAD 2019

education

May 2019 - Present

Grasshopper

- Created architectural diagram and cost evaluation for storage locker installation in an

- Laid re-bar and poured concrete for patio / outdoor stairwell

September 2017 - Present

3D

Public Representative for UWSA “Sustainability Collective” Editor, now Bookkeeper for galt. Publications


2


01 ZOETROPE ADVISOR: DERECK REVINGTON STUDIO: ARCH 292 The final work in a four-month series of explorations seeking to understand the function of affect in architecture, Zoetrope draws on film, sculpture, and philosophy to craft an inspiring spatial experience for its occupants. When purpose is stripped away, we discover that the function of affect is something independent of meaning.

5 3


Day at the Gallery

4 6


Mid Section

Entrance Section

5 7


6 8


7 5


Night in the Courtyard

8


02 THE IDLER’S INSTITUTE ADVISOR: DONALD MCKAY STUDIO: ARCH 193

A speculation on the future of libraries based on past and present examples. Community center and public library combined into a single community hub, this design will meet the growing local demands for safe and forward-thinking educational spaces as the Toronto Junction area evolves into a denser, busier climate.

9


Assembly Diagram

10


11


Superstructure Concept Graphics

Width Section - High-line Entrance

Longitudinal Section

12


13


Site Plan

14


03 SALVAGE ADVISOR:

DONALD MCKAY

STUDIO:

ARCH 193

CO-CREATORS:

MADDY KIM, JACK

DEMAREST, ALEXEY

VASILIEV, SARAH SOUDKI,

Mazlow’s hierarchy shows us the universal need for self-actualization. Given a small brownfield parcel in Cambridge, Ontario, and a very real demand for community shelters, challenges arise and a core philosophy motivates solutions: “How can we live a creative life?” SALVAGE is a collaborative effort to convert abandoned industrial sites into shelters for people who just want to feel human again.

15


53mm

N/A

139mm

1.18 RSI

60mm

0.55 RSI

STEEL PANEL ROOFING CROSS-LAMINATED TIMBER (LOAD BEARING) IKO ENERTHERM ALU RIGID POLYISOCYANURATE FOAM CLOSED-CELL POLYURETHANE

95mm

4.20 RSI

2mm

N/A

VAPOUR BARRIER

50mm

N/A

GYPSUM BOARD

399mm

5.94 RSI

SPRAY INSULATION

57mm

N/A

9.5mm

0.46 RSI

TOTAL

SHOU SUGI BAN FINISH EASTERN WHITE CEDAR SIDING

129.05mm 5.08 RSI

2mm

N/A

OSB SHEATHING CLOSED-CELL POLYURETHANE SPRAY INSULATION BETWEEN STEEL SUPPORT PLATES (750mm VERTICAL DISTANCE) VAPOUR BARRIER

139mm

1.18 RSI

CROSS-LAMINATED TIMBER

336mm

6.26 RSI

TOTAL

(LOAD BEARING)

300mm

2.55 RSI

CROSS-LAMINATED TIMBER (LOAD BEARING)

50mm

0.95 RSI

RIGID HIGH DENSITY EXPANDED POLYSTYRENE BOARD

200mm

7.87 RSI

CLOSED-CELL POLYURETHANE SPRAY INSULATION BETWEEN STEEL SUPPORT PLATES

50mm

0.44 RSI

WEATHER-TREATED PLYWOOD SHEATHING

600mm

11.81 RSI

TOTAL

1m

2m

5m

Construction Detail

16


17


Activity Section

18


Collapsible Closet (Inspiration Concept)

CLT Assembly Axo

19


Duplex Plan

Duplex Elevation

20


04 PARALLELS ADVISOR: TERRI MEYER BOAKE STUDIO:

CISC ARCHITECTURAL STEEL

DESIGN COMPETITION (FINALIST) CO-CREATOR:

AURORA CHI

PARALLELS was conceptualized as a structurally creative response to U.S. President Trump’s eight 10-metre high wall prototypes in San Diego, California, introduced in October 2017 to be erected along the United States / Mexico border. More than just a viewing platform, PARALLELS tackles a dialogue about the positive and negative potential impacts of architecture on the global community.

21


A Concert at Night

22


23


24


LET’S START A CONVERSATION

MAGNUS GLENNIE 2018 (647) - 763 - 0997 MHAGLENNIE@GMAIL.COM mglennie.com