
1 minute read
Greendale Construction starts 12-month SCOLA refurbishment
Greendale Construction has started work on a 12-month SCOLA refurbishment project for The Wavell School, in Farnborough.
The 12-month works for Hampshire County Council will be split into four phases to enable the school to retain use of parts of the building.
Advertisement
Andy Musselwhite, contracts director for Greendale Construction, said: “The main works involve the removal of the 1960s designed existing external façade and roof, and replacing with new, highly insulated brick slip façade and replacement roof. This includes new aluminium double glazed windows, and a number of internal upgrades, including Natural Ventilation with Heat Recovery (NVHR) units to provide tempered fresh air to classrooms.” www.greendaleconstruction.com