IMAGE GANDHI ELECTRO MECHANICAL WORKS Specialists in HVAC Systems & Structural works
INDEX INTRODUCTION
03
VISION & MISSION
05
SERVICES
06
COMPANY STRUCTURE
08
MAJOR PROJECTS
12
PROJECTS EXECUTED (VALUE)
24
GENERAL BUSINESS INFORMATION Legal Name(S)
Gandhi Electro Mechanical Co Gandhi Air Conditioning Systems
Lisence No
577959 602498
Legal Type
Limited Liability Company (L.L.C)
Office Address
Office No. 1, Alpha Offices Building, Nad Al Hammar, Dubai, UAE, PO Box 30925
TRN Tax Group
100539235000003
Telephone No:
Electro Mechanical Co.
(04)-2896057 (04)-2896054 - Fax
Managing Partner Raja Sankar
G a ndhi
Mobile No:
Mail ID (office)
eemwac01@gmail.com
Mail ID (work)
rajasankar@gemcomep.com
(050) -4560451
INTRODUCTION
IMAGE
Gandhi Electro Mechanical & Gandhi Air conditioning Systems is a part Everest Group of companies, established in the year 1996 initially in the name of BLUESKY, located in Dubai, U.A.E with an earnest effort to serve our valued clients in a professional and efficient way and cater to the ever growing requirements in Mechanical and Electrical works those were kept changing time to time with an update of new technology in the field of MEP of the Construction industry. We have initially started our operations works at United Arab Emirates in the field of Mechanical & Fabrication works. After few years of our operation, we were successful in securing satisfaction of beloved clients, which paved way for our company’s ventures in to other areas like Designing, Execution, procuring along with the maintenance of all our execution in addition to maintenance contracts.
VISION & MISSION We will pursue the development of our financial and human resources through diversified business activities, in an ethical and socially responsible manner and in pace with the advancement of the day. We will uphold a professional code of conduct in the pursuit of our goal and are committed to taking up social responsibilities as a corporate citizen by dedicating a significant share of our productive surpluses for espousing social causes that would benefit our employees, their families and society at large Setting targets and achieving goals is the primary mission of our association. Always aiming for the highest degree of perfection in all our efforts, we shall be committed to continually acquiring and developing skills that help achieve goals. Most importantly, we shall continue promoting and nurturing the pioneering spirit of man, in our continual quest for growth.
IMAGE
SERVICES The main purpose of this establishment, Everest Group of companies is in fact to provide our valuable clientele with all the services of a single partner, allowing them to make coherent decision on complete engineered packages needed in the MEP construction industry.
IMAGE
IMAGE
Chilled Water Piping System works
Design, Fabrication & Installation of support system
Installation & Testing of complete works related to water and Air distribution systems from Piping Installation, Equipment erections with its valve assembly, Insulation until its final testing stages.
We design the support with stress and load calculations as required and fabricate the support at site or workshop and carry out the installation at site.
IMAGE
Execution of Firefighting Projects Installation of fire pumps, sprinklers, fire hose reel cabinets, breeching inlets and all sorts of piping works that was required to get the system works as per the project requirement.
COMPANY STRUCTURE With over 100 specialized skilled workers on Chilled water piping systems and the ability to increase the manpower to 200 is one of our key backgrounds to company structure
TECHNICAL STAFF
MANAGEMENT SUPPORT
Our company’s main strength is derived from the experiences and dedicated engineers who are well versed in taking right decision in accordance with the site’s demand. The engineers and supervisors are given direction to go full pledged commitments to the main objective of the company via customer satisfaction.
The management of the company is structured to give maximum management support to the engineering division with sufficient engineers and draftsmen. A brief profile of the key members of the management is enclosed.
INFRASTRUCTURE Having been in the construction business since 1996 under this company and since 1975 associated in elsewhere but on various companies and through our joint well-wishing arguably due to long term relationship with the company like M/s.ETA, M/s. International electromechanical works, M/s. Al Futtaim engineering and sterling Wilson electromechanical works has well established infrastructure for execution of operations. We have a modern office setup, advances equipment and tools, storage yard, transport division with the fleet of different offices.
TRAINING AND DEVELOPMENT We have organized and laid great emphasis on conducting in house and on the job training for all our personnel. All new personnel are put through a rigorous induction/training program and are also given practical training so that the quality of work does not fall below the described standard.
PROJECT EXECUTION The most important aspect of our engineering division is our planning and monitoring of the project activities to ensure timely completion of the projects. As soon as the order is placed the planning engineering group prepares detailed work schedules, store projection and cost estimates. A manual for the construction of site management acts as guide for the engineers to ensure quick mobilization of the site, starting from the main project, monitoring and review of the activities.
DATABASE
HEALTH & SAFELTY ENVIRONMENT
TQM (Total Quality Management)
One of the prime parameters in the operational setup is HSE. All personnel are trained to know the essential features of HSE requirements and a strict watch is kept at various levels to ensure that instructions are enforced rigidly in this regards.
The company ensures that our activities and policies are in line with total quality management system and we take up quick follow up action on any complaint during maintenance period or thereafter. We all put in teamwork for complete customer satisfaction.
We have vast experience in a variety of construction jobs. Over a period of time, we have established a wide data-base and latest techniques which is accessible to all our staffs.
OUR PORTFOLIO
MOBILITY PAVILION, EXPO 2020 Mobility Pavilion is thematic district in EXPO bridging to oppurtunity by connecting people, goods and ideas and provising easier access markets, knowledge and innvovation. Client
Dubai EXPO
Main Contractor
Al Futtaim Constructions
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
-
Commercial Date
September 2018
Completion Date
April 2019
Scope of works included construction/installation of Chiller plant room with condenser piping network to cooling towers. The works included installation of 3 nos 1800 tonnes each water cooled chillers with 800 mm dia piping to 6 nos cooling tower with all structural supports as per specification. Our works includes ETS room for Parcel A works and associated works.
MARSA AL SEEF, AL SEEF Client
MERAAS
Main Contractor
Ducto Balfour Betty L.L.C
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
ATKINS
Commercial Date
June 2017
Completion Date
June 2018
Marsa Al seef, Phase 3 ‘s chilled water system has 4-5 nos separate air cooled chillers at the roof of 5 building out of as many as 55 buildings serving approximately 4500 tonnes of chilled water to the complete network including Basement 1 & Basement 2
DUBAI LAND RESIDENTIAL COMPLEX DISTRICT COOLING PROJECT Client
EMPOWER
Main Contractor
AMANA PIPELINE COMPANY
MEP Sub-Contractor
-
MEP Consultant
EMPOWER
Commercial Date
March 2017
Completion Date
October 2017
Installation of chilled water pipes ranging from 1200mm dia to 600 mm for the complete project network. The project adheres to strict welding regulations and incorporates approved 6G welder from EMPOWER and 100% NDT for every joint welded. The project will serve cooling water to the existing and new establishment in Dubai Land.
AVENUE MALL –CITY WALK PHASE-2 Client
MERAAS
Main Contractor
Al Futtaim Carillon
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
WSP Middle East
Commercial Date
October 2014
Completion Date
July 2015 Handed Over
Installed the complete chilled water piping system, the network consists of 7 Chillers, 7 primary pumps, 7 condenser pumps, 6 cooling towers and chilled water pipe dia starting form 800 mm to small sizes connecting to complete 756 nos FCU, 64 AHU nos valve assembly. The project involves construction of a family entertainment and retail development spread out in an area of over a million square feet. It will have a REEL Cinema Citywalk that will include 7 premier and 3 platinum screens covering over 7,000 sqm
FAMILY HOTEL & SA2 ,BLUE WATERS, DUBAI Client
MERAAS
Main Contractor
BROOKFIELD MULTIPLEX
MEP Sub-Contractor
JAMES L WILLIAMS
MEP Consultant
CKR
Commercial Date
September 2015
Completion Date
June 2017
Blue Waters is a man-made island located off the coast of Jumeirah Beach Residence. It would center the world’s largest observation wheel, forms the unique centerpiece of this development that is poised to become one of the world’s largest tourism hotspots. Family hotel consists of piping network mainly serving hotel guest rooms and equipment of around 30 AHU (including valve assembly) & around 910 FCU. The ETS room consists of 7 Heat exchangers and 14 pumps serving both Family hotel and Service apartment which itself have around 850 FCU and 34 AHUS.
MIRDIF CITY CENTRE, MIRDIF, DUBAI Client
Majid Al Futtaim
Main Contractor
ALEC
MEP Sub-Contractor
Emirates Trading Agency
MEP Consultant
WSP Middle East
Commercial Date
August 2008
Completion Date
February 2010
Mirdif City Centre is a shopping mall located in the residential area of Mirdif, in Dubai, United Arab Emirates. Mirdif City Centre has a area of 196,000 sqm, houses 465 retail stores and is the first shopping mall in the region to have been awarded a Gold LEED rating for its environmentally sustainable design.
CLEVELAND CLINIC, AL MARYAH ISLAND, ABU DHABI Client
Mubadala
Main Contractor
Belhasa Six construct & Samsung
MEP Sub-Contractor
Emirates Trading Agency
MEP Consultant
AECOM
Commercial Date
September 2010
Completion Date
February 2014
The Cleveland Clinic Abu Dhabi is a multi-specialty academic medical centre located in Abu Dhabi, UAE. This 364 (expandable to 490) bed facility will be an extension of the Cleveland Clinic model of care, offering a range of tertiary/ quaternary medical services.
DUBAI SPORTS COMPLEX, DUBAI Client
Dubai Municipality
Main Contractor
Bin Laden Cont. Group
MEP Sub-Contractor
Saudi Bin Laden
MEP Consultant
Arup Gulf Ltd.
Commercial Date
October 2009
Completion Date
March 2010
Dubai Sports Complex is a multi-purpose stadium in Dubai, United Arab Emirates. It hosted the 2010 FINA World Swimming Championships (25 m), in which 153 countries participated.
DUBAI INTERNATIONAL AIRPORT CONCOURSE 3, DUBAI Client
Dubai Aviation
Main Contractor
ALEC
MEP Sub-Contractor
Emirates Trading Agency
MEP Consultant
Dar- Al- Handash
Commercial Date
June 2011
Completion Date
September 2012
Undertook the installation of all the major plant rooms, from pump installation, AHU assembly, fans installation, tunnel services, rotunda units etc.
DUBAI INTERNATIONAL AIRPORT CONCOURSE 4 EXPANSION, DUBAI Client
Dubai Aviation
Main Contractor
ALEC
MEP Sub-Contractor
BK Gulf LLC
MEP Consultant
Dar- Al- Handash
Commercial Date
February 2014
Completion Date
Feb 2015
Installation of complete chilled water piping and AHU valve packages for four plant rooms at arrivals & departures zone. An additional of 17 rotunda plant room packages was commissioned in the final stages.
MASDAR HEAD QUARTERS, MASDAR CITY, ABU DHABI Client
Masdar, A Mubadala Group
Main Contractor
Brookfield Multiplex
MEP Sub-Contractor
James L Williams
MEP Consultant
HOA RE LEA Consul. Eng.
Commercial Date
June 2013
Completion Date
February 2014
The Masdar Headquarters complex is set to become one of the most sustainable, energy-efficient offices in the United Arab Emirates and, once complete, will house the headquarters for Masdar and the International Renewable Energy Agency (IRENA). Located in Masdar City – a clean technology cluster and low carbon city in Abu Dhabi – the 32,000sqm, 7-storey Grade A office and retail complex will consist of three oval-shaped buildings fitted with 1,000 square meters of rooftop photovoltaic solar panels that will supply renewable electricity to tenants.
TOYOTA SERVICE CENTRE, DUBAI
Client
Majid AL Futtaim
Main Contractor
Khansaheb
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
OAL Architects
Commercial Date
February 2006
Completion Date
October 2006
Installation of complete chilled water piping and AHU valve packages for four plant rooms at arrivals & departures zone. An additional of 17 rotunda plant room packages was commissioned in the final stages.
D1 TOWER, DUBAI Client
Emirates Sun Land Group
Main Contractor
Kele
MEP Sub-Contractor
Hastie International
MEP Consultant
National Eng. Bureau
Commercial Date
February 2006
Completion Date
October 2006
Need Text
DUBAI INTERNATIONAL AIRPORT CONCOURSE 4 EXPANSION, DUBAI Client
Dubai Aviation
Main Contractor
ALEC
MEP Sub-Contractor
BK Gulf LLC
MEP Consultant
Dar- Al- Handash
Commercial Date
February 2014
Completion Date
Feb 2015
Installation of complete chilled water piping and AHU valve packages for four plant rooms at arrivals & departures zone. An additional of 17 rotunda plant room packages was commissioned in the final stages.
RUWAIS HOUSING COMPLEX, AL RUWAIS Client
ADNOC
Main Contractor
ASCON
MEP Sub-Contractor
International Elec. Mechanical
MEP Consultant
ALTORATH Eng. Consultant
Commercial Date
March 2011
Completion Date
June 2011
Need Text
AL SUFOUH TRANSIT SYSTEMS, DUBAI Client
RTA
Main Contractor
Six Construct
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
SYSTRA
Commercial Date
November 2013
Completion Date
August 2014
Under took the installation of plant room for the tram station with 2 air cooled chillers and 7 pumps including major AHU plant rooms for the service buildings.
AL NASR STADIUM, DUBAI Client
Al Nasr Group
Main Contractor
BIN LADEN GROUP
MEP Sub-Contractor
Bin Laden constructions
MEP Consultant
-
Commercial Date
June 2018
Completion Date
November 2018
Need Text
IKEA FESTIVAL PLAZA Client
Al Futtaim
Main Contractor
Al Futtaim Constructions
MEP Sub-Contractor
Al Futtaim Engineering
MEP Consultant
BSG
Commercial Date
May 2019
Completion Date
September 2019
Undertook the installation of plant room works with 4 nos (1200 tonnes each) watercooled chiller with 23 nos primary pumps serving to different zones of the mall. Installation included 4 nos cooling tower with 5 nos condenser water pumps. The works was completed in constricted time and executed structural works.
PROJECTS EXECUTED S.NO
PROJECT
CLIENT
PROJECT WORTH (AED)
1
AVENUE MALL, CITY WALK
Al Futtaim Eng.
4,210,000.00
2
BLUE WATERS
JLW
3,170,000.00
3
MIRDIF CITY CENTRE
ETA
10,559,601.00
4
CLEVELAND HOSPITAL
ETA
9.922,181.00
5
7WX TOWER
ETA
5,273,701.00
6
DUBAI AIRPORT, C3
ETA
3,220,576.00
7
DEIRA CITY CENTRE
ETA
3,628,910.00
8
DUBAI MARINA TOWER
ALEC
1,708,040.00
9
HOTEL JAL TOWER
Hastie Intl.
3,079,076.00
10
D1 TOWER
Hastie Intl.
2,050,037.00
11
PRINCESS TOWER
ETA
1,030,505.00
12
JBR TOWER
ETA
1,472,870.00
13
IKEA ABU DHABI
Al Futtaim Eng.
652,00.00
14
METRO, DUBAI
Al Futtaim Eng.
853,868.00
15
DUBAI SPORTS COMPLEX
Bin Laden
813,00.00
16
MASDAR H.QUARTERS
J.LW
754,000.00
17
IKEA Big Box, Jabel Ali
Al Futtaim Eng.
1,750,000.00
18
Mobility Pavilion, Expo 2020
Al Futtaim Eng.
2,250,000.00