Thanks you all for visiting rei expo 2017 at greator noida exibition (20th 22nd sept 2017)

Page 1

Thanks you All Exhibitors and Visitors who has visited REI EXPO 2017 Inspire me to Show Sun Power again in Year 2018 Let Commit to Gather

Grand Success from JMV LPS Ltd Picture to abhi Suru huwi hey Dostoan Salamat aur Phalta Phulta Rahe Dostana Hamara Exhibitors and Visitors both are Bond togather without Thanks and Appericiation this Exhibition will not Compelet Lets do our Duty(Target 175GW)


Exhibitors and Visitors(Customer) are my HERO Thanks you all from SUN Heart with Sunny SMILE


• • • • • • • • •

India Plan 100GW Solar Power in Year 2022 Solar Power Now Changing Many Phases Use with Genset Use with Wind Power Use with High Energy Storage(Battery) Instalation on Ground/Cannel Mounted Instalation on Roof (Building) Instalation on Water (Floating) Instaltion on Building(BIPV Building Integrated Transparent Photovoltaic Solar Glass • Follow NBC2016 Follow IEC62305 • Follow IEEE 80 Follow NFC 17-102


Exhibitors Duty/Responsiblity Since we have are host and welcome our Prestegious Visitors(Customers) at our stall and shown our display products and attended Technical and Commercial quiries our duty to send thanks with address to their quries or in general thanks mail but as per herarky try to send separate mail not in bulk form. If you have local presence at Visitors(Customers) area and you have enquiry try to attend asap Sampling or Technical Document which you have not offered at the time of Exhibition kindly do send asap with reference to your meeting at stall because if delay always chance to loase opportunity and this may one reason of Failure by many companies leads not turn to bussines because they do not attend important lead in time and do not do proper Follow-up. Remarks this is my feedback if some one not agree my Applologies for same in advance


Visitors(Customers) Duty/Resposiblity Since you have been in the Exhibitors stall and their staff has host you and shown products which they have kept for display and also attended your quiry if any you have raised and they have noted . Your one appreciation letter or thanks letter may boost energy and exhibitor feel their investment of Time , Money and Display efforts is recovered and difinitely next year you will find they will Exhibit more and more new Innovated products by them this is one place and opportunity without investing your money and much time in one place you are finding the products which may be you are looking for but not found supplier let appreciate for same to Exhibitors. Remarks this is my feedback if some one not agree my Applologies for same in advance


Thanks ,Appreciation or Sorry everthing should come from heart this is not just Word Realy Mean and feel Because of crowed or some bussy if you Feel by unknowing you have heart any body who has visited Stall (Exhibitors) or Have wrong argument by Vistors reason may be anything JUST SAY SORRY . If you found some your know visitors has visited your stall with more Visited who you have no contact earlier send thanks letter separate for doing this favour by your known visitors, Visitors should send appreciation notes to exhibitors if they have found some new information which they was looking for Remarks this is my feedback if some one not agree my Applologies for same in advance




Renewable power Microgrid control system

Energy storage and grid stabilization



Sikhane ke liye Aap Aaye Aapka Sukriya Electrical &Human Safety First


An Arcing Fault is the flow of current through the air between phase conductors or phase conductors and neutral or ground. Concentrated radiant energy is released at the point of arcing an a small amount of time resulting in Extremely High Temperature.



Fire Accident in Solar PV Power Plant Reason Lose Contact Earthing Disorder and Lightning


Solar Panel Fire Accident


Surge in Systems and Result


Surge in DC Application



Earthing Design and Require Result • For substation Large Power below 1.00Ohm • For substation Small Power below 2.00Ohm • SCADA/TELECOM and AutomationFor substation Large Power below 0.50Ohm • Tower and Other Structure between 8-15Ohm • Lightning Surge Protection 50KA below 5Ohm or 100KA between 8-15Ohm • Follow Standard IEC /IEEE • Recommended use of Hybrid Metal to Protect from Theft Copper Clad Steel/Alumineum Clad Copper • Exothermeic weld IEEE 837


Maintenance Free - Equipment Earthing


33KV Electrical Sub Station


Grid/Earth Mat Design


Lightning Risk assessment Study is actually the measure of risk of a lightning strike and probability of damages. As Per IEC62305-2.

All these calculations are based on: Lightning strike density inthat particular area(provided byOMV i.e.Ng = 8), Danger for people, Occupation coefficient of structure, Relative location of site, Fire Risk, Associated services, Electrical Lines, Lightning Protection Level, Surge Arrestor and Dimensions of installation.


Risk Assessment Calculator as per IS/IEC 62305


ESE Installation Guidence

ESE AT with radius protection form 32 mtr to 107 mtr. DMC Insulator .

GI/FRP Mast .

Down Conductor Copper / Copper Cadmium Cable 70 sq. mm Copper Bonded Ground Earthing


JMV Products Everything of Electrical Safety and Protection


Products


JMV’s Clients


Contact Professionals for Advise


We Protect You Use Electrical Safety Earthing & Protection


Contact our Team JMV INDIA Leader and Insperation behind Mr.Neeraj Saini neeraj@jmv.co.in Mr.Mahesh Chandra Manav Brand JMV HOD manav@jmv.co.in Solar@jmv.co.in www.jmv.co.in Moblie -919910398999 Telecom -9191204590000


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.