ILLUMINATION of Outer Ring Road


Bongulur Junction


ILLUMINATION of Outer Ring Road


Sulthanpur Junction

LED Lighting on

Outer Ring Road from Kokapet to Shamshabad ( 0 to 136Km.)


ONCE A VISION

Now a reality

Sri Arvind Kumar, I.A.S. Spcl. CS & MC HMDA

The Hyderabad Metropolitan Development Authority (HMDA) has taken up the project “Illumination of Outer Ring Road” to enhance the safety of road users on the Main Carriage way, Service roads, Interchanges and Vehicular/Pedestrian under passes. It was approved by the Govt. of Telangana and has been successfully completed.

Sri Santhosh B.M, I.A.S. MD HGCL

It is the country’s first longest illuminated ring road with a length of 158Km which can be switched on asynchronously with GSM (Global System for Mobile communications) based Automation system. We wish to thank The Hon’ble Special Chief Secretary, MA & UD Dept. & Metropolitan Commissioner, HMDA Sri Arvind Kumar, I.A.S. and The Hon’ble Managing Director, HGCL Sri Santhosh B.M, I.A.S. for bringing this project in reality with their valuable support. We also wish to thank The Hon’ble Member Engineer/ Chief Engineer, HMDA Sri B.L.N. Reddy and The Hon’ble Chief General Manager(Tech)/ HGCL Sri Mohammed Majid Shareef for their invaluable suggestions and guidance at every stage for successful completion of this project.

Sri B.L.N. Reddy Chief Engineer

A summary of the key interventions in completion of this project is presented in this book.

By

Sri Mohd. Majid Shareef Chief General Manager

Electrical Team HGCL


HGCL Electrical Team

Sri P. Sampath Kumar, DGM (Elec.) Sri. B. Madduleti, AE (Elec.)

Sri M. Anil Kumar, AGM (Elec.) Smt. S. Sowmya, AGM (Elec.)


PROJECT Highlights


Pg - 6

Illumination of ORR


LUMINARIES TESTING at CPRI Lab during Tender Evaluation

Photometric Test & Electrical Characteristics

IK 08 (Impact Resistance) Test

Pg - 7


ILLUMINATION OF ORR (PHASE-II) (Kokapet to Shamshabad via Patancheru)

Cost of the Project: Rs.100.22 Crores (Incl. 7 years O&M)

Work carried out by M/s. Sabhari Eletricals. and M/s. KMV Projects Ltd. S.No. Description

1

Main Carriage Way (12m height DA poles with 210w/235w LED Lights with 30m spacing)

4,538 9,076 136

2

Service Roads (7.5m SA poles with 120w LED Lights with 30m spacing)

1,235 1,235 37

3

Junctions(15Nos) (20m/30m High mast with 400w LED Lights)

17 504 -

4

Up & Down Ramps @ Junctions (9.0m height SA/DA poles with 130W LED Lights with 30m spacing)

393

5

Vehicle /Pedestrian underpasses (80w /30w lights)

6

National Highways crossing ORR (9.0m height DA poles with 130w LED Lights with 30m spacing)

Pg - 8

Poles LED Lights Length (Nos.) (Nos.) (Km)

1,443

12

- 690/130 -

TOTAL :

157

314

5.5

6,340

13,392

190.5

Illumination of ORR


N ad

o pur R arsa ) (SH

To N

IC

6

-0

52 + 200

E

W

To Kar imn (SH agar )

Pkg - 2 34 - 67 (33km)

r agpu To N 44) (NH-

ILLUMINATION OF OUTER RING ROAD

S

67 + 000

52200

IC - 05

42 + 700

IC

34 + 000

7

-0

61 + 100

Ra

31 + 000

dia

IC - 04

oa

lR d1

14

Growing Global

Ra dia

lR oad

Radial Ro

0.000

03

d 32

IC -

l Roa

ad 31

22 + 500

Radia

Radial Ro

100.000

ad 12

1

To Mu (NH mbai - 65 )

oa

lR

dia

Ra

5 d1

Pkg - 1 0 to 34 (34 km)

Ro ad 13

IC - 08 Radial Road 9

ad 8

Rad 60.00m PAVEMENT

ial R

5 1

oad

60.00m RIGID PAVEMENT

1

10

Ex

0.45

2.00

BULL NOSE

BULL NOSE

0.45

3.50

2.20

30

RIGID

60.00m PAVEMENT

BULL NOSE

BULL NOSE

5 1

1

oa

Phase - II ( 0.00 to 136.00 km) COST OF THE PROJECT : Rs. 100.22 Cr.

33 d

di

oa

al

Ro

ad

R

ad

ia

lR

Ra

Ra

Ra

IC - 19 Concrete Base 25m

0.55

Long

2.00

2.00

0.55

0.55

9

ial R

4700.000

4500.000

Radial Road 5

4600.000 4800.000

4700.000

4800.000 4900.000

5000.000 400.000

5100.000 200.000

300.000

5200.000 5300.000 5400.000 0.000

5500.000

Ra

dia

ial

ad

oa lR Ra

-1 ad

24

d2

-1

320

68

SULTHANPUR

High mast (20m/ 30m with 400W)

05

100

34 - 67 (33km)

Main Carriage Way (12m with 210W)

1099

2198

363

363

SAREGUDEM,

KEESARA, GHATKESAR,

Service road (7.5m with 120W)

475

Junction Ramps & NH (9.0m with130W)

244

High mast (20m/ 30m with 400W)

07

148

1115

2230

354

354

Main Carriage Way (12m with 210W) Service road (7.5m with 120W)

325

TARAMATIPET,

Junction Ramps & NH (9.0m with130W)

212

PEDDAMBERPET

High mast (20m/ 30m with 400W)

02

166

101 -136 (35km)

Main Carriage Way (12m with 210W)

1160

2320

320

320

26

323

BONGULURU, RAVIRYAL, TUKKUGUDA,

Service road (7.5m with 120W) Junction Ramps & NH (9.0m with130W)

1100.000

TOTAL - 1

03

6,340

90

13,392

900.000

800.000

STOP

STOP

STOP

STOP

STOP STOP

700.000

500.000

600.000

2

300.000

200.000

100.000

To

STOPSTOP

r ga Sa

STOPSTOP

)

H

(S

IC - 13

na

STOP

STOP

Phase - I ( 136.00 to 158.00 km) COST OF THE PROJECT : Rs. 30.00 Cr.

108 + 900

ju ar ag

N

STOP

To Srisailam (SH)

198

Junction Ramps & NH (9.0m with130W)

1000.000

STOP

STOP

IC

-

2328

198

400.000

27

Radial Road 26

d

oa

121 + 500

14

1164

STOP STOP

STOP

Rad ial R o

IC lR dia

Ra

Radial Road 28

IC - 15

Service road (7.5m with 120W)

LIGHTS

PEDDAGOLCONDA High mast (20m/ 30m with 400W)

STOP STOP

ad 1

1

5

Radial Road 29

4.

0.000

129 + 750

3.

101 + 000

International Airport

re lo ga 4) an 4 B HTo (N

To Vijayaw ada (NH- 65)

Main Carriage Way (12m with 210W)

POLES

PATANCHERU,

67 - 101 (34km)

l Ro

96 + 650

IC - 16

KOLLUR,

MEDCHAL,

89 + 750

oa

142+ 600

136 + 100

2.

KOKAPET,

SHAMIRPET

lR

IC - 17

Phase - 1 136 to 158 (22 km)

22

dia

dia

b ara Vik R) To (MD

Ra

Ra

143 + 800

ad

Radial Road 23

dia

147 + 650

ad

l Ro

3

d2

Ro

0

ad 4

STRETCH / INTERCHANGES COVERED 0 to 34 (34 km)

1.

Radial Road 21

Radial Ro

d Ra

S. No.

Radial Road 20

100.000

IC - 18

Pkg - 3 67 - 101 (34km)

1 oad

Rad

Concrete Base 25m Long

IC - 1

6

154 + 35

2.00

0.55 2.00

02 + 000

81 + 550

-0

oa dia

han ka (SH rpalli )

8

ad 1

Ro dial

IC

d3

158 + 01

lR

To S

P-1

0

lR

- 02

dia

IC

Ra

13 + 900

d

5

9

100.000

60.00m PAVEMENT RIGID

0.000 2.20

14.40

d 17

l Roa

Radia

t.

5

0.55

0.55 2.00

5.50

1.00

IC

BULL NOSE

BULL NOSE

3.05

25.00

HYDERABAD GROWTH CORRIDOR LIMITED

l

ga aran To WH-163) (N

-1

0.45

BULL NOSE 2.20

14.40

73 + 000

16

IC

0.55 2.00

3.50

BULL NOSE

0.45

2.20

RIGID

25.00

3.05

0.55 2.00

5.50

1.00

Rad

l

dia

Ra

Ra dia l

Radial Ro

d7

oa ial R

d

a Ro

S. No.

STRETCH / INTERCHANGES COVERED 136 to 158 (22 km)

116 + 000

Pkg - 4 101 -136 (35km)

1.

SHAMSHABAD, RAJENDRA NAGAR,

Main Carriage Way (12m with 210W) Service road (7.5m with 120W)

POLES

LIGHTS

929

1858

2312

2312 180

TSPA,

Junction Ramps & NH (9.0m with130W)

90

NANAKRAMGUDA

High mast (20m/ 30m with 400W)

35

250

3,366

4,828

TOTAL - 2

Pg - 9


SALIENT Features

1).

Main Carriage Way: The Illumination of MCW of 136Km length is provided with 210/235 watts LED Luminaries with 12 m. height Galvanized Octagonal Poles with 2.5m Decorative double arm bracket at a spacing of 30m between poles. Average Luminance is 30 Lux. (Total No. of Poles 4538 Nos. & 210 watts LED Luminaries 9076 Nos.)

2).

Service Roads: The Illumination of Service Roads is provided with 120 watts LED Luminaries with 7.5 m. height Galvanized Octagonal Poles with single arm standard bracket with 30 m. spacing between poles. Average Luminance is 25 Lux. (Total No. of Poles 1235 Nos. & 120 watts LED Luminaries 1235 Nos.)

3).

4).

Up & Down Ramps: The Illumination of Up and Down Ramps is provided with 130 watts LED Luminaries with 9.0 m. height Galvanized Octagonal Poles with single/double arm decorative brackets with 30 m. spacing between poles. Average Luminance is 30 Lux. (Total No. of Poles 393 Nos. &130 watts LED Luminaries 1443 Nos.) Junction Lighting: The Illumination of junctions is provided with 20/30 m. High Mast Poles with 400W X 10 LED Luminaries and by replacing the lights of existing High Mast Poles. Average Luminance is 50 Lux. (High Mast Poles 17 Nos. & LED Luminaries 504 Nos.)

5).

VUP/ PUP Lighting: The Illumination of VUPs/ PUPs is proposed with LED 80 watts high bay lights and 30 watts street lights. Average Luminance is 30 Lux. (Total Nos. of Luminaries 820 Nos ( 80 watts 690 Nos. and 30 watts 130 Nos.)

6).

National Highway Lighting: The Illumination of NHs are also provided with 130 watts LED Luminaries with 9.0 m. height Galvanized Octagonal Poles with double arm decorative brackets with 30 m. spacing between poles. Average Luminance is 30 Lux. (Total No. of Poles 157 Nos. &130 watts LED Luminaries 314 Nos.)

Pg - 10

7). The special feature of the illumination of ORR is provided with GSM based automation system consisting of

a) Web Based Management for lighting operation remotely from Laptop/Cell Phone.

b) Programming and Reporting System

c) Remote controlling light intensity for dimming and monitoring the functioning of the street lights online.

d) Dimming option of lights up to 10% to 100% in 5 stages or linear dimming for saving the Power consumption during low traffic time.

e) Highly reliable system providing alert messages for

l Power theft

l Short circuit

l Energy leakages, and energy losses due to earth leakages

l Fused lights & health of street lights

l Over/under voltage & Current

l Power failure

Illumination of ORR


MAJOR Materials

Kokapet to Shamshabad via Patancheru Makes of major materials used in this Project:

l Octagonal poles and High Masts

: M/s Valmont Structures Ltd.

l LED Luminaries

: M/s Signify Innovations India Ltd. (Philips) & M/s Lighting Technologies Ltd.

l LT Cables

: M/s Havells Ltd. & M/s Polycab India Ltd.

l Automatic street light control

: M/s Philips Amplight System & M/s Cimcon Automation Pvt Ltd.

Sulthanpur Junction Pg - 11


Edula Nagula Pally Junction Exit No.02

Pg Pg -- 12 12

Illumination of ORR


Pg - 13


Patancheru Junction Exit No. 3

Pg Pg -- 14 14

Illumination of ORR


Pg - 15


Sulthanpur Junction Exit No. 4

Pg Pg -- 16 16

Illumination of ORR


Pg - 17


Kandlyakoya Junction Exit No. 6

Pg Pg -- 18 18

Illumination of ORR


Pg - 19


Keesara Junction Exit No. 8

Pg Pg -- 20 20

Illumination of ORR


Pg - 21


Bongulur Junction Exit No. 12

Pg Pg -- 22 22

Illumination of ORR


Pg - 23


Raviryal Junction Exit No. 13

Pg Pg -- 24 24

Illumination of ORR


Pg - 25


Tukkuguda Junction Exit No. 14

Pg Pg -- 26 26

Illumination of ORR


Pg - 27


POLES INSPECTION

at M/s Valmont Structures Ltd.

Technical Specifications of Octagonal poles and High masts l

Poles shaft is fabricated from special 4 mm thick steel plates conforming to ASTM A 572 Gr 50 with less than 0.06 % silicon content to assure a better and lasting quality for galvanizing.

l

Hot dip galvanizing above 86 Microns as per BS729.

Pg - 28

Illumination of ORR


Tensile Test

Bend Test

TESTING

at NABL Lab

Samples collected for testing Pg - 29


LUMINARIES

Inspection

Technical Specifications of Luminaries l

LED Street Light Luminaries with efficacy > 125 Lumens/ Watt.

l

Housing: High pressure Die-cast LM6/ADC12 Aluminum housing with

corrosion resistant Polyester powder coating with Separate optical compartment.

l

Non-Corrosive Optical Cover, Extra-white Toughened Glass thermally hardened.

l

Gasket: Silicon Rubber.

l

IP-66 and IK-08 Protected.

l

Correlated Colour Temperature shall be nominal 5700K and

Colour Rendering Index>70

l

External surge protection of 10KV.

l

100% replacement guarantee for a period of seven years.

Chemical Testing Pg - 30

Illumination of ORR


TESTING

at NABL Lab of M/s Signify Innovations India Ltd (Philips)

Photometric Test & Electrical Characteristics

IP 66 (Ingress Protection) Test

Pg - 31


TESTING

at NABL Lab of M/s. Lighting Technologies Ltd.

Photometric Test & Electrical Characteristics

IP 66 (Ingress Protection) Test

Surge Test Pg - 32

Illumination of ORR


CABLES

Inspection

High voltage Test

Hot Set Test

Tensile Test Pg - 33


CONTROL PANELS

Inspection

Pg - 34

Illumination of ORR


CONTROL PANEL Inspection by ETDC Engineers

Functionality Testing of Automatic street light control system by ETDC Engineers

Pg - 35


INSPECTION

of site during execution of work

Pg - 36

Illumination of ORR


TEST CHARGE

Pg - 37


TEST CHARGE

Pg - 38

Illumination of ORR


LUX MEASUREMENT before commissioning

Pg - 39


LUX MEASUREMENT

before commissioning

Pg - 40

Illumination of ORR


ORR PHASE-II

ORR PHASE-II INAUGURATION EVENT ON 16-12-2021 Inauguration Event On 16-12-2021

Pg - 41


ORR PHASE-II

Inauguration Event On 16-12-2021

Pg - 42

Illumination of ORR


ILLUMINATION OF ORR (PHASE-I)

(Gachibowli to Shamshabad) Cost of the Project : Rs. 30.00 Crores (Incl. O&M 5 Years) Work Carried out by M/s. Philips India Ltd. S.No. Description

Poles LED Lights Length (Nos.) (Nos.) (Km)

1.

Main Carriage Way (10/12m height DA poles with 210w LED Lights)

929 1,858 22

2.

Service Roads (6m SA poles with 90W LED Lights)

2,312 2,312 58

3.

Junctions(5Nos) (30m High mast with 500W LED Flood lights)

35 250 -

4.

Up & Down Ramps @ Junctions (10.0m height SA/DA poles with 210w LED Lights)

90 180 -

Vehicle /Pedestrian underpasses (28w florescent tube lights)

- 228 -

5.

TOTAL:

3,366

4,828

80

Pg - 43


ILLUMINATION of Outer Ring Road


ORR PHASE-I

Inauguration

Pg - 46


Patancheru Junction


Hyderabad Metropolitan Development Authority

Hyderabad Growth Corridor Limited


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.