BIM portfolio

Page 1

Mahmoud Ashraf Kamel BIMPortfolio 2017-2019

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


MAHMOUD ASHRAF KAMEL Architect designer & BIM solutions at THE

CONTACTS

PERSONAL INFO.

Name Mahmoud ashraf Mohamed

+20 1098080519 , +20 1118367361 mahmoud.ashraf.kamel73@gmail.com

Nationality Egyptian

in

Date of birth 12/11/1992

www.linkedin.com/in/mahmoud-kamel-668467122 mahmoud_hero1992

Martial status Single Military status Final exemption from the military duty Current location Cairo , Egypt

Education

f

https://www.facebook.com/mahmoud.ashraf.9619 https://issuu.com/mahmoudashraf91

Language

2011 – 2016 B.Sc. Architecture Faculty of Engineering, H.T.I - Higher Technological Institute GPA 3 Accumulative Grade Very Good Graduation Project train station Design Project Grade Very Good

Arabic

English

French

first language

full professional

basics

proficiency

2006 – 2011 El-Wehda Language School Percentage : 91%

Objective Looking for a the suitable opportunity that suits my skills especially in BIM Implementation field and it share my same passion in architecture to leads me to export my optimum level of my skills in our same field I have always dreamt of in my field.

Interests Mus i c D e c o r ati o n

Pho to graphy

re adi ng c o mi c bo o ks


Experience IN BIM FIELD Au gast 201 8

T.H.E a r c hi t e c t s , pl anne rs & c i vi l e ngi ne e rs as B IM C o o rdi nato r W o rki ng e x p e ri e nc e: P A R TI CI P A T E D I N B IM IM PLEM EN TATION F OR T.H.E BY CREATIN G R E V I T P R O J E CT TE M PLATE

WADI LAHMI AZUR RESORT MAIN BUILDING MARSA ALAM , EGYPT FULL DETAILED DESIGN LOD 300

DAR ALTEB Maternity & IVF Specialized Hospital FIFTH SETTLEMENT , EGYPT FULL DETAILED DESIGN LOD 300

ALHIAYH UNIVERSITY FACULTY OF DENTISTRY FIFTH SETTLEMENT , EGYPT FULL DETAILED DESIGN LOD 300 Ju n 2017 – Au gast 2 0 1 8

2 m 2 S q ua r e B I M S o l uti o n as B IM Mo dul e r W o rki ng e x p e ri enc e: P A R T I CE P A TE I N O N E D AY TUTORIAL IN TH E H IG H ER TECH N OLOG Y I N S TI T U TE I N 1 0 TH OF RAM D AN CITY TH AT D EF IN ES TH E BIM TE CH N O LO G Y A N D IT’S M ETH OLG Y

BIN HAIDER 5 ASTAR HOTEL D U B A I W O R L D CENTRA L , J EBEL A L I , U .A .E. FULL DETAILED DESIGN LOD 300

ELSHEK ZAEID HIGH RAISEING BUILDING , SHEIKH ZAYED HIGHWAY ROAD , U.A.E BIM MODELING

Technical Skills A U TO CA D

S KET C H UP

RE VIT A R CH I TECTU R E

D YNAMO REVIT

3 DSMA X

NAVIES WORK

A d ob e Pho to sh o p A d ob e In-design RH I NO - G R ASSH O P PER LUMION 3D

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


BIM

D D. DRAWING

FAM BASE =

10000

OTHER


M. MODELING

712

003 053

0062

512

42 71

0052

26

3 703A

00 42 752

053

10 1

3 05

952

6161

412

0052

36

762

21 52

05 00

902

3154

81 01

95 00

05 91

00 4

00 05

9 00

4 00

00 4

0273

05 00

092

00 52

0568 0546

00 4

00 4

0031 004

00 4

2642

00 05

12 32-20033AA

00 13

48 00

00 31

96

004

0023

004

0043

002

0521

0031

004

0484

6551

782

021 004 051

582

00 4

00 2

2 005

88 22

86

00 4 00 32

30 92

6439

00 05

882

00 55

11 15

682

00 63

2 00

EG AROTS 03

802

46 81

00 09

00 4

78 56 00

S

00 52 192

0023

00 32

23 13

85 21

004

66

80 53 1

0032

06 00

00 05

1754

382

56

0031

212

83 43

EG AROTS 34

24 31

7025 3- TF AHS TC ART XE 23 002

T

4 00

00 57

2 00

9 10

002 46

112

13 00

562

55 00

00 05

002

424

3 05

05 00

94 72

00 57

05 41

362

55 00

4 00 5

0003

312

00 83

0061

1 65

162

92 94

MOOR PMUP NOITAGIRRI 74

812

612

2 00

47301

23

59 54

13 00

4 005

6439

1 00

07

99 9

00 54

00 48

2 005

13

054 17

00 05

00 42 1

6439

EG AROTS 92

03

6052

0052

7483 1 603A

12 0005

55 0 0 37 02 00

R

0052

06 00

27

00 48

5401

0056

0861

0057

207

0052

2652

00001

056

0057

009

00 2 3 00

47

92

57

67

77

87

97

08

18

28

38

48

58

68

78

88

98

00 48

00 24

82

72 545

5118

93651

32

0048

00 77

0418

53 07

52 41 1

G

1 303A

1 103A

10 02

0144

62

'52

52

Q

42

P

5A

N

4A

MILY CREATION

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


BIM. MODELING


BIN HAIDER 5 ASTAR HOTEL

ZAEID HIGH RAISEING BUILDING

ALHIAYH UNIVERSITY FACULTY OF DENTISTRY

DAR ALTEB SPECIALIZED HOSPITAL

WADI LAHMY AZUR RESORT

OTHERS Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


BIN HAIDER 5 ASTAR HOTEL Loc at ion Du b a i , U A E Siz e 4 6,0 0 0 s q m , G F A 7 0 , 0 0 0 s q. B U A 3 BAS E M ENT S , GROUND , ME ZZA NINE A ND 9 LE V E LS P LUS R OOF BI M MO DE L ING ,1 0 0 % A R C HI T EC T U R E FU L L Y DET A I LD


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


BIM MODELING B Y U S IN G REVI T WE HA VE MO DE LE D ST R U CTURE , BA CK OF HOU S E & FA CAD E F ORM

FACADE FORM


BACK OF HOUSE FORM

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


ELSHEK ZAEID HIGH RAISEING BUILDING L ocat io n D u b ai , UA E COM M E R CI A L/OFFI CE/RES IDE NT IA L B U IL D IN G (2B+G+M+6 OFFIC E S + 6 1 R E S ID E N TI A L +2 LVL PENT H O U S E + 4 ME CHAN ICA L+ROOF+UPP E R RO O F) W IT H PA R K IN G BUI LDI NG (3B+G + 9 T YP . + RO O F & UR) B IM M O D ELI NG


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


BIM MODELING B Y USIN G R E V I T WE HA VE M O DE LE D S T RUCT U R E , BA CK OF HOUS E & FA CA DE F O R M

BACK OF HOUSE FORM

STRUCTURE FORM

-0.650 SSL. -0.650 SSL.

+0.000 SSL.

+0.005 SSL.


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


ALHIAYH UNIVERSITY FACULTY OF DENTISTRY FIF TH S E TTLEMENT , EGYP T 2 B AS E M E NT A ZS , GROUN D , A ND 2 LE V E LS P LU S RO O F B IM M O D ELI NG ,100%A RC H IT E C T U RE FU LLY DE T A ILD

FACADE FORM BACK OF HOUSE FORM STRUCTURE FORM


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


DAR ALTEB Maternity & IVF Specialized Hospital FIF TH S E TTLEMENT , EGYP T 1 B AS E M E NT A ZS , GROUND , A ND 3 LE V E LS P LU S RO O F B IM M O D ELLI NG ,100%A RC H IT E C T U RE FU LLY DE T A ILE D AN D Q U ANT I T Y T A K E OFF

STRUCTURE FORM

BACK OF HOUSE FORM FACADE FORM


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


WADI LAHMY AZUR RESORT MAR S A ALA M , EGYPT GR O U N D , A ND 1 LEVEL P LU S RO O F B IM M O D ELLI NG ,100%A RC H IT E C T U RE

FACADE FORM STRUCTURE FORM


BACK OF HOUSE FORM Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


ALFLAJ SOCIAL WELFARE AL F L AJ , KS A GR O U N D AND 2LEVELS PLU S RO O F B IM M O D ELLI NG ,100%A RC H IT E C T U RE FU L L Y D E T A I LED

`


‫‪ELSEWEDY SEDCO FACTORY‬‬ ‫‪1 0 TH O F R AM A DA N CI T Y , C A IRO , E G YP T‬‬ ‫‪G R O UN D A ND LEVEL1 PLU S RO O F‬‬ ‫‪BIM M O D ELLI NG‬‬ ‫‪,100 %AR CHI T ECT URE FUL LY‬‬ ‫‪DETAIL E D‬‬

‫‪5‬‬

‫‪9.90‬‬

‫‪1.00‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬

‫‪4‬‬

‫‪2‬‬

‫‪3‬‬

‫‪-‬‬

‫‪-‬‬

‫‪---‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬

‫‪2.31‬‬

‫‪9.90‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬

‫‪2.31‬‬

‫‪9.90‬‬

‫‪3.00‬‬

‫‪1.69‬‬

‫‪3.00‬‬

‫‪1.19‬‬

‫‪2.42‬‬

‫‪3.45‬‬

‫‪1.95‬‬ ‫‪3.45‬‬

‫‪1.50‬‬

‫‪1.50‬‬

‫‪0.03 1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪3.45‬‬

‫‪1.95‬‬ ‫‪1.50‬‬

‫‪3.45‬‬ ‫‪0.57‬‬

‫‪0.57‬‬

‫‪1.07‬‬

‫‪1.07‬‬

‫‪1.07‬‬

‫‪1.07‬‬

‫‪1.07‬‬

‫‪0.72‬‬ ‫‪0.32‬‬

‫‪2.03‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪3.45‬‬ ‫‪0.57‬‬

‫‪0.57‬‬ ‫‪0.50 1.95‬‬

‫‪1.98‬‬

‫‪-0.57‬‬

‫‪1.04‬‬

‫‪0.00‬‬ ‫ﺻﻔر‬

‫‪0.00‬‬ ‫ﺻﻔر‬ ‫‪-0.57‬‬

‫‪1.98‬‬

‫اﻟدور اﻷرﺿﻲ‬

‫‪3.45‬‬

‫اﻟدور اﻷرﺿﻲ‬

‫‪1.04‬‬

‫اﻟدور اﻷرﺿﻲ‬

‫‪-0.57‬‬

‫‪North‬‬

‫‪3.45‬‬

‫‪1.95‬‬

‫‪2.02‬‬

‫اﻟدور اﻷول‬ ‫‪3.45‬‬

‫‪2.82‬‬

‫اﻟدور اﻷول‬

‫‪1.48‬‬

‫‪1.50‬‬

‫‪2.82‬‬

‫اﻟدور اﻷول‬

‫‪2.61‬‬

‫‪2.82‬‬

‫‪2.82‬‬

‫‪0.00‬‬ ‫ﺻﻔر‬ ‫‪-0.57‬‬

‫‪South‬‬

‫‪3‬‬

‫‪1 : 100‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬ ‫‪6.90‬‬

‫‪1.98‬‬

‫‪3.45‬‬

‫‪1.60‬‬

‫‪2.61‬‬

‫‪2.82‬‬

‫‪6.90‬‬

‫‪1.47‬‬

‫اﻟدور اﻷول‬

‫‪2.82‬‬

‫‪2.02‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬ ‫‪6.90‬‬

‫‪2.82‬‬

‫‪2.82‬‬

‫‪1.31‬‬

‫‪2.82‬‬

‫‪2.82‬‬

‫‪2.61‬‬

‫‪2.82‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬

‫‪2.61‬‬

‫‪2.82‬‬

‫‪1.48‬‬

‫‪0.680.240.27‬‬

‫‪0.680.240.77‬‬

‫‪9.90‬‬

‫‪6.90‬‬

‫‪0.00‬‬ ‫ﺻﻔر‬

‫‪1‬‬

‫‪2‬‬

‫‪4‬‬

‫‪---‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬

‫اﻟدور اﻷرﺿﻲ‬

‫‪1‬‬

‫‪3‬‬

‫‪5‬‬

‫‪1 : 100‬‬

‫‪2‬‬

‫‬‫‪---‬‬

‫‪3D View 1_1‬‬ ‫س‬

‫ش‬

‫ن‬ ‫‪EQ‬‬

‫‪16.13‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬

‫‪2.00‬‬

‫‪9.90‬‬

‫م‬

‫ل‬

‫ي‬

‫ك‬

‫ط‬

‫ز‬

‫ح‬

‫‪3.26‬‬

‫و‬

‫د‬ ‫‪EQ‬‬

‫ه‬

‫ب‬

‫ج‬

‫‪1:1‬‬

‫أ‬

‫‪5.72‬‬

‫‪23.15‬‬

‫‪4‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ ﻟﻐرﻓﺔ اﻟﺳﻠم‬ ‫‪9.90‬‬

‫‪1.78‬‬

‫‪0.30 1.78‬‬

‫‪3.00‬‬ ‫‪3.00‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬ ‫‪6.90‬‬

‫‪3.45‬‬

‫‪1.98‬‬

‫‪1.98‬‬

‫‪1.95‬‬

‫‪1.95‬‬

‫‪1.47‬‬

‫‪3.45‬‬

‫‪3.45‬‬ ‫‪0.57‬‬

‫‪0.47‬‬

‫‪0.72‬‬ ‫‪0.32 1.98‬‬

‫‪1.98‬‬

‫‪2.10‬‬

‫‪0.00‬‬ ‫ﺻﻔر‬ ‫‪-0.57‬‬

‫‪1.95‬‬

‫اﻟدور اﻷرﺿﻲ‬

‫اﻟدور اﻷول‬

‫‪1.70‬‬

‫‪2.80‬‬

‫‪1.95‬‬

‫‪3.45‬‬

‫‪2.80‬‬

‫‪3.70‬‬

‫‪2.82‬‬

‫‪1.73‬‬ ‫‪11.47‬‬

‫اﻟدور اﻷول‬

‫‪4.90‬‬

‫‪1.55‬‬

‫‪1.70‬‬

‫‪2.82‬‬

‫‪2.82‬‬

‫ﻣﺳﺗوى اﻟﺳطﺢ‬ ‫‪6.90‬‬

‫اﻟدور اﻷرﺿﻲ‬ ‫‪0.00‬‬ ‫ﺻﻔر‬ ‫‪-0.57‬‬

‫‪West‬‬ ‫‪1 : 100‬‬

‫‪Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com‬‬

‫‪1‬‬

‫`‬


1 303A

1 103A

712

003

10 02

0144

053

0062

00 42 512

752

053

42 71

0052

26

3 703A

10 1

3 05

952

6161 92 94

36

412

21 52

212

83 43

05 00

EG AROTS 34

902

3154

24 31

81 01

7025

95 00

05 91

00 4

00 05

9 00

4 00

00 4

0273

05 00

00 52

0568 0546

00 32

0031 004

00 4 96

2642

00 05

12 32-20033AA

00 13

48 00

00 31

30 92

00 4

00 4

86

004

0023

004

0043

002

0521

0031

004

0484

6551

782

021 004 051

582

00 4

00 2

2 005

00 55

11 15

882

00 4

2 00

EG AROTS 03

092 682

00 63

00 05

S

802

46 81

00 09

00 4

78 56 00

80 53 1

00 52 192

0023

00 32

23 13

85 21

004

66

0032

06 00

00 05

1754

382

56

0031

6439

1 00

07

99 9

00 54

00 48

2 005

13

054 17

00 05

00 42 1

6439

EG AROTS 92

6052

0052

7483 1 603A

12 0005

55 0 0 37 02 00

R

0052

06 00

27

00 48

5401

0056

0861

0057

207

0052

2652

00001

056

0057

009

00 2 3 00

47

57

67

77

87

97

08

18

28

38

48

58

68

78

88

98

00 48

00 24

82

72 0418

545

5118

93651

32

0048

00 77

92

53 07

03

52 41 1

D D. DRAWING

4 00

88 22

002

762

00 57

2 00

9 10

6439 46

3- TF AHS TC ART XE 23 002

T

112

13 00

562

55 00

00 05

424

3 05

05 00

94 72

002

00 57

05 41

362

55 00

4 00 5

0003

312

00 83

0052

MOOR PMUP NOITAGIRRI 74

812

612

2 00 0061

1 65

162

47301

23

59 54

13 00

4 005

62

'52

52

Q

42

P

5A

N

4A


865

+22.050 m LEVEL-4

01 866

EGL-07

REFER TO ID FOR CEILING

865

269

+18.600 m LEVEL-3

866 ALUMI. CAPPING TO MATCH CW FRAME

865

866

3450

01 EGL-2

EGL-07

REFER TO ID FOR CEILING

+18.600 m LEVEL-3

BUILDING MAINTENANCE UNIT

+39.000 m LEVEL-9

865

+39.000 m LEVEL-9

3450

3450

3000

866

438

865

EGL-2 866

+36.000 m LEVEL-8

EMW-07

+15.150 m LEVEL-2

866

250

866

REFER TO ID FOR CEILING

EGL-07

3600

866

4650

866

866 REFER TO ID FOR CEILING

+10.500 m LEVEL-1

866

866

REFER TO ID FOR CEILING

150

866

50mm ROCK WOOL INSULATION WITH GALVANISED STEEL BACK PAN

865

4350

1503

3185

3450

PLASTERBOARD ON METAL STUD WITH INSULATION

866

250

866

EGL-07

EMW-7

3450

EMW-07 866

1015

865

352 4350

865

270

2575

+28.950 m LEVEL-6

EGL-07

866

+6.150 m Level-MEZZANINE

866

EGL-07

EMW-03 EMW-07

REFER TO ID FOR CEILING

865

SSL. +6.075

+28.950 m LEVEL-6

REFER TO ID FOR CEILING

EGL-2 EWF-01

2400

615

866

EGL-07

978

250

EGL-07

866

290

+32.400 m LEVEL-7

DINNING/LIVING

200mm THICK SOLID BLOCK WORK WALL

+32.400 m LEVEL-7

978

EGL-2 +10.500 m LEVEL-1

250 352 230

400

BIN HAIDER 5 ASTAR HOTEL

REFER TO ID FOR CEILING

978

3210

EMW-7

SWIMMING POOL STRUCTURE TO ENGINEER'S / LANDSCAPE DETAILS

SSL. +9.990

REFER TO ID FOR CEILING

3450

EMW-07

3120

3450

+6.150 m Level-MEZZANINE

866

325

865

EGL-03

866

EMW-7 865

50mm ROCK WOOL INSULATION

+25.500 m LEVEL-5

865

5250

269

+25.500 m LEVEL-5

EGL-07

REFER TO ID FOR CEILING

866

EGL-07 5250

865

REFER TO ID FOR CEILING

EMW-07

EMW-07

FFL. +0.800

FFL. +0.550

250 100

866

6900

+22.050 m LEVEL-4

EGL-07

OUTS RESTAURANT 1

FFL. +0.900

LEVEL-11 +0.900 m LEVEL-GROUND

EGL-07

+22.050 m LEVEL-4

866

SSL. +0.000

2500

866 865

1010

269

400

FOR EXTERNAL FINISHES, REFER TO LANDSCAPE DETAILS.

EGL-2

1020

900

EGL-03

EMW-7

+0.900 m LEVEL-GROUND

FOR EXTERNAL FINISHES, REFER TO LANDSCAPE DETAILS.

865

FFL. +0.900

866

3117

865

EWF-01

866

4925

2850

EGL-2

200mm THICK SOLID BLOCK WORK WALL

3450

SSL. +9.375

866

3600

866

865

REFER TO ID FOR CEILING

4650

+36.000 m LEVEL-8

FFL. +35.800

866

EGL-07 EGL-07

FFL. +36.000

866

50mm ROCK WOOL INSULATION WITH GALVANISED STEEL BACK PAN

EMW-7

ROOF BUILD-UP TO SPEC.

SSL. +35.800

RCC CONCRETE WALL TO ENGINEER'S DETAIL

866

+15.150 m LEVEL-2

866

865

866

RCC CONCRETE WALL TO ENGINEER'S DETAIL

ALUMI. CAPPING TO MATCH CW FRAME

EGL-2

3000

865

866

REFER TO ID FOR CEILING

866

3110

866

EGL-07 BUILDING MAINTENANCE UNIT

EMW-7

REFER TO ID FOR CEILING

865

865

3450

REFER TO ID FOR CEILING

3113

866

866

3990

EMW-7

269

865

+18.600 m LEVEL-3

866

866

EGL-07

-4.100 m BASMENT- B1

+18.600 m LEVEL-3

4650

5000

865

EGL-2

PLANR ROOM -2

EGL-07

REFER TO ID FOR CEILING

REFER TO ID FOR CEILING -4.100 m BASMENT- B1

1

34

WALL SECTION DETAIL (PART 1 OF 2)

2

1 : 50

33

32

31

30

29

28

27

26

25

WALL SECTION DETAIL (PART 2 OF 2)

4

1 : 50

24

23

22

21

20

19

18

17

WALL SECTION DETAIL ( PART 1 OF 2) Copy 1

3

1 : 50

16

15

14

13

12

11

WALL SECTION DETAIL ( PART 1 OF 2) 1 : 50

10

8

7

6

DRY DECORE

W1

W1

W1

W1

W1

W1

W1

3

CW 9

2

1

DRY DECORE

CW 5

CW 5

CW 5

CW 5

CW 5

ALHIAYH UNIVERSITY FACULTY OF DENTISTRY CW 5

CW 5

CW 5

CW 9

CW 5

4.50

4.50

CW 5

CW 5

CW 9

CW 5

CW 9

CW 5

CW 5

CW 9

CW 5

CW 5

CLADDING

CW 9

CW 9

CW 9

CW 9

1ST FFL

CW 9

CW 9

CW 5

CW 9

CW 9

CW 9

CW 5

CW 5

CW 5

CW 5

CURTAIN PANEL

CW 9

CLADDING

+2.10 F.F.L

-0.90

LECTURE HALL

F.F.L

4.20 4.20

CW 5

4.50

4.50

CLADDING

CW 9

CLADDING

CW 9

CW 5

CW 5

CW 5

CW 5

W2

W2

CW 5

CW 9

CW 5

-5.10

CW 9

LECTURE HALL

F.F.L

1.80 1.80

4.50

CW 5 5.10

W1

0.38

W1

3.00 3.00

GROUND FFL

CW 5

W1

+6.60 F.F.L

4.50 4.50

CW 9

4.50

4.50

CLADDING CW 9

+11.10 F.F.L

4.50 4.50

2ND FFL

CLADDING CW 9

+15.50 F.F.L

5.70 4.40

ROOF SSL

CLADDING

4.40 W1

4

CLADDING

CLADDING

W1

5

DRY DECORE

DRY DECORE

ALUMINUM SCREEN

9

'1

1

2

3

4

5

6

7 302 30

00.4

00.2

01.2

01.1

01.1

54.8

88.1

05.1

54.1-

uni mulA m gniddalC

'A

9

56.2

05.1

3W

.LFF

8

01

03.2

52.1 05.1

06.2

85.1

3W

05.1

31

50.2

00.4 83.8

3W

3W

05.1

03.2

'A

05.1

51.0

05.1

21

55.1

05.1

AERA GNIT NALP

02.0

02.8

11

12.82

39.1

05.1

thgieh m07 .0 kro W kci rB enot S

12.1

52.0

05.1

17.71

81.0

39.1

.LFF

41 D

05.2

.LFF

58.2

50.3-

04.2

50.3-

ROTARE NEG

31 D

00.1

74.0

39.1

86.1

01.7

06.7

74.0

.LFF

00.6

51.0

00.6

7D 50.3TNEITA P TUO GNITI AW A ERA

59.7 LA CI DEM S ES AG 1 -S 1 -F

53.9

2 ,1 -C 1 - W

00.1

7D

evobA nepO

evobA nepO 50.7

83.0

04.0

57.11

A

38.1

07.1

32.6

00.1

HSA RT

00.2

23.1

05.1

7D

1 -S 1 -F

75.1

00.1

63.0

09.0

01.1

38.3

57.0

2D

3D

RETNUOC

03.2

21.0

09.0

80.5 86.6

09.0

2 ,1 -C 1 - W

88.1 08.0

28.1

97.5 52.0

09.0

08.2

09.0

02.1

41.7

18.5

51.0

3D

09.0

07.3

35.1

3D

21.6

37.2

3D

NOITATS ES RUN

51.0

51.2

56.2

1 -S 1 -F

37.5

68.1

RODI RROC 2 ,1 -C 1 - W

51.0

52.0

79.4

37.5

3D 21.0

E

5D

2 ,1 -C 1 - W

3D 09.0

thgieH m2 noititraP LPH

21.0

1 -S 1 -F

01.1

4D

59.3

09.0

3D

lla W gniniateR

07.2

07.2

CI NI LC

57.4 00.3

.LFF

G

-- -S 2 -F 2 ,1 -C 2 - W

1 -S 1 -F 2 ,1 -C 1 - W

2 ,1 -C 1 - W

69.1

4 WC

52.3-

39.2

CI NI LC

1 -S 1 - F

1 502

07.1

38.3

.LFF

5D

08.0

33.0

64.3 33.5

NEMOW REK COL

50.3RODI RROC

5D F

08.1

28.1

76.1

06.0

06.1

.LFF

02.1

5D

thgieH m2 noititraP LPH

09.0

97.0

93.1

ND

.LFF

33.0

1 -S 1 -F

2 ,1 -C 2 - W

97.0

04.0

08.0

00.2 EG AI RT 2 ,1 -C 1 - W

50.3-

-- -S 2 -F

96.0

26.2

06.1

52.3-

D 02.4

4D

07.1

REK CO L NEM

3D

01 D

00.2

ecnartnE ycneg re mE

64.3

3D

3 -C 1 - W

PU

.LFF

50.2

09.0

2 -S 3 -F

50.3-

402 40

00.4

SRIA TS

1 -S 1 -F 2 ,1 -C 1 - W

08.0

04.2

Y BBO L NIAM

.LFF

leetS hseM

21.0

35.3

07.4

88.1

50.3-

.LFF ecnartnE tneitaptuO

unimulA m gniddalC

80.2

1 -S 1 -F

73.0

21.0

07.4

80.4

52.3-

1 502

C

08.0

80.2

10.82

3D

RETNUOC NOITPECER

E

25.3

Y RDNU AL

09.0

REHS IUGN ITXE ER IF

F

B

59.1

00.1

64.2

evobA nepo tfahs ot tnemesaB mo rf fooR

86.0

48.0

00.3 R OTAVELE

evobA nepO

4D

88.0

04.1

R OTAVELE

08.1

04.2

80.2

92.3

08.1

2 ,1 -C 1 - W

05040 slairet aM yrnos aM cisa B sdohteM dna

013 90 eliT cimareC

6D

29.1

1 -S 1 -F

04.4

00.2

13.0

96.2

50.2

80.4

4D

00.1

89.1

89.1

89.1

89.1

20.2

59.1

39.1

-- -S 2 -F 2 ,1 -C 2 - W

NOI TAZI LI RET S

evobA nepo tfahS ot tnemesaB mo rf fooR

Y TI LI TU YTRID

-- -S 2 -F 2 ,1 -C 2 - W

11 D

3 WC

85.0

RETNUOC

00.2

C. W

2 ,1 -C 2 - W

unimulA m gniddalC

48.0

46.1 C. W -- -S 2 -F

2 ,1 -C 2 - W

1 -S 1 -F

3D

67.3

4D

56.1

D

KCO L RI A 2 ,1 -C 1 - W

08.21

53.1

4D

C. W -- -S 2 -F

woleb nepo t fahs tne mesaB mo rf foo R ot

.LFF

2 ,1 -C 1 - W

84.1

3D

37.1

lla W draoB muspyG thgieH m 5.1 noititraP

41 D

52.3-

enot S

0001.0.0

12.81

08.0

02.4

63.1

48.1

08.0

44.1

21.0

ND

B

09.0

05.1

1 -S 1 -F 2 ,1 -C 1 - W

59.0

69.3

.LFF RODI RROC

04.2

C

52.0

50.3-

.LFF ecnartnE tneitaptuO

07.0

21.0

05.1

3W

3 107

lla W draoB muspyG thgieH m 0.2 noiti traP

50.302.4

DAR ALTEB SPECIALIZED HOSPITAL

56.2

2 ,1 -C 1 - W

-- -S 6 -F

enot S

A

03.0

09.0

67.2

-- -S 2 -F

21.0

00.1

1 -S 1 -F 2 ,1 -C 1 - W

2 ,1 -C 2 - W

53.3

2 ,1 -C 1 - W

7D

54.0

07.3

53.3

1 -S 1 -F

39.3

MOO R R. E

74.1

09.0

N AE LC Y TI LITU

3D

G

CI NI LC

55.2

69.3

47.0 68.1

86.0

08.0

H

84.2

50.3.LFF PU SRIA TS 2 -S 3 -F

50.2

50.2

06.1

3 -C 1 - W

C. W

86.1

-- -S 2 -F 2 ,1 -C 2 - W

67.3

68.3 88.1

evobA nepo tfahs ot tnemesaB mo rf fooR

H 88.3

4D

52.0

I

I

10 102

00.4

00.2

01.2

01.1

01.1

88.1

39.1

56.2

52.1

06.2

55.1

50.2

00.4

12.42

'1

1

2

3

4

5

6

7

8

9

01

11

21

31

WADI LAHMY AZUR RESORT

‫موﯾﻧوﻣﻟأ ةرزو‬ ‫جردﺗﻣ ﻰﺻﺣ‬ ‫م ﺳ‬7 ‫كﻣﺳ طﺳوﺗﻣ لوﯾﻣ ﺔﺗﺎﺳرﺧ‬ ‫م ﺳ‬3 ‫ﺔﺑﺗﻧﻣﺳا ﺔﺳﺎﯾﻟ‬ ‫رﺗﺳﯾﻟوﺑﻟا فﺎﯾﻟأ نﻣ ﺔﯾ ﺎﻣﺣ ﺔﻘﺑط‬ ‫نﯾﻣوﺗﯾﺑﻟا ﺢﺋارﺷ نﻣ نﯾﺗﻘﺑط ﺔﺑوطرﻠﻟ لزﺎﻋ‬ ‫رﺗﺳﯾﻟوﺑﻟا فﻠﯾﻟﻷا تﻧﻣ ﮫﯾﺎﻣﺣ ﺔﻘﺑط‬ ‫نﯾرﺗ ﺳﯾﻟوﺑﻟا نﻣ ةرارﺣ لزﻋ مﺳ‬5 ‫م ﺳ‬3 ‫ﺔﺑﺗﻧﻣﺳا ﺔﺳﺎﯾﻟ‬ ‫ﺔﺣﻠﺳﻣ ﺔﯾﻧﺎﺳرﺧ ﺔطﻼﺑ‬

4 LEVEL m 004.61+

‫رﺎﻌﺗﺳﻣ فﻘﺳ‬ 0 5 3 . 5 1+ 0513

0 5 8 . 4 1+

0 5 2 . 3 1+

0 5 1 . 3 1+

0083

2 LEVEL m 054.9+

0 5 4 . 9+

0 5 4 . 9+

05171 0093

0093

OTHERS

0 5 3 . 4 1+

3 LEVEL m 052.31+

1 LEVEL m 055.5+

0 5 5 . 5+

0084

0084

LEVEL DNUARG m 057.0+

0 5 0 . 1+

0 5 7 . 0+

5 5 9 . 0+

0041

058 0 5 6 . 0-

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


A400 2

J

1 A303-1

U 5 42 11

0 05 11

H

K

1 A300

V

W

1 A301

L

7025

G

11

12

13 35 70

8400

8400

37

W1 2 A304 00 77

10

2 A308

48 21

5 73 14

11425

38

M

14 00 84

F

10275

00 84

00 84

09

3 A309

00 84

00 84

08

E

36

15

16

6750

1 A302-1

00 84

---

D

35

17

00 84

9135

9346

A410 1

18 34

07 00 84

8400

00 84

20

33

9346

1 A305

A401

1 A308

8400

06

1

9346

19

2

00 84

21

3 A307

05 1 A310

00 84

1

22

A406

32

A725 9346

8400

21651

04 00 84

T

31

9346

1 A302-3

00 84

30 S

1 A306 00 84

00 42

00 84

03

00 42

1 A304

23

10225

7025

1 A307

35 70

01

1 A300

B

R

27

A1' 8115

A

1 A303-1

28

00 77

20 43

02

29

9346

A401

N

24

545

25

8140

25'

26

C

5 42 11

P

Q 1 A400

BASEMENT-3

BASEMENT-2

VOIDS 3 m² NC 7233 OUTLINE: m² 60 LIFT 195 m² SHAFT

GROUND LEVEL

MECH. 202 m² SHAFT TOTAL GFA 6587 m²

SERVICES 133 m²

STAIRS 113 m²

TOTAL 6587 GFA m²

LIFT 176 m² SHAFT

MEZZANINE FLOOR


BIN HAIDER 5 ASTAR HOTEL Full Packag e of arch i tectur e drawin g s Ove rall & p arti al p l an s ,sec tio n &G FA

3 A310

2 A307

1 A300

1 A307

3000

+39.000 m LEVEL-9

3600

+36.000 m LEVEL-8

3450

+32.400 m LEVEL-7

3450

+28.950 m LEVEL-6

3450

+25.500 m LEVEL-5

+18.600 m LEVEL-3

3450

35500

38500

3450

+22.050 m LEVEL-4

4650

+15.150 m LEVEL-2

4350

+10.500 m LEVEL-1

5250

+6.150 m Level-MEZZANINE

5000

+0.900 m LEVEL-GROUND

11400

3400

-4.100 m BASMENT- B1

3400

-7.500 m BASMENT- B2

-10.900 m BASMENT- B3

865

+22.050 m LEVEL-4

01 866

EGL-07

REFER TO ID FOR CEILING

865

269

+18.600 m LEVEL-3

866 ALUMI. CAPPING TO MATCH CW FRAME

EGL-07

865

866

3450

01 EGL-2

REFER TO ID FOR CEILING

+18.600 m LEVEL-3

BUILDING MAINTENANCE UNIT

+39.000 m LEVEL-9

865

+39.000 m LEVEL-9

3450

3450

3000

866

+15.150 m LEVEL-2

866

438

865

EGL-2

+36.000 m LEVEL-8

866

SSL. +35.800

+15.150 m LEVEL-2

EMW-07

866

866

250

+36.000 m LEVEL-8

REFER TO ID FOR CEILING

EGL-07

3600

866

4650

REFER TO ID FOR CEILING

866

978

3210

EMW-7

866

SWIMMING POOL STRUCTURE TO ENGINEER'S / LANDSCAPE DETAILS

866

50mm ROCK WOOL INSULATION WITH GALVANISED STEEL BACK PAN

865

4350

1503

3185

3450

PLASTERBOARD ON METAL STUD WITH INSULATION

866

EMW-7

3450

866 866

150

866

1015

865

352 4350

865

270

2575

EGL-2 +28.950 m LEVEL-6

EGL-07

EMW-03 EGL-07

866

+6.150 m Level-MEZZANINE

REFER TO ID FOR CEILING

865

EMW-07

REFER TO ID FOR CEILING

3450

EMW-07

3120

3450

+6.150 m Level-MEZZANINE

866

325

865

EGL-03

866

EMW-7 865

50mm ROCK WOOL INSULATION

+25.500 m LEVEL-5

865

2850

EGL-2

200mm THICK SOLID BLOCK WORK WALL

EGL-07

REFER TO ID FOR CEILING

866

EGL-07 5250

865

REFER TO ID FOR CEILING

EMW-07

EMW-07

866

FFL. +0.800

FFL. +0.550

EGL-07

250 100

+22.050 m LEVEL-4

6900

SSL. +0.000

2500

866 865

269

1010

EGL-2

1020

900

400

FOR EXTERNAL FINISHES, REFER TO LANDSCAPE DETAILS.

OUTS RESTAURANT 1

FFL. +0.900

LEVEL-11 +0.900 m LEVEL-GROUND

EGL-07

+22.050 m LEVEL-4

866

FOR EXTERNAL FINISHES, REFER TO LANDSCAPE DETAILS.

EGL-03

EMW-7

+0.900 m LEVEL-GROUND

865

FFL. +0.900

866

3117

865

EWF-01

3450

5250

269

+25.500 m LEVEL-5

866

4925

866

EWF-01

SSL. +6.075

+28.950 m LEVEL-6

REFER TO ID FOR CEILING

2400

615

+10.500 m LEVEL-1

EMW-07 EGL-07

866

250

REFER TO ID FOR CEILING

866

250

978

EGL-07

REFER TO ID FOR CEILING

200mm THICK SOLID BLOCK WORK WALL

400

EGL-07

DINNING/LIVING

866

290

+32.400 m LEVEL-7

250 352 230

SSL. +9.990

+32.400 m LEVEL-7

978

EGL-2 +10.500 m LEVEL-1

SSL. +9.375

866

3600

866

865

REFER TO ID FOR CEILING

4650

FFL. +35.800

866

EGL-07 EGL-07

FFL. +36.000

866

50mm ROCK WOOL INSULATION WITH GALVANISED STEEL BACK PAN

EMW-7

ROOF BUILD-UP TO SPEC.

866

865

866

RCC CONCRETE WALL TO ENGINEER'S DETAIL

ALUMI. CAPPING TO MATCH CW FRAME

EGL-2

RCC CONCRETE WALL TO ENGINEER'S DETAIL

3000

865

866

REFER TO ID FOR CEILING

866

3110

866

EGL-07 BUILDING MAINTENANCE UNIT

EMW-7

REFER TO ID FOR CEILING

865

865

3450

REFER TO ID FOR CEILING

866

3990

3113

866

EMW-7

865

+18.600 m LEVEL-3

EGL-07

866

+18.600 m LEVEL-3

4650

EGL-2

866

269

5000

865

-4.100 m BASMENT- B1

PLANR ROOM -2

EGL-07

REFER TO ID FOR CEILING

REFER TO ID FOR CEILING -4.100 m BASMENT- B1

1

WALL SECTION DETAIL (PART 1 OF 2) 1 : 50

2

WALL SECTION DETAIL (PART 2 OF 2) 1 : 50

4

WALL SECTION DETAIL ( PART 1 OF 2) Copy 1 1 : 50

3

WALL SECTION DETAIL ( PART 1 OF 2) 1 : 50

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


ALHIAYH UNIVERSITY FACULTY OF DENTISTRY A

+11.10 F.F.L

B

A

Gypsum false ceiling

2ND FFL

0.50

0.38

1.40

1.30

1.30

1.12

0.72

0.10

0.28

B

+11.10 F.F.L

2ND FFL

B

0.10

3.60

4.50

2.40

ROOM

1.40

1.30

1.30

CLASS 5

1.30

4.50

0.50

‫ﻏرﻓﺔ‬

5 ‫ﻓﺻل‬

1.30

A

3.60

0.70

1.80 +15.50 F.F.L

0.68

+6.60 F.F.L

ROOF SSL

1.12

1.40

1.40

0.38

0.28 0.40

0.72 0.72

1.12

0.70

+11.10 F.F.L

2ND FFL

0.10 4.40

2.40

0.10 4.50

1.40

3.00 3.00

0.38

0.28 0.40

0.10

0.70

0.70

0.28

0.40

2ND FFL

0.28

2ND FFL

+11.10 F.F.L

0.38

0.40

+11.10 F.F.L

+2.10 F.F.L

GROUND FFL 0.38

3.00 0.70

GROUND FFL

1.40

0.10

1.12

1.12

0.72

1.12

0.72

0.10

0.38

0.40

+2.10 F.F.L

+2.10 F.F.L

1.90

2 301

GROUND FFL

0.28

Concrete slab Gypsum false ceiling

1.40

2.40

Concrete slab Gypsum false ceiling

Porcelain Tiles Skirting 10cm Porcelain 60*60 Mortar 2cm Sand 6cm Concrete slab Gypsum false ceiling

0.72

Sand 6cm

Sand 6cm

3 ‫ﻗﺻل‬

0.10

Mortar 2cm

0.10

1.12

1.40 4.50

Porcelain 60*60

Mortar 2cm

4.50

3.40

3.00

Porcelain Tiles Skirting 10cm Porcelain 60*60 Mortar 2cm Sand 6cm Concrete slab Gypsum false ceiling

0.10

-2.40 F.F.L

5 ‫ﻓﺻل‬ 2.40

BASE-1 FFL

4.50

BASE-1 FFL

4.50

3.40 -2.40 F.F.L

Porcelain Tiles Skirting 10cm

Porcelain Tiles Skirting 10cm

CLASS 3

1.40 1.90

GROUND FFL

CLASS 11

Porcelain 60*60

0.10 +2.10 F.F.L

+6.60 F.F.L

1ST FFL

0.72

0.10

p la ns ,se cti on &E l ev a ti o n s

11 ‫ﻓﺻل‬

CLASS 3

1.40

0.70

0.10 1.40

1ST FFL

0.10

+6.60 F.F.L

3 ‫ﻗﺻل‬

3.00

Porcelain Tiles Skirting 10cm Porcelain 60*60 Mortar 2cm Sand 6cm Concrete slab Gypsum false ceiling

2.40

2.40

0.10

4.50

5 ‫ﻓﺻل‬ CLASS 5

1.40

22.40

1.40

1.12

0.72

+15.50 F.F.L

0.10

0.10

2.40

3.00

Porcelain Tiles Skirting 10cm Porcelain 60*60 Mortar 2cm Sand 6cm Concrete slab Gypsum false ceiling

ROOF SSL

0.28

1ST FFL

0.70

0.70 0.40

1ST FFL

0.28

1.40 0.10 0.10

2ND FFL

Gypsum false ceiling

0.38

0.28

3.00

0.10 +6.60 F.F.L

11 ‫ﻓﺻل‬

0.10 1.40

+11.10 F.F.L

Sand 6cm Concrete slab

Concrete slab Gypsum false ceiling

1.12

0.72

0.10

Mortar 2cm

Sand 6cm

CLASS 11

1.40

4.40

Full P ac k age of a rch i tec tu re d r aw ings

Porcelain 60*60

Mortar 2cm

+15.50 F.F.L

ROOF SSL

0.68

ROOF SSL

Porcelain Tiles Skirting 10cm

Porcelain Tiles Skirting 10cm Porcelain 60*60

1.40

1.30 0.70

1.80

+15.50 F.F.L

3 301

Porcelain Tiles Skirting 10cm Porcelain 60*60 Mortar 2cm Sand 6cm Concrete slab Gypsum false ceiling

0.70

4.50

1.30

‫ﻏرﻓﺔ‬

ROOM

1.40 3.00

3.00

3.40

3.40

CLASS 5

Porcelain Tiles Skirting 10cm

Porcelain Tiles Skirting 10cm

Porcelain 60*60 Porcelain 60*60 Mortar 2cm

0.10

Mortar 2cm

Sand 6cm

Sand 6cm Concrete slab

0.70

Concrete slab

Gypsum false ceiling

-2.40 F.F.L

1ST FFL

1ST FFL

+6.60 F.F.L

0.10

0.28

BASE-1 FFL

0.38

BASE-1 FFL

+6.60 F.F.L

0.40

-2.40 F.F.L

1.40

Gypsum false ceiling

WALL SEC 1

1

1

2

3

4

5

6

7

8

9

10

11

WALL SEC 1 PART 1

2

1 : 50

12

13

14

15

16

17

3

1 : 20

18

19

20

21

22

23

24

25

26

WALL SEC 1 PART 2

4

1 : 20

27

28

29

30

31

32

33

WALL SEC 1_3D

34

88.00 2.65

2.05

3.00 2.50

4.65

2.50

2.90 3.60

2.40

2.60

1.90 6.00

1.20

1.60

3.00

2.50 2.40

2.40

3.50

2.00 5.80

1.20

4.30

2.85 3.80

2.00

0.85

2.00 2.00

1.70 0.27 1.76 4.60

0.27

3.50

2.50

1.20

3.60

1.20

1.20

3.00 1.20

3.50 2.40

1.20

0.50 1.50 2.15 1.20 2.40

1.55

2.00 3.00

1.80

1.30 1.20

2.00

2.00 4.77

5.50 2.00

1 203

201 01 1 205

Open Above ‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬

1 301

GROUND FLOOR LIMIT

Open Above

W2

5.83

1.20

D4

2.00

1.03

1.34

1.20

1.50

1.38

2.40 1.20 4.00

1.20

1.36

D4

9.34

UP

D4 1.79

1.20

0.65

2.00

1.00

2.10

7.31

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬ 4.05

W-1 C-(1,2)

GYPSUM PARTITION

W2

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫��ر‬STAFF �‫ا�ﺗ‬

1

STAFF

F-3 S-2

4.35

W2

4

3

2

1.00 0.33 2.75

2.05

3.60

1

F

2.54

3.20

3.00

5.75

1.60 F-1

1.00

1.00

1.60

0.72

W1

04 202

1.00

1.58

3.52

0.70 1.00

-6.900

W1

FFL.

0.95

F-1 S-1

15

11

16

10

W-3 C-(1,2)

W1

L

�‫ﻋ����ا‬

1.08

9 8 7 6

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

UTILITIES ROOM

5 4 3

F-2

2

STAFF

W-2

1

D1

M

S--

F-3 S-2 W-1 C-(1,2)

GYPSUM PARTITION 1.23

2.00

I

K

CLINIC'S CLUSTER

-4.971 FFL.

FFL.

12

W-1 C-(1,2)

W-1 C-(1,2)

D 12

H

J

S--

14 13

-4.650

D6

F-3 S-2

302

F-3 S-2

5

W-3 C-(1,2)

D6

D6

2.00

13.70

4.02 D6

W2

3.35

6

0.39

0.70

D6

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

STERILE

F-3 S-2 W-1 C-(1,2)

D6

D6

7

‫اﺷﻌﺔ‬

5.08

10

8

G

STAFF

W-1 C-(1,2)

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

4.00

9

1

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬ 5.00

F-3 S-2

2.00

D6

D6

STAFF

F-3 S-2 W-1 C-(1,2)

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬ 0.65

9

10.43

1.35

1.00

W-3 C-(1,2)

E

-6.900 FFL.

W1

1.00

2.00

2.00

1.00

1.88 5.10 1.10

0.70

D6

‫اﺷﻌﺔ‬

S--

D6

5.00

8.51

1.08

1.30

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

D6

S--

W4

CORRIDOR

GYPSUM PARTITION

STAFF

F-3 S-2

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

D1

=

W-1 C-(1,2)

2.54

W-1 C-(1,2)

F-3 S-2 W-1 C-(1,2)

F-1

F-1 S-1

7 8

STAFF

0.23

0.92

10

RADIOLOGY

D6

0.30 1.00

11.25

1.80

4 5

14.60

2.16 STAFF

1.42

4.00 D7

D6

3.30

6

2

CW 6

1.16

2.10

0.80

2.88

D8

1.00

D6

2 3

3

II

F-3 S-2 W-1 C-(1,2)

W-1 C-(1,2)

1

5.30

2.16

2.00

1.34 2.00

F-3 S-2

II

2.93

F-1

W-3 C-(1,2)

5.10

4.19

1.00

RADIOLOGY

F-3 S-2 W-1 C-(1,2)

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

�����‫ا�و‬

W-21.75 C-3

D8

2.57

‫اﺷﻌﺔ‬

1.58

-6.900 FFL.

1

9

4.98

2

8

1.00

3

7

15 16 17 18

3.00

3.35 4

STAFF

S--

W-2 C-3

D6

2.49

5

6

1.00

6

BUFFET F-2

5

-4.650 FFL.

6.93

7

S--

1.00

8

STAFF

STAFF

STAFF

1 �‫ﻣ���ر‬

F-(1,4) S-2

F-1

W-3 C-(1,2)

S--

4

0.98

9

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

GYPSUM PARTITION

0.63

D 10

0.80

F-2

3

W-3 C-(1,2)

RADIOLOGY

W.C

S--

2

S--

14 13 12 11 10

2.70

Basement Entrancee D 12

1

=

�‫ﻣﺷ�ر‬

SOCIAL WORKER F-1

2

3.15

=

14 13 12 11 10

1.00

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ا�ﺗ���ر‬

D 10

3.90

-4.650 FFL.

D 10

D6

2.00 D2

5.70

W3

W.C

D6

D 10

0.63

�����‫��ر‬

2.75

3.25

W3

W-2 C-3

F-2

3.60

3.00 D 10

D3

15 16 17

F-3 S-2

S--

W-2 C--

1.63

6.50

W3 1.15

0.80

F-2

3

1

ELEC.ROOM

S--

D

8.19

14.99

D 11 W.C F-2

W-2 C-3

1.20 4.00

0.75 1.20

3.06 1.00

1.00

2.40

4.20 0.66

1.06

0.90

D7

0.75 3.26

D6 D2

3.07

1.45 W3

W3

W-1 C-(1,2)

1.80

1.00

1.00

�����‫��ر‬

OPEN ABOVE STEEL HANDRAIL

STEEL BRIDGE

W3

‫�ر���ﺔ �ﻋ����� �����ﺔ‬ ��‫ ا�ﺗ���ر‬STAFF

S--

3.25

3.25

8.64

8.18

F-2

W-2 C--

W3

0.80 0.44 0.80

1.43 3.75

D 10

0.70

10.67

OPEN ABOVE STEEL HANDRAIL

0.80 0.45 0.80

2.75

D 10

D 11

2.53

2.25

W3

14.60

0.26

2.00

D 10

ELEC.ROOM HVAC OPENING

4

1.35

1.90

5.70 D 10

0.94

D9

S--

1.63

2.00

2.30

1.20

0.90

2.00

D 10

3.80

W-1 C-(1,2)

W-1 C-(1,2)

3.00 8.09

1.20

0.71

1.88

F-2

W-2 C-3

3.00 13.10

0.45

0.45

1 �‫ﻣ���ر‬

1.00

D7 BUFFET

S--

F-(1,4) S-2

1.00

O

1.34

8.03

D4

16.55

4.00

2.00

2.00

2.00

1.00

1.03

F-2

W-2 C-3

‫ﻣﻣر‬

L

N

8.03

D4 1.20

2.10

D7

W.C

F-1 S-1

0.96

0.80

0.50

0.80

0.50

CORRIDOR

D2

LECTURE HALL 1

M

1.36

5.03

2.75

1.00

D6

D2

4.05

1.20

0.77

7.24

2.00

202 03

1.75

‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬

4.59

FFL.

2.00

3.00 3.00 20.95 48.15 3.50 0.50 1.50 3.40

Open Above

1.40

D4

1.20

UP

1.48

J

K

4.09

D4 0.80

-6.900

1 204

Retaining wall

1.36

D4

1.20

10.70

10.80

2.79

=

C

��‫ﻣﻌﻣ‬

‫ﻣﺧزن‬

1.00

D 12

1

W-3 C-(1,2)

3.52 3.50 48.01

1.34

7.80

3.25

D6

1.00 0.50 1.50

7.80

10.73

D6

4.98 3.40

2

S--

1.00 1.75

3

F-1

3.50

4

F-1 S-2

STORAGE

D6

3.00

1.36

5.45

Open Above LABORATORY

‫�ر���ﺔ ﺗ�����ر‬

D6

1.85

1.00

2.47

3.25

W-3 C-(1,2)

1.20

S--

W-3 C-(1,2)

FFL. 5.45

4.80

4.75

5

2.70

F-1

2.40

W-3 C-(1,2)

F-1 S-2

3 �����

0.80

PREPRATION ROOM

��‫ﻣﻌﻣ‬ LABORATORY

W-1 C-(1,2)

-6.900

FFL. 10.50

1.20 0.15

1.00

6

1.90

3.50

7

�����‫�ﺗ���ﺔ ﺗ‬

H I

W2

0.25

GYPSUM PARTITION 8

LECTURE HALL 1

G

1.20 3.04

��‫ﻣﻌﻣ‬

STEEL HANDRAIL W2

1.20

0.44

3.10 1.10

F-3 S-2

W-1 C-(1,2)

F

1.19

3.35

1.20

-6.900

11 12 13 14 15 16 17

D2

3.61

F-1 S-1

F-1 S-1

4 �����

F-1 S-1 W-1 C-(1,2)

W-1 C-(1,2)

5.65

1.20

CLASS 3

W-1 C-(1,2)

DIGITAL LIBRARY

15.20

E

2.08

CLASS 4

4

W-1 C-(1,2)

1.75 3.35

STEEL HANDRAIL

9

3.60

UP

1

STUDENT ACTIVITTES

3.35

3.60

10

1.20

3

D6

0.45

‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬ D

2.40

2

D6

F-3 S-2

Open Above

2.40

F-3 S-2

1.08

2.40 1.20 4.00

0.90

D6 D6

STUDENT ACTIVITTES

A

1.70

B

1.35

W-1 C-(1,2)

Open Above

C

3.75

STUDENT ACTIVITTES 4.20

F-3 S-2 W-1 C-(1,2)

GYPSUM PARTITION

3.75

0.40

1.20 STUDENT ACTIVITTES

‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬

1 304

1.00

2.40

1.20

4.00 1.20

0.75

2.15

1.70

8.05

1.50 1.00

B

W2

Aluminum Cladding

Aluminum Cladding

1.00

A

Open Above

GROUND FLOOR LIMIT

N O

4 2 1

CW 6

UP

Open Above

Aluminium screen

5.10 4.00

4.00 0.20

W2

3

W2

4.05

W2

Aluminum Cladding CW 6

W2

‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬ Open Above

Basment Entrance

9.95

P

P

0.50

5.00

1.00

W1

5.00

W1

1.00

7.51

1.51

‫ﻣﻔﺗوح ﻻﻋﻠﻰ‬

16.25

1.09

02 201

Q

Q

0.25

16.40 2.65

2.05

1

2

3.00

1.21 0.22

2.50

3

4

34

33

2.90

2.60

5

32

6

31

30

9

27

10

26

2.00

1.59

2.50

2.00

3.50

11

25

1.21 0.70 2.00

12

24

23

2.00

1.90

4.30

13

2.00

1.90

2.85

0.85 75.45

14

22

21

15

20

19

2.00

16

18

2.42

2.00

17

2.00

1.70 0.27 1.76

17

16

18

19

15

20

1.60

0.27

2.00

3.50

1.48

2.75

2.50

21

3.00

22

14

23

13

3.50

0.50 1.50

24

25

12

26

11

2.15

27

1.55

28

10

2.00

29

1.30

30

9

8

2.00

31

2.00

32

7

34

5

4

3

1

DRY DECORE CLADDING

ROOF SSL

CLADDING CW 9

W1

2

DRY DECORE

4.40

4.40

W1

5.50

33

6

DRY DECORE

W1

CW 5

CW 5

CW 5

CW 5

CW 5

CW 5

CW 5

CW 5

CW 9

4.50

4.50

CW 5

CW 5

CW 9

CW 5

CW 9

CW 5

CW 5

CW 9

CW 5

CW 5

CLADDING

17.90

1ST FFL

W1

CW 9

CW 9

CW 9

CW 9

CW 9

CW 9

CW 9

CW 9

CW 5

+6.60 F.F.L

4.50 4.50

W1

4.50

CLADDING W1

4.50

1ST FFL

CLADDING CW 9

W1

+11.10 F.F.L

4.50 4.50

2ND FFL

W1

+15.50 F.F.L

CW 5

2ND FFL

4.50 +2.10 F.F.L

28

1.45

CLADDING

W1

+6.60 F.F.L

29

8

2.12 3.00

ROOF SSL

4.50

+11.10 F.F.L

7

2.00

1.60

DRY DECORE

ALUMINUM SCREEN +15.50 F.F.L

1.90

5.70 4.40

8.90

CW 9

GROUND FFL

GROUND FFL

+2.10 F.F.L

W1

W1

CW 5

CW 9

CW 9

CW 5

CW 5

CW 5

CW 5

CURTAIN PANEL

CW 9

CLADDING

3.00 3.00

CLADDING

CW 9

4.50

W1

-0.90 LECTURE HALL

F.F.L

BASE-1 FFL

CW 9

CW 5

CW 5

CW 5

CW 5

W2

W2

CW 5

CW 9

CW 5

-5.10

CW 9

LECTURE HALL 1.80 1.80

CLADDING

4.50

CW 5

BASE-2 FFL 0.38

-6.90 F.F.L

5.10

4.50 5.48

4.20 4.20

-2.40 F.F.L

4.50

4.50

CW 5

F.F.L


DAR ALTEB Maternity & IVF Specialized Hospital

Ful l Pac ka ge of a rc h i tec tu re draw ings pl ans ,se cti on &E l ev a ti o n s

8

7

6

2.65

1.58

1.93

1.50

0.25

1.21

2.30

Grey paint

1.50

1.50

4 709

GENERATOR

FFL.

D 14

Grey Cladding

FFL.

OUT PATIENT WAITING AREA

1.93

Roof

2.00

9.35

0.25

0.97

0.70

0.31

Third Floor

2.40

1.88

0.40

0.40

0.90

2.15

Second Floor

CW 4

3.00

G

0.30

Grey Cladding

D7 1.00

F-1 S-1 W-1 C-1,2

0.12

3.35

E.R ROOM

3.93

0.45

3.35

0.74

0.90 3.96

F-2 S--W-2 C-1,2

3.70

D3

0.90

1.47

2.76

CLEAN UTILITY

1.20

-3.25 FFL.

2.55

F-1 S-1 W-1 C-1,2

Brick Sill 0.3m

F.F.L

2.40

D3

CLINIC

Handrail 0.7m

+9.05

W-1 C-1,2

5.15

4.75

G

Curtain win.

1.96

F-1 S-1

2.65

2.73 0.15

5.73

1.10

CORRIDOR

D6 0.80

W4

1.88

shaft open Above from Basement to Roof

I

0.25

1.68

W.C F-2 S--W-2 C-1,2

0.70

2.05

MAIN LOBBY

Porcelain Tiles Cement Mortar Clean Sand R.C Slab False Ceiling

3.86

F-3 S-2 W-1 C-3

1.60

3.76

STAIRS

H

2.05

3.88

0.68

D4

1.20

2.48

FFL. UP

1.20

1.86

-3.05 H

MAIN LOBBY

Porcelain Tiles Cement Mortar Clean Sand R.C Slab False Ceiling

0.30

0.12

FFL.

16.35

1.86

1.20

Emergency Entrance

-3.25

DN

FFL.

4.97

D3 0.25

5.81

NURSE STATION

1.53

0.90

0.25

5.79 1.20

0.90 0.15

6.12

3.70

0.90

-3.05

7.14

0.15

5.73

D3 2.80

D3

W4

2.35

2.00

D3

E

0.70

W-1 C-1,2

F-1 S-1 W-1 C-1,2

F-1 S-1 W-1 C-1,2

0.90

2.70

CORRIDOR

CLINIC

3.95

F-1 S-1

FFL.

F-1 S-1 W-1 C-1,2

Aluminu m Cladding

1.60

TRIAGE

-3.05 CLINIC

Mesh Steel

1.39

2.00

0.60

0.33

1.67

W-2 C-1,2

1.20

0.79

D 10 0.33

0.80

F

FFL.

3.83

D3

Blue Cladding

1.25

28.01

CW 6 D

1.60

Outpatient Entrance

Porcelain Tiles Cement Mortar Clean Sand R.C Slab False Ceiling

F.F.L

4.70

W-1 C-1,2

2.93

F-2 S---

0.40

+12.65

2.05

2.69

1.40

2.62

1 205

FFL.

FFL.

F-1 S-1

-3.05 UP

WOMEN LOCKER

0.12

-3.25

-3.05

MAIN LOBBY

1.80 5.33

1.30

C

0.12

4.08

2.70

0.90

3.46

2 709

Stone

FFL.

CW 3

3.53

F-3 S-2

0.69

W-2 C-1,2

1.82

2.40

STAIRS

2.35

1.35

-3.25

Aluminu m Cladding

1.00

shaft open below from Basement to Roof

4.08

1.40

F-2 S--W-2 C-1,2

W-2 C-1,2

MAIN LOBBY

1.70 0.44

W.C

1.93

F-2 S---

W.C F-2 S---

3.29

ELEVATOR

4.70

0.37

4.00

White Cladding

1.95

W.C

W-2 C-1,2

2.40

2.08

B

1.65

1.98

DIRTY UTILITY

DN

2.02

1.64

1.98

1.98

2.30

W-1 C-3

F-2 S---

2.27

4.20

W3

CW 7

2.40

D 14

D4

1.96

D4

1.30

0.95

1.30

0.12

0.75

0.80

FIRE EXTINGUISHER

MEN LOCKER

0.80

1.82

D5

D4

1.36

0.88 0.90

3.00 ELEVATOR

D3

HPL Partition 2m Height

0.80

D2

W-2 C-1,2

0.68

0.90

0.12 0.80

D3

F

D5

1.57

RECEPTION COUNTER

0.79

D5

1.00

F-2 S---

D3

3.46 1.70

1.70

HPL Partition 2m Height

0.36

D 11 D6

shaft open Above from Basement to Roof

F-1 S-1

D4

Shaft open Above from Basement to Roof

1.80

2.08

2.08

2.05

COUNTER

09310 Ceramic Tile

2.46

LAUNDRY

4.20

0.90

D3

2.00

4.40

1.92

04050 Basic Masonry Materials and Methods

0.90

W-1 C-1,2

0.80

1.10

1.98

3.76 0.84

1.80

W-1 C-1,2

Open Above

3.52

D5 1.88

3.83

Gypsum Board Wall Partition 1.5 m Height

2.00

F-1 S-1

1.50

FFL.

0.10 0.00

STERILIZATION

0.84

1.95

0.12

COUNTER

1.00

Retaining Wall

1.18

Outpatient Entrance 1.73

0.90

1.00

D

E

White Cladding

1.00

-3.05

F-1 S-1 W-1 C-1,2

D3

6.68

0.80

1 205

11.75

7.05

FFL.

Gypsum Board Wall Partition 2.0 m Height

CORRIDOR

F-1 S-1

12.80

18.21

1.84

0.58

D4

204 04

3 701

1.50

0.12

0.25

D3

AIR LOCK

0.90

1.48 1.44

-3.05

W-1 C-1,2

5.08

C

Steel Mesh

1.00 0.40

0.38

1.83

0.70

A

F-1 S-1

3.96

4.20

1.70 1.50

1.00

D7

White Cladding

S.F.L

Stone

Open Above

1.32

6.23 TRASH W-1 C-1,2

D4

+16.25

F-6 S--W-1 C-1,2

D7

Mozico skirting Moziko Tiles Cement Mortar Clean Sand Sloped Concrete Thermal Insulation Water Proofing R.C Slab False Ceiling

1.08

0.47

+17.25

0.100.10 0.78

1.68

1.00

-3.05

0.20 0.10 0.20

6.00

D7

Open Above

A

B

A'

8.20

W-1 C-1,2

2.65

Aluminu m Cladding

FFL.

1.50

-3.05

2.40

FFL.

0.47

S.F.L

Stone

-1.45

W3

W3

1.50

+19.25

Roof

4.00 8.45

17.71

-3.05

2.85

2.50 0.15

6.00

1'

2.00

Brick Work 0.70m height

1.93

F-1 S-1

1

2.10

1.50

0.30

1.50

D 13

7.95

2

1.10

1.50

0.20

0.15 0.18

MEDICAL GASES

3

1.10

1.50

W3

A'

4

1.88

2.30

PLANTING AREA

W3

5

203 03

28.21 1.25

1.50

2.25

9

2.60

2.30

10

1.55

0.25

11

2.05 8.38

7.60

12

4.00

7.10

13

I

Handrail 0.7m Brick Sill 0.3m

+5.45

0.30

First Floor

F.F.L

3.35

0.95

01 201

2.05

1.55

2.60

1.25

2.65

1.93

1.88

1.10

1.10

2.10

2.00

4.00

2.35

4.00

24.21

12

11

10

9

8

7

6

5

4

3

2

1

MAIN ENTRANCE LOBBY

1'

C.W1

3.60

5.20

13

2.20

2.20

D4

Porcelain Tiles Cement Mortar Clean Sand R.C Slab False Ceiling

+0.90

GROUND FLOOR F.F.L

I

G

E

F

D

A

A'

UPPER ROOF

Blue Cladding

0.30 0.55

0.50 2.58

2.10

+16.25 F.F.L

4.82

Steel Mesh Third Floor

+12.65 F.F.L

W2

W2

W2

W1

3.60

White paint

1.20

1.20

W1

White paint

First Floor

1.68

1.57

0.50

3.53

3.47 0.80

+0.90 F.F.L

-1.40

1.65

3.70

3.95

W3

0.80

0.60 1.90

0.50 1.50 0.80

0.50

CW 4

3.15

3.80

Grey paint

Basement Floor

1.62

3.01

1.20

1.50

GROUND FLOOR paint BLUE

0.55

+0.00

-3.05 F.F.L

+2.13

4.55

2.98 0.10

CW 2

CW 3

+0.55

1.70

GROUND FLOOR

1.80

+0.90 F.F.L

8.50

0.10

1.20

W2

+5.45 F.F.L

1.70

+3.75 White Cladding

0.20

Grey Cladding

0.20

3.15

0.40

6.90

1.00

+5.45

louvers

W1

+9.05 F.F.L

3.60

1.20

0.10

2.90

W1

Grey Cladding First Floor

3.35

+5.45 F.F.L

Second Floor

20.00

0.60

1.10

Grey Cladding

White Cladding

W2

1.20

W1

+8.95

2.40

2.20

Steel Mesh

0.10

14.65 3.60

1.20

16.40

17.70

Second Floor

Grey Cladding

2.40

+9.05 F.F.L

1.10

0.10

3.60

1.20

0.10

6.00

2.40

8.50

W1

3.60

W2 Steel Mesh

1.20

W2

2.20

2.40

Roof White paint

4.82

1.20

W2

Steel Mesh Third Floor

0.20 0.30

2.00 White paint

0.10

3.60

1.20

W1

+17.25

Blue Cladding

0.50

2.00

Blue Cladding

0.10

2.10

Roof

+19.25 S.F.L

+17.95

0.20 0.300.34

0.50 0.30

0.30

Grey Cladding

2.60

0.30

Grey Cladding

+12.65 F.F.L

B

UPPER ROOF

+17.80

+16.25 F.F.L

C

2.58

+19.25 S.F.L

H

Grey paint Basement Floor

-3.05 F.F.L

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


WADI LAHMY AZUR RESORT Full P ac k age of a rch i tec tu re d r aw ings p la ns & secti on

104

103

102

101

100

1

2

3

3'

4

5

6

7

8

9

10

11

12

13

13'

79.23 5.50

6.12

3.96

3.96

4.52

2.17

0.72 0.70 0.20 0.60 1.30 0.60 0.20 0.70

6.12 1.97

6.12

0.70 0.20 0.60 1.30 0.60 0.20 0.70

1.97

6.12

0.70 0.20 0.60 1.30 0.60 0.20 0.70

1.97

0.70 0.200.60

0.28

1.30 0.60 0.20 0.70

5.00

5.00

1.39

5.00

9.13

0.80

5.00

3.15

3.00

201 03

5.00 3.05

0.80

5.00

3.15

3.00

5.00 3.05

0.80

5.00

1.82

3.00

6.50

1.82

2.72 3.32

0.28

1.00

1.02 0.25

6. 16

201

3

.09 11

202

Grass

6. 16

BACK ENTRANCE

1 2

200

3.8 8

1 2

+0.15 FFL.

3

+0.15 FFL.

OUT OF SCOPE TO BE DESIGNED BY SHED SPECIALIST

Tent Structure

+0.45 FFL. OUT DOOR AREA

4

F-1 S-1

5

204

+0.45 FFL.

6

W-1 C---

7

+0.45 FFL.

+0.15 FFL.

8 9

F-1 S-1 W-1 C---

4.00

3.05

3.00

3.05

0.90

3.05

3.00

3.05

0.28

2.09

0째

AIR LOCK

3.88

4.00

0.90 3.63 CW 5

2.50

W3

4.75

0.77 F-1 S-1 W-1 C-(1,2)

+0.30 FFL.

I 7.00

Arch With 3.85m Hieght

+0.30 FFL.

Arch With 3.85m Hieght

+0.30 FFL.

Arch With 3.85m Hieght

+0.45 FFL. 1.20 0.21

3.17

Arch With 3.85m Hieght

+0.30 FFL.

+0.30 FFL.

1.80

1.50

1.80

1.45

W1

1.50

1.10

1.10

1.40

0.24

+0.15 FFL.

+0.15 FFL.

+0.15 FFL.

VCAFE'S ENTRANCE

+0.30 FFL.

2.70 1.58

35.04

1.38

1.50

0.56

1.00 0.25 0.53

W2

G' 1.02

12.13

MAIN ENTRACE'S LOBBY

W2

CW 7

LUGGAGE HOLD

F-1 S-1

1.70

FLOWER BOX

+0.45 FFL.

0.900.10 D8

2.85 W3

3.28

CW 1 F-1 S-1

1.56

W-1 C---

2.50

3.28

2.85

14.75 +0.45 FFL. 2

+0.15 FFL.

1

3 202

+0.15 FFL. MAIN ENTRANCE

15

+0.15 FFL.

01 201

Grass

.43

+0.15 FFL.

Grass

Grass

35. 00째

3.55

9.98 5.50

4.89 6.12

1.20

3.96

2.17

4.90

1.20

6.12

4.90

1.20

6.12

4.90 6.12

0.80 0.57 0.28

4.00

0.80

5.00

1.25

1.50

1.26

0.80 0.54 0.70 0.20 1.50

5.00

0.20 0.69 1.00 0.700.20

5.00

1.50

0.20 0.70

1.17

0.70 0.23 1.50

5.00

1.03 0.60 0.28 0.92

1.55

5.00

1.55

3.28

2.50

5.00

3.28

5.00

1.55

1.56

0.53 0.23 1.00 0.60 1.00 0.60

5.00

3.00

1.00 0.25 0.53 2.72

0.28

83.80

104

103

102

207

101

100

1

2

3

3'

4

5

6

7

H

4.48

0.60 0.22

W1

4.00

3.50

3.63 4.00

4.00 9 10 11 12 13 14 15

W2

Open Above

+0.30 FFL.

202

8

W-1 C-(1,2)

F-2 S--W-2 C-3

2

+0.15 FFL.

7

0.23 1.00 0.60 1.00 0.60

11.25

1

+0.15 FFL.

6

1.25

1.55

F-1 S-1

W1

5

G

2.26

D2 OFFICE W-1 C-(1,2)

1.50

W1

0.12

4

2.72

2.00 3.70

3

FLOWER BOX

1.43 2.45 2.08

3.70

F-1 S-1

2

2.30

4.73

0.800.12

D2 D2 0.56 0.900.12 0.120.90 0.56

2.00

OFFICE

1.45

1.09

Reservation Counter

D2 0.900.12 0.12

F-1 S-1 W-1 C-(1,2)

W-1 C-(1,2)

+0.45 FFL.

CW 4

1.26 4.40 OFFICE

F-1 S-1 W-1 C-(1,2)

F

4.65

+0.30 FFL.

2.00

5.10 OFFICE

5.21

1.20

4.00

CW 2

5.22

D2 0.52 0.900.30 0.12

3.38

W-1 C-(1,2)

1.20

W5

0.300.50

4 2.8

+0.30 FFL.

+0.30 FFL.

+0.30 FFL.

4.91

W5

E 0.28

4.23 1

1.20

13.77

W5

+0.45 FFL.

+0.45 FFL.

2.15

F-1 S-1

+0.45 FFL.

1

+0.45 FFL.

2.48

To Hotel Rooms Building

HVC SHAFT

1.85

SHOP

W-1 C-(1,2)

1.20

0.15

4.66

0.15

0.15

1.20

11.40

1.75

6.15 +0.45 FFL.

0.25

0.25

F-1 S-1

W-1 C-(1,2)

4.35

W-1 C-(1,2)

CW 10

F-1 S-1

SHOP

4.00

F-1 S-1

+0.45 FFL.

W-1 C-(1,2)

F-1 S-1

4.48

SHOP

5.87 SHOP

2.70

2.80

18.42

5 1.5

+0.45 FFL.

SHOP

5.87 +0.45 FFL.

2.80

5.87

2.80

W-1 C-(1,2)

D2 0.27 0.90

2.37

16

W-1 C-(1,2)

0.27 0.90

D4

2

STAIRS F-3 S-2

0.63

17

D2

1.20

3

18

3.15

3.75

12.13

F-1 S-1

0.25

4.29

5.59

STORAGE

0.68

D4

W-1 C-(1,2)

4.00

2.50

11.37 +0.45 FFL.

W-1 C-(1,2)

F-1 S-1

4

3.15

F-1 S-1

W.C F-2 S---

D4

2.13

V.CAFE

2.00

F-2 S--W-2 C-3

1.38

2.00

D4

D

5

False Ceiling Beneath The Doom Determined by Site

ARCHIVE

W-2 C-3

F-1 S-1

2.13

7.37

F-2 S--W-2 C-3

W-2 C-3

D3

1.20

6

ELEC.ROOM

2.15

6.67

5.88

W.C

D1 D1 1.07 1.000.100.10 1.00 1.07 GENRATOR 2.16 ROOM

SEMINAR

D6

9.75

W-1 C-(1,2)

2.49

7

15.47

F-1 S-1

2.83

2.73

4.93

F-2 S---

D3

D3

2.20

4.57

D7

3.42

1.46

2.20

2.00

0.800.22

1.46

8

W-1 C-4

0.53

0.61

0.75

2.50

D6

1.28

1.12

4.00

2.00

3.10

+0.45 FFL. CORRIDOR

1 401

W-1 C-(1,2)

G

1.02

3.63

D6

F-1 S-1

2.00

3.50

CORRIDOR

D6

1.28

H

1.02

0.75

20.27 D6

F

G'

3.00

W-1 C---

2.00

LOADING DECK

202 02

4.00

4.52

9.75

13.37

9

13 14

2.37

1.00

0.80

CW 9

F-1 S-1

+0.45 FFL.

Open Above

1.60

+0.45 FFL.

D7

2.48

11 12

15

28.00

+0.45 FFL.

2.00

4.00

2.50

43.26

+0.00 FFL.

E

2.48 10

2.74

0.83

CW 9

D6

C

4.00

W7

8.48

D6

+0.45 FFL. ENTRANCE LOBBY

4.00

CW 9

2.00

D6

2

Open Above

4.20

+0.45 FFL. 1

Arch With 5.60m Hieght

04 202

1.00

OUT OF SCOPE TO BE DESIGNED BY KITCHEN SPECIALIST

4.00

+0.15 FFL.

206

CW 6

HVC SHAFT

1.12

W3

3.00

W3

1.60

W3

W-1 C-(1,2)

D

CW 9

W-1 C-(1,2)

W3

0.83

W3

B

3.69

+0.45 FFL.

1.60

W3

F-1 S-1

15.63

W3

STORAGE

12.20

4.00

F-1 S-1

Walkway Passage

+0.45 FFL.

W-1 C-(1,2)

3.30

CW 3

RESTAURANT

C

Arch With 5.60m Hieght

F-1 S-1

+0.45 FFL.

7.50

.79

A

1.16

9.75

00째

20.02

6.50

29.75

+0.45 FFL. 13

B

A' 0.90

3.00

3.30

3.00

4 9.4

205

Arch With 7.20m Hieght

0.70

+0.45 FFL.

8.00

105.

75.0

2

40.00 째

13 14

2

1

9.00

2.50

12

1

9.10

5.20

0.70

A

10 11

CW 11

CW 11

4.00

+0.45 FFL.

CW 11

4.00

A'

8

9

10

11

12

13

13'

I


ALFLAJ SOCIAL WELFARE F ull Pac kag e of a rc h i tec tu r e dr awi n gs plans & se c t ion

B1-201 4

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

37500

1500 2

5700

10

1100

25

26

27

28

1400 800

29

1020

2880

MAIN ENTRACE

11 65

11

1750

1700

1600

1200

FFL.

4 3 2

‫ واﺟﮭﺔ‬1

1

1 : 100

UP

2

W01

‫ واﺟﮭﺔ‬2

W01

4100 1355 2140

2150 1550

3255 1900 380 2999

1272

799

+9.450 m LEVEL 2

1600

13

1600

5152

749

5599

FFL.

+5.550 m LEVEL 1

UP 3

2

00 60

1

2244

2864

2100

+0.000

4

18 50

799

300 +0.750

W06

1276

999

W06

750

5

FFL. 426

1568

1700 1100

1600

W01

4852

2300

1550

W01

6799

W.C

12

+0.750 m GRAUND 13LEVEL 18 17 16 15 14

12 2864 2244

23 13

2 B1-202

+0.750 m GRAUND LEVEL

14

1992

20

W02

D06 1700

D08

D02

1272

9 10

W01

23 13

+0.750

MANGER ROOM

BUFFET

W02

SECRETARY ROOM

7 8

21 19

W02

6900

6

22

14

W04

D05

4500

MEETING ROOM

5

25

2140

MEN ENTRANCE 3000

4

26

4698

3

27

4900

2402

UP

W04

4109

1

28

1

+16.400 m LEVEL 4

11

1500

1700

2

10

5151

2200

D06

UP

150450

29

23

200 1100

800

MEN EMRGANCY EXITD06

24

15

1660

15

+13.250 m LEVEL 3

W04

2880

D06

1500

14

201 1100

600

300

D05 1740

940

530

V.I.P. GESTS

D05 1000

1500

2570 6000

899

D06 2550

2140 2605

1600 800 80

13

W01 24

W04

2480

800 120

1200

12

1700

6100 W04

MEN SECTION 1500

3110

3650

1795

11

2299

1100

1600

940

2350

Room

+5.550 m LEVEL 1

2

1490

W01

4500

W.C

780 1000

30 0

300 D03

1000

1600

6700

9500 1500 1600

1700

2450

UP

9

1

1560

23

3

2140

4

750 200

5

9

22

2300

820 6

200

7

1700

1450

1950 200 1400

8

1568

2240

3300

3000 21

9

426

1500

3000

9500 2614

89 3 10 00 20 0

11

D09

D 10

D07 1400

12

B1-201

3

D05 D 10

641

850

950

2800

3000

3200

2800

1100

2750

3

15

7267

7700

1 : 100

1 B1-202 800

4100

3300

1700

2150

1550

1795

2605

1900

4100

2999

3000

6000

1100

37636

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

1 B1-201

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

O

N

M

L

K

J

I

H

G

F

E

D

C

---

B

A

1 B1-202 +16.400 m LEVEL 4

+16.400 m LEVEL 4

+13.250 m LEVEL 3

W04

W04

W04

W04

W04

W03

W01

W01

W04

W06

W04

W04

W04

W04

W04

+9.450 m LEVEL 2

+9.450 m LEVEL 2

+5.550 m LEVEL 1

+5.550 m LEVEL 1

+0.750 m GRAUND LEVEL

+0.750 m GRAUND LEVEL

W06

W01

‫ واﺟﮭﺔ‬3

4

1 : 100

‫ واﺟﮭﺔ‬4 1 : 100

‫وزرة أﻟﻣوﻧﯾوم‬ ‫ﺣﺻﻰ ﻣﺗدرج‬ ‫ ﺧرﺳﺎﺗﺔ ﻣﯾول ﻣﺗوﺳط ﺳﻣك‬7‫ﺳم‬ ‫ ﻟﯾﺎﺳﺔ اﺳﻣﻧﺗﺑﺔ‬3‫ﺳم‬ ‫طﺑﻘﺔ ﺣﻣﺎﯾﺔ ﻣن أﻟﯾﺎف اﻟﺑوﻟﯾﺳﺗر‬ ‫ﻋﺎزل ﻟﻠرطوﺑﺔ طﺑﻘﺗﯾن ﻣن ﺷراﺋﺢ اﻟﺑﯾﺗوﻣﯾن‬ ‫طﺑﻘﺔ ﺣﻣﺎﯾﮫ ﻣﻧت اﻷﻟﯾﻠف اﻟﺑوﻟﯾﺳﺗر‬ 5‫ﺳم ﻋزل ﺣرارة ﻣن اﻟﺑوﻟﯾﺳﺗرﯾن‬ ‫ ﻟﯾﺎﺳﺔ اﺳﻣﻧﺗﺑﺔ‬3‫ﺳم‬ ‫ﺑﻼطﺔ ﺧرﺳﺎﻧﯾﺔ ﻣﺳﻠﺣﺔ‬

+16.400 m LEVEL 4

‫ﺳﻘف ﻣﺳﺗﻌﺎر‬ +15.350 3150

+14.850 +14.350

+13.250 m LEVEL 3

+13.250

3800

+13.150

+9.450 m LEVEL 2

+9.450

3900

3900

17150

+9.450

+5.550 m LEVEL 1

+0.955

+1.050

4800

+5.550

4800

3

W01

+13.250 m LEVEL 3

W04

+0.750 m GRAUND LEVEL

+0.750 850

W05

1400

1

13

8

1739

W.C

+9.450 m LEVEL 2

4

W01

14

2200

D08200

78 48

13 W03

W01

15

D05 3110

ELEVATOR

2850

W01

20

16

8

3000

900

1600

Room 1800

W04

W06

7

17

W01

7050

2159

6000

1100

2140

560

12

W04

5THEATRE CORRIDOR 6

18

7

2000

W04

19

D08

BUFFET

3100

W04

10

D 12

W01

6

D05

D05

4039 200

2039

1000

W04

100

760

D09

1700

W04

D07 900

+13.250 m LEVEL 3

580

2999 W04

W01

140

OFFICES

3700

W01

+16.400 m LEVEL 4

11

0 20

4

3

6000

4000

1600

2140

1 B1-202

W06

BUFFET

THEATRE CORRIDOR

6900

7267

3

---

UP

1600

200

2

D02

2100

1

100 1100 100 1100 100

12 68 4

300 1000

900 9800

9 10 11 12 13

6799

300

O

8

1600

N

7

OFFICES

1700

8000

200 900 200

2650

M

6

2221

L

5

650

K

4

200

1500

J

3

WOMEN EMERGANCY ENTRANCE

D05

650

I

00 18

1000 220

H

00 10

2200

G

2

D07

D 10

D 10

1270

F

W.C

---

0 20

93 20 0 20

D05

2643

2100

E

00 17

10250

850

D

1

1282

250 250 250

1400

RAMP 1795 2650 2605 2140

38099 1900

C

0 20

4100

B

93 20

1282

4600

W06

UP

5 WOMEN SECTION

SURVICES CORRIDOR

7 94

A

0 20

85 59

FFL.

300 800 200

D06

4737

3700

00 18

+0.900 5342

0 20

D05

FFL.

FFL.

1100

10

00 17

FFL.

W02

15

D05

01 13

9

2

4600

73 73

5100

RAMP 2140

+1.0505 13 5

FFL.

+0.650

B1-201

D07 BUFFET

THEATRE HALL

+0.900

900 100

2787

13 75

2250 15 80

3300 1550 250

2150

00 12

1550

00 12

FFL.

+0.500

16 14

OFFICES

2100

+0.200

FFL. +0.350

2

17

4

+0.750

FFL.

1

18

Room

00 12

1700

00 12

8

+0.500

3104

W02

W06

29 28 27 26 25 24 23 22 21 20 19

D03

6000

+0.350

FFL.

7

ELEVATOR

FFL.

00 12

6

+0.900

1280

+0.200

FFL.

FFL.

D04

850

3909

1280

07 82

1600

D06

1280

5 1

1100

200 900 200

FFL.

930

530

1200

1280

2

1600

+0.650

+0.500

FFL.

FFL.

2140

4100

1200

1280

UP

850

2600

1200

+0.350

+0.200

2030

6350

1200

FFL.

2100

1100 201

2980

RAMP

STAGE

3787

3200

1800

1

794

4

580

6000

UP

200 800

2

200

3

2140

6000

W01

4039

800 300

1000 200

4

3000

UP

5005

3295

560

W01

15 60

200

1723

200

W02

1200

W02

2999

D04 5

0 20

W.C

3

4100

2140

4600

06 31

D07

56 18

4100

200 900 236

1900

W02

50

200

2550

STAGE SERVICES

200

UP

1608

4600

FFL. +1.005 D 11

2605

1600

W02

800 690

800

1300

1200

2

2274

1795

800

2140

1550

1100

2274

2150

4600

2140

1 W02B1-202

1

1700

5342

1473

3300

1100

2 B1-202

4100

3104

200 800

-0.650

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


FAMILY CREATION BASE =

10000


AL BAHR TOWER PANEL 1000 BASE =

EQ

0

EQ

Exterior

TA RO A TE

EXTRUDE = 200

2 W

=

83

REVOLVING PANEL

2

= LE NG 0 45.0 °

00.05 = 2HT 00.05 = 2HT 00.05 = 2HT

00.052 = 1ht

00.05 = 2HT

PITAL BIN HAIDER PANEL

ARCHITECTURAL SYMBOLS LEVEL MARK

Elevation F.F.L

Name

LEVEL NAME

LEVEL HEIGHT

GRID MARK GRID NAME

### SPOT LEVEL SYMBOL

FOR FACADE & DETAILS USE

ELEVATION MARK VIEW NAME

1

1

A101

SHEET NUMBER

SHEET NUMBER

SECTION MARK

FOR BUILDING SECTION USE

1

1

DETAIL NAME

1

A101

SHEET NUMBER

SHEET NUMBER

VIEW TITLE

CALLOUT MARK

REFRANCE LABEL

1

A101

SECTION NAME

1 A101

A101

SHEET NUMBER

Ref 1

FOR WALL SECTION USE

SECTION MARK

SECTION NAME

A101

1 Ref

DETAIL NAME

1

A101

Ref

FOR BUILDING ELEVATION USE

Ref

ELEVATION MARK

DRAWING NAME

View Name

1

1 : 100

SHEET NUMBER

DRAWING SCALE DRAWING LOCATION NUMBER

WINDOW TAG

DOOR TAG

D## ROOM TAG FLOOR FINISH

ROOM NAME SKIRTING FINISH

Name F-0

LINE STYLE

W##

DOOR NUMBER

DASH LINE BLACK & GRAY (1- 8) LINE WEIGHT

LINE STYLE

CENTER LINE BLACK & GRAY (1-8) LINE WEIGHT

WINDOW NUMBER

FLOOR TAG FLOOR MATERIAL

S-0

FLOOR TYPE NAME

W-0 C-0

WALL FINISH

CEILING FINISH

N W

CURTAIN WALL TAG

NORT H

CW#

E

S

FOR ELEVATION & SECTION VIEWS USE

+0.000

SPOT TARGET

ZERO FLOOR LEVEL

+0.000 F.F.L. +0.000 S.S.L +0.000 S.C.L +0.000 T.O.S +0.000 POV.

SUSPENDED CEILING LEVEL TOP OF SLAB LEVEL PAVEMENT FINISH LEVEL

DIM.

2mm

DIM. 2.5mm

DIM. 3mm

0.3 0

EXTERIOR DIMENSIONS

EXTERIOR TEXT STYLE

0.60

DIM. 2mm

DIM. 2.5mm

DIM. 3mm

DIM. 5mm

DIM. 5mm

DIM. 7mm

DIM. 4mm

DIM. 6mm

DIM. 7mm

DIM. 8mm

DIM. 8mm

DIM. 10mm

DIM. 10mm

DIM. 9mm

HIDDEN LINE BLACK & GRAY (1-8) LINE WEIGHT

TOP OF SLAB LEVEL PAVEMENT FINISH LEVEL

DIM. 3.5mm

DIM. 6mm

LINE STYLE

SUSPENDED CEILING LEVEL

DIM. 3.5mm

DIM. 4mm

DASH LINE BLACK & GRAY (1- 8) LINE WEIGHT

FINISHED FLOOR LEVEL SLAB FLOOR LEVEL

90.

00°

0.60

INTERIOR TEXT STYLE

LINE STYLE

ZERO FLOOR LEVEL

90.

INTERIOR DIMENSIONS

CURTAIN WALL NUMBER

FOR PLAN VIEW USE

+0.000 +0.000 F.F.L. +0.000 S.S.L +0.000 S.C.L +0.000 T.O.S +0.000 POV.

FINISHED FLOOR LEVEL SLAB FLOOR LEVEL

00°

NORTH ARROW

SPOT TARGET

DIM. 9mm

0.3 0

LINE STYLE

CONTINUOUS LINE BLACK (1-16) LINE WEIGHT

LINE STYLE

CONTINUOUS LINE GRAY (1-16) LINE WEIGHT

T.H.E TEMPLATE CREATION

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


AL BAHR TOWER PANEL The pu rp o s e i n th i s p roj ect is to m ak e a s cri p t of v i su al PROGRA MMIN G T H ATS H E L P S TO CONTRO L A N O P E N I N G P AN E L S WI TH S O L A R P A T H B Y L I N K I N G THE SUN PAT H W IT H T H E S O L AR S E N S O RS PA NE L A S IN

T H E E L B AH R TO W E R .


12:00 PM

1:10 PM

12:00 PM

N

S

10000 BASE =

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


REVOLVING PANEL

I N THIS P R O J E C T I C RE AT E D A P ANEL WI TH R O T A T IO N AL P ARAM E T E R TO CRE A TE A FA C A DE TH AT B AS E D O N G RADIEN T IMA G E W I T H M U L T I P L E PI XE L M A PP ING B Y U S I N G DY N AMO V ISUA L PA N E L


EQ

EQ

TA RO A TE

EXTRUDE = 200

Exterior

2 W

=

83

2

= LE NG 00 45. °

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


REVIT TEMPLATE

Model Content

General Settings

System Family Types

Project Units

Model Text

Project Properties

Rooms

Shared Parameters

Area

Project Parameters Sheet Issues/Revisions

CRE A TING A FIR M ` ARC I T E C H T U R E

Assembly Codes

R E VI T TE MPL A T E WI TH T O HE L P I N TH E B I M WORKFL O W T O P R O DU C E A A P ROJEC T W IT H M I N I M U M L O D 3 50

Views

Annotation Content

Starting View

Grid Bubble Types

Callout Tags

Level Head Types

Elevation Tags

Dimensions Types

Section Tags

Filled Region

Viewport Types

Repeating Detail

View Templates

Text Types

View Types

Tags

Drafting Views

View Reference Types

Basic Sheets/Placeholder

Color Fill Legend Types

Abbreviations Legend

Arrowheads

Schedules

Graphic Standards Object Styles Fill Patterns Line Styles Line Weights

2.20 1.00

1.00

1.00

1.00

1.00

2.20

2.20

2.20

2.20

Line Patterns

1.00

1.20

0.80

0.90

1.00

SINGLE-HINGED

DOOR TYPE

SINGLE-HINGED

DOOR TYPE

SINGLE-HINGED

STRUCT. OP

800X2200mm

STRUCT. OP

1200X2200mm

STRUCT. OP

1000X2200mm

N/A

FIRE RATING

N/A

FIRE RATING

N/A

FIRE RATING

N/A

MATERIAL

Wood

MATERIAL

Wood

MATERIAL

Wood

MATERIAL

WOOD WITH STEEL PLATE

MATERIAL

WOOD WITH STEEL PLATE

DOOR TAG

D1

DOOR TAG

D2

DOOR TAG

D3

DOOR TAG

D1

DOOR TAG

D2

1.00

1.00

1.00

1.00

1.00

2.50 1.50

2.20

DOOR TYPE

900X2200mm

FIRE RATING

2.20

SINGLE-HINGED

STRUCT. OP

N/A

2.20

DOOR TYPE

1000X2200mm

FIRE RATING

2.20

SINGLE-HINGED

STRUCT. OP

2.20

DOOR TYPE

1.50

2.00

2.00

DOOR TYPE

DOUBLE-HINGED

DOOR TYPE

SINGLE-HINGED

DOOR TYPE

SINGLE-HINGED

DOOR TYPE

DOUBLE-HINGED

DOOR TYPE

DOUBLE-HINGED

STRUCT. OP

1500X2200mm

STRUCT. OP

2000X2200mm

STRUCT. OP

2000X2200mm

STRUCT. OP

1500X2200mm

STRUCT. OP

1500X2200mm

FIRE RATING

N/A

FIRE RATING

N/A

FIRE RATING

N/A

FIRE RATING

N/A

FIRE RATING

N/A

MATERIAL

Wood

MATERIAL

Wood

MATERIAL

Wood

MATERIAL

WOOD WITH STEEL PLATE

MATERIAL

WOOD WITH STEEL PLATE

DOOR TAG

D1

DOOR TAG

D2

DOOR TAG

D2

DOOR TAG

D1

DOOR TAG

D1


ARCHITECTURAL SYMBOLS LEVEL MARK

Elevation F.F.L

Name

LEVEL NAME

GRID MARK

LEVEL HEIGHT

GRID NAME

### SPOT LEVEL SYMBOL

FOR FACADE & DETAILS USE

ELEVATION MARK VIEW NAME

1

A101

1

A101

SHEET NUMBER

SHEET NUMBER FOR BUILDING SECTION USE

SECTION MARK

1

1

SHEET NUMBER

Ref 1

SECTION NAME

1 A101

A101

SHEET NUMBER

SHEET NUMBER

VIEW TITLE

CALLOUT MARK DETAIL NAME

1

A101

REFRANCE LABEL

1

A101

FOR WALL SECTION USE

SECTION MARK

SECTION NAME

A101

1 Ref

DETAIL NAME

1

Ref

ELEVATION MARK

Ref

FOR BUILDING ELEVATION USE

DRAWING NAME

View Name

1

1 : 100

SHEET NUMBER

DRAWING SCALE DRAWING LOCATION NUMBER

WINDOW TAG

DOOR TAG

D##

LINE STYLE

W##

DOOR NUMBER

ROOM TAG FLOOR FINISH

WINDOW NUMBER

FLOOR TAG

ROOM NAME SKIRTING FINISH

Name F-0

DASH LINE BLACK & GRAY (1- 8) LINE WEIG

FLOOR MATERIAL

S-0

FLOOR TYPE NAME

W-0 C-0

WALL FINISH

CEILING FINISH

N NORT H

CW#

E

S

FOR ELEVATION & SECTION VIEWS USE

+0.000 +0.000 F.F.L. +0.000 S.S.L +0.000 S.C.L +0.000 T.O.S +0.000 POV.

FINISHED FLOOR LEVEL SLAB FLOOR LEVEL SUSPENDED CEILING LEVEL TOP OF SLAB LEVEL PAVEMENT FINISH LEVEL

INTERIOR DIMENSIONS

DIM.

90 .00

+0.000

ZERO FLOOR LEVEL

+0.000 F.F.L. +0.000 S.S.L +0.000 S.C.L +0.000 T.O.S +0.000 POV.

FINISHED FLOOR LEVEL

DIM. 2.5mm

DIM. 3mm

DIM. 3mm

DIM. 4mm

DIM. 4mm

DIM. 6mm

DIM. 7mm

DIM. 7mm

DIM. 8mm SILL HEIGHT=##

SILL HEIGHT=##

SILL HEIGHT=##

F.F.L.

F.F.L.

WIDTH= 1.50

DIM. 9mm HEIGHT= 1.00

DIM. 10mm

SILL HEIGHT=##

HEIGHT= 1.00

HEIGHT= 1.00

HEIGHT= 1.00

DIM. 9mm

HEIGHT= 1.00

DIM. 8mm

DIM. 10mm

F.F.L.

Width = 2.00

F.F.L.

WIDTH = 0.80

F.F.L.

WIDTH= 1.00

WIDTH= 1.50

WINDOW TYPE

DOUBLE SLIDING WINDOW

WINDOW TYPE

DOUBLE SLIDING WINDOW

WINDOW TYPE

DOUBLE SLIDING WINDOW

WINDOW TYPE

DOUBLE SLIDING WINDOW

WINDOW TYPE

FIXED WINDOW

WINDOW TYPE

FIXED WINDOW

STRUCT. OP

1500 x 1000 mm

1000 x1000 mm

STRUCT. OP

1500 x 1000 mm

STRUCT. OP

2000 x 1000 mm

STRUCT. OP

800 x 1000 mm

STRUCT. OP

1000 x 1000 mm

STRUCT. OP

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

WINDOW TAG

W1

WINDOW TAG

W2

WINDOW TAG

W3

WINDOW TAG

W1

WINDOW TAG

W2

WINDOW TAG

W3

0.46

F.F.L.

0.30

F.F.L.

WIDTH= 0.80

WIDTH= 1.00

HEIGHT= 1.00

SILL HEIGHT=##

F.F.L.

SILL HEIGHT=##

HEIGHT= 1.00

HEIGHT= 2.00 SILL HEIGHT=##

1.14

HEIGHT= 1.50

0.30

0.36

SILL HEIGHT=##

HEIGHT= 2.00

1.66

SILL HEIGHT=##

HEIGHT= 1.50 SILL HEIGHT=##

0.36

0.46

1.66

0.30

0.86

0.72

CONTINUOUS LINE BLACK (1-16) LINE WEIG

DIM. 5mm

DIM. 6mm

WIDTH= 1.00

LINE STYLE

0. 30

DIM. 3.5mm

DIM. 5mm

HEIGHT= 1.00

PAVEMENT FINISH LEVEL

DIM. 2mm

DIM. 3.5mm

SILL HEIGHT=##

TOP OF SLAB LEVEL

DIM. 2.5mm

F.F.L.

DASH LINE BLACK & GRAY (1- 8) LINE WEIG

SUSPENDED CEILING LEVEL

0.60

EXTERIOR TEXT STYLE

2mm

LINE STYLE

SLAB FLOOR LEVEL

EXTERIOR DIMENSIONS

0. 30

°

0.60

INTERIOR TEXT STYLE

FOR PLAN VIEW USE

SPOT TARGET

ZERO FLOOR LEVEL

SILL HEIGHT=##

SPOT TARGET

CURTAIN WALL NUMBER

°

W

CURTAIN WALL TAG

90 .00

NORTH ARROW

F.F.L.

WIDTH= 0.80

F.F.L.

WIDTH= 1.00

WINDOW TYPE

AWNING WITH FIXED UPPER PANELS WINDOW

WINDOW TYPE

AWNING WITH FIXED UPPER PANELS WINDOW

WINDOW TYPE

AWNING WITH FIXED UPPER PANELS WINDOW

WINDOW TYPE

STRUCT. OP

F.F.L.

WIDTH= 0.80

WIDTH= 1.00

AWNING WITH FIXED UPPER PANELS WINDOW

WINDOW TYPE

AWNING WINDOW

WINDOW TYPE

AWNING WINDOW

800 x 1000 mm

STRUCT. OP

800 x 1000 mm

STRUCT. OP

800 x 1000 mm

STRUCT. OP

800 x 1000 mm

STRUCT. OP

800 x 1000 mm

STRUCT. OP

1000 x 1000 mm

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

MATERIAL

ALUM.

WINDOW TAG

W1

WINDOW TAG

W1

WINDOW TAG

W1

WINDOW TAG

W1

WINDOW TAG

W1

WINDOW TAG

W1

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


PARAMETRIC MASS CONSTRUCTION BY US IN G V ISUA L P R OG R AM M ING A S D YNA M O C ONSTR U CT PA RA MET RI C SHAPE S BY US IN G M A T HEMA T I C FORMUL AS AND TRAN S F O R M ING I T I NT P R OG R AM IN G scri p t WIT H S E R IE S OF POI NT S A ND C OOR D IN ATE S .


Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


THANKS FOR REVIEWING

Mahmoud kamel T: +20 1098080519 , +20 1118367361 EMAIL : mahmoud.ashraf.kamel73@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.