Neu kohln +1 the concept revolove around merging the site into the neukolhn social vibe by export, as a result from the analysis we found that the mixed use of the existing site deminishes its social vibe and render it into an unactive site , the concept is to export the neighbouring potentials which surrounds the site form each side , north there is the treptow and golitzer park possible connection through an abadnoned railway turned into a green passageway flexible for interventions , from the east a new s-bahn station that will change the site cmpletly giving a new vaccum to be filled , form the south the water front and its neighbouring side public areas surrounding the water front and lastly the west side wich already contain a neighbouring public park with culturel potenitial in the stadlibrary and the wall of berlin passisng through both sites , the intervention is moving from micro to macro scale throught the site to callibrate between the potentials found and to conservate the balance already in the site from the function wise

the site context

historical background 1940

Neukohln in the the western side typologies emerge 1977

2021

before the wall fall the situa�on was con�nues as it was , the western side is turning more residen�al and civic facili�es began to appear as kindergardens , schools , and shelters

Neukohln before the ww2 bombing 1940

Neukohln the wall falls 1988-1989

Neukohln borough was an industrial district most of the site area was designated to factories and few social worker houses and and the empty spaces remained as greeneries however it was divided into parcels

the wall falling opened a problem that the 2 divded sectors of the site are forming a mishmash of residen�al industrial areas that diminshes eachother since the divider was removed and both sector progressed diffrently

Neukölln (the site scale)

Neukohln in process of reurbenising 1956

Neukohln thepublic area degenera�on 2000

a�er the bombing the site was slightly affected by the it and in the reurbenising process the allotment garden began to be established and mapped a slight changes in the exsis�ng building took places to repair the damages but no new project took places

The industrial parts were refurbished into seimens Corperte building and the urban language in the previous east side began to focus on added greenery which degenerated gradualy �ll current situa�on

Karpfenteich

Neukohln in the wall breaking the fabric 1968

Neukohln th current situa�on

TE

the commercial expension covered the greenery in the nothern part and the commercial and industrial zones became dominant in the site making it a mixed use area that wasn’t designed but only formed due to the progress gap between the used to be eastern side of the wall and west side of the wall

N

HAFE

OBER

RH

AF

EN

it changed the fabric of the site as the western side began to focus on making its part more residen�al which lead to new typologies emerging in the site of began to expands on neighboring parcels on the account of the allotment gardens while on the eastern side the progress halted due to the hinterlands

UN

the site lies in the nothern border divided between neukolhn and alt treptow by the Berlin wall in the most densified areas in neukoln borough

Karpfenteich

current


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Neukohln +1 by mahmoud fahmy - Issuu