Graduation Project-Transportation Hub

Page 1

transportation hub


Project development

This project was developed over the course of 6 months in which the program, design considerations and form were detatiled and articulated at each turning point towards the presented final product.


STUDIES

Project Layout


STRUCTURAL GRID


STUDIES CONT’D


Plans

Ground floor plan


First floor plan


Basment floor plan


Sections & Elevations

Western Elevation

North east Elevation



Shots



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.