transportation hub
Project development
This project was developed over the course of 6 months in which the program, design considerations and form were detatiled and articulated at each turning point towards the presented final product.
STUDIES
Project Layout
STRUCTURAL GRID
STUDIES CONT’D
Plans
Ground floor plan
First floor plan
Basment floor plan
Sections & Elevations
Western Elevation
North east Elevation
Shots