ARCHITECTURE a D
n E
S
d I
G
N
p o r t f o l i o 2
0
M a r g o t
2
0
d e
M a n
C O N T E N T S 02
CURRICULUM VITAE
educational 04
THE URBAN LANDSCAPE
08
URBAN AGRICULTURE UNITS
14
GROUNDWORK
20
BRIDGING THE TIBER
28
ATRIA IN FEIJENOORD
34
DELTA SHELTER
38
CONDOMINIUM 3.0
professional 54
THE VIEWFINDER
60
COMPARATIVE ANALYSIS
62
GARNISH
66
BINCK TWINS
68
CLEMATISLAAN
72
other works
Margot de Man (Ir. MSc. B.Arch.Sci.) margot@deman.ca Toronto, ON 1 (647) 768-4626 publications: issuu.com/margot.deman profile: www.linkedin.com/in/margot-de-man-56827051 Languages: Native English, Intermediate French, Intermediate Dutch
Education Sept 2015 - Apr 2018
Delft University of Technology MSc Architecture, Urbanism and Building Sciences Graduated in the Architecture Track: Affordable Housing in the Global Urban South (Mentors: Dick van Gameren, Nelson Mota)
Sept 2010 - June 2014
Ryerson University BArchSc Graduated in the Architecture Specialization
Sept 2005 - July 2010
Danforth Collegiate and Technical Institute High School Diploma Gifted/Enriched Program
Extracuricular Experience Mar 2017 - Nov 2019
X - TUDelft Open Studio Workspace Assistant (current), Supervisor and Community Manager
Jan 2015 - June 2018
ARGUS Architecture Master Student Association (www.argus.cc) Board (2017/18) - Treasurer/Chairman and Excursion Committee Supervisor Helped in the continuous growth and significance of this organization Annual and Expo Committee (2015/16 and 2016/17) Re-establishing and organizing the production of the annual student work puplication
Feb 2013 - June 2014
RU - TU Delft Collab with Parallel52 Collaborative exercise on Walk-ability and Cycle-ability in Toronto and Amsterdam
Jan 2013 - Mar 2013
E.R.A. Architects Inc. Design-Builder VIEWFINDER for 2014: Culture of Outports - Community Design-Build in Botwood, NF
Mar 2012 - Mar 2014
325 Magazine with Ryerson Department of Architectural Science (DAS) Marketing/Sponsorship/Graphics
Mar 2012 - Mar 2014
[R]ED[U]X LAB with DAS (http://reduxlab.com/) Design and Fabrication 2012: The Stop’s Night Market Fabrication 2012: Come Up To My Room at the Gladstone Hotel
Awards and Publications 2015/16 and 2016/17
ARGUS Architecture Annual (https://issuu.com/argusasa/docs/booklet_issuu2_def)
2015
FIRST PLACE SOCIAL INNOVATION at the Sustainable Design Awards in Toronto
2014
Voted BEST IN SHOW by Designlines Magazine for DBG’s Garnish (https://designlinesmagazine.com/results/)
June 16 2014 2011/12 and 2012/13
Architectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare (https://issuu.com/margot.deman/docs/bridgepoint_july-15) 325 Magazine (https://issuu.com/mag325/docs/325_magazine_2012-2013) 2
Professional Skills Drafting: AutoCAD 2018, Revit 2018 Modeling: Rhinoceros 5.0, Revit, SketchUp Rendering: V-Ray (Rhino), Enscape (Revit) Adobe CC: Photoshop, InDesign, Illustrator, Premier Microsoft Office: Word, Excel Digital Tools: Laser Cutter, 3D Printer, CNC Router Hand Drawing, Drafting, Modeling, Small Scale Construction and Fabrication Ceramics, Screen Printing, Jewelery Design, Sewing and Textile Arts
Professional Experience Mar 2020 - Present Dec 2009 - Present (Occasional) 2015 - Present (Occasional)
Feb 2013 - Present (Occasional)
Mar 2019 - Nov 2019
Sept 2014 - Jul 2015
Sept 2013 - June 2014
Puffin Gear Production Manager Graphic Design, Packaging Design, Production and Manufacturing Atkinson Architect Architectural Design, Drafting and Presentation Drawing Design and construction drawings for residential rennovation and addition (Ongoing) Promotional drawings for historical restoration and addition Design + Build + Grow Studio (design-build-grow.tumblr.com, facebook.com/designbuildgrow) Founder Grow Op at the Gladstone Hotel in 2016 The Stop’s Night Market: ‘Garnish’ in 2014 (Project Lead) and ‘Juicy Roots’ in 2015 KOW Architecten Technical Designer - Valued by the office for my knowledge and experience working on both the design and technical sides of their office and in between, sparking a conversation in the office to better integrate them. - Worked on a project in design development to more seamlessly prepare the Revit model for construction documents. - Managed a highly complex housing development project, concurrently across the design phases to build an architectural toolkit within Revit for the client which was a large development firm. Projects: Expansive work in innovative Dutch housing projects Interior and exterior school renovation to accommodate children with disabilities Redevelopment and densification of large commercial building Stages: Schematic Design, Design Development and Construction Documents WGD Architects Intern - Worked with clients including holding meetings and conducting presentations - Responsible for coordinating with engineers, materials and product representatives Projects: Large scale buildings such as community centers and arenas Office building interiors Landscape design Stages: Project Proposals and Bid Documents, Conceptual and Schematic Design, Design Development, Presentation Drawings and Material Boards, Technical Drafting/Construction Documents Bridgepoint Collaboratory for Research and Innovation + Ryerson University Research Assistant and Graphic Designer
Dr C. Alvaro (Bridgepoint Collaboratory for Research and Innovation) Prof C. Atkinson (Ryerson Department of Architectural Science)
Architectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare with the Ontario Ministry of Health and funded by the Canadian Institute of Health Research May 2013 - Sept 2013
Oct 2009 - Jun 2010
Ryerson University Research Assistant Wellington Street Proposal (C. Atkinson) Kneider Architects Co-op Student 3
01
The Urban Landscape Toronto Financial District High-rise
Financial District, Toronto, Canada Ryerson BArchSci, 3rd year Integration Studio: Office of The Future September 2012 to April 2013 Supervisor: Cheryl Atkinson (catkinson@ryerson.ca) and Paul Floerke (paul.floerke@ryerson.ca) Description: How do we create the office of the future? A dense city office tower with functional space bordering city streets; reuniting the people with the streets and opening up to the ground plane; connecting the people with businesses, amenities, landscapes, and each other; respecting the city, the landscape, and the individual. The tower arises as a product of it’s context.
4
5
detail model
east elevation 1:1500
south
east
north final massing model 6
west
8 1 Cloud Gardens 2 lobby
13
3 path connection
6
4 retail 5 loading ramp 6 service 7 HVAC
6
8 winter garden
10
9 daycare
7
10 gallery
12
11 reception 12 private office 13 group work space
thirteenth floor plan 1:750
4
2 5
11 4 6 4
11 2 1 6
9
7 3 2
ground floor plan 1:750
east-west section through atrium 1:750 7
winter garden perspective section 1:100 8
9
02
Urb an A g r i c ul t ur e U ni t s Toronto Pilot Project on Downtown Campus
Ryerson University Campus, Toronto, Canada Ryerson BArchScie, 4th year Option Studio: Local Food Landscapes September 2013 to December 2013 Supervisor: Mark Gorgolewski, mgorgo@ryerson.c Role: Individual Project with the Urban Agriculture Initiative, Rye Home Grown. In addition to the regular studio format we met with local stakeholders and the Ryerson community and worked to make our design realistic and applicable to the city’s regulations and bylaws. Within the studio we began with a group project in which we designed and built chicken coops. Description: How do we house agriculture in an accelerating urban environment? Urban agriculture is growing in popularity, most effective when implemented into a community scenario. Rye home grown continues to develop systems on the Ryerson Campus and would benefit from increased growing space and community involvement. The development of the growing space is accelerated through the use of the Urban Agriculture Units (UAU). The Sears parking lot site is an example of a development site that has been purchased and will sit unused for a certain number of years, in this case ten. These sites have great potential for urban agriculture. UAU’s are designed as greenhouses which fit into individual parking spaces. In addition to greenhouses they can be used to house a wide range of functions, from market stalls, to outdoor planting beds, to study spaces. They can easily be deployed in stages and in any amount. After their time on the site comes to an end they can be moved to any other parking lot or street parking space. These units can phase out the density of parking in the city center as we evolve to use more sustainable means of transportation.
10
11
campus boundaries
current growth
current rye home grown space
future growth of rye home grown
UAU phasing
future growth
new site frontage
...
...
post site development
sample elevation
sample section The UAU can stand amongst vehicles or be placed in a series of patterns to create dynamic spaces. These modular, versatile structures can be used as information booths, office spaces, study spaces or galleries. They can be combined with modular planters and outdoor seating which can be stored within the frame during off seasons. The initial phasing of the Sears parking lot site occurs where there is the highest visibility. Information and social units as well as educational growing units can be used here to provoke project interest and entice new participants from the school and the community.
sample unit plan 12
unit density on site over time
unit density on site over time
unit configuration samples 13
As the project is further developed, individual UAU’s can be privately invested into. A participant is given the essential unit structure which can be developed in terms of interest, or availability of means and can house a range of food production from simple pop bottle planters to aquaponic systems.
and corrugated plastic roofing. The roof plane collects water into an interior basin. There are sliding doors and windows and a fold out ramp for accessibility. The form and size of the units are designed in a way that they do not shade their neighbors. The next step is the UAU’s adaptability to street parking around the city which can create a dynamic secondary sidewalk frontage and differentiate from the regularity of street parking.
The structure is a simple quintessential aluminium frame which the components fit into. Pictured is a primarily polycarbonate clad unit with thermally modified wood paneling on the base
model of parts catalogue sample
14
envelope assembly
aluminium frame structure
15
03
Groundwork University
Retreat
Centre
The Don Valley, Toronto, Canada Ryerson BArchSci, 4th year Option Studio: Poetics of Construction Winter 2014 Supervisor: Garth Norbraten, gregarth@total.net Description: In this studio we examined methods of construction and detailing for the creation of an off-campus university facility. The facility was to house seminar and conference spaces as well as student residences and guest accommodations for visiting lecturers. With this project I focused on the community, implementing a community garden, greenhouse and gallery into the facility. In regard to formality and materiality, my concept arose from an idea about the longevity of the facility and the creation of a sum of parts where program is broken up into separate buildings and made specifically to their function. Inspiration was derived from a drawing by Christine Ă–dlund titled Greetings from Uranus Madame Blavatsky and the reconstruction of the SzatmĂĄry Palace by MARP
16
17
outdoor study courtyard
east elevation
C D
A
C
B A greenhouse plan
p
existing school o
j
i
h n
k
r r s u
m u
s
n
i b l
q
l
h
x
m
t
x v
t
w
site plan
ground level plan 18
main level plan
k
f e
c
d
a
b
b
g
level two plan
level three plan 19
a. large convention space b. greenhouse atrium c. administration/offices d. event space e. library f. connection to school auditorium g. small study spaces h, public lobby i. university commons lobby j. open gallery k. seminar space l. community garden m. student commons n. admin. courtyard o. food services p. computer lab q. split level presentation space r. outdoor study courtyard s. the gathering place t. guest accommodation u. apartment residences v. apartment living room w. guest living room x. common courtyard
11
2. Horizontal Timber Beam
22
1
1
8
2
1. Bridge to Curtain Wall Frame Connection
3. Timber Truss System 4. 25 mm Glass Panel
33
5. Cable Truss System 6. Spider Connection
3
3
7. Timber Floor
44
5
55
4 6
66
7
77
A
B
20
4
5
6
7
13 13 14 5 6 4 8 D
1
1
2
3
4 5 6
1. Horizontal Cross Bracing consisting of Steel Rods and Cables 2. Structural Steel Column 3. Cable Truss System 4. Spider Connection
A. bridge section B. bridge glazing elevation C. curtain wall section at grade D. curtain wall plan detail at corner E. summer shading F. winter shading
5. 25 mm Glass Panel 6. Structural Silicone Sealant
1. bridge to curtain wall frame 2. connection 3. horizontal timber beam 4. timber truss system 5. cable truss system 6. spider connection 7. timber floor 8. structural silicone sealant 9. springs to allow movement 10. u-channel for glass pane 11. bolts with spring system 12. concrete slab 13. horizontal cross bracing - steel rods 14, structural steel column
6 8
1 2
4 5
3
4
E 9
5
10 11 12 6 7 8
C
F
21
04
Bridging the Tiber Lapidarium for Rome’s Embankments
Ponte della Scienza, Rome TU Delft MSc1 Public Building Studio - Reclaiming Rome September 2015 to January 2015 Group: Margot de Man, Eva Fuehrer, Magdalena Nalepa Supervisors: Nicola Marzot, Niklaas Beboutte, Sien van Dam, Susanne Komossa Description: Bridges were our focus for research in Rome. During our excursion we fully analyzed the bridges along the Tiber River with the conclusion they are used primarily to connect the two sides of the city but at the same time creating disconnect with the lower embankment of the river. We also noticed a variety of social activity layers happening on, underneath and in close proximity to the bridges. We found the need to collect and merge those activities fluently and use them as a tool to reestablish a physical connection between the river and the city, creating a contemporary answer for the notion of the Lapidarium solving the contextual issues of the site. We translated our found ‘stones’ into a series of programs which combined act as a drawing force and generator for revitalizing the abandoned sites and the embankment of the Tiber. Metaphorically we saw the potential to collect near the base of the city where previously at the Gasometer Site, the cranes were used to bring goods from the main spine of transportation, up the bank towards the city. We chose the existing bridge as our intervention site not only because it is the existing connection between two districts but also because through recycling it, we reestablish new opportunities for the bridge typology. In addition to our design proposal, we have considered our urban intervention as a strategy for the foreseen future development of the industrial area into a cultural district and for the revitalization of the lower embankment. Our bridge proposal offers a multitude of connections; between the embankments; between the river and city level; and as a link between two districts (Industrial and residential). By fronting the river on both sides, ties are created physically and visually. In order to blur divisions our intervention functions as a gate, a connector between levels and sides and a collector - a lapidarium of Rome’s activities.
22
23
section B 1:500
CafĂŠ
Pub
Street Market
Atelier
Thought Classes
Library
Movement Classes section A 1:500
section C 1:500
section D B
E A
B
F
G
D C
ground level plan f
ground level plan 1:2000 24
fragment - library 1:500
section E 1:500
Workshops
Lounge
Restaurant
Bookshop
Restaurant
D 1:500
section F 1:500
section G 1:500
E
ground level plan fragment - cafĂŠ 1:500 25
louver shading system
summer - ventilation/sun
winter - ventilation/sun
summer - cooling
winter - heating
rain water/plumbing
26
cross section 1:100
substratum (150mm)
Our lapidarium consists of the exhibition plane in the form of bridge and landscape and the exhibited layers of programme in the form of the coloured blocks.
filter fleece (5mm) drainage (100mm) gas baking (10mm) waterproof membrane (3x10mm) insulation (120mm vapour barrier (3mm) separation layer (3mm) composite slab
The exhibited elements are expressed in a colour associated to that layer in terms of its colour psychology. Faรงade elements are in the form of perforated metal fins and are rotatable according to their location in order to act as both sun shading devices and provide variances in transparency, directing views.
IPE 400
suspended ceiling
parapet detail 1:20 27
VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT
VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT
VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT
28
29
05
A t r i a i n Fe i j e n o o r d Afordable Co-Housing for Rotterdam
Kop van Feijenoord, Rotterdam, The Netherlands TU Delft MSc2 Dutch Dwelling Studio - Housing in Rotterdam February 2016 to June 2016 Supervisor: Olv Klijn Description: Through group research we found economical evidence of a hard boundary line along the old rail corridor in the Kop van Feijenoord neighbourhood in Rotterdam. We concluded that we should aim to satisfy the needs of the area in order to blur the line, meeting the concerns of three groups identified as traditional middle-class, innovators, and local working-class. The locals on the east are afraid of being pushed out due to gentrification. The traditionals on the west are unconnected to their neighbourhood due to a lack of amenities which spark their interest. Beneficially to our aspirations, these three groups work together in harmony. An example of this occurs in a chain of commercial exchange: the locals on the east side benefit from a live/work scenario and run local businesses; the innovators appreciate these local businesses to support them and also see entrepreneurial opportunities for themselves in what they see as an up-and-coming neighbourhood; the traditionals will find interest and value in the new economic endeavours of the innovators. My individual design aims to maintain the symbiotic relationship between target groups. I defined new target groups as family, students/juniors, seniors/handicap, innovators/ artists/entrepreneurs, and shop owners. In the Atria in Feijenoord residences, all these target groups are situated within the building, all sharing a central circulation network, atria and winter garden, communal living spaces, and a roof terrace. The result is a mixed residential building. Sitting upon a new square both sides of the site are linked, maintaining the symbiotic relationship of the targeted groups.
30
31
block design scheme
buildinG concept diagrams
32
perspective cross section 1:250
ground floor plan 1:250 33
+6 FAMILY TARGET GROUP
+5 FAMILY TARGET GROUP
+4 STUDENT TARGET GROUP
+3 SENIOR TARGET GROUP
+2 STUDENT TARGET GROUP
+1 LOFT INNOVATOR TARGET GROUP
0 GROUND storefronts, shops, galleries, offices, ateliers
floor plans 1:1000
partial floor plans 1:300 34
+6
EXTERIOR BRICK ON PANELISED CLT WALLS
FAMILY TARGET
+5
+3
PANELISED CLT FLOOR AND ROOF SLABS
FAMILY TARGET
+6 FAMILY TARGET
natural lighting
+4
INTERIOR PANELISED CLT
RE F
.
STUDENT TARGET W
D
+5
RE F
.
W
D
FAMILY TARGET
SECONDARY ADDITIONAL PANELISED CLT
+3 SENIOR TARGET
+4
W
STUDENT TARGET
PRIMARY PANELISED CLT LOAD BEARING STRUCTURE RE
U P
+3
natural ventilation summer
SENIOR TARGET W
RE F.
D
D W
STUDENT TARGET possible stair connection
2-storey dwelling
Family Senior possible stair connection Student Loft/Studio twoAtelier/Gallery storey dwelling Storefront two storey dwelling
CTL POST AND BEAM STRUCTURES U P
possible connection +1
W
CONCRETE ELEVATOR CORES
STUDENT TARGET
CONCRETE FOUNDATION
W
possible stair connection LOFT - INNOVATOR TARGET
+2
R E F .
Family Senior Student Loft/Studio Atelier/Gallery Storefront
F.
+2
0 GROUND
Family Senior Student Loft/Studio Atelier/Gallery Storefront
R E F .
ATRIUM CLT COLUMNS
U P
R E F .
two storey dwelling GROUND LEVEL CLT COLUMNS
0 CONCRETE ELEVATOR CORE
+1
W
ATRIUM CLT BEAMS
LOFT - INNOVATOR TARGET
GROUND FLOOR SPAN DIRECTION UP
storefronts, shops, galleries,
C
B U P
offices, atteliers1:400 STRUCTURAL AXONOMETRIC
unit connection diagram UNIT (S, M, L)
structural axonometric
A
family units senior units student units studio loft units atelier gallery units storefront units
˿
s.m. per person s.m. per person s.m. per person
0
natural ventilation winter
GROUND storefronts, shops, galleries, offices, atteliers
level 0 CLT posts atrium CLT posts atrium CLT beams concrete elevator core
The unit connection diagram depicts the organization of the various unit types within the building as a whole. There is a symbiotic relationship between the senior and student residences with subsides where the seniors share their living spaces with the students who pay lower rents. There are a variety of commecial types on the ground floor from the standard storefront to livework loft units.
6
5
COMMON SPACE
PARTIAL AXONOMETRIC 1:100
˿
˿
WC / STORAGE
4
STOREFRONT (shops, gallerys, ateliers, offices)
UNIT (S, M, L)
storefront STOREFRONT (shops, gallerys, ateliers, offices) wc/storage WC / STORAGE commons COMMON SPACE 17-20 m2/person FLOOR PLANS 1:500 20-27 m2/person 2 27-31 m /person 35
The building appears as a monolithic whole despite the variety of uses within. A CLT post and beam system is used on the ground floor for flexibility and in the atrium for natural light while a panelized CLT system is used for the dwellings. The atrium supports the climate scheme as well as an extensive green roof and solar collectors. The interior use of wood contrasts the brick façade which blends into the surroundings.
06
Delta Shelter
Form and Modeling Studies
Summerhouse on Venetian Island TU Delft Msc2 Architecture Design Elective February 2016 to June 2016 Supervisors: Peter Koorstra Description: The focus of this project was to design a summerhouse on a small Venetian island amongst the ruins of an old factory. The design and presentation of the proposal was done primarily through modeling, including a series of sketch models, collaged design drawings and a series of final presentation models. I focussed on using leftover materials from around the studio and minimized the use of new materials, making a more sustainable and economical project.
36
37
1. rise
canal model
transverse section
2. hide
shelter model
transverse elevation
3. lean
longitudinal elevation
4. preserve
longitudinal section
5. hide/slice/pop
ground floor plan
process sketch models
collaged orthos 38
1:1000 presentation model 1:200 presentation model
1:100 presentation model
1:50 presentation model
1:50 presentation model 39
07
Co ndominium 3.0
Affordable Housing for Addis Ababa
Geja Sefer, Lideta, Addis Ababa, Ethiopia TU Delft MSc-3/4 Global Dwelling Studio - Affordable Housing for Sustainable Development in the Global Urban South September 2016 to April 2018 Supervisors: Prof. Ir. Dick van Gameren, Dr. Ir. Nelson Mota, Ir. Anteneh Tesfaye Tola Description: This thesis focuses on alternative methods of combating the affordable housing crisis in Addis Ababa, Ethiopia with a focus on developing convivial communities through an abundantly existing typology. Large areas of informal settlements, called sefers have been replaced by this typology in the form of mid-rise condominium blocks. In Addis Ababa, the Grand Housing Program (GHP) which began in 2004 is responsible for this mass redevelopment in an aim to replace what was seen as ‘dilapidated housing stock’, pictured on the following page and in order to address extreme housing shortages. Although the focus was on supplying low-income housing it was not actually affordable for most and led to the displacement of the sefer’s citizens. In addition, the new developments lack a quality of resilience and conviviality inherent to the preexisting informal settlements. Despite the condominium’s issues, the program represents an efficient and already strongly implemented model for housing Addis Ababa. Condominium 3.0 aims to continue the efficient development of the condominium while reintroducing the qualities of the sefers into the existing and new condominium projects to maintain the resiliency and conviviality of their communities. It is constructed in a way which does not displace the sefer’s existing inhabitants and further densifies to alleviate the housing shortages across social classes.
40
41
social spaces
qualities of the existing traditional sefer neighborhood (pictured on previous page)
inner streets
tej house
shop windows
street stalls
recycling
corrugated metal
bamboo
clothes lines
concrete block
stone paving
mud walls and corrugated metal
building techniques
borders
income generation
compound courtyards
qualities of the existing condominium development (pictured on following page)
Research Question
social spaces
If combined, can the sefer’s resilience and the condominium block’s efficiency render convivial and inclusively affordable communities for Addis Ababa? leftover space
storefront
informality
income generation
courtyard
42
How can the Grand Housing Program (GHP) be altered in order to meet the needs of both low and middle-income inhabitants, increasing density, community conviviality, and economic inclusiveness while minimizing the displacement of citizens from informal settlements allocated for redevelopment?
43
Geja sefer in 2010
area: 5.9 hectares units: 390 density: 206 units/hectare
Geja sefer in 2011
105% increase in density if development were to continue in the current manner
2010
2011 44
area: 5.9 hectares units: 1238 density: 217 units/hectare
the Geja sefer would not benefit from continued development in the current manner
first phase of development under Condominium 3,0 model
comparative block + additions
focus block
completed phased development under Condominium 3,0 model
130% increase in density development under Condominium 3,0 model
Condominium 3.0 - additions to existing condominium typology 45
area: 5.9 hectares units: 1594 density: 270 units/hectare
street - existing
courtyard - existing
street - addition
courtyard - addition
street - new
courtyard - new 46
Solution Condominium 3.0 aims to continue the efficient development of the condominium while reintroducing the qualities of the sefer into the existing and new condominium projects to maintain the resiliency and conviviality of their communities. To avoid relocation the construction is done in phases where small communities of the Geja seffer residents are relocated directly to their adjacent permanent dwellings along with new middle class residents and businesses. This method also further densifies to alleviate the housing shortages across all social classes. The density has increased to 270 units per hectare. Opportunities for small businesses have been created, leftover space has been reduced and the quality of open to sky spaces have been improved both in the existing condominium areas and in new developments.
existing condominium typology
Condominium 3.0 47
block plan level 0 (top) and level -1 (bottom) 1:500 48
A level 0 plan 1:200
south elevation 1:200 49
A level 4 plan 1:200
A level 5 plan 1:200 50
section A 1:100 51
a. b. c. d. e. f. g. h. i.
corrugated metal roofing bamboo rafters bamboo cross bracing bamboo ties wood roof joist wood stud wall and roof framing bamboo beam bamboo column facade system A - eucalyptus framed and coated closed-weave bamboo panel - eucalyptus furring - rigid insulation between studs - closed-weave bamboo panel j. window A - wood window head - steel casement window - eucalyptus framed open-weave bamboo shutter - single glazing
k. eucalyptus wood flooring l. bamboo floor joist m. closed-weave bamboo panel n. wood sill o. roof flashing p. cast-in-place concrete beam q. hollow concrete block (HCB) r. bamboo trellis - open-weave bamboo panel - bamboo trellis framing - bamboo rain gutter s. trellis post t. bamboo rail u. open-weave bamboo panel v. wood plank w. wood furring x. slab HCB y. precast concrete beam z. plaster details 1:20 52
penthouse addition model
existing condition block model
slab and service unit addition model
existing block model with additions
commercial addition model
new block model
structural/material model 53
communal rooftop 54
penthouse dwelling 55
08
The Viewfinder Community Design-Build in Newfoundland
Botwood, Newfoundland, Canada Culture of Outports 2013 Group: Team of 4 architects from E.R.A. Architects Inc. and 6 student interns from Ryerson University Supervisor: Andrew Pruss, andrewp@era.on.ca Role: As a Bachelor student at Ryerson Universtity I applied for this role. We conducted research on Botwood, Newfoundland and public installation projects. We held design charettes at E.R.A Architects and did preliminary designs. We travelled to Botwood in the midst of winter for only two weeks to complete the design-build project. We met with the community, conducting more design charettes there and getting input from the community. We then made working drawings, gathered supplies and materials and with the help of the community constructed and errected the projec. I also presonally organized an ice-candle making kick off event for our arrival in Botwood. Description: On the Bay of Exploits in the north-central sector of Newfoundland, the community is historically a hub for aviation and industrial exporting. Botwood today retains traces of its rich history and culture and the Viewfinder frames and celebrates these with views to the historic flying boat on site and to a historic crash site in the bay. The Viewfinder acts as a gathering and rest point on the peninsula used in all seasons.
56
57
A
B
exploded axo
plan
section A
section B
future growth 58
59
roof detail
sill detail
east elevation
north elevation 60
long bench detail
corner bench detail
west elevation
south elevation 61
09
Comparative Analysis
Bridgepoint Active Healthcare
Archtiectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare Research assistant: Bridgepoint Collaboratory for Research and Innovation Sept 2013 to June 2014 Supervisor: C Atkinson, C Alvaro Description: This analysis compared the former Bridgepoint Health building built in 1963 by Chapman and Hurst to the new Bridgepoint Active Healthcare building built in 2013 in collaboration with Stantec Architecture, KPMB Architects, HDR Architecture and Diamond Schmitt Architects. A third healthcare facility called West Park, built in 1980 by Armstrong and Molesworth Architects is used as a control for this analysis. The purpose of this study was to create a systematic methodology for the measurement of design factors which have an impact on the patients and staff of complex chronic desease facilities. In order to achieve this goal we rigerously studied, graphically represented and sumarized the chosen three buildings in regards to building scale, context, typology, program, circulation, and fenestration.
62
Bridgepoint 2013 (BAH)
Bridgepoint 1963 (BH)
West Park 1980 (WP)
463 In-Patients
558 In-Patients
312 In-Patients
63
10
G a r
n i s h
Food Cart Design for The Stop’s Night Market
Honest Edd’s Alley, Toronto, Canada The Stop’s Night Market 2014 Group: Design + Build + Grow (DBG) Awarded BEST IN SHOW by DESIGNLINES MAGAZINE Role: As team leader I managed the production of the project and took part in all aspects of design and construction. Description: The concept of DBG’s food cart is rooted in the ability to adapt, reuse and re-imagine existing materials and to push the boundaries of innovative sustainable design. Our aim was to promote the practice of cultivating, processing and distributing food in an urban setting. We hoped to embody into the design and construction of our cart a framework founded on a shared ethos of nature, food and community holism. The Design consists of a welded steel frame, salvaged wood and water bottles. The caps of the bottles are bolted to the frame and the bottles planted with various herbs can be screwed onto the frame, used as garnish for events and then be distributed to serve as personal self watering herb containers.
64
65
b
c
e a
d f g
a. herbs planted in water bottle tops with cheese cloth b. screwed onto frame network c. used to garnish dishes at night market d. given away or sold -place in bottom of bottle to create self watering planter
h
i q r
k
j
s t u l e. reclaimed oak roof slats - later slits were cut to hang wine glasses for use as a bar at a party f. welded steel frame section 1 g. back-lit, etched acrylic chef signage h. water-jet cut steel DBG signage i. welded steel frame section 2.1 j. welded steel frame section 2.2 k. menu chalk-board, sponsors and business card rack l. reclaimed oak counter slats m. welded steel section 3 n. 1” steel angles o. up-cycled plastic water bottles p. planted herbs and micro-greens q. up-cycled water bottle r. 1.5” hollow steel section s. 1” steel angle t. bottle cap u. self-tapping screw
n
m
o
66
a
b
c
e
d
f
a. mock-up b. planting leafy greens c. welding technique practice
d. painted steel, planed and stained reclaimed wood e. self-taping screws secure bottle caps f. chef garnishes pizza from cart 67
11
Binck K O W
Tw i n s
A r c h i t e c t e n
Transformation Feasibility Study in Trekvlietzone, The Hague KOW Architecten (kow.nl) May 2019 to July 2019 Supervisor: RenĂŠ Buur Description: This project focused on the transformation and optimization of an existing building situated in a commercial zone currently undergoing redevelopment to include additional mixed-use amenities and residential blocks. The existing building housed mainly mechanical and automotive companies with little street frontage. The proposal is to extend existing parking facilities within the courtyard building which already has a large ramp to roof parking. This parking would also serve neighboring residential projects and would be toped by solar collectors and a community rooftop park. Additional affordable, modular residential units with street access are integrated into the building. Various facade treatments are explored as well as the possibility of additional built structures for amenities.
68
existing situation
+ additional parking
+ park, solar energy and recreational facility
s l a a p ka m e r 6,8 m²
k eu ke n 10,9 m²
s l a a p ka m e r 11,7 m²
b a d k am e r 3,1 m²
t oi l e t 1,5 m² b er g in g 4,0 m²
t oi l e t 1,3 m²
w oo n k am e r 24,2 m²
residential unit infill
potential mixed outcome 69
w oo n k am e r 25,7 m²
44 m 2
46 m 2
lower level
upper level
12
Clematislaan K O W
A r c h i t e c t e n
Accessible transformation: primary school and care facility in Gouda KOW Architecten (kow.nl) June 2019 to Sept 2019 Supervisor: Michel Schaap Description: The transformation aimed to future-proof the existing school with a sustainable and healthy design. A new insulating facade system on the existing structure unifies the older and newer buildings. The building is fitted with PV panels on the roof to provide a large part of electricity needs. A balanced ventilation system to control CO2 output meets “fresh school� requirements. The school will house a number of specialty programs for children where not only accessibility but also smart design were important for the success of the program. We worked on the interior design of the areas for older age groups working closely with an interior designer who foccussed on the areas for younger age groups.
70
Foto’s bestaand
4
Impressie
Clematislaan 25 september 2019
existing situation
5
transformation impressions 26
Clematislaan 25 september 2019
71
Clema
beton_ihw (bestaand)
beton_ihw (bestaand)
200
100 60 100
230
200
EPS isolatie
3e verd.dak as14-24
+9860
3e verd.dak as14-24 koppelstuk
120 200 120
602
260 * *
(De Ark)
*
1300
+9860 koppelstuk
* 270145 *
60 100
230
70 70
bestand kozijn slopen en ruimte uitvullen
3e verd. as15'-12 +10680
100 100
550
100 60
*
68
*
*
*
116
*
260
Formaat
1:5
+6680
200
*
13 163
druklaag
A3
+6860
2e verd.
+3500
Ecophon Master Ds
+7337 ok koz
Schaal
2e verd as 15'-12
+8098 ok koz
1e verd. 38x235
+9220 plafondlijn
vzv vloerverwarming
*
40
20
300
* *
+9860
*
*
3e verd.dak as14-24
i.o.m. leverancier en aannemer 100
+9020 ok stuc/ bk koz
*
+10305 ok stuc/ bk koz
EPS isolatie
3e verd.dak as14-24
2. 32 K l eed k a m er j o n g en s
zandcement
116 *
*
*
252,7 m² verblijfsruimte
bestand kozijn slopen en ruimte uitvullen
+9860
200
3e verd. as15'-12 +10680
gy m z a a l
*
*
270686
+9860
i.o.m. leverancier en aannemer 3e verd. as15'-12 +10680
10beton_ihw 0 250(bestaand) 100 70 100
beton_ihw (bestaand)
luchtdicht afplakken
*
68
68
3e verd.dak as14-24 +9860 +11220 bk stuc
68
40
20
* 270145 *
*
38x235
*
*
*
+10305 ok stuc/ bk koz
+11566 ok stuc/ bk koz
13 163
vloeropbouw: • afwerkvloer d=70mm • druklaag d=70mm • kanaalplaatvloer d=260mm
alu kozijn, RT72-Reflex 3e Multiwindow verd. as15'-12 +10680
116
(De Ark)
*
270686
+13535 bk stuc +10305 ok stuc/ bk koz
Ecophon Master Ds
230
100 60
200
EPS isolatie
260
252,7 m² verblijfsruimte
vleermuiskast
60 100
200
3e verd. as15'-12 +10680
gy m z a a l
*
* *
3e verd. as15'-12 +10680
4e verd/dak gymzaal +13610 +4102 ok koz
+9220 plafondlijn
gevelstuc, d=230mm (RAL 9002)
EPS isolatie 250
(De Ark)
100 70 100
EPS isolatie 116
bestaand houten dak
Ecophon Master Ds
Onderdeel
principe details (uitbreiding)
*
beton_ihw (bestaand)
54,4 m² verblijfsruimte
250
beton_ihw (bestaand) beton_ihw (bestaand)
+9020 ok stuc/ bk koz +10345 bk stuc
alu kozijn, RT72-Reflex Multiwindow
100
13 163
voorkant zetwerk 3e verd. as15'-12 +10680
*
*
luchtdicht afplakken
Ecophon B groep s rui m tMaster e V SO
550
Ecophon Master Ds
230
+12600 ok plafond
3e verd.dak as14-24
100 100
200
*
*
230
spouw volschuimen
+11566 ok stuc/ bk koz
13 163
260
bouwbesluit artikel 2.20: Ter voorkoming van overklauterbaarheid mag er tussen 0,2m en 0,7m boven een vloer, tredevlak of vloer van een hellingbaan geen opstapmogelijkheid zijn.
+9860
vleermuiskast
60 100
N
gevelstuc, d=230mm (RAL 9002)
EPS isolatie 250
100 60 100
*
+9860 3e verd.dak as14-24
beton_ihw (bestaand)
Ecophon Master B vleermuiskast
H'
+12600 ok plafond
90
45°
3e verd.dak as14-24
177
+11220 bk stuc
gelijkwaardigheid: de kozijnen worden voorzien van doorvalveilig glas + beweegbare delen met vastzetinrichting alleen op kiepstand te openen.
+10345 bk stuc
spouw volschuimen
72
1300
EPS isolatie
Project
3e verd. as15'-12 +10680
4e verd/dak gymzaal +13610
Transformatie schoolgebouw Clematislaan te Gouda
Opdrachtgever
Gemiva-SVG Groep
100 60
vleermuiskast
345
113
EPS isolatie
+11566 ok stuc/ bk koz
*
*
K
+14160 bk stuc
107
bouwbesluit artikel 2.18: Een vloerafscheiding als bedoeld in artikel 2.17 lid 1, heeft een hoogte van tenminste 1 m, gemeten vanaf de vloer. Tenzij de vloer hoger ligt dan 13m boven het aansluitende terrein, water of vloer, dan heeft deze een hoogte van tenminst 1,2 m gemeten vanaf de vloer. In afwijking hiervan heeft een vloerafscheiding ter plaatse van een al dan niet beweegbaar raam een hoogte van ten minste 0,85m vanaf de vloer.
+13535 bk stuc
beton_ihw (bestaand)
42 NIEUWBOUW
+8098 ok koz
bestaand houten dak
*
*
+11566 ok stuc/ bk koz
ZA O
_ihw (bestaand)
EPS isolatie
EPS isolatie
*
+10305 ok stuc/ bk koz
2002e verd as 15'-12
+6860
2e verd as 15'-12
+6860
3e verd.dak as14-24 2e verd.
+9860 +6680
2e verd.
+6680
54,4 m² verblijfsruimte
EPS isolatie
(De Ark)
2. 32 K l eed k a m er j o n g en s 120 40
5 100 130 100
groep s rui m te V SO
beton_ihw (bestaand)
260
535 100
300
60 100
230
2e verd as 15'-12
+6860
2e verd as 15'-12
+6860
2e verd.
+6680
3e verd.dak as14-24 2e verd.
+9860 +6680
beton_ihw (bestaand)
beton_ihw (bestaand)
+8098 ok koz
EPS isolatie
* *
20
* * **
* * * * *
40 68 10 68
bu-A-11 +z
3050
3600
* *
E (TO) TO-301
3600
16
+1238 ok koz
3600
3600
entresolvloer
* *
Ecophon Master Ds i.o.m. leverancier en aannemer
50
+2860 ok plafond
+2600
3600
19
3600
h o o f dt r a p
20
3600
38,7 m² verkeersruimte
3(gemeenschappelijk) 600
21
3600
bu-A-12
bu-A-12
91
30
155
34,0 m² buitenruimte
bu-A-12
90
85 30
350
5
90
38x157
38x157
85
Checker
Projectnummer
Contact
A-2016603
www.kow.nl
1 : 20
30
Opdrachtgever
0. 19 ga n g
TO-350
44,2 m² verkeersruimte
principe details (bestaand gebouw) R2019
A0 (1189x841)
bi-H-09 (s)
Wijziging
-600
0. 44 er g o
0. 14 ka n t o o r
0. 12 s p eel o t h eek
11,3 m² verblijfsruimte
11,2 m² verblijfsruimte
12,0 m² onbenoemde ruimte
(Gemiva)
(Gemiva)
10 p.
2 p.
Datum
(Gemiva)
2 p.
bi-H-09 (s)
liftschacht
0. 03
0. 04 toc hts luis
Formaat entreehal ( ni euw bo uw )
A0
14,1 m² verkeersruimte
Projectfase
33 94
bi-H-33
bi-H-02 (s)
garderobekast onder kozijn
1,2 m² toiletruimte
1,2 m² toiletruimte
kast
drsn IV
0 g r o ep s r u
0. 35 groep s rui mt e SO
70 verbli
68,9 m² verblijfsruimte
(D
1
(De Ark)
15 p.
15 p.
bi-H-26
bu-A-01 +z +m
bi-H-36
bu-A-01 +m (s)
bu-A-01 +m (s)
bu-A-01 +z +m
bu-A-01 +m (s)
bu-A-01 +z +m
bu-A-01 +z +m
drsn I TO-350
Gecontroleerd
(gemeenschappelijk)
Checker
Contact
Tekeningnummer
TO-350
balustrade, stripstaal, bk 1000+vl
R2019 balustrade, stripstaal, bk 1000+vl
bi-H-28
bi-H-14
drsn X TO-352
Datum
30-08-2019
www.kow.nl
2023 A0 (1189x841)
+15 bk mat
bu-A-08 +z
35 0. 06a bergi ng
peil= +0
bu-A-07 +z (s)
bu-A-07 +z (s)
0. 07a bergi ng 11,8 m² onbenoemde ruimte
11,8 m² onbenoemde ruimte
(Gemiva)
(Gemiva)
bergingswand tot 300 onder verlaagd plafond
bergingswand tot 300 onder verlaagd plafond
bi-H-09
0. 07 groep srui mte KDC
0. 06 groep srui mte KDC
67,4 m² verblijfsruimte
67,4 m² verblijfsruimte (Gemiva)
15 p.
bi-H-21
bi-H-21 (s)
bu-A-07 +z
15 p.
bu-A-07 +z
7000
schommel
schommel 0. 05 ga n g
bi-H-20
36
36
(Gemiva)
reservering voor toekomstige douche
0. 07c w erkruimte
13,6 m² badruimte
(Gemiva)
(Gemiva)
15,5 m² verblijfsruimte
(Gemiva)
bui tenrui m te KDC
bi-H-11 (s)
bi-H-11
7000
166,8 m² buitenruimte
0. 06c w erkruimte
(Gemiva)
bi-H-11 (s)
7023
bu-A-14 +z
0. 06b ve r s c h o n e n
13,6 m² badruimte
17313
0. 07b ve r s c h o n e n
bu-A-07 +z
schommel
bu-A-07 +z (s)
202,3 m² buitenruimte
bi-H-22 (s)
54,9 m² verkeersruimte
brancard
bu-A-14 +z (s)
bui tenrui mte KDC
bi-H-20 (s)
schommel
bi-H-22
3,5%
2500
0
-540
bi-H-02
-585 bk mat
21,0 m² verkeersruimte
vide
Getekend
MS
Projectnummer peil=A-2016603 +0
1 : 20
bi-H-09 (s)
(Gemiva)
1,2 m² toiletruimte
(De Ark)
I tm IV
0. 01 toc hts lu is
TO
64,2 m² verkeersruimte
Schaal(gemeenschappelijk)
(gemeenschappelijk)
peil= +0
2330
(Gemiva)
(Gemiva)
0. 37c to ilet
(gemeenschappelijk)
a=250 o=150
bu-A-05 +z +m
bu-A-05 +z +m (s)
bu-A-28
5250
bi-H-09 (s)
Onderdeel
0. 02 doorsnedes lifts c hprincipe a c ht doorlooplift 5,8 m²
Transformatie schoolgebouw Clematislaan te Gouda
3
463,0 m² buitenruimte
0. 37b to ilet
(gemeenschappelijk)
-1160
drsn II TO-350
DO-401
bui tenrui m te KDC
(De Ark)
bi-H-05
DEFINITIEF
11,5 m² onbenoemde ruimte
Project kruipruimte
39
bu-A-09 +z (s)
38,9 m² onb.rmte
0. 37a to ilet
kast
46,8 m² verblijfsruimte
56,3 m² verblijfsruimte
3%
groen- z one
TO_det-13 (De Ark)
2,9 m² verkeersruimte
bi-H-10
verkeersruimte
bi-H-33
garderobekast onder kozijn
bi-H-08
0. 33 z o n . g r o e p De A r k
0. 30 Z on Groep G em eens c happ eli jk (gemeenschappelijk)
Omschrijving
Gemiva-SVG Groep
35
Tekeningnummer62,8 m²
0. 28a vl u ch t t r a p 02 hwa
12,1 m² onbenoemde ruimte
Opdrachtgever
bu-A-05 +z +m
0. 23b to ilet 1,0 m² toiletruimte
0. 11 ontv angs t rui m te/p ant ry
plantenbak
bu-A-05 +z +m
bi-H-08
bu-A-24
(Gemiva)
1075
bu-A-05 +z +m (s)
(De Ark)
aankleedtafel
bi-H-08
0. 28b to ilet
4,7 m² toiletruimte
0. 03a buggy- en ro ls t oelb ergi ng
33,1 m² verblijfsruimte
drsn IV
www.kow.nl
bi-H-05
Datum
C 21-06-2019 0. 37 D toi le18-07-2019 trui m te D 4,5 m² E 30-08-2019
Checker
Contact
A-2016603
15 p.
speelveld
MS
Projectnummer
-1160
1,6 m² toiletruimte
0. 28c mi va t oilet
CONSTRUCTIES: Van de Laar, d.d. 23-08-2019 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG)
H' buitenpost
TO
DEFINITIEF
0. 19a 19-06-2018 h a l
Datum
toiletruimte
bu-A-29
drsn VI TO-351
-1160
bu-A-05 +z +m (s)
kruipruimte
0. 45 fys io therap ie
bi-H-33 drsn IV
Getekend Gecontroleerd Wijz.
bi-H-02
kruipruimte
bi-H-29
schommel
A3
0. 28a to ilet
1200
170 35
-600
170
speelveld
bi-H-23
1,6 m² ? (gemeenschappelijk)
bi-H-02 (s)
bi-H-02 (s)
pantry (close in boiler)
60 40
40
bi-H-02
c o ns t r uc t i e s : i ns t a l l a t i e s : E PC :
bi-H-17
6,4 m² technische ruimte (gemeenschappelijk)
-600 Projectfase
Schaal
bi-H-02
0. 23a to ilet 1,0 m² toiletruimte
bi-H-07 bi-H-07
1,8 m² toiletruimte
0. 03b s c ha c ht
3,6 m² liftschacht
(gemeenschappelijk)
bi-H-01
8,0 m² technische ruimte (gemeenschappelijk)
5,2 m² toiletruimte
0. 16 lifts c ha c ht
drsningelinkte III modellen/onderleggers van derden:
+0
(Gemiva)
60 40
4,4 m² technische ruimte (gemeenschappelijk)
0. 28 to iletruim te (gemeenschappelijk)
(Gemiva)
PEIL=0
speelveld
Formaat
1:5
bi-H-33
0. 13 p a t ch k a s t
2,9 m² onbenoemde ruimte
0. 47 LS
(De Ark)
Gemiva-SVG Groep
19,1 m² onb.rmte
drsntra0IIfo.4ru6ima te
0. 46 TR
+0
10630
PEIL=0
40 (De Ark)
bi-H-02 (s)
170
drsn I
33 94
Z1
K'
bi-H-09 (s)
B (TO) TO-300 EPS isolatie
6,5 m² toiletruimte
garderobekast onder kozijn
bi-H-02
hwa
35,7 m² onb.rmte
0. 17 kl eed k a m er
(Gemiva)
170 35
0. 23 toi let- /do uc heruim te
Onderdeel
Transformatie schoolgebouw Clematislaan te Gouda
-1160
(De Ark)
143
construction drawings - principle detail
Project
bi-H-09
bi-H-09 (s)
bu-A-18
(gemeenschappelijk)
AFWERKING TRAPPENHUIS: bestaand hekwerk + handregel handhaven overal pvc
+0
bi-H-05
Tekeningnummer
17,2 m² verkeersruimte
AFWERKING TRAPPENHUIS: bestaand hekwerk + handregel handhaven overal pvc
bi-H-37
Schaal
(Gemiva)
2,5 m² onb.rmte
387 PEIL=0
bi-H-11 (s)
Datum bi-H-02 (s)30-08-2019
garderobekast onder kozijn
15,5 m² verkeersruimte
-1160
40
Gecontroleerd
MS
0. 28 vl u ch t t r a p 02
33 94
60 40 170
bi-H-22 (s) bi-H-19
95 bi-H-11 (s)
130
kruipruimte
kast
Getekend
TO
bi-H-25
60 40
drsn III
-540 -600
0. 15 bergi ng
kruipruimte
(De Ark)
15 p.
bi-H-09 (s)
Projectfase
A0
bi-H-16
0. 21 w er kka s t
45,9 m² verblijfsruimte
(De Ark)
15 p.
(Gemiva)
hwa
0. 48 vl u ch t t r a p 01
0. 36 groep s rui mt e V SO MG
55,5 m² verblijfsruimte
4 p.
2 p. 20
0. 34 groep s rui mt e V SO MG
27,4 m² verblijfsruimte (De Ark)
(Gemiva)
68
0. 20a bergi ng 4,9 m² onbenoemde ruimte
beton_ihw (bestaand)
-600
0. 32 snoez elruimte
12,5 m² badruimte
principe doorsnedes I tm IV
Formaat
peil= +0
hwa
speelveld
EPS isolatie 0. 20b ve r s c h o n e n
Onderdeel EPS isolatie
Gemiva-SVG Groep
-525
b er gi n g
4 p.
170 35
113 72
Opdrachtgever
peil= +0
38,7 m² verkeersruimte
2023
(Gemiva)
200
+0
hellingbaan
Speelveld bk. tegels speelveld
(Gemiva)
Transformatie schoolgebouw Clematislaan te Gouda
bu-A-01 +z +m
h o o f dt r a p
Resol-isolatie
(Gemiva)
48,2 m² verblijfsruimte
-525
1100
-1160
bu-A-21
60 40
L'
535
60 40
PEIL=0
38,7 m² verkeersruimte
13,9 m² (gemeenschappelijk) verkeersruimte
Project
38,7 m² verkeersruimte
-1160
h o o f dt r a p
170
kruipruimte
H (TO) TO-301
kruipruimte
EPS isolatie
construction drawings - principle sections
+1238 ok koz
drsn IV TO-350
DEFINITIEF
170
(Gemiva)
-1160
bu-A-01 +m (s)
(gemeenschappelijk)
15 p.
(gemeenschappelijk)
drsn II0g.a3ng9
R
Omschrijving
pvc pvc pvc
bi-H-24
8,8 m² badruimte
drsn IV
170
ringen
kruipruimte
beton_ihw (bestaand) i.o.m. leverancier en aannemer
bu-A-20
stootborden: bordessen: vloeren:
i.o.m. leverancier en aannemer
bu-A-01 +m (s)
bestaande betonkolom 350x350mm
13,6 m² verblijfsruimte
0. 20 groeps ruim te
50
+0
-540 -600
Wijzigingbovenzijde tredes: grindbetonDatum (bestaand)
bu-A-01 +z +m
+0
0. 20c w erkruim te
voorzijde Movair dorpel
AFWERKING TRAPPENHUIS:
+2600 -600
bu-A-01 +m (s)
PEIL=0
schommel
117
33 94 *
*
78
touwen 170verwijderen 35 40
R 0. 41 kleedruimte
(Gemiva)
Speelveld bk. tegels speelveld
entresolvloer speelveld
bi-H-15
bi-H-13
200
+1238 ok koz
28
bi-H-12 (s)
1100
177,6 m²
K
bu-A-01 +m (s)
geleiding zonwering
0. 40 gym z aal / mo tori ekruim te Speelveld bk. tegels -540 verblijfsruimte speelveld -600 (Gemiva) +657 ok koz 75 p.
bi-H-09 (s)
135
alu kozijn, RT72 Reflex
d.d. 23-08-2019 c ons tr uc tbu-A-16 i es : CONSTRUCTIES: Van de Laar, bu-A-17 INSTALLATIES: Innax, d.d. <> beton_ihw (bestaand) i ns t a l l a t i e s : Innax, d.d. 18-04-2019 (EPG) E PC :
0. 18 h o o f dt r a p
*
200
(Gemiva)
bu-A-01 +m (s)
EPS isolatie
N
bi-H-13
EPS isolatie
100
0. 43 kleedruim te 6,5 m² onbenoemde ruimte
24,8 m² verblijfsruimte
ZB
drsn I
bi-H-12 (s)
0. 22 hal
*
PEIL=0 beton_ihw (bestaand)
R
(Gemiva)
i ns ta lla tieruim te
bu-A-01 +z +m
drsn IV TO-350
ingelinkte modellen/onderleggers van derden:
+0
hellingbaan
5,1 m² onbenoemde ruimte
29,7 m² verkeersruimte
0. 55 -1160
PEIL=0
160
kruipruimte
+0
EPS isolatie
94 66 10 68
-1160
PEIL=0
0. 42a (bestaand) toi let leid er( sbeton_ihw t er )
140 40
kruipruimte
(Gemiva)
drsn III TO-350
flex pur
K
+3500
(Gemiva)
drsn V TO-351
bi-H-09
200
bi-H-11 (s)
I (TO) TO-301
ok plafond
-540 -600
170
170
entresolvloer speelveld
100 130 100
F (TO) TO-301
17,6 m² verblijfsruimte +2860 (Gemiva)
Speelveld bk. tegels +2600 -600 speelveld +657 ok koz
schommel
11,3 m² (Gemiva) verblijfsruimte
bi-H-12
20 p.
Ecophon Master Ds
200 60 40
135
0. 31 p er r o n z w em b a d
(Gemiva)
bu-A-11 +z (s)
drsn V 100 TO-351 200 60 40
(Gemiva)
15,5 m² verblijfsruimte
bi-H-11
(Gemiva)
peil= +0
peil= +0
43
43
0. 09c w erkruim te
bu-A-07 +z (s)
drsn IX TO-352
drsn IX TO-352 schommel
5000
bi-H-11
15,5 m² verblijfsruimte
bi-H-11 (s)
0. 08b ve r s c h o n e n
13,6 m² badruimte
13,6 m² badruimte
(Gemiva)
(Gemiva)
reservering voor toekomstige douche
D (TO) TO-301
bi-H-11 (s)
0. 09b ve r s c h o n e n
(Gemiva)
bu-A-14 +z
37
bi-H-11
0. 08c w erkruimte 15,5 m² verblijfsruimte (Gemiva)
bu-A-07 +z
D (TO) TO-301
DO-401
schommel
1
18 parkeerplaatsen medewerkers
reservering voor toekomstige douche
6 (bus)parkeerplaatsen
bu-A-14 +z (s)
37
bu-H-01 (s)
schommel 20
b=1200mm o=205.9mm a=200.0mm
0. 09 groep s rui m te KDC
bi-H-09
67,3 m² verblijfsruimte
drsn VIII TO-352
bu-H-01
0. 58 bui tenb ergi ng
hwa
(Gemiva)
2
drsn VIII TO-352
(Gemiva)
bergingswand tot 300 onder verlaagd plafond
15 p.
0. 10 ga n g 14,3 m² verkeersruimte
0. 09a bergi ng
bu-H-01 (s)
(Gemiva)
bergingswand tot 300 onder verlaagd plafond
15 p.
12,0 m² onbenoemde ruimte
bi-H-09
(Gemiva)
67,2 m² verblijfsruimte
0. 08a bergi ng
(Gemiva)
11,9 m² onbenoemde ruimte
-600
0. 08 groep s rui m te KDC
bi-H-09 (s)
bu-A-07 +z
7000
(De Ark)
7,8 m² onbenoemde ruimte
bi-H-22
schommel
7,8 m² onbenoemde ruimte
30
bi-H-20
bu-A-07 +z (s)
bi-H-27
(Gemiva)
hwa
20
bi-H-21
bu-A-07 +z (s)
0. 57 bui tenb ergi ng
bi-H-20 (s)
bi-H-21 (s)
bi-H-22 (s)
hwa
bu-A-07 +z
*
I (TO) TO-301
10230 10230
46,8 m² verblijfsruimte
EPS isolatie
29 fiesten
*
40 68 10 68
z we m b a d
bi-H-04
beton_ihw (bestaand)
beton_ihw (bestaand)
R
PEIL=00. 54 +0
+0
5,9 m² ergo toiletruimte
140 40
bu-A-11 +z (s)
200
1e verd.
160
449 buit enruim te
+657 ok koz
bu-A-12
94 66 10 68
0
bu-A-12
0. 42 R MI VA t oilet
+3500
PEIL=0
0. 59 bui tenb ergi ng 11,5 m² onbenoemde ruimte
DO-401
(Gemiva)
38 bu-A-08 +z (s)
0 .1 0 A G
bu-A-10 +z
12000
0,7 m² onbenoemde ruimte (Gemiva)
bu-A-19
bu-A-08 +z (s) brandweeringang vzv sleutelbuis
3200
38
bu-A-08 +z
12000 6000
39
40
41
42
E (TO) TO-301
Kiss & RIde
23 5
3600
38x157
*
100 130 100
(De Ark)
22
38x157
*
70,4 m² verblijfsruimte
EPS isolatie
1e verd.
160
5
18
(Gemiva)
groep s rui mte S O MG
5000
17
155
+657 ok koz
ZA
C (TO) TO-300
15
94 66 10 68
40 68 10 68
3600
14
geleiding zonwering
13
*
3050
drsn III TO-350
12
195
*
+2660 ok stuc/ bk koz3050
alu kozijn, RT72-Reflex Multiwindow
i.o.m. leverancier en aannemer
11
113
117
78
*
270145
* 270686 *
*
3050
10
alu kozijn, RT72 Reflex
3050
TO_det-14
30-08-2019
09
28
131
08
72
voorzijde Movair dorpel
160
20
koppelstuk luchtdicht afplakken
Datum
flex pur
(Gemiva)
227
118
*
bu-A-11 +z
D E F
78
20
**
*
270145
*
**
www.kow.nl
535 190
*
20
* 270145 *
*
270686
94 66 10 68
520
Contact
A-2016603
11,3 m² verblijfsruimte
38,7 m² Ecophon Master Ds 06' 21-06-2019verkeersruimte 19-06-201807 (gemeenschappelijk) 3018-07-2019 50 30Tekeningnummer 50
25
(Gemiva)
*
MS
Projectnummer
+2820 plafondlijn h o o f dt r a p Datum
*
*
9283
05' Checker
*
*
TO
Getekend Gecontroleerd Wijz.
177,6 m² verblijfsruimte
*
*
+2660 ok stuc/ bk koz
1:5
H (TO) TO-301
+3500
24
gym z aal / mo tori ekruim te
Clematislaan 25 september 2019
200
*
*
*
A3
Projectfase
+2600
1e verd.
*
*
60 100
DEFINITIEF
er g o
links verplaatst!
entresolvloer
+3500
EPS isolatie
40
beton_ihw (bestaand)
i.o.m. leverancier en aannemer
alu kozijn, RT72-Reflex Schaal Multiwindow
*
78
* 270686 *
120 40
1e verd.
35
as Z1 naar luchtdicht afplakken Formaat
+2600
alu kozijn, RT72-Reflex Multiwindow
345
Z1
entresolvloer
+2660 ok stuc/ bk koz
Meilof Riks element: • EPS isolatie • alu zetwerk
120
Ecophon Master Ds +2860 ok plafond
i.o.m. leverancier en aannemer
+3500
250
Groep
beton_ihw (bestaand)
*
*
270145
*
**
* 270686 *
20
*
270145
* 270686 *
*
* 270686* **
120 40
120
20
* 270145 *
*
270686
*
*
*
225
*
+4157 ok koz
luchtdicht afplakken
+2660 ok stuc/ bk koz
+3500
+4706 ok stuc/ bk koz
(Gemiva)
*
*
entresolvloer +2600 alu kozijn, RT72-Reflex Multiwindow 100
(De Ark)
2780
177,6 m² verblijfsruimte
Ecophon Master Ds
70,4 m² verblijfsruimte
A (TO) TO-300
1e verd. gym z aal / mo tori ekruim te
koppelstuk
+2820 plafondlijn
200 238
Onderdeel
O
+6680 +3500
200
520
60 100
+6040 +2860 ok plafond
EPS isolatie
principe details +1238 ok koz(uitbreiding)
+6860
2e 1e verd.
345
58
65
2 35 10
10
40
345
177
2
Ecophon Master Ds
groep s rui mte S O MG
schoolgebouw Clematislaan te Gouda
2e verd as 15'-12
+3500
EPS isolatie
*
40 68 10 68
1e verd. beton_ihw (bestaand)
*
*
90
**
16,2 m² verblijfsruimte
250
Ecophon Master B
+4706 ok stuc/ bk koz
+4157 ok koz
267 345
(Gemiva)
1e verd.
22
* 270145*
238
+3500
Resol-isolatie
+4157 ok koz
beton_ihw (bestaand)
72
s p e l e n m u zi e k
225
38x195
72
113 107
*
*
68
+5840 ok stuc/alu bk kozijn, koz RT72-Reflex alu kozijn, RT72-Reflex Multiwindow
alu kozijn, RT72-Reflex Multiwindow
42
luchtdicht afplakken
535 21 118 5 100 130 100
68
840
20 263
120 40 700
68
alu kozijn, RT72 Reflex
geleiding zonwering
20
* 270145 *
*
270686
*
40
20
* 270145 *
*
270686
*
38x150
38x150
107
113
6
200
1e verd.
*
+4157 ok koz
*
+5840 ok stuc/ bk koz
+4706 ok stuc/ bk koz
+2660 bk koz
*
Ecophon Master B
+6680
*
+6680 +3500
EPS isolatie
+6860
2e verd.
*
beton_ihw (bestaand)
2e verd as 15'-12 EPS isolatie
Ecophon Master Ds
Ecophon Master Ds
verblijfsruimte (De Ark)
beton_ihw (bestaand)
+6040 ok plafond
luchtdicht afplakken
*
+6860
2e 1e verd.
groep s rui mt e SO 69,9 m² zonwering geleiding
+6680 luchtdicht afplakken
DEFINITIEF
EPS isolatie
+6860
2e verd.
16,2 m² verblijfsruimte
Datum
Tekeningnummer
beton_ihw (bestaand)
200 2e verd as 15'-12
2e verd as 15'-12
38x235 beton_ihw (bestaand)
s p e l e n m u zi e k
535 5 100 130 100
100 60
(Gemiva)
19-06-2018
190
550
+5840 ok stuc/ bk koz
alu kozijn, RT72-Reflex Multiwindow
+6000 plafondlijn
TO_det-09
*
72
21-06-2019 18-07-2019 30-08-2019
*
alu kozijn, RT72-Reflex Multiwindow
+6040 ok plafond 100 100
luchtdicht afplakken
*
+6680
luchtdicht afplakken 38x195
100 60
193 153
Ecophon Master Ds *
+6860
2e verd.
Datum
*
550
2e verd as 15'-12
D E F
*
brandwerende bekleding
alu kozijn, RT72 Reflex
42
107
+6000 plafondlijn
38x150
(De Ark)
100 100
Checker
38x150
69,9 m² verblijfsruimte
Getekend Gecontroleerd Wijz.
Ecophon Master B groep s rui mt e SO
Contact
EPS isolatie
Ecophon Master Ds
260
+6040 ok plafond
+5840 ok stuc/ bk koz
200
38x235
Ecophon Master Ds
267
MS
*
beton_ihw (bestaand)
+8098 ok koz
www.kow.nl
*
alu kozijn, RT72-Reflex Multiwindow
535 5 100 130 100
+4706 ok stuc/ bk koz
345
72 +7337 ok koz
luchtdicht afplakken
700
40
113
Projectfase
107
Projectnummer
35
Ecophon Master B
TO
EPS isolatie
A-2016603
beton_ihw (bestaand)
construction drawings - partial plan sample 72
2 parkeerplaatsen
1 parkeerplaats
Zuid-west gevel - as H' (DO) DO-201
38
37
43
36
35
H'
K
K'
ZB M
L L'
I (DO) DO-301
ZA O
N
F (DO) DO-301
A (DO) DO-300
7 170
B (DO) DO-300
4e verd/dak gymzaal +13610
35
I n s t a ll a t i e r u i m t e
Zuid-west gevel - as H' (DO) DO-201
H'
K
K'
L L'
M M'
N
O
3e verd. as15'-12 +10680 3e verd.dak as14-24
05'
06'
07
08
39
09
10
D (DO) DO-301
11
13 40
12
41 14
C (DO) DO-300
VMK
VMK
42
18
19
20
C (DO) DO-300
21
1e verd. VMK
VMK entresolvloer
15 p.
1. 22 k a nt o o r
isostuc (wit) 2 540
bu-A-02 +z +m (s)
bu-A-02 +z +m PEIL=0
+0
kruipruimte
-1160
zwembadvloer
-1800
-540
bu-A-10 +z (s)
bu-A-08 +z
bu-A-08 +z
+4157 o.k. kozijn
bu-A-02 +z +m
bu-A-02 +z +m (s)
+9860
2e verd as 15'-12
+6860
(De Ark)
bu-A-02 +z +m (s)
bu-A-02 +z +m
bu-A-02 +z +m
bu-A-02 +z +m
bu-A-08 +z (s)
+7337 o.k. kozijn
0. 29 g ro ep s r ui m t e S O M G
2 860
bu-A-02 +z +m
isostuc (grijs) bu-A-06 +z +m
bu-A-02 +z +m
isostuc (grijs)
+5840 b.k. kozijn
bu-A-06 +z +m (s)
bu-A-02 +z +m (s)
4 80
bu-A-02 +z +m (s)
Speelveld bk. tegels
bu-A-06 +z +m (s)
3e verd.dak as14-24
+9020 b.k. kozijn
27,9 m² verblijfsruimte
4 p.
h o o f d t r a p p e n h ui s
H (TO) TO-301
bu-A-06 +z +m
+5840 b.k. kozijn
70,4 m² verblijfsruimte (De Ark)
bu-A-02 +z +m (s)
bu-A-02 +z +m
+4103 o.k. kozijn
+0
PEIL=0
-1800
zwembadvloer
isostuc (wit)
bu-A-02 +z +m15 p.
+4157 o.k. kozijn Speelveld bk. tegels
1e verd.
isostuc (wit)
isostuc (grijs)
+2660 b.k. kozijn
bu-A-20
isostuc (wit) bu-A-05 +z +m
bu-A-05 +z +m (s)
bu-A-05 +z +m (s)
Zuid-west gevelbu-A-08 - as H' +z (DO) (s) DO-201
isostuc (grijs)
isostuc (wit)
bu-A-19
+2660 b.k. kozijn
-540
+2660 b.k. kozijn
bu-A-10 +z
bu-A-08 +z (s)
+657 o.k. kozijn
isostuc I (DO) (grijs) DO-301
entresolvloer
+2600
bu-A-01 +m (s)
bu-A-08 +z
bu-A-01 +z +m
bu-A-01 +m (s)
bu-A-01 +z +m
bu-A-01 +z +m C (DO)
bu-A-01 +z +m (s)
B (DO) DO-300
DO-300
A (DO) DO-300
F (DO) DO-301
+657 o.k. kozijn
+922 o.k. kozijn
cementgebonden plaat (geisoleerde kantplank) (grijs)
PEIL=0
doorsnede G-G
doorsnede -1160 kruipruimte E-E -1800
+2600
VMK
e nt r e e z o n e
+5840 b.k. kozijn
+0
(De Ark)
VMK
isostuc (wit) bu-A-25
+3500
55,6 m² verblijfsruimte
2e verd as 15'-12
+3500
4 80
+10365
2e verd.
F (DO) DO-301
2. 24 g r o ep s r uim t e V S O
drsn I TO-350 +6860
+6680
A (DO) DO-300
G (TO) TO-301
+6860
g a ng
v e r k e er s r u i m t e G em i v a
26
4 80
2e verd as 15'-12
+11240
v e r k e er s r u i m t e G em i v a
B (DO) 24 25 DO-300
23 23'
VMK
+10680 3e verd. as15'-12
rooster
22
isostuc (grijs)
drsn II TO-350
V er k ee r s r u i m t e G em i v a
17
E (TO) TO-301
+13555
2e verd.
isostuc (wit)
16
drsn IV TO-350 +14180
+6680
15
3 21
Z1
+9860
E (TO) TO-301
zwembadvloer
H (TO) TO-301
Zuid-west gevel - as H' (DO) DO-201 drsn I TO-350
drsn II TO-350
G (TO) TO-301
drsn IV TO-350
zuidwest gevel Z1
05'
06'
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23 23'
24 25
26
E (DO) DO-301 4e verd/dak gymzaal +13610
26
25
24
23'
23
22
21
20
19
18
3. 01
16 trap4,9pem²nhuis
17
15
14
verkeersruimte
+9860
+6860
2. 27 gy m z a a l
2. 07 ho o f d t ra p
252,7 m² verblijfsruimte
33,9 m² verkeersruimte
11
10
09
06'
G (DO) DO-301
05'
Z1
08
07
VMK
2. 15 p ra k t i j k r ui m t e
2. 26a t o i le t
2. 26b t o i le t
2. 26c t o i le t
2. 16 v lu c h t t r a p 02
2. 17 p ra k t i j k r ui m t e
45,9 m² verblijfsruimte
1,2 m² toiletruimte
1,2 m² toiletruimte
1,2 m² toiletruimte
8,3 m² verkeersruimte
54,1 m² verblijfsruimte
drsn III TO-350
H (TO) TO-301 4e verd/dak gymzaal +13610
2. 11 g r o ep s r uim t e V S O
2. 25 g a ng
54,9 m² verblijfsruimte
114,3 m² verkeersruimte
VMK
2. 13 IB
2. 14 g r o ep s r uim t e V S O
28,3 m² verblijfsruimte
54,0 m² verblijfsruimte
+11566 b.k. kozijn
VMK
VMK
VMK
VMK
33,9 m² verkeersruimte
1. 09 g ro ep s r ui m t e S O
bu-A-12
bu-A-12
bu-A-12
bu-A-12
bu-A-12
68,1 m² verblijfsruimte
1. 40 t ec hi ek r ui m t e
1. 12 p ra k t i j k r ui m t e
1. 13a t o i le t
1. 13b t o i le t
1. 13c t o i le t
1. 15 v lu c h t t r a p 02
1. 16 lo k a a l ( p r a k t i j k r u i m t e )
45,9 m² verblijfsruimte
1,2 m² toiletruimte
1,2 m² toiletruimte
1,2 m² toiletruimte
23,9 m² verkeersruimte
54,2 m² verblijfsruimte
24,8 m² technische ruimte
bu-A-02 +z +m
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
bu-A-02 +z +m
bu-A-02 +z +m
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
2e verd.
0. 55 i n s t a ll a t i e r u i m t e
+5840 b.k. kozijn
24,8 m² verblijfsruimte
0. 22 ha l
0. 41 k le e d r u i m t e
29,7 m² verkeersruimte
8,8 m² badruimte
0. 40 g y mz aal / m ot orisostuc i ek r ui mt e
(grijs)
177,6 m² verblijfsruimte
0. 18 ho o f d t ra p
0. 20a b erg i ng
38,7 m² verkeersruimte
4,9 m² onbenoemde ruimte
0. 20b v ers c ho n en
isostuc (grijs)
0. 34 g ro ep s r ui m t e V S O M G
isostuc (grijs)
12,5 m² badruimte
0.isostuc 23 t o i l et - / d o uc her ui mt e
55,5 m² verblijfsruimte
6,5 m² toiletruimte
isostuc (wit) +0
PEIL=0
-1800
zwembadvloer
bu-A-02 +z +m (s)
bu-A-02 +z +m
bu-A-02 +z +m
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
bu-A-02 +z +m (s)
bu-A-02 +z +m
bu-A-02 +z +m
bu-A-17
bu-A-02 +z +m (s)
0. 23a (wit) t o i le t 1,0 m² toiletruimte
0. 23b t o i le t
0. 28 v lu c h t t r a p 02
0. 28a v lu c h t t r a p 02
1,0 m² toiletruimte
17,2 m² verkeersruimte
2,9 m² verkeersruimte
bu-A-13 +z +m (s)
bu-A-01 +m (s)
+657 o.k. kozijn +0
PEIL=0
-1160
kruipruimte
-1800
zwembadvloer
bu-A-12
Materialistie
bu-A-01 +z +m
bu-A-01 +m (s)
bu-A-01 +z +m
bu-A-01 +m (s)
bu-A-01 +m (s)
bu-A-01 +m (s)
bu-A-12
M' ZBM
N I (TO) TO-301 drsn V TO-351
L'
F (TO) TO-301
A (TO) TO-300
L
+2660 b.k. kozijn
bu-A-12
Interieur - Clematislaan Gouda bu-A-11 +z
+1238 o.k. kozijn
drsn IV TO-350
PEIL=0
+0
+6860
Speelveld bk. tegels
-540
kruipruimte
-1160
zwembadvloer
-1800
ingelinkte modellen/onderleggers van derden: c o n s t r u c ti es : i n s ta l l a t i e s : E PC :
CONSTRUCTIES: Van de Laar, d.d. 23-08-2 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG) entresolvloer
+2600
bu-A-11 +z
+1172 o.k. kozijn
Wijziging
Datum
Omschrijvin
A
30-08-2019
afrondin
drsn III TO-350
Project
E (TO) TO-301
Transformatie schoolgebouw Clematislaan te Gouda
H (TO) TO-301
Opdrachtgever
Gemiva-SVG Groep
Formaat
Projectfase
A0
Savanne O ZA
steppe
bu-A-12
construction drawings - section and elevation
savanna
+2600
cementgebonden plaat (geisoleerde kantplank) (grijs)
cementgebonden plaat (geisoleerde kantplank) (grijs)
doorsnede F-F noordoost gevel
bu-A-12
14
bu-A-01 +z +m
Verdieping 2_Plattegrond
H (DO) DO-301 G (TO) TO-301
entresolvloer
2e verd as 15'-12
+4706 b.k. kozijn
bu-A-16
+2660 b.k. kozijn
bu-A-01 +z +m
+3500
57,9 m² verblijfsruimte
16,3 m² onb.rmte
1e verd.
1e verd.
0. 27 lo k a a l ( p r a k t i j k r u i m t e )
0. 60 p o m p r ui mt e
+4157 o.k. kozijn +3500
bu-A-02 +z +m
+6680
+8098 o.k. kozijn
bu-A-02 +z +m
+7337 o.k. kozijn +6680
2e verd.
3e verd. as15'-12 +10680
1. 07 ho o f d t ra p
VMK
3e verd.dak as14-24
+9020 b.k. kozijn
12
drsn IV TO-350
H (DO) DO-301
2e verd as 15'-12
+9860
E (TO) TO-301
G (TO) TO-301
3e verd.dak as14-24
13 3e verd. as15'-12 +10680
TO
Schaal
Projectnum
1 : 100
A-201660
6
K'
K
35
H'
36
43
Steppe B (TO) TO-300
37
38
D (TO) TO-301
+13610 4e verd/dak gymzaal
VMK
VMK
VMK
Polder isostuc (grijs)
+10680 3e verd. as15'-12
VMK
jungle +6680
Wolken isostuc (wit)
entresolvloer bu-A-11 +z (s)
kruipruimte
noordwest gevel
Oceaan
+2600
accent wall
+2660 b.k. kozijn
bu-A-21
+9860
2e verd as 15'-12
+6860
5B
bu-A-27
bu-A-07 +z
+5840 b.k. kozijn
bu-A-07 +z
bu-A-07 +z (s)
bu-A-07 +z
bu-A-07 +z (s)
+4102 o.k. kozijn
isostuc (grijs)
bu-A-05 +z +m (s)
Woestijn drsn V TO-351
I (TO) TO-301
3e verd.dak as14-24
drsn VIII TO-352
7 bu-A-07 +z bu-A-06 +z +m
isostuc (wit) bu-A-07 +z (s)
bu-A-11 +z (s)
PEIL=0
zwembadvloer
5A
VMK
+4157 o.k. kozijn
+1172 o.k. kozijn
desert -1160
VMK
+5839 b.k. kozijn
bu-A-18
1e verd.
-1800
VMK
drsn IX TO-352
+2660 b.k. kozijn
+0
VMK
drsn VI TO-351
isostuc (wit)
2e verd.
ocean
C (TO) TO-300
bu-A-20
Jungle
isostuc (wit)
cloud +3500
Zuidwest gevel - as H' (TO) TO-201
VMK
polder
F (TO) TO-301
A (TO) TO-300
Accentwand in kleur B (TO) TO-300
isostuc (wit) bu-A-07 +z
bu-A-07 +z (s)
isostuc (grijs)
+2660 b.k. kozijn
bu-A-07 +z (s)
ingelinkte modellen/onderleggers van derden: c o n s t r u c ti es : i n s ta l l a t i e s : E PC :
CONSTRUCTIES: Van de Laar, d.d. 23-08-2019 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG)
bu-A-28 +922 o.k. kozijn
+657 o.k. kozijn
drsn VI TO-351
drsn IX TO-352
Zuidwest gevel - as H' (TO) TO-201
Wijziging
Datum
Omschrijving
A
30-08-2019
afronding TO
drsn VIII TO-352
Project
Transformatie schoolgebouw Clematislaan te Gouda Opdrachtgever
D (TO) TO-301
Gemiva-SVG Groep
2nd floor plan
2e verd. INT 1 : 500
section 5A
group rooms and washrooms interior materialization drawings 73
Formaat
Projectfase
A0
TO
Schaal
Projectnummer
1 : 100
A-2016603
13
Other h a n d m a d e
Wo r k s
c o l l e c t i o n s
Toronto and Delft 2010 - present Description: Currently focusing on handmade jewelry using porcelain and silver and embroidery, I always have a project going. My range of artistic and design interests include: CNC milling, 3D printing, laser cutting, ceramics, metal work, stones and gems, screen printing, sewing, embroidery, and the growing of mushrooms. a. screen printed sugar owl b. porcelain bead collection c. porcelain and copper jewelry set d. porcelain and silver jewelry sets e. CNC milled kids chair f. porcelain rings g. home grown oyster mushrooms h. dill imprinted porcelain bowl i. 3D modeled and printed air plant cage pendant j. arduino lighting system, acrylic and paper
74
a
b
c
e
d
f
g
i
j 75
h