Margot de Man Architecture Portfolio 2019

Page 1

ARCHITECTURE a D

n E

S

d I

G

N

p o r t f o l i o 2

0

M a r g o t

2

0

d e

M a n



C O N T E N T S 02

CURRICULUM VITAE

educational 04

THE URBAN LANDSCAPE

08

URBAN AGRICULTURE UNITS

14

GROUNDWORK

20

BRIDGING THE TIBER

28

ATRIA IN FEIJENOORD

34

DELTA SHELTER

38

CONDOMINIUM 3.0

professional 54

THE VIEWFINDER

60

COMPARATIVE ANALYSIS

62

GARNISH

66

BINCK TWINS

68

CLEMATISLAAN

72

other works


Margot de Man (Ir. MSc. B.Arch.Sci.) margot@deman.ca Toronto, ON 1 (647) 768-4626 publications: issuu.com/margot.deman profile: www.linkedin.com/in/margot-de-man-56827051 Languages: Native English, Intermediate French, Intermediate Dutch

Education Sept 2015 - Apr 2018

Delft University of Technology MSc Architecture, Urbanism and Building Sciences Graduated in the Architecture Track: Affordable Housing in the Global Urban South (Mentors: Dick van Gameren, Nelson Mota)

Sept 2010 - June 2014

Ryerson University BArchSc Graduated in the Architecture Specialization

Sept 2005 - July 2010

Danforth Collegiate and Technical Institute High School Diploma Gifted/Enriched Program

Extracuricular Experience Mar 2017 - Nov 2019

X - TUDelft Open Studio Workspace Assistant (current), Supervisor and Community Manager

Jan 2015 - June 2018

ARGUS Architecture Master Student Association (www.argus.cc) Board (2017/18) - Treasurer/Chairman and Excursion Committee Supervisor Helped in the continuous growth and significance of this organization Annual and Expo Committee (2015/16 and 2016/17) Re-establishing and organizing the production of the annual student work puplication

Feb 2013 - June 2014

RU - TU Delft Collab with Parallel52 Collaborative exercise on Walk-ability and Cycle-ability in Toronto and Amsterdam

Jan 2013 - Mar 2013

E.R.A. Architects Inc. Design-Builder VIEWFINDER for 2014: Culture of Outports - Community Design-Build in Botwood, NF

Mar 2012 - Mar 2014

325 Magazine with Ryerson Department of Architectural Science (DAS) Marketing/Sponsorship/Graphics

Mar 2012 - Mar 2014

[R]ED[U]X LAB with DAS (http://reduxlab.com/) Design and Fabrication 2012: The Stop’s Night Market Fabrication 2012: Come Up To My Room at the Gladstone Hotel

Awards and Publications 2015/16 and 2016/17

ARGUS Architecture Annual (https://issuu.com/argusasa/docs/booklet_issuu2_def)

2015

FIRST PLACE SOCIAL INNOVATION at the Sustainable Design Awards in Toronto

2014

Voted BEST IN SHOW by Designlines Magazine for DBG’s Garnish (https://designlinesmagazine.com/results/)

June 16 2014 2011/12 and 2012/13

Architectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare (https://issuu.com/margot.deman/docs/bridgepoint_july-15) 325 Magazine (https://issuu.com/mag325/docs/325_magazine_2012-2013) 2


Professional Skills Drafting: AutoCAD 2018, Revit 2018 Modeling: Rhinoceros 5.0, Revit, SketchUp Rendering: V-Ray (Rhino), Enscape (Revit) Adobe CC: Photoshop, InDesign, Illustrator, Premier Microsoft Office: Word, Excel Digital Tools: Laser Cutter, 3D Printer, CNC Router Hand Drawing, Drafting, Modeling, Small Scale Construction and Fabrication Ceramics, Screen Printing, Jewelery Design, Sewing and Textile Arts

Professional Experience Mar 2020 - Present Dec 2009 - Present (Occasional) 2015 - Present (Occasional)

Feb 2013 - Present (Occasional)

Mar 2019 - Nov 2019

Sept 2014 - Jul 2015

Sept 2013 - June 2014

Puffin Gear Production Manager Graphic Design, Packaging Design, Production and Manufacturing Atkinson Architect Architectural Design, Drafting and Presentation Drawing Design and construction drawings for residential rennovation and addition (Ongoing) Promotional drawings for historical restoration and addition Design + Build + Grow Studio (design-build-grow.tumblr.com, facebook.com/designbuildgrow) Founder Grow Op at the Gladstone Hotel in 2016 The Stop’s Night Market: ‘Garnish’ in 2014 (Project Lead) and ‘Juicy Roots’ in 2015 KOW Architecten Technical Designer - Valued by the office for my knowledge and experience working on both the design and technical sides of their office and in between, sparking a conversation in the office to better integrate them. - Worked on a project in design development to more seamlessly prepare the Revit model for construction documents. - Managed a highly complex housing development project, concurrently across the design phases to build an architectural toolkit within Revit for the client which was a large development firm. Projects: Expansive work in innovative Dutch housing projects Interior and exterior school renovation to accommodate children with disabilities Redevelopment and densification of large commercial building Stages: Schematic Design, Design Development and Construction Documents WGD Architects Intern - Worked with clients including holding meetings and conducting presentations - Responsible for coordinating with engineers, materials and product representatives Projects: Large scale buildings such as community centers and arenas Office building interiors Landscape design Stages: Project Proposals and Bid Documents, Conceptual and Schematic Design, Design Development, Presentation Drawings and Material Boards, Technical Drafting/Construction Documents Bridgepoint Collaboratory for Research and Innovation + Ryerson University Research Assistant and Graphic Designer

Dr C. Alvaro (Bridgepoint Collaboratory for Research and Innovation) Prof C. Atkinson (Ryerson Department of Architectural Science)

Architectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare with the Ontario Ministry of Health and funded by the Canadian Institute of Health Research May 2013 - Sept 2013

Oct 2009 - Jun 2010

Ryerson University Research Assistant Wellington Street Proposal (C. Atkinson) Kneider Architects Co-op Student 3


01

The Urban Landscape Toronto Financial District High-rise

Financial District, Toronto, Canada Ryerson BArchSci, 3rd year Integration Studio: Office of The Future September 2012 to April 2013 Supervisor: Cheryl Atkinson (catkinson@ryerson.ca) and Paul Floerke (paul.floerke@ryerson.ca) Description: How do we create the office of the future? A dense city office tower with functional space bordering city streets; reuniting the people with the streets and opening up to the ground plane; connecting the people with businesses, amenities, landscapes, and each other; respecting the city, the landscape, and the individual. The tower arises as a product of it’s context.

4


5


detail model

east elevation 1:1500

south

east

north final massing model 6

west


8 1 Cloud Gardens 2 lobby

13

3 path connection

6

4 retail 5 loading ramp 6 service 7 HVAC

6

8 winter garden

10

9 daycare

7

10 gallery

12

11 reception 12 private office 13 group work space

thirteenth floor plan 1:750

4

2 5

11 4 6 4

11 2 1 6

9

7 3 2

ground floor plan 1:750

east-west section through atrium 1:750 7


winter garden perspective section 1:100 8


9


02

Urb an A g r i c ul t ur e U ni t s Toronto Pilot Project on Downtown Campus

Ryerson University Campus, Toronto, Canada Ryerson BArchScie, 4th year Option Studio: Local Food Landscapes September 2013 to December 2013 Supervisor: Mark Gorgolewski, mgorgo@ryerson.c Role: Individual Project with the Urban Agriculture Initiative, Rye Home Grown. In addition to the regular studio format we met with local stakeholders and the Ryerson community and worked to make our design realistic and applicable to the city’s regulations and bylaws. Within the studio we began with a group project in which we designed and built chicken coops. Description: How do we house agriculture in an accelerating urban environment? Urban agriculture is growing in popularity, most effective when implemented into a community scenario. Rye home grown continues to develop systems on the Ryerson Campus and would benefit from increased growing space and community involvement. The development of the growing space is accelerated through the use of the Urban Agriculture Units (UAU). The Sears parking lot site is an example of a development site that has been purchased and will sit unused for a certain number of years, in this case ten. These sites have great potential for urban agriculture. UAU’s are designed as greenhouses which fit into individual parking spaces. In addition to greenhouses they can be used to house a wide range of functions, from market stalls, to outdoor planting beds, to study spaces. They can easily be deployed in stages and in any amount. After their time on the site comes to an end they can be moved to any other parking lot or street parking space. These units can phase out the density of parking in the city center as we evolve to use more sustainable means of transportation.

10


11


campus boundaries

current growth

current rye home grown space

future growth of rye home grown

UAU phasing

future growth

new site frontage

...

...

post site development

sample elevation

sample section The UAU can stand amongst vehicles or be placed in a series of patterns to create dynamic spaces. These modular, versatile structures can be used as information booths, office spaces, study spaces or galleries. They can be combined with modular planters and outdoor seating which can be stored within the frame during off seasons. The initial phasing of the Sears parking lot site occurs where there is the highest visibility. Information and social units as well as educational growing units can be used here to provoke project interest and entice new participants from the school and the community.

sample unit plan 12


unit density on site over time

unit density on site over time

unit configuration samples 13


As the project is further developed, individual UAU’s can be privately invested into. A participant is given the essential unit structure which can be developed in terms of interest, or availability of means and can house a range of food production from simple pop bottle planters to aquaponic systems.

and corrugated plastic roofing. The roof plane collects water into an interior basin. There are sliding doors and windows and a fold out ramp for accessibility. The form and size of the units are designed in a way that they do not shade their neighbors. The next step is the UAU’s adaptability to street parking around the city which can create a dynamic secondary sidewalk frontage and differentiate from the regularity of street parking.

The structure is a simple quintessential aluminium frame which the components fit into. Pictured is a primarily polycarbonate clad unit with thermally modified wood paneling on the base

model of parts catalogue sample

14


envelope assembly

aluminium frame structure

15


03

Groundwork University

Retreat

Centre

The Don Valley, Toronto, Canada Ryerson BArchSci, 4th year Option Studio: Poetics of Construction Winter 2014 Supervisor: Garth Norbraten, gregarth@total.net Description: In this studio we examined methods of construction and detailing for the creation of an off-campus university facility. The facility was to house seminar and conference spaces as well as student residences and guest accommodations for visiting lecturers. With this project I focused on the community, implementing a community garden, greenhouse and gallery into the facility. In regard to formality and materiality, my concept arose from an idea about the longevity of the facility and the creation of a sum of parts where program is broken up into separate buildings and made specifically to their function. Inspiration was derived from a drawing by Christine Ă–dlund titled Greetings from Uranus Madame Blavatsky and the reconstruction of the SzatmĂĄry Palace by MARP

16


17


outdoor study courtyard

east elevation

C D

A

C

B A greenhouse plan

p

existing school o

j

i

h n

k

r r s u

m u

s

n

i b l

q

l

h

x

m

t

x v

t

w

site plan

ground level plan 18

main level plan

k


f e

c

d

a

b

b

g

level two plan

level three plan 19

a. large convention space b. greenhouse atrium c. administration/offices d. event space e. library f. connection to school auditorium g. small study spaces h, public lobby i. university commons lobby j. open gallery k. seminar space l. community garden m. student commons n. admin. courtyard o. food services p. computer lab q. split level presentation space r. outdoor study courtyard s. the gathering place t. guest accommodation u. apartment residences v. apartment living room w. guest living room x. common courtyard


11

2. Horizontal Timber Beam

22

1

1

8

2

1. Bridge to Curtain Wall Frame Connection

3. Timber Truss System 4. 25 mm Glass Panel

33

5. Cable Truss System 6. Spider Connection

3

3

7. Timber Floor

44

5

55

4 6

66

7

77

A

B

20

4

5

6

7


13 13 14 5 6 4 8 D

1

1

2

3

4 5 6

1. Horizontal Cross Bracing consisting of Steel Rods and Cables 2. Structural Steel Column 3. Cable Truss System 4. Spider Connection

A. bridge section B. bridge glazing elevation C. curtain wall section at grade D. curtain wall plan detail at corner E. summer shading F. winter shading

5. 25 mm Glass Panel 6. Structural Silicone Sealant

1. bridge to curtain wall frame 2. connection 3. horizontal timber beam 4. timber truss system 5. cable truss system 6. spider connection 7. timber floor 8. structural silicone sealant 9. springs to allow movement 10. u-channel for glass pane 11. bolts with spring system 12. concrete slab 13. horizontal cross bracing - steel rods 14, structural steel column

6 8

1 2

4 5

3

4

E 9

5

10 11 12 6 7 8

C

F

21


04

Bridging the Tiber Lapidarium for Rome’s Embankments

Ponte della Scienza, Rome TU Delft MSc1 Public Building Studio - Reclaiming Rome September 2015 to January 2015 Group: Margot de Man, Eva Fuehrer, Magdalena Nalepa Supervisors: Nicola Marzot, Niklaas Beboutte, Sien van Dam, Susanne Komossa Description: Bridges were our focus for research in Rome. During our excursion we fully analyzed the bridges along the Tiber River with the conclusion they are used primarily to connect the two sides of the city but at the same time creating disconnect with the lower embankment of the river. We also noticed a variety of social activity layers happening on, underneath and in close proximity to the bridges. We found the need to collect and merge those activities fluently and use them as a tool to reestablish a physical connection between the river and the city, creating a contemporary answer for the notion of the Lapidarium solving the contextual issues of the site. We translated our found ‘stones’ into a series of programs which combined act as a drawing force and generator for revitalizing the abandoned sites and the embankment of the Tiber. Metaphorically we saw the potential to collect near the base of the city where previously at the Gasometer Site, the cranes were used to bring goods from the main spine of transportation, up the bank towards the city. We chose the existing bridge as our intervention site not only because it is the existing connection between two districts but also because through recycling it, we reestablish new opportunities for the bridge typology. In addition to our design proposal, we have considered our urban intervention as a strategy for the foreseen future development of the industrial area into a cultural district and for the revitalization of the lower embankment. Our bridge proposal offers a multitude of connections; between the embankments; between the river and city level; and as a link between two districts (Industrial and residential). By fronting the river on both sides, ties are created physically and visually. In order to blur divisions our intervention functions as a gate, a connector between levels and sides and a collector - a lapidarium of Rome’s activities.

22


23


section B 1:500

CafĂŠ

Pub

Street Market

Atelier

Thought Classes

Library

Movement Classes section A 1:500

section C 1:500

section D B

E A

B

F

G

D C

ground level plan f

ground level plan 1:2000 24


fragment - library 1:500

section E 1:500

Workshops

Lounge

Restaurant

Bookshop

Restaurant

D 1:500

section F 1:500

section G 1:500

E

ground level plan fragment - cafĂŠ 1:500 25


louver shading system

summer - ventilation/sun

winter - ventilation/sun

summer - cooling

winter - heating

rain water/plumbing

26


cross section 1:100

substratum (150mm)

Our lapidarium consists of the exhibition plane in the form of bridge and landscape and the exhibited layers of programme in the form of the coloured blocks.

filter fleece (5mm) drainage (100mm) gas baking (10mm) waterproof membrane (3x10mm) insulation (120mm vapour barrier (3mm) separation layer (3mm) composite slab

The exhibited elements are expressed in a colour associated to that layer in terms of its colour psychology. Faรงade elements are in the form of perforated metal fins and are rotatable according to their location in order to act as both sun shading devices and provide variances in transparency, directing views.

IPE 400

suspended ceiling

parapet detail 1:20 27

VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT

VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT

VON EINEM AUTODESK-SCHULUNGSPRODUKT ERSTELLT


28


29


05

A t r i a i n Fe i j e n o o r d Afordable Co-Housing for Rotterdam

Kop van Feijenoord, Rotterdam, The Netherlands TU Delft MSc2 Dutch Dwelling Studio - Housing in Rotterdam February 2016 to June 2016 Supervisor: Olv Klijn Description: Through group research we found economical evidence of a hard boundary line along the old rail corridor in the Kop van Feijenoord neighbourhood in Rotterdam. We concluded that we should aim to satisfy the needs of the area in order to blur the line, meeting the concerns of three groups identified as traditional middle-class, innovators, and local working-class. The locals on the east are afraid of being pushed out due to gentrification. The traditionals on the west are unconnected to their neighbourhood due to a lack of amenities which spark their interest. Beneficially to our aspirations, these three groups work together in harmony. An example of this occurs in a chain of commercial exchange: the locals on the east side benefit from a live/work scenario and run local businesses; the innovators appreciate these local businesses to support them and also see entrepreneurial opportunities for themselves in what they see as an up-and-coming neighbourhood; the traditionals will find interest and value in the new economic endeavours of the innovators. My individual design aims to maintain the symbiotic relationship between target groups. I defined new target groups as family, students/juniors, seniors/handicap, innovators/ artists/entrepreneurs, and shop owners. In the Atria in Feijenoord residences, all these target groups are situated within the building, all sharing a central circulation network, atria and winter garden, communal living spaces, and a roof terrace. The result is a mixed residential building. Sitting upon a new square both sides of the site are linked, maintaining the symbiotic relationship of the targeted groups.

30


31


block design scheme

buildinG concept diagrams

32


perspective cross section 1:250

ground floor plan 1:250 33


+6 FAMILY TARGET GROUP

+5 FAMILY TARGET GROUP

+4 STUDENT TARGET GROUP

+3 SENIOR TARGET GROUP

+2 STUDENT TARGET GROUP

+1 LOFT INNOVATOR TARGET GROUP

0 GROUND storefronts, shops, galleries, offices, ateliers

floor plans 1:1000

partial floor plans 1:300 34


+6

EXTERIOR BRICK ON PANELISED CLT WALLS

FAMILY TARGET

+5

+3

PANELISED CLT FLOOR AND ROOF SLABS

FAMILY TARGET

+6 FAMILY TARGET

natural lighting

+4

INTERIOR PANELISED CLT

RE F

.

STUDENT TARGET W

D

+5

RE F

.

W

D

FAMILY TARGET

SECONDARY ADDITIONAL PANELISED CLT

+3 SENIOR TARGET

+4

W

STUDENT TARGET

PRIMARY PANELISED CLT LOAD BEARING STRUCTURE RE

U P

+3

natural ventilation summer

SENIOR TARGET W

RE F.

D

D W

STUDENT TARGET possible stair connection

2-storey dwelling

Family Senior possible stair connection Student Loft/Studio twoAtelier/Gallery storey dwelling Storefront two storey dwelling

CTL POST AND BEAM STRUCTURES U P

possible connection +1

W

CONCRETE ELEVATOR CORES

STUDENT TARGET

CONCRETE FOUNDATION

W

possible stair connection LOFT - INNOVATOR TARGET

+2

R E F .

Family Senior Student Loft/Studio Atelier/Gallery Storefront

F.

+2

0 GROUND

Family Senior Student Loft/Studio Atelier/Gallery Storefront

R E F .

ATRIUM CLT COLUMNS

U P

R E F .

two storey dwelling GROUND LEVEL CLT COLUMNS

0 CONCRETE ELEVATOR CORE

+1

W

ATRIUM CLT BEAMS

LOFT - INNOVATOR TARGET

GROUND FLOOR SPAN DIRECTION UP

storefronts, shops, galleries,

C

B U P

offices, atteliers1:400 STRUCTURAL AXONOMETRIC

unit connection diagram UNIT (S, M, L)

structural axonometric

A

family units senior units student units studio loft units atelier gallery units storefront units

˿

s.m. per person s.m. per person s.m. per person

0

natural ventilation winter

GROUND storefronts, shops, galleries, offices, atteliers

level 0 CLT posts atrium CLT posts atrium CLT beams concrete elevator core

The unit connection diagram depicts the organization of the various unit types within the building as a whole. There is a symbiotic relationship between the senior and student residences with subsides where the seniors share their living spaces with the students who pay lower rents. There are a variety of commecial types on the ground floor from the standard storefront to livework loft units.

6

5

COMMON SPACE

PARTIAL AXONOMETRIC 1:100

˿

˿

WC / STORAGE

4

STOREFRONT (shops, gallerys, ateliers, offices)

UNIT (S, M, L)

storefront STOREFRONT (shops, gallerys, ateliers, offices) wc/storage WC / STORAGE commons COMMON SPACE 17-20 m2/person FLOOR PLANS 1:500 20-27 m2/person 2 27-31 m /person 35

The building appears as a monolithic whole despite the variety of uses within. A CLT post and beam system is used on the ground floor for flexibility and in the atrium for natural light while a panelized CLT system is used for the dwellings. The atrium supports the climate scheme as well as an extensive green roof and solar collectors. The interior use of wood contrasts the brick façade which blends into the surroundings.


06

Delta Shelter

Form and Modeling Studies

Summerhouse on Venetian Island TU Delft Msc2 Architecture Design Elective February 2016 to June 2016 Supervisors: Peter Koorstra Description: The focus of this project was to design a summerhouse on a small Venetian island amongst the ruins of an old factory. The design and presentation of the proposal was done primarily through modeling, including a series of sketch models, collaged design drawings and a series of final presentation models. I focussed on using leftover materials from around the studio and minimized the use of new materials, making a more sustainable and economical project.

36


37


1. rise

canal model

transverse section

2. hide

shelter model

transverse elevation

3. lean

longitudinal elevation

4. preserve

longitudinal section

5. hide/slice/pop

ground floor plan

process sketch models

collaged orthos 38


1:1000 presentation model 1:200 presentation model

1:100 presentation model

1:50 presentation model

1:50 presentation model 39


07

Co ndominium 3.0

Affordable Housing for Addis Ababa

Geja Sefer, Lideta, Addis Ababa, Ethiopia TU Delft MSc-3/4 Global Dwelling Studio - Affordable Housing for Sustainable Development in the Global Urban South September 2016 to April 2018 Supervisors: Prof. Ir. Dick van Gameren, Dr. Ir. Nelson Mota, Ir. Anteneh Tesfaye Tola Description: This thesis focuses on alternative methods of combating the affordable housing crisis in Addis Ababa, Ethiopia with a focus on developing convivial communities through an abundantly existing typology. Large areas of informal settlements, called sefers have been replaced by this typology in the form of mid-rise condominium blocks. In Addis Ababa, the Grand Housing Program (GHP) which began in 2004 is responsible for this mass redevelopment in an aim to replace what was seen as ‘dilapidated housing stock’, pictured on the following page and in order to address extreme housing shortages. Although the focus was on supplying low-income housing it was not actually affordable for most and led to the displacement of the sefer’s citizens. In addition, the new developments lack a quality of resilience and conviviality inherent to the preexisting informal settlements. Despite the condominium’s issues, the program represents an efficient and already strongly implemented model for housing Addis Ababa. Condominium 3.0 aims to continue the efficient development of the condominium while reintroducing the qualities of the sefers into the existing and new condominium projects to maintain the resiliency and conviviality of their communities. It is constructed in a way which does not displace the sefer’s existing inhabitants and further densifies to alleviate the housing shortages across social classes.

40


41


social spaces

qualities of the existing traditional sefer neighborhood (pictured on previous page)

inner streets

tej house

shop windows

street stalls

recycling

corrugated metal

bamboo

clothes lines

concrete block

stone paving

mud walls and corrugated metal

building techniques

borders

income generation

compound courtyards

qualities of the existing condominium development (pictured on following page)

Research Question

social spaces

If combined, can the sefer’s resilience and the condominium block’s efficiency render convivial and inclusively affordable communities for Addis Ababa? leftover space

storefront

informality

income generation

courtyard

42

How can the Grand Housing Program (GHP) be altered in order to meet the needs of both low and middle-income inhabitants, increasing density, community conviviality, and economic inclusiveness while minimizing the displacement of citizens from informal settlements allocated for redevelopment?


43


Geja sefer in 2010

area: 5.9 hectares units: 390 density: 206 units/hectare

Geja sefer in 2011

105% increase in density if development were to continue in the current manner

2010

2011 44

area: 5.9 hectares units: 1238 density: 217 units/hectare

the Geja sefer would not benefit from continued development in the current manner


first phase of development under Condominium 3,0 model

comparative block + additions

focus block

completed phased development under Condominium 3,0 model

130% increase in density development under Condominium 3,0 model

Condominium 3.0 - additions to existing condominium typology 45

area: 5.9 hectares units: 1594 density: 270 units/hectare


street - existing

courtyard - existing

street - addition

courtyard - addition

street - new

courtyard - new 46


Solution Condominium 3.0 aims to continue the efficient development of the condominium while reintroducing the qualities of the sefer into the existing and new condominium projects to maintain the resiliency and conviviality of their communities. To avoid relocation the construction is done in phases where small communities of the Geja seffer residents are relocated directly to their adjacent permanent dwellings along with new middle class residents and businesses. This method also further densifies to alleviate the housing shortages across all social classes. The density has increased to 270 units per hectare. Opportunities for small businesses have been created, leftover space has been reduced and the quality of open to sky spaces have been improved both in the existing condominium areas and in new developments.

existing condominium typology

Condominium 3.0 47


block plan level 0 (top) and level -1 (bottom) 1:500 48


A level 0 plan 1:200

south elevation 1:200 49


A level 4 plan 1:200

A level 5 plan 1:200 50


section A 1:100 51


a. b. c. d. e. f. g. h. i.

corrugated metal roofing bamboo rafters bamboo cross bracing bamboo ties wood roof joist wood stud wall and roof framing bamboo beam bamboo column facade system A - eucalyptus framed and coated closed-weave bamboo panel - eucalyptus furring - rigid insulation between studs - closed-weave bamboo panel j. window A - wood window head - steel casement window - eucalyptus framed open-weave bamboo shutter - single glazing

k. eucalyptus wood flooring l. bamboo floor joist m. closed-weave bamboo panel n. wood sill o. roof flashing p. cast-in-place concrete beam q. hollow concrete block (HCB) r. bamboo trellis - open-weave bamboo panel - bamboo trellis framing - bamboo rain gutter s. trellis post t. bamboo rail u. open-weave bamboo panel v. wood plank w. wood furring x. slab HCB y. precast concrete beam z. plaster details 1:20 52


penthouse addition model

existing condition block model

slab and service unit addition model

existing block model with additions

commercial addition model

new block model

structural/material model 53


communal rooftop 54


penthouse dwelling 55


08

The Viewfinder Community Design-Build in Newfoundland

Botwood, Newfoundland, Canada Culture of Outports 2013 Group: Team of 4 architects from E.R.A. Architects Inc. and 6 student interns from Ryerson University Supervisor: Andrew Pruss, andrewp@era.on.ca Role: As a Bachelor student at Ryerson Universtity I applied for this role. We conducted research on Botwood, Newfoundland and public installation projects. We held design charettes at E.R.A Architects and did preliminary designs. We travelled to Botwood in the midst of winter for only two weeks to complete the design-build project. We met with the community, conducting more design charettes there and getting input from the community. We then made working drawings, gathered supplies and materials and with the help of the community constructed and errected the projec. I also presonally organized an ice-candle making kick off event for our arrival in Botwood. Description: On the Bay of Exploits in the north-central sector of Newfoundland, the community is historically a hub for aviation and industrial exporting. Botwood today retains traces of its rich history and culture and the Viewfinder frames and celebrates these with views to the historic flying boat on site and to a historic crash site in the bay. The Viewfinder acts as a gathering and rest point on the peninsula used in all seasons.

56


57


A

B

exploded axo

plan

section A

section B

future growth 58


59


roof detail

sill detail

east elevation

north elevation 60


long bench detail

corner bench detail

west elevation

south elevation 61


09

Comparative Analysis

Bridgepoint Active Healthcare

Archtiectural Comparative Analysis Report for the POE of Bridgepoint Active Healthcare Research assistant: Bridgepoint Collaboratory for Research and Innovation Sept 2013 to June 2014 Supervisor: C Atkinson, C Alvaro Description: This analysis compared the former Bridgepoint Health building built in 1963 by Chapman and Hurst to the new Bridgepoint Active Healthcare building built in 2013 in collaboration with Stantec Architecture, KPMB Architects, HDR Architecture and Diamond Schmitt Architects. A third healthcare facility called West Park, built in 1980 by Armstrong and Molesworth Architects is used as a control for this analysis. The purpose of this study was to create a systematic methodology for the measurement of design factors which have an impact on the patients and staff of complex chronic desease facilities. In order to achieve this goal we rigerously studied, graphically represented and sumarized the chosen three buildings in regards to building scale, context, typology, program, circulation, and fenestration.

62


Bridgepoint 2013 (BAH)

Bridgepoint 1963 (BH)

West Park 1980 (WP)

463 In-Patients

558 In-Patients

312 In-Patients

63


10

G a r

n i s h

Food Cart Design for The Stop’s Night Market

Honest Edd’s Alley, Toronto, Canada The Stop’s Night Market 2014 Group: Design + Build + Grow (DBG) Awarded BEST IN SHOW by DESIGNLINES MAGAZINE Role: As team leader I managed the production of the project and took part in all aspects of design and construction. Description: The concept of DBG’s food cart is rooted in the ability to adapt, reuse and re-imagine existing materials and to push the boundaries of innovative sustainable design. Our aim was to promote the practice of cultivating, processing and distributing food in an urban setting. We hoped to embody into the design and construction of our cart a framework founded on a shared ethos of nature, food and community holism. The Design consists of a welded steel frame, salvaged wood and water bottles. The caps of the bottles are bolted to the frame and the bottles planted with various herbs can be screwed onto the frame, used as garnish for events and then be distributed to serve as personal self watering herb containers.

64


65


b

c

e a

d f g

a. herbs planted in water bottle tops with cheese cloth b. screwed onto frame network c. used to garnish dishes at night market d. given away or sold -place in bottom of bottle to create self watering planter

h

i q r

k

j

s t u l e. reclaimed oak roof slats - later slits were cut to hang wine glasses for use as a bar at a party f. welded steel frame section 1 g. back-lit, etched acrylic chef signage h. water-jet cut steel DBG signage i. welded steel frame section 2.1 j. welded steel frame section 2.2 k. menu chalk-board, sponsors and business card rack l. reclaimed oak counter slats m. welded steel section 3 n. 1” steel angles o. up-cycled plastic water bottles p. planted herbs and micro-greens q. up-cycled water bottle r. 1.5” hollow steel section s. 1” steel angle t. bottle cap u. self-tapping screw

n

m

o

66


a

b

c

e

d

f

a. mock-up b. planting leafy greens c. welding technique practice

d. painted steel, planed and stained reclaimed wood e. self-taping screws secure bottle caps f. chef garnishes pizza from cart 67


11

Binck K O W

Tw i n s

A r c h i t e c t e n

Transformation Feasibility Study in Trekvlietzone, The Hague KOW Architecten (kow.nl) May 2019 to July 2019 Supervisor: RenĂŠ Buur Description: This project focused on the transformation and optimization of an existing building situated in a commercial zone currently undergoing redevelopment to include additional mixed-use amenities and residential blocks. The existing building housed mainly mechanical and automotive companies with little street frontage. The proposal is to extend existing parking facilities within the courtyard building which already has a large ramp to roof parking. This parking would also serve neighboring residential projects and would be toped by solar collectors and a community rooftop park. Additional affordable, modular residential units with street access are integrated into the building. Various facade treatments are explored as well as the possibility of additional built structures for amenities.

68


existing situation

+ additional parking

+ park, solar energy and recreational facility

s l a a p ka m e r 6,8 m²

k eu ke n 10,9 m²

s l a a p ka m e r 11,7 m²

b a d k am e r 3,1 m²

t oi l e t 1,5 m² b er g in g 4,0 m²

t oi l e t 1,3 m²

w oo n k am e r 24,2 m²

residential unit infill

potential mixed outcome 69

w oo n k am e r 25,7 m²

44 m 2

46 m 2

lower level

upper level


12

Clematislaan K O W

A r c h i t e c t e n

Accessible transformation: primary school and care facility in Gouda KOW Architecten (kow.nl) June 2019 to Sept 2019 Supervisor: Michel Schaap Description: The transformation aimed to future-proof the existing school with a sustainable and healthy design. A new insulating facade system on the existing structure unifies the older and newer buildings. The building is fitted with PV panels on the roof to provide a large part of electricity needs. A balanced ventilation system to control CO2 output meets “fresh school� requirements. The school will house a number of specialty programs for children where not only accessibility but also smart design were important for the success of the program. We worked on the interior design of the areas for older age groups working closely with an interior designer who foccussed on the areas for younger age groups.

70


Foto’s bestaand

4

Impressie

Clematislaan 25 september 2019

existing situation

5

transformation impressions 26

Clematislaan 25 september 2019

71

Clema


beton_ihw (bestaand)

beton_ihw (bestaand)

200

100 60 100

230

200

EPS isolatie

3e verd.dak as14-24

+9860

3e verd.dak as14-24 koppelstuk

120 200 120

602

260 * *

(De Ark)

*

1300

+9860 koppelstuk

* 270145 *

60 100

230

70 70

bestand kozijn slopen en ruimte uitvullen

3e verd. as15'-12 +10680

100 100

550

100 60

*

68

*

*

*

116

*

260

Formaat

1:5

+6680

200

*

13 163

druklaag

A3

+6860

2e verd.

+3500

Ecophon Master Ds

+7337 ok koz

Schaal

2e verd as 15'-12

+8098 ok koz

1e verd. 38x235

+9220 plafondlijn

vzv vloerverwarming

*

40

20

300

* *

+9860

*

*

3e verd.dak as14-24

i.o.m. leverancier en aannemer 100

+9020 ok stuc/ bk koz

*

+10305 ok stuc/ bk koz

EPS isolatie

3e verd.dak as14-24

2. 32 K l eed k a m er j o n g en s

zandcement

116 *

*

*

252,7 m² verblijfsruimte

bestand kozijn slopen en ruimte uitvullen

+9860

200

3e verd. as15'-12 +10680

gy m z a a l

*

*

270686

+9860

i.o.m. leverancier en aannemer 3e verd. as15'-12 +10680

10beton_ihw 0 250(bestaand) 100 70 100

beton_ihw (bestaand)

luchtdicht afplakken

*

68

68

3e verd.dak as14-24 +9860 +11220 bk stuc

68

40

20

* 270145 *

*

38x235

*

*

*

+10305 ok stuc/ bk koz

+11566 ok stuc/ bk koz

13 163

vloeropbouw: • afwerkvloer d=70mm • druklaag d=70mm • kanaalplaatvloer d=260mm

alu kozijn, RT72-Reflex 3e Multiwindow verd. as15'-12 +10680

116

(De Ark)

*

270686

+13535 bk stuc +10305 ok stuc/ bk koz

Ecophon Master Ds

230

100 60

200

EPS isolatie

260

252,7 m² verblijfsruimte

vleermuiskast

60 100

200

3e verd. as15'-12 +10680

gy m z a a l

*

* *

3e verd. as15'-12 +10680

4e verd/dak gymzaal +13610 +4102 ok koz

+9220 plafondlijn

gevelstuc, d=230mm (RAL 9002)

EPS isolatie 250

(De Ark)

100 70 100

EPS isolatie 116

bestaand houten dak

Ecophon Master Ds

Onderdeel

principe details (uitbreiding)

*

beton_ihw (bestaand)

54,4 m² verblijfsruimte

250

beton_ihw (bestaand) beton_ihw (bestaand)

+9020 ok stuc/ bk koz +10345 bk stuc

alu kozijn, RT72-Reflex Multiwindow

100

13 163

voorkant zetwerk 3e verd. as15'-12 +10680

*

*

luchtdicht afplakken

Ecophon B groep s rui m tMaster e V SO

550

Ecophon Master Ds

230

+12600 ok plafond

3e verd.dak as14-24

100 100

200

*

*

230

spouw volschuimen

+11566 ok stuc/ bk koz

13 163

260

bouwbesluit artikel 2.20: Ter voorkoming van overklauterbaarheid mag er tussen 0,2m en 0,7m boven een vloer, tredevlak of vloer van een hellingbaan geen opstapmogelijkheid zijn.

+9860

vleermuiskast

60 100

N

gevelstuc, d=230mm (RAL 9002)

EPS isolatie 250

100 60 100

*

+9860 3e verd.dak as14-24

beton_ihw (bestaand)

Ecophon Master B vleermuiskast

H'

+12600 ok plafond

90

45°

3e verd.dak as14-24

177

+11220 bk stuc

gelijkwaardigheid: de kozijnen worden voorzien van doorvalveilig glas + beweegbare delen met vastzetinrichting alleen op kiepstand te openen.

+10345 bk stuc

spouw volschuimen

72

1300

EPS isolatie

Project

3e verd. as15'-12 +10680

4e verd/dak gymzaal +13610

Transformatie schoolgebouw Clematislaan te Gouda

Opdrachtgever

Gemiva-SVG Groep

100 60

vleermuiskast

345

113

EPS isolatie

+11566 ok stuc/ bk koz

*

*

K

+14160 bk stuc

107

bouwbesluit artikel 2.18: Een vloerafscheiding als bedoeld in artikel 2.17 lid 1, heeft een hoogte van tenminste 1 m, gemeten vanaf de vloer. Tenzij de vloer hoger ligt dan 13m boven het aansluitende terrein, water of vloer, dan heeft deze een hoogte van tenminst 1,2 m gemeten vanaf de vloer. In afwijking hiervan heeft een vloerafscheiding ter plaatse van een al dan niet beweegbaar raam een hoogte van ten minste 0,85m vanaf de vloer.

+13535 bk stuc

beton_ihw (bestaand)

42 NIEUWBOUW

+8098 ok koz

bestaand houten dak

*

*

+11566 ok stuc/ bk koz

ZA O

_ihw (bestaand)

EPS isolatie

EPS isolatie

*

+10305 ok stuc/ bk koz

2002e verd as 15'-12

+6860

2e verd as 15'-12

+6860

3e verd.dak as14-24 2e verd.

+9860 +6680

2e verd.

+6680

54,4 m² verblijfsruimte

EPS isolatie

(De Ark)

2. 32 K l eed k a m er j o n g en s 120 40

5 100 130 100

groep s rui m te V SO

beton_ihw (bestaand)

260

535 100

300

60 100

230

2e verd as 15'-12

+6860

2e verd as 15'-12

+6860

2e verd.

+6680

3e verd.dak as14-24 2e verd.

+9860 +6680

beton_ihw (bestaand)

beton_ihw (bestaand)

+8098 ok koz

EPS isolatie

* *

20

* * **

* * * * *

40 68 10 68

bu-A-11 +z

3050

3600

* *

E (TO) TO-301

3600

16

+1238 ok koz

3600

3600

entresolvloer

* *

Ecophon Master Ds i.o.m. leverancier en aannemer

50

+2860 ok plafond

+2600

3600

19

3600

h o o f dt r a p

20

3600

38,7 m² verkeersruimte

3(gemeenschappelijk) 600

21

3600

bu-A-12

bu-A-12

91

30

155

34,0 m² buitenruimte

bu-A-12

90

85 30

350

5

90

38x157

38x157

85

Checker

Projectnummer

Contact

A-2016603

www.kow.nl

1 : 20

30

Opdrachtgever

0. 19 ga n g

TO-350

44,2 m² verkeersruimte

principe details (bestaand gebouw) R2019

A0 (1189x841)

bi-H-09 (s)

Wijziging

-600

0. 44 er g o

0. 14 ka n t o o r

0. 12 s p eel o t h eek

11,3 m² verblijfsruimte

11,2 m² verblijfsruimte

12,0 m² onbenoemde ruimte

(Gemiva)

(Gemiva)

10 p.

2 p.

Datum

(Gemiva)

2 p.

bi-H-09 (s)

liftschacht

0. 03

0. 04 toc hts luis

Formaat entreehal ( ni euw bo uw )

A0

14,1 m² verkeersruimte

Projectfase

33 94

bi-H-33

bi-H-02 (s)

garderobekast onder kozijn

1,2 m² toiletruimte

1,2 m² toiletruimte

kast

drsn IV

0 g r o ep s r u

0. 35 groep s rui mt e SO

70 verbli

68,9 m² verblijfsruimte

(D

1

(De Ark)

15 p.

15 p.

bi-H-26

bu-A-01 +z +m

bi-H-36

bu-A-01 +m (s)

bu-A-01 +m (s)

bu-A-01 +z +m

bu-A-01 +m (s)

bu-A-01 +z +m

bu-A-01 +z +m

drsn I TO-350

Gecontroleerd

(gemeenschappelijk)

Checker

Contact

Tekeningnummer

TO-350

balustrade, stripstaal, bk 1000+vl

R2019 balustrade, stripstaal, bk 1000+vl

bi-H-28

bi-H-14

drsn X TO-352

Datum

30-08-2019

www.kow.nl

2023 A0 (1189x841)

+15 bk mat

bu-A-08 +z

35 0. 06a bergi ng

peil= +0

bu-A-07 +z (s)

bu-A-07 +z (s)

0. 07a bergi ng 11,8 m² onbenoemde ruimte

11,8 m² onbenoemde ruimte

(Gemiva)

(Gemiva)

bergingswand tot 300 onder verlaagd plafond

bergingswand tot 300 onder verlaagd plafond

bi-H-09

0. 07 groep srui mte KDC

0. 06 groep srui mte KDC

67,4 m² verblijfsruimte

67,4 m² verblijfsruimte (Gemiva)

15 p.

bi-H-21

bi-H-21 (s)

bu-A-07 +z

15 p.

bu-A-07 +z

7000

schommel

schommel 0. 05 ga n g

bi-H-20

36

36

(Gemiva)

reservering voor toekomstige douche

0. 07c w erkruimte

13,6 m² badruimte

(Gemiva)

(Gemiva)

15,5 m² verblijfsruimte

(Gemiva)

bui tenrui m te KDC

bi-H-11 (s)

bi-H-11

7000

166,8 m² buitenruimte

0. 06c w erkruimte

(Gemiva)

bi-H-11 (s)

7023

bu-A-14 +z

0. 06b ve r s c h o n e n

13,6 m² badruimte

17313

0. 07b ve r s c h o n e n

bu-A-07 +z

schommel

bu-A-07 +z (s)

202,3 m² buitenruimte

bi-H-22 (s)

54,9 m² verkeersruimte

brancard

bu-A-14 +z (s)

bui tenrui mte KDC

bi-H-20 (s)

schommel

bi-H-22

3,5%

2500

0

-540

bi-H-02

-585 bk mat

21,0 m² verkeersruimte

vide

Getekend

MS

Projectnummer peil=A-2016603 +0

1 : 20

bi-H-09 (s)

(Gemiva)

1,2 m² toiletruimte

(De Ark)

I tm IV

0. 01 toc hts lu is

TO

64,2 m² verkeersruimte

Schaal(gemeenschappelijk)

(gemeenschappelijk)

peil= +0

2330

(Gemiva)

(Gemiva)

0. 37c to ilet

(gemeenschappelijk)

a=250 o=150

bu-A-05 +z +m

bu-A-05 +z +m (s)

bu-A-28

5250

bi-H-09 (s)

Onderdeel

0. 02 doorsnedes lifts c hprincipe a c ht doorlooplift 5,8 m²

Transformatie schoolgebouw Clematislaan te Gouda

3

463,0 m² buitenruimte

0. 37b to ilet

(gemeenschappelijk)

-1160

drsn II TO-350

DO-401

bui tenrui m te KDC

(De Ark)

bi-H-05

DEFINITIEF

11,5 m² onbenoemde ruimte

Project kruipruimte

39

bu-A-09 +z (s)

38,9 m² onb.rmte

0. 37a to ilet

kast

46,8 m² verblijfsruimte

56,3 m² verblijfsruimte

3%

groen- z one

TO_det-13 (De Ark)

2,9 m² verkeersruimte

bi-H-10

verkeersruimte

bi-H-33

garderobekast onder kozijn

bi-H-08

0. 33 z o n . g r o e p De A r k

0. 30 Z on Groep G em eens c happ eli jk (gemeenschappelijk)

Omschrijving

Gemiva-SVG Groep

35

Tekeningnummer62,8 m²

0. 28a vl u ch t t r a p 02 hwa

12,1 m² onbenoemde ruimte

Opdrachtgever

bu-A-05 +z +m

0. 23b to ilet 1,0 m² toiletruimte

0. 11 ontv angs t rui m te/p ant ry

plantenbak

bu-A-05 +z +m

bi-H-08

bu-A-24

(Gemiva)

1075

bu-A-05 +z +m (s)

(De Ark)

aankleedtafel

bi-H-08

0. 28b to ilet

4,7 m² toiletruimte

0. 03a buggy- en ro ls t oelb ergi ng

33,1 m² verblijfsruimte

drsn IV

www.kow.nl

bi-H-05

Datum

C 21-06-2019 0. 37 D toi le18-07-2019 trui m te D 4,5 m² E 30-08-2019

Checker

Contact

A-2016603

15 p.

speelveld

MS

Projectnummer

-1160

1,6 m² toiletruimte

0. 28c mi va t oilet

CONSTRUCTIES: Van de Laar, d.d. 23-08-2019 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG)

H' buitenpost

TO

DEFINITIEF

0. 19a 19-06-2018 h a l

Datum

toiletruimte

bu-A-29

drsn VI TO-351

-1160

bu-A-05 +z +m (s)

kruipruimte

0. 45 fys io therap ie

bi-H-33 drsn IV

Getekend Gecontroleerd Wijz.

bi-H-02

kruipruimte

bi-H-29

schommel

A3

0. 28a to ilet

1200

170 35

-600

170

speelveld

bi-H-23

1,6 m² ? (gemeenschappelijk)

bi-H-02 (s)

bi-H-02 (s)

pantry (close in boiler)

60 40

40

bi-H-02

c o ns t r uc t i e s : i ns t a l l a t i e s : E PC :

bi-H-17

6,4 m² technische ruimte (gemeenschappelijk)

-600 Projectfase

Schaal

bi-H-02

0. 23a to ilet 1,0 m² toiletruimte

bi-H-07 bi-H-07

1,8 m² toiletruimte

0. 03b s c ha c ht

3,6 m² liftschacht

(gemeenschappelijk)

bi-H-01

8,0 m² technische ruimte (gemeenschappelijk)

5,2 m² toiletruimte

0. 16 lifts c ha c ht

drsningelinkte III modellen/onderleggers van derden:

+0

(Gemiva)

60 40

4,4 m² technische ruimte (gemeenschappelijk)

0. 28 to iletruim te (gemeenschappelijk)

(Gemiva)

PEIL=0

speelveld

Formaat

1:5

bi-H-33

0. 13 p a t ch k a s t

2,9 m² onbenoemde ruimte

0. 47 LS

(De Ark)

Gemiva-SVG Groep

19,1 m² onb.rmte

drsntra0IIfo.4ru6ima te

0. 46 TR

+0

10630

PEIL=0

40 (De Ark)

bi-H-02 (s)

170

drsn I

33 94

Z1

K'

bi-H-09 (s)

B (TO) TO-300 EPS isolatie

6,5 m² toiletruimte

garderobekast onder kozijn

bi-H-02

hwa

35,7 m² onb.rmte

0. 17 kl eed k a m er

(Gemiva)

170 35

0. 23 toi let- /do uc heruim te

Onderdeel

Transformatie schoolgebouw Clematislaan te Gouda

-1160

(De Ark)

143

construction drawings - principle detail

Project

bi-H-09

bi-H-09 (s)

bu-A-18

(gemeenschappelijk)

AFWERKING TRAPPENHUIS: bestaand hekwerk + handregel handhaven overal pvc

+0

bi-H-05

Tekeningnummer

17,2 m² verkeersruimte

AFWERKING TRAPPENHUIS: bestaand hekwerk + handregel handhaven overal pvc

bi-H-37

Schaal

(Gemiva)

2,5 m² onb.rmte

387 PEIL=0

bi-H-11 (s)

Datum bi-H-02 (s)30-08-2019

garderobekast onder kozijn

15,5 m² verkeersruimte

-1160

40

Gecontroleerd

MS

0. 28 vl u ch t t r a p 02

33 94

60 40 170

bi-H-22 (s) bi-H-19

95 bi-H-11 (s)

130

kruipruimte

kast

Getekend

TO

bi-H-25

60 40

drsn III

-540 -600

0. 15 bergi ng

kruipruimte

(De Ark)

15 p.

bi-H-09 (s)

Projectfase

A0

bi-H-16

0. 21 w er kka s t

45,9 m² verblijfsruimte

(De Ark)

15 p.

(Gemiva)

hwa

0. 48 vl u ch t t r a p 01

0. 36 groep s rui mt e V SO MG

55,5 m² verblijfsruimte

4 p.

2 p. 20

0. 34 groep s rui mt e V SO MG

27,4 m² verblijfsruimte (De Ark)

(Gemiva)

68

0. 20a bergi ng 4,9 m² onbenoemde ruimte

beton_ihw (bestaand)

-600

0. 32 snoez elruimte

12,5 m² badruimte

principe doorsnedes I tm IV

Formaat

peil= +0

hwa

speelveld

EPS isolatie 0. 20b ve r s c h o n e n

Onderdeel EPS isolatie

Gemiva-SVG Groep

-525

b er gi n g

4 p.

170 35

113 72

Opdrachtgever

peil= +0

38,7 m² verkeersruimte

2023

(Gemiva)

200

+0

hellingbaan

Speelveld bk. tegels speelveld

(Gemiva)

Transformatie schoolgebouw Clematislaan te Gouda

bu-A-01 +z +m

h o o f dt r a p

Resol-isolatie

(Gemiva)

48,2 m² verblijfsruimte

-525

1100

-1160

bu-A-21

60 40

L'

535

60 40

PEIL=0

38,7 m² verkeersruimte

13,9 m² (gemeenschappelijk) verkeersruimte

Project

38,7 m² verkeersruimte

-1160

h o o f dt r a p

170

kruipruimte

H (TO) TO-301

kruipruimte

EPS isolatie

construction drawings - principle sections

+1238 ok koz

drsn IV TO-350

DEFINITIEF

170

(Gemiva)

-1160

bu-A-01 +m (s)

(gemeenschappelijk)

15 p.

(gemeenschappelijk)

drsn II0g.a3ng9

R

Omschrijving

pvc pvc pvc

bi-H-24

8,8 m² badruimte

drsn IV

170

ringen

kruipruimte

beton_ihw (bestaand) i.o.m. leverancier en aannemer

bu-A-20

stootborden: bordessen: vloeren:

i.o.m. leverancier en aannemer

bu-A-01 +m (s)

bestaande betonkolom 350x350mm

13,6 m² verblijfsruimte

0. 20 groeps ruim te

50

+0

-540 -600

Wijzigingbovenzijde tredes: grindbetonDatum (bestaand)

bu-A-01 +z +m

+0

0. 20c w erkruim te

voorzijde Movair dorpel

AFWERKING TRAPPENHUIS:

+2600 -600

bu-A-01 +m (s)

PEIL=0

schommel

117

33 94 *

*

78

touwen 170verwijderen 35 40

R 0. 41 kleedruimte

(Gemiva)

Speelveld bk. tegels speelveld

entresolvloer speelveld

bi-H-15

bi-H-13

200

+1238 ok koz

28

bi-H-12 (s)

1100

177,6 m²

K

bu-A-01 +m (s)

geleiding zonwering

0. 40 gym z aal / mo tori ekruim te Speelveld bk. tegels -540 verblijfsruimte speelveld -600 (Gemiva) +657 ok koz 75 p.

bi-H-09 (s)

135

alu kozijn, RT72 Reflex

d.d. 23-08-2019 c ons tr uc tbu-A-16 i es : CONSTRUCTIES: Van de Laar, bu-A-17 INSTALLATIES: Innax, d.d. <> beton_ihw (bestaand) i ns t a l l a t i e s : Innax, d.d. 18-04-2019 (EPG) E PC :

0. 18 h o o f dt r a p

*

200

(Gemiva)

bu-A-01 +m (s)

EPS isolatie

N

bi-H-13

EPS isolatie

100

0. 43 kleedruim te 6,5 m² onbenoemde ruimte

24,8 m² verblijfsruimte

ZB

drsn I

bi-H-12 (s)

0. 22 hal

*

PEIL=0 beton_ihw (bestaand)

R

(Gemiva)

i ns ta lla tieruim te

bu-A-01 +z +m

drsn IV TO-350

ingelinkte modellen/onderleggers van derden:

+0

hellingbaan

5,1 m² onbenoemde ruimte

29,7 m² verkeersruimte

0. 55 -1160

PEIL=0

160

kruipruimte

+0

EPS isolatie

94 66 10 68

-1160

PEIL=0

0. 42a (bestaand) toi let leid er( sbeton_ihw t er )

140 40

kruipruimte

(Gemiva)

drsn III TO-350

flex pur

K

+3500

(Gemiva)

drsn V TO-351

bi-H-09

200

bi-H-11 (s)

I (TO) TO-301

ok plafond

-540 -600

170

170

entresolvloer speelveld

100 130 100

F (TO) TO-301

17,6 m² verblijfsruimte +2860 (Gemiva)

Speelveld bk. tegels +2600 -600 speelveld +657 ok koz

schommel

11,3 m² (Gemiva) verblijfsruimte

bi-H-12

20 p.

Ecophon Master Ds

200 60 40

135

0. 31 p er r o n z w em b a d

(Gemiva)

bu-A-11 +z (s)

drsn V 100 TO-351 200 60 40

(Gemiva)

15,5 m² verblijfsruimte

bi-H-11

(Gemiva)

peil= +0

peil= +0

43

43

0. 09c w erkruim te

bu-A-07 +z (s)

drsn IX TO-352

drsn IX TO-352 schommel

5000

bi-H-11

15,5 m² verblijfsruimte

bi-H-11 (s)

0. 08b ve r s c h o n e n

13,6 m² badruimte

13,6 m² badruimte

(Gemiva)

(Gemiva)

reservering voor toekomstige douche

D (TO) TO-301

bi-H-11 (s)

0. 09b ve r s c h o n e n

(Gemiva)

bu-A-14 +z

37

bi-H-11

0. 08c w erkruimte 15,5 m² verblijfsruimte (Gemiva)

bu-A-07 +z

D (TO) TO-301

DO-401

schommel

1

18 parkeerplaatsen medewerkers

reservering voor toekomstige douche

6 (bus)parkeerplaatsen

bu-A-14 +z (s)

37

bu-H-01 (s)

schommel 20

b=1200mm o=205.9mm a=200.0mm

0. 09 groep s rui m te KDC

bi-H-09

67,3 m² verblijfsruimte

drsn VIII TO-352

bu-H-01

0. 58 bui tenb ergi ng

hwa

(Gemiva)

2

drsn VIII TO-352

(Gemiva)

bergingswand tot 300 onder verlaagd plafond

15 p.

0. 10 ga n g 14,3 m² verkeersruimte

0. 09a bergi ng

bu-H-01 (s)

(Gemiva)

bergingswand tot 300 onder verlaagd plafond

15 p.

12,0 m² onbenoemde ruimte

bi-H-09

(Gemiva)

67,2 m² verblijfsruimte

0. 08a bergi ng

(Gemiva)

11,9 m² onbenoemde ruimte

-600

0. 08 groep s rui m te KDC

bi-H-09 (s)

bu-A-07 +z

7000

(De Ark)

7,8 m² onbenoemde ruimte

bi-H-22

schommel

7,8 m² onbenoemde ruimte

30

bi-H-20

bu-A-07 +z (s)

bi-H-27

(Gemiva)

hwa

20

bi-H-21

bu-A-07 +z (s)

0. 57 bui tenb ergi ng

bi-H-20 (s)

bi-H-21 (s)

bi-H-22 (s)

hwa

bu-A-07 +z

*

I (TO) TO-301

10230 10230

46,8 m² verblijfsruimte

EPS isolatie

29 fiesten

*

40 68 10 68

z we m b a d

bi-H-04

beton_ihw (bestaand)

beton_ihw (bestaand)

R

PEIL=00. 54 +0

+0

5,9 m² ergo toiletruimte

140 40

bu-A-11 +z (s)

200

1e verd.

160

449 buit enruim te

+657 ok koz

bu-A-12

94 66 10 68

0

bu-A-12

0. 42 R MI VA t oilet

+3500

PEIL=0

0. 59 bui tenb ergi ng 11,5 m² onbenoemde ruimte

DO-401

(Gemiva)

38 bu-A-08 +z (s)

0 .1 0 A G

bu-A-10 +z

12000

0,7 m² onbenoemde ruimte (Gemiva)

bu-A-19

bu-A-08 +z (s) brandweeringang vzv sleutelbuis

3200

38

bu-A-08 +z

12000 6000

39

40

41

42

E (TO) TO-301

Kiss & RIde

23 5

3600

38x157

*

100 130 100

(De Ark)

22

38x157

*

70,4 m² verblijfsruimte

EPS isolatie

1e verd.

160

5

18

(Gemiva)

groep s rui mte S O MG

5000

17

155

+657 ok koz

ZA

C (TO) TO-300

15

94 66 10 68

40 68 10 68

3600

14

geleiding zonwering

13

*

3050

drsn III TO-350

12

195

*

+2660 ok stuc/ bk koz3050

alu kozijn, RT72-Reflex Multiwindow

i.o.m. leverancier en aannemer

11

113

117

78

*

270145

* 270686 *

*

3050

10

alu kozijn, RT72 Reflex

3050

TO_det-14

30-08-2019

09

28

131

08

72

voorzijde Movair dorpel

160

20

koppelstuk luchtdicht afplakken

Datum

flex pur

(Gemiva)

227

118

*

bu-A-11 +z

D E F

78

20

**

*

270145

*

**

www.kow.nl

535 190

*

20

* 270145 *

*

270686

94 66 10 68

520

Contact

A-2016603

11,3 m² verblijfsruimte

38,7 m² Ecophon Master Ds 06' 21-06-2019verkeersruimte 19-06-201807 (gemeenschappelijk) 3018-07-2019 50 30Tekeningnummer 50

25

(Gemiva)

*

MS

Projectnummer

+2820 plafondlijn h o o f dt r a p Datum

*

*

9283

05' Checker

*

*

TO

Getekend Gecontroleerd Wijz.

177,6 m² verblijfsruimte

*

*

+2660 ok stuc/ bk koz

1:5

H (TO) TO-301

+3500

24

gym z aal / mo tori ekruim te

Clematislaan 25 september 2019

200

*

*

*

A3

Projectfase

+2600

1e verd.

*

*

60 100

DEFINITIEF

er g o

links verplaatst!

entresolvloer

+3500

EPS isolatie

40

beton_ihw (bestaand)

i.o.m. leverancier en aannemer

alu kozijn, RT72-Reflex Schaal Multiwindow

*

78

* 270686 *

120 40

1e verd.

35

as Z1 naar luchtdicht afplakken Formaat

+2600

alu kozijn, RT72-Reflex Multiwindow

345

Z1

entresolvloer

+2660 ok stuc/ bk koz

Meilof Riks element: • EPS isolatie • alu zetwerk

120

Ecophon Master Ds +2860 ok plafond

i.o.m. leverancier en aannemer

+3500

250

Groep

beton_ihw (bestaand)

*

*

270145

*

**

* 270686 *

20

*

270145

* 270686 *

*

* 270686* **

120 40

120

20

* 270145 *

*

270686

*

*

*

225

*

+4157 ok koz

luchtdicht afplakken

+2660 ok stuc/ bk koz

+3500

+4706 ok stuc/ bk koz

(Gemiva)

*

*

entresolvloer +2600 alu kozijn, RT72-Reflex Multiwindow 100

(De Ark)

2780

177,6 m² verblijfsruimte

Ecophon Master Ds

70,4 m² verblijfsruimte

A (TO) TO-300

1e verd. gym z aal / mo tori ekruim te

koppelstuk

+2820 plafondlijn

200 238

Onderdeel

O

+6680 +3500

200

520

60 100

+6040 +2860 ok plafond

EPS isolatie

principe details +1238 ok koz(uitbreiding)

+6860

2e 1e verd.

345

58

65

2 35 10

10

40

345

177

2

Ecophon Master Ds

groep s rui mte S O MG

schoolgebouw Clematislaan te Gouda

2e verd as 15'-12

+3500

EPS isolatie

*

40 68 10 68

1e verd. beton_ihw (bestaand)

*

*

90

**

16,2 m² verblijfsruimte

250

Ecophon Master B

+4706 ok stuc/ bk koz

+4157 ok koz

267 345

(Gemiva)

1e verd.

22

* 270145*

238

+3500

Resol-isolatie

+4157 ok koz

beton_ihw (bestaand)

72

s p e l e n m u zi e k

225

38x195

72

113 107

*

*

68

+5840 ok stuc/alu bk kozijn, koz RT72-Reflex alu kozijn, RT72-Reflex Multiwindow

alu kozijn, RT72-Reflex Multiwindow

42

luchtdicht afplakken

535 21 118 5 100 130 100

68

840

20 263

120 40 700

68

alu kozijn, RT72 Reflex

geleiding zonwering

20

* 270145 *

*

270686

*

40

20

* 270145 *

*

270686

*

38x150

38x150

107

113

6

200

1e verd.

*

+4157 ok koz

*

+5840 ok stuc/ bk koz

+4706 ok stuc/ bk koz

+2660 bk koz

*

Ecophon Master B

+6680

*

+6680 +3500

EPS isolatie

+6860

2e verd.

*

beton_ihw (bestaand)

2e verd as 15'-12 EPS isolatie

Ecophon Master Ds

Ecophon Master Ds

verblijfsruimte (De Ark)

beton_ihw (bestaand)

+6040 ok plafond

luchtdicht afplakken

*

+6860

2e 1e verd.

groep s rui mt e SO 69,9 m² zonwering geleiding

+6680 luchtdicht afplakken

DEFINITIEF

EPS isolatie

+6860

2e verd.

16,2 m² verblijfsruimte

Datum

Tekeningnummer

beton_ihw (bestaand)

200 2e verd as 15'-12

2e verd as 15'-12

38x235 beton_ihw (bestaand)

s p e l e n m u zi e k

535 5 100 130 100

100 60

(Gemiva)

19-06-2018

190

550

+5840 ok stuc/ bk koz

alu kozijn, RT72-Reflex Multiwindow

+6000 plafondlijn

TO_det-09

*

72

21-06-2019 18-07-2019 30-08-2019

*

alu kozijn, RT72-Reflex Multiwindow

+6040 ok plafond 100 100

luchtdicht afplakken

*

+6680

luchtdicht afplakken 38x195

100 60

193 153

Ecophon Master Ds *

+6860

2e verd.

Datum

*

550

2e verd as 15'-12

D E F

*

brandwerende bekleding

alu kozijn, RT72 Reflex

42

107

+6000 plafondlijn

38x150

(De Ark)

100 100

Checker

38x150

69,9 m² verblijfsruimte

Getekend Gecontroleerd Wijz.

Ecophon Master B groep s rui mt e SO

Contact

EPS isolatie

Ecophon Master Ds

260

+6040 ok plafond

+5840 ok stuc/ bk koz

200

38x235

Ecophon Master Ds

267

MS

*

beton_ihw (bestaand)

+8098 ok koz

www.kow.nl

*

alu kozijn, RT72-Reflex Multiwindow

535 5 100 130 100

+4706 ok stuc/ bk koz

345

72 +7337 ok koz

luchtdicht afplakken

700

40

113

Projectfase

107

Projectnummer

35

Ecophon Master B

TO

EPS isolatie

A-2016603

beton_ihw (bestaand)

construction drawings - partial plan sample 72

2 parkeerplaatsen

1 parkeerplaats


Zuid-west gevel - as H' (DO) DO-201

38

37

43

36

35

H'

K

K'

ZB M

L L'

I (DO) DO-301

ZA O

N

F (DO) DO-301

A (DO) DO-300

7 170

B (DO) DO-300

4e verd/dak gymzaal +13610

35

I n s t a ll a t i e r u i m t e

Zuid-west gevel - as H' (DO) DO-201

H'

K

K'

L L'

M M'

N

O

3e verd. as15'-12 +10680 3e verd.dak as14-24

05'

06'

07

08

39

09

10

D (DO) DO-301

11

13 40

12

41 14

C (DO) DO-300

VMK

VMK

42

18

19

20

C (DO) DO-300

21

1e verd. VMK

VMK entresolvloer

15 p.

1. 22 k a nt o o r

isostuc (wit) 2 540

bu-A-02 +z +m (s)

bu-A-02 +z +m PEIL=0

+0

kruipruimte

-1160

zwembadvloer

-1800

-540

bu-A-10 +z (s)

bu-A-08 +z

bu-A-08 +z

+4157 o.k. kozijn

bu-A-02 +z +m

bu-A-02 +z +m (s)

+9860

2e verd as 15'-12

+6860

(De Ark)

bu-A-02 +z +m (s)

bu-A-02 +z +m

bu-A-02 +z +m

bu-A-02 +z +m

bu-A-08 +z (s)

+7337 o.k. kozijn

0. 29 g ro ep s r ui m t e S O M G

2 860

bu-A-02 +z +m

isostuc (grijs) bu-A-06 +z +m

bu-A-02 +z +m

isostuc (grijs)

+5840 b.k. kozijn

bu-A-06 +z +m (s)

bu-A-02 +z +m (s)

4 80

bu-A-02 +z +m (s)

Speelveld bk. tegels

bu-A-06 +z +m (s)

3e verd.dak as14-24

+9020 b.k. kozijn

27,9 m² verblijfsruimte

4 p.

h o o f d t r a p p e n h ui s

H (TO) TO-301

bu-A-06 +z +m

+5840 b.k. kozijn

70,4 m² verblijfsruimte (De Ark)

bu-A-02 +z +m (s)

bu-A-02 +z +m

+4103 o.k. kozijn

+0

PEIL=0

-1800

zwembadvloer

isostuc (wit)

bu-A-02 +z +m15 p.

+4157 o.k. kozijn Speelveld bk. tegels

1e verd.

isostuc (wit)

isostuc (grijs)

+2660 b.k. kozijn

bu-A-20

isostuc (wit) bu-A-05 +z +m

bu-A-05 +z +m (s)

bu-A-05 +z +m (s)

Zuid-west gevelbu-A-08 - as H' +z (DO) (s) DO-201

isostuc (grijs)

isostuc (wit)

bu-A-19

+2660 b.k. kozijn

-540

+2660 b.k. kozijn

bu-A-10 +z

bu-A-08 +z (s)

+657 o.k. kozijn

isostuc I (DO) (grijs) DO-301

entresolvloer

+2600

bu-A-01 +m (s)

bu-A-08 +z

bu-A-01 +z +m

bu-A-01 +m (s)

bu-A-01 +z +m

bu-A-01 +z +m C (DO)

bu-A-01 +z +m (s)

B (DO) DO-300

DO-300

A (DO) DO-300

F (DO) DO-301

+657 o.k. kozijn

+922 o.k. kozijn

cementgebonden plaat (geisoleerde kantplank) (grijs)

PEIL=0

doorsnede G-G

doorsnede -1160 kruipruimte E-E -1800

+2600

VMK

e nt r e e z o n e

+5840 b.k. kozijn

+0

(De Ark)

VMK

isostuc (wit) bu-A-25

+3500

55,6 m² verblijfsruimte

2e verd as 15'-12

+3500

4 80

+10365

2e verd.

F (DO) DO-301

2. 24 g r o ep s r uim t e V S O

drsn I TO-350 +6860

+6680

A (DO) DO-300

G (TO) TO-301

+6860

g a ng

v e r k e er s r u i m t e G em i v a

26

4 80

2e verd as 15'-12

+11240

v e r k e er s r u i m t e G em i v a

B (DO) 24 25 DO-300

23 23'

VMK

+10680 3e verd. as15'-12

rooster

22

isostuc (grijs)

drsn II TO-350

V er k ee r s r u i m t e G em i v a

17

E (TO) TO-301

+13555

2e verd.

isostuc (wit)

16

drsn IV TO-350 +14180

+6680

15

3 21

Z1

+9860

E (TO) TO-301

zwembadvloer

H (TO) TO-301

Zuid-west gevel - as H' (DO) DO-201 drsn I TO-350

drsn II TO-350

G (TO) TO-301

drsn IV TO-350

zuidwest gevel Z1

05'

06'

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23 23'

24 25

26

E (DO) DO-301 4e verd/dak gymzaal +13610

26

25

24

23'

23

22

21

20

19

18

3. 01

16 trap4,9pem²nhuis

17

15

14

verkeersruimte

+9860

+6860

2. 27 gy m z a a l

2. 07 ho o f d t ra p

252,7 m² verblijfsruimte

33,9 m² verkeersruimte

11

10

09

06'

G (DO) DO-301

05'

Z1

08

07

VMK

2. 15 p ra k t i j k r ui m t e

2. 26a t o i le t

2. 26b t o i le t

2. 26c t o i le t

2. 16 v lu c h t t r a p 02

2. 17 p ra k t i j k r ui m t e

45,9 m² verblijfsruimte

1,2 m² toiletruimte

1,2 m² toiletruimte

1,2 m² toiletruimte

8,3 m² verkeersruimte

54,1 m² verblijfsruimte

drsn III TO-350

H (TO) TO-301 4e verd/dak gymzaal +13610

2. 11 g r o ep s r uim t e V S O

2. 25 g a ng

54,9 m² verblijfsruimte

114,3 m² verkeersruimte

VMK

2. 13 IB

2. 14 g r o ep s r uim t e V S O

28,3 m² verblijfsruimte

54,0 m² verblijfsruimte

+11566 b.k. kozijn

VMK

VMK

VMK

VMK

33,9 m² verkeersruimte

1. 09 g ro ep s r ui m t e S O

bu-A-12

bu-A-12

bu-A-12

bu-A-12

bu-A-12

68,1 m² verblijfsruimte

1. 40 t ec hi ek r ui m t e

1. 12 p ra k t i j k r ui m t e

1. 13a t o i le t

1. 13b t o i le t

1. 13c t o i le t

1. 15 v lu c h t t r a p 02

1. 16 lo k a a l ( p r a k t i j k r u i m t e )

45,9 m² verblijfsruimte

1,2 m² toiletruimte

1,2 m² toiletruimte

1,2 m² toiletruimte

23,9 m² verkeersruimte

54,2 m² verblijfsruimte

24,8 m² technische ruimte

bu-A-02 +z +m

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

bu-A-02 +z +m

bu-A-02 +z +m

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

2e verd.

0. 55 i n s t a ll a t i e r u i m t e

+5840 b.k. kozijn

24,8 m² verblijfsruimte

0. 22 ha l

0. 41 k le e d r u i m t e

29,7 m² verkeersruimte

8,8 m² badruimte

0. 40 g y mz aal / m ot orisostuc i ek r ui mt e

(grijs)

177,6 m² verblijfsruimte

0. 18 ho o f d t ra p

0. 20a b erg i ng

38,7 m² verkeersruimte

4,9 m² onbenoemde ruimte

0. 20b v ers c ho n en

isostuc (grijs)

0. 34 g ro ep s r ui m t e V S O M G

isostuc (grijs)

12,5 m² badruimte

0.isostuc 23 t o i l et - / d o uc her ui mt e

55,5 m² verblijfsruimte

6,5 m² toiletruimte

isostuc (wit) +0

PEIL=0

-1800

zwembadvloer

bu-A-02 +z +m (s)

bu-A-02 +z +m

bu-A-02 +z +m

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

bu-A-02 +z +m (s)

bu-A-02 +z +m

bu-A-02 +z +m

bu-A-17

bu-A-02 +z +m (s)

0. 23a (wit) t o i le t 1,0 m² toiletruimte

0. 23b t o i le t

0. 28 v lu c h t t r a p 02

0. 28a v lu c h t t r a p 02

1,0 m² toiletruimte

17,2 m² verkeersruimte

2,9 m² verkeersruimte

bu-A-13 +z +m (s)

bu-A-01 +m (s)

+657 o.k. kozijn +0

PEIL=0

-1160

kruipruimte

-1800

zwembadvloer

bu-A-12

Materialistie

bu-A-01 +z +m

bu-A-01 +m (s)

bu-A-01 +z +m

bu-A-01 +m (s)

bu-A-01 +m (s)

bu-A-01 +m (s)

bu-A-12

M' ZBM

N I (TO) TO-301 drsn V TO-351

L'

F (TO) TO-301

A (TO) TO-300

L

+2660 b.k. kozijn

bu-A-12

Interieur - Clematislaan Gouda bu-A-11 +z

+1238 o.k. kozijn

drsn IV TO-350

PEIL=0

+0

+6860

Speelveld bk. tegels

-540

kruipruimte

-1160

zwembadvloer

-1800

ingelinkte modellen/onderleggers van derden: c o n s t r u c ti es : i n s ta l l a t i e s : E PC :

CONSTRUCTIES: Van de Laar, d.d. 23-08-2 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG) entresolvloer

+2600

bu-A-11 +z

+1172 o.k. kozijn

Wijziging

Datum

Omschrijvin

A

30-08-2019

afrondin

drsn III TO-350

Project

E (TO) TO-301

Transformatie schoolgebouw Clematislaan te Gouda

H (TO) TO-301

Opdrachtgever

Gemiva-SVG Groep

Formaat

Projectfase

A0

Savanne O ZA

steppe

bu-A-12

construction drawings - section and elevation

savanna

+2600

cementgebonden plaat (geisoleerde kantplank) (grijs)

cementgebonden plaat (geisoleerde kantplank) (grijs)

doorsnede F-F noordoost gevel

bu-A-12

14

bu-A-01 +z +m

Verdieping 2_Plattegrond

H (DO) DO-301 G (TO) TO-301

entresolvloer

2e verd as 15'-12

+4706 b.k. kozijn

bu-A-16

+2660 b.k. kozijn

bu-A-01 +z +m

+3500

57,9 m² verblijfsruimte

16,3 m² onb.rmte

1e verd.

1e verd.

0. 27 lo k a a l ( p r a k t i j k r u i m t e )

0. 60 p o m p r ui mt e

+4157 o.k. kozijn +3500

bu-A-02 +z +m

+6680

+8098 o.k. kozijn

bu-A-02 +z +m

+7337 o.k. kozijn +6680

2e verd.

3e verd. as15'-12 +10680

1. 07 ho o f d t ra p

VMK

3e verd.dak as14-24

+9020 b.k. kozijn

12

drsn IV TO-350

H (DO) DO-301

2e verd as 15'-12

+9860

E (TO) TO-301

G (TO) TO-301

3e verd.dak as14-24

13 3e verd. as15'-12 +10680

TO

Schaal

Projectnum

1 : 100

A-201660

6

K'

K

35

H'

36

43

Steppe B (TO) TO-300

37

38

D (TO) TO-301

+13610 4e verd/dak gymzaal

VMK

VMK

VMK

Polder isostuc (grijs)

+10680 3e verd. as15'-12

VMK

jungle +6680

Wolken isostuc (wit)

entresolvloer bu-A-11 +z (s)

kruipruimte

noordwest gevel

Oceaan

+2600

accent wall

+2660 b.k. kozijn

bu-A-21

+9860

2e verd as 15'-12

+6860

5B

bu-A-27

bu-A-07 +z

+5840 b.k. kozijn

bu-A-07 +z

bu-A-07 +z (s)

bu-A-07 +z

bu-A-07 +z (s)

+4102 o.k. kozijn

isostuc (grijs)

bu-A-05 +z +m (s)

Woestijn drsn V TO-351

I (TO) TO-301

3e verd.dak as14-24

drsn VIII TO-352

7 bu-A-07 +z bu-A-06 +z +m

isostuc (wit) bu-A-07 +z (s)

bu-A-11 +z (s)

PEIL=0

zwembadvloer

5A

VMK

+4157 o.k. kozijn

+1172 o.k. kozijn

desert -1160

VMK

+5839 b.k. kozijn

bu-A-18

1e verd.

-1800

VMK

drsn IX TO-352

+2660 b.k. kozijn

+0

VMK

drsn VI TO-351

isostuc (wit)

2e verd.

ocean

C (TO) TO-300

bu-A-20

Jungle

isostuc (wit)

cloud +3500

Zuidwest gevel - as H' (TO) TO-201

VMK

polder

F (TO) TO-301

A (TO) TO-300

Accentwand in kleur B (TO) TO-300

isostuc (wit) bu-A-07 +z

bu-A-07 +z (s)

isostuc (grijs)

+2660 b.k. kozijn

bu-A-07 +z (s)

ingelinkte modellen/onderleggers van derden: c o n s t r u c ti es : i n s ta l l a t i e s : E PC :

CONSTRUCTIES: Van de Laar, d.d. 23-08-2019 INSTALLATIES: Innax, d.d. <> Innax, d.d. 18-04-2019 (EPG)

bu-A-28 +922 o.k. kozijn

+657 o.k. kozijn

drsn VI TO-351

drsn IX TO-352

Zuidwest gevel - as H' (TO) TO-201

Wijziging

Datum

Omschrijving

A

30-08-2019

afronding TO

drsn VIII TO-352

Project

Transformatie schoolgebouw Clematislaan te Gouda Opdrachtgever

D (TO) TO-301

Gemiva-SVG Groep

2nd floor plan

2e verd. INT 1 : 500

section 5A

group rooms and washrooms interior materialization drawings 73

Formaat

Projectfase

A0

TO

Schaal

Projectnummer

1 : 100

A-2016603


13

Other h a n d m a d e

Wo r k s

c o l l e c t i o n s

Toronto and Delft 2010 - present Description: Currently focusing on handmade jewelry using porcelain and silver and embroidery, I always have a project going. My range of artistic and design interests include: CNC milling, 3D printing, laser cutting, ceramics, metal work, stones and gems, screen printing, sewing, embroidery, and the growing of mushrooms. a. screen printed sugar owl b. porcelain bead collection c. porcelain and copper jewelry set d. porcelain and silver jewelry sets e. CNC milled kids chair f. porcelain rings g. home grown oyster mushrooms h. dill imprinted porcelain bowl i. 3D modeled and printed air plant cage pendant j. arduino lighting system, acrylic and paper

74


a

b

c

e

d

f

g

i

j 75

h



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.