Dear reader,
My name is Maria Makri, I am an architect holding both a master’s degree in Architecture and a postgraduate degree in BIM Management.
During my student years, I found the carefully studied connection between landscape and space, in Norwegian architecture, particularly interesting. The desire to pursue this interest motivated me to move to Norway in 2016. Two rounds of Erasmus in Norway have given me a valuable introduction to Norwegian architecture and have given me insight into a different approach to architecture.
In the years I have spent in Norway, I gained both academic and professional project experience working with different climates, cultures and urban settings. In my professional career, I have been able to take on the great responsibility of the implementation of our BIM strategies and protocols, and this has also allowed me to improve my teamworking and communication skills.
On a personal note, I am self-motivated, proactive, and easily adaptable to new working environments. I am artistically curious about the combination of art in all its forms combined with the digital world and curious to learn new software platforms that will help productivity in my work.
I am currently looking for new opportunities where i can keep learning while at the same time provide the office with all the knowledge and passion I have for this profession and grow through the process in a warm and exciting atmosphere.
Kind regards,
Maria Makri
3
MARIA MAKRI
Welcome to my CV. I am Maria Makri, I am an architect and BIM Specialist.
+4792514339 Oslo
mariamakri.2112@gmail.com @m.andtherest
Experience
09.2021 - present Architect and BIM Coordinator | SPACEGROUP
Have worked with the development of medium-sized projects in various phases. Projects include hotels, residential and commercial buildings from concept to detail phase.
03.2019 - 08.2021 Architect | Don Lawrence
Have worked with the development of small and medium-sized projects from application to preliminary project. Projects include residential buildings, cottages and landscape design.
09.2016 - present
Project-based Architect| ASH
Have worked with housing projects of smaller and medium size. Assisted with modelling, architectural design and development.
05.2017 - 08.2017 Architect Intern| SQ-1
Have worked with the development of medium-sized projects in the competition phase and design.Projects include include headquarters and office buildings.
Education
05.2021 - 12.2022
Master’s in BIM Management | Butic | The new school BIM Master in modelling, parametric design and development of methodology and official BIM technology.
08.2018 - 07.2020
Master’s in Architecture | Universidad Politecnica de Valencia
Diploma thesis in sustainable and wooden architecture, mixed-use, retrofit, urban renewal and circular economy.
09.2012 - 09.2018
08.2018 - 06.2019
Bachelor’s in Architecture | Universidad Politecnica de Valencia
Master’s in Architecture (exchange) | The Oslo School of Architecture and Design (AHO)
08.2016 - 05.2017 Sustainable architecture and urbanism (exchange) | Norwegian University of Life Sciences (NMBU)
KEY COMPETENCE
Concept development
Narrative Analysis
Architectural design
Visualization and drawing development
Bim Modelling & Coordination
Self-motivated and easily adapttable to new working environments
Fast learner of new softwares
Prizes
Exhibition and official ceremony for the winning award for “The Ministry of labor and social insurance”, in Cyprus
Exhibition of selected works to represent the UPV exchange programme
Nomination for outstanding use of computer graphics AHO | The Oslo School of Architecture and Design
4
and exhibitions
Achievements Profesional Certification buildingSMART buildingSMART International
Cyprus Ministry of
and social insurance
construction and rehabilitation of existing | 6000 m²
, Urban
&
Arkitektur + ALLIANZ | New headquarters in Stuttgart| 170,500 m2 07.2022 07.2017 07.2022 01.2019 06.2019 + 12.2018 02.2022 Skills BIM/Revit ||||||||||||||||||||| Autocad ||||||||||||||||||||| Rhino ||||||||||||||||||||| Lumion ||||||||||||||| Enscape |||||||||||| V-ray |||||||| Archicad ||||||||| Adobe Photoshop ||||||||||||||||||||| Adobe Ilustrator |||||||||||||||||| Adobe InDesign ||||||||||||||||||||| Grasshopper ||||| Dynamo ||| Languages Greek ||||||||||||||||||||| English |||||||||||||||||||| Spanish |||||||||||||||||||| Norwegian |||||||| [B2]
Competitions 1st prize competition with SPACEGROUP & ASH Official competition in
labor
New
2nd prize in invited competition with SQ1
Agency
RKW
s. 6-8
SPACEGROUP
09.2021 - present
Ministry of labour and social insurance, Cyprus l Office l 6 000 m² l ongoing l 1st prize in competition
Role: Architect | BIM Coordinator
Hotel, Nuuk, Greenland l Hotel l 30 000 m² l ongoing l
s. 9-11
Role: Architect | BIM Coordinator
HAVNEPARKEN , BFK2, Sandnes | Residential | 10.000m² | under construction |
s. 12-13
Role: Architect |BIM modelling | Development of families
ACADEMIC PROJECTS
s. 14-20
Rehabilitation of neoclassical building and change of use | Office
Diploma project | BIM
s. 21-26
COHERENT EXISTANCE| Mixed-use project for the revitalization of the industrial area in Kabelgata, Økern | Commercial, residential, food production
Diploma project | Master’s in Architecture
5 PROJECTS | Index
Ministry of labour and social insurance, Cyprus
Project description | Office | 6000 m2 | in progress | 1st prize in competition
The project deals with the design and construction of a new building, adjacent to a neoclassical building , to hold the function of the ministry of labour in Paphos, Cyprus. The building is distributed in 4 levels and 1 underground floor.
Software used | Revit, BIM360, Autocad, In-design, Navisworks
Role | BIM Coordinator + Architect
The project started after an initative I had to bring this project to the office. My first role was to manage the team and the tasks we followed for the completion of the competition phase. It involved continuous collaboration with the local team through BIM360, presentation and delivery of documentation.
At a later stage, my role encompassed tasks as BIM Coordinator. I was the main person in charge for completing the design and modelling up the project, collaborating closely with the project leader for the completion of the project.
In the whole process I was reading and informing the team for the regulations and made sure we complied with the project standards and regulations in Cyprus.
Some of the BIM tasks included:
A. PROJECT SET UP
- Coordinates, project browser, templates, sheets, views, levels, phases
B. ARCH
- Architecture modeling
- Schemes, schedules, area calculations
- Develop elements on rhino and connect with RhinoInside.
C. COORDINATION
- Create publishing file
- Coordinate and detect clashes between Arch. + Str. Ministry of labour and social insurance
| SPACEGROUP + ASH
THE PROJECT | Model and outcome
The project was divided in two sub-projects. Our partners worked on Autocad while we developed the project on Revit. The autocad files where linked in for presenta tion purposes.
7 Ministry of labour and social insurance | SPACEGROUP + ASH
The inner courtyard is the heart of the complex, this starts the indoor/outdoor sequence. The composite idea brings the two buildings together and extends towards the North to keep them in relation to each other.
The well-known Cypriot Wall is raised around the perimeter, reflecting the tradition of continuous construction in the area.
8 FOOTPRINT OF GREENERY, BACKARD AND EXISTING VOLUMETRIC FORMATION IN THREE LEVELS MARKINGOF BOUNDARIES AND USE OF THE VOID FINAL VOLUME ADAPTED TO THE PLACE AND THE LOCAL CLIMATE BIRDS EYE VIEW SHOWING THE RELATIONSHIP BETWEEN THE BUILDINGS AND THE NEIGHBOURHOOD
GROUND FLOOR AND LANDSCAPE PROPOSAL SECOND FLOOR AND LANDSCAPE PROPOSAL Ministry of labour and social insurance | SPACEGROUP + ASH
THE CONCEPT | Bonus slide for architecture
Hotel Nuuk, Greenland
Project description | Rooms | lobby | spa | restaurant | greenhouse | 8 000 m2
The project is located at an exclusive location at Nuuk, Greenland and it desires to develop a luxury hotel with 122 rooms. It holds a program of lobby area, restaurants, expedition hall and kitchen on the ground floor, a spa and greenhouse on the underground floor.
Software used | Revit, Rhino, RhinoInside, In-design, Navisworks, Visio
Role | BIM Coordinator + Architect
This project is used as a “Pilot Project” in the office. As a BIM Coordinator in the office, I use this project as a showcase to build the standards, protocols and procedures for modelling and drafting BIM documentation, BEP and other manuals,
I initiated the project in the detail phase using Revit, after the concept development on Rhino. Together with the team we build up an information “hotel” with families to use and built up the model for further discussion with the collaborators.
Some of the BIM tasks included:
A. PROJECT SET UP
- Coordinates, project browser, templates, sheets, views, levels, phases
B. ARCHITECTURE
- Architecture modeling
- Explore different design options
- Develop elements on rhino and connect with RhinoInside.
- Create walls, floors, ceiling schemes, schedules, area calculation
C. DOCUMENTATION
- BEP (Pre-Bep)
D. STANDARDS
- Naming structure, check-lists, manual of use
Hotel Nuuk | SPACEGROUP
After the project was passed from Rhino to Revit, we found a lot of inaccuracies that had to be dealt with. For that we created a series of design options that helpd us illustrate the different solutions.
For the modelling of the facade, we came up with a reproducable modular system, to avoid errors and build a more efficient model.
10
| SPACEGROUP
Hotel Nuuk
THE PROJECT | Model and outcome
11 Hotel Nuuk | SPACEGROUP THE CONCEPT | Bonus slide for architecture
Havneparken - BFK2, Sandnes
Project description | Housing | under construction | 10 000 m2
Havneparken is an urban plan that has been developed by Spacegroup at Sandnes. The office is responsible for carrying out several projects in the area, one of them is the housing project of BFK2 that is now under construction.
I joined this project in detail phase. The project is distributed in 8 levels, 2 parking floors and 1 mezzanine level with a total of 88 aparments.
| BIM Specialist + Architect
A. ARCHITECTURE
- Architecture modeling
- Develop specific families for the windows. We had a total of 27 different types of windows that had to be created as individual families.
- Create schemes, schedules and area calculations
B. ANALYSIS
- Produce analysis and reports of the amount of sun (per m2) that each appartment receives (Solar Analysis)
12
Role
| SPACEGROUP
Havneparken, BFK2
THE PROJECT | Model and outcome
In this project we had to carry out a detailed analysis of the sun radiation that each balcony gets in m2 and make sure that all the apartments got enough sun.
13 03 DIRECT SUN kl.08 kl.09 kl.10 kl.11 MARCH Balkong Balkong D201 C203 B203 A203 A202 Balkong Balkong D201 C203 B203 A203 A202 Balkong Balkong Balkong Balkong 2 ETG DIRECT SUN kl.12 kl.13 kl.14 kl.16 MARCH F203 F202 F201 E203 D202 D201 B203 B202 A203 A202 Balkong Balkong F203 F202 F201 E203 D202 D201 B203 B202 A203 A202 F203 F202 F201 E203 D202 D201 B203 B202 A203 A202 2 ETG 07 DIRECT SUN kl.12 kl.13 kl.14 kl.16 MARCH D301 D302 C303 B303 A302 Balkong Balkong D301 D302 C303 B303 A302 D301 D302 C303 B303 A302 D301 D302 C303 B303 A302 3 ETG
Havneparken, BFK2 | SPACEGROUP
Renovation of neoclassical building in Cyprus
Project description |
The project was the rehabilitation and retrofit of an existing neoclassical building in the Mediterranean. For the BIM certifications, both Hard and Soft Skills were developed. From the Master’s degree in BIM Manager, I gained the necessary knowledge that enables me to become part of any work team that uses the BIM methodology. It gave me the opportunity to model architectural projects in all phases of the project, from a preliminary or basic project phase, to an execution or as-built project of the building. It also enabled me to manage and organize the work structure of a BIM team and coordinate all members in a collaborative environment.
Software used | Revit, Rhino, RhinoInside,Grasshopper, Dynamo, Navisworks, Presto, CostIt, Lighting analysis tools (revit)
Role | BIM Coordinator (Student)
A. PROJECT SET UP
- Coordinates, project browser, templates, sheets, views, levels, phases
B. ARCHITECTURE
- Architecture modeling
- Modeling of existing situation from Point Cloud
- Develop complex detailing for the facade, the windows and the doors
- Schemes, schedules, area calculations
- Develop elements on rhino and connect with RhinoInside.
- Develop the model from a pointcloud scan
C. STR
- Structural modeling of systems, columns, slabs, roof
- Create specific structural components
D. MEP
- Modeling of MEP systems
- Create specific components
E. COORDINATION
- Create publishing file
- Coordinate and detect clashes between the three disciplines in Navisworks.
F. DOCUMENTATION
- BEP (Pre-Bep)
- Cost calculation via Presto and CostIt
G. STANDARDS
- Naming structure, check-lists, manual of use
Renovation of neoclassical building in Cyprus
DIPLOMA | BIM
Existing Plans | Design phase
14
BIM
DIPLOMA PROJECT
Graphic representation place a big role in the delivery of my projects. In this assignment, I tried to create a representation style of my own using Revit.
New Plans |
Construction phase
Renovation of neoclassical building in Cyprus
DIPLOMA | BIM
15
16
After Before
Renovation of neoclassical building in Cyprus DIPLOMA | BIM
A big part of the project where the original doors and windows. I build up families to recreate all those elements and have given them specifications under theirr parameters to be able to retrieve, maintain or reproduct in the future
17
Renovation of neoclassical building in Cyprus DIPLOMA | BIM
18
The representation of several technical elements, like the walls, floor types and zones, was done with the use of colour for more clarity and less misinterpretations.
Renovation of neoclassical building in Cyprus DIPLOMA | BIM
19 Street view
Renovation of neoclassical building in Cyprus
DIPLOMA | BIM
For this project I developed the structure of the building and the MEP installations. I developed the model and the connections, and all the element were then collected in tables, for the quantity survey.
STRUCTURAL MODEL
STRUCTURAL MODEL | LOFT
STRUCTURAL MODEL | SECOND FLOOR
STRUCTURAL MODEL | FIRST FLOOR
STRUCTURAL MODEL | FUNDAMENTS
20
Renovation of neoclassical building in Cyprus DIPLOMA | BIM
(Co)herent existance | Industrial reconversion
Project description | Rooms | lobby | spa | restaurant | greenhouse | 8 000 m2
My project dealt with exemplifying the reconstruction of industrial areas and their readaption to modern needs.
I developed this project at Kabelgata, Økern to hold multiple uses that promote a sustainable framework, such as, housing + locally grown food + circular economy + working and living in the same area. For that the exisitng building was used with an addition of a greenhouse on the top and a timber building to hold more technologically demanding uses.
Software used | Revit, Rhino
Role | Architect (Student)
Conceptual development | The project was thoroughly developed conceptually to manifest different aspects of the modern way of life, that have been left out of residential and urban developments nowadays.
Further development | To complete the project according to Spanish standards, I developed construction details, structural analysis, sun and shadow analysis, plan for the mechanical, electrical and plumping installations and planing for water management.
To see the complete diploma:
21
!
Timber construction
What a nice way to transform the old cable factory !
ARCHITECTURE DIPLOMA PROJECT
DIPLOMA | ARCHITECTURE
(Co)herent Existance
URBAN RENEWAL
This project will form an example that could be extrapolated in a series of interventions to restore urban life to a system formed by an industrial network.
At the same time, it is intended on the one hand to respect the current urban development paradigm, proposing buildings for residential and recreational purposes, and on the other to question whether production can once again become an integral and natural part of the urban functions that surround us on a daily basis.
(Co)herent Existance DIPLOMA | ARCHITECTURE
22Existing situationProposed situation -
- Road development -
- Main crossing -
- Area of focus -
23 Phase 1 Phase 2 Phase 3 Existing situation Demolishing elements New elements Existing building Floor 1 Market New building Floor 1 + 2 Market New building Floor 3 Common floor Added building Vertical garden Added building Policarbonated roof Added floor inside market Vertical garden exhibition New building Floor 4 + 5 Residential New building Saw tooth roof
(Co)herent Existance DIPLOMA | ARCHITECTURE
24
Second floor No access / Private access Semi floor Individual access from unit C Roof
Unit C 178 m2 Unit A 64.5 m2 TETRIS
178
First floor Access from corridor
(Co)herent Existance DIPLOMA | ARCHITECTURE
Unit B
m2
ROOM DISTRIBUTION
(Co)herent Existance DIPLOMA | ARCHITECTURE
25 EXTERIOR
NEW
VIEW//
BUILDING
26
(Co)herent Existance DIPLOMA | ARCHITECTURE
27