P o r t f o l i o
phone 7 7 5 - 3 4 2 - 5 0 0 8
email M A R I S S A M 1 0 2 4 @ G M A I L . C O M
CONTACT
M A R I S S A M c K I N N E Y 1458 WEST LA JOLLA DRIVE TEMPE, AZ 85282
T h i s
P a g e
W a s
I n t e n t i o n a l l y B l a n k
L e f t
S t u d i o 3 6 1 H a l l b e r g R e s i d e n c e
Resi d e n t i a l
Maris s a Mc K inne y
S t u d i o 3 6 1 H a l l b e r g R e s i d e n c e Issue: The project required that the family be able to entertain 40 people, outdoors, at one time. The existing Spanish colonial tile and retaining wall, as well as outdated planting did not fit with the contemporary tastes of the owners Solution: A newly engineered retaining wall adapts to the grade change of the space, four floating concrete pads connected with StepStones速 allow for two ten top tables, as well as two more on the newly refinished covered patio. Desert planting and nuanced color appeal to the contemporary tastes of the owner Role: Client interaction, design, construction documenting, retaining wall engineering, construction management, planting/irrigation installation, problem solving
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
S t u d i o W h y s h y v a n u k
Resi d e n t i a l
3 6 1 R e s i d e n c e
Maris s a Mc K inne y
S t u d i o W h y s h y v a n u k
3 6 1 R e s i d e n c e
Issue: The side yard of this downtown condo is less than 100 sq. ft. and was a blank slate, described as “the prison yard.� Making use of the small space for a multitude of activities all while making it feel inviting and spacious was the challenge Solution: Floating concrete pads provide a space to lounge while complementing the contemporary nature of the condo. The custom metal planters allow for ample vegetable gardening in this small space. Faux turf provides a great doggy area and Mexican beach pebble detailing creates continuity throughout the space Role: Client interaction, design, construction management, installation of rock, irrigation, faux turf and dog step
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
A r i z o n a S t a t e U n i v e r s i t y P y r e n e a n S t o n e s
D esi gn
Maris s a Mc K inne y
A r i z o n a S t a t e U n i v e r s i t y P y r e n e a n S t o n e s Issue: The sculptures were donated to the University from the Hollis family and placed in a location without any landscaping. Currently, many ASU facilities employees, staff and students park and walk through the space which poses an issue for the safety of the artwork. The landscape design had to prevent this while mimicking the desert feel of its previous location at the Hollis’ home and complementing the adjacent desert landscaping Solution: Simple layering of desert adaptive plants complement the existing tree and, along with boulders, will prevent students and staff from parking and traveling through the space potentially damaging the sculptures. Sculptural agaves provide a contemporary feel while soft grasses add movement Role: Landscape design, rendering, construction estimating
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
A r i z o n a S t a t e U n i v e r s i t y N e l s o n F i n e A r t s C e n t e r
D esi gn
Maris s a Mc K inne y
A r i z o n a S t a t e U n i v e r s i t y N e l s o n F i n e A r t s C e n t e r Issue: Frontage on to Mill avenue makes this space a highly visible area of campus that has had minimal landscaping since its conception. Grading and drainage issues also create an eyesore. There is no procession to and from the frontage area along Mill Avenue, the existing pots near the building are not irrigated and hard to maintain. Solution: The key to creating a SHPO approved landscape is maintaining the views to the building and using desert adaptive materials to avoid a total irrigation remodel. A new promenade was added to reach out to Mill Avenue and sculptural plant elements have been added to alleviate maintenance woes and reduce water use. Role: Design, rendering, estimating
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
A r i z o n a S t a t e U n i v e r s i t y B o o k s t o r e U m b r e l l a s
D esi gn
Maris s a Mc K inne y
A r i z o n a S t a t e U n i v e r s i t y B o o k s t o r e U m b r e l l a s Issue: The bookstore on the Tempe Campus purchased two large umbrellas to place somewhere adjacent to their building, our office was notified after the fact and asked to fit the umbrellas, that were far to large in scale, into this space. The challenge was in matching existing grades on adjacent sidewalks and accommodating an existing tunnel and lid. Solution: The area was surveyed and the difficult grades were observed, in order to accommodate the different grades and various obstacles pavers were chosen. In order to accommodate the large umbrellas we had to stack them so those grades had to be kept in mind as well. The patio is now well activated and highly used. Role: Surveying, design, construction documents
0’
5’
10’
N
CORNER PAVER DETAIL ASU Tempe Campus Bookstore Umbrellas -Construction Plan 8 August 2011 Scale 1” = 10’-0”
SCALE 1” = 2’-0”
PAVER DETAIL
Office of the University Architect
SCALE 1” = 2’-0”
UMBRELLA TO PAVER DETAIL SCALE 1” = 2’-0”
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
A r i z o n a S t a t e U n i v e r s i t y H a l l e G a r d e n R e n n o v a t i o n
Plannin g/ D esi gn
Maris s a Mc K inne y
A r i z o n a S t a t e U n i v e r s i t y H a l l e G a r d e n R e n n o v a t i o n Issue: The existing sunken garden required renovation as work was being completed on ISTB4, a new science building and Air Apparent, a sculpture by James Turrell at the eastern gateway to the Tempe campus Solution: New plant types, better adapted to the now mature landscape, were massed in keeping with the original intent of the garden but also to add new, nuanced color to the space. Different heights and colors of plants will add new dimension to the garden and fit with it’s now shady climate because of a canopy of mature trees. Role: Plan compiling, irrigation inventory, plant inventory, plant research, planting massing, estimating, in field plant placement, installation oversight.
Plant Selecti
Biodesign B
Larrea tri Creosote
Salvia cle Chaparra
Muhlenb Deer Gra
Justicia ca Chuparos
Viguiera Goldeney
Oenother Mexican
Pennstem Parry’s Pe
ace
r Ter
Biodesign A
d Roa
Dasylirion Texan Sot
Anemops Yerba Ma
Euphorbi Gopher P
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
Parkinson Palo Brea
Prosopis Native M
A r i z o n a D e s e r t
S t a t e U n i v e r s i t y A r b o r e t u m P a r k
Phase 1: • East stair entrance from parking • Reception/south entrance area Phase 2: • Garden area Phase 3: • Second entry point at north end
Phase 4: • Trail improvements to Sun Devil Stadium • Bank improvements • Upper and lower pond improvements as well as stream and waterfall improvements
Office of the University Architect
Plannin g/ D esi gn Facilities Development & Management
ARIZONA STATE UNIVERSITY
E-mail | Byron.Sampson@asu.edu
Improvement Phasing
Desert Arboretum Park Upgrades
0 ft.
50
100
Maris s a Mc K inne y
2012-50321
06.14.2012
A r i z o n a D e s e r t
S t a t e U n i v e r s i t y A r b o r e t u m P a r k
Issue: The existing space lacked the necessary exits to accommodate larger events and which would require additional hardscape. The space was obscured from view by a tall memorial wall that disconnected the park from the campus. Solution: The first step was to survey the area and create another exit so that they accommodate more people on the site. Materials were selected to keep with the desert feel of the area, however, turf was added to accommodate younger tailgaters and future sun devils. The area is heavily used now for tailgating events and is lovely enough to stage weddings and other formal events. Role: Diagraming, design, material selection, installation oversight
Existing Pavilion New Trees
New Pavers New Turf New Landscaped Areas Existing Trees New Stairs 20’x20’ Media Area New Sidewalk
Option Title of Sheet Goes 1Here
Office of the University Architect
DesertTitle Arboretum Park Project Goes Here Upgrades
0 ft.
10
20
Facilities Development & Management
ARIZONA STATE UNIVERSITY
2012-50321 20XX-XXXX
E-mail xxxxxxxx.xxxxxxxxx@asu.edu E- mail| Byron.Sampson@asu.edu
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
06.26.2012 00.00.0000
A r i z o n a S t a t e U n i v e r s i t y S i t e F u r n i t u r e R e p l a c e m e n t
PD-C
UT-Z VW -C
1
WF-Z
W
F-
C
2 -C VW
MP-Z2 MP-Z P-Z Z1 MP-Z1 PV-C1 PV V
PV-
C2
PV-Z
TM-C3
TM-Z3 BD-C1
OR-C2
ID-Z2
AC
3
ID-Z1
GA-C2
MU-Z CM-Z
BK-Z
OR-C4
WP-C2
P.6
1
-C
WP
LM-C1
OR-C5
SR-C1
RB-Z
SR-Z2
WP-Z LM-C2
P.1
P.2
SR-Z1
LM-C3
LM-C4 LM C4 S. Rural Rd.
BH-Z
P.3
SRC-C2 C2 C2
-C ID
ST-Z1 FM-C1
G
TM-Z4
MM-C1 MM C1
HL-Z
S. Rural Rd.
TM-Z2
PW-C1 1
GA-C2
GA-Z
TM-Z1
SS-Z
CA-C1
GA-C1
2
PW-C2
FE-Z
MW-Z
IS-Z1
WH-Z OR-C33 FM-C2
PH-Z
OM
TM-C2
2 CA-C2
FM-C3
CH-Z3
OR-C1
UC-Z
OM-Z
-C
TM-C1
CH-Z2 FA-Z
E. University Dr.
MM-C2
CA-Z
P.5
UD-C2
PW-C3
1 -C
DE-Z NH-Z
CH-Z1
UD-Z2
UD-C1
MH-Z
OM
S. Mill Ave.
FM-C4 F M C4
UD-Z1
C
H-
M
P.4
E. Apache Blvd.
SC-Z 0’
200’
400’
N
Office of the University Architect
Pl a n n i n g
Implementation | Development Phasing Group 1
Group 3
Group 2
Group 4
P.1
Maris s a Mc K inne y Project Responsibility
A r i z o n a S t a t e U n i v e r s i t y S i t e F u r n i t u r e R e p l a c e m e n t Issue: The existing site furniture on the Tempe campus dated back to 1985 and was still in use. The furniture was in disrepair and the placement and condition proved very unappealing. Solution: Much study was done to determine what type of furniture people would enjoy and what would hold up in our intense climate. All furniture on campus then had to be inventoried. Extensive diagraming, inventorying, and budgeting were involved. The project was so large that phasing had to be implemented. Within each phase construction documents had to be done for each piece of furniture. There has been a noted increase in use since the installation of the furniture. Role: Inventory, construction documents, estimating, installation oversight
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
A r i z o n a S t a t e U n i v e r s i t y A c c e s s M a n a g e m e n t P l a n
Pl a n n i n g
Maris s a Mc K inne y
A r i z o n a S t a t e U n i v e r s i t y A c c e s s M a n a g e m e n t P l a n Issue: With an ever increasing student population the Tempe campus there has been an increase in conflicts with various modes of transportation on the malls. Many pedestrians have registered complaints with the President’s office and the initial reaction was to ban bikes on campus, our office took over to find a more plausible solution Solution: Extensive survey of the malls was our first step, we physically counted the amount of people using various types of transportation. Then, we organized a physical count of bikes on campus using student volunteers. We now have a good idea of what types of transportation are used on campus, and where and how to better protect students by creating “no wheel” areas. Role: inventory, data aggregation, diagraming
Top 50 Bike Parking Locations Mondays 600
500
400
300
200
100
0
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
M a r a n a
Pl a n n i n g
M U E P D o w n t o w n A c t i v i t y
C e n t e r
Maris s a Mc K inne y
M U E P D o w n t o w n A c t i v i t y
M a r a n a
C e n t e r
7th Street
Central Avenue
7th Avenue
15th Avenue
19th Avenue
Interstate 17
Issue: The Town of Marana is a bedroom community located just north of Tuscon, Arizona. Marana is looking to develop a plan for the expansion of their downtown over the next 50 years. Solution: Our class has been performing inventorying and site visits thus far. We have done an initial presentation to a city planner who was very excited about the direction that we’re heading. Our final product will include five districts with visions, descriptions, case studies, design guidelines and renderings of district character. At the end of the capstone we will be presenting our final product to the city council, at which time they will vote on if the plan should be adopted or not. Role: inventory, diagraming, design, presentation
Roosevelt Street
Van Buren Street
Lincoln Street
Buckeye Road
P
Phoenix Overlay
775-342-5008
E
MARISSAM1024@GMAIL.COM
Marana’s proposed downtown stretches from Maricopa Street and 21st Avenue to 7th Street and Roosevelt Street
0 mi
.25
.5
1
M U E P Te m p o r a r y D e v e l o p m e n t
M e s a
Pl a n n i n g
Public Art Public Park Space
Public Art
Mesa Gateway
Speak to the Street
Speak to the Street
As Public Art
Urban Tree Farm
Speak to the Street
public art murals street art gra p hi cs
Speak to the Street
Maris s a Mc K inne y
M e s a
M U E P Te m p o r a r y D e v e l o p m e n t
Issue: The cities of Tempe, Phoenix and Mesa wanted to focus on temporary development along the light rail corridor. Mesa in particular has an interesting site on the corner of Country Club and Main Street, there is currently a moratorium on permanent development because of the Bailey Brake case. They wished to do something temporary that would attract people to downtown Mesa. Solution: Our group proposed temporary public art, a small public park space, a gateway area at the direct corner and an urban tree farm to be used on future Mesa development projects. We specified that whatever the final design be that it spoke directly to the streets on either side and paid special attention to incorporating transit of all kinds; bus, light rail and cycling. Role: inventory, design, case studies, presentation
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
L a r g e
Pl a n n i n g
B S L A S c a l e L a n d
P l a n n i n g
Maris s a Mc K inne y
L a r g e
B S L A S c a l e L a n d
P l a n n i n g
Issue: This was a third year undergraduate studio and an exercise in large scale land/community planning. The site is in north Phoenix off of Carefree Highway. Bordered by the highway to the north and an existing community to the south we had to incorporate the flood plain, existing topography as well as needs of the community. Solution: The project, titled Sweeping Vistas, was a community designed around recreation in this pristine desert community. A boulevard took you from Carefree highway through open preserve space and over the rolling topography into a town center with amble space for varying activities. I learned a great deal about planning from this studio and was inspired to pursue my MUEP. Role: Design, rendering, presentation
3’ BARRIER TO SPINY PLANTS
8’ 6’ PAVED PLANT WALK BUFFER
P
10’ PARKING
775-342-5008
4’ BIKE LANE
12’ TRAFFIC LANE
E
3’ UNPAVED WALKING PATH
12’ TRAFFIC LANE
3’ BARRIER TO SPINY PLANTS
4’ BIKE LANE
10’ PARKING
6’ PLANT BUFFER
MARISSAM1024@GMAIL.COM
B S L A P a r k R e d e s i g n
H a r m o n
M
N
J O
B
I
B
1
B L
H
M
2
K
A G
M
F
E
3
A
M C
D
M
Pl a n n i n g
Maris s a Mc K inne y
H a r m o n
B S L A P a r k R e d e s i g n
Issue: This was a third year undergraduate studio and an exercise in park design. The current Harmon Park is surrounded by section 8 housing and was in desperate need of redevelopment. However, the current baseball fields are highly used as is the existing playground. The design of the park should speak to the new, contemporary library placed adjacent to the park. Solution: My design for the park was to be a nexus for the community, a large corten steel tree design to catch rain was the literal nexus in the center of the park. The design incorporated a community garden, olympic grade pool, regulation soccer fields, basebal fields and basketball court so that children in the area could have a safe place to exercise. Role: Design, rendering, presentation
P
775-342-5008
E
MARISSAM1024@GMAIL.COM
P o r t f o l i o
phone 7 7 5 - 3 4 2 - 5 0 0 8
email M A R I S S A M 1 0 2 4 @ G M A I L . C O M
CONTACT
M A R I S S A M c K I N N E Y 1458 WEST LA JOLLA DRIVE TEMPE, AZ 85282
P r o j e c t s
Residential
Rummery Residence - Studio 361 Biller Residence - Studio 361 Hallberg Residence - Studio 361 Anton Bessette Residence - Studio 361 Levitt Residence - Studio 361 Desert Crest Drive Residence - Studio 361
Planning
Site Furniture Replacement Study - OUA Access Management Study - OUA North Campus Diagraming - OUA Open Space Engagement Plan - OUA Signage Locations - OUA Signage Landscape Modifications - OUA Halle Garden Master Planning and Revegetation - OUA Algae Research Fence - OUA Marana Town Downtown Activity Center - MUEP Temporary Development Opportunities in Mesa - MUEP Large Scale Land Planning - BSLA
Design
Bookstore Umbrellas - OUA Nelson Fine Arts Center Renovation - OUA Halle Garden Renovation - OUA Pyrenean Stones Landscape - OUA Manzanita Hall Wall Study - OUA Desert Arboretum Park - OUA Secure Bike Parking (Downtown, ISTB4) - OUA Exercise and Wellness Revegetation - OUA Downtown Kitchen Garden - OUA Mercado Fountain Remodel - OUA University Drive Streetscaping - OUA Stadium Parking Structure Exit - OUA Halle Garden Master Planning and Revegetation - OUA Harmon Park Redesign - BSLA
Presentation
CFO Presentation - OUA ASLA Presentation Pamphlet - OUA Landscape Forms Presentation - OUA ABOR Master Plan Presentation - OUA Director Presentations - OUA Site Amenities Package - OUA