Mark Allner Architecture Portfolio 2013

Page 1

+44 7792 787859 Mark Allner

BA (Hons) Architecture RIBA Part I studiomarkallner.com mallner.tumblr.com markallner@gmail.com


E D U C A T I O N BA (Hons) Architecture Degree 1st Class (RIBA Part 1 accreditation) Arts University College Bournemouth Jun 2012 5

FdA Interior Architecture and Design Foundation Degree (FdA) Arts University College Bournemouth Oct 2010 GCE O’Level: English Language, English Literature, Mathematics, Physics, Geometrical Drawing CSE: Mathematics, Physics, Geography, Technical Drawing, Wood Design & Construction

1

8

4

6

2

7

3

E X P E R I E N C E To widen my understanding of architecture and design I have travelled to Paris, New York, Venice, Rome and most recently Norway. I have worked with a number of architecture and urban design practices. I have also worked closely with the American composer/artist/architect Christopher Janney installing his interactive Sonic Forest Installation at locations throughout the UK.

8

8

1 2 3 4 5 6 7 8

entrance atrium reception / workshop basement / storage cafe bar / restaurant computer suite medical facility whispering gallery / knowledge exchange


P R O F I L E I am an open minded individual who believes in idea sharing and collaboration and I have a positive outlook on life with varying interests outside of architecture and design. My architecture projects are driven by the needs of the end user and by the materials used to create atmosphere and experience. I adapt a philosophical and conceptual approach, and explore the technological aspects of a project from a craft viewpoint towards materiality. I look for inspiration in all fields not only creative ones, continually challenging the norm questioning why? and what? with a strong desire to design to enhance social and cultural experience. I believe that design and architecture processes can be applied across many disciplines. I am creative! Not only in the artistic sense, but because I think about things differently to others with an adaptive attitude to suit any situation. I N T E R E S T S

&

A C T I V I T I E S

I love the site specific and innovative architecture of Japan and Scandinavia and the work and philosophies of Alvar Aalto, Carlo Scarpa, John Pawson and Steven Holl. Outside of architecture and design my interests include, art, sport, music, fashion, film, gardening and cooking. Walking, Bodyboarding and bicycle riding keeps me active.


01

02

P R A C T I C E / E X P E R I E N C E

05 01

David James Architects 5 Wolterton Road Poole Dorset BH12 1LR

Crichel Mount Road Rooftop Extension (Feb 2013) Sandbanks Road New Development (Feb 2013)

Dot Architecture 1106 Christchurch Road Bournemouth Dorset BH7 6DT e: mail@dotarchitecture.co.uk

Petersfield Road Extension (Dec 2012) Holdenhurst Road Re-model (Nov 2012) Charminster Road Re-model (Oct 2012)

04

11

10

02

01

001 | proposed north west [rear] elevation | 1:100 @ A3

11

03

02

06 05

Rebecca Granger Architects Old Harry House 11 Gervis crescent Poole Dorset w: http://www.rebeccagranger.co.uk/

Marine Antiquities Museum Competition (Sep 2012) Lake Drive House New Build (Aug 2012)

01

04

001 | proposed north west [rear] elevation | 1:100 @ A3

01

render

02

ppc aluminium framed windows frame colour and spec tbc

03

ppc aluminium doors frame colour and spec tbc

04

ppc aluminium folding sliding doors frame colour and spec tbc

05

ppc aluminium coping to parapet

06

frameless laminated glass balustrade ss bolt connector / steel clamp at base

07

single ply membrane f lat roof

08

ppc aluminium garage door colour and spec tbc

09

ppc aluminium f lashing

10

extension of existing pitched roof slate tiles

11

roof light

This drawing is for plannig purposes only.

7111 | 3 horsa road | bournemouth | planning


P R A C T I C E / E X P E R I E N C E Feria Urbanism Studio 11 Fernside Road Bournemouth Dorset e: info@feria-urbanism.eu

Bournemouth by Night public consultation workshop (Apr 2012)

RBStudio Architects Prestige Vehicle Repair Centre design (Aug 2011) 21A Haven Road Horsa Road Extension (Jul 2009) Poole GStudio Garden Studio design (Jun 2009) Dorset BH13 7LE e: office.rbstudio@mac.com Janney Sound PhenomenArts Inc 75 Kendall Road Lexington MA 02421 e: christopher@janneysound.com

Sonic Rings Installation Weymouth Bayside Festival (Jul 2012) Sonic Forest Installation AUCB (Oct 2011) Sonic Forest Installation Bournemouth Arts Festival (Sep 2011) Sonic Forest Installation Eco-ecovelocity Festival (Aug 2011) Sonic Forest Installation Glastonbury Festival (June 2011)


P R A C T I C E / E X P E R I E N C E Red Shoe Design Collective Active Founding Member London Festival of Architecture Testbed1 / Doodles Bar 33 Parkgate Road Battersea London SW11 4NP e: hello@thedoodlebar.com D2 Office Interiors Drewitt House 865 Ringwood Road Bournemouth Dorset BH11 8LL e: duncan@d2ltd.co.uk

Chair design + concept production (June 2012) Olympic Information Pavilion competition (Jun 2011) Winner AUCB Architecture t-shirt design competition (Apr 2011) Winner Architects’ Journal Sketchbook competition (Mar 2011)

AUCB Graduate Show Exhibition Co-ordinator (Jul 2012)

Prestige Vehicle Repair Centre Design (Aug 2011)


P E R S O N A L • •

Full UK driving licence including upto 7.5 tonne truck classification Power Tool proficient

S O F T W A R E • • • • •

Vectorworks Autocad Rhino Adobe Creative Suite Microsoft Office

S K I LL S • • • •

&

S T R E N G T H S

Passionate about architecture and design Exceptional eye for detail Practical experience Can draw


sandcastlier de FMLIAHA

homeless centre for non working architects studiomarkallner.com mallner.tumblr.com markallner@gmail.com


Sandcastlier de FMLIAHA*

On any one night there are almost 2,200 people sleeping rough in England. Nearly a further 23,000 people are in emergency accommodation, including hostels.

5

1

8

4

6

8

3

2

8

7

3

1 2 3 4 5 6 7 8

entrance atrium reception / workshop basement / storage cafe bar / restaurant computer suite medical facility whispering gallery / knowledge exchange

homeless centre and workshop for non working architects autocad + rhino + photoshop


sandcastlier de FMLIAHA concept sketch ink

sandcastlier de FMLIAHA whispering gallery / knowledge exchange visualisation rhino + photoshop


sandcastlier de FMLIAHA 1:200 structure model corrugated card + mesh + vacuum formed acrylic

sandcastlier de FMLIAHA whispering gallery / knowledge exchange visualisation rhino + photoshop


sandcastlier de FMLIAHA concept model grey card + wax

sandcastlier de FMLIAHA site montage rhino + photoshop


sandcastlier de FMLIAHA adapted construction model rhino + photoshop

sandcastlier de FMLIAHA adaptive re-use study montage photoshop



11

1

6

4

1

5 3

accommodation unit vertical section scale

7

2

8

10

9

12

reclaimed corrugated galvanised iron 100mm SIPs panel 18mm outer sheath with 64mm insulating core 3 2mm donated tarpaulin waterproof membrane 4 internal panel 18mm pallet softwood outer sheath with 64mm recycled newspaper inner core 5 4 layers of 3mm re-used cardboard packaging sound insulating wall finish 6 18mm marine ply roof panel over 2mm tarpaulin waterproof membrane, 7 reclaimed double glazed panel 8 floor construction consists 64mm recycled newspaper insulation between 18mm pallet softwood 9 305mm grade 43 steel beam / column 10 in-situ reinforced concrete 11 100mm plywood roof panel consists 64mm recycled newspaper insulation core sandwiched between 18mm pallet softwood 12 60/495mm recycled polycarbonate multi wall light diffusing sheet (to full height of 2nd floor); U-value: 1:65 W/mk2K 1 2

sandcastlier de FMLIAHA construction detail autocad + photoshop


sandcastlier de FMLIAHA site study test montage photoshop


sandcastlier de FMLIAHA site study test montage photoshop


tubular bells music school urban regeneration studiomarkallner.com mallner.tumblr.com markallner@gmail.com tubular bells music school concept sketch ink


03

10

04

10

11

01

15

09

09

02 06 11

05

13

13 08

07

11 16

07 07 12

02

14

04

14

13 01 02 03 04 05 06 07 08

Vocal Room Administration Office Non-amplified Instruments Full Size Piano Room Disabled Toilets Amplified Instruments Toilets Drum Room

09 10 11 12 13 14 15 16

13

Performance Space Double height performance space Raised metal grate walkway Entrance / circulation space Double height circulation space / bar Auditorium Recording studio Changing rooms

mixed media interior circulation space sketch pencil + graphite + ink + photoshop

tubular bells music school floor plans autocad


tubular bells music school concept sketch ink

tubular bells music school concept model scented wax + acrylic


tubular bells music school structure model mdf + dowel + photoshop

tubular bells music school model scale 1:100 trotec laser cutting machine + mdf + spaghetti


tubular bells music school drum room montage trotec laser cut mdf model + photoshop

tubular bells music school drum room internal visualisation rhino + photoshop


01

02

04

03

01 02 03 04

Services Auditorium Storage Double height circulation space / bar

tubular bells music school auditorium section autocad + photoshop

tubular bells music school adjustable acoustic ceiling design rhino + photoshop + in-design


special study

phenomenology studiomarkallner.com mallner.tumblr.com markallner@gmail.com phenomenology special study concept sketch ink


phenomenology special study collaboration autocad + rhino + photoshop

phenomenology special study model wax + LED lights


phenomenology special study model wax + LED lights

phenomenology special study model wax + LED lights


phenomenology special study montage photoshop


peregrine falcon breeding centre intervention

studiomarkallner.com mallner.tumblr.com markallner@gmail.com peregrine falcon breeding centre ink


1:50 South Elevation

falkland square elevation drawing autocad


falkland square / venice montage photoshop


1:20 Window Detail (With shadow for demonstration purposes only as elevation is South facing)

falkland square detail drawing autocad

Mark Allner Visual Studies 3 ARC 511 Scale 1:50 and 1:20 Wednesday 19th January 2011

falkland square peregrine falcon breeding centre montage photoshop


professional experience

horsa road residential extension studiomarkallner.com mallner.tumblr.com markallner@gmail.com


01

02

01

02

03

02 08

06 05

3

01

04

07 11

10

11

11

11 10

10

001 11 north west [rear] elevation | 1:100 @ A3 11 | proposed

02

01

02

03

02 02

0201

06 05 01

04

05

01

04

04

03 aluminium 02 02 ppc framed windows frame colour and spec tbc

03

ppc aluminium doors frame colour and spec tbc

04

ppc aluminium folding sliding doors frame colour and spec tbc

05

ppc aluminium coping to parapet

06

frameless laminated glass balustrade ss bolt connector / steel clamp at base

07

single ply membrane f lat roof

08

ppc aluminium garage door colour and spec tbc

09

ppc aluminium f lashing

10

extension of existing pitched roof slate tiles

11

roof light

06

06

05 01

0103 02

render

This drawing is for plannig purposes only.

001 | proposed north west [rear] elevation | 1:100 001 | @ proposed A3001 | proposed north westnorth [rear]west elevation [rear] |elevation 1:100 @ |A3 1:100 @ A3

7111 | 3 horsa road | bournemouth | planning

01

01

08

3

09 02

002 | proposed south east [front] elevation | 1:100 @ A3

02

02 01

01

07

07

01

01

01

08

08

3

09

09

02

02

3

002 | proposed south east [front] elevation | 1:100 002 | @ proposed A3 002 | proposed south eastsouth [front]east elevation [front] |elevation 1:100 @ |A3 1:100 @ A3

P012 | proposed elevations | 1:100


01

001 | proposed south west [side] elevation | 1:100 @ A3

07 10

07

10 01 01

01

09

01 02

01

09

02

01

01

render

02

ppc aluminium framed windows frame colour and spec tbc

03

ppc aluminium doors frame colour and spec tbc

04

ppc aluminium folding sliding doors frame colour and spec tbc

05

ppc aluminium coping to parapet

06

frameless laminated glass balustrade ss bolt connector / steel clamp at base

07

single ply membrane f lat roof

08

ppc aluminium garage door colour and spec tbc

09

ppc aluminium f lashing

10

extension of existing pitched roof slate tiles

11

roof light

10

01

001 | proposed 001 | proposed south west south[side] west elevation [side] elevation | 1:100| @ 1:100 A3 @ A3

01

01

render 01 render

02

ppc ppc aluminium framedframed windows windows 02 aluminium frame frame colour colour and spec andtbc spec tbc

03

ppc ppc aluminium doors doors 03 aluminium


01 02

01

ppc aluminium framed windows frame colour and spec tbc

03

ppc aluminium doors frame colour and spec tbc

04

ppc aluminium folding sliding doors frame colour and spec tbc

05

ppc aluminium coping to parapet

06

frameless laminated glass balustrade ss bolt connector / steel clamp at base

07

single ply membrane f lat roof

08

ppc aluminium garage door colour and spec tbc

09

ppc aluminium f lashing

10

extension of existing pitched roof slate tiles

11

001 | proposed south west [side] elevation | 1:100 @ A3 10

01

01

002 | proposed north east [side] elevation | 1:100 @ A3

This drawing is for plannig purposes only.

02

10

01

roof light 01 render 02

ppc aluminium framed windows frame colour and spec tbc

03

ppc aluminium doors frame colour and spec tbc

04

ppc aluminium folding sliding doors frame colour and spec tbc

05

ppc aluminium coping to parapet

06

frameless laminated glass balustrade ss bolt connector / steel clamp at base

07

single ply membrane f lat roof

08

ppc aluminium garage door colour and spec tbc

09

ppc aluminium f lashing

10

extension of existing pitched roof slate tiles

11

roof light


professional experience

crichel mount road residential roof extension studiomarkallner.com mallner.tumblr.com markallner@gmail.com


0

1

2

3

4

5

0

10m

BALCONY FAMILY/DINING

1

2

3

4

5

10m

PLAN & ELEVATION 1:100

PLAN & ELEVATION 1:100

FLAT ROOF ACCESS FOR MAINTENANCE ISSUES ONLY

BALCONY AT LOWER LEVEL

BALCONY

LOUNGE BEDROOM 3

BEDROOM 4

BEDROOM 3

LOW WALL TO BE TAKEN BACK TO MAKE ROOM FOR ROOF TERRACE

BEDROOM 4 1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

1

ROOF TERRACE

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

2 3

BEDROOM 2

STUDY/ BED 5

3 4

ROOFLIGHT TO BE REMOVED MECHANICAL EXTRACT TO BE RELOCATED TO FLAT ROOF AREA

BEDROOM

1

BATH

5

BREAKFAST

KITCHEN

EXISTING DOUBLE DOORS TO BE REMOVED AND REPLACED BY NEW WALL AND SINGLE DOOR

ROOFLIGHT TO BE REMOVED

BATH

LAUNDRY

HALL

DRESSER

BOILER

FLAT ROOF ACCESS FOR MAINTENANCE ISSUES ONLY

LAUNDRY

DRESSER

MASTER

SUN ROOM

MASTER

LANDING

LANDING 11

12

1

10

13

2 3

8

4

7

ENS 2

9

14

8

ENS 2

7

5 6

GARAGE

ROOFLIGHTS TO BE REMOVED

6 5

5

ROOF TERRACE

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

4

4 3

3 2

2

1

EXISTING STEPS TO BE REMOVED AND LEVEL FILLED

BEDROOM 2

BEDROOM 2

MECHANICAL EXTRACT TO BE RELOCATED TO FLAT ROOF AREA

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN FLAT ROOF ACCESS FOR MAINTENANCE ISSUES ONLY

K E Y: 1 Existing Walls

Existing Ground Floor Plan

Proposed First Floor Plan

Existing First Floor Plan

Proposed Second Floor Plan

2 New Walls

Note: Proposed internal changes only to Þrst ßoor

3 To be removed or demoilshed

revisions: rev_A_01.03.13_roof terraces reduced in size and visibility screens added

revisions:

1234 | 14a Crichel Mount Road | Mrs C Endean-Cance | Planning Application 1234 08 | Existing Ground and First Floor Plans | Scale 1:100 @A3 | February 2013 | davidjames architects LLP

c

Note: Do not scale from this drawing. The contractor is to check all dimensions on site. This drawing is copyright and remains the property of David James Architects LLP Unauthorised use for any purpose is prohibited.

1234 | 14a Crichel Mount Road | Mrs C Endean-Cance

1234 03 A | Proposed First and Second Floor Plan | Scale 1:100 @A3 | February 2013 | davidjames architects LLP

c

Note: Do not scale from this drawing. The contractor is to check all dimensions on site.

This drawing is copyright and remains the property of David James Architects LLP Unauthorised use for any purpose is prohibited.


1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

0

Proposed South West Elevation

2

3

4

5

10m

PLAN & ELEVATION 1:100 0

1

2

3

4

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

5

10m

PLAN & ELEVATION 1:100

Proposed South West Elevation Proposed South West Elevation

SOUTH WEST ELEVATION

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

1

SOUTH WEST ELEVATION

SOUTH WEST ELEVATION

M A T E R I A L S K E Y:

1 M A T E R I A L S K E Y:

2

1 M A T E R I A L S K E Y:

Timber Cladding

Proposed South West Elevation Existing South East Elevation

SOUTH WEST ELEVATION

Existing South West Elevation revisions: rev_A_01.03.13_roof terraces reduced in size and visibility screens added

2

3 | 4Mrs C5Endean-Cance 1234 | 14a Crichel Mount Road

revisions: 0 1 2 rev_A_01.03.13_roof terraces reduced in size and visibility screens added

PLAN & ELEVATION 1:100

10m

South West Elevation Existing South Proposed East Elevation

White Render

3

2

Timber Cladding

White Render

Aluminium Framed Windows / Folding doors

3

SOUTH EAST ELEVATION

SOUTH WEST ELEVATION

Existing South West Elevation

1 SOUTH WEST ELEVATION

Timber Cladding

White Render

Aluminium Framed Windows / Folding doors

SOUTH WEST ELEVATION

03 @A3 1 | February 2 3 2013 4 | davidjames 5 1234 04 A | Proposed South West Elevation | Scale 1:100 architects LLP Aluminium Framed Windows

PLAN SOUTH EAST ELEVATION

& ELEVATION 1:100 / Folding doors

c

Note: Do not scale from this drawing. The contractor is to check all dimensions on site.

This drawing is copyright and remains the property of David James Architects LLP Unauthorised use for any purpose is prohibited.

10m


1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

0

1

2

3

4

5

10m

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

PLAN & ELEVATION 1:100 0

1

2

3

4

5

1.8m HIGH OBSCURE GLASS VISIBILITY SCREEN

10m

PLAN & ELEVATION 1:100

Proposed South East Elevation

Existing South East Elevation

SOUTH EAST ELEVATION

SOUTH EAST ELEVATION

Existing South East Elevation

0

1

2

3

4

SOUTH EAST & ELEVATION PLAN ELEVATION

5

1:100

10m

Proposed South East Elevation

0

1

2

3

4

5

PLAN & ELEVATION 1:100 SOUTH EAST ELEVATION

10m


professional freelance work

prestige vehicle reception area re-model studiomarkallner.com mallner.tumblr.com markallner@gmail.com


Obscured storage / printer space

Workshop manager

glass partitioned workshop control

access to stairs and workshop

feature wall with graphic and internet station / coffee bar

hospitality area / coffee / recessed plasma screen

C

D

E

F

toilet lobby

C

A

D

A

E

B

F

B

customer toilet 2

integrated dropped ceiling element

integrated desk system

integrated reception desk

comms room access

prestige vehicle repair centre section A-A autocad + photoshop


feature dropped ceiling with recessed lighting

glass partitoned office 1

Obscured storage / printer space

glass partitioned workshop control

integrated desk system

feature dropped ceiling with recessed lighting

epoxy resin floor surface

feature wall with graphic / internet station / coffee bar

staff room

toilet lobby screen

customer toilets

integrated reception desk

prestige vehicle repair reception area remodel rhino

prestige vehicle repair reception area visualisation autocad + rhino + photoshop


prestige vehicle repair centre visualisation autocad + rhino + photoshop

prestige vehicle repair centre visualisation autocad + rhino + photoshop


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.