Apta rail conference article final draft

Page 1

APTA Rail Conference Article: Learn Not to Duck With the tenacity of prize fighters, transit agencies throughout the country have found themselves on the ropes, deflecting blows delivered by battle-weary constituents, punch drunk by a one-two combination of diminished service and across-the-board fare and fee hikes. A recent APTA survey shows 84 percent of U.S. public transportation agencies polled have raised their fares, cut their service or considered either of these actions since January 2009. The relentless pounding our agencies must endure as the result of actions forced upon us by a lingering economic downturn should not discourage us, but instead reaffirm our end goal. At the SFMTA that goal can be assessed by two key metrics, the safe transport of our customers and keeping the systems entrusted to us in a state of good repair. It is a foregone conclusion that the common industry practice of transferring money allocated for capital projects to cover mounting operational deficits—54 percent of systems polled according to the APTA survey—only aggravate service issues important to customers and make our already precarious situation worse. The shifting of monies earmarked for future growth as a means of addressing the financial crisis of the moment foreshadows dire consequences for those forced to continually revisit the practice—the equivalent of putting a band-aid on a bullet wound. With that in mind, the SFMTA has moved forward to advance numerous capital projects that adhere to our vision of investing in system infrastructure to improve the safety and reliability of service for our customers. Rail Renewal Program Emphasizing infrastructure improvement as a key element to improving San Francisco’s quality of life, the SFMTA is aggressively pursuing a $141 million Rail Renewal Program consisting of 10 key projects that cover major track work on Muni Metro lines. The Miscellaneous Rail Replacement Project that began in fall 2009, when completed later this year, will have upgraded 70 miles of track work on the N Judah, J Church and L Taraval lines that is more than 30 years old. Upgrading of these rail lines will ensure safe, reliable Muni service for generations to come. Improvements beyond new trackways include streetscape enhancements, upgraded water lines, new overhead wire poles, curb ramps and updated Muni train signal priority devices. Light Rail Vehicle (LRV) and Motor Coach Rehabilitation The SFMTA has used 93 percent of $71 million in American Recovery and Reinvestment (ARRA) funding to significantly advance its state of good repairs. Using $15 million in allocated ARRA funding, the SFMTA has restored 143 Light Rail Vehicles (LRVs) to original operating specifications improving vehicle reliability and ensuring the fleet’s ability to reach its expected life cycle of 25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.