THE VISION A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
1
4
CONTENTS FROM THE MD’S DESK
7
UNITED ARAB EMIRATES
8-33
QATAR
34-45
OMAN BAHRAIN
KUWAIT
46-49
50-53
54-55
SAUDI ARABIA
56-57
INDIA
58-61
5
6
FROM THE MD’S DESK
TO OUR VALUED CUSTOMERS, Greetings! Knauf is a family name and a corporate group of global dimensions at the same time synonymous with a type of corporate culture which has become rare. Knauf is a typical Family firm in spite of its size and this is precisely the reason for its amazing success. It is short and direct decision-making paths, the courage to tackle new ideas, innovations, investments and the wealth of ideas contributed by all Knauf employees that characterize the company. From its beginnings in gypsum processing, Knauf has expanded and diversified to become a corporation with worldwide activities, Knauf UAE has been active in the Middle East for more than a decade. Knauf shows its commitment not only in the GCC, headquarters in Dubai UAE, but also in the subcontinent.We have offices based in Saudi, Qatar and India to support the market and dealers.Knauf provides value-added products and services in the following fields: • Building materials and systems based on gypsum and gypsum-related products • ASTM certified products & systems • Multi- Purpose Joint compounds • Knauf Aquapanel interior and exterior wall systems • Knauf Insulations sustainable, high-performance, cost-effective insulation solutions • Knauf AMF acoustic designs for Interior and Exterior in ceiling & partition systems • Knauf Integral’s Knauf GIFA Floor, sheet-panelled access floors • Thermal and sound insulation materials • Value engineering and technical consultancy for architects and consultants to meet specified design requirements • On site hands-on training and supervision for contractors when installing drywall systems • Knauf systems are approved by Dubai, Abu Dhabi, Ras Al Khaimah and Qatar Civil Defense Sustainability is central to our vision of doing the right thing for our clients, our people and the communities in which we work. We maintain and provide certificates for individual products and designs to improve quality and performance. Knauf systems combine innovative products to realize speed of installation and warranted high performance-based systems as per ASTM, EN-BS and DIN Standards. Knauf is not only committed towards it Products and System but also towards it employees. Within the framework of its four key K-Values; Partnership, Commitment, Entrepreneurship and Menschlichkeit meaning human touch Knauf looks after its people and drives a sense of passion in all its staff. This is what makes Knauf Unique and special! Safety is something that Knauf does not compromise on again whether for its products or people and therefore all our products are tested and approved by Intertek to make sure that nothing leaves the plant which is not up to the mark.
Amer Bin Ahmed Managing Director Knauf GCC & India
7
8
UNITED ARAB EMIRATES
9
UNITED ARAB EMIRATES
BURJ KHALIFA Region: Dubai Knauf Systems used: D112 Main Contractor: Arabtec Year of Completion: 2009 10
HABTOOR PALACE – DUBAI Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2016
11
UNITED ARAB EMIRATES FAIRMONT HOTEL - ABU DHABI
Region: Abu Dhabi Knauf Systems used: ASTM Partition & Ceilings [Offered tailored made solution to meet the highest rated performance systems]. Main Contractor: Arabtec
SHARJAH MILITARY HOSPITAL Region: Sharjah Knauf Systems used: EN-BS Ceilings Sub Contractor: Vancouver Year of Completion: 2015
12
THE ADDRESS BOULEVARD DUBAI
Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings with special board PRO-HD Main Contractor: Brookfield Multiplex Year of Completion: 2016
AL AMAL PSYCHIATRIC HOSPITAL Region: Dubai Knauf Systems used: D112 Main Contractor: China State Construction Year of Completion: 2016
13
UNITED ARAB EMIRATES
DUBAI AUDI SHOWROOM Region: Dubai Knauf Systems used: Cleaneo Acoustic Ceiling Main Contractor: Al Sahel Contracting Year of Completion: 2014
14
LANDMARK TOWER
Region: Abu Dhabi Knauf Systems used: Knauf D112 Suspension Ceiling Systems, Knauf EN-BS Partition Systems + Knauf Aquapanel for wet areas Main Contractor: Arabtec / Al Habtoor Year of Completion: 2012
15
UNITED ARAB EMIRATES BAB AL QASR HOTEL & SERVICED APARTMENTS – ABU DHABI Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Nurol Year of Completion: 2015
16
IRANIAN HOSPITAL EXPANSION PROJECT DUBAI: Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Al Sahel Contracting Year of Completion: 2013
17
UNITED ARAB EMIRATES GHAYATHI HOSPITAL Region: Abu Dhabi Knauf Systems used: ASTM Ceilings Main Contractor: Al Amana Contracting Year of Completion: 2015
18
SILA HOSPITAL Region: Abu Dhabi Knauf Systems used: ASTM Main Contractor: Al Fara’a Contracting Year of Completion: 2015
19
UNITED ARAB EMIRATES CITY WALK 4D
Region: Dubai Knauf System Used: Knauf V-Brace & Mass Barrier Ceiling Main Contractor: Pino Intl Year of Completion: 2015
20
DEIRA CITY CENTRE - CINEMA PROJECT (The Largest Cinema Screen in the Middle East & North Africa) Region: Dubai Knauf System Used: Knauf V-Brace/Knauf U-Stud & Mass Barrier Ceiling Main Contractor: Al Tayer Stocks Year of Completion: 2016
21
UNITED ARAB EMIRATES
BAWADI - CINEMA PROJECT
Region: Al Ain Knauf System Used: Knauf V-Brace/Knauf U-Stud & Mass Barrier Ceiling Main Contractor: Dzine Year of Completion: 2014
22
AJMAN CITY CENTRE - CINEMA PROJECT
Region: Region: Ajman Knauf System Used: Knauf V-Brace & Mass Barrier Ceiling Main Contractor: Khansaheb Year of Completion: 2016
HABTOOR THEATRE
Region: Dubai Knauf System Used: Knauf V-Brace & Mass Barrier Ceiling Main Contractor: HLG Year of Completion: 2016
23
UNITED ARAB EMIRATES OPERA HOUSE PROJECT
Region: Dubai Knafu Systems Used: Knauf U – Stud & Mass Barrier Cinema Systems Main Contractor: Greenline Year of completion: 2016
AL HILAL BANK
Region: Abu Dhabi Knauf Systems used: ENBS Ceiling/Partitions Main Contractor: Al Fara’a Contracting Year of Completion: 2013
24
AL MUNEERA
Region: Abu Dhabi Knauf Systems used: EN-BS Partition D112 Ceilings (One of the biggest Aquapanel project) Main Contractor: Al Futtaim Carillion Year of Completion: 2011
RAJMAHAL THEATRE
Region: Dubai Knafu Systems Used: Knauf V brace & U - Stud Cinema Systems Main Contractor: CPD Year of completion: 2016 25
UNITED ARAB EMIRATES
CONRAD HILTON
Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Arabtec Year of Completion: 2011
AL BUSTAN COMPLEX
Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2012
26
ARZANAH MEDICAL CENTER Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2012
NATION TOWERS
Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings + Knauf Cinema Systems Main Contractor: Arabtec & NPC Year of Completion: 2012
JW MARRIOTT MARQUIS Region: Dubai Knauf Systems used: EN-BS Main Contractor: Brookfield Multiplex Year of Completion: 2012
27
UNITED ARAB EMIRATES INDEX TOWER
REgion: DIFC Dubai System Used: Knauf GIFAFloor Year : June 2011
YAS MALL
Region: Abu Dhabi Knauf Systems used: EN-BS Ceilings Main Contractor: Six Construct Year of Completion: 2014
28
FOUR SEASONS HOTEL
Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Al Futtaim Carillion Year of Completion: 2015
29
UNITED ARAB EMIRATES DRAGON MART EXPANSION & CINEMA’S Region: Dubai Knauf Systems used: EN-BS Ceilings &Cinema System Main Contractor: UNEC Year of Completion: 2015
IMG THEME PARK (The biggest indoor theme park in the world) Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings + Cinema System. (High walls) Main Contractor: Simplex Infrastructure Year of Completion: 2016
30
JUMEIRAH PARK VILLAS
Knauf System used: Knauf D112 Ceiling Systems Main Contractor: S.S.Lootah Completion: 2015
CITY WALK RESIDENTIAL BUILDINGS
Region: Dubai Knauf Systems used: Knauf Wall Lining 611 + Knauf Aquapanel Exterior Solution Main Contractor: Al Shafar Contg. Year of Completion: 2016
AL SHAAM HOSPITAL – RAS AL KHAIMAH Knauf System used: EN-BS Partition & Ceiling Systems Main Contractor: Ali Moosa & Sons Completion: 2015
31
UNITED ARAB EMIRATES PADDOCK CLUB “FORMULA RACE VIP CLUB“
Region : Abu Dhabi-UAE Systems/Products Used : Aquapanel Exterior wall Main Contractor : ISG Year of Completion : 2014
MASDAR CITY
Region : Abu Dhabi-UAE Systems/Products Used : Aquapanel Exterior wall Main Contractor : Brookfield Multiplex Year of Completion : 2013-2014 32
CAYAN TOWER
Region : Dubai-UAE Systems/Products Used : Aquapanel Exterior cladding in semi exposed areas Main Contractor : Arabtec
DUBAI INTERNATIONAL AIRPORT TERMINAL 3
Region – City and Country : Dubai-UAE Systems/Products Used : Aquapanel Exterior ceiling Main Contractor : Alec Year of Completion : 2010 33
34
QATAR A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
35
QATAR BARZAN CAMP
Region: Doha Knauf System used: EN-BS Ceilings D112 Main Contractor: REDCO AlMana Year of Completion: 2015
FALCON TOWER
Region: Doha Knauf System used: BN-BS Ceilings & Aquapanel Main Contractor: Tuscana Year of Completion: 2015 36
&
Access Panels
WORLD TRADE CENTER Region: Doha Knauf System used: ASTM System Main Contractor: BluuGulf Year of Completion: 2015
42 GOVERNMENT SCHOOLS FOR ASHGHAL Region: Doha Knauf System used: Heradesign Main Contractor: JTC/AMANA/ITC/Hassanesco/Alsyraia/Tadmur/ITCC/AlDarwish Year of Completion: 2014 & 2015
37
QATAR QATAR MALL
Region: Doha Knauf System used: ASTM & EN-BS Ceilings Main Contractor: KCT / UCC Year of Completion: 2016
ASPIRE ZONE EXTENSION
Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: SEG Year of Completion: 2015
FESTIVAL CITY - CINEMA PROJECT Region: Doha Knauf System Used: Knauf V-Brace/Knauf U-Stud & Mass Barrier Ceiling Main Contractor: Alec Year of Completion: 2016 38
ISF CAMP
Region: Doha Knauf System used: EN-BS Systems, Hatfurring & Aquapanel Main Contractor: QD-SBG Year of Completion: 2016
MALE & FEMALE CLASSROOMS QATAR UNIVERSITY Region: Doha Knauf System used: EN-BS Systems & Cleaneo D126 Main Contractor: Commodore Co. Year of Completion: 2016
OXYGEN PARK QATAR FOUNDATION
Region: Doha Knauf System used: EN-BS Systems & Aquapanel Main Contractor: Man Enterprises Year of Completion: 2014
39
QATAR SHERATON HOTEL RENOVATION
Region: Doha Knauf System used: EN-BS System Main Contractor: KCT Year of Completed: 2015
BANANA ISLAND (ANANTARA) Region: Doha Knauf System used: EN-BS Ceiling & Aquapanel Main Contractor: UCC Year of Completed: 2014
AL WAJBA PALACE
Region: Doha Knauf System used: EN-BS System & Aquapanel Main Contractor: UCC Year of Completed: 2014 40
QATALUM
Region: Doha Knauf System used: D112 system Main Contractor: Dicotech Year of Completed: 2014
HILTON DOUBLE TREE Region: Doha Knauf System used: EN-BS System Main Contractor: Derwin Year of Completed: 2015
ALSADD MULTIPURPOSE HALL
Region: Doha Knauf System used: EN-BS System & Aquapanel Main Contractor: AKTOR Year of Completed: 2014 41
QATAR
MINISTRY OF INTERIOR - HEAD QUATERS Region: Doha Knauf System used: D112 system & Cleaneo Main Contractor: WCT Year of Completed: 2015
COMMUNICATION & MEDIA COLLEGE QATAR FOUNDATION
Region: Doha Knauf System used: Ceiling/Parition & Aquapnel Main Contractor: HBK JV REC Year of Completed: 2015 42
DEVELOPMENT & RESEARCH CENTER QATAR FOUNDATION Region: Doha Knauf System used: ASTM Ceiling/Parition & Aquapnel Main Contractor: REDCO Al Manaa Year of Completed: 2014
SIDRA MEDICAL & RESEARCH CENTER
Region: Doha Knauf System used: EN-BS Ceiling/Parition Aquapanel & Alurevo access panel Main Contractor: Midmac Year of Completed: 2015
QATAR NATIONAL MUSEUM Region: Doha Knauf System used: EN-BS Curve Drywall & Heradesign Main Contractor: Hyundai Year of Completed: 2013 completion 2016 end
43
QATAR
BARWA FINANCE DISTRICT Region: Doha Knauf System used: EN-BS Ceiling/Parition Main Contractor: Promer Qatar Year of Completed: 2013
PUBLIC WORKS AUTHORITY ASHGHAL TOWER 3 Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: Promer Qatar Year of Completed: 2013
44
NATIONAL LIBRARY QATAR FOUNDATION Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: Brookfield Multiplex Year of Completed: 2015
QATAR AIRWAYS CREW HOUSING Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: REDCO Year of Completed: 2014
45
46
OMAN A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
47
OMAN
GUTECH UNIVERSITY, MUSCAT 2014/ BS Partitions and DIN ceilings/ 40K sqr mtrs Main Contractor: L&T
RAS AL HAMRA DEVELOPMENT, MUSCAT 2016/ DIN ceilings/ 95K sqrmtrs Main Contractor: Al Turki Enterprise
48
SARAY BANDER JISSA, MUSCAT
Ongoing/ BS ceilings, partitions and Wall linings/ 35K sqr mtrs Main Contractor: Habtoor Leighton Group
KEMPINSKI HOTEL, MUSCAT On going/ BS ceilings/ 30K sqr mtrs Main Contractor: Carillion-Alawi
BURAIMI UNIVERSITY, BURAIMI 2015/ BS partitons and ceilings/ 25K sqr mtrs Main Contractor: L&T
49
50
BAHRAIN A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
51
BAHRAIN BARAKA BANK HQ Type: Commerial System used: EN-BS Product used: Gypsum drywall & ceilings Year completed: 2014 Main Contractor: ALYUSUF Decor Location: Bahrain
52
DRAGON CITY ALMUHRAQ Type: Commerial System used: EN-BS Product used: Hat Furring EN-BS Year completed: 2015 Location: Bahrain
FOUR SEASONS HOTEL
Region – City and Country : Bahrain Systems/Products Used : Aquapanel interior walls Main Contractor : Sixo Year of Completion : 2014 53
KUWAIT A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
54
KUWAIT
MINISTRY OF EDUCATION
Type: Government System used: EN-BS /ASTM Product used: D112 & ASTM 12.7mm Year completed: 2015 Main Contractor: AlKharafi Location: Kuwait
55
SAUDI ARABIA A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
56
SAUDI ARABIA
CLOCK TOWER MECCA
One of the largest building projects in the Arab countries, the new Clock Tower at Mecca has been under construction for 18 months. It is the central building of the unique complex that forms the holiest of all Muslim sites. When finished, the 76-floor tower will be one of the largest in the world, built at a cost of USD 1.6 billion. The first shipment of Knauf building materials for this project 80,000 square meters of gypsum fiber boards were sent to the site in 2009. With a strong presence in countries across the Arab world, Knauf is ideally situated to add value to this prestigious project, offering innovative building solutions through the technical competence, logistics and consulting services and high-quality system technology of individual Knauf partners.
57
58
INDIA A PORTFOLIO OF OUR PAST & PRESENT PROJECTS
59
INDIA OBEROI ESQUIRE
Region: India Systems Used: Knauf EN- BS Partition & Ceiling Systems Main Contractor: Oberoi Realty Year Completion: on-going
RITZ CARLTON
Region: India Systems Used: Knauf ENBS & ASTM Partition, Ceilings & Shaft wall systems with 3 layers of PRO – HD Knauf Aquapanel Interior Solutions Main Contractor: Samsung Year of Completion : On-going , Expected completion 2018
60
+
SHIVANANDA ASHRAM UTTARKASHI
Knauf Systems Used: Knauf EN-BS Partition systems + Knauf Aquapanel Exterior Solutions Year: 2013
BOSCH HEADQUARTERS – BANGALORE INDIA Region: India Main Contractor: Bosch System Used: Knauf EN- BS Partition & Ceiling Systems Completion: On going , expected completion 2016
61
62
63
Knauf LLC, PO BOX 112871 Dubai, UAE Tel: +971 4 337 7170 Fax: +971 4 334 9659
Knauf RAK Plant PO BOX 50006 Ras Al Khaimah, UAE Tel: +971 7 221 5300 Fax: +971 7 221 5301
Knauf Qatar, PO BOX 27111 Doha, State of Qatar Tel: +974 4452 8191 Fax: +974 4452 8181
Website : www.knauf.ae | E-Mail : info@knauf.ae