Architecture Portfolio 2017

Page 1

marta calvinho almeida barreira botelho

chicago, tokyo, london  architecture portfolio 2017


universal design studio sou fujimoto

03 04 05 06 23 24 33 34 37 38 39

about timeline

smng-a thesis


Lisbon, PT

martabarreiracalvinho @gmail.com

hi, i’m marta calvinho. i’d love to work with you.

hobbies:

• photography • travel • @eatingarchitecture • technology/coding • cooking • internet • bike riding • lists • netflix • soccer 3


2008 2009 2010 2011 2012 BArch // Lisbon WKK Photography Cinema 4d  MArch // Chicago Teacher Assistant Travel Scholarship: Japan 4


 2013 2014 2015 2016 Roula Architects Mandarin LG Construction Thesis Project Featured SMNG-A Sou Fujimoto Universal Design Studio

5


Feb - Present ‘16

Professional 2016 work

London, UK

Universal Design Studio

In my time at UDS I have developed knowledge and sensitivity to materials and overall interior development, that only an internationally active interior studio could provide. I have assisted from pitching, to design detailing, as well as submitting a project for planning application and following through construction. I have also developed useful skills in vectorworks.

Studio renovation British Airways QIC Residential tower IBM* Nespresso* *currently unable to disclose information on these projects 6


Universal Design Studio bought a building next door and are currently expanding. I was assigned with the design, development, planning application, and overseeing construction. The GF will be two meeting rooms, FF will be studio space, 2F will be model making, 3F will be the directors studio. GF has also been used as a temporary London Design Festival space for MAP, UDS’s sister company. Construction is currently on going, set to finish end of December

1 Studio Renovation

1 Pre-construction

2 Initial Demo, bringing down original dividing wall

3 Demo of plasterboard and recovering brick wall

4 Temporary Londong Design Week exhibition

role //

• planning application • design• electrical coordinstion • RCP • construction set • furniture audit •existing/demo/proposed

software //

vectorworks • photoshop • illustrator

7


Demolition Plan Ground Floor Existing electrical cupboard + electrical head Existing radiator

Relocate existing radiator

Relocate existing radiator

Remove radiator

Relocate existing radiator

Move location of existing boiler Existing security grills 2000 B Black vinyl floor FFL +9980 FCL +13028

Existing security grills Removal of partition walls marked in red

SKYLIGHT SKYLIGHT

A 2000

Remove existing fire break glass Remove radiator A 3000

B

EXISTING LIFT

EXISTING WC

Existing shutter

3001

Wooden Stairs Up

Existing shutter

1

00_GF_Demo Plan Scale: 1:50

EXISTING WC

Toilet & sink removed Remove existing lift. Build floor per 2F.

Remove cupboard

Existing FD 30 door

Existing shower

Existing p/board wall 30 mins Fr. Existing manhole cover

Existing FD 30 door

Remove existing sink

Proposed Plan Ground Floor Notes

Revisio n -

Existing electrical cupboard + electrical head

Key.

Existing radiator Brickwork

Demolition

860

1120

Electrical + data plug EQ

600

Existing fireplace to be made good and painted w/ RAL 7022

Relocated existing radiator 600

600

600

Date

Description

Project No.43 Charlotte Roa d

Acoustic soundproof wall to be placed after LDF

Electrical + data

Relocated existing radiator

Existing fireplace Drawing Title to be made good Existing and painted w/ RAL 7022

Ground Floor De molition Plan

Consul table

EQ

EQ

Date 15/07/2016

Studwork

Status

600

Planning

Project nu mber

Drawing nu mber

Revisio n

0831

0900

/

Relocated existing radiator

Electrical + data plug, centered between two radiators

Scale 600

600 Drawn

600 Checked

1:50 @ A3

MC

RR

600

EQ Black C:50% M:0% Y:0% K:100%

© Universal Design Studio Do not sc ale fro m this drawing. All di mensions to be checked on site. Ba rber &Os gerby Studio to be notified of a ny discrepancies between theeen drawing and site Universal Design to be notified of any discrepancies betw the dra wing EQ EQ conditions. and site conditions.

360

360

To be read in conjunction with all relevant specific ations, schedules and drawings.

2200

1

4400

37– 42 C harlotte Road London E C2A 3PG + 44 (0)20 7033 3881 Poppins umbrella stand info @universald esignstu dio.com

Existing security grills

4005

FFL +9980 FCL +13028

Vitra Wooden Table

Existing security grills

600

600

600

EQ

EQ

200

EQ

600

EQ.

1041

600

600

600

600

EQ

EQ

600

600

600

EQ

New FD 30 door for access to boiler

50

EQ

821

2000 A

New FD 30 min wall to enclose the proposed new boiler location

Electrical and data plug centered to wall.

1250

Refer to flooring details drawing 1030

Vitra Wooden Table

900 ± 3717

Grey vinyl floor Forbo color 171

900

2000 B

385

STORAGE

A

New FD 30 door to meeting room, to match existing doors Entrance matting

3000 Existing shutter

Existing FD 30 wall retained with new addition wall installed

Grey vinyl floor Forbo color 171

Wooden Stairs Up

Entrance matting

B 3001

Door edges to align with each other Existing shutter

Fire break glass

- 600 x 600 x 800 cupboard - 400 x 600 x 800 cupboard - white top -frosted glass backsplash - sink

00_GF_Proposed Plan Scale: 1:50

770

2 4001 Existing door retained

EXISTING WC

Existing door retained

Existing radiator

905

1

New tea point

618

Storage unit in lift space. Rail to hang jackets + shelf for printer

Existing shower New aluminium shower door (6 series framed pivot)

660

Existing man hole cover access to be retained Vitsoe shelves

1 4003

Notes

Revisio n -

Date

Description

Project N o.4 3 C h a r lotte R oa d Drawing Title P r opos e d G r oun d F loor P la n

Key. Brickwork

Studwork

AA00

Future Asset-see furniture schedule for details

AA00

Present Asset-see furniture schedule for details

*NOTE: Soundproof wall to only be completed after LDF Electrical and data plug

Date

Status

Scale

Drawn

Checked

1 5 / 0 7/ 2 0 1 6

P la n n in g

1: 5 0 @ A3

MC

RR

To be r e a d in c on ju n ction with a ll r ele va n t s pe cific a tion s , s c h e d ule s a n d d r a win gs .

• vectorworks

Drawing nu mber

Revisio n

0831

1000

/

Black C:50% M:0% Y:0% K:100%

© U n ive r s a l De s ign S tu d io Do n ot s c a le fr o m this d r a win g. All di m e ns ion s to be c h e c k e d on s ite. B an rive ber r by Stotube otifie of a nyd dis s be n the win g aa nwing d s ite U rs& a lOs Dege s ign d ion to be dnotifie of acnr ey pa d isnccrie e pa n ctwe ies ebe tw eednr ath e dr . ditions . ac on n d dition s ite c son

software //

Project nu mber

3 7– 4 2 C h a rl ot te R oa d L on don E C 2 A 3 P G + 4 4 (0 )2 0 7 0 3 3 3 8 8 1 i nf o @ u n iver s a ld es ign s tu dio. c om

8


Meeting Room Dividing Wall Drawings TB02

EQ

30

EQ

TB02

CH02

VS01

30

700

30

700

EQ

TB02

CH02

3555 30

395

4 1500

PF

SH01

TV01

2348

2348

1900

SH01

SH01

SH01

CH01

TB01

SH01 CH01

CH01

TB01

740

15mm shadow gap at junction between walls.

TV01

260

1900 to top of TV

900

03

15

GF_Section A Scale: 1:50

3 2

2

GF_Section B Scale: 1:50

150 125 30mm MDF 15mm MDF

Midpoint of TV to align with midpoint of track

Triple glazing with noise insulation layer

Midpoint of TV to align with midpoint of wall

5 53

44

53

44 Double Glazing with aluminium spacers and noise insulation layer. Timber frame

Sealent for sound insulation

30mm MDF sill 70mm metal studs (70 S 50) at 600mm c/c. 2 layers 15mm Gyproc T/E SoundBloc fixed at centres not exceeding 300mm. with 25mm & 36mm Gyproc drywall screws 50mm Isowool 1200

15 mm shadow gap with plasterboard angle beads

3

PF 03

1

GF_RCP Scale: 1:50

Plaster rendered smooth surface.

C

C

Wooden Stairs Up

A

Notes

GF_Wall and glazing detail Scale: 1:4

4

Revisio n -

Date

Description

5

GF_glazing plan detail Scale: 1:5

Project No.43 Charlotte Road Drawing Title Proposed GF _Partition wall Date

Status

Scale

Drawn

Checked

19/07/2016

Planning

varies @ A3

JHH

RR

Project nu mber

Drawing nu mber

Revis

0831

4001

/

Black C:50% M:0% Y:0% K:100%

© Universal Design Stu dio Do not scale fro m this dra wing. All dime nsions to be checke d o n site. Barber &Osgerby to bdio e nto otifie of any discrepa ncies between the drawin g a nd site Universal Design Stu be dnotifie d of any discrepa ncies between the drawin g conditio and site ns. co ndition s. To b e re ad in conju nctio n wit h all relevant specifications, sche dule s and dra wings.

Meeting Room #2 construction

software //

vectorworks • construction

37–42 C harlotte R oad London EC 2A 3PG + 44 (0)20 7033 3881 info@ universaldesignstudio.co

Meeting Room #1 construction

9


Section Ground Floor Meeting Rooms

Meeting Room #2 finished

software //

vectorworks • construction

10


Bathroom Plan Ground Floor

Bathroom Ground Floor construction software //

vectorworks • construction

Bathroom Ground Floor finished 11


This is a project in London’s Soho neighborhood to develop a hotel that embodied the development of the neighborhood over the past 300 years. From the birth place of the plague, immigrant central to hub of London’s thriving creative force. I designed, rendered and 3D modeled the rooftop bar which is developed into different types of social spaces: bar, group booths, informal terrace, private event space- much like Soho itself which has lots of different types of spaces under one area.

1 Soho Hotel Renovation bar

retaurant

rooms

lobby basement

target users

Soho locals

Business nomads

Tourists

day or evening visit work/dine/visit

overnight stay 1-2 nights

longer stay 3-7nights

role //

• renders • conceptual design • 3D modeling • competition development • diagrams

software //

vectorworks • photoshop • indesign

12


software //

• vectorworks • photoshop

13


Courtyard bar

Rooftop bar

1 Bed and bathroom

software //

vectorworks • photoshop • illustrator

14


This was the development of British Airways Construction Manual, which will have the standards for all their future stores. There are three tiers of membership, and each space has different amenities. Bespoke furniture was designed and detailed in collaboration with Universal Design Studios sister company Barber & Osgerby.

2 British Airways

MAIN ENTRANCE

HELLO/ GOODBYE

BOH

GUEST SERVICES

WC

WC

BOH

WC

DEPARTURE BOARD

BOUTIQUE DINING

MAITRE D' STATION

CRAFT BEER PHONE BOOTH

LOCKERS

SELF SERVING STATION

CLEANING STATION

CLEANING STATION

BOH

Equipment Counter _ Printer / Fax machine

GOLD VESTIBULE

BRASSERIE

EVENT SPACE

GRAB & GO

WINE / COFFEE

LOBBY

CLEANING STATION

LOCKER

PHONE BOOTH

CLEANING STATION

CLUB VESTIBULE

ARCADE / (NEWSPAPERS)

ARCADE

OFFICE CUSTOMER SERVICE

FIRST VESTIBULE

SPA / SANCTUARY BOH

MAITRE D' STATION

CLEANING STATION

CLEANING STATION

BAR

CLEANING STATION

BAR

WC

SELF SERVING STATION

WINE ROOM

CLEANING STATION

PANTRY

BOH

MAITRE D' STATION

WC

ARCADE / (POP-UP PLAY)

CUSTOMER SERVICE

PARLOUR

BAR

CUSTOMER SERVICE

CLEANING STATION

CLEANING STATION

MAITRE D' STATION

LOCKER

MAITRE D' STATION

Self Serve Drinks and Coffee

LOCKER

WC

TOTEM

SHOWCASE

BOH

STUDY

CHEF'S TABLE

SOLITARY

SOCIAL SPACE

SELF SERVING STATION

CLEANING STATION

GIN BAR /SOLITARY

role //

• renders • drafting • construction manual

software //

• photoshop • vectorworks

15


Allowance for unswitched flat plate double power socket finish. Refer to power socket drawing for details

3 Line indicates stone direction JF 37

JF 04 JF

630

1

Stone top

Stone top

630

140

1400

4

04

Metal plate for power

JF 61

JF 04

530

3340

Steel box section (RHS) powder coated

Stone legs

530

2

Plan

Axo

Bespoke suspended light fitting. Refer to suspended light drawing for details.

JF 04

JF

Stone top and legs

13

Upholestered seat pad

40

137

137

350

690

730

12

2 JF 37

Metal skirtings detail

1

Side Elevation 1

Front Elevation 2

JF 13

Short Section 3

Short Section 4

Plan

Axo

Elevation 1

Upholestered seat pad

137

145

2

350

450 JF 37

390

137

12

2

UP 19

Metal skirtings detail

Strap

JF 37

Metal skirtings detail

50

3 1

Plan

145

2

390

vectorworks • photoshop • cinema 4d UP 19

Strap

JF 37

Metal skirtings detail

3 50

450

software //

Section 2

Axo

Elevation 1

Section 2

Detail 2

Nylon feet

Detail 3

Detail 2

Nylon feet

Detail 3

16


software //

• vectorworks • photoshop • cinema 4d

17


1

3

Plan - wall light

250

8

200

6

400

4

164

2

200

5

Plan - Free standing light

250

75 250 75

117

7

Plan - Low level light

Plan - High level built in light

Elevation 5

Elevation 7

JF 05

Elevation 1

Elevation 3

Screw fit fixing detail

Standard E14 screw fit lamp holder

Standard E14 screw fit lamp holder

JF 05

JF

JF

05

05

Internal threaded wall mounting texture

Screw fixing to wall

Stainless steel CHS

Silicon rubber non-slip glide pad

Silicon rubber non-slip glide pad to base

4

JF

Stone top

Section 4

JF

CL

33

330

Allowance for unswitched flat plate double power socket finish. Refer to power socket drawing for details

Section 2

145

33

Stone top

Power cable

Section 6

Section 8 Line indicates stone direction

1100

740

860

2

Threaded brass ferule

Screw fit fixing detail

Stainless steel CHS

Standard E14 screw fit lamp holder

JF 21

Timber

625

3

1

Plan

Front Elevation 1

Axo

Side elevation 2 Recessed shadow gap

10

10

Axo- Wall light

Axo- Free standing light

Short Section 3

Axo- Low level light

Axo- High level built in light

Long Section 4

5

JF

Stone top

740

840

33

6

Plan

software //

Short Section 6

Long Section 5

Axo

vectorworks • photoshop • cinema 4d

18


QIC requested UDS to renovate a mall in Australia. The job consisted of corridors, bathrooms, bespoke furniture stairs, and food court. worked on all these parts but for brevity have include donly the bespoke furniture. The idea was to create a module of different furniture pieces that could be configured in different ways through out the mall. The materials are colored lightweight concrete, leather and bronze.

3 QIC Mall Furniture

S

4005

900

1995

2900

3500

4100

2000

3000

3000 1975

750

4100

2005

1992.7

1992

6000

3000

4000

1400

800

4000

1230

2900

2005

4100

1100

4100

1995

SMALL LAYOUTS

4000

1100

Different configurations through out mall 1

F2-01 Scale: 1:100

2

F2-05 Scale: 1:100

7

16

F1-02 Scale: 1:100

4005

3000

3000

1000

1061.2

1100

900

2900

3

F1-05 Scale: 1:100

995

4100

F1-01 Scale: 1:100

B

5

1

Axo 2 (F1-04) 1800 Scale: 1:50

2

1

D

3

1

2

4

F1-07 Scale: 1:100

3

Axo 1 (F1-07) Scale: 1:50

A

Axo 3 (F1-09) Scale: 1:80

1

7

1

2

1

1

5

2

1

role //

• renders • design development • drafting • diagrams • 3D modeling

software //

• photoshop • indesign • vectorworks

19

2


Plans for configurations MEDIUM LAYOUTS

1100

3000

1000

1992

6000

2000

4000

1100

4100

1800 4100

5

F2-03 Scale: 1:100

6

F2-04 Scale: 1:100

7

1999.5

4100

F2-05 Scale: 1:100

1000

1000

2200

2200

4100

1800 1990

1800

B

8

F1-03 Scale: 1:100

9

Axo 2 (F1-04) Scale: 1:50

F1-04 Scale: 1:100

5

5

1

2

1

3

1

2

0

250200

200250

90

750

750

650

Pieces available

3000 1100

3000

750

900 650

1100 400

450

850

850

1100

500

900

1595

900

905

1100

3489

1905

2000

900

900

180

650

1000

400

1800

vectorworks • photoshop • illustrator 0

450

software //

20


Interior design for two residential towers in London, currently in develoment. Originally designed by Dugan Morris, and then handed to UDS for further development. The idea is that these apartments are attractive to young couples which might soon become families. There are spaces which can be transformed into yoga rooms, offices, baby rooms, etc, the idea is to provide flexibility and acompany the natural growth of a family. Materials are genuine, simple and modern.

4 Residential Tower London

role //

• conceptual design • 3D modeling • plan layout studies

software //

• photoshop • illustrator • vectorworks

21


Typical 2bed option

Bedroom

Living Room

Ceiling recessed cove down light, detail tbc Strip light integrated in kitchen unit, detail tbc

695

2400

EQ

01

EQ

EQ

EQ

EQ

950

T

EQ

EQ

P

FFL +0000.00 FCL +2700.00

900

CF

4000 EQ

1150

KITCHEN

3G

500 1075

EQ

+2700

675

900

P

01

EQ

EQ

EQ

+2500

HD

EQ

500

+2500

BATH

FFL +0000.00 FCL +2500.00

01

01

FFL +0000.00 FCL +2500.00

PF

PF

PF

350

675

FFL +0000.00 FCL +2500.00

FFL +0000.00 FCL +2500.00

700

+2700

700

700

850 350

675

SHOWER

700

350

HALL

650

850

650

LIVING/DINING

1150

FFL +0000.00 FCL +2500.00

PF

PF

01

01

EQ

SD

TERRACE

800

2150

BED 2 SD

EQ

T BED 1 FFL +0000.00 FCL +2500.00

CF

800

1075

01

* Ceiling height and finish tbc with architect EQ

1

EQ

EQ

EQ

Reflected Ceiling Plan Scale: 1:50

OPTION 1 - EXPOSED SLAB IN LIVING SPACE

Kitchen typical 2bed software //

vectorworks • photoshop • illustrator

22


seto N

Bathroom Typical 2bed- color option 1

:tnetni ngiseD ehT .ylno tnetni ngised etacidni sgniwarD .10 & stnatlusnoc tnaveler & rotcartnoc/tcetihcra evitucexe gnidliub tnerruc lla erusne ot srotcartnoc-bus ro/ , stnemeriuqer yrotutats rehto & , sdradnats , snoitaluger era stnemeriuqer droldnal dna ecitcarp fo sedoc . noitcurtsnoc & tnempoleved ngised htiw detnemelpmi ehT . etis no dekcehc eb ot snoisnemid llA .20 tuo tes lluf ecudorp ot si rotcartnoc/tcetihcra evitucexe . lavorppa SDU rof noitcurtsnoc ot roirp sgniward ,yrenioJ sehsiniF SDU htiw noitcnujnoc ni daeR .30 sedesrepus hcihw seludehcS epytotorP dna serutxiF ynA . gniward siht nihtiw deniatnoc seton yna ot roirp yletaidemmi detroper eb ot secinapercsid . deilppa gnieb sehsinif sehsinif lla fo selpmas lortnoc ylppus ot rotcartnoC .40 . lavorppa SDU rof noitcurtsnoc/tnemerucorp ot roirp lla erusne ot rotcartnoC/tcetihcra evitucexE .50 , noitaluger ot ylpmoc dna esoprup rof tif era slairetam ni stnemeriuqer yna eveihca sehsinif lla erusne dna . emalf fo daerps ecafrus dna snoitaluger erif fo smret gnithgil lla rof ofni srengiseD gnithgiL ot refeR .60 . snoitacificeps & stuoyal )E&M( lacirtcelE & lacinahceM ot refeR .70 & stuoyal E&M dna ytefas erif rof ofni s’tnatlusnoc . snoitacificeps yfsitas ot si rotcartnoc/tcetihcra evitucexe ehT .80 lla fo ytilibats larutcurts eht ot sdrager htiw sevlesmeht . noitamrofni tnetni ngised yna taht mrifnoc ot rotcartnoc/tcetihcra evitucexE .90 roolf gnitsixe rof elbatius si noitcurtsnoc/noitallatsni . noitcurtsnoc ot roirp sgnidaol llaw dna yna eerga ot si rotcartnoc/tcetihcra evitucexe ehT .01 noitcurtsnoc ot roirp tneilc/tcetihcra eht htiw snoitairav . erutcafunam/slairetam yna fo tnemerucorp ro ot eb ot erutcurts dna snoitacificeps gnizalg llA .11 eb ot sgniward pohS . sliated s’ rotcartnoc tsilaiceps . lavorppa SDU rof decudorp

T

T

T

T

50

50

50

40

LCF 0052+

FP

AHS-B

80

2-HS-B

5561

3-A-B

M-B 1-A-B

YEK

0012

5521

1 EPYT - MOOR REWOHS

)part edulcni ot( nisabhsaw dessecer-imeS

1

)etsaw edulcni ot( pat nisaB

T-B

T-B

1

yart rewohS

TS-B

1-S-B

1

daeh rewohS

2-HS-B

1

mra detnuom llaw draeh rewohS

1

lortnoc citatsomrehT

1-S-B

0052

RT-B

0012

1

M-B

2-SG-B 0052

metI

0052

0052

ytQ

T 50

2-CT-B T-B

SS-B

1-S-B FCW-B 548

088

548

AHS-B

CW-B

2-CT-B

flehs rewohS

1

neercs rewohS

1

emarf delaecnoc edulci ot( CW llaw ot kcaB )nretsic

CW-B

1

nottub hsulF

FCW-B

1

flehs a htiw rorrim elgniS

M-B

1

liar lewoT

RT-B

1

regnah lewoT

1-A-B

1

kooh rooD

3-A-B

3

3 thgil gnilieC

T

SS-B

T

004

1

TS-B

50

2-SG-B

mm077 - rood rewohs 8721

noitavelE tfeL - mooR rewohS 02:1 :elacS

noitavelE kcaB - mooR rwohS 02:1 :elacS

4

40

TS-B

0921

008

113 noitavelE thgiR - mooR rwohS 02:1 :elacS

3

LFF 00+

mm805 - lenap dexif

0041 noitavelE tnorF - mooR rewohS 02:1 :elacS

2 T

1

T

50

40

0022

T 40

1 epyT - MOOR REWOHS 2m

hsiniF FP 80

T

2m7.5 .xorppa

40

0061

50

2m9.11 .xorppa

2

2m2.6 .xorppa

T

1

T

50

4

T

3

50

:latot

T 40

2 epyT - MOOR REWOHS

/ n oit pi r c s e D

eta D

n o i si v e R FP

T

80

50

oi d u t S n g is e D l a s r e vi n U ©

T

e b o t s n o i s n e m i d ll A . g n i w a r d si h t m o rf el a c s t o n o D e b o t o i d u t S n g i s e D l a s r e v i n U . e ti s n o d e k c e h c g n i w a r d e h t n e e w t e b s e i c n a p e r c s i d y n a f o d e i fi t o n . s n oiti d n o c e ti s d n a

50

nalP - mooR rewohS 02:1 :elacS

t n a v e l e r l l a h t i w n o i t c n u j n o c n i d a e r e b oT . s g ni w a r d d n a s e l u d e h c s , s n oit a cifi c e p s

5

0012

t c ej or P 3 0 . 8 1 al u s n in e P h ci w n e er G e l t iT g n i w a r D d e s o p or P 2 e p yT 0 2 T P m o o r r e w o h S eta D 61 02/90/70

nwarD

e la c S

GS

SA

0 A @ 0 2:1

n o i si v e R

g niw a r D reb m un

t c ej or P reb m un

/ 111 4 - 0 2 A

2280

0061

s uta tS t n etnI n g is e D d e kc eh C

FC 50

2 weiV - mooR rewohS

1 weiV - mooR rewohS

8

PCR - mooR rewohS 02:1 :elacS

7

6

kcalB %001:K %0:Y %0:M %05:C

d a o R e tt o lr a h C 2 4 – 7 3 G P3 A2 C E nodnoL 1 8 8 3 3 3 0 7 0 2 )0 ( 4 4 + m o c.oi d u ts n gis e dla s r e vin u @ o fni

Kitchen Typical 2bed Key

BASE CABINETS +2 800 AFFL

+2 500 AFFL

PF 04

751

2400

K-BC-600AT

K-WC-1

K-BC-600TO

K-A-CH

K-R

K-WT-1

05

K-WT-1

K-A-H

K-A-O

K-S K-A-F

K-A-O K-WT-1

05

K-WT-1

K-BC-800D-S

K-WC-1 K-R

K-A-F

K-WT-1

K-SB-1 K-WC-1

40

K-R

K-BC-600D K-BC-600D

K-BC-600S

K-BC-600D K-BC-600H

K-BC-600DW

K-BC-600S

K-BC-600H

K-BC-600DR

K-T K-T K-S K-S

60

60

3 Elevation B Scale: 1:20

K-A-O K-A-O K-A-O K-A-H K-A-H K-A-H K-A-H K-A-CH K-A-CH K-A-CH K-A-CH K-A-CH K-A-F K-A-F K-A-F K-A-F K-A-DW K-A-DW K-A-DW

4

Elevation B Scale: 1:20

4

600(w) x 650(d) x 800(h) Base cabinet for Hob 600(w) x 650(d) x 800(h) Base cabinet for Dishwasher

Wall Cabinet See drawing for dimensions

Worktop See drawing for dimensions Rail See drawing for dimensions

Tap Sink

N otes BASE CABINETS Base Units Fronts finish Matt White K-BC-600T Design intent: K-BC-600T 600(w) x 650(d) x 2000(h) K-BC-600TF Tall Base Cabinet for Fridge K-BC-600TF 01. Drawings indicate design intent only. The K-BC-600TO K-BC-600TF executive architect/contractor & relevant consultants & 600(w) x 650(d) x 2000(h) K-BC-600TO K-BC-600AT /or sub-contractors to ensure all current building Tall Base Cabinet for Oven K-BC-600TO K-BC-600AT regulations, standards, & other statutory requirements , K-BC-800D 600(w) x 650(d) x 400(h) K-BC-600AT codes of practice and landlord requirements are K-BC-600D Above Tall Cabinet K-BC-1200D implemented with design development & construction. K-BC-600D K-BC-600DR 02. All dimensions to be checked on site. The 600(w) x 650(d) x 800(h) K-BC-600DR K-BC-800D executive architect/contractor is to produce full set out K-BC-800DR Base cabinet with Drawers K-BC-800DR drawings prior to construction for UDS approval. K-BC-600S 600(w) x 650(d) x 800(h) K-BC-600S 03. Read in conjunction with UDS Finishes Joinery, K-BC-600S Base cabinet for Sink Fixtures and Prototype Schedules which supersedes K-BC-800S K-BC-800S any notes contained within this drawing. Any K-BC-600H 600(w) x 650(d) x 800(h) K-BC-600H K-BC-600H discrepanices to be reported immediately prior to Base cabinet for Hob K-BC-800H K-BC-800H finishes being applied. 04. Contractor to supply control samples of all finishes 600(w) x 650(d) x 800(h) K-BC-600DW K-BC-600DW prior to procurement/construction for UDS approval. Base cabinet for Dishwasher 05. Executive architect/Contractor to ensure all K-BC-800D-S materials are fit for purpose and comply to regulation, and ensure all finishesWALL achieve CABINETS any requirements: in Wall Cabinets and Accessories PLY/BAMBOO terms of fire regulations and surface spread of flame. Wall Cabinet K-WC-1 06. Refer to Lighting Designers info for all lighting See drawing for dimensions layouts & specifications . K-R 07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & and Splashbacks HIMACS specifications. WORKTOPS : CONCRETE/ Worktops 08. The executive architect/contractor is to satisfy K-WT-1 Worktop themselves with regards to the structural stability of all See drawing for dimensions K-SB-1 K-WC-1 design intent information. 09. Executive architect/contractor to confirm that any Rail K-R installation/construction is suitable for existing floor See drawing for dimensions and wall loadings prior to construction. 10. The executive architect/contractor is to agree any K-A-DWand Brassware Sanitary variations with the architect/client prior to construction or procurement of any materials/manufacture . Tap K-T K-T 11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be K-S K-S Sink produced for UDS approval.

N otes Design intent: 01. Drawings indicate design intent only. The executive architect/contractor & relevant consultants & /or sub-contractors to ensure all current building regulations, standards, & other statutory requirements , codes of practice and landlord requirements are implemented with design development & construction. 02. All dimensions to be checked on site. The executive architect/contractor is to produce full set out drawings prior to construction for UDS approval. 03. Read in conjunction with UDS Finishes Joinery, Fixtures and Prototype Schedules which supersedes any notes contained within this drawing. Any discrepanices to be reported immediately prior to finishes being applied. 04. Contractor to supply control samples of all finishes prior to procurement/construction for UDS approval. 05. Executive architect/Contractor to ensure all materials are fit for purpose and comply to regulation, and ensure all finishes achieve any requirements in terms of fire regulations and surface spread of flame. 06. Refer to Lighting Designers info for all lighting layouts & specifications . 07. Refer to Mechanical & Electrical (M&E) consultant’s info for fire safety and M&E layouts & specifications. 08. The executive architect/contractor is to satisfy themselves with regards to the structural stability of all design intent information. 09. Executive architect/contractor to confirm that any installation/construction is suitable for existing floor and wall loadings prior to construction. 10. The executive architect/contractor is to agree any variations with the architect/client prior to construction or procurement of any materials/manufacture . 11. All glazing specifications and structure to be to specialist contractor’s details. Shop drawings to be produced for UDS approval.

Appliances

Appliances

60

Elevation A Scale: 1:20

Elevation A Scale: 1:20

600(w) x 650(d) x 800(h) Base cabinet with Drawers 600(w) x 650(d) x 800(h) Base cabinet for Sink

K-A-DWand Brassware Sanitary

800

800 60

3

K-BC-600DW K-A-DW

K-A-DW FFL

FFL

K-BC-600D

K-BC-600DR

800

K-BC-600D

800

K-BC-600D

600(w) x 650(d) x 2000(h) Tall Base Cabinet for Oven 600(w) x 650(d) x 400(h) Above Tall Cabinet

and Splashbacks WORKTOPS : CONCRETE/ Worktops HIMACS

K-A-H

40

560

K-WT-1

PF

K-BC-600TF

600(w) x 650(d) x 2000(h) Tall Base Cabinet for Fridge

Wall Cabinets and Accessories WALL CABINETS : PLY/BAMBOO

K-T

560

K-R K-T K-WT-1 K-S

K-A-CH

K-BC-600TF

K-BC-600T K-BC-600T K-BC-600TF K-BC-600TF K-BC-600TO K-BC-600TF K-BC-600TO K-BC-600AT K-BC-600TO K-BC-600AT K-BC-800D K-BC-600AT K-BC-600D K-BC-1200D K-BC-600D K-BC-600DR K-BC-600DR K-BC-800D K-BC-800DR K-BC-800DR K-BC-600S K-BC-600S K-BC-600S K-BC-800S K-BC-800S K-BC-600H K-BC-600H K-BC-600H

K-BC-800H K-BC-800H K-BC-600DW K-BC-600DW

1200

K-BC-600TO

PF

600

600

K-WC-1

600

2400

K-BC-600AT

600

K-BC-600AT

400

751

600

04

K-BC-600AT

1200

PF

600

+2 500 AFFL

400

+2 800 AFFL

Key Base Units Fronts finish Matt White

K-A-O K-A-O K-A-O K-A-H K-A-H K-A-H K-A-H K-A-CH K-A-CH K-A-CH K-A-CH K-A-CH K-A-F K-A-F K-A-F K-A-F K-A-DW K-A-DW K-A-DW

Oven Hob Cooker Hood Fridge Dishwasher

Oven Hob Cooker Hood Fridge Dishwasher

K-T

K-T

3751 3751 151 600

600

600

K-BC-600D

K-BC-600D

600

600

K-BC-600DW

K-BC-600H

K-A-DW

K-A-H

600

600

600

600

600

600

600

600

600

650

390 650

K-BC-600S

K-S

K-BC-600D K-BC-600AT

K-BC-600D K-BC-600AT

K-BC-600TO

K-S K-BC-600TF

K-A-O

K-A-F

K-BC-600DR

600

K-BC-600AT

K-BC-600AT

K-BC-600DW

K-BC-600H

K-BC-600DR

K-BC-600TO

K-BC-600TF

K-A-DW

K-A-H

K-A-O

K-A-F

600

390

151

K-BC-600S

B

A

A

1450

1450

B

420

/

420

/ R evision

Plan Scale: 1:20

1

Plan Scale: 1:20

1

Reflected Ceiling Plan Scale: 1:20

2

R evision

Reflected Ceiling Plan Scale: 1:20

2

D ate

D o not scale fro m this dra wing. All dim ension s to be ch ecked on site. Universal D esig n Stu dio to be notified of any discrep ancies b etw een th e dra wing and site con ditio ns.

950

650

CUT OUT FOR SINK

665

560

CUT OUT FOR HOB

950

665

560

To be rea d in co njunction with all releva nt sp ecificatio ns, sched ules a nd dra win gs.

620

620

D o not scale fro m this dra wing. All dim ension s to be ch ecked on site. Universal D esig n Stu dio to be notified of any discrep ancies b etw een th e dra wing and site con ditio ns. To be rea d in co njunction with all releva nt sp ecificatio ns, sched ules a nd dra win gs.

Project G re en wich P eninsula 18.03

Project Gre en wich P eninsula 18.03

CUT OUT FOR HOB

CUT OUT FOR SINK

650

956

956

Dra wing Title Pro pose d 2be d Kitche n Typ e 1

Dra wing Title Pro pose d 2be d Kitche n Typ e 1

D ate

18

5

software //

Work top Scale: 1:20

• vectorworks

40

40

D esign Inte nt Dra wn

C he cke d

1:2 0 @ 18 A 1

LD

SG

Project nu m ber

Dra wing nu m ber

R evision

0822

A03-4200 /

UPSTAND ALONG EDGE

420 UPSTAND ALONG EDGE

5

Status

12/07/20 16 Scale

Status

12/07/20 16

D esign Inte nt

Scale

Dra wn

C he cke d

1:2 0 @ A 1

LD

SG

Project nu m ber

Dra wing nu m ber

R evision

0822

A03-4200 /

40

40

50

50

1465

1465

D ate

420

D escriptio n

© U niversal D e sign Studio © U niversal D e sign Studio

3751 3751

D ate

D escriptio n

Black C:50% M:0% Y:0% K:100% Black C:50% M:0% Y:0% K:100%

Work top Scale: 1:20

6

Edge detail Scale: 1:5

7

Upstand detail Scale: 1:5

6

Edge detail Scale: 1:5

7

Upstand detail Scale: 1:5

37–42 Charlotte Road London EC2A 3P G + 44 (0)20 7033 3881 info@ universaldesignstudio.com

37–42 Charlotte Road London EC2A 3P G + 44 (0)20 7033 3881 info@ universaldesignstudio.com

23


Sep - Dec ‘15

Professional 2016 work

London, UK

Sou Fujimoto

My time in Japan taught me many lessons, one of them being to not be afraid to think outside the box, but also to produce many iterations for the same concept. My diagrams, conceptual thinking, renderings and illustrator skills were greatly improved. My patience and dedication to architecture were greatly tested with the 14 hour, 7 day, work days.

Hokkaido Bridge Switzerland Canopy Chiba Townhall Paris Student Housing

24


This is a project for Sou Fujimoto’s hometown, Hokkaido. He was asked to design an emblematic bridge for the town. The concept draws on Hokkaido’s famous hills for inspiration, creating a weaving passage through different colored flora, resulting in a ‘floating forest’.

1 Hokkaido bridge

role //

• renders • study models • presentation model • conceptual design • 3D modeling • competition • development • diagrams

software //

rhino • photoshop • illustrator

25


The requirement for this competition was to develop a canopy for the train station of Bulle, that was both iconic and relevant to the city. The project was born through an analysis of the typical arched bridges of Switzerland. The arch was inverted to bring views of the mountains into the station.

2 Switzerland Canopy

role //

• renders • study models • presentation model • conceptual design • 3D modeling • competition • development • diagrams

software //

• photoshop • illustrator • rhino

26


Competition for a town hall in Chiba, the south of Japan, a city surrounded by mountains. The concept is to bring to life the surrounding mountains, through the flow of the white roof. The space doubles both as a town hall and a community center. It is largely transparent to help bring the outside-inside and to allow flexibility of use.

3 Chibba Townhall

role //

• renders • study models • presentation model • conceptual design • 3D modeling • competition • development • diagrams

software //

rhino • photoshop • illustrator

27


28


theater meeting

common

classes

15_まちと公民館を繋ぐ縁側のようなエントランス

まちの中庭

tools//

x-acto • ruler • patience

エントランス

まちの広場

29


Paris 13 is a district of Paris that has undergone intense renovation in the last years. For this student housing since the internal program space was small we focused on bringing the facade to life. The idea is these “dancing balconies” that create pockets of social interaction

4 Paris Student Housing

role //

• renders • study models • presentation model • conceptual design • 3D modeling • competition • development • diagrams

software //

• photoshop • illustrator • rhino

30


2.98

2.50

1

Longitudinal Section

Roof

Level 12

Level 11

Level 10

Level 9

31

37.1

Level 8

Level 7

Level 6

Level 5

Level 4

Level 3

4.2

Level 2

Level 1

software //

photoshop • illustrator • rhino

31


Shapes Catalog

software //

photoshop • illustrator

32


Axon

PA RV IS T4 PR O M EN AD E PL AN TE E

PA SS AG E

software //

photoshop • illustrator • rhino

33


Jun ‘14 - Jun ‘ 15

Professional 2016 work

Chicago, US

SMNG-A

Smng-a was my first job out of architecture school and it was a good introduction to the field, I worked on a complete set of drawings for a Chicago Public school. I focused a lot on drawing standards being in charge of elevations and plans. I also did a lot of spec control and electrical coordination.

Chicago Public School Kiosk Chicago Biennial

34


SMNG-A has been the Chicago public school architect of record for the last five years. In 2014 Chicago went through massive public spending cuts which reflect their tolerance for spending in architecture. SMNG-A was chosen to design this school as a guide line for the next phase of public school building. This project is currently in construction, set to open summer 2016.

1 Chicago Public School

role //

• renders • interior elevations • construction drawings • RCP • submittals • materials • finish plans • electrical coordination

software //

rhino • photoshop • illustrator

35


Material Development ACCENT WALL COLORS SCHEME

ACCENT WALLS

PT3

VINYL TILE FLOOR

- SECOND FLOOR

PT4

PT5

PT6

VT1

VT2

VT3

Interior Elevations

36


SMNG-A has been the Chicago public school architect of record for the last five years. In 2014 Chicago went through massive public spending cuts which reflect their tolerance for spending in architecture. SMNG-A was chosen to design this school as a guide line for the next phase of public school building. This project is currently in construction, set to open summer 2016.

2 Kiosk Chicago Biennial

role //

conceptual design • 3D modeling • competition • development • diagrams

software //

• revit • photoshop • illustrator

37


Jun ‘14 - Jun ‘ 15

Professional 2016 work

Chicago, US

Thesis

Louis Sullivan once said: “Chicago is young, clumsy, foolish, its architectural sins are unstable, captious and fleeting; it can pull itself down and rebuild itself in a generation, if it will…There can be no new New York, but there may be a new Chicago.”

38


As an European I found the empty American concrete plazas heart breaking. I sought to bring life to them. The outcome are these modular transparent teardrop shapes that are combined to inject the plazas with program. The programs ranged from libraries, food pods, greenhouses, water collectors, public pools, rock climbing, and aquariums.

1 Activating Public Space

software //

rhino • photoshop • illustrator • plastic vacuum forming • autocad

39



thank you,

 mabbc


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.