DESIGN FOR DISCOVERY

Next Article
DESIGN FOR ECONOMY

DESIGN FOR ECONOMY

COTE MEASURE 10 - DISCOVERY

DESIGN FOR DISCOVERY ANALYSIS

Advertisement

There were multiple post occupancy studies done in order to evaluate the building process and provide insight to the users and design industry at large.

Multiple studies were conducted to interact with the users and understand their experience, including: contacting the owner after occupancy, comparing utility bills to design predictions, and testing the actual daylighting and air quality of the building.

It was important to the design process as well to share post occupancy findings with the owner, but also the design industry at large to help in the furtherance of sustainable design. Outcomes and lessons were compiled and presented to the industry, as well as published for the general public.

Calculators: Enter your values into the yellow cells. Enter non-numerical data into the green cells

1 - Level of Commissioning

Which of the following did you do to stay engaged with the building?

Basic Commissioning Yes Continuous Commissioning Yes Enclosure Commissioning Yes

Commissioning Score 60%

Enhanced Commissioning (Third Party) No Monitoring-Based Commissioning No

2 - Level of Post Occupancy Engagement

Which of the following did you do to stay engaged with the building?

Contact the owner / Occupant to see how things are going Yes Obtain utility bill to determine actual performance Yes Survey building occupants on satisfaction Yes Formal onsite daylight measurements Yes Share collected data with building occupants Yes

Post Occupancy Evaluation Score 90%

Formal post occupancy air quality testing Yes Data logging of indoor environmental measurements No Post occupancy energy analysis Yes Develop and share strategies to improve the building's Performance Yes Teach occupants and operators how to improve building performance Yes

3 - Level of Transparency

Which of the following did you do to share the lessons of the project?

Present the design of the project to the office Yes Present the design of the project to the profession Yes Present the design of the project to the public No Publish post occupancy data from the building Yes other: No

Transparency Score 60%

Present outcomes and lessons learned to the office Yes Present outcomes and lessons learned to the profession Yes Present outcomes and lessons learned to the public No Publish any lessons learned from design, construction, or occupancy Yes other: No

4 - Level of Occupant Feedback

Who has access to performance feedback?

Choose one Occupants who specifically request it

Feedback Score 60%