Federal Way Elementary School project consists of three schools - Lake Grove, Wildwood and Mirror Lake Elementary Schools.
The schools are based on the similar floor plans to conserve the budget.
School Field- Perspective
B. Federal Way Wildwood Elementary School
Project Site: Federal Way, WA
Client: Federal Way School District
Responsibility: Job Captain
Federal Way Elementary School project consists of three schools - Lake Grove, Wildwood and Mirror Lake Elementary Schools.
The schools are based on the similar floor plans to conserve the budget.
Main Entrance - Perspective from North-East
C. Federal Way Mirror Lake Elementary School
Project Site: Federal Way, WA
Client: Federal Way School District
Responsibility: Job Captain
Federal Way Elementary School project consists of three schools - Lake Grove, Wildwood and Mirror Lake Elementary Schools.
The schools are based on the similar floor plans to conserve the budget.
01. Dolores Affordable Housing
Project Site: Hillsboro, OR
Client: Hacienda CDC
Role: Job Captain
I worked for the project from DD through CD phases. This project became my first project at Access Architecture. My main role was coordination with client, consultants, and developping the designs and details. I have drafted all the details shown here.
02. East Pierce Fire and Rescue Headquarter Station 111
Project Site: East Pierce County, WA
Client: East Pierce Fire and Rescue
Role: Job Captain
I worked for the project from DD through CD phases under employment of Rice Fergus Miller Architecture. My main role was coordination with client, consultants, and developping the designs and details. I have drafted all the details shown here.
03. First Interstate Center for the Art
Renovation
First Interstate Center for the Art was originally design for the The Expo ‘74 in Spokane, WA by WMFL, the former company of Integrus Architecture.
Most of the interior finish, mechanical & systems were intact as the original condition.
This 22 million-dollars project aimed to revitalize one the most prominent symbols in Downtown of Spokane.
The focus of this renovation included Lobby, Rehearsal Room, curtain walls and roofs.
I was a project architect for this project from SD to CA.
I was in charge of most of the drawing production, presentation, code compliances, also worked for CA & consultant coordination.
Reception Room
This room used to be used as a rehearsal room. Since the construction in early 70’s, the interior finishes were not up to date. The room was entirely repurposed to welcome guests who come in earlier for shows. The bar and lounge were furnished to relax while listening music.
Reception
Enlarged Bar Plan
Reception Room
This room used to be utilized as a rehearsal room. Since the construction in early 70’s, the interior finishes were not up to date. The room was entirely refurbished to welcome guests who come in earlier for shows. The bar and lounge were designed to relax while listening music.
To inherit the spirit of the original Mid-Century Modern design, we have used ply wood and wood slats to finish the ceiling and walls. The stain of wood slats matches with the original finger-jointed wood slat in Auditorium ceiling.
The bar countertop is finished with illuminated translucent resin panel. The ceiling also has coved lights at the perimeter of the walls. For the users relaxation and enjoyable time, we have pursued enriched space, yet succeeded the spirit of mid-century modern. South Elevation - Entry & Lounge, NTS
The room to welcome guests who come in earlier for shows. have used and wood slats to walls. wood slat in ceiling riched space, yet the
Perspective from Grand Stair
Perspective from Grand Stair
Room
04. Grace Peck Terrace Renovation
Project Site: Portland, OR
Client: East Home Forward
Role: Job Captain / Project Architect
I worked for the project from DD through CD phases under employment of Studio Petretti. My main role was coordination with client, consultants, and developping the designs and details. For CA phase, I started to work as Project Architect. I have drafted all the details shown here.