Masataka Beppu | Portfolio
01. Dolores A ordable Housing
Project Site: Hillsboro, OR
Client: Hacienda CDC
Responsibility: Job Captain
I worked for the project from DD through CD phases. This project became my rst project at Access Architecture. My main role was coordination with client, consultants, and developping the designs and details. I have drafted all the details shown here.
02. Claudia’s Place Permanent Supportive Housing
Project Site: Vancouver WA
Client: Vancouver Housing Authority
Responsibility: Projet Architect during Shematic Design phase
Number of Type A Accessible Units; 4
Number of Type B Accessible Units; 35
03. Villa Maria
Project Site: Lake Oswego, OR
Client: Marylhurst University
Responsibility: Job Captain during Construction Document phase Program; Dormitory for guest faculties
04. Grace Peck Terrace Renovation
Project Site: Portland, OR
Client: Home Forward
Responsibility: Job Captain during Design Development and Construction Document phases
Project Architect during Construction Administration phase
Program: A ordable Housing
05. Alberta Alive - 510 NE Alberta St.
Project Site: Portland, OR
Client: Community Development Partners
Responsibility: Job Captain during Construction Document phase
06. Alberta Alive - 780 NE Alberta St.
Project Site: Portland, OR
Client: Community Development Partners
Responsibility: Job Captain during Construction Document phase