1 minute read

RENOVATION | CATH / EP LAB

With the addition of a new acclaimed electrophysiologist, and a projected doubling of cardiology volumes in 6 months, MMA moved quickly with a 3 week effort to design and price an expansive PCI program in renovated space to meet the Owner’s CON filing expectations. This project was the first component in a newly launched cardiology service line encompassing over 31,000 square feet.

“The Project team exceeded our expectations”. David Bailey, MSN, RN, MBA , Service Line Director

3 Week CON Design and Filing for $4.7 Million Cardiology Program

MMA is skilled at designing technologically complex environments in antiquated space. Accommodating new Phillips Allura bi-plane systems, with overhead rolling weights that of a small car , in low 12 foot floor to floor heights with insufficient structural capacity to carry the load is MMA’s specialty. The final design is not perceived as a renovation at all but instead appropriately as a flagship service line of the hospital. MMA, with its history of accomplishing tech - nically challenging initiatives, had to assure the Owner in the first 2 weeks of the engagement that the new technologies would work in their 1966 era building. Going beyond just meeting the demanding parameters of this project, MMA also showed Hospital Leadership how non-invasive diagnostics could be connected the labs and to the Emergency Department below.

This article is from: