1 minute read

REPLACEMENT ACUTE CARE HOSPITAL

LEAN Critical Access Hospital

Maximizing clinical efficiency while providing the latest in ‘Evidence Based Patient Centered Design’ under HUD 242 financing is a challenge.

Greensboro’s new access hospital is super efficient, beats national and current CAH models, and incorporates all key patient / customer and staff satisfiers. Each clinical care pathway was LEAN evaluated based on a lowest level third shift cross-trained staff compliment being able to provide as much care as humanly possible in error free and safe environments.

Aside from conforming to all emerging waste reduction and cost containment mandates for healthcare, sustainable features include healing gardens, rooftop terraces, daylight introduced into the building’s core and around which key patient services emanate, energy efficient energy plant technologies, etc. The facility is also configured for growth.

Mri

Maximizing clinical efficiency while providing the latest in ‘Evidence Based Patient Centered Design’ under HUD 242 financing is a challenge.

Greensboro’s new access hospital is super efficient, beats national and current CAH models, and incorporates all key patient / customer and staff satisfiers. Each clinical care pathway was LEAN evaluated based on a lowest level third shift cross-trained staff compliment being able to provide as much care as humanly possible in error free and safe environments.

Aside from conforming to all emerging waste reduction and cost containment mandates for healthcare, sustainable features include healing gardens, rooftop terraces, daylight introduced into the building’s core and

This article is from: