1 minute read
DESIGN & CONSTRUCTION OBJECTIVE
from INTEGRATED PROJECT DELIVERY SYSTEM (IPD) utilizing DESIGN for MANUFACTURING & ASSEMBLY (DfMA) -2
Since our first clinic assembly nearly five years ago MMA has come a long way with our IPD & DfMA process. We are now designing, assembling, and building 100,000+ sf central prescription, prescription mail order and specialty fulfillment facilities, as well as projects in optometry, vision, and swipe-up branding programs nationwide. MMA developed a premanufactured swipe up brand prototype, allowing for several hundred linear feet of branding work to be completed within 1-3 days at each site. The work was done during non-operational store hours so not to impact store operations.
CVS is growing organically and by acquiring new entities, MMA can refurbish existing locations and bring your new ventures to market quickly. MMA worked with Oak Street Health on three clinics in the Dallas & Fort Worth area and we were instrumental in helping to bring their clinics to market in record time. Everything from the ceiling grid down to the floor was completed in roughly 12 days, including all walls, finished floors, electrical, plumbing, casework and all medical equipment and furnishings. These were some of the fastest clinics MMA has designed, assembled, and built to date.