P R T F L
matteo de francesco
2020
architect
m a t t e o
d e
f r a n c e s c o
June 7th 1990, Rome, Italy matteodefancesco1@gmail.com IT +39 329 28 25 152
WORK EXPERIENCES L G S M A - I A N + - ARCHITECTURE
B H + - architecture
architect - interior architect Rome, italy
assistant architect Bruxelles, Belgium
N C B H A M - ARCHITECTURE
S H S H - ARCHITECTURE + SCENOGRAPHY
architect - interior architect Bruxelles, Belgium
assistant architect Bruxelles, Belgium
EDUCATION
2020 2010 - 2016
2012 - 2013
Autodesk Revit 100h gopillar academy Master Degree in Architecture magna Graduation January 2016 I.U.A.V Erasmus exchange programme (1yr) Facultade de Arquitecture da Universidade Tecnica de Lisboa
RELEVANT EXPERIENCES Co-founder of ETEROTOPIA collective http://www.eterotopia.net Workshop Organiser - La maddalena Sardinia - Italy http://www.eterotopia.net NON plus ultra - installation at belgian pavillion Biennale di architettura di Venezia - italy
SKILLS AND LANGUAGES Photoshop
Autocad
Revit
Italian - native
InDesign
Sketchup
Model-making
English - advanced
Illustrator
Rhino
Archicad
French - good
Premiere
Cinema 4D + V
Vector works - basic
Portuguese - basic
CONTENTS T W EED
01
UP TOW N
02
N ON P LUS ULT R A
03
UP TOW N
04
T HE BR A INE
05
OP HE M
06
01 TWEED working collaboration - NCBHAM
Bruxelles, Belgium - 2020
TWEED is the arrangement of two very different types of offices - the client, was looking for both the traditional and new N-WOW office concept. • • •
1 reception, 2 cafeterias an outdoor cafeteria
plan level 0
10
reception hall
Common area main cafeteria
11
02
LORENTEGGIO LIBRARY
II place - architectural competition - Milan municipality working collaboration _ BAN
Milan, Italy - 2018
The new library is a nude structure; Not iconic and permeable, where spaces are flexible and transformable through the furnishings. A strong relation with the context, completely traversable and transparent; A brutal and flexible object: fluid and open space where everything is moving. The library is an experiential space; The grid is a neutral space ready to be modified.
masterplan
14
first floor plan external main view
15
16
detail section distribution scheme
17
18
internal view
19
03
NON PLUS ULTRA
Spatial installation at the belgian Pavillion EUROTOPIE - Traumnovelle 16th international architecture exhibition of La Biennale di Venezia
Venice, Italy - 2018
Mythology says that Hercules, in one of the 12 labours, built two columns at the Strait of Gibraltar to mark the edge of the known world. Non plus ultra was what the ancients wrote over them, as a warning for sailors to go beyond, but also for monsters to come through. Today Europe comes at a critical stage, alternating social media agitation and vacant civic spaces, materialising a barrier of emptiness which forbids people to discuss face to face the sorts of our present. The column embeds an obstacle which corrupts the practice of interaction; it’s a disturbing element that reveal the importance of this civic space through a condition of crisis. The alteration of the space raises a critic toward the distortion of collective confrontation and the precarity of individual political commitment. 20
event poster
22
axonometry
view of the main entrance internal view
23
24
25
04 UPTOWN Working collaboration _ BH+
Zaventem, Belgium - 2019
The development and study of the urban area in the vicinity of Brussels International Airport of Zaventem. A business campus in the heart of Europe. An open, green encironment were employees can live, work and meet in bot a formal and informal way. credentials: - Urban strategy - Faรงade study - Schemes
GYM
main view from te street
28
29
30
solution scheme
first cluster zoom wiew from the park
31
05
THE braine
working collaboration - NCBHAM
la Hulpe, Belgium - 2020
THE brain is a design project
restaurant and interior
It consists of 3 main areas: two restaurants with counters and seating areas, and a passage area with take away restaurants. custom made furniture and counters have been custom designed respecting technical rules of equipment while maintaining a clean design.
main plan
16
15
17
18
19
20
LÉGENDE:
21
Zone Hors projet Limité projet
C
14
Béton
Armoire pour lance d 1379
15
L
b.
N.A
E3
M
LOCAL DÉCHETS
+0.00 -0.10
3
4
SANITAIRES FEMMES
E3
9 18
B
744
Hsfp: +6,05m
LAVERIE
F 282
7
10
2200 204
6 259
182
10
P
Paillasson 4.81 146m²
11
Q
13
0 668 Nouveau sol en PU: 53.66 m² Pose sur PU existant +0.00 -0.10
R
0
220
12
7.0
110 210 110 267
6
O
9
.4
28
:1
33
couverts & micro-ondes
Puits contrôle
380 1
6
chauds vitrine réfrigéré
25
10
2 x borne de paiement
11
Ventilation V.V.
Ventilation V.V.
Indice
Ventilation V.V.
16
559
17 Nouveau sol en PU renforcé: 12 m² Pose sur carrelage
18
19
20
21
406
969
Date
800
34
9
S
Puits contrôle
Ventilation V.V.
plonge
simple + wok
COMPTOIR E
26
62
82
recup.
Hsfp: +2,62m Hsp: +3,10m
1
16
3
33
127.50
tes
sie
as
16
9
27
41
38
31
00
b.
N.A
7
ntrô
6
128.
s
ds
9
tapa
53
au ch e oir fé ca arm gere refri
es
du
tte
9
8
co
5 4
S
0
table
38
1
Pu
Ventilation V.V.
en
Ventilation V.V.
1
Ventilation V.V.
7
43 le
ntrô
3
en
28
es
2 x borne de paiement
16
its
co
50
s
sp
on
su
lad
18
66
43
le
its
erts
uv
co
14 9
21
-0.02
31
1 51
12
C
ZONE FREE-FLOW
71
8
52
+0.00 -0.10
Paillasson 9.03 m²
95
o
iss
B
sa
+0.00 -0.10
Nouveau sol en PU: 86.91 m² Pose sur carrelage
E2
10
Pu
TV
IR
9
39
,35m
4
31
122
0
E5
E6
4
ZONE RESTAURANT
0
TO
7
+2
40
fp:
+0.00 -0.10
G
H
tte
IR
TO
+0.00 -0.10 4
10
0
MP
Hs
5
29
Nouveau sol en PU: 63.36 m² Pose sur PU existant
0 11
MP
,10m &m
E1
0
CO
+6
70
6
27
erts
11
7.0
ds
au
ch
fp:
s
de
o-on
icr
co
R
tablette
H.S
+0.00 -0.10
.0
28
l :1
.C
328
0
65
CO
186
Nouveau sol en PU: 155.80 m² Pose sur PU existant
0
0
.2
27
:1
33
COMPTOIR D
table
ds
au
ch s
on
iss
bo
uv
8
F
e iqu s ram ce mitte ar ro vit ur m e po soup
Hs
636
7 11 19
E
91 1
E4
515
ds
au
ch
105
COMPTOIR E 326
chauds
0
9
0 11
18
Q
chauds
boissons
30
49
endu
0
24
697
55 0
25
+0.00 -0.10
E3
+0.00 -0.10
chauffe assiettes nouveau en option
18
6
TV susp
364
6
27
98
21
E4
40 10
27
caisse
01
Nouveau sol en PU: 175.39 m² Pose sur PU existant
90
ffe au ttes ch sie u as uvea n no optio en
0 11
ab
bo
6
18
825
12
1
80
56
13
10
0
56.16 m² Pose sur des carreaux existants
16
1
12
CUISINE FROIDE
boissons table preparation
1
ZONE CAFÉ
0
E4
9
E1
sandwiches
23
1
22
8
E1
COMPTOIR A
desserts
2x
0
,65m
31
+2 ca
1
5
27
fp:
CHAMBRE FROIDE
fé
86
13 I
chauds
7 23Nouveau sol en PU renforcé:
9
E3
lav
5
3
23
Hs
1
E2
SANITAIRES HOMMES
salades
20
P
COULOIR
E1 6
5
E1
8 36 188
1
17 0
E1
20
o 8 25 lavab
38
H
0
E2
CUISINE CHAUDE
7
SERVICE armoire refrigeré0
O
+0.00 -0.10
protection du bouton d'arrêt d'urgence
84
36
90
31
32
5
Paillasson 4.74 m²
3
E2
21
27
11
DÉBARRASSAGE
2
E2
RESERVE FOOD
SAS
b.
N.A
.9
26
:1
l.
.C
H.S
0
12
M
N
e
iss
ca
rre
80
4
E2
2
E1
1 E1
76
N.A
0
0
.1
26
:1
bie
92
BUREAU
3
6
14
G
E2
E2 4
E1
E1
Nouveau sol en PU: 44.82 m² 3 Pose sur PU existant 35
141
E3
N
8
KOT
4
5
SANITAIRES FEMMES
18
b.
18
CHAMBRE FROIDE POSITIVE
DÉGAGEMENT
00
14
6
38
0
plateaux
7 53 0 53
CAGE ESCALIER
00
14
9
E2
.8
25
:1
l.
H.S
CHAMBRE FROIDE NÉGATIVE
6
E2
TOTAL personnes a
0
.0
25
:1
.C
E2
2
12
Nouveau sol en PU: 73.30 m² Pose sur PU existant
E 2
E3
7
3
SANITAIRES PMR
L
8
Plinthes en PU pose
K
23
00
SAS
5
E3
12
1153
6.
E31
40
12
7
150
Hsfp: +2,65m
18
E3
24
Extincteur d'incendie 30
E3
E3
9
A
Sirène d’alarme
1 27
8
K
10
5
Bouton d' urgence
D SANITAIRES HOMMES 6
4
Numero de la porte Cloison existant
13
6
Niveau
E...
Cloison gyproc sur os
12 11
+0.00 -0.10
1500
Projet: THE BRAINE - Parc de l'Allian Phase: APD Titre: Plan d' implantation_projet
3
I
Maître d'Ouvrage
2 1
Aramark NV
Avenue de Finlande 3, 1420, Braine-l
NC & BHAM
Rue de l'Hôtel des Monnaies 66 / 106 Tel/Fax: 02/538.60.13
Entreprise générale de constru
A définir / Les mesures et niveaux son L'entrepreneur est tenu de vérifier ces
ÉTAGE - RESTAURANT
1.Ces plans sont la propriété de NCBHAM, notre propriété 2.Pendant la préparation et en cours de la phase d'exécuti 3.La compatibilité des mesures ou autres indications sont
34
section AA - section EE comptoir section plan
35
06 OPHEM working collaboration _ SHSH architecture, V+
Brussels, Belgium - 2016/2017
This project is a new apartment building which is located in the corner of the Ophem street and De Witte de Haelen street in the centre of Brussels. The new 6 floor apartment block has a curved corner in order to respect city scape and use the line of the existing street. The volume and height of the building is not going to disturb the neighbour by considering to protect as much as open skyline for neighbourhood buildings. Each apartment has a terrace which provides fresh air and a open plan living and dining room. On the top floor, there are two duplex apartments in order to give the best view of the street side from each apartment. The facade of the building is slightly textured in stainless steel, which will beautifully spread the street lights. The project has been considered as a lowenergy building.
construction site
extincteur 6L type AB
38
chassis bois + remontée en Ytong
émbras
chassis bois + remontée en Ytong
émbrasement bois seuil inox
garde-corps
plan floor 1 to 5 construction window detail
39
Matteo de Francesco matteodefancesco1@gmail.com Skype: matteo.de.francesco | rome
‘‘