Malaga • River Systems • Multiple Sites
RESPONDING TO SOMETHING UNCERTAIN
ACTING ON THE EXTREME
REDUCING WIDESPREAD PROBLEMS.
MODULAR COMPONENTS
CREATING A SERIES OF STRUCTURES
CONTROLLING CLIMATE OCCURRENCES
Plan • Section • 1:50
Section 1:50 5
1 Steel cylindrical framework - welded joints, diameter 100mm, varying lengths 2 Steel universal beams - welded joints, 203mm x 102mm x 2750mm 3 Central bamboo rainwater chute - diameter 300mm, height 4100mm 4 Bamboo flooring laid on top of bamboo cross supports - thickness 30mm, formed in triangular shaping 5 Fold out walls forming stairs or decking space 6 Exterior of wall 7 Bamboo stanchions supporting canvas roof slotted joints into central column, diameter 100mm, length 2400mm
4
5
5
Support Level
Plan 1:50
Floor Level
Roof Level
1
6
3
6000mm
3 2
4
7
5
3000mm
2600mm 2600mm
Modules • Prefabricated System • Transportation
6000mm
2750mm
Upper Framework
Louvre Wall
Upper Bamboo wall
Louvre wall in stair formation
Bamboo wall (also used as fold out decking)
6000mm
1500mm
Supporting Structure
Maximum delivery dimensions = 6m x 3m
On-site Work -One side of frame positioned above lower supports and welded in place. -Other frame welded to structural base and previously added frame. -Two cross supports added to firmly connect top section of framework.
-Holes inserted in every section of structural frame.
-Bamboo roof stanchions then connected to frame and central column.
-Holes also cut in appropriate sections, to allow bolts to be threaded all the way through and be tightened from the inside. -Only top hole used in stair and decking sections to allow tie to go through and enable sections to be pulled back upright.
-Cylindrical beam permanently held inside wall piece. -Wall then positioned into structural frame. Holes at either end allow the cylindrical beam to be inserted and allow the triangular wall piece to rotate.
-Pile foundations laid in relation to each corner of structure. -Central column connected to lower water pipe. -Two sections of module connected to foundations and then welded together at two corner points. -Two additional I beams lowered into place and welded to corners and central column.
Custom Spaces • Modules • Flexibility Plans 1:100
Folding Stairs
Roof
1
Canvas roof with decking
2
Angled walls
Folding Decking
3
Connection at the top of pole
Canvas roof additions
Decking in open position Cable through top of structure
Fold out decking
Explosion • Layering • Details Canvas Roof Roof Supports
Upper wall sections
Lower wall sections
Framework
Bamboo Floor
Flooring Supports
Structural Base
Foundations
Relation to Climate • 1:50 • Elevation
RAISED STRUCTURE CONTAINING SHADE
REDUCING TEMPERATURES
AVOIDING FLOODS Rainfall + Flood Water Air Circulation Sunlight
Other Details • Louvre/Stairs • Water Collection Internal pulley system
4
3 4 2
5
1 Fine netting covering gaps 2 Bamboo board with vertically cut bamboo external cladding 3 Two layers of horizontal bamboo
4 Cable connected to pulley system
1
Pulley connected to central column
5 Supports connecting stairs
Rainwater Flow
All additions to the modules continue to guide rainwater into the central column. Canvas attachments allow shade in the decking area and allow more rainfall to be collected. Once rainwater is collected in the storage tank it can be reused on land in the summer when weather is much drier. Central rainwater pipe
Water is pumped back up from tank into central tap, which can then be connected to an output.
Model Images • Context • 1:50