Djakasaputra_Portfolio_2019

Page 1

Maxwell Djakasaputra PORTFOLIO 2019


ABOUT ME I am looking for a studio that can foster my interests in becoming a well-rounded designer/project manager and licensed architect. I am interested in forwardlooking issues such as sustainability, verticality, and technological innovation. I am motivated to learn more about the future of workplaces, the evolving culture of retail/hospitality, and the architectural impact on the “Disruption Economy.�


Maxwell Djakasaputra PROFILE 24-year old aspiring architect from Houston, Texas with a passion for mixed-use

CONTACT (832)-758-7705

EDUCATION UNIVERSITY OF SOUTHERN CALIFORNIA Bachelor of Architecture Fellowship

Conducted a feasibility analysis on the Olympia C o n v e n t i o n Center for Capital & Counties Properties PLC of L o n d o n , U K

EXPERIENCE AC MARTIN PARTNERS Technical Coordinator + Designer

LOS ANGELES, CA Jun 2018-Present

Coordinated and produced construction documentat i o n , P h a s e Submittals, material selections, and LEED requir e m e n t s

APT# 103

Facilitated and led Design Coordination and Clus t e r m e e t i n g s at field office for the DGS NNRH office tower in S a c r a m e n t o , C A

LOS ANGELES, CA 90005

Developed massing studies, block & stack diagram s , a n d programmatic planning schemes for UCI Student Su c c e s s B u i l d i n g Founded ACM's Internship Program and New Hire Pr e s e n t a t i o n series for weekly Happy Hour

MDHUANG94@GMAIL.COM

SKILLS

Spring 2017

ED W A R D & YOL A N DA W ON G TR A V E L IN G F E L L OW SHIP Fellowship awarded to 5 architecture students to s i m u l a t e t h e interdisciplinary, collaborative process of a mi x e d - u s e development

859 S. NEW HAMPSHIRE AVE.

LINKEDIN.COM/IN/MDHUANG94

May 2018

US C P HI SIG MA THE TA HON OR SOCIE TY

HKS ARCHITECTS Architectural Design Intern

LOS ANGELES, CA Jun 2017- Aug 2017

Collaborated in design charrettes via 3D modelin g i n R h i n o f o r the Performance Venue at the LA Rams Stadium-Hol l y w o o d P a r k

AUTOCAD ILLUSTRATOR

Picked up redlines and update Revit model for 10 0 % D D p h a s e o f UC San Diego North Torrey Pines Learning Neighbo r h o o d

INDESIGN

Ensured graphic legibility in the production of c o n s t r u c t i o n documentation for USC Norris Comprehensive Cance r C e n t e r .

PHOTOSHOP RHINO+V-RAY REVIT+ENSCAPE

LEHMAN-SMITH MCLEISH Architectural Design Intern

LANGUAGES

WASHINGTON, D.C. Sept 2016- Dec 2016

Produced construction documents sets using Micro S t a t i o n ; required to self teach new software and research c o n s t r u c t i o n methods, symbols and terminology for MEP coordin a t i o n

NATIVE: ENGLISH & INDONESIAN

Updated client presentation including renderings f e a t u r i n g material selections and experiential views using V - R a y a n d P S

ADVANCED: MANDARIN

Increased clarity in graphic and written communi c a t i o n o f marketing proposals, design proposals, and in-ho u s e p r o j e c t s

ELEMENTARY: SPANISH BASIC: PORTUGESE

INVOLVEMENT INTERESTS

AAa/e

LOS ANGELES, CA

Banquet Committee Member Jan 2019-present Lead graphics designer/editor and coordinator FITNESS FOOD CORTADOS

USC ARCHITECTURAL GUILD Student Mentor

LOS ANGELES, CA Aug 2018-present

ART HISTORY FASHION URBANISM

AIA Associate AIA Member

LOS ANGELES, CA Jun 2018-present


PART ONE:

PROFESSIONAL WORK AC MARTIN PARTNERS - LOS ANGELES, CA JUNE 2018-PRESENT 4


CONTENTS 01

DGS NEW NATURAL RESOURCES HEADQUARTERS

06-11

Technical Coordinator, Job Captain, Assistant Project Manager

02 UC IRVINE STUDENT SUCCESS BUILDING Designer

12-17

5


DGS NEW NATURAL RESOURCES HEADQUARTERS DESIGN-BUILD PARTNERSHIP: TURNER+AC MARTIN

PROJECT DIRECTOR: TAMMY JOW, LEED-AP PROJECT ARCHITECT: TIM REDMOND, AIA PROJECT DESIGNER: GAIL BOUVRIE, AIA, LEED-AP

Responsibilities: + Coordinated and produced toilet room, elevator lobby: material finishes, elevations, finish plans, accessibility plans, RCPs, floor transition details, tile pattern details, and ADA details + Facilitated and led Design Coordination and BreakOut Cluster meetings while maintaining Design Constraint Log at field office + Managed Phase Submittal compilations and packaging + LEED liaison and coordinator for project

6


DEPARTMENT OF GENERAL SERVICES

NEW NATURAL RESOURCES HQ 715 P STREET SACRAMENTO, CA 98514 PROJECT COORDINATOR 7


3

2

7

4

1

5

6 SITE PLAN

8


SOUTH

WEST

EAST

NORTH

STREET VIEW PERSPECTIVE

NORTH

SOUTHEAST

NORTHEAST

NORTHWEST

9


consultant

TOILET ROOM RENDERING

0 10 30 TYPICAL UPPER LEVEL FLOOR PLAN

10

N Presentation 8TH FLOOR SCALE: 1/8" = 1'-0"


KEYNOTES 102.D1 102.D2 102.D7 102.D9

8

102.D10 102.F1 102.H2 102.H3 102.K2 102.L1 102.M1

3 3' - 9 1/2"

TYPICAL 3RD-8TH FLOOR - EAST MENS & WOMENS RESTROOM

28' - 9 1/8" 10' - 10 3/4"

1' - 7"

102.L1

3' - 1" CL 3' - 1"

1' - 7"

FD

2' - 2"

3' - 0 1/2"

6' - 7"

3' - 1"

102.H2 102.H3 102.D7

102.D10 TOILET PARTITION

A-622

3' - 1"

by revision

sheet title

9' - 2 3/4"

102.D7 A-621 18

3' - 1"

5' - 0 1/2"

14

8' - 9 5/8"

5' - 6 1/4"

CL

102.H3

TOILET PARTITION

15 A-621 12

8

1' - 5 1/2"

CL 1' - 5 1/2" 102.H2

102.D10

11

MEN 13-510

5' - 2"

2

4 102.M1

102.F1 1' - 7" 102.L1 1' - 7"

9' - 3"

A-622

4' - 4"

13' - 1 1/4"

5

102.M1

4' - 10"

1

5' - 7 1/2"

CL 5' - 1 1/2" FD

102.F1

20-510

3' - 1"

14' - 2"

11' - 5 1/4"

20TH FLOOR - MENS & WOMENS RESTROOM

TYPICAL 13TH-19TH FLOOR - MENS & WOMENS RESTROOMS

5

SCALE: 1/4" = 1'-0"

4

SCALE: 1/4" = 1'-0"

A-360

Issue Date construction issue date

A-360

sheet number

project

A-360

NEW NATURAL RESOURCES HEADQUARTERS

1' - 5 1/2"

MEN

102.H3 102.H2

1' - 7"

1' - 8"

7 A-614

102.D7

FD

1' - 7"

1' - 5 1/2"

A-621 13

DEPARTMENT OF GENERAL SERVICES

5' - 1 1/2"

5' - 1 1/2"

TOILET PARTITION 102.D7 102.D9

9' - 3"

3' - 1"

102.L1

2' - 2"

3' - 1"

4' - 3 3/4"

19

2' - 2"

102.H3

1' - 8"

4' - 10"

4' - 11"

102.D7

FD

3' - 1"

3

1' - 2"

A-622

9' - 2 3/4"

11' - 4 3/4"

TOILET PARTITION 7 102.D7 102.D9

102.K2 20-511

20 A-621 17 102.F1

13-511

9

WOMEN

102.M1

WOMEN

6

10 A-622

102.F1 102.M1

5' - 2"

2' - 2"

2' - 2" 1' - 7" 102.L1

CL

5' - 6 1/2"

16

4' - 11 1/2"

1' - 7"

3' - 1 1/2" 3' - 1 1/2" 3' - 1 1/2"

5' - 0 1/2"

4' - 10"

3' - 1"

2' - 6"

3' - 1"

PHASE III DESIGN - STRUCTURE & CORE - MAY 20, 2019

d3 23' - 2 1/4" 3' - 1 1/2"

Checker

A-360

3 3 5' - 3 1/4"

Author

1

SCALE: 1/4" = 1'-0"

715 P STREET, SACRAMENTO, CA 95814

2

drawn by

3-503

checked by

WOMEN

C

A-360

date

revision information

9" 18

3' - 0 1/2"

EQ

SCALE: 1/4" = 1'-0"

no.

2' - 2"

4' - 11" 3' - 1"

3' - 1"

2' - 11 1/2"

TYPICAL 3RD-8TH FLOOR - WEST MENS & WOMENS RESTROOM

3

3' - 1" CL 3' - 1"

Tim Redmond

EQ

A-360

5' - 6 3/4"

CL 5' - 5 3/4"

2017109

5' - 0 1/2"

Tammy Jow

3' - 1"

102.K2

C

4' - 11 1/2"

SCALE: 1/4" = 1'-0"

3' - 1"

102.F1 102.L1 102.M1

Gail Bouvrie

C

TYPICAL 9TH-12TH FLOOR - MENS & WOMENS RESTROOM

3' - 0 1/2"

19 A-620 17

job number

5' - 10" 1' - 5 1/2"

5' - 0 1/2"

20' - 11 1/8"

16 102.D7

TOILET PARTITION

project director

3' - 1"

1' - 7"

project architect

5' - 7"

3' - 1"

102.H3 20 A-620

7' - 1 1/2"

3' - 1"

FD

102.H2

8

NOTES 1. FOR ACCESS COMPLIANCE DIMENSIONS SEE A-360A, A-361A, AND A-362A. 2. SEE A-612 FOR TYPICAL TOILET ROOM DETAILS, DIMENSIONS AND MOUNTING HEIGHTS FOR PLUMBING FIXTURES AND TOILET ACCESSORIES.

102.L1

project designer

7

3-510

3' - 0 1/2"

A-620

9

MEN

4

102.H3

TOILET PARTITION

102.M1 102.F1

1' - 7"

1' - 7"

102.H2

102.D10

102.M1

10 A-620 8

13

102.D7

plan check submittal date

A-621

14 A-620 12

1' - 7"

FD

102.H3

1' - 5 1/2"

102.D7 FD

102.F1

6

102.D7

102.D9 TOILET PARTITION

2

2' - 4" 102.L1

102.H3

3' - 1"

102.H2

5' - 1 1/2"

project information

1 A-621

2' - 4"

102.H2

5' - 1 1/2"

15 A-620

102.H2

3' - 1"

SS

11

ENLARGED TOILET ROOM PLANS

5 ALIGN

1' - 5 1/2"

2' - 2"

5' - 1 1/2"

1' - 5 1/2"

102.D7 102.H3

3' - 1"

FLS

3-502

3

2' - 6"

1' - 8" 3' - 1"

FD

A-620

FD

1' - 6"

37' - 10"

3' - 1"

URINAL SCREEN

TOILET PARTITION 102.D7

DATE

MEN

3' - 0 1/2"

consultant

102.M1

9-510

2' - 4"

2' - 2"

4' - 11"

2' - 2"

3' - 1"

2' - 6" 2' - 4"

102.F1

2

4

102.L1

102.H2

1' - 6"

8' - 1"

2' - 4"

A-620

102.F1

2' - 4"

102.D7

FD

5

3' - 1"

6"

3

102.M1

102.H3

2' - 4"

2' - 2" 1' - 8"

A-621

TOILET PARTITION 102.D9

102.K2

3-511

AC

5' - 0 1/2"

4' - 3"

7

9

102.F1

WOMEN

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES

5' - 0 1/2"

9' - 0 1/2"

3' - 1"

1' - 8"

3' - 1"

1

2' - 6"

10 A-621

102.K2 102.M1

2' - 4" 102.L1

MEN

5' - 0 1/2"

4' - 10"

3' - 1"

1' - 6"

9-511

3' - 1"

6

ALIGN

WOMEN

3' - 1"

1' - 6"

3' - 0 1/2" ELEC RM

3' - 0 1/2"

2' - 2"

5' - 9"

3

D

TOILET PARTITION URINAL SCREEN WOMEN'S RECESSED COMBINATION UNIT WOMEN'S PARTITION MOUNTED COMBINATION UNIT MEN'S SURFACE MOUNTED COMBINATION UNIT SOAP DISPENSER, WALL MOUNTED 36" GRAB BAR 42" GRAB BAR FEMININE NAPKIN VENDOR, RECESSED MIRROR RECESSED PAPER TOWEL DISPENSER/WASTE RECEPTACLE

plot date: 5/13/2019

6:00:50 PM

KEYNOTES 102.D1 102.D7 102.D9 102.D10 102.F1 102.H2 102.H3 102.K2 102.L1 102.M1

STARTING POINT

3 CT102

9' - 0" 21 A-612

AC

FLS

SS

DATE

INTERIOR ELEVATION - RESTROOM 20 - 510 - NORTH

1

SCALE: 1/4" = 1'-0"

Checker

Issue Date

Author drawn by

Tim Redmond project architect

checked by

Gail Bouvrie project designer

construction issue date

A-622

plan check submittal date

no.

revision information

2017109

2

SCALE: 1/4" = 1'-0"

project information

INTERIOR ELEVATION - RESTROOM 20 - 510 - EAST A

Tammy Jow

6"

7 A-622

job number

9' - 0"

9' - 0" 6"

48" MAX

SCALE: 1/4" = 1'-0"

A-622

102.L1 102.F1

CT101

CT101

INTERIOR ELEVATION - RESTROOM 20 - 511 - EAST A

11

SCALE: 1/4" = 1'-0"

OPEN TO BEYOND

2' - 10" 4"

CT102

TYPICAL 3RD-8TH FLOOR - WEST MENS & WOMENS RESTROOM FINISH PLAN - FOR TILE PATTERN ONLY

CT101

PT101

project director

PT101 OPEN TO BEYOND

consultant

CT102

102.L1

48" MAX

102.F1

C

2' - 10" 4"

CT102

date

revision

CT103

CT103

by

CT101

A-622

CT102

CT102

RF

6 A-622

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES

LEGEND 1. FOR STANDARD TOILET INFORMATION AND DETAILS SEE A-612 2. FOR MATERIAL DESCRIPTIONS SEE A-711 3. FOR CT-103 PATTERN, SEE 11/12/13 A-622.

CT101

SCALE: 1/4" = 1'-0"

CT103

102.H3 102.D7

CT102

INTERIOR ELEVATION - RESTROOM 20 - 511 - NORTH

CT101

102.H2

6"

48" MAX.

12 A-622

102.D1

CT101

PT101

PT101

6"

CT101

GL106

102.F1 102.M1

2' - 10" 4"

CT102 CT103

102.L1

EQ

CT103

4' - 0"

CT103

102.D10

102.D1

EQ

CT101

CT102

9' - 0"

RF

TOILET PARTITION WOMEN'S RECESSED COMBINATION UNIT WOMEN'S PARTITION MOUNTED COMBINATION UNIT MEN'S SURFACE MOUNTED COMBINATION UNIT SOAP DISPENSER, WALL MOUNTED 36" GRAB BAR 42" GRAB BAR FEMININE NAPKIN VENDOR, RECESSED MIRROR RECESSED PAPER TOWEL DISPENSER/WASTE RECEPTACLE

STARTING POINT

COVE 1/4" GROUT

CT102

CT102

CT102

CT103B

CT102

CT102

CT102

CT102

CT103B

CT102

CT103A

CT102

CT103B

CT102

CT103B

CT102

CT103A

CT102

CT103B

CT102

CT102

CT103B

CT102

CT103A

CT102

CT103B

CT102

CT103B

CT102

CT103A

CT102

CT103B

CT103B

CT102

CT103B

CT103B

CT103A

CT103A

CT103B

CT102

CT103B

CT103B

CT103A

CT103A

CT103A

CT103B

CT103A

CT101

CT103A

CT103B

CT103A

CT103B

CT103A

CT101

CT103A

CT103B

CT103B

CT101

CT103B

CT103A

CT103B

CT101

CT103B

CT101

CT103B

CT103A

CT103B

CT101

102.D7

4' - 0"

4' - 0"

CT103

CT103

102.D7

CT101

102.H3

9' - 0"

9' - 0"

6"

6" CT103B

CT101

CT103B

CT101

CT103B

CT101

CT103B

CT101

CT103B

CT101

CT103B

CT101

CT101

CT101

CT101

CT103A

CT101

CT101

CT101

CT101

CT101

CT103A

CT101

102.H2

CT103

CT103

SCALE: 1/4" = 1'-0"

CT101

RESTROOM TILE COLOR BAND PATTERN - FLOOR

CT101

INTERIOR ELEVATION - RESTROOM 20 - 511 EAST B

8 A-622

CT101

INTERIOR ELEVATION - RESTROOM 20 - 510 EAST B

3

SCALE: 1/4" = 1'-0"

A-622

12

SCALE: 1 1/2" = 1'-0"

1/4"

CT101

CT103B

CT102

CT103B

CT102

CT103B

CT101

CT101

CT103B

CT103A

CT103B

CT102

CT103A

CT102

CT101

CT103B

CT103A

CT101

CT103B

CT103A

CT102

CT102

CT103A

CT101

CT103B

CT103A

CT103A

CT102

CT103B

CT102

CT101

CT103B

CT101

CT103B

CT103A

CT103B

CT102

CT102

CT101

CT101

CT103B

CT103A

CT103B

CT103A

CT103B

CT102

CT101

CT103B

CT101

CT103B

CT102

CT103B

CT102

CT103B

PT101

102.D7

CERAMIC TILE (CT) OVER THINSET, SEE INTERIOR ELEV. 1/4" GROUT JOINT, TYP.

CL

6"

INTERIOR ELEVATION - RESTROOM 20 - 511 - SOUTH SCALE: 1/4" = 1'-0"

CT102

CT102

9 A-622

21 A-612

INTERIOR ELEVATION - RESTROOM 20 - 510 - SOUTH SCALE: 1/4" = 1'-0"

4 A-622

CT102

CT103A

CT101

CT103B

CT103A

CT103A

CT102

CT103B

CT102

CT101

CT103B

CT101

CT103B

CT103A

CT103B

CT102

CT102

SCALE: 1 1/2" = 1'-0"

4' - 0" CT102

102.M1

102.M1

102.F1

102.F1

CT102

CT103

CT101

102.L1

2' - 10" 4"

6"

RESTROOM TILE COLOR BAND PATTERN - WALL

4' - 0" 102.K2 CT103

CT101

6"

CT101

13 A-622

project

CT102

CT102

4 A-612

CT103

CT102

INTERIOR ELEVATION - RESTROOM 20 - 511 - WEST SCALE: 1/4" = 1'-0"

CT102

10 A-622

CT103

CT101

INTERIOR ELEVATION - RESTROOM 20 - 510 - WEST SCALE: 1/4" = 1'-0"

5 A-622

sheet number

CT103A

CT103A

9' - 0"

CT102

CT103B

6"

CT103B

CT101

SCALE: HALF FULL SIZE

48" MAX

CT103A

CT103A

6"

CT103B

CT103B

EVERY SIX INCHES

CT101

CT101

CL CL PATTERN REPEATS

CT101

THINSET MORTAR

CERAMIC TILE COVE BASE2

2' - 10" 4"

1/8"

R

3/ 8"

CL

102.L1 102.F1 102.M1

CT101

CERAMIC TILE (CT) COVED BASE OVER THINSET, SEE INTERIOR ELEV.

CERAMIC TILE (CT) OVER MORTAR BED, SEE FINISH FLOOR PLAN

GL106

PT101

2' - 10" 4"

CT103B

CT101

102.H3

6"

CT101

102.H2 WALL PER WALL TYPE

9' - 0"

CT102

6"

CT103B

1/4" 5 3/4"

CT103A

6"

CT103B

102.D1

102.D9

1/4" 5 3/4"

CT103A

EVERY SIX INCHES

6"

CT103B

CL PATTERN REPEATS

6"

CT101

9' - 0"

4' - 0 1/4" SMALL TILE BAND

CT101

9' - 0"

1/4"

sheet title

A-622

CL

4' - 0"

SMALL TILE BAND 6"

CT101

102.H3

PHASE III DESIGN - STRUCTURE & CORE - MAY 20, 2019

CT102

715 P STREET, SACRAMENTO, CA 95814

CT102

INTERIOR ELEVATIONS - TOILET ROOMS

FINISH WALL

PATTERN REPEATS

CL

CT103B

NEW NATURAL RESOURCES HEADQUARTERS

6"

CT102

9' - 0"

1/4"

PATTERN REPEATS CL 6" CL

1/4"

6"

1/4" 5 3/4"

5 3/4" 1/4"

2' - 11 3/4"

DEPARTMENT OF GENERAL SERVICES

2' - 11 3/4"

A-622

plot date: 5/15/2019

10:26:02 AM

11


TYPICAL UPPER LEVEL FLOOR PLAN

ELEVATOR LOBBY RENDERING

TYPICAL UPPER LEVEL FLOOR PLAN

12


MATERIALS & FINISHES

9

9.4

1. FOR INTERIOR FINISHES REFER TO MATERIAL AND FINISH SCHEDULE ON SHEET A-721. 2. FOR TYPICAL ELEVATOR DETAILS REFER TO SHEET A-613 3. FOR TYPICAL SIGNAGE (ELEVATOR) DETAILS REFER TO SHEET A-613 AND SIGNAGE DRAWINGS SG-SERIES

7

11' - 0 1/2"

6

7 A-613

7

NORTH LOBBY 1-005

D D

+12' - 0"

AC

EQ

ELEVATOR LOBBY

ELEVATOR LOBBY 1-506

2' - 0"

EQ.

by

EQ

1-506

EQ

revision information

AMC101 +13' - 3"

9.4

6

C

Issue Date

Checker checked by

construction issue date

Author

Tammy Jow

Tim Redmond

job number

2017109

C

GB

project information

consultant

+12' - 0"

11 A-711

drawn by

EQ 4' - 2 1/2"

1' - 5 3/4"

D

9' - 3 1/2"

16 A-645

Gail Bouvrie

2

5

project director

A-321

project architect

3

project designer

9

date

revision

2 A-662

5 A-662

A-321

SS

EQ

EQ.

8

FLS

DATE

17 A-613

SERVICE ELEVATOR AT BASEMENT FLOOR PLAN 9 SCALE: 1/4" = 1'-0"

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES

D

no.

16 A-613

D

GB

4' - 2 1/2"

9' - 3 1/2"

1' - 5 3/4"

D

plan check submittal date

6 3/4"

6

C

SECURE LOBBY 1-002

11' - 0 1/2"

7 4

SCALE: 1/4" = 1'-0"

A-321

1ST FLOOR ELEVATOR LOBBY PLAN

A-321

1

SCALE: 1/4" = 1'-0"

5 A-662 SIM.

4 A-662

6 A-662

3 A-662

PL102

CT107

GL106

PL102

A-321

5 A-662 SIM.

PL102

GL106

PL102

GL106

GL106

PL102

CT107

FINISH TO MATCH ELEVATOR DOOR; SEE L3 ELEVATOR IDENTIFICATION, ILLUMINATED

ST102

ST102 7 A-662

SCALE: 1/4" = 1'-0"

ELEVATOR CALL BUTTON KEY PAD TILE BASE TO MATCH FLOORING

1ST FLOOR ELEVATOR LOBBY TYP. - EAST

5

2

SCALE: 1/4" = 1'-0"

A-321

A-321

BLUE METAL PANEL CLNG. PL102 PT104 GL106

CT107

PL102

GL106

PL102

GL106

PL102

GL106

PL102

GL106

FINISH TO MATCH ELEVATOR DOOR; SEE L3

CT107

GL109

4' - 0"

7' - 2"

ELEVATOR IDENTIFICATION, ILLUMINATED

1ST FLOOR 0"

project

1ST FLOOR 0" ELEVATOR CALL BUTTON KEY PAD

DEPARTMENT OF GENERAL SERVICES

1ST FLOOR ELEVATOR LOBBY TYP. - SOUTH

NEW NATURAL RESOURCES HEADQUARTERS

FIRE PULL STATION 1ST FLOOR 0" RECESSED EVACUATION SIGN , SEE SIGNAGE DWGS.

4"

1ST FLOOR 0"

4' - 0"

4' - 0"

sheet title

1 A-662

OPEN TO LOBBY BEYOND

PHASE IV DESIGN – COMPREHENSIVE DESIGN (100% CD) - AUGUST 26, 2019

1ST FLOOR - ELEVATOR LOBBY RCP

7

SCALE: 1/4" = 1'-0"

715 P STREET, SACRAMENTO, CA 95814

6 SERVICE ELEVATOR AT FIRST FLOOR

ELEVATOR LOBBY-ENLARGED PLAN/RCP/INTERIOR ELEVATIONS

6 3/4"

TILE BASE TO MATCH FLOORING

SCALE: 1/4" = 1'-0"

1ST FLOOR ELEVATOR LOBBY TYP. - WEST

6

3

SCALE: 1/4" = 1'-0"

A-321

A-321

sheet number

1ST FLOOR ELEVATOR LOBBY TYP. - NORTH

A-321

plot date: 8/5/2019 6:04:37 PM

DOOR AND FRAME (WHERE OCCURS)

EPOXY FLOORING

NATURAL STONE PAVERSOVER THIN SET

STRUCTURAL CONC. SLAB

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

CLEAVEGE MEMBRANE RADIANT HEATING TUBES 3/4" STONE PAVERS 7/8" MORTAR BED

3/4"

CRACK ISOLATION MEMBRANE

FINISH FLOOR 0'-0"

6" 1/2"

T.0. SLAB

1/2"

MORTAR SETING BED W/ REINFORCING WIRE MESH

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES

T.0. SLAB

AC

-0'-1 3/4"

-0'-1 3/4"

2"

1/2"

1

7/8"

+0'-0"

3/4"

1/4" 1/2"

1

+0'-0"

FIRST FLOOR

2

2

1/4"

1

FIRST FLOOR

NATURAL STONE PAVERS OVER THINSET

3/8"

NATURAL STONE OVER THIN SET

2" RIGID INSULATION

1/8" GROUT JOINT, TYP.

CL

3/4"

1

CARPET FLOORING

1

2

1/4" 1/4"

2

2

3/8"

1

CL

2

1/4"

RUBBER TRANSITION (ADA COMPLIANT)

CL

DOOR AND FRAME (WHERE OCCURS)

1/4"

RESILIENT FLOORING

3/4"

DOOR AND FRAME

FLS

SS

DATE

POUR BACK- SEE STRUCTURAL

FINISH FLOOR TRANSITION - RESILIENT FLOORING TO CARPET SCALE: 6" = 1'-0"

16

FINISH FLOOR TRANSITION - EPOXY TO STONE PAVERS

11

SCALE: 6" = 1'-0"

FINISH SLAB 1 (TCNA #RH 110A-18)

6

SCALE: 6" = 1'-0"

A-671

1

SCALE: 1 1/2" = 1'-0"

A-671

A-671

by

A-671

FINISH FLOOR TRANSITION - CERAMIC TILE TO CERAMIC TILE AT RESTROOMS

1

1/2"

T.0. SLAB -0'-1 3/4"

1/8" GROUT JOINT, TYP.

FOR RADIANT FLOORING ASSEMBLY REFER TO DETAIL 1/A-671 FOR BALANCE OF INFORMATION

CL

2

2

NATURAL STONE PAVERS OVER THIN SET POUR BACK - SEE STRUCTURAL DRAWINGS

NATURAL STONE PAVERS OVER THIN SET

1/8" GROUT JOINT, TYP.

SEALED CONCRETE

SCALE: 6" = 1'-0"

20

15 A-671

EPOXY FLOORING

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

ENTRANCE FLOOR GRILLES (SEE FINISH PLAN)

POUR-BACK - SEE STRUCTURAL

1/2"

+0'-0"

POUR BACK - SEE STRUCTURAL DRAWINGS

1

2

2

FIRST FLOOR 1

+0'-0"

1/4"

1/2"

KITCHEN CL

3/8" CARPET MIN.

STAINLESS STEEL WALK-OFF MAT PERIMETER ANGLE

T.0. SLAB

POUR-BACK - SEE STRUCTURAL

-0'-1 3/4"

Issue Date

Checker checked by

construction issue date

Author

Tim Redmond

drawn by

project architect

plan check submittal date

Tammy Jow

Gail Bouvrie

T.0. SLAB

1/8" GROUT JOINT, TYP.

FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE SCALE: 6" = 1'-0"

1

DOOR AND FRAME (WHERE OCCURS)

SEALED CONCRETE

A-671

project

2

DOOR AND FRAME

FINISH FLOOR

1/4"

+0'-0" T.0. SLAB

A-671

2

FIRST FLOOR

-0'-1" POUR BACK - SEE STRUCTURAL DRAWINGS

FINISH FLOOR TRANSITION - CARPET TO TILE FLOORING

1

1/4"

1/4"

1

1/8"

3/8"

2

CL

NATURAL STONE PAVERS OVER THIN SET

3/8"

2

1/4"

1

1/4"

CERAMIC TILE OVER THINSET

1/4"

2

1/2"

1

1/2"

1/4"

1/2"

1/8" GROUT JOINT, TYP.

CL

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)

4

SCALE: 6" = 1'-0"

A-671

DOOR AND FRAME (WHERE OCCURS)

CARPET FLOORING

FINISH FLOOR TRANSITION - CARPET TO NATURAL STONE PAVERS

9

SCALE: 6" = 1'-0"

A-671

DOOR AND FRAME (WHERE OCCURS)

ADA COMPLIANT TRANSITION STRIP (FINISH T.B.D.)

CL

14

SCALE: 6" = 1'-0"

A-671

-0'-1 1/2"

FINISH FLOOR TRANSITION - SEALED CONCRETE TO WALK-OFF MATT SCALE: 6" = 1'-0"

10 A-671

FINISH FLOOR TRANSITION - CARPET TO EPOXY SCALE: 6" = 1'-0"

5 A-671

sheet number

FINISH FLOOR TRANSITION - CARPET TO STONE PAVERS

19

SCALE: 6" = 1'-0"

FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE

3/8"

-0'-6"

no.

revision information consultant

+0'-0"

T.0. SLAB -0'-1 3/4"

POUR BACK - SEE STRUCTURAL DRAWINGS

T.0. SLAB

FINISH FLOOR TRANSITION - CARPET TO RUBBER FLOORING

job number

2017109

FIRST FLOOR 1

1/2"

PHASE IV DESIGN – COMPREHENSIVE DESIGN (100% CD) - AUGUST 26, 2019

3/8" CARPET MIN.

+0'-0"

NATURAL STONE PAVERS OVER THIN SET

date

revision

3/4" 3/4"

1/4" 1/4"

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME) FIRST FLOOR

1

715 P STREET, SACRAMENTO, CA 95814

1/4"

2

sheet title

SEALED CONCRETE

1/2"

A-671

NEW NATURAL RESOURCES HEADQUARTERS

1/2"

2

1/4"

1/4"

3/4"

1/2" 1/2"

CL

1/2" 1

3

SCALE: 6" = 1'-0"

DOOR AND FRAME (WHERE OCCURS)

3/4"

FINISH FLOOR

1/4"

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

1

1/4"

1/4"

2

1/2"

2

1/4"

1

1/4"

3/4" DOOR AND FRAME (WHERE OCCURS)

3/8" CARPET MIN.

CARPET FLOORING

0'-10 1/2"

FINISH FLOOR TRANSITION - SEALED CONCRETE TO WOOD FLOORING

8 A-671

DOOR AND FRAME (WHERE OCCURS)

RUBBER TRANSITION (ADA COMPLIANT)

-0'-6"

SCALE: 6" = 1'-0"

A-671

RUBBER FLOORING

CL

+1'-0" T.0. SLAB

WOOD FLOOR FINISH

FOR RADIANT FLOORING ASSEMBLY REFER TO DETAIL 1/A-671 FOR BALANCE OF INFORMATION T.0. SLAB

FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE

13

SCALE: 6" = 1'-0"

FIRST FLOOR

1

3/4"

18 A-671

2

1/8" GROUT JOINT, TYP.

-0'-2 1/2"

SCALE: 6" = 1'-0"

1/4"

1/4"

1/4"

NATURAL STONE PAVERS OVER THIN SET

T.0. SLAB

FINISH FLOOR TRANSITION - CONCRETE TO CARPET

ALIGN

PLYWOOD SUBSTRATE

1/8" GROUT JOINT, TYP.

FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE

2

1/2"

CERAMIC TILE OVER THIN SET

POUR-BACK - SEE STRUCTURAL

1

SEALED CONCRETE

1/4"

1/2"

1/2"

A-671

CL

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)

FINISH FLOOR

1/4"

+0'-0"

SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)

1/8"

1/2"

2

FIRST FLOOR

1

DOOR AND FRAME (WHERE OCCURS)

SEALED CONCRETE

CL

1

1/4"

2

3/4"

2

1/4"

1

1/4"

1

DOOR AND FRAME (WHERE OCCURS)

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

CL

CARPET

3/4"

1

RUBBER TRANSITION (ADA COMPLIANT) 2

2

SCALE: 1 1/2" = 1'-0"

A-671

DOOR AND FRAME (WHERE OCCURS)

SEALED CONCRETE

CL

FLOOR DETAIL AT ELEV. LOBBY L1 AND L2

7

SCALE: 6" = 1'-0"

A-671

DOOR AND FRAME

2

FINISH FLOOR TRANSITION - STONE PAVERS TO STONE PAVERS

12

SCALE: 6" = 1'-0"

1/4"

FINISH FLOOR TRANSITION - CARPET TO STONE PAVERS

project director

NATURAL STONE PAVERS OVER THINSET POUR BACK- SEE STRUCTURAL

project designer

1"

STRUCTURAL CONC. SLAB

-0'-1 3/4"

T.0. SLAB -0'-2 1/2"

NATURAL STONE PAVERS OVER THIN SET

17 A-671

project information

FINISH FLOOR TRANSITION - CARPET TO CARPET FLOORING SCALE: 6" = 1'-0"

1/2" THINSET MORTAR CRACK ISOLATION MEMBRANE

T.0. SLAB

FLOOR TRANSITION DETAILS

1'-5 1/4"

1/2" STONE PAVERS

1/8" GROUT JOINT, TYP.

1

1/2"

1/2"

T.0. SLAB

POUR BACK - SEE STRUCTURAL DRAWINGS

2

1/4"

+1'-7"

1/2"

2

DEPARTMENT OF GENERAL SERVICES

1/2"

1

+0'-0"

FIRST FLOOR

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

CL

FIRST FLOOR

3/8"

1

1/4"

1

2

3/4"

1

ALIGN

2

3/4"

1/4"

CL

CARPET FLOORING

1/4"

1

RUBBER TRANSITION (ADA COMPLIANT) 2

3/4"

STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME

1/4"

CL

NATURAL STONE PAVERS OVER THIN SET

3/8" CARPET MIN.

CARPET FLOORING

2

DOOR AND FRAME (WHERE OCCURS)

DOOR AND FRAME (WHERE OCCURS)

DOOR AND FRAME (WHERE OCCURS)

A-671

plot date: 8/5/2019 6:08:56 PM

13


UCI STUDENT SUCCESS BUILDING SITE + BUILDING PLANNING CRITERIA ARCHITECT: AC MARTIN

PROJECT DIRECTOR: SUSAN O’CONNELL, AIA, DBIA, LEED-AP BD+C PROJECT PLANNER: ANDREA STALKER, LEED-AP Responsibilities: + Developed massing studies, block & stack diagrams, programmatic planning schemes, and room criteria diagrams

14


UNIVERSITY OF CALIFORNIA - IRVINE

STUDENT SUCCESS BUILDING IRVINE, CALIFORNIA DESIGNER 15


4 STORY TERRACE SCHEME

450 Stall Parking Structure 6 stories ~72,000 SF Future Building 6 stories @ 12,000 sf/story 115,800 SF Student Success Building Top 3 stories @ 26,100 sf/story

Roof Deck / Terrace at Level 2 provides outdoor space Shade canopy creates gathering space at the Ring Mall

Ground Level @ 37,500 sf/story

SITE PLAN

5 STORY BAR SCHEME

450 Stall Parking Structure 6 stories ~ 90,000 SF Future Building 6 stories @ 15,000 sf/story 90,000 SF Student Success Building 5 stories @ 18,000 sf/story

SITE PLAN

6 STORY COURT SCHEME

450 Stall Parking Structure 6 stories ~ 84,000 SF Future Building 6 stories @ 14,000 sf/story 90,000 SF Student Success Building 6 stories @ 15,000 sf/story

SITE PLAN

16

Plaza connects with entries for both Student Success & Anteater Learning Pavilion


5 STORY BAR SCHEME DTEI, ATC, AVC

Counseling

SWHP, VSC, CARE

DCP

DSC

AXONOMETRIC VIEW

4 STORY TERRACE SCHEME Shelled Space

Counseling, CARE, VSC

DTEI, ATC, AVC

DSC, DCP, SWHP

AXONOMETRIC VIEW

6 STORY COURT SCHEME DTEI, ATC CC (Counseling) VSC, CARE, CC DSC

DCP, SWHP, AVC

DCP

AXONOMETRIC VIEW

17


PART TWO:

ACADEMIC WORK UNIVERSITY OF SOUTHERN CALIFORNIA - LOS ANGELES, CA BACHELOR OF ARCHITECTURE - 2018 18


CONTENTS 01

HEAVY TIMBER HIGH-RISE IN LA ARTS DISTRICT

20-29

Comprehensive Studio - FA 2017

02 PERFORMANCE + STORAGE BOX FOR 32ND ST. SCHOOL Research Design Build Studio - SP 2017

30-35

03 LATIN + SOUTH AMERICA STUDY ABROAD Global Studies - Urban Planning Studio - SU 2016

36-41

04 ARCHITECTURAL PRACTICES RE-IMAGINED Thesis Studio - SP 2018

42-47

19


Heavy Timber High-Rise in LA Arts District site: 707 traction avenue Los Angeles, ca 90013 Instructor: Olivier touraine Comprehensive studio Fall 2017 In an effort to search for more sustainable methods of construction, researching the capabilities of mass timer construction on mid- and high-rise buildings is becoming increasingly relevant. In this comprehensive studio, we were challenged to propose an incubator office tower in the Los Angeles Arts District that explores heavy timber as a construction technique and space-making structure. This project explores the idea of creating a wicker basket as an exoskeleton structural system that twists onto itself at the top. Due to the weaving structure that goes in and out of the floor plates, the project explores the idea of a modular, triangular curtain wall system to create a faceted facade.

20


21


SITE PLAN

22


COMPREHENSIVE SITE PLAN

WIND-ROSE DIAGRAM

SUN-PATH DIAGRAM

WICKER WICKER POINT WICKER POINT POINT

orDerinG orDerinG sYsteM orDerinG sYsteMsYsteM

WICKER WICKER POINT WICKER POINT POINT

orDerinG sYsteM orDerinG sYsteMsYsteM orDerinG

EXTRUDE. EXTRUDE

EXTRUDE.

EXTRUDE. OFFSET. OFFSET OFFSET.

OFFSET. TRIM.

TRIM.

TRIMTRIM.

EXTRUDE.

EXTRUDE.

EXTRUDE. OFFSET.

OFFSET. TRIM.

TRIM.

TRIM.

TWIST.

TWIST.

TWIST.

LIFT.

TWIST. TWIST

TWIST.

TWIST.

LIFT.

OFFSET.

LIFT

LIFT.

LIFT.

WEAVE.

WEAVE.

WEAVE.

LIFT.

LIFT.

WEAVE.

WEAVE.

WEAVE. WEAVE

23


EXOSKELETON

GRAVITY LOAD

COLUMN & BEAM SYSTEM

NORTHWEST PERSPECTIVE

24


DW

DW

REF

DW

REF

MW REF

REF

GROUND FLOOR PLAN

NORTH

SOUTHEAST PERSPECTIVE

25


A

B

C

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

1 2 3 4

DW

5

REF

MW

6 7 8 9 10 11 12 13 LEVEL 7 (TYPICAL OFFICE) PLAN

26

NORTH ELEVATION

WEST ELEVATION


DW

ROOF (BAR) PLAN

SOUTH ELEVATION

EAST ELEVATION

27


R EXIT

11 EXIT

EXIT

EXIT

10 9

EXIT

8

EXIT

7

EXIT

6 5

EXIT

4 EXIT

3 EXIT

2 EXIT

M 1 EXIT

28 SECTION PERSPECTIVE 1/4” = 1’ - 0”


29


PERFORMANCE + STORAGE BOX site//CLIENT: 32ND STREET usc MAGNET SCHOOL 822 WEST 32nd ST. lOS Angeles, CA 90007 Instructors: VALERY AUGUSTIN & Charles LAGRECO RESEARCH-DESIGN-BUILD TOPIC studio SPRING 2017 The goal of the RDB studio was the development of a research-based approach to design build, tasking students with defining a series of tactics and strategies for fabricating functional prototypes for the 32nd Street USC Magnet School. The resultant solutions were to be site specific, however, the broader ambition of the studio was to speculate on solutions that are adaptable, scalable and deployable as prototypes for multiple LAUSD campuses. The semester was organized to run both sequentially and concurrently; focused research serves as a point of departure for studies and models that function as data to inform further research. The information gleaned became the basis of design for built prototypes; i.e. a feedback loop for informed design.

30


31


TEAM MEMBERS: 32nd Street

PROJECT ARCHITECTS: MAXWELL DJAKASAPUTRA MILTON VILATORO

PARKING

PARKING 32nd ST ENTRANCE

SITE 2

PROJ ECT MANAGERS: HAYLEE BEYNON ALEKSANDR DRABOVSKIY

SITE 7

PROJECT DESIGNERS: LUIS GARCIA MAX JACKOWITZ

SITE 9-A

SITE 6

University Way

Shrine Auditorium Parking Lot

SITE 5 SITE 4

EMERGENCY EXIT

SITE 3-B SITE 8

SITE 9-B

SITE 3-A

SITE 1

JEFFERSON ENTRANCE

JEFFERSON AVENUE

1 : 25

32nd STREET MAGNET SCHOOL OVERALL SITE PLAN

SITE PLAN

PERFORMANCE A-1

ANALYSIS LOCATIONS SCHOOL BUILDINGS GREEN

32


GLULAM COLUMN 1X4 BLOCKING WHITE ALUM SHEATHING

WATER PROOFING

1/2” DOWEL

WHITE ALUM SHEATHING

1X4 BLOCKING WEATHER PROOFING

CNC RIB JOINT

2X4 HEADER

1/2” DOWEL

GLULAM COLUMN CNC GLULAM JOINT

A 1

A 3

A 1

1X4 BLOCKING

GLULAM COLUMN

A 3

1/2” DOWEL WEATHER PROOFING

1/2” DOWEL

WHITE ALUM SHEATHING

3/4” PLYWD

3/4” PLYWD

0'-11"

0'-6"

0'-7"

2X6 FRAMING

2X6 LAMINATED FRAME

LEVELING CASTER 3”X1-3/16”

LEVELING CASTER 3”X1-3/16”

A 2

A 4

0'-5"

A 2

A 4

CONNECTION POINT SECTIONS

33


34


12 17c

17c

01

17d

17c

11 17e 18 22

13

23

09

18

25

17a

19

17c

15 17a 17b

16

13 14

09

09

01

01- 3” PHILIPS SCREW 02- 2x6 BASE FRAMING 03- NYLON LEVELING CASTER 04 1/2” BOLT 05- 2x6 BLOCKING 07- 3/4” PLYWD PLATFORM 08- NOTCH FOR COLUMN 09- RIB JOINT 10- 1/2” DOWEL 11- 1/4”X1-1/4” BATT & BOARD 12- 1/2”- 3/4” NAIL 13- 1/2” FINISH PLYWD 14- 3/4” GLULAM RIB 15- 1/2” DOWEL HOLE 16- 2” EXTERIOR DECK SCREWS 17- WHITE ALUM SHEET a. 48”x48” b.23-1/2”x38” c. 48”x38” d.51”x48” e. 23-1/2”x48” 18- 3/4” SHEET METAL SCREW W/ RUBBER WASHER 19- 1x4 SHEATHING WOOD 20- 2x4 DBL HEADER 21- 2x4 COLUMN 22- 2x2 DOOR FRAMING 23- BLACK DOOR HANDLE 24- BALL TRANSFER 25- DOOR HINDGE 26- ADJUSTIBLE DOOR STAY 27- CLOSET TRACK

20

01 15 14 10

14 21

11 10

12

09 27 01

06

11

07

01

26 19

08

19

13

12

06 01 06

02

1

17

02

22

25

24

23 18

26

17

02 02

05

01

02 01

03 04

EXPLODED ASSEMBLY AXONOMETRIC

35


LATIN & SOUTH AMERICA STUDY ABROAD COUNTRIES: MEXICO, PERU, BRAZIL Instructor: JAMES STEELE GLOBAL STUDIES studio SUMMER 2016 Located in the Mooca district, a postindustrial area in Sao Paulo, the site offers a plethora of opportunities for redevelopment and revitalization. We recognized the need to maximize the site, educate the people, and ultimately host the public. The site offers views to a proposed lake front on the west facade and views to a railway park on the east facade. With access to the Tamanduatei River and proposal of revitalizing the rivers of Sao Paulo, biological waste can be dropped off to the site to fertilize the soil. The cultivation of beans would also educate the people and ultimately allow for a source of income. With a Favela located across from the site, the proposal includes a prototype for social housing where the inhabitants will be invited to relocate to. Lastly, the proposal prepares the site to host the public by including a market, dining options, and green spaces. By retrofitting the structures of the existing building, a House of Culture will provide a space for artisans to gather, learn and create their crafts.

36


37


site: Av. Presidente Wilson, 2237 Mooca, São Paulo - SP, 03107-002, Brazil PROGRAM: CULTURAL CENTER, housing PARTNER INSTITUTION: Faculdade de Arquitetura e Urbanismo - Universidad de Sao Paulo (FAU-USP) GRUPO METROPOLE FLUVIAL STUDIO 336 700

336 600

336 600

336 500

336 500

336 400

336 400

336 300

336 300

46º36'15"W 23º33'45"S 23º33'45"S

PD

0 78

785

.48 784

BÉ 77 0

ETI A ÓPI

8 0.5 75

SÍL

ICA

A SS LE 755

RUA

1

BÉ 78 1.3 6

RU A 8 4.0 77 8 0.5 77

9 768.5

0 760.4

775

AIM GU

TA

RU A

OS BARR

S RE PE

DE

UE

IQ RU A

IAN ADR

DR. RUA

0

74

7 392 400

731.44 735.67

7 392 400

E ENT SID

PRE

DO

725

AGOSTINHO

FOR

0 73

D

728.62

.17 728

727.93

728.36

DO

727.83

INA

PAS

CRIST

STIN

A

PAS

.74 729

DIA NÓ LIS

PO

.76 729

EZA

CRI

RO

730

.39 728

.93 729

730.28

729.45

DO

731.79

PRE E

ENT

.56 728

SID

DO

730.17

IO

728.58

ÔN ANT

729.43

729.28

IRIR

7 391 800

Í

RIO

RY HEN

730.47

730.21

.29 730

7 391 800

CAD

7 391 800

RUA

09

.75 728

728.67

727.59

729.81 731.53 728.55

728.64 729.12

7 391 700

733.78

7 391 700

733.55

733.87

733.61

7 391 700

733.38

733.72

7 391 600

733.67

7 391 600

729.45

728.80

730.45 730.25

730.63

730.60

729.26

733.72

NA 733.89 733.69

729.96

728.80

730.63

NOS

ISTA

729.65 730.11

PAUL

730.01 728.05 7 391 600

728.35

733.84

730.18

730.45

730.27 728.83

727.88

.86 728

733.70

728.85 730.22 728.80

728.29

730

BOM

728.91

7 391 700

728.90 728.47

729.67

733.87

733.49

730.98

729.39

729.11

730.74

734.05

7 391 700

NA 720.89

729.67 V

733.84

733.76

NA 725.48

7 391 700

729.90

V

733.58

.61 728

734.22

BENTO

734.19

ATEÍ DU AN TAM

733.68 733.93

733.97

V

7 391 700

729.25

728.71

729.43

728.80

731.22

733.86

733.79

733.45

728.70

730.33

730.36

GINÁSIO

731.72

733.67

727.74

729.69

733.31 733.41

733.83

730.3 1

7 730.3

733.37

732.84 732.53 731.84

731.56

URBAN PLAN 730.85

730.12

.50 728

733.14

733.41

730.21

12

7 391 700

729.67

.58 728

RUA

730.40

730.76 730.58

NA 720.83

728.67

728.43 V

730.24

0

P

7 391 700

730.37

728.68

730.

728.43

73

RUA

730.37

V

733.21

731.69

730.64

728.65

728.60

2

729.39 P

733.48

731.83

7 391 800

730.67

729.50

730.82

TABOR

V

7 391 700

728.67

7 391 800

728.51

729.62

CLUBE ATLÉTICO YPIRANGA

732.86 733.32

TABOR

730.

729.32

7 391 800

728.63

IPIRANGA SETOR 040

729.77

732.68 V

733.44

728.35

728.48 NA 720.75

732.25

731.68

730.18

728.71 729.56

732.65 732.86

733.07

733.38

7 391 700

ZZI

ARI

CHI

730.31

728.38

731.86

7 391 800

733.39

IDA

ATER

2 729.7

7 391 900

728.83

728.22

733.82

AVEN

.68 729

TER

RUA

730

.53 728

EZA

.56 729

RUA 729.96

730.14 727.64

729.35

7 391 800

733.52

RUA

AVE

LIS PO

Í

.40 728

TER

IRIR

.36 728

.43 728

7 391 900

729.82

MOÓCA SETOR 032

728.65

729.49

728.51

ONA ORIZ

AGOSTINHO

730.64

7 391 800

733.47

SETOR 040

DUFER S/A. EMPRESA DO SISTEMA USIMINAS

728.48 NA 720.70

731.75

733.43

733.90

7 391 900

729.49

728.77

732.88

730.40

V

7 391 900

727.63

729.51

733.19

731.75

7 391 900

728.28

729.36

732.72

733.33

733.33

7 391 900

727.86

731.52

730

731.30

731.70

728.42

733.75

731.22

730.24

730.31

728.91

731.50

732.42

733.11

NA 724.96

7 392 000

729.34

728.48

NA 720.68

731.45

733.73

731.59

MBÉ

GUE

729.49

733.40

PÇ. ENG. GARCIA

A NID

.33 728

727.49

732.79

733.33 733.36

730.73

731.07

729.43

RUA

732.53

732.83

V

IGREJA MATRIZ NSRA. DAS DORES

7 392 000

731.25

730.46

V

FICO

7 391 800

728.75

731.46

.43 728

.24 728

V

V

732.83

CIPRIANO

COSTA V

V

730.79 729.58

728.30

727.68

732.72

733.47 733.63

729.06

.29 728

A

RUA

V

732.83

733.10

733.65

729.35

730.74

728.31

731.34

ANH

732.33 733.10

729.48

729.09

AVE

.44 728

ARIR

7 391 900

RUA

728.78

NA 724.79

.41 728

A NID

DO

V V

ACAÇA

ATLANTE

733.62

727.75

727.67

731.84

V

728.11

7 392 000

7 392 000

732.86

728.86

727.27

RUA

728.45

731.37

7 391 900 V

733.56

729.24

7 391 800

7 392 000

7 392 000

730.87

731.80

7 391 900 E.E. JÚLIO DE

SETOR 035

733.21

728.29

731.41

733.48

730.80 731.34

728.76

730.84

733.38

DO

7 392 100

733.17

728.24

V

733.42

46º35'37.50"W 23º34'22.50"S 46º35'37.50"W

732.37

MOV. TERRA

730.81

728.86

727.69

727.58

RUA

733.74

337 300

731.26

729.25

728.28

727.83

727.64

V

733.30

727.78

LA

732.86

NA 724.57

733.51

337 300

734.63

731.17

CONAB MINISTÉRIO DA AGRICULTURA

727.87

MESQUITA FILHO

V

729.42

337MOV. 300 TERRA

7 392 100

LA

7 391 900

733.36

728.64

337 200

337 300

731.18

728.71

730

IRÓS

732.86

727.56

337 200

730.72

731.12

7 392 100

728.59

732.90

RUA

732.68

QUE

727.48

727.32

RUA

CASTRO

O

337 100

729.40

732.85

R

337 100

337 200

731.21

728.57

728.44

V

733.89

727.48

729.51

337 200

729.07

728.53

V

728.30

728.44

727.90

728.34

733.61

V

PEDR

L NA

Z

TINE

733.17

727.61

CA

MAR 727.38

TV.

337 000

337 100

731.45

V

NA 724.33 727.31

727.50

ÃES

SA RE

727.67

SA RE

NA 720.67

IPIRANGA SETOR 035

V

337 000

337 100

728.36

727.25

729.41

TV.

729.32

336 900

MOÓCA SETOR 032

728.40

728.41

727.57

727.81

MAGALH

AVE

IDA

54

JANUÁRIO

727.57

JANUÁRIO

CÔNEGO

RUA

E.E. JÚLIO DE MESQUITA FILHO

728.23

727.37 727.90 727.17

CÔNEGO

729.71 728.72

PEDRO

1

NA 720.63

727.86

LEME

728.07

RUA

729.

729.29

729.71 728.26

727.12 727.89

728.44

7 392 000

7 392 000 RUA

336 900

337 000

729.76

728.35

727.32

727.86

728.25

727.11

NA 724.18

730

727.92

336 700 336 700

728.63

727.88

728.09

727.24

730.67

727.53

336 700

337 000

727.87

727.76

727.81

727.86

7 392 000

7 392 000

727.77

727.72

728.31

727.64

727.10

727.63

336 700

V

C

727.74

727.60 727.58

336 600

336 900

729.19

727.73

GARCIA

727.30

727.44 727.83

727.42

CO

336 600

336 600

728.05

729.31

CHI

336 600

336 900

728.32

727.89

727.78 727.32

726.79

727.18 726.87

UH

BBO

CHA

RUA

730.40

727.62

727.56 727.64

727.30

IO

ECC

336 500

727.25 726.67 727.94

728.24

DIO EGY

336 500

336 500

46º35'56.25"W 336 800 23º34'22.50"S 23º34'22.50"S 46º35'56.25"W 336 800

NA 720.60

A ID

TENENTE

730.47

728.33 V

7 392 000

727.25

EN AV

727.78

730 730.59

727.18

728.09

336 500

728.78

7 392 100

728.84

728.19

727.68

728.37

336 400

728.09

729.74

RUA

336 400

336 400

RUA

RUA

727.57

728.48

RUA

727.18

7 392 100

727.61

V

NA 724.09

726.88

725

POLIS

727.28

A

336 400

EN AV

BUENÓ

726.85

REIR

P

727.17

NA 728.39

729.83

7 392 100

727.71

RUA

727.11

GE

728.76

727.39

DE HONRA 729.11

728.71

727.14

726.80

MO

7 392 100

727.25 HONRA

CAD

7 392 100

336 300 46º36'15"W 23º34'22.50"S 23º34'22.50"S 728.13 46º36'15"W RUA GUARDA 336 300

336 200

726.83

727.83

D

336 200

GUARDA

731.34 731.19

FOR

727.46 336 200

336 200

DE

726.86 726.93

RUA

RY HEN

336 100

728.30

.36 728

336 100

336 100

727.78

SON

336 100

726.90

732.87

731.49

CONAB MINISTÉRIO DA AGRICULTURA

728.37

729.14

WIL

336 000

DO

336 000

336 000

727.57

732.67 731.73

732.47

730.38

728.39 728.20 728.17

727.67

729.42

730.63

7 392 200

730.80

ESTA

336 000

NA 723.85

RIBE

729.46

728.06

Í

335 900

727.68

G.

A 335 900

335 900

R. ANTÔNIA DOS SANTOS

BARATA

HELEN 335 900

GOMES

CRISTINA

727.21

727.88 728.27

ESTADO

IA

R.

727.35

727.56

727.33

730

729.09

728.70

727.79

NA 720.57

727.70

7 392 200

DIA

CRISTINA

MAR

727.69

730.40 730.57

7 392 200

A NID AVE

TV.

727.88

726.71

726.82

731.67 730.89

728.43

7 392 200

727.47

43 727.

.43 728

726.89

726.72

NA 723.67

726.55

7 392 200

730.84 730.89

728.36

IPIRANGA SETOR 035 7727.84 392 200

UATE TAMAND

726.85 726.70

726.76

7 392 200

.34 728

728.51

727.90

727.55

726.59

335 800

731.78

7 392 200

729.40

727.85

726.48

730.89

727.67 727.31 C

726.69

727.08

728.78 728.90

7 392 200

727.67

727.60

727.17

731.48

729.26

729.24

.24 728

RIO

7 392 200

PAULO

RUA

726.51

V

731.40 730.90

731.02

728.24 728.31 728.38

728.38

726.62

726.68

726.68

726.64

7 392 300

730.20

730.20

730

729.29

FAVELA

PAULO RUA BARBOSA

BARBOSA

726.82

726.56

726.59 726.60

731.50

731.04

727.68

727.50

726.39

7 392 300

730.42 730.26

DO

NA 720.55

V

726.19

731.64

731.44 730.20 729.32

727.34

DE 726.27

7 392 300

7 392 300

728.62 728.60

729.40

ÊNI EUG

7 392 300

7 392 300

728.50

728.48

726.70

726.42

735.86

729.22

727.42

726.62

GEN

O NT

SA

731.50

730.92

728.74

NA 723.60

726.39

7 392 400

740.50

731.04

729.87

728.17

726.44

726.39

0

5

735.56

729.20

726.17

O MEL

727.30

75

7 392 400

A NID

AVE

725

7 392 300

7 392 300

728.06

7 392 200

HE

NR

O

RUA

74 735.54

728.52

728.30

7 392 300

7 392 300

727.36

727.56

NA 723.52

727.09

NID A

78

2.6

M AN A 769.54

RUA

RUA

COS

E

729.84

730.20

727.11

727.07

730.49

7 392 400

727.70

727.10

726.14

731.74

7 392 400

728.24

727.32

729.65

RUA

NT

5

728.57

727.04

SOARES

727.06

CIPRIANO

TEREZA

726.59

730.12

NA 725.05

P

MO 73

730.90

730.80

731.42

HIPÓLITO

L NA CA

TEREZA

729.69

727.09

7 392 500

736.02

MOÓCA SETOR 032

729.87

.52 728

TATINI

RUA

731.35

GU AIM

ES PA

LO PAU

DOS

IPIRANGA SETOR 035

RUA

7 392 300

731.64

LO

730.50

726.50

CORREIA

GU

728.34

SECRETARIA DE ESTADO DA CULTURA DIVISÃO DE ARQUIVO DO ESTADO ARQUIVO INTERMEDIÁRIO 728.50

727.06

726.36

FARIA

P

728.38

7 392 400

7 392 500

755.28

731.10

729.12

CIA. SUDESTE DE ARMAZENAGEM DISTRIBUIÇÃO E LOGÍSTICA

728.54

728.18

727.40

727.06

726.78

728.20

P

731.08

726.09

DR.

730

A RU

ES

R

DO

727.82

728.17

DAUNT

PRAÇA DO MONUMENTO

DO

TA

729.20

7 392 500 730.82

729.17

A ID EN AV

RUA

ES

727.06

JO

728.10

726.55

726.44

7 391 600

GA

RUA

728.26

757.49

750.52

740.21

DE

732.10

CIA. AUXILIAR DE ARMAZÉNS GERAIS

728.44

730.44 7NA 392 400 720.54

726.36

38

BAR

5

7 392 500

LI

RU A

RY HEN

72

NA 723.31

726.64

726.37

7 391 700

EM

A

RUA

CORÁ

730.04

5

7 392 400

RICA

7 391 800

7 392 500

729.26

MOÓCA SETOR 032

728.48

728.48

730

728.34

72

7 392 400

MANOEL

DES

EIR

AVENIDA

726.42

POLÍCIA CIVIL DIVISÃO DE TRANSPORTES

DO

Í

728.12

727.74

DI LM A PO

COMPANHIA BRASILEIRA DE ARMAZÉNS GERAIS LTDA. C.B.A.G.

729.28

7 392 500

TA

RDO

7 392 600

754.69

RIS

728.18

7 392 500 729.58

ES

TA MAN DUA TE

727.04

726.46

728.12

TV. 728.47

RUA

RUA

PER

L ICIPA L RA MUN ONA EITU REGI .29 PREF ETARIA 727 SECR

RUA

729.08

728.78

729.24

728.60

727.42

726.98

728.47

NIO 747.49

ANTÔ

729.28 729.96

729.26

728.76

7 392 500

728.67

NA 720.23

7 392 400

728.71

RU A

732.20

727.03

727.09

7 392 600

757.94 749.90

728.70

727.54

RUA

7 392 600

729.22

728.12 7 392 500

728.58

RUA

729.22

0

730

7 392 600

729.04

727.74

744.74

STA 7 392 600

727.42

727.54

ELETROPAULO ESTAÇÃO DE TRANSFORMAÇÃO DE DISTRIBUIÇÃO MONUMENTO

755.26

745

734.67

727.09

727.54

V

726.74

TO

726.32

S

GO

MÁRIO VERDADE

V

726.89

QUE

752.40

P

NE

RÃ O

745

729.14

RIO DO

PRAÇA MARTINS

727.09

727.92

MAR

P

BA

735.08

726.07

BARRE

726.42

P

AZEV

734.28

733.54

7 392 600

729.06

727.14

P

V

EDO

7 392 600

729.14

727.68

LIMA

46º35'37.50"W 23º34'03.75"S 46º35'37.50"W

7 392 700

740.80

729.26

727.12

726.58

JOR

337 300

Í

A NID

CO 7 392 600

7 392 500

727.49

337 300 760

337 300

738.11

728.58

727.64

728.24

337 300

CELS

745.72

7 392 500

335 800

337 200

V

IRIR

AVE

E

A NID

ENT

730

729.06

7 392 600

728.38

IRO

337 200

337 200RUA

729.48

NA 719.63 727.44

727.70

335 800

337 200

DE

729.20

AVE

SID

O PINT

7 392 600

728.02

726.31

335 800

753.52

O

RU A

727.96

728.02

727.02

727.02

ODI

S

337 100

750

753.62

740

729.08

727.13

7 392 100

PROJETO SOCIAL C.I.E.E.-PEC

RU A

744.84

727.12

727.14

337 100

QUE

337 100

337 100

NA 723.21

7 392 500

727.21

337 000

P

V

727.24

727.12

O

MAR

A 744.70

V 337 000

337 000

729.08

DO

726.68

L

752.70

SS

337 000

CAD

729.67

7 392 700

EDO

LE

336 900

733.58

730

729.60

7 392 700

AZEV

NI O

336 900

336 900 336 900

OAB-SP PROJETO SOCIAL C.I.E.E.-PEC

730

RUA

7 392 700

S. PRE N SO

PRE

TA

IDA

RUA

DO

769.90

DE

AN TÔ

NT O

OAB-SP PROJETO SOCIAL C.I.E.E.-PEC

728.68

728.50

727.08

727.10

ERA

E

735

PRE

7 392 600

727.14

PROJETO SOCIAL C.I.E.E.-PEC

NT

7 392 700

336 800 46º35'56.25"W 23º34'03.75"S 23º34'03.75"S 336 800 46º35'56.25"W

728.62

SETOR 032

728.52

727.01

336 700 336 700

727.96

728.92

7 392 300

336 700 336 700

SID

NA 722.47

7 391 900

5 9.7

74

336 500

336 600 336 600

751.14

GO

7 392 700

Í

336 500

336 400

336 600 336 600

V

O

734.67

727.24

727.35

726.60

ES

P V

CELS

NE

MO

IRIR

336 400

336 300

336 500

336 500

WIL

728.58

TO

PIN

727.84

726.31

726.42

DE

CAD

336 200

E

NA 719.62

727.14

PRAT

756.20

750.04

750

RU A

V

SA

729.92 336 400

336 400

336 300

ENT

ID A

727.37

727.10

P

D

336 200

A LIM

COS

EN AV

727.08 7 392 600

729.88

IPIRANGA

728.24

336 300 46º36'15"W 23º34'03.75"S 23º34'03.75"S 336 300 46º36'15"W 7 392 700 7 392 700

. PRES

728.54

AV EN

RUA 5

730.32

FOR

336 100

336 200

RUA

PERE

RUA

IDA

336 100

336 200

IRA

PRE

AV EN

336 100

.90 729

336 000

336 100

727.24

727.84

725

0

336 000

BATI

720

72

NAL

7 391 900

IS

.04 730

726.68 STA

336 000

7 392 700

729.12

727.20

336 000

AV.

335 900

CA

TV.

LO

74

BA

RÃ O

SON

335 900

S.

72

727.02

P

769.74 P

ME

RU A

729.50 7 392 700

A

O

335 900

7 392 800

7 392 800

LO

P

734.40

728.27

RUA 728.08 335 900 727.80

5

765

P

ME

NT O

730

WIL

EIR

PER

AD EST

IPIRANGA SETOR 032

ENT

SID

PRE 727.34

DO

727.54

7 392 000

7 392 800

SA 730.52

730.32 729.12

726.92

TA

727.47

P

764.48 P

DE

P

728.06

ES

NA 719.58

335 800

727.47

728.07

760.26

755.10

DE

RY HEN

OS RL

7 392 800 730.52

UI M

JO AQ

755

728.29

V

TO PIN

UAT ND MA TA

.25 726

335 800

772.79

UIM

P

0

ISTA

727.22

726.78

E

726.25 335 800

335 800

7 392 100

75

5

73

CA

RIO

DO 727.67

LON

RAS

SÃO 7 392 800

735.82

728.63

IPIRANGA SETOR 035

DR.

JO AQ 752.67 734.58

750.17

7 392 700

P

CON DE

BAT

727.74

728.08

727.76

AJA

A NID

STA

M

7 P392 800

NTE

BS CONTINENTAL FÁBRICA DE FOGÕES

726.60

RUA

728.06

727.50

DO 7 392 800

760.09

MO

7 392 800

A

780.79

P

0

M

731.24

SÃO TO

VIA

726.50

727.88

46º36'33.75"W 23º34'22.50"S 46º36'33.75"W

TAB

RUA

AVE

.38 730

STA

CO

DO

IDA

DO

EN AV

EIR

PER

CAMÉ

759.17

76

760.36

DO

7 392 800

730.08

DU

NA 719.57

7 392 900

P

759.50

759.32

RU A

SETOR 032

0

7 392 900

RU A

ENT

726.57

P P

755.24

E

727.39

LO

5

LOS

7 392 800

78

775.64 775.55

760

A RU

ME

74 740

PRE

729.02

780.32 V

765.90

765.90

775.10

A RU

741.52

735.24

CAR

728.06 726.60

V

7 392 900

ÃO

DE

OS

773.53

767.27 P

SID

728.54

726.60

RUA

RUA

RA VEI

O

745.76 745

BAR

RUA 735.03

730.32

728.54

726.24

7 392 ME 900 LO

735.04

A RU

732.63

727.36

7 392 800

763.93

RUA

750

730.40

M

TO

DU

CPT

VIA

CO

L NA

CA

RES

SOA

P V

758.83

DE

736.04

730.36

727.32 727.10

768.73

7 392 900

DE

757.46

RUA

RR

782.79

V

7 392 900

751.89

UIM

7 393 000 786.90

BA

779.93

RIO MÔN ACO

UIM

JO AQ

OS

781.35

P

ROSÁ

755.47

JO AQ

736.08

7 392 900

730.77

BA RR 785.41

772.82 769.24

761.35

5

RU A

744.92

739.24

RED

V

BERN INI

765.77

75

M

747.14

743.45

UEI

726.33

RUA 726.54

7 392 200

APU

739.56

734.93

FIG

3

730.59

7 392 900

PUR

760

OLI

.72 730

IDA

BRA

727.06

76

RAS

.94 730

E

EN AV

ÃO ND

728.83

ANA . PEST

760

AJA

E

E

ENT

SAR

742.32

DO 734.62

V

727.18

7 392 400

A AIV

ENT

SID

ENT

735.50

7 392 900

DO

785.17

770.58

766.72

747.70

Í

M

7 392 900

46º36'33.75"W 23º34'03.75"S 46º36'33.75"W

SAR

SID

PRE

SID

PRE 7 392 900

730.55

SID

V

764.55

763.34

APU

784.25

V

772.31

RU A

765.73

763.92 760.15

RU A

Í

SAR

745.33 V

727.18

E

ENT

766.31

7 393 000

747.36

RUA 739.90

778.58

766.12

747.65

O ISC

NC

FRA

735.65

735.67

PRE

727.69

7 393 000

739.89

733.98 730.98

730.64

ÃO

726.50

R. ALM

.90

766

728.36

BAR

V

7 392 800

TAB

DE

7 393 000

.80

766

P

7 393 000

MOÓCA SETOR 032

765.31

P

P

NO

VIA OTA

746.41

PRE

DE

726.50

PA

760

IO

DE 742.34 735.59

7 393 000 726.74

727.19

784.03 774.15

P

772.77

730.90

7 393 000

V

769.47 7 393 000

756.43

747.78

785.85

782.80

.88

767

7 393 000

759.70

.83 730

DE

780.67

771.46

753.30

AJA GU

V

781.59

772.86 771.13

DE

733.60

728.92

727.11

775

UTO

TÔN AN

7 393 000

783.14

781.54

735

.84 730

RUA

7 393 000

7 393 100

762.67

P

763.67 P

730.59

729.65

RUA

783.86

783.21

755.97

748.30

RUA

727.19

PRE

727.52

V

761.10

752.39

739.96

727.35

NA 719.51

7 393 100

736.76

E

A ID

CAN

740

M

7 393 100

P

733.81

ENT

US

780.35

749.29

740.22 731.31 731.49

SID

JU

762.97

758.17 729.70

INDÚSTRIA LORENZETTI

C

DE 782.54

A

AN M

775.56

767.93 766.74 P P

741.02

727.86

A EID

ALM 727.12

7 392 900

V

P

755.41

782.62 7 393 100

753.78

741.76

7 393 100

727.74

727.59

760

S RGE

CPT 7 393 100

PRAÇA LORENZETTI

DE

7 393 100

IEL

EZE

745.45

742.10

P

727.96

779.60

778.63

769.31 7 393 100

756.69

739.01

779.33

778.64

748.17

742.31

733.49

ARN O

RU A

781.15 766.25 764.57

730.64

7 393 100

782.21

761.81 P V

QU

UTO

CO

729.11 727.43

7 393 200

779.64

GRUPO METROPOLE FLUVIAL STUDIO

752.90 749.80

V

INDÚSTRIA ARNO

781.56

ESCOLA ESTADUAL PANDIÁ CALÓGERAS 776.54

RUA

O JOÃ

BO

7 393 100

779.89

775.62

V

768.26

760

738.59

731.85 7 393 100

V

754.63

745

F

750

.27 731 731.50

P

RUA 7 393 200

753.76

MOÓCA SETOR 028

736.56

7 393 200

M AD

RAM

747.63

735.99

729.73

P

779.64

RE

734.44

RUA

727.91

EZEQ

766.06

761.83

7 393 200 OS

732.82

7 393 100

SO

779.86

UIEL

765

754.70

758.42

CAMBUCI SETOR 028

728.27

RA PO

779.95

753.28

E

ND

CO

VIS

728.51

728.03

EN AV

ALEXANDRE DELIJAICOV (FAU-USP)

727.90

726.51

7 393 200

765

762.88

V

750.61

735.93

7 393 200

731.82

731.15

8

7.8

77

TEATRO ARTHUR AZEVEDO

773.98 777.32

763.62

732.79

AVE NID A

A ID EN AV

P

746.22

7 393 200

755

740.49 V

7 393 200

7 393 000

4 0.1

A RU

RUA

7 393 200

V

SUBESTAÇÃO

77

RUA

RUA

.40 731

7 393 200

728.76

728.85

773.48

OS RAM

769.97

DE

730.18

7 393 200

E.

770.21

767.08

735.55

731.67

RU A

P

778.84

762.92

753.76 V

.91 750

732.50

RUA

A NID

7 393 200

735

AVE

INDÚSTRIA ARNO

775.73

23º33'45"S

749.39

IM

MER

INHO 744.98

731.93

731.19

23º33'45"S

V

731.41

730.17

JU

336 200

336 200

336 100

336 100

336 000

336 000

770

instructors: JAMES STEELE (usc)

335 900

335 900

335 800

335 800

46º36'33.75"W 23º33'45"S

732.49

728.67

7 391 600

730.43 728.42

728.17

733.84 734.05

ES

728.92

729.23 728.66

729.41

729.71 730.16

7 391 600


SITE PHOTOS

TAMANDUATEI RIVER

BEAN GROWING AREA

PRESIDENTE WILSON AVE.

BEAN PROCESSING SPACE + MARKET + DINING + SOCIAL HOUSING + HOUSE OF CULTURE

NEW TRAIN STATION

RAILWAY PARK

SITE SECTION

SITE SECTION @ 1 : 500

REF MW DW REF MW DW

SITE PLAN

STEP 1: ANALYZE SITE

PROGRAM DIAGRAM

STEP 2: CONNECT SITE TO URBAN CONDITION

STEP 3: SITUATE SOCIAL HOUSING

STEP 4: MAXIMIZE SITE VIEWS

39


MEXICO

PERSPECTIVE SECTION

MUSEO SOUMAYA

MACCHU PICCHU

MUSEO NACIONAL DE ANTROPOLOGIA

SãO PAULO, BRAZIL

SACSAYHUAMAN

Brasilia, BRAZIL

CASA DE VIDRO

BRASILIA FROM TORRE DE TV

RIO DE JANEIRO, BRAZIL

40

MUSEU DE ARTE CONTEMPORANEA DE NITEROI

MUSEU DO AMANHA


CUZCO, PERU

BIBLIOTECA VASCONCELOS

LINA BO BARDI STOOL MAKING WORKSHOP

CHICHEN ITZA

INSTITUTO TOMIE OHTAKE

SESC POMPEIA

SUN PATH DIAGRAM

CONGRESSO NACIONAL BRASILEIRO

CRISTO REDENTOR

EXTERIOR OF CATEDRAL DE BRASILIA

INTERIOR OF CATEDRAL DE BRASILIA

41

ENGENHAO - RIO 2016 OLYMPICS


Architectural practices re-imagined site: 3625 S. GRAND AVE Los Angeles, ca 90007

Advisor: HADRIAN PREDOCK THESIS studio SPRING 2018 The Insider. I deal with the interiority of architecture and work in various scales from a chair to urban rooms. I am most interested in challenging the binary status of architecture comprised of interior and exterior practices. I am believe that architecture has been pitted against interior practices and has drifted towards becoming solely a materialization of exterior practices. Instead, architecture aught to incorporate interior practices just like how Mies, Loos, Rudolf, and Panton have done for a period of time in their career as architects. Perhaps architecture can start to index qualities of an interior rather than become solely a expressionistic, weatherproofed shell. Perhaps interiors can start to index exterior systems and logics rather than become solely a space for program.

42


43


Architecture is in a state of having an identity crisis. Architecture is being forced to choose to be either a materialization of exterior or interior practices.

Architecture has become solely focused on exterior logics, aesthetics and practices. Architecture has become dissatisfied with just one way of being.

Architecture is nostalgic for the days when there was a higher interest for the inside, resulting in Mies’, Loos’, Rudolf ’s, and Panton’s experimentation with interiors. Architecture isn’t sure what it wants to be anymore.

Architecture has decided to go to therapy.

44


Hello Therapist. I am having an identity crisis. I am not satisfied being just the materialization of exterior practices.

The Site scales up to the urban grid to create an urban room.

The Site.

The Site scales up to the urban grid to create an urban room.

The Site.

The Site scales up to the urban grid to create an urban room.

The Site scales up to the urban grid to create an urban room.

The Site scales up to the urban grid to create an urban room.

45


T 46


Surfaces.

Volumes.

Lines.

Grids.

Materials.

The Index Room. 47


REFRENCES 01

DIANA TANG, LEED AP BD+C

Associate, HKS Los Angeles dtang@hksinc.com 310.788.7700

02 JAMES BLACK MCLEISH III, AIA Senior Partner, LSM jmcleish@lsm.com 202.295.4825

03 OLIVIER TOURAINE Associate Professor of Practice , USC Architecture olivier@studiotouraine.com 213.740.2723


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.