MAXWELL DJAKASAPUTRA PORTFOLIO 2020
ABOUT ME I am looking for a studio that can foster my interests in becoming a well-rounded designer, project manager and licensed architect. I am interested in forwardlooking issues such as sustainability, verticality, and design innovation. I am motivated to learn more about the future of workplaces post COVID-19, the evolving culture of retail & hospitality, and the architectural impact on the “Disruption Economy.�
Maxwell Djakasaputra
EDUCATION UNIVERSITY OF SOUTHERN CALIFORNIA Bachelor of Architecture
May 2018
U S C P H I S I G M A T H E T A H O NO R S O C I E T Y Fellowship
PROFILE 25-year old aspiring architect
E D W AR D & Y O L AND A W O NG T R AV E L I NG F E L L O W S H I P F e l l o w s h i p a w a r d e d t o 5 a r c h i t e c t u r e s t u d e n t s to simulate the i n t e r d i s c i p l i n a r y , c o l l a b o r a t i v e p r o c e s s o f a mixed-use development
from Houston, Texas with
C o n d u c t e d a f e a s i b i l i t y a n a l y s i s o n t h e O l y m p i a Convention C e n t e r f o r C a p i t a l & C o u n t i e s P r o p e r t i e s P L C o f London, UK
a passion for mixed-use
CONTACT (832)-758-7705
EXPERIENCE HKS ARCHITECTS
APT A
C o o r d i n a t e d i n t e r i o r s t e a m a n d s u b - c o n s u l t a n t s on submittal p a c k a g e s , d o o r + h a r d w a r e s c h e d u l e s , a n d p l a n c h eck requirements E n s u r e d C A S p R e v i e w c o m m e n t s w e r e r e v i e w e d a n d reflected throughout entire renovation of Westin Palo Alto
LINKEDIN.COM/IN/MDHUANG94
P a r t i c i p a t e d i n m a r k e t i n g i n t e r v i e w f o r H e a r s t Hotel historic p r e s e r v a t i o n a n d c o n v e r s i o n t o c l i e n t r e p r e s e n tatives
MDHUANG94@GMAIL.COM
AC MARTIN PARTNERS Technical Coordinator + Designer
D e v e l o p e d m a s s i n g s t u d i e s , b l o c k & s t a c k d i a g r a ms, and p r o g r a m m a t i c p l a n n i n g s c h e m e s f o r U C I S t u d e n t S uccess Building F o u n d e d A C M ' s I n t e r n s h i p P r o g r a m a n d N e w H i r e P r esentation series for weekly Happy Hour
RHINO+V-RAY REVIT+ENSCAPE
HKS ARCHITECTS Architectural Design Intern
E n s u r e d g r a p h i c l e g i b i l i t y i n t h e p r o d u c t i o n o f construction d o c u m e n t a t i o n f o r U S C N o r r i s C o m p r e h e n s i v e C a n c e r Center.
ELEMENTARY: SPANISH
FITNESS FOOD CORTADOS ART HISTORY FASHION URBANISM
Jun 2017- Aug 2017
P i c k e d u p r e d l i n e s a n d u p d a t e R e v i t m o d e l f o r 1 00% DD phase of U C S a n D i e g o N o r t h T o r r e y P i n e s L e a r n i n g N e i g h b orhood
ADVANCED: MANDARIN
INTERESTS
LOS ANGELES, CA
C o l l a b o r a t e d i n d e s i g n c h a r r e t t e s v i a 3 D m o d e l i n g in Rhino for t h e P e r f o r m a n c e V e n u e a t t h e L A R a m s S t a d i u m - H o l lywood Park
NATIVE: ENGLISH & INDONESIAN
BASIC: PORTUGESE
Jun 2018-Sep 2019
F a c i l i t a t e d a n d l e d D e s i g n C o o r d i n a t i o n a n d C l u s ter meetings a t f i e l d o f f i c e f o r t h e D G S N N R H o f f i c e t o w e r i n Sacramento, CA
ILLUSTRATOR
LANGUAGES
LOS ANGELES, CA
C o o r d i n a t e d a n d p r o d u c e d c o n s t r u c t i o n d o c u m e n t a t ion, Phase S u b m i t t a l s , m a t e r i a l s e l e c t i o n s , a n d L E E D r e q u i r ements
AUTOCAD
PHOTOSHOP
Oct 2019-Apr 2020
D o c u m e n t e d a n d p r o d u c e d e x i s t i n g / d e m o p l a n s , t echnical details, and accessibility upgrades in Revit and AutoCAD
SAN FRANCISCO, CA 94118
INDESIGN
SAN FRANCISCO, CA
Design Professional 1 - Architecture
536 5TH AVENUE
SKILLS
Spring 2017
INVOLVEMENT USC ARCHITECTURAL GUILD Student Mentor
AIA Associate AIA Member
AAa/e
LOS ANGELES, CA Aug 2018-present
LOS ANGELES, CA Jun 2018-present
LOS ANGELES, CA
Banquet Committee Member Jan 2019-Oct 2019 Lead graphics designer/editor and coordinator
PART ONE:
PROFESSIONAL WORK AC MARTIN PARTNERS - LOS ANGELES, CA JUNE 2018 - SEP 2019 HKS ARCHITECTS - SAN FRANCISCO, CA OCT 2019 - PRESENT 4
CONTENTS 01
DGS NEW NATURAL RESOURCES HEADQUARTERS
06-11
Technical Coordinator, Job Captain, Assistant Project Manager
02 UC IRVINE STUDENT SUCCESS BUILDING Designer
12-17
03 WESTIN PALO ALTO RENOVATION
18-21
Project Coordinator
5
DGS NEW NATURAL RESOURCES HEADQUARTERS DESIGN-BUILD PARTNERSHIP: TURNER+AC MARTIN
PROJECT DIRECTOR: TAMMY JOW, LEED-AP PROJECT ARCHITECT: TIM REDMOND, AIA PROJECT DESIGNER: GAIL BOUVRIE, AIA, LEED-AP
RESPONSIBILITIES: + Coordinated and produced toilet room, elevator lobby: material finishes, elevations, finish plans, accessibility plans, RCPs, floor transition details, tile pattern details, and ADA details + Facilitated and led Design Coordination and BreakOut Cluster meetings while maintaining Design Constraint Log at field office + Managed Phase Submittal compilations and packaging + LEED liaison and coordinator for project
6
DEPARTMENT OF GENERAL SERVICES
NEW NATURAL RESOURCES HQ 715 P STREET SACRAMENTO, CA 98514 PROJECT COORDINATOR 7
3
2
7
4
1
5
6 SITE PLAN
8
SOUTH
WEST
EAST
NORTH
STREET VIEW PERSPECTIVE
NORTH
SOUTHEAST
NORTHEAST
NORTHWEST
9
consultant
TOILET ROOM RENDERING
0 10 30 TYPICAL UPPER LEVEL FLOOR PLAN
10
N Presentation 8TH FLOOR SCALE: 1/8" = 1'-0"
KEYNOTES 102.D1 102.D2 102.D7 102.D9
8
102.D10 102.F1 102.H2 102.H3 102.K2 102.L1 102.M1
3 3' - 9 1/2"
TYPICAL 3RD-8TH FLOOR - EAST MENS & WOMENS RESTROOM
28' - 9 1/8" 10' - 10 3/4"
1' - 7"
102.L1
3' - 1" CL 3' - 1"
1' - 7"
FD
2' - 2"
3' - 0 1/2"
6' - 7"
3' - 1"
102.H2 102.H3 102.D7
102.D10 TOILET PARTITION
A-622
3' - 1"
by revision
sheet title
9' - 2 3/4"
102.D7 A-621 18
3' - 1"
5' - 0 1/2"
14
8' - 9 5/8"
5' - 6 1/4"
CL
102.H3
TOILET PARTITION
15 A-621 12
8
1' - 5 1/2"
CL 1' - 5 1/2" 102.H2
102.D10
11
MEN 13-510
5' - 2"
2
4 102.M1
102.F1 1' - 7" 102.L1 1' - 7"
9' - 3"
A-622
4' - 4"
13' - 1 1/4"
5
102.M1
4' - 10"
1
5' - 7 1/2"
CL 5' - 1 1/2" FD
102.F1
20-510
3' - 1"
14' - 2"
11' - 5 1/4"
20TH FLOOR - MENS & WOMENS RESTROOM
TYPICAL 13TH-19TH FLOOR - MENS & WOMENS RESTROOMS
5
SCALE: 1/4" = 1'-0"
4
SCALE: 1/4" = 1'-0"
A-360
Issue Date construction issue date
A-360
sheet number
project
A-360
NEW NATURAL RESOURCES HEADQUARTERS
1' - 5 1/2"
MEN
102.H3 102.H2
1' - 7"
1' - 8"
7 A-614
102.D7
FD
1' - 7"
1' - 5 1/2"
A-621 13
DEPARTMENT OF GENERAL SERVICES
5' - 1 1/2"
5' - 1 1/2"
TOILET PARTITION 102.D7 102.D9
9' - 3"
3' - 1"
102.L1
2' - 2"
3' - 1"
4' - 3 3/4"
19
2' - 2"
102.H3
1' - 8"
4' - 10"
4' - 11"
102.D7
FD
3' - 1"
3
1' - 2"
A-622
9' - 2 3/4"
11' - 4 3/4"
TOILET PARTITION 7 102.D7 102.D9
102.K2 20-511
20 A-621 17 102.F1
13-511
9
WOMEN
102.M1
WOMEN
6
10 A-622
102.F1 102.M1
5' - 2"
2' - 2"
2' - 2" 1' - 7" 102.L1
CL
5' - 6 1/2"
16
4' - 11 1/2"
1' - 7"
3' - 1 1/2" 3' - 1 1/2" 3' - 1 1/2"
5' - 0 1/2"
4' - 10"
3' - 1"
2' - 6"
3' - 1"
PHASE III DESIGN - STRUCTURE & CORE - MAY 20, 2019
d3 23' - 2 1/4" 3' - 1 1/2"
Checker
A-360
3 3 5' - 3 1/4"
Author
1
SCALE: 1/4" = 1'-0"
715 P STREET, SACRAMENTO, CA 95814
2
drawn by
3-503
checked by
WOMEN
C
A-360
date
revision information
9" 18
3' - 0 1/2"
EQ
SCALE: 1/4" = 1'-0"
no.
2' - 2"
4' - 11" 3' - 1"
3' - 1"
2' - 11 1/2"
TYPICAL 3RD-8TH FLOOR - WEST MENS & WOMENS RESTROOM
3
3' - 1" CL 3' - 1"
Tim Redmond
EQ
A-360
5' - 6 3/4"
CL 5' - 5 3/4"
Gail Bouvrie
5' - 0 1/2"
2017109
3' - 1"
102.K2
C
4' - 11 1/2"
SCALE: 1/4" = 1'-0"
3' - 1"
102.F1 102.L1 102.M1
Tammy Jow
C
TYPICAL 9TH-12TH FLOOR - MENS & WOMENS RESTROOM
3' - 0 1/2"
19 A-620 17
job number
5' - 10" 1' - 5 1/2"
5' - 0 1/2"
20' - 11 1/8"
16 102.D7
TOILET PARTITION
project director
3' - 1"
1' - 7"
project architect
5' - 7"
3' - 1"
102.H3 20 A-620
7' - 1 1/2"
3' - 1"
FD
102.H2
8
NOTES 1. FOR ACCESS COMPLIANCE DIMENSIONS SEE A-360A, A-361A, AND A-362A. 2. SEE A-612 FOR TYPICAL TOILET ROOM DETAILS, DIMENSIONS AND MOUNTING HEIGHTS FOR PLUMBING FIXTURES AND TOILET ACCESSORIES.
102.L1
project designer
7
3-510
3' - 0 1/2"
A-620
9
MEN
4
102.H3
TOILET PARTITION
102.M1 102.F1
1' - 7"
1' - 7"
102.H2
102.D10
102.M1
10 A-620 8
13
102.D7
plan check submittal date
A-621
14 A-620 12
1' - 7"
FD
102.H3
1' - 5 1/2"
102.D7 FD
102.F1
6
102.D7
102.D9 TOILET PARTITION
2
2' - 4" 102.L1
102.H3
3' - 1"
102.H2
5' - 1 1/2"
project information
1 A-621
2' - 4"
102.H2
5' - 1 1/2"
15 A-620
102.H2
3' - 1"
SS
11
ENLARGED TOILET ROOM PLANS
5 ALIGN
1' - 5 1/2"
2' - 2"
5' - 1 1/2"
1' - 5 1/2"
102.D7 102.H3
3' - 1"
FLS
3-502
3
2' - 6"
1' - 8" 3' - 1"
FD
A-620
FD
1' - 6"
37' - 10"
3' - 1"
URINAL SCREEN
TOILET PARTITION 102.D7
DATE
MEN
3' - 0 1/2"
consultant
102.M1
9-510
2' - 4"
2' - 2"
4' - 11"
2' - 2"
3' - 1"
2' - 6" 2' - 4"
102.F1
2
4
102.L1
102.H2
1' - 6"
8' - 1"
2' - 4"
A-620
102.F1
2' - 4"
102.D7
FD
5
3' - 1"
6"
3
102.M1
102.H3
2' - 4"
2' - 2" 1' - 8"
A-621
TOILET PARTITION 102.D9
102.K2
3-511
AC
5' - 0 1/2"
4' - 3"
7
9
102.F1
WOMEN
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES
5' - 0 1/2"
9' - 0 1/2"
3' - 1"
1' - 8"
3' - 1"
1
2' - 6"
10 A-621
102.K2 102.M1
2' - 4" 102.L1
MEN
5' - 0 1/2"
4' - 10"
3' - 1"
1' - 6"
9-511
3' - 1"
6
ALIGN
WOMEN
3' - 1"
1' - 6"
3' - 0 1/2" ELEC RM
3' - 0 1/2"
2' - 2"
5' - 9"
3
D
TOILET PARTITION URINAL SCREEN WOMEN'S RECESSED COMBINATION UNIT WOMEN'S PARTITION MOUNTED COMBINATION UNIT MEN'S SURFACE MOUNTED COMBINATION UNIT SOAP DISPENSER, WALL MOUNTED 36" GRAB BAR 42" GRAB BAR FEMININE NAPKIN VENDOR, RECESSED MIRROR RECESSED PAPER TOWEL DISPENSER/WASTE RECEPTACLE
plot date: 5/13/2019
6:00:50 PM
KEYNOTES 102.D1 102.D7 102.D9 102.D10 102.F1 102.H2 102.H3 102.K2 102.L1 102.M1
STARTING POINT
3 CT102
9' - 0" 21 A-612
AC
FLS
SS
DATE
INTERIOR ELEVATION - RESTROOM 20 - 510 - NORTH
1
SCALE: 1/4" = 1'-0"
Checker
Issue Date
Author drawn by
Tim Redmond project architect
checked by
Gail Bouvrie project designer
construction issue date
A-622
plan check submittal date
no.
revision information
2017109
2
SCALE: 1/4" = 1'-0"
project information
INTERIOR ELEVATION - RESTROOM 20 - 510 - EAST A
Tammy Jow
6"
7 A-622
job number
9' - 0"
9' - 0" 6"
48" MAX
SCALE: 1/4" = 1'-0"
A-622
102.L1 102.F1
CT101
CT101
INTERIOR ELEVATION - RESTROOM 20 - 511 - EAST A
11
SCALE: 1/4" = 1'-0"
OPEN TO BEYOND
2' - 10" 4"
CT102
TYPICAL 3RD-8TH FLOOR - WEST MENS & WOMENS RESTROOM FINISH PLAN - FOR TILE PATTERN ONLY
CT101
PT101
project director
PT101 OPEN TO BEYOND
consultant
CT102
102.L1
48" MAX
102.F1
C
2' - 10" 4"
CT102
date
revision
CT103
CT103
by
CT101
A-622
CT102
CT102
RF
6 A-622
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES
LEGEND 1. FOR STANDARD TOILET INFORMATION AND DETAILS SEE A-612 2. FOR MATERIAL DESCRIPTIONS SEE A-711 3. FOR CT-103 PATTERN, SEE 11/12/13 A-622.
CT101
SCALE: 1/4" = 1'-0"
CT103
102.H3 102.D7
CT102
INTERIOR ELEVATION - RESTROOM 20 - 511 - NORTH
CT101
102.H2
6"
48" MAX.
12 A-622
102.D1
CT101
PT101
PT101
6"
CT101
GL106
102.F1 102.M1
2' - 10" 4"
CT102 CT103
102.L1
EQ
CT103
4' - 0"
CT103
102.D10
102.D1
EQ
CT101
CT102
9' - 0"
RF
TOILET PARTITION WOMEN'S RECESSED COMBINATION UNIT WOMEN'S PARTITION MOUNTED COMBINATION UNIT MEN'S SURFACE MOUNTED COMBINATION UNIT SOAP DISPENSER, WALL MOUNTED 36" GRAB BAR 42" GRAB BAR FEMININE NAPKIN VENDOR, RECESSED MIRROR RECESSED PAPER TOWEL DISPENSER/WASTE RECEPTACLE
STARTING POINT
COVE 1/4" GROUT
CT102
CT102
CT102
CT103B
CT102
CT102
CT102
CT102
CT103B
CT102
CT103A
CT102
CT103B
CT102
CT103B
CT102
CT103A
CT102
CT103B
CT102
CT102
CT103B
CT102
CT103A
CT102
CT103B
CT102
CT103B
CT102
CT103A
CT102
CT103B
CT103B
CT102
CT103B
CT103B
CT103A
CT103A
CT103B
CT102
CT103B
CT103B
CT103A
CT103A
CT103A
CT103B
CT103A
CT101
CT103A
CT103B
CT103A
CT103B
CT103A
CT101
CT103A
CT103B
CT103B
CT101
CT103B
CT103A
CT103B
CT101
CT103B
CT101
CT103B
CT103A
CT103B
CT101
102.D7
4' - 0"
4' - 0"
CT103
CT103
102.D7
CT101
102.H3
9' - 0"
9' - 0"
6"
6" CT103B
CT101
CT103B
CT101
CT103B
CT101
CT103B
CT101
CT103B
CT101
CT103B
CT101
CT101
CT101
CT101
CT103A
CT101
CT101
CT101
CT101
CT101
CT103A
CT101
102.H2
CT103
CT103
SCALE: 1/4" = 1'-0"
CT101
RESTROOM TILE COLOR BAND PATTERN - FLOOR
CT101
INTERIOR ELEVATION - RESTROOM 20 - 511 EAST B
8 A-622
CT101
INTERIOR ELEVATION - RESTROOM 20 - 510 EAST B
3
SCALE: 1/4" = 1'-0"
A-622
12
SCALE: 1 1/2" = 1'-0"
1/4"
CT101
CT103B
CT102
CT103B
CT102
CT103B
CT101
CT101
CT103B
CT103A
CT103B
CT102
CT103A
CT102
CT101
CT103B
CT103A
CT101
CT103B
CT103A
CT102
CT102
CT103A
CT101
CT103B
CT103A
CT103A
CT102
CT103B
CT102
CT101
CT103B
CT101
CT103B
CT103A
CT103B
CT102
CT102
CT101
CT101
CT103B
CT103A
CT103B
CT103A
CT103B
CT102
CT101
CT103B
CT101
CT103B
CT102
CT103B
CT102
CT103B
PT101
102.D7
CERAMIC TILE (CT) OVER THINSET, SEE INTERIOR ELEV. 1/4" GROUT JOINT, TYP.
CL
6"
INTERIOR ELEVATION - RESTROOM 20 - 511 - SOUTH SCALE: 1/4" = 1'-0"
CT102
CT102
9 A-622
21 A-612
INTERIOR ELEVATION - RESTROOM 20 - 510 - SOUTH SCALE: 1/4" = 1'-0"
4 A-622
CT102
CT103A
CT101
CT103B
CT103A
CT103A
CT102
CT103B
CT102
CT101
CT103B
CT101
CT103B
CT103A
CT103B
CT102
CT102
SCALE: 1 1/2" = 1'-0"
4' - 0" CT102
102.M1
102.M1
102.F1
102.F1
CT102
CT103
CT101
102.L1
2' - 10" 4"
6"
RESTROOM TILE COLOR BAND PATTERN - WALL
4' - 0" 102.K2 CT103
CT101
6"
CT101
13 A-622
project
CT102
CT102
4 A-612
CT103
CT102
INTERIOR ELEVATION - RESTROOM 20 - 511 - WEST SCALE: 1/4" = 1'-0"
CT102
10 A-622
CT103
CT101
INTERIOR ELEVATION - RESTROOM 20 - 510 - WEST SCALE: 1/4" = 1'-0"
5 A-622
sheet number
CT103A
CT103A
9' - 0"
CT102
CT103B
6"
CT103B
CT101
SCALE: HALF FULL SIZE
48" MAX
CT103A
CT103A
6"
CT103B
CT103B
EVERY SIX INCHES
CT101
CT101
CL CL PATTERN REPEATS
CT101
THINSET MORTAR
CERAMIC TILE COVE BASE2
2' - 10" 4"
1/8"
R
3/ 8"
CL
102.L1 102.F1 102.M1
CT101
CERAMIC TILE (CT) COVED BASE OVER THINSET, SEE INTERIOR ELEV.
CERAMIC TILE (CT) OVER MORTAR BED, SEE FINISH FLOOR PLAN
GL106
PT101
2' - 10" 4"
CT103B
CT101
102.H3
6"
CT101
102.H2 WALL PER WALL TYPE
9' - 0"
CT102
6"
CT103B
1/4" 5 3/4"
CT103A
6"
CT103B
102.D1
102.D9
1/4" 5 3/4"
CT103A
EVERY SIX INCHES
6"
CT103B
CL PATTERN REPEATS
6"
CT101
9' - 0"
4' - 0 1/4" SMALL TILE BAND
CT101
9' - 0"
1/4"
sheet title
A-622
CL
4' - 0"
SMALL TILE BAND 6"
CT101
102.H3
PHASE III DESIGN - STRUCTURE & CORE - MAY 20, 2019
CT102
715 P STREET, SACRAMENTO, CA 95814
CT102
INTERIOR ELEVATIONS - TOILET ROOMS
FINISH WALL
PATTERN REPEATS
CL
CT103B
NEW NATURAL RESOURCES HEADQUARTERS
6"
CT102
9' - 0"
1/4"
PATTERN REPEATS CL 6" CL
1/4"
6"
1/4" 5 3/4"
5 3/4" 1/4"
2' - 11 3/4"
DEPARTMENT OF GENERAL SERVICES
2' - 11 3/4"
A-622
plot date: 5/15/2019
10:26:02 AM
11
TYPICAL UPPER LEVEL FLOOR PLAN
ELEVATOR LOBBY RENDERING
TYPICAL UPPER LEVEL FLOOR PLAN
12
MATERIALS & FINISHES
9
9.4
1. FOR INTERIOR FINISHES REFER TO MATERIAL AND FINISH SCHEDULE ON SHEET A-721. 2. FOR TYPICAL ELEVATOR DETAILS REFER TO SHEET A-613 3. FOR TYPICAL SIGNAGE (ELEVATOR) DETAILS REFER TO SHEET A-613 AND SIGNAGE DRAWINGS SG-SERIES
7
11' - 0 1/2"
6
7 A-613
7
NORTH LOBBY 1-005
D D
+12' - 0"
AC
EQ
ELEVATOR LOBBY
ELEVATOR LOBBY 1-506
2' - 0"
EQ.
by
EQ
1-506
EQ
revision information
AMC101 +13' - 3"
9.4
6
C
Issue Date
Checker checked by
construction issue date
Author
Tammy Jow
Tim Redmond
job number
2017109
C
GB
project information
consultant
+12' - 0"
11 A-711
drawn by
EQ 4' - 2 1/2"
1' - 5 3/4"
D
9' - 3 1/2"
16 A-645
Gail Bouvrie
2
5
project director
A-321
project architect
3
project designer
9
date
revision
2 A-662
5 A-662
A-321
SS
EQ
EQ.
8
FLS
DATE
17 A-613
SERVICE ELEVATOR AT BASEMENT FLOOR PLAN 9 SCALE: 1/4" = 1'-0"
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES
D
no.
16 A-613
D
GB
4' - 2 1/2"
9' - 3 1/2"
1' - 5 3/4"
D
plan check submittal date
6 3/4"
6
C
SECURE LOBBY 1-002
11' - 0 1/2"
7 4
SCALE: 1/4" = 1'-0"
A-321
1ST FLOOR ELEVATOR LOBBY PLAN
A-321
1
SCALE: 1/4" = 1'-0"
5 A-662 SIM.
4 A-662
6 A-662
3 A-662
PL102
CT107
GL106
PL102
A-321
5 A-662 SIM.
PL102
GL106
PL102
GL106
GL106
PL102
CT107
FINISH TO MATCH ELEVATOR DOOR; SEE L3 ELEVATOR IDENTIFICATION, ILLUMINATED
ST102
ST102 7 A-662
SCALE: 1/4" = 1'-0"
ELEVATOR CALL BUTTON KEY PAD TILE BASE TO MATCH FLOORING
1ST FLOOR ELEVATOR LOBBY TYP. - EAST
5
2
SCALE: 1/4" = 1'-0"
A-321
A-321
BLUE METAL PANEL CLNG. PL102 PT104 GL106
CT107
PL102
GL106
PL102
GL106
PL102
GL106
PL102
GL106
FINISH TO MATCH ELEVATOR DOOR; SEE L3
CT107
GL109
4' - 0"
7' - 2"
ELEVATOR IDENTIFICATION, ILLUMINATED
1ST FLOOR 0"
project
1ST FLOOR 0" ELEVATOR CALL BUTTON KEY PAD
DEPARTMENT OF GENERAL SERVICES
1ST FLOOR ELEVATOR LOBBY TYP. - SOUTH
NEW NATURAL RESOURCES HEADQUARTERS
FIRE PULL STATION 1ST FLOOR 0" RECESSED EVACUATION SIGN , SEE SIGNAGE DWGS.
4"
1ST FLOOR 0"
4' - 0"
4' - 0"
sheet title
1 A-662
OPEN TO LOBBY BEYOND
PHASE IV DESIGN – COMPREHENSIVE DESIGN (100% CD) - AUGUST 26, 2019
1ST FLOOR - ELEVATOR LOBBY RCP
7
SCALE: 1/4" = 1'-0"
715 P STREET, SACRAMENTO, CA 95814
6 SERVICE ELEVATOR AT FIRST FLOOR
ELEVATOR LOBBY-ENLARGED PLAN/RCP/INTERIOR ELEVATIONS
6 3/4"
TILE BASE TO MATCH FLOORING
SCALE: 1/4" = 1'-0"
1ST FLOOR ELEVATOR LOBBY TYP. - WEST
6
3
SCALE: 1/4" = 1'-0"
A-321
A-321
sheet number
1ST FLOOR ELEVATOR LOBBY TYP. - NORTH
A-321
plot date: 8/5/2019 6:04:37 PM
DOOR AND FRAME (WHERE OCCURS)
EPOXY FLOORING
NATURAL STONE PAVERSOVER THIN SET
STRUCTURAL CONC. SLAB
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
CLEAVEGE MEMBRANE RADIANT HEATING TUBES 3/4" STONE PAVERS 7/8" MORTAR BED
3/4"
CRACK ISOLATION MEMBRANE
FINISH FLOOR 0'-0"
6" 1/2"
T.0. SLAB
1/2"
MORTAR SETING BED W/ REINFORCING WIRE MESH
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT OFFICE OF REGULATION SERVICES
T.0. SLAB
AC
-0'-1 3/4"
-0'-1 3/4"
2"
1/2"
1
7/8"
+0'-0"
3/4"
1/4" 1/2"
1
+0'-0"
FIRST FLOOR
2
2
1/4"
1
FIRST FLOOR
NATURAL STONE PAVERS OVER THINSET
3/8"
NATURAL STONE OVER THIN SET
2" RIGID INSULATION
1/8" GROUT JOINT, TYP.
CL
3/4"
1
CARPET FLOORING
1
2
1/4" 1/4"
2
2
3/8"
1
CL
2
1/4"
RUBBER TRANSITION (ADA COMPLIANT)
CL
DOOR AND FRAME (WHERE OCCURS)
1/4"
RESILIENT FLOORING
3/4"
DOOR AND FRAME
FLS
SS
DATE
POUR BACK- SEE STRUCTURAL
FINISH FLOOR TRANSITION - RESILIENT FLOORING TO CARPET SCALE: 6" = 1'-0"
16
FINISH FLOOR TRANSITION - EPOXY TO STONE PAVERS
11
SCALE: 6" = 1'-0"
FINISH SLAB 1 (TCNA #RH 110A-18)
6
SCALE: 6" = 1'-0"
A-671
1
SCALE: 1 1/2" = 1'-0"
A-671
A-671
by
A-671
FINISH FLOOR TRANSITION - CERAMIC TILE TO CERAMIC TILE AT RESTROOMS
1
1/2"
T.0. SLAB -0'-1 3/4"
1/8" GROUT JOINT, TYP.
FOR RADIANT FLOORING ASSEMBLY REFER TO DETAIL 1/A-671 FOR BALANCE OF INFORMATION
CL
2
2
NATURAL STONE PAVERS OVER THIN SET POUR BACK - SEE STRUCTURAL DRAWINGS
NATURAL STONE PAVERS OVER THIN SET
1/8" GROUT JOINT, TYP.
SEALED CONCRETE
SCALE: 6" = 1'-0"
20
15 A-671
EPOXY FLOORING
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
ENTRANCE FLOOR GRILLES (SEE FINISH PLAN)
POUR-BACK - SEE STRUCTURAL
1/2"
+0'-0"
POUR BACK - SEE STRUCTURAL DRAWINGS
1
2
2
FIRST FLOOR 1
+0'-0"
1/4"
1/2"
KITCHEN CL
3/8" CARPET MIN.
STAINLESS STEEL WALK-OFF MAT PERIMETER ANGLE
T.0. SLAB
POUR-BACK - SEE STRUCTURAL
-0'-1 3/4"
Issue Date
Checker checked by
construction issue date
Author
Tim Redmond
drawn by
project architect
plan check submittal date
Tammy Jow
Gail Bouvrie
T.0. SLAB
1/8" GROUT JOINT, TYP.
FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE SCALE: 6" = 1'-0"
1
DOOR AND FRAME (WHERE OCCURS)
SEALED CONCRETE
A-671
project
2
DOOR AND FRAME
FINISH FLOOR
1/4"
+0'-0" T.0. SLAB
A-671
2
FIRST FLOOR
-0'-1" POUR BACK - SEE STRUCTURAL DRAWINGS
FINISH FLOOR TRANSITION - CARPET TO TILE FLOORING
1
1/4"
1/4"
1
1/8"
3/8"
2
CL
NATURAL STONE PAVERS OVER THIN SET
3/8"
2
1/4"
1
1/4"
CERAMIC TILE OVER THINSET
1/4"
2
1/2"
1
1/2"
1/4"
1/2"
1/8" GROUT JOINT, TYP.
CL
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)
4
SCALE: 6" = 1'-0"
A-671
DOOR AND FRAME (WHERE OCCURS)
CARPET FLOORING
FINISH FLOOR TRANSITION - CARPET TO NATURAL STONE PAVERS
9
SCALE: 6" = 1'-0"
A-671
DOOR AND FRAME (WHERE OCCURS)
ADA COMPLIANT TRANSITION STRIP (FINISH T.B.D.)
CL
14
SCALE: 6" = 1'-0"
A-671
-0'-1 1/2"
FINISH FLOOR TRANSITION - SEALED CONCRETE TO WALK-OFF MATT SCALE: 6" = 1'-0"
10 A-671
FINISH FLOOR TRANSITION - CARPET TO EPOXY SCALE: 6" = 1'-0"
5 A-671
sheet number
FINISH FLOOR TRANSITION - CARPET TO STONE PAVERS
19
SCALE: 6" = 1'-0"
FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE
3/8"
-0'-6"
no.
revision information consultant
+0'-0"
T.0. SLAB -0'-1 3/4"
POUR BACK - SEE STRUCTURAL DRAWINGS
T.0. SLAB
FINISH FLOOR TRANSITION - CARPET TO RUBBER FLOORING
job number
2017109
FIRST FLOOR 1
1/2"
PHASE IV DESIGN – COMPREHENSIVE DESIGN (100% CD) - AUGUST 26, 2019
3/8" CARPET MIN.
+0'-0"
NATURAL STONE PAVERS OVER THIN SET
date
revision
3/4" 3/4"
1/4" 1/4"
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME) FIRST FLOOR
1
715 P STREET, SACRAMENTO, CA 95814
1/4"
2
sheet title
SEALED CONCRETE
1/2"
A-671
NEW NATURAL RESOURCES HEADQUARTERS
1/2"
2
1/4"
1/4"
3/4"
1/2" 1/2"
CL
1/2" 1
3
SCALE: 6" = 1'-0"
DOOR AND FRAME (WHERE OCCURS)
3/4"
FINISH FLOOR
1/4"
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
1
1/4"
1/4"
2
1/2"
2
1/4"
1
1/4"
3/4" DOOR AND FRAME (WHERE OCCURS)
3/8" CARPET MIN.
CARPET FLOORING
0'-10 1/2"
FINISH FLOOR TRANSITION - SEALED CONCRETE TO WOOD FLOORING
8 A-671
DOOR AND FRAME (WHERE OCCURS)
RUBBER TRANSITION (ADA COMPLIANT)
-0'-6"
SCALE: 6" = 1'-0"
A-671
RUBBER FLOORING
CL
+1'-0" T.0. SLAB
WOOD FLOOR FINISH
FOR RADIANT FLOORING ASSEMBLY REFER TO DETAIL 1/A-671 FOR BALANCE OF INFORMATION T.0. SLAB
FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE
13
SCALE: 6" = 1'-0"
FIRST FLOOR
1
3/4"
18 A-671
2
1/8" GROUT JOINT, TYP.
-0'-2 1/2"
SCALE: 6" = 1'-0"
ALIGN
1/4"
1/4"
1/4"
NATURAL STONE PAVERS OVER THIN SET
T.0. SLAB
FINISH FLOOR TRANSITION - CONCRETE TO CARPET
2
PLYWOOD SUBSTRATE
1/8" GROUT JOINT, TYP.
FINISH FLOOR TRANSITION - STONE PAVERS TO SEALED CONCRETE
1
1/2"
CERAMIC TILE OVER THIN SET
POUR-BACK - SEE STRUCTURAL
SEALED CONCRETE
1/4"
1/2"
1/2"
A-671
CL
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)
FINISH FLOOR
1/4"
+0'-0"
SPECIFIED THRESHOLD FOR FIRE RATED DOOR (ALIGN W/ WIDTH OF DOOR FRAME)
1/8"
1/2"
2
FIRST FLOOR
1
DOOR AND FRAME (WHERE OCCURS)
SEALED CONCRETE
CL
1
1/4"
2
3/4"
2
1/4"
1
1/4"
1
DOOR AND FRAME (WHERE OCCURS)
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
CL
CARPET
3/4"
1
RUBBER TRANSITION (ADA COMPLIANT) 2
2
SCALE: 1 1/2" = 1'-0"
A-671
DOOR AND FRAME (WHERE OCCURS)
SEALED CONCRETE
CL
FLOOR DETAIL AT ELEV. LOBBY L1 AND L2
7
SCALE: 6" = 1'-0"
A-671
DOOR AND FRAME
2
FINISH FLOOR TRANSITION - STONE PAVERS TO STONE PAVERS
12
SCALE: 6" = 1'-0"
1/4"
FINISH FLOOR TRANSITION - CARPET TO STONE PAVERS
project director
NATURAL STONE PAVERS OVER THINSET POUR BACK- SEE STRUCTURAL
A-671
project designer
1"
STRUCTURAL CONC. SLAB
-0'-1 3/4"
T.0. SLAB -0'-2 1/2"
NATURAL STONE PAVERS OVER THIN SET
17
SCALE: 6" = 1'-0"
project information
FINISH FLOOR TRANSITION - CARPET TO CARPET FLOORING
1/2" THINSET MORTAR CRACK ISOLATION MEMBRANE
T.0. SLAB
FLOOR TRANSITION DETAILS
1'-5 1/4"
1/2" STONE PAVERS
1/8" GROUT JOINT, TYP.
1
1/2"
1/2"
T.0. SLAB
POUR BACK - SEE STRUCTURAL DRAWINGS
2
1/4"
+1'-7"
1/2"
2
DEPARTMENT OF GENERAL SERVICES
1/2"
1
+0'-0"
FIRST FLOOR
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
CL
FIRST FLOOR
3/8"
1
1/4"
1
2
3/4"
1
ALIGN
2
3/4"
1/4"
CL
CARPET FLOORING
1/4"
1
RUBBER TRANSITION (ADA COMPLIANT) 2
3/4"
STONE THRESHOLD (ADA COMPLIANT) SET IN THINSET, ALIGN W/ WIDTH OF DOOR FRAME
1/4"
CL
NATURAL STONE PAVERS OVER THIN SET
3/8" CARPET MIN.
CARPET FLOORING
2
DOOR AND FRAME (WHERE OCCURS)
DOOR AND FRAME (WHERE OCCURS)
DOOR AND FRAME (WHERE OCCURS)
A-671
plot date: 8/5/2019 6:08:56 PM
13
UCI STUDENT SUCCESS BUILDING SITE + BUILDING PLANNING CRITERIA ARCHITECT: AC MARTIN
PROJECT DIRECTOR: SUSAN O’CONNELL, AIA, DBIA, LEED-AP BD+C PROJECT PLANNER: ANDREA STALKER, LEED-AP RESPONSIBILITIES: + Developed massing studies, block & stack diagrams, programmatic planning schemes, and room criteria diagrams
14
UNIVERSITY OF CALIFORNIA - IRVINE
STUDENT SUCCESS BUILDING IRVINE, CALIFORNIA DESIGNER 15
4 STORY TERRACE SCHEME
450 Stall Parking Structure 6 stories ~72,000 SF Future Building 6 stories @ 12,000 sf/story 115,800 SF Student Success Building Top 3 stories @ 26,100 sf/story
Roof Deck / Terrace at Level 2 provides outdoor space Shade canopy creates gathering space at the Ring Mall
Ground Level @ 37,500 sf/story
SITE PLAN
5 STORY BAR SCHEME
450 Stall Parking Structure 6 stories ~ 90,000 SF Future Building 6 stories @ 15,000 sf/story 90,000 SF Student Success Building 5 stories @ 18,000 sf/story
SITE PLAN
6 STORY COURT SCHEME
450 Stall Parking Structure 6 stories ~ 84,000 SF Future Building 6 stories @ 14,000 sf/story 90,000 SF Student Success Building 6 stories @ 15,000 sf/story
SITE PLAN
16
Plaza connects with entries for both Student Success & Anteater Learning Pavilion
4 STORY TERRACE SCHEME Shelled Space
Counseling, CARE, VSC
DTEI, ATC, AVC
DSC, DCP, SWHP
AXONOMETRIC VIEW
5 STORY BAR SCHEME DTEI, ATC, AVC
Counseling
SWHP, VSC, CARE
DCP
DSC
AXONOMETRIC VIEW
6 STORY COURT SCHEME DTEI, ATC CC (Counseling) VSC, CARE, CC DSC
DCP, SWHP, AVC
DCP
AXONOMETRIC VIEW
17
WESTIN PALO ALTO RENOVATION ARCHITECT OF RECORD: HKS SAN FRANCISCO
PRINCIPAL-IN-CHARGE: DON HARRIER, AIA, CDS, LEED AP PROJECT ARCHITECT: FATEN ABDULLAH PROJECT DESIGNER: DESIGN ATELIER
RESPONSIBILITIES: + Documented and produced existing/demo plans, technical details, and accessibility upgrades in Revit and AutoCAD + Coordinated interiors team and sub-consultants on updating design, submittal packages, door+hardware schedules, and other plan check requirements + Ensured CASp Review comments were reviewed and reflected throughout entire renovation
18
PACIFIC HOTEL MANAGEMENT, LLC
WESTIN PALO ALTO RENOVATION 675 EL CAMINO REAL PALO ALTO, CA 94301 PROJECT COORDINATOR 19
ARCHITECT HKS ARCHITECTS, INC.
539 BRYANT STREET, SUITE 100
WESTIN - PALO ALTO
SAN FRANCISCO, CA 94107
OWNER PACIFIC HOTEL MANAGEMENT, LLC 400 SOUTH EL CAMINO REAL SUITE 200 SAN MATEO, CA 94402-1731
INTERIOR DESIGNER DESIGN ATELIER 1410 3RD STREET SAN RAFAEL, CA 94901
GENERAL CONTRACTOR CW HORTON GENERAL CONTRACTOR, INC 3295 DEPOT ROAD HAYWARD, CA 94545
STRUCTURAL ENGINEER GREGORY PAUL WALLACE, SE 5865 DOYLE STREET, SUITE 112 EMERYVILLE, CA 94608
LIGHTING DESIGNER LUMINAE SOUTER ASSOCIATES, LLC 504 ROOSEVELT WAY SAN FRANCISCO, CA 94114
KEY PLAN
REVISION NO. DESCRIPTION
DATE
HKS PROJECT NUMBER
DATE
12/20/2019 ISSUE
SHEET TITLE
EXISITING ACCESSIBLE PATH OF TRAVEL
2/13/2020 1:49:08 PM
SHEET NO.
ARCHITECT HKS ARCHITECTS, INC.
539 BRYANT STREET, SUITE 100 we d g m d m ls.co we d g m d m ls.co
6"
SPA
2' - 0 1/2" VIF
8"
LOCATION OF EXISTING SHOWER HEAD. ADJUST HEIGHT OF CONTROLS AS SHOWN
EXISTING DRAIN PIPE TO REMAIN
F
25.11 25.14
J
32.9
K L
J
L
6"
32.10
Level 02 109' - 9"
32.11 32.12 32.13 32.14
MIN 60" LONG HOSE
32.15 32.16
A
G
32.17 32.18 32.20
A
Level 1 100' - 0"
32.21
DESCRIPTION A 24 INCH GRAB BAR TO BE INSTALLED AT THE FOOT OF THE TUB LOCATED 33” TO 36” AFF FLUSH TO FRONT EDGE OF TUB. DIAGRAM 11B-607.4.2.2. LACKING BAR AT FOOT OF TUB. LACKING SEATS IN TUB. INSTALL TO COMPLY. TWO 24” GRAB BARS TO BE LOCATED 12” MAX FROM FRONT CONTROL WALL AND 24” MAX. FROM BACK WALL WITH TOP BAR MOUNTED 33” TO 36” AFF WITH THE BOTTOM BAR 9” TO CENTER ABOVE TOP OF TUB. 11B-607.4.2.1. EXISTING GRAB BARS LACK 24" LENGTH MEASURED CENTER TO CENTER. INSTALLED AT 13" FROM FRONT WALLS. REINSTALL GRAB BAR TO COMPLY. THE WATER VALVE MUST BE SINGLE LEVER TYPE, AND MOUNTED BELOW THE GRAB BAR FLUSH TO THE FRONT EDGE OF TUB. 11B-607.5 CURRENTLY NOT CENTERED TO THE FRONT EDGE OF TUB. SHIFT/ADJUST VALVE TO COMPLY. SEAT TUB TO BE NON SLIP AND NOT TO ALLOW MOVEMENT WHEN IN USE. AND TO PROVIDE A STRUCTURAL STRENGTH OF 250 LBS. POINT LOAD. 11B-607.3, 11B-610 CURRENTLY LACKING SEAT IN TUBS. PROVIDE A SECURE MOUNTED SEAT IN TUB. THE REAR EDGE OF THE SEAT MUST BE 2 ½” MAXIMUM AND THE FRONT EDGE 15” MINIMUM AND 16” MAXIMUM FROM THE SEAT WALL. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT. THE REAR EDGE OF THE “L” PORTION OF THE SEAT MUST BE 1 ½” MAXIMUM FROM THE WALL AND THE FRONT EDGE 14” MINIMUM AND 15” MAXIMUM FROM THE WALL. THE END OF THE “L” MUST BE 22” MINIMUM AND 23” MAXIMUM FROM THE MAIN SEAT WALL. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT. THE SHOWER SEAT MUST PROVIDE A MINIMUM STRUCTURAL STRENGTH TO SUPPORT A VERTICAL OR HORIZONTAL 250 LBS. POINT LOAD. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT. GRAB BARS MUST BE LOCATED ON BACK WALL AND SIDE WALL FURTHEST FROM THE ENTRY IN ALT. ROLL IN AND OPPOSITE THE SEAT AND INSTALLED 6” MAXIMUM FROM THE ADJACENT WALLS AND NOT ABOVE THE SEAT. LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. GRAB BAR MUST BE L-SHAPED AND CONTINUOUS ALONG THE WALL OPPOSITE FROM AND ADJACENT TO THE SEAT. (BUT NOT EXTENDED TO INCLUDE THE PORTION OF WALL OVER THE SEAT) LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. GRAB BARS MUST BE MOUNTED BETWEEN 33”–36” ABOVE FLOOR SURFACE MEASURED TO THE TOP OF GRIPPING SURFACE. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE CLEARANCE BETWEEN THE WALL AND GRAB BAR MUST BE 1 ½” THE SPACE BETWEEN THE GRAB BAR AND OBJECTS BELOW MUST BE 1 ½” MINIMUM AND THE SPACE BETWEEN THE GRAB BAR AND OBJECTS ABOVE MUST BE 12” MAXIMUM. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE BARS MUST BE SMOOTH WITH AN OUTSIDE DIAMETER OF 1 1/4” MINIMUM AND 2” MAXIMUM CIRCULAR CROSS SECTION, AND FOR NON-CIRCULAR CROSS SECTION A PERIMETER OF 4” MINIMUM AND 4.8” MAXIMUM. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE BARS MUST PROVIDE A MINIMUM STRUCTURAL STRENGTH TO SUPPORT A 250 LB. POINT LOAD. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE GRAB BARS MUST BE STABLE AND DO NOT ROTATE WITHIN THEIR FITTINGS. LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. OPERABLE PARTS OF THE CONTROL FAUCET MUST BE LOCATED ON THE BACK WALL OF THE COMPARTMENT ADJACENT TO THE SEAT WITHIN REACH RANGE OF NO LESS THAN 19” AND NO MORE THAN 27” FROM THE REAR EDGE OF THE SEAT ABOVE THE GRAB BAR BUT NO HIGHER THAN 48” ABOVE THE SHOWER FLOOR. MOVE CONTROLS TO COMPLY WITH REQUIREMENTS. OPERABLE PARTS OF CONTROLS AND FAUCETS MUST BE INSTALLED ON THE SIDE WALL ADJACENT TO THE SEAT WALL, 19” MINIMUM AND 27” MAXIMUM FROM THE SEAT WALL ABOVE THE GRAB BAR BUT NO HIGHER THAN 48” ABOVE THE SHOWER FLOOR. MOVE CONTROLS TO COMPLY WITH REQUIREMENTS.
X
REFER TO MANUFACTURER'S INSTRUCTIONS AND ENGINEERED CALCULATIONS FOR INSTALATION REQUIREMENTS.
H
6"
G
GRAB BARS FOR ALTERNATE ROLL-IN TYPE SHOWERS
SHOWER SEAT. FURNTURE ITEM TO BE DESIGNED. REFER TO ID DRAWINGS.
25.1 25.2
ALTERNATE ROLL-IN TYPE SHOWER CLEARNACES, AS PER 2010 ADA STANDARD FOR ACCESSIBLE DESIGN, CHAPTER 6 - 608.2.3
K
ITEM NO.
5' - 0"
H
SEAT
ANCHOR SOCKET. CUSTOM POLE EXTENSION. EPOXY OR HYDROLIC CEMENT TO BE USED TO SECURE ANCHOR IN PLACE.
A
WESTIN - PALO ALTO
G
EXISTING 12" MIN. STRUCTURAL SLAB
CASp REPORT-ADA COMPLIANCE KEYNOTE - POOL SHOWER
we d g m d m ls.co
4' - 0"
EXISTING 4" CONCRETE PAVING
we d g m d m ls.co we d g m d m ls.co
we d g m d m ls.co
1' - 6"
OR APPROVED EQUAL
SAN FRANCISCO, CA 94107
Level 3 - UNITS 119' - 6"
we d g m d m ls.co we d g m d m ls.co
NEW RAIL ADDED TO COMPLY WITH CALIFORNIA CODE OF REGULATIONS TITLE 24, SECTION 3119B AND POOL ENCLOSURE REQUIREMENTS. RAILS TO MATCH EXISTING DECORATIVE ADD-ON BALCONY ON SECOND FLOOR
A
REFER TO MANUFACTURER'S INSTRUCTIONS AND ENGINEERED CALCULATIONS FOR INSTALATION REQUIREMENTS.
3' - 6"
Swim-Lift® Traveler II XRC500 Part Number 2761
F
5"
SPECTRAM AQUATICS
12
CONTRACTOR TO VERIFY MOVING ANCHOR SLEEVE CLOSER TO POOL WALL TO MAXIMIZE DEPTH ACHIEVED BY POOL LIFT, AND ALLOW CLEARANCE FOR SPA SEAT.
3' - 0"
33" MAX. SETBACK
2' - 1 1/4"
EDGE OF SPA SEAT
CL LIFT AT SPA
FLOOR MOUNTED GRAB BAR
CL
EDGE OF POOL WALL
LIFT AT POOL
4 POOL SHOWER - PLAN
SHOWER SEAT
3 POOL SHOWER - ELEVATION
1/4" = 1'-0"
1/4" = 1'-0"
MAX. 25" SETBACK FOR LIFT TO ACHIEVE MAX. DEPTH
CONTRACTOR TO VERIFY MOVING ANCHOR SLEEVE CLOSER TO POOL WALL AND STAY CLEAR OF POOL COPING.
SPECTRAM AQUATICS Swim-Lift® Traveler II XRC500 Part Number 2761
EXISTING WALL MOUNTED LIGHTING FIXTURE
EXISTING PLANTER IRRIGATION
EXISTING PLANTER LIGHTING FIXTURE
NEW FLOOR POWER OUTLET
EXISTING PLANTERS TO BE REMOVED
OWNER PACIFIC HOTEL MANAGEMENT, LLC 400 SOUTH EL CAMINO REAL SUITE 200 SAN MATEO, CA 94402-1731
EXISTING SQUARE PLANTER TO REMAIN
INTERIOR DESIGNER DESIGN ATELIER 1410 3RD STREET
14
13
12
14
13
SAN RAFAEL, CA 94901
12
GENERAL CONTRACTOR
OR APPROVED EQUAL
CW HORTON GENERAL CONTRACTOR, INC 3295 DEPOT ROAD
NEW RAIL ADDED TO COMPLY WITH CALIFORNIA CODE OF REGULATIONS TITLE 24, SECTION 3119B AND POOL ENCLOSURE REQUIREMENTS. RAILS TO MATCH EXISTING DECORATIVE ADD-ON BALCONY ON SECOND FLOOR
1' - 6"
LIVING WALL BY AMBIUS REFER TO ID DRAWINGS. DOES NOT NEED ELECTRICITY OR PLUMBING.
D
NEW POOL LIFT BY SPECTRAM AQUATICS.
E
NYX - STUDIO NISHO FIRE PIT. REFER TO ID DRAWINGS
F
PATH OF TRAVEL MIN. 4' WIDE
wo d g m ls.cm e d
we d g m d m ls.co
GREGORY PAUL WALLACE, SE
we d g m d m ls.co
mo g w d ls.cm e d
we d g m d m ls.co
we d g m d m ls.co
we d g m d m ls.co
wo d g m ls.cm e d
X
A 4' - 0" X
F.1
ITEM NO.
4' - 0"
B
G
POOL LIFTS MUST BE LOCATED WHERE THE WATER LEVEL IS NOT DEEPER THAN 48 INCHES.
TEMPLATE VERSION: 3.0.0.20170623
PLOT DATE:
4' - 0"
31.20
CLEAR DECK SPACE
KEY PLAN
A
B H
X
X
CL 2' - 0 1/4"
2/13/2020 1:54:31 PM
D
4' - 0"
4FT
H
C
4FT
POOL
REVISION NO. DESCRIPTION
5FT
ACCESSIBLE POOL LIFT: THE SIDE OF THE SEAT OPPOSITE THE WATER MUST PROVIDE A CLEAR DECK SPACE THAT IS PARALLEL WITH THE SEAT. THE SPACE MUST BE MIN 36” WIDE AND EXTEND FORWARD 48” MIN FROM A LINE LOCATED 12” BEHIND THE REAR EDGE OF THE SEAT. THE CLEAR DECK SPACE MUST HAVE A SLOPE NOT STEEPER THAN 2%. SPA DECK HAS 3.8% SLOPE AND MUST BE REDONE TO COMPLY WITH REQUIREMENT.
5FT 5FT
THE POOL MUST BE EQUIPPED WITH AN ACCESSIBLE LIFT DEVICE THAT MEETS THE REQUIREMENTS. SPA DECK HAS 3.8% SLOPE AND MUST BE REDONE TO COMPLY WITH REQUIREMENT.
DATE
X
A
B
4' - 1 1/2"
31.12
Ø 86 11/16"
1' - 0"
POOL/SPA WALL
POOL/SPA
4' - 0"
G
C X
3' - 8" X
X
3FT
DESCRIPTION ACCESSIBLE POOL LIFT: WHEN IN THE RAISED POSITION, THE CENTERLINE OF THE SEAT MUST BE LOCATED OVER THE DECK AT 16” MIN. FROM THE EDGE OF THE POOL – ALSO, THE DECK SURFACE BETWEEN THE CENTERLINE OF THE SEAT AND POOL EDGE MUST HAVE A SLOPE NO GREATER THAN 2%. SPA DECK HAS 3.8% SLOPE AND MUST BE REDONE TO COMPLY WITH REQUIREMENT.
LUMINAE SOUTER ASSOCIATES, LLC 504 ROOSEVELT WAY
A
E
X
31.11
F.1
LIGHTING DESIGNER SAN FRANCISCO, CA 94114
F
ADA COMPLIANCE KEYNOTES - POOL LIFT
3/4" = 1'-0"
F
4' - 0"
NOTE: EXISTING CONCRETE PAVING AND STRUCTURAL SLAB DIMENSIONS ARE AS PER RECORD DRAWINGS PROVIDED BY CLIENT. CONTRACTOR TO VERIFY ON SITE WHERE REQUIRED.
6 POOL LIFT_SECTION
5865 DOYLE STREET, SUITE 112 EMERYVILLE, CA 94608
F
X
PATIO UMBRELLA WITH DECK MOUNTED BASE. REFER TO ID DRAWINGS.
we d g m d m ls.co
we d g m d m ls.co
ls.cm e d g m wo d
X
REFER TO MANUFACTURER'S INSTRUCTIONS AND ENGINEERED CALCULATIONS FOR INSTALATION REQUIREMENTS.
B
C
wo d g m ls.cm e d
ls.cm e d mo g w d
m ls.co d g m we d
m ls.co d me g w d
X
ANCHOR SOCKET. CUSTOM POLE EXTENSION. EPOXY OR HYDROLIC CEMENT TO BE USED TO SECURE ANCHOR IN PLACE.
STRUCTURAL ENGINEER
we d g m d m ls.co ls.cm e d g m wo d
m ls.co d me g w d
m ls.co d me g w d
m ls.co d g m we d
m ls.co d me g w d
X
6"
POOL SHELL
m ls.co d g m we d
m ls.co d me g w d
m ls.co d g m we d
X
A
EXISTING 12" MIN. STRUCTURAL SLAB
POOL
HAYWARD, CA 94545
FIRE DOOR
EXISTING 4" CONCRETE PAVING
X
TYP. NOTE: CBC 3112B.2 BULL-NOSED COPING TO BE OF REINFOCED CONCRETE, OR MATERIAL EQUIVALENT IN STRENGTH AND DURABILITY, WITH ROUND SLIP RESTANT EDGES. THE OVERHANG OF THE BULL-NOSED COPING SHALL NOT EXCEED 2" OR BE LESS THAN 1" AND SHALL NOT EXCEED 2 1/2" IN THICKNESS.
20
A1.01
© 2019 HKS ARCHITECTS, INC.
X
PLOT DATE:
TEMPLATE VERSION: 3.0.0.20170623
23214.000
PERMIT SET
H.8
H.8
J
J
C SPA
DECK
HKS PROJECT NUMBER
23214.000 DATE
12/20/2019 ISSUE
3' - 0"
5 POOL LIFT_PLAN 3/4" = 1'-0"
PERMIT SET
2 POOL DECK - NEW LAYOUT 3/16" = 1'-0"
1
SHEET TITLE
POOL DECK EXISTING PLANTERS, LIGHTING, IRRIGATION
POOL DECK DETAILS
3/16" = 1'-0" SHEET NO.
© 2019 HKS ARCHITECTS, INC.
A3.82
F.C.L.
DESCRIPTION
COVE LIGHTING
A 24 INCH GRAB BAR TO BE INSTALLED AT THE FOOT OF THE TUB LOCATED 33” TO 36” AFF FLUSH TO FRONT EDGE OF TUB. DIAGRAM 11B-607.4.2.2. LACKING BAR AT FOOT OF TUB. LACKING SEATS IN TUB. INSTALL TO COMPLY. TWO 24” GRAB BARS TO BE LOCATED 12” MAX FROM FRONT CONTROL WALL AND 24” MAX. FROM BACK WALL WITH TOP BAR MOUNTED 33” TO 36” AFF WITH THE BOTTOM BAR 9” TO CENTER ABOVE TOP OF TUB. 11B-607.4.2.1. EXISTING GRAB BARS LACK 24" LENGTH MEASURED CENTER TO CENTER. INSTALLED AT 13" FROM FRONT WALLS. REINSTALL GRAB BAR TO COMPLY.
32.11
32.13
32.15
32.16
F.F.L.
32.20
32.21
3/8" = 1'-0"
F.C.L. COVE LIGHTING
1' - 6"
VENT
MAKE UP MIRROR
ROBE HOOK
TO CORRIDOR
WALL TILE
4
4
F.F.L. TILE BASE
10
THE BARS MUST PROVIDE A MINIMUM STRUCTURAL STRENGTH TO SUPPORT A 250 LB. POINT LOAD. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE GRAB BARS MUST BE STABLE AND DO NOT ROTATE WITHIN THEIR FITTINGS. LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. OPERABLE PARTS OF THE CONTROL FAUCET MUST BE LOCATED ON THE BACK WALL OF THE COMPARTMENT ADJACENT TO THE SEAT WITHIN REACH RANGE OF NO LESS THAN 19” AND NO MORE THAN 27” FROM THE REAR EDGE OF THE SEAT ABOVE THE GRAB BAR BUT NO HIGHER THAN 48” ABOVE THE SHOWER FLOOR. MOVE CONTROLS TO COMPLY WITH REQUIREMENTS.
32.18
SAN FRANCISCO, CA 94107
11 UNIT 153 - ADA - ELEVATION - SOUTH
3/8" = 1'-0"
THE BARS MUST BE SMOOTH WITH AN OUTSIDE DIAMETER OF 1 1/4” MINIMUM AND 2” MAXIMUM CIRCULAR CROSS SECTION, AND FOR NON-CIRCULAR CROSS SECTION A PERIMETER OF 4” MINIMUM AND 4.8” MAXIMUM. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS.
32.17
HKS ARCHITECTS, INC.
539 BRYANT STREET, SUITE 100
TILE BASE
TILE BASE
12 UNIT 153 - ADA - ELEVATION - WEST
GRAB BAR MUST BE L-SHAPED AND CONTINUOUS ALONG THE WALL OPPOSITE FROM AND ADJACENT TO THE SEAT. (BUT NOT EXTENDED TO INCLUDE THE PORTION OF WALL OVER THE SEAT) LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. GRAB BARS MUST BE MOUNTED BETWEEN 33”–36” ABOVE FLOOR SURFACE MEASURED TO THE TOP OF GRIPPING SURFACE. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS. THE CLEARANCE BETWEEN THE WALL AND GRAB BAR MUST BE 1 ½” THE SPACE BETWEEN THE GRAB BAR AND OBJECTS BELOW MUST BE 1 ½” MINIMUM AND THE SPACE BETWEEN THE GRAB BAR AND OBJECTS ABOVE MUST BE 12” MAXIMUM. LACKS GRAB BARS .INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS.
32.14
32" MIN CLEAR WIDTH
THE SHOWER SEAT MUST PROVIDE A MINIMUM STRUCTURAL STRENGTH TO SUPPORT A VERTICAL OR HORIZONTAL 250 LBS. POINT LOAD. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT. GRAB BARS MUST BE LOCATED ON BACK WALL AND SIDE WALL FURTHEST FROM THE ENTRY IN ALT. ROLL IN AND OPPOSITE THE SEAT AND INSTALLED 6” MAXIMUM FROM THE ADJACENT WALLS AND NOT ABOVE THE SEAT. LACKS GRAB BARS. INSTALL GRAB BARS TO COMPLY WITH REQUIREMENTS.
32.12
ARCHITECT
3 1' - 0"
WESTIN - PALO ALTO
32.9
32.10
BALCONY RAIL WHERE APPLICABLE ON UPPER LEVELS
3
THE WATER VALVE MUST BE SINGLE LEVER TYPE, AND MOUNTED BELOW THE GRAB BAR FLUSH TO THE FRONT EDGE OF TUB. 11B-607.5 CURRENTLY NOT CENTERED TO THE FRONT EDGE OF TUB. SHIFT/ADJUST VALVE TO COMPLY. SEAT TUB TO BE NON SLIP AND NOT TO ALLOW MOVEMENT WHEN IN USE. AND TO PROVIDE A STRUCTURAL STRENGTH OF 250 LBS. POINT LOAD. 11B-607.3, 11B-610 CURRENTLY LACKING SEAT IN TUBS. PROVIDE A SECURE MOUNTED SEAT IN TUB. THE REAR EDGE OF THE SEAT MUST BE 2 ½” MAXIMUM AND THE FRONT EDGE 15” MINIMUM AND 16” MAXIMUM FROM THE SEAT WALL. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT. THE REAR EDGE OF THE “L” PORTION OF THE SEAT MUST BE 1 ½” MAXIMUM FROM THE WALL AND THE FRONT EDGE 14” MINIMUM AND 15” MAXIMUM FROM THE WALL. THE END OF THE “L” MUST BE 22” MINIMUM AND 23” MAXIMUM FROM THE MAIN SEAT WALL. LACKS FOLDED SEAT. INSTALL FOLDED SEAT TO COMPLY WITH REQUIREMENT.
25.14
1' - 6"
2' - 10"
25.11
MAKE UP MIRROR
4' - 0"
25.2
G2A02
ITEM NO.
5' - 0"
2% MAX SLOPE
23.26 CASp REPORT-ADA COMPLIANCE KEYNOTE - GUESTROOMS 113, 133, 134, 213, 233, & 234
25.1
TILE BASE
UNIT 153 - ADA - ELEVATION - EAST 3/8" = 1'-0"
9
E2A02
UNIT 153 - ADA - ELEVATION - NORTH 3/8" = 1'-0" C2A02
B2A.2
OPERABLE PARTS OF CONTROLS AND FAUCETS MUST BE INSTALLED ON THE SIDE WALL ADJACENT TO THE SEAT WALL, 19” MINIMUM AND 27” MAXIMUM FROM THE SEAT WALL ABOVE THE GRAB BAR BUT NO HIGHER THAN 48” ABOVE THE SHOWER FLOOR. MOVE CONTROLS TO COMPLY WITH REQUIREMENTS.
OWNER
9
PACIFIC HOTEL MANAGEMENT, LLC 400 SOUTH EL CAMINO REAL SUITE 200 SAN MATEO, CA 94402-1731
12 A2.21a 10 A2A02
11
INTERIOR DESIGNER
23.13
22.24
DESIGN ATELIER 1410 3RD STREET SAN RAFAEL, CA 94901
3/8" = 1'-0" BALCONY RAIL WHERE APPLICABLE AT LEVEL 02
F.C.L. COVE LIGHTING
22.42
RELOCATE PHONE
25.11
3295 DEPOT ROAD
TYPICAL LAYOUT FOR UNITS 153 & 154
HAYWARD, CA 94545
STRUCTURAL ENGINEER GREGORY PAUL WALLACE, SE
1' - 0"
5865 DOYLE STREET, SUITE 112
AT LEVEL 01: REPLACE EXISTING SLIDING DOOR WITH HINGED DOOR TO COMPLY WITH ADA OPENING SIZE REQUIREMENTS
EMERYVILLE, CA 94608
G
F
BALCONY RAIL WHERE APPLICABLE ON UPPER LEVELS
F.1
G
LIGHTING DESIGNER LUMINAE SOUTER ASSOCIATES, LLC
22.2
SAN FRANCISCO, CA 94114
9
32" MIN
23.26 ROOM 153
4' - 0"
22.18 17" - 19"
33" - 36"
1' - 7"
MIN TO OUTLET
33" - 36"
40" MAX
7" - 9"
6 UNIT 2A - ADA - ELEVATION - WEST
3/8" = 1'-0"
CW HORTON GENERAL CONTRACTOR, INC
23.8
CLEAR WIDTH
E3 25.2
3/8" = 1'-0"
9
1' - 0"
3' - 0"
22.27
E3 25.1
1' - 3"
22.24
1' - 6"
GENERAL CONTRACTOR
ENLARGED FLOOR PLAN - UNIT 2A- ADA - DEMO
504 ROOSEVELT WAY
TOP OF SEAT
MIN
G2A01
F
5' - 0"
MIRROR
1' - 0"
7
TYPICAL LAYOUT FOR UNITS 153 & 154
2% MAX SLOPE
8
ENLARGED FLOOR PLAN - UNIT 2A- ADA - NEW
F.F.L.
5 UNIT 2A - ADA - ELEVATION - SOUTH 3/8" = 1'-0"
TYPICAL LAYOUT FOR UNIT 408
TYPICAL LAYOUT FOR UNIT 408
COVE LIGHTING
KEY PLAN
F.C.L. EQ
EQ
EXISTING VENT
MAKE UP MIRROR
SEAT
80" MIN CLEAR
24" MAX FOR 44" MAX REACH AT ROOM 153
2' - 0" MAX 33" min TO 36" max
25.14 25.1
E3 25.2 22.4
2' - 10"
25.3
3' - 8"
2' - 9" MIN
7' - 0"
TOWEL BAR
22.38
REVISION NO. DESCRIPTION
10
4 UNIT 2A - ADA - ELEVATION - EAST 3/8" = 1'-0"
25.1
25.2 E3
10
25.1 25.3 E1 3' - 3 1/2"
3 UNIT 2A - ADA - ELEVATION - NORTH 3/8" = 1'-0"
TYPICAL LAYOUT FOR UNIT 408
DATE
F.F.L.
EXISTING DOOR TO BE RELOCATED
TYPICAL LAYOUT FOR UNIT 408
E2A01
23.26 ROOM 153
ACCESSIBLE THRESHOLD REQUIRED HERE. (DO NOT USE STANDARD DOOR THRESHOLD)
13 COURTYARD THRESHOLD DETAILS
17" - 18"
AS PER AS-BUILT DRAWIMGS: MODIFIED BITUMIN SELF-ADHERING MEMBRANE. MEMBRANE FLASHING UP ADJOINING WALLS AT LEAST 6" ABOVE FINAL COURTYARD TOPPING
22.11
HKS PROJECT NUMBER
23214.000 DATE
01/27/20
5' - 2 1/2"
1' - 8 1/4"
22.17 22.26
22.27
22.3
ISSUE
60" FRONT PULL SIDE APPROACH
0"
A2A.1
ø 5' -
22.19
23.13
A3
1/2" MAX
TURN HOT FLUID APPLIED WATERPROOFING MEMBRANE AND DRAINAGE PROTECTION PANEL UP FACE OF CONCRETE
LAP SS SILL FLASHING DOWN OVER 3" MIN
32" MIN CLEAR
5
22.35 22.38 22.42 22.4
SLOPED 1/8"/FT
1 PIECE, 22 GA SS FLASHING SILL - SEAL ENTIRE PERIMETER WITH CONTINUOUS SEALANT
B2A01
22.43
OPENING WIDTH
3' - 2"
6 A2.21a 4
22.33
EXISTING SLAB AND WATERPROOFING SYSTEM GC TO VERIFY ON SITE ADJUST AT ROOMS 113, 134, 213
2/13/2020 1:49:11 PM
SEALANT
3
EXISTING PAVING SYSTEM
EXTERIOR COURTYARD WATERPROOFING UNDERLAYMENT CONT OVER FLASHING
1' - 2"
1' - 0" 4' - 6"
22.29
SHEET TITLE
22.11 DEMO WALL TO PROVIDE 60" FRONT PULL SIDE APPROACH & BATHROOM DOOR MANEUVERING SPACE DRY VANITY TO BE REMOVED.
22.2 22.16
MIN
3/8" = 1'-0"
ENLARGED GUESTROOM PLANS UNIT TYPE 2A - ADA
32" MIN CLEAR WIDTH
2 ENLARGED FLOOR PLAN - UNIT 2A - ADA - NEW
3" = 1'-0"
1 ENLARGED FLOOR PLAN - UNIT 2A - ADA - DEMO 3/8" = 1'-0"
TYPICAL LAYOUT FOR UNITS 113, 133, 134, 213, & 234
© 2019 TYPICAL LAYOUT FOR UNITS 113, 133, 134, 213, & 234
F.C.L.
SHEET NO.
A2.21a
HKS ARCHITECTS, INC.
F.C.L.
TO GUESTROOM
ARCHITECT HKS ARCHITECTS, INC.
539 BRYANT STREET, SUITE 100 SAN FRANCISCO, CA 94107
F.F.L.
F.F.L. TILE BASE
14 UNIT TYPE 5 - ENTRY ELEVATION - SOUTH 13 UNIT TYPE 5 - ENTRY ELEVATION - EAST
3/8" = 1'-0"
3/8" = 1'-0"
12 UNIT TYPE 5 - ENTRY ELEVATION - NORTH10 UNIT TYPE 5 - BATHROOM ELEVATION - WEST
3/8" = 1'-0"
WESTIN - PALO ALTO
15 UNIT TYPE 5 - ENTRY ELEVATION - WEST
3/8" = 1'-0"
3/8" = 1'-0"
TYP. EXISTING CROWN MOLDING TO REMAIN
F.C.L.
EXISTING VENT
F.F.L. TYP. TILE BASE
9
8
UNIT TYPE 5 - BATHROOM ELEVATION - SOUTH 3/8" = 1'-0"
7
UNIT TYPE 5 - BATHROOM ELEVATION - EAST 3/8" = 1'-0"
TYP. BASE BOARD TO REMAIN
6
UNIT TYPE 5 - BATHROOM ELEVATION - NORTH 3/8" = 1'-0"
UNIT TYPE 5 - BEDROOM ELEVATION - WEST 3/8" = 1'-0"
TYP. EXISTING CROWN MOLDING TO REMAIN
EXISTING VENTS
F.C.L.
OWNER PACIFIC HOTEL MANAGEMENT, LLC 400 SOUTH EL CAMINO REAL SUITE 200 SAN MATEO, CA 94402-1731
INTERIOR DESIGNER
TO CORRIDOR
TO OFFICE
DESIGN ATELIER
CLOSET
1410 3RD STREET SAN RAFAEL, CA 94901
EXISTING FIREPLACE
GENERAL CONTRACTOR CW HORTON GENERAL CONTRACTOR, INC 3295 DEPOT ROAD HAYWARD, CA 94545
F.F.L.
STRUCTURAL ENGINEER
TYP. BASE BOARD TO REMAIN
GREGORY PAUL WALLACE, SE 5865 DOYLE STREET, SUITE 112
5 UNIT TYPE 5 - BEDROOM ELEVATION - SOUTH
EMERYVILLE, CA 94608
4 UNIT TYPE 5 - BEDROOM ELEVATION - EAST
3/8" = 1'-0"
3/8" = 1'-0"
10
11
10
11
3
UNIT TYPE 5 - BEDROOM ELEVATION - NORTH
LIGHTING DESIGNER
3/8" = 1'-0"
LUMINAE SOUTER ASSOCIATES, LLC 504 ROOSEVELT WAY
10
SAN FRANCISCO, CA 94114
31' - 0"
J
BALCONY RAIL @ 2ND FLOOR
D
3
3
10 A2.24A 8
12
9
9
1-HR. MECH. SHAFT, TYP.
15 A2.24A 13
BATH
J
14
5
UNIT 5 210-K LIVING ROOM
MINI BAR
J
J
13' - 0"
7
B05
ARCHWAY ABOVE
12
J
2 LAYERS 5/8" GYP. BD.
D.9 ENTRY
D05
HKS PROJECT NUMBER
SPRINKLER J
J
TEMPLATE VERSION: 3.0.0.20170623
E
SPRINKLER
EXHAUST
PLOT DATE:
DATE
14
LIGHT FIXTURE
RECESSED LIGHT
REVISION NO. DESCRIPTION
15 A2.24A 13 FAN COIL UNIT
1' - 0"
J
5
7 10 A2.24A 8
OFFICE
6 A2.24A 4
6 A2.24A 4 SPRINKLER
SPRINKLER
KEY PLAN
J
SPRINKLER
2/13/2020 1:49:12 PM
PLOT DATE:
TEMPLATE VERSION: 3.0.0.20170623
ALIGN THRESHOLD WITH TOP OF FINISH FLOOR SEALANT CARPET FINISH METAL EDGE PROVIDE LEVELING COMPOUND TO ACHIEVE A LEVEL TRANSITION AT DOOR OPENING WHERE NECESSARY
SILL FASTENER - SEAL PENETRATIONS WITH LIQUID WATERPROOFING
C2A01 2' - 0"
DOOR BOTTOM ATTACHMENT WITH SWEEP
1'-6" MIN.
INSTALL INVERTED "L" SHAPED CLOSURE PROFILE: LENGTH TBD BY FIELD MEASUREMENT
J
23214.000
ELEC. P231
DATE
05/31/19 ISSUE
SHEET TITLE
11
ENLARGED REFLECTED CEILING PLAN - UNIT TYPE 5 3/8" = 1'-0"
2
ENLARGED FLOOR PLAN - UNIT TYPE 5 - NEW 3/8" = 1'-0"
1
ENLARGED GUESTROOM PLANS UNIT TYPE 5
ENLARGED FLOOR PLAN - UNIT TYPE 5 - DEMO
SHEET NO.
3/8" = 1'-0"
© 2019 HKS ARCHITECTS, INC.
A2.24A
21
PART TWO:
ACADEMIC WORK UNIVERSITY OF SOUTHERN CALIFORNIA - LOS ANGELES, CA BACHELOR OF ARCHITECTURE - 2018 22
CONTENTS 01
HEAVY TIMBER HIGH-RISE IN LA ARTS DISTRICT
24-33
Comprehensive Studio - FA 2017
02 PERFORMANCE + STORAGE BOX FOR 32ND ST. SCHOOL Research Design Build Studio - SP 2017
34-39
03 LATIN + SOUTH AMERICA STUDY ABROAD Global Studies - Urban Planning Studio - SU 2016
40-45
04 ARCHITECTURAL PRACTICES RE-IMAGINED Thesis Studio - SP 2018
46-51
23
HEAVY TIMBER HIGH-RISE IN LA ARTS DISTRICT SITE: 707 TRACTION AVENUE LOS ANGELES, CA 90013 INSTRUCTOR: OLIVIER TOURAINE COMPREHENSIVE STUDIO FALL 2017 In an effort to search for more sustainable methods of construction, researching the capabilities of mass timer construction on mid- and high-rise buildings is becoming increasingly relevant. In this comprehensive studio, we were challenged to propose an incubator office tower in the Los Angeles Arts District that explores heavy timber as a construction technique and space-making structure. This project explores the idea of creating a wicker basket as an exoskeleton structural system that twists onto itself at the top. Due to the weaving structure that goes in and out of the floor plates, the project explores the idea of a modular, triangular curtain wall system to create a faceted facade.
24
25
SITE PLAN
26
COMPREHENSIVE SITE PLAN
WIND-ROSE DIAGRAM
SUN-PATH DIAGRAM
WICKER WICKER POINT WICKER POINT POINT
orDerinG orDerinG sYsteM orDerinG sYsteMsYsteM
WICKER WICKER POINT WICKER POINT POINT
orDerinG sYsteM orDerinG sYsteMsYsteM orDerinG
EXTRUDE. EXTRUDE
EXTRUDE.
EXTRUDE. OFFSET. OFFSET OFFSET.
OFFSET. TRIM.
TRIM.
TRIMTRIM.
EXTRUDE.
EXTRUDE.
EXTRUDE. OFFSET.
OFFSET. TRIM.
TRIM.
TRIM.
TWIST.
TWIST.
TWIST.
LIFT.
TWIST. TWIST
TWIST.
TWIST.
LIFT.
OFFSET.
LIFT
LIFT.
LIFT.
WEAVE.
WEAVE.
WEAVE.
LIFT.
LIFT.
WEAVE.
WEAVE.
WEAVE. WEAVE
27
EXOSKELETON
GRAVITY LOAD
COLUMN & BEAM SYSTEM
NORTHWEST PERSPECTIVE
28
DW
DW
REF
DW
REF
MW REF
REF
GROUND FLOOR PLAN
NORTH
SOUTHEAST PERSPECTIVE
29
A
B
C
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
1 2 3 4
DW
5
REF
MW
6 7 8 9 10 11 12 13 LEVEL 7 (TYPICAL OFFICE) PLAN
30
NORTH ELEVATION
WEST ELEVATION
DW
ROOF (BAR) PLAN
SOUTH ELEVATION
EAST ELEVATION
31
R EXIT
11 EXIT
EXIT
EXIT
10 9
EXIT
8
EXIT
7
EXIT
6 5
EXIT
4 EXIT
3 EXIT
2 EXIT
M 1 EXIT
32 SECTION PERSPECTIVE 1/4” = 1’ - 0”
33
PERFORMANCE + STORAGE BOX SITE//CLIENT: 32ND STREET USC MAGNET SCHOOL 822 WEST 32ND ST. LOS ANGELES, CA 90007 INSTRUCTORS: VALERY AUGUSTIN & CHARLES LAGRECO RESEARCH-DESIGN-BUILD TOPIC STUDIO SPRING 2017 The goal of the RDB studio was the development of a research-based approach to design build, tasking students with defining a series of tactics and strategies for fabricating functional prototypes for the 32nd Street USC Magnet School. The resultant solutions were to be site specific, however, the broader ambition of the studio was to speculate on solutions that are adaptable, scalable and deployable as prototypes for multiple LAUSD campuses. The semester was organized to run both sequentially and concurrently; focused research serves as a point of departure for studies and models that function as data to inform further research. The information gleaned became the basis of design for built prototypes; i.e. a feedback loop for informed design.
34
35
TEAM MEMBERS: 32nd Street
PROJECT ARCHITECTS: MAXWELL DJAKASAPUTRA MILTON VILATORO
PARKING
PARKING 32nd ST ENTRANCE
SITE 2
PROJ ECT MANAGERS: HAYLEE BEYNON ALEKSANDR DRABOVSKIY
SITE 7
PROJECT DESIGNERS: LUIS GARCIA MAX JACKOWITZ
SITE 9-A
SITE 6
University Way
Shrine Auditorium Parking Lot
SITE 5 SITE 4
EMERGENCY EXIT
SITE 3-B SITE 8
SITE 9-B
SITE 3-A
SITE 1
JEFFERSON ENTRANCE
JEFFERSON AVENUE
1 : 25
32nd STREET MAGNET SCHOOL OVERALL SITE PLAN
SITE PLAN
PERFORMANCE A-1
ANALYSIS LOCATIONS SCHOOL BUILDINGS GREEN
36
GLULAM COLUMN 1X4 BLOCKING WHITE ALUM SHEATHING
WATER PROOFING
1/2” DOWEL
WHITE ALUM SHEATHING
1X4 BLOCKING WEATHER PROOFING
CNC RIB JOINT
2X4 HEADER
1/2” DOWEL
GLULAM COLUMN CNC GLULAM JOINT
A 1
A 3
A 1
1X4 BLOCKING
GLULAM COLUMN
A 3
1/2” DOWEL WEATHER PROOFING
1/2” DOWEL
WHITE ALUM SHEATHING
3/4” PLYWD
3/4” PLYWD
0'-11"
0'-6"
0'-7"
2X6 FRAMING
2X6 LAMINATED FRAME
LEVELING CASTER 3”X1-3/16”
LEVELING CASTER 3”X1-3/16”
A 2
A 4
0'-5"
A 2
A 4
CONNECTION POINT SECTIONS
37
38
12 17c
17c
01
17d
17c
11 17e 18 22
13
23
09
18
25
17a
19
17c
15 17a 17b
16
13 14
09
09
01
01- 3” PHILIPS SCREW 02- 2x6 BASE FRAMING 03- NYLON LEVELING CASTER 04 1/2” BOLT 05- 2x6 BLOCKING 07- 3/4” PLYWD PLATFORM 08- NOTCH FOR COLUMN 09- RIB JOINT 10- 1/2” DOWEL 11- 1/4”X1-1/4” BATT & BOARD 12- 1/2”- 3/4” NAIL 13- 1/2” FINISH PLYWD 14- 3/4” GLULAM RIB 15- 1/2” DOWEL HOLE 16- 2” EXTERIOR DECK SCREWS 17- WHITE ALUM SHEET a. 48”x48” b.23-1/2”x38” c. 48”x38” d.51”x48” e. 23-1/2”x48” 18- 3/4” SHEET METAL SCREW W/ RUBBER WASHER 19- 1x4 SHEATHING WOOD 20- 2x4 DBL HEADER 21- 2x4 COLUMN 22- 2x2 DOOR FRAMING 23- BLACK DOOR HANDLE 24- BALL TRANSFER 25- DOOR HINDGE 26- ADJUSTIBLE DOOR STAY 27- CLOSET TRACK
20
01 15 14 10
14 21
11 10
12
09 27 01
06
11
07
01
26 19
08
19
13
12
06 01 06
02
1
17
02
22
25
24
23 18
26
17
02 02
05
01
02 01
03 04
EXPLODED ASSEMBLY AXONOMETRIC
39
LATIN & SOUTH AMERICA STUDY ABROAD COUNTRIES: MEXICO, PERU, BRAZIL INSTRUCTOR: JAMES STEELE GLOBAL STUDIES STUDIO SUMMER 2016 Located in the Mooca district, a postindustrial area in Sao Paulo, the site offers a plethora of opportunities for redevelopment and revitalization. We recognized the need to maximize the site, educate the people, and ultimately host the public. The site offers views to a proposed lake front on the west facade and views to a railway park on the east facade. With access to the Tamanduatei River and proposal of revitalizing the rivers of Sao Paulo, biological waste can be dropped off to the site to fertilize the soil. The cultivation of beans would also educate the people and ultimately allow for a source of income. With a Favela located across from the site, the proposal includes a prototype for social housing where the inhabitants will be invited to relocate to. Lastly, the proposal prepares the site to host the public by including a market, dining options, and green spaces. By retrofitting the structures of the existing building, a House of Culture will provide a space for artisans to gather, learn and create their crafts.
40
41
SITE: AV. PRESIDENTE WILSON, 2237 MOOCA, SÃO PAULO - SP, 03107-002, BRAZIL PROGRAM: CULTURAL CENTER, HOUSING PARTNER INSTITUTION: FACULDADE DE ARQUITETURA E URBANISMO - UNIVERSIDAD DE SAO PAULO (FAU-USP) GRUPO METROPOLE FLUVIAL STUDIO 336 700
336 600
336 600
336 500
336 500
336 400
336 400
336 300
336 300
46º36'15"W 23º33'45"S 23º33'45"S
PD
0 78
BÉ 78 1.3 6
RU A 8 4.0
785
77 8 0.5 77
.48
9
784
768.5
0 760.4
775
AIM GU BÉ 77 0
ETI A ÓPI
8 0.5 75
SÍL
ICA
A SS LE 755
RUA
1 78
2.6
M AN A 769.54
RUA
RUA
TA
RU A
OS BARR
S RE PE
DE
UE
IQ RU A
IAN ADR
DR. RUA
P
MO
NT
E 74
73
0
5 735.54
74
5
7 392 400
7 392 400
7 392 400
740.50
731.04
731.44 735.67
729.87
7 392 400
PRE E
A NID
AVE
725
ENT
SID
L NA CA
TEREZA CIPRIANO
DO
AGOSTINHO
0 73
D
728.62
.17 728
V
727.93
DO
INA
PAS
CRIST
STIN
A
PAS
.74 729
DIA NÓ LIS
PO
.76 729
EZA
CRI
RO
730
.39 728
.93 729
730.28
729.45
DO
731.79
PRE E
ENT
.56 728
SID
DO
730.17
IO
728.58
ÔN ANT
729.43
729.28
IRIR
7 391 800
Í
RIO
RY HEN
730.47
730.21
.29 730
7 391 800
CAD
7 391 800
RUA
09
.75 728
728.67
727.59
729.81 731.53 728.55
728.64 729.12
7 391 700
733.78
7 391 700
733.55
733.87
733.61
7 391 700
733.38
733.72
7 391 600
733.67
7 391 600
729.45
728.80
730.45 730.25
730.63
730.60
729.26
733.72
NA 733.89 733.69
729.96
728.80
730.63
NOS
ISTA
729.65 730.11
PAUL
730.01 728.05 7 391 600
728.35
733.84
730.18
730.45
730.27 728.83
727.88
.86 728
733.70
728.85 730.22 728.80
728.29
730
BOM
728.91
7 391 700
728.90 728.47
729.67
733.87
733.49
730.98
729.39
729.11
730.74
734.05
7 391 700
NA 720.89
729.67 V
733.84
733.76
NA 725.48
7 391 700
729.90
V
733.58
.61 728
734.22
BENTO
734.19
ATEÍ DU AN TAM
733.68 733.93
733.97
V
7 391 700
729.25
728.71
729.43
728.80
731.22
733.86
733.79
733.45
728.70
730.33
730.36
GINÁSIO
731.72
733.67
727.74
729.69
733.31 733.41
733.83
730.3 1
7 730.3
733.37
732.84 732.53 731.84
731.56
URBAN PLAN 730.85
730.12
.50 728
733.14
733.41
730.21
12
7 391 700
729.67
.58 728
RUA
730.40
730.76 730.58
NA 720.83
728.67
728.43 V
730.24
0
P
7 391 700
730.37
728.68
730.
728.43
73
RUA
730.37
V
733.21
731.69
730.64
728.65
728.60
2
729.39 P
733.48
731.83
7 391 800
730.67
729.50
730.82
TABOR
V
7 391 700
728.67
7 391 800
728.51
729.62
CLUBE ATLÉTICO YPIRANGA
732.86 733.32
TABOR
730.
729.32
7 391 800
728.63
IPIRANGA SETOR 040
729.77
732.68 V
733.44
728.35
728.48 NA 720.75
732.25
731.68
730.18
728.71 729.56
732.65 732.86
733.07
733.38
7 391 700
ZZI
ARI
CHI
730.31
728.38
731.86
7 391 800
733.39
IDA
ATER
2 729.7
7 391 900
728.83
728.22
733.82
AVEN
.68 729
TER
RUA
730
.53 728
.40 728
EZA
.56 729
RUA 729.96
730.14 727.64
729.35
7 391 800
733.52
RUA
AVE
LIS PO
Í
.36 728
.43 728
TER
NÓ
IRIR CAD
A NID
.33 728
7 391 900
729.82
MOÓCA SETOR 032
728.65
729.49
728.51
ONA ORIZ
AGOSTINHO
730.64
7 391 800
733.47
SETOR 040
DUFER S/A. EMPRESA DO SISTEMA USIMINAS
728.48 NA 720.70
731.75
733.43
733.90
7 391 900
729.49
728.77
732.88
730.40
V
7 391 900
727.63
729.51
733.19
731.75
7 391 900
728.28
729.36
732.72
733.33
733.33
7 391 900
727.86
731.52
730
731.30
731.70
728.42
733.75
731.22
730.24
730.31
728.91
731.50
732.42
733.11
NA 724.96
7 392 000
729.34
728.48
NA 720.68
733.73
731.59
MBÉ
GUE
729.49
733.40
PÇ. ENG. GARCIA
.43 728
.24 728
727.49
732.79
733.33 733.36
730.73
731.07
729.43
RUA
732.53
732.83
V
IGREJA MATRIZ NSRA. DAS DORES
7 392 000
731.25
730.46
V
FICO
7 391 800
728.75 729.06
.29 728
V
V
732.83
CIPRIANO
COSTA V
V
730.79 729.58
728.30
727.68
732.72
733.47 733.63
729.09
AVE
.44 728
A
RUA
V
732.83
733.10
733.65
729.35
730.74
728.31
731.34
ANH
732.33 733.10
729.48
731.46
.41 728
A NID
DO
ARIR
731.45
RUA
728.78
NA 724.79
7 392 000
7 392 000
728.86
727.27
7 391 900
731.84
V V
ACAÇA
ATLANTE
733.62
727.75
727.67
RUA
V
728.11
7 392 000
7 392 000
732.86
733.17
728.86
727.69
727.58
RUA
728.45
731.37
7 391 900 V
733.56
729.24
7 391 800
731.41
733.48 730.87
731.80
7 391 900 E.E. JÚLIO DE
SETOR 035
733.21
728.29
7 392 100
730.80 731.34
728.76
730.84
733.38
DO
46º35'37.50"W 23º34'22.50"S 46º35'37.50"W
732.37
MOV. TERRA
730.81
728.24
V
733.42
337 300
731.26
729.25
728.28
727.83
727.64
V
733.30
727.78
LA
732.86
RUA
733.74
337 300
734.63
731.17
CONAB MINISTÉRIO DA AGRICULTURA
727.87
MESQUITA FILHO
V
729.42
337 200
337MOV. 300 TERRA
7 392 100
LA
7 391 900
NA 724.57
733.51
727.56
337 200
337 300
731.18
728.71
730
733.36
728.64
337 100
730.72
731.12
7 392 100
728.59
732.90
IRÓS
732.86
727.48
727.32
RUA
CASTRO
732.68
QUE
337 100
337 200
728.36
729.40
732.85
R
O
729.51
337 200
731.21
728.57
728.44
V
733.89
727.48
337 000
337 100
729.07
728.53
V
728.30
728.44
727.90
728.34
733.61
V
PEDR
L NA
Z
TINE
733.17
727.61
CA
MAR 727.38
TV.
337 000
337 100
731.45
V
NA 724.33 727.31
SA RE
727.67
SA RE
NA 720.67
IPIRANGA SETOR 035
V
337 000
727.25
729.41
TV.
729.32
727.50
JANUÁRIO
336 900
MOÓCA SETOR 032
728.40
728.41
727.57
ÃES
AVE
IDA
LEME
54
JANUÁRIO
727.57
CÔNEGO
CÔNEGO
RUA
727.81
MAGALH
727.37 727.90 727.17
E.E. JÚLIO DE MESQUITA FILHO
728.23
1
NA 720.63
727.86
729.71 728.72
PEDRO
725
GARCIA
728.07
RUA
729.
729.29
729.71 728.26
727.12 727.89
728.44
7 392 000
7 392 000 RUA
336 900
337 000
729.76
728.35
727.32
727.86
728.25
727.11
NA 724.18
730
727.92
336 700 336 700
728.63
727.88
728.09
727.24
730.67
727.53
336 700
336 900
727.87
727.76
727.81
727.86
7 392 000
7 392 000
727.77
727.64
727.10
727.63
336 700
336 900
729.19
727.73
727.72
728.31
727.60 727.58
336 600
V
C
727.74
727.83
727.42
CO
336 600
336 600
728.05
729.31
CHI
336 600
NA 720.60
A ID
TENENTE
727.44
727.30
727.18 726.87
UH
BBO
CHA
RUA
730.40
727.62
46º35'56.25"W 336 800 23º34'22.50"S 23º34'22.50"S 46º35'56.25"W 336 800
728.32
727.89
727.32
726.79
IO
ECC
DIO EGY
336 500
727.56 727.78
727.30
727.25
EN AV
727.78
730.47
727.64
728.24
728.09
336 500
336 500
727.25 726.67 727.94
7 392 000
728.37
336 500
728.78
7 392 100
728.84
730 730.59
727.18 728.33 V
729.74
RUA
336 400
728.09
728.19
727.68 V
NA 724.09
726.88
336 400
336 400
RUA
727.57
728.48
RUA
727.18
7 392 100
727.61
RUA
727.28
A
336 400
EN AV
POLIS BUENÓ
726.85
REIR
P
727.17
NA 728.39
729.83
7 392 100
727.71
RUA
727.11
GE
728.76
727.39
DE HONRA 729.11
728.71
727.14
726.80
MO
7 392 100
727.25 HONRA
727.83
D
7 392 100
336 300 46º36'15"W 23º34'22.50"S 23º34'22.50"S 728.13 46º36'15"W RUA GUARDA 336 300
336 200
726.83
GUARDA
731.34 731.19
FOR
336 200
DE
726.86 726.93
RUA
RY HEN
727.46 336 200
336 200
728.30
.36 728
336 100
727.78
SON
336 100
336 100
726.90
732.87
731.49
CONAB MINISTÉRIO DA AGRICULTURA
728.37
729.14
WIL
336 100
DO
336 000
727.57
732.67 731.73
732.47
730.38
728.39 728.20 728.17
727.67
729.42
730.63
7 392 200
730.80
ESTA
336 000
336 000 NA 723.85
RIBE
729.46
728.06
Í
336 000
727.68
G.
335 900
R. ANTÔNIA DOS SANTOS
BARATA
A 335 900
335 900
GOMES
CRISTINA
727.21
HELEN
R.
335 900
727.56
727.33 726.82
730
729.09
728.70 727.88
728.27
ESTADO
IA MAR
726.71
DIA
727.83
727.79
NA 720.57
727.70
7 392 200
A NID
CRISTINA
727.88
730.40 730.57
7 392 200
AVE
TV.
727.35
.43 728
726.89
726.72
NA 723.67
731.67 730.89
728.43
7 392 200
727.47
43 727.
7 392 200
730.84 730.89
728.36
IPIRANGA SETOR 035 7727.84 392 200
UATE TAMAND
726.85 726.70
727.69
.24 728
728.51
727.90
727.55
726.59
726.55
7 392 200
.34 728
727.85
335 800
731.78
7 392 200
729.40
726.69
726.76
730.89
727.67 727.31 C
726.48
731.48
729.26
729.24
728.78 728.90
7 392 200
727.67
727.60
727.17
731.40 730.90
731.02
728.24 728.31 728.38
RIO
7 392 200
PAULO
RUA
726.51
V
730.20
730.20
730
729.29
FAVELA
728.38
726.62
726.68
726.68
726.64
7 392 300
727.68
PAULO RUA BARBOSA
BARBOSA
726.82
726.56
726.59
731.50
731.04
FOR
DO
NA 720.55
728.36
726.60
7 392 300
730.42 730.26
728.17
726.19
731.64
731.44 730.20 729.32
727.42
727.50
726.39
7 392 300
7 392 300
728.62 728.60
727.34
DE 726.27
ÊNI EUG
7 392 300
7 392 300
728.50
728.48
725
TEREZA
7 392 300
7 392 300
729.40
727.08
735.86
729.22
728.74
726.70
726.42
O NT
SA
731.50
730.92
728.30
7 392 300
7 392 300 726.62
GEN
7 392 400
735.56
729.84
730.20
727.36
727.56
NA 723.60
726.39
0
7 392 400
727.70
727.10
726.44
726.39
75
730.90
730.80
729.20
726.17
O MEL
727.30
HE
NR
O
RUA
736.02
MOÓCA SETOR 032
729.87
728.24
727.32
728.06
7 392 200
7 392 500
728.34
728.57
727.04
SOARES
727.06
NA 723.52
727.09
NID A
GU AIM
ES PA
COS
LO
728.52
728.50
727.11
730.49
GU
731.42
HIPÓLITO
729.65
727.07
731.74
LÓ
P
728.38
7 392 400
7 392 500
755.28
731.10
729.12
CIA. SUDESTE DE ARMAZENAGEM DISTRIBUIÇÃO E LOGÍSTICA
728.18
727.40
726.14 727.09
RUA
731.08
728.54
.52 728
TATINI 726.59
730.12
730
A RU
ES
LO PAU
DOS
IPIRANGA SETOR 035
RUA
726.50
NA 725.05
SÉ
730.50
729.69
PRAÇA DO MONUMENTO
R
RUA
DO
JO
P
SECRETARIA DE ESTADO DA CULTURA DIVISÃO DE ARQUIVO DO ESTADO ARQUIVO INTERMEDIÁRIO
A ID EN AV
RUA
TA
727.82
727.06
7 392 300
7 391 600
DO
730
RUA
ES
727.06
729.20
7 392 500 730.82
729.17
7NA 392 400 720.54
727.06
726.36
731.35
DE
732.10
CIA. AUXILIAR DE ARMAZÉNS GERAIS
728.44
730.44
7 392 500
LI
757.49
750.52
740.21
COMPANHIA BRASILEIRA DE ARMAZÉNS GERAIS LTDA. C.B.A.G.
729.28
7 392 500
728.10
DR.
731.64
PO
RU A
RY HEN
5
728.17
726.78
726.44
CORREIA
RIS
726.09
RUA
7 392 600
754.69
DI LM A
A
RUA
CORÁ
730.04
5
726.36
42
GA
Í
EIR
AVENIDA
726.42
728.48
730
728.34
72
DAUNT 726.37
7 391 700
BAR
IRIR
PER
L ICIPA L RA MUN ONA EITU REGI .29 PREF ETARIA 727 SECR
RUA
728.26 726.64
726.55
FARIA
NIO 747.49
ANTÔ
729.26
MOÓCA SETOR 032
728.48
DO
Í
72
NA 723.31
RICA
MANOEL
RU A
729.28
7 392 500
POLÍCIA CIVIL DIVISÃO DE TRANSPORTES
729.58
ES
TA MAN DUA TE
727.04
726.46
7 392 400
RDO
7 392 600
757.94 749.90
728.18
7 392 500
7 392 400
TV. 728.47
744.74
745
729.96
729.08
728.12
728.20
7 392 600
729.26
728.78
729.24
728.60
728.67
NA 720.23
728.12
7 391 800
755.26
728.76
7 392 500
727.42
726.98
727.09
S
GO
734.67
729.22
TA
V
726.74
TO
726.32
QUE
752.40
P
732.20
7 392 400
727.74
MAR
P
NE
RÃ O
728.70
727.03
728.47
AZEV
CÔ
BA
STA 7 392 600
728.12 7 392 500
728.58
727.54
728.71
7 392 700
V
734.28
733.54
7 392 600
727.42
RUA
RUA
0
CAD
CO 7 392 600
729.04
726.89
46º35'37.50"W 23º34'03.75"S 46º35'37.50"W
EDO
727.09
727.54
729.22
337 300
740.80
MÁRIO VERDADE
727.54
727.74
337 300 760
337 300
DE
745
729.14
RIO DO
PRAÇA MARTINS
V
ELETROPAULO ESTAÇÃO DE TRANSFORMAÇÃO DE DISTRIBUIÇÃO MONUMENTO
337 300
CELS
735.08
727.09
727.92
337 200
738.11
729.06
726.07
BARRE
726.42
P
337 200
337 200RUA
729.26
727.14
P
337 200
V
7 392 600
729.14
727.68
LIMA
JOR
753.52
O
RU A
728.58
727.12
726.58
727.49
730
RUA
A NID
E
A NID
ENT
AVE
SID
7 392 600
NA 719.63 727.44
7 392 500
728.24
S
337 100
750
753.62
740
745.72
727.64
335 800
PROJETO SOCIAL C.I.E.E.-PEC
RU A
729.48
7 392 500
IRO
337 100
QUE
337 100
337 100
729.20
730
729.06
7 392 600
728.38
335 800
337 000
P
727.96
727.70
335 800
V 337 000
337 000
729.08
728.02
726.31
727.02
ODI
MAR
A 744.70
337 000
730
AVE
PRE
IDA
RUA
DO
728.02
727.02
7 392 100
752.70
SS
336 900
733.58
729.08
727.13
727.14
7 392 700
EDO
LE
336 900
336 900 336 900
744.84
727.12
727.21
7 392 700
AZEV
NI O
NT O
OAB-SP PROJETO SOCIAL C.I.E.E.-PEC
NA 723.21
7 392 500
7 391 900
EM
74
Í
S. PRE N SO
729.60
7 392 600
727.24
727.12
O
DE
AN TÔ
735
7 392 700
DO
726.68
L
E
OAB-SP PROJETO SOCIAL C.I.E.E.-PEC
728.68
728.50
727.08
727.10
ERA
CÔ
PROJETO SOCIAL C.I.E.E.-PEC
NT
7 392 700
PRE
7 392 600
727.14
7 392 700
336 800 46º35'56.25"W 23º34'03.75"S 23º34'03.75"S 336 800 46º35'56.25"W
V
SETOR 032
728.52
727.01
336 700 336 700
727.96
728.92
7 392 300
336 700 336 700
SID
NA 722.47
769.90
734.67
727.24
727.35
726.60
751.14
GO
IRIR
336 500
336 600 336 600
V
O
728.62
727.84
726.31
726.42
ES
P V
CELS
NE
MO
CAD
336 500
336 400
336 600 336 600
729.67
PIN
E
NA 719.62
727.14
336 400
336 300
336 500
336 500
ENT
ID A
727.37
727.10
PRAT
756.20
750.04
750
RU A
V
SA
729.92 336 400
336 400
336 300
WIL
728.58
O PINT
EN AV
727.08
P
D
336 200
TO
TA
AV EN
RUA 5
DE
FOR
336 200
A LIM
COS
728.54
7 391 900
LO
74
BA
730.32
729.88
IPIRANGA
728.24
336 300 46º36'15"W 23º34'03.75"S 23º34'03.75"S 336 300 46º36'15"W 7 392 700 7 392 700
. PRES
IDA
336 100
RUA
PERE
RUA
AV EN
336 100
336 200
.90 729
336 000
336 200
727.24
727.84
725
0
336 000
336 100
IRA
PRE
720
72
NAL
TV.
DES
.04 730
726.68 STA
BATI
336 100
AV.
335 900
336 000
7 392 700
729.12
A
O
335 900
CA
P
769.74 P
ME
RU A
729.50 7 392 700
727.20
336 000
7 392 800
7 392 800
LO
P
734.40
RÃ O
SON
EIR
PER
AD EST
EÍ 335 900
S.
72
7 392 600
765
P
ME
NT O
728.27
RUA 728.08 335 900 727.80
727.02
7 392 000
7 392 800
SA 730.52
730.32
730
WIL
TO PIN
UAT ND MA TA
.25 726
IPIRANGA SETOR 032
ENT
SID
PRE 727.34
DO
5
P
764.48 P
DE
729.12
726.92
TA
727.54
728.07
760.26
755.10
DE
RY HEN
OS RL
7 392 800 730.52
UI M
P
728.06
ES
727.47
772.79
JO AQ
755
728.29
V
NA 719.58
335 800
727.47
P
CON DE
UIM
P
0
5
73
CA
RIO
DO 335 800
7 392 100
JO AQ 752.67
75
ISTA
727.22
726.78
E
726.25 335 800
335 800
LON
RUA
A NID
SÃO
M
7 P392 800
734.58
750.17
727.67
DR.
RAS
AVE
STA
7 392 800
735.82
728.63
IPIRANGA SETOR 035
727.76
760.09
BAT
727.74
728.08
7 392 700
727.50
AJA
O
.38 730
STA
CO
DO
IDA
DO
EN AV
BS CONTINENTAL FÁBRICA DE FOGÕES
726.60
RUA
728.06
46º36'33.75"W 23º34'22.50"S 46º36'33.75"W
DO 7 392 800
NTE
7 392 800
A
P
0
MO
VIA
726.50
727.88
727.39
TAB
RUA
RED
M
TO
DU
CPT
VIA
CO
L NA
CA
EIR
PER
780.79 759.17
76
760.36
M
731.24
SÃO TO
DU
NA 719.57
CAMÉ
759.50
DO
7 392 800
730.08
E
726.57
7 392 900
P
7 392 900
759.32
RU A
SETOR 032
LOS
7 392 800
P P
RU A
ENT
729.02
RUA
LO
5
CAR
728.06
0
760
A RU
ME
74 740
PRE
726.60 728.54
78
775.64 775.55
775.10
A RU
741.52
735.24
SID
728.54
780.32 V
765.90
765.90
7 392 900
ÃO
DE
OS
773.53
767.27 P
V
755.24
BAR
RUA 735.03
730.32
726.60
IS
RA VEI
UEI
745.76 745
735.04
A RU
732.63
727.36
7 392 800
7 392 ME 900 LO
750
730.40
763.93
RUA
DE
736.04
730.36
RES
SOA
P V
758.83
757.46
RUA
727.32 727.10
768.73
7 392 900
DE
736.08
7 392 900
730.77
RR
782.79
V
7 392 900
751.89
UIM
7 393 000 786.90
BA
779.93
RIO MÔN ACO
UIM
JO AQ
OS
781.35
P
ROSÁ
755.47
JO AQ
744.92
739.24
BA RR 785.41
772.82 769.24
761.35
5
RU A
743.45
734.93
FIG
726.33
RUA 726.54
726.24
75
M
747.14
739.56
V
BERN INI
765.77
RUA
OLI
.72 730
IDA
3
730.59
7 392 900
PUR
760
.94 730
E
EN AV
BRA
7 392 200
APU
742.32
DO 734.62
ÃO ND
728.83 727.18
727.06
5 9.7
RAS
E
E
ENT
SAR
DO
785.17
770.58
766.72
747.70
Í
M
7 392 900
7 392 400
A AIV
ENT
SID
ENT
735.50
7 392 900
V
46º36'33.75"W 23º34'03.75"S 46º36'33.75"W
SAR
SID
PRE
PRE
SID
PRE 7 392 900
730.55
SID
V
764.55
763.34
APU
784.25
V
772.31
RU A
765.73
763.92
745.33 V
727.18
E
ENT
766.31
7 393 000
760.15
RU A
Í
SAR
PRE
727.69
7 393 000
747.36
RUA 739.90 735.67
778.58
766.12
747.65
O ISC
NC
FRA
735.65
726.50
ANA . PEST
.90
766
739.89
733.98 730.98
730.64
ÃO
V
V
760
AJA
DE
7 393 000
.80
766
P
7 393 000
MOÓCA SETOR 032
765.31
P
P
NO
VIA OTA
746.41
728.36
BAR
727.19
R. ALM
TAB
DE 742.34 735.59
7 393 000
DE
V
727.11
784.03 774.15
P
772.77
730.90
726.74
RUA
769.47 7 393 000
756.43
747.78
785.85
782.80
.88
767
7 393 000
759.70
.83 730
RÁ
7 393 000
7 392 800
76
IO
733.60
728.92
726.50
PA
760
TÔN AN
7 393 000
DE
771.46
753.30
AJA GU
727.52
NA 719.51
RUA
UTO
735
.84 730
RUA
7 393 000
781.59 780.67
DE
730.59
729.65
783.14
781.54 772.86 771.13
P
763.67 P
748.30
RUA
727.19
PRE
7 393 100
762.67
755.97
752.39
739.96
E
783.86
783.21
761.10
736.76
727.35
7 392 900
7 393 100
P
733.81
ENT
775
760
CAN
740
M
7 393 100
740.22 731.31 731.49
INDÚSTRIA LORENZETTI
SID
V
749.29
758.17 729.70
A EID
ALM 727.12
C
US
780.35
762.97
741.02
727.86
PRAÇA LORENZETTI
727.96
DE 782.54
JU
766.74 P P
A
AN M
775.56
767.93
741.76
7 393 100
727.74
726.51
760
S RGE
CPT
P
7 393 100
ARN O
727.59
V
P
730.64
7 393 100
7 393 100
753.78
755.41
782.62
7 393 100
IEL
EZE
745.45
742.10
778.63
769.31 7 393 100
756.69
739.01
DE
778.64
748.17
742.31
733.49
779.60
761.81 P V
QU
UTO
CO
729.11 727.43
RU A
781.15
752.90 749.80
V
INDÚSTRIA ARNO
782.21
779.33
764.57
750
O JOÃ
BO
7 393 100
7 393 200
779.64
GRUPO METROPOLE FLUVIAL STUDIO
754.63
745
F
738.59
731.85 7 393 100
781.56
ESCOLA ESTADUAL PANDIÁ CALÓGERAS 776.54
766.25
MOÓCA SETOR 028
736.56
779.89
775.62
V
768.26
753.76
.27 731 731.50 729.73
P
V
7 393 200
747.63
735.99
7 393 200
M AD
RE
734.44
RUA
727.91
SO
P
779.64
RUA 761.83
7 393 200 OS
732.82
7 393 100
EZEQ
766.06
RAM
758.42
CAMBUCI SETOR 028
728.27
PO
779.86
UIEL
765
754.70
728.51
728.03
RA
779.95
753.28
E
ND
CO
VIS
A ID
ALEXANDRE DELIJAICOV (FAU-USP)
727.90
7 393 000
7 393 200
765
762.88
V
750.61
735.93
7 393 200
731.82
731.15
8
7.8
77
TEATRO ARTHUR AZEVEDO
773.98 777.32
763.62
732.79
AVE NID A
EN AV
P
746.22
7 393 200
755
740.49 V
7 393 200
A ID EN AV
A RU
RUA
7 393 200
V
SUBESTAÇÃO
4 0.1 77
RUA
RUA
.40 731
7 393 200
728.76
728.85
773.48
OS RAM
769.97
DE
730.18
7 393 200
E.
770.21
767.08
735.55
731.67
RU A
P
778.84
762.92
753.76 V
.91 750
732.50
RUA
A NID
7 393 200
735
AVE
INDÚSTRIA ARNO
775.73
23º33'45"S
749.39
IM
MER INHO 744.98
731.93
731.19
23º33'45"S
V
731.41
730.17
JU
336 200
336 200
336 100
336 100
336 000
336 000
770
INSTRUCTORS: JAMES STEELE (USC)
335 900
335 900
335 800
335 800
46º36'33.75"W 23º33'45"S
732.49
728.67
7 391 600
730.43 728.42
728.17
733.84 734.05
ES
728.92
729.23 728.66
729.41
729.71 730.16
7 391 600
SITE PHOTOS
TAMANDUATEI RIVER
BEAN GROWING AREA
PRESIDENTE WILSON AVE.
BEAN PROCESSING SPACE + MARKET + DINING + SOCIAL HOUSING + HOUSE OF CULTURE
NEW TRAIN STATION
RAILWAY PARK
SITE SECTION
SITE SECTION @ 1 : 500
REF MW DW REF MW DW
SITE PLAN
STEP 1: ANALYZE SITE
PROGRAM DIAGRAM
STEP 2: CONNECT SITE TO URBAN CONDITION
STEP 3: SITUATE SOCIAL HOUSING
STEP 4: MAXIMIZE SITE VIEWS
43
MEXICO
PERSPECTIVE SECTION
MUSEO SOUMAYA
MACCHU PICCHU
MUSEO NACIONAL DE ANTROPOLOGIA
SÃO PAULO, BRAZIL
SACSAYHUAMAN
BRASILIA, BRAZIL
CASA DE VIDRO
BRASILIA FROM TORRE DE TV
RIO DE JANEIRO, BRAZIL
44
MUSEU DE ARTE CONTEMPORANEA DE NITEROI
MUSEU DO AMANHA
CUZCO, PERU
BIBLIOTECA VASCONCELOS
LINA BO BARDI STOOL MAKING WORKSHOP
CHICHEN ITZA
INSTITUTO TOMIE OHTAKE
SESC POMPEIA
SUN PATH DIAGRAM
CONGRESSO NACIONAL BRASILEIRO
CRISTO REDENTOR
EXTERIOR OF CATEDRAL DE BRASILIA
INTERIOR OF CATEDRAL DE BRASILIA
45
ENGENHAO - RIO 2016 OLYMPICS
ARCHITECTURAL PRACTICES RE-IMAGINED SITE: 3625 S. GRAND AVE LOS ANGELES, CA 90007
ADVISOR: HADRIAN PREDOCK THESIS STUDIO SPRING 2018 The Insider. I deal with the interiority of architecture and work in various scales from a chair to urban rooms. I am most interested in challenging the binary status of architecture comprised of interior and exterior practices. I am believe that architecture has been pitted against interior practices and has drifted towards becoming solely a materialization of exterior practices. Instead, architecture aught to incorporate interior practices just like how Mies, Loos, Rudolf, and Panton have done for a period of time in their career as architects. Perhaps architecture can start to index qualities of an interior rather than become solely a expressionistic, weatherproofed shell. Perhaps interiors can start to index exterior systems and logics rather than become solely a space for program.
46
47
Architecture is in a state of having an identity crisis. Architecture is being forced to choose to be either a materialization of exterior or interior practices.
Architecture has become solely focused on exterior logics, aesthetics and practices. Architecture has become dissatisfied with just one way of being.
Architecture is nostalgic for the days when there was a higher interest for the inside, resulting in Mies’, Loos’, Rudolf ’s, and Panton’s experimentation with interiors. Architecture isn’t sure what it wants to be anymore.
Architecture has decided to go to therapy.
48
Hello Therapist. I am having an identity crisis. I am not satisfied being just the materialization of exterior practices.
The Site scales up to the urban grid to create an urban room.
The Site.
The Site scales up to the urban grid to create an urban room.
The Site.
The Site scales up to the urban grid to create an urban room.
The Site scales up to the urban grid to create an urban room.
The Site scales up to the urban grid to create an urban room.
49
T 50
Surfaces.
Volumes.
Lines.
Grids.
Materials.
The Index Room. 51
REFRENCES 01
TAMMY JOW, LEED AP
Principal, AC Martin Partners tammy.jow@acmartin.com 213.614.6068
02 DIANA TANG, LEED AP BD+C Associate, HKS Los Angeles dtang@hksinc.com 424.248.2782
03 OLIVIER TOURAINE Associate Professor of Practice , USC Architecture olivier@studiotouraine.com 213.740.2723