MIDDLE EAST GENERAL CAPABILITY STATEMENT
MIDDLE EAST GENERAL CAPABILITY STATEMENT
CONTENTS Introduction
1
01 Transportation and Infrastructure
11
02 Property
45
03 Utilities and Environment
77
04 Global Design Centres - Manila and Bangalore 95 05 Quality Assurance, Systems and Procedures
99
Middle East General Capability
1
Middle East General Capability
INTRODUCTION
2
INTRODUCTION
We have been successfully delivering key landmark projects in over 100 countries for over 150 years. Our Philosophy
Values
As a multi-national advisory and design consultancy, Hyder is a trusted partner of valued clients. We create exceptional design and engineering solutions for public and private sector organisations. We are passionate about providing quality, value and optimum business outcomes.
In our pursuit towards achieving our strategic vision, our values define how we behave as an organisation:
One of our guiding principles is creating partnerships with our clients. This means that we develop long-term relationships built on a high degree of trust and gain an excellent understanding of our clients’ aspirations.
Middle East General Capability
3
Client Focus – we differentiate through our tailored skills and depth of client understanding; Excellence – we strive for excellence, recognising that excellence is defined by our clients; Trust – we build and retain relationships of trust with our clients, colleagues and business partners; Teamwork – we work together as a team for the Group not just the individual; and Responsibility – we take responsibility for our performance and for safety.
CHIEF EXECUTIVE OFFICER IVOR CATTO
FINANCIAL DIRECTOR RUSSEL DOWN
REGIONAL MANAGING DIRECTORS
UK & EUROPE
GERMANY
MIDDLE EAST
AUSTRALIA
ASIA
GRAHAM REID
MARCUS VOIGT
WAEL ALLAN
GREG STEELE
KEVIN JONES
Samar Jodha/Spectra Maxima International
Hyder is a multi-national engineering advisory and design consultancy which operates across three geographical regions and four market sectors. As one of the world’s longest established engineering consultancies, Hyder has a history of projects which go back over 150 years. We have designed some of the world’s most instantly recognised landmarks including London’s Tower Bridge, Sydney Harbour Bridge, the Taiwan High Speed Railway and Berlin’s main station. In recent times, we have seen the opening of Burj Khalifa, the world’s tallest building, the design of a new submerged tube tunnel in Hong Kong and the design of several new interstate highways across Australia.
4
Hyder offers multi-disciplinary engineering and scientific services to clients in the UK, Europe, Middle East, Australia, and Asia Pacific. Our experience and capabilities encompass four main sectors; Transport, Property, Utilities and Environment. We provide strategic advice based on knowledge and experience gained from a broad portfolio of international projects. Hyder has access to international resources of approximately 4,200 staff worldwide - 1,200 of whom are located in the Middle East.
Middle East General Capability
Corporate Organisation Chart
Company History Timeline
Acer acquired by Welsh Water
John Taylor & Sons
1857
Middle East General Capability
5
Acer Consultants formed through merger of Freeman Fox and John Taylor
2002 2001
1993
1882
Freeman Fox & Partners
Management buy-out
1996
1987
Group restructured to align more closely with client needs in four key sectors: transport, property, utilities and environment
Renamed as Hyder Consulting
2010 2009
Floatation on London Stock Exchange
Established in the GCC for 5 decades
Middle East Organisation Chart Hyder Consulting Middle East Limited is a wholly owned subsidiary of Hyder Consulting Plc, which is listed on the London stock exchange (HYC.L). Revenue for the Hyder Consulting Group for March 2010 was £308.6m (2009: £319.0m).
REGIONAL MANAGING DIRECTOR
MANAGING DIRECTOR
MANAGING DIRECTOR
MANAGING DIRECTOR
TRANSPORTATION AND INFRASTRUCTURE
PROPERTY
UTILITIES AND ENVIRONMENT
Our long-standing service across the Gulf region is extensive; having successfully carried out civil engineering projects for over 50 years for a wide range of public and private sector clients. With a presence in Abu Dhabi, Al Ain, Bahrain, Doha, Dubai and Saudi Arabia, we are one of the largest international multi-discipline consultancies in the region. Our expertise in architecture and numerous engineering fields ensures we deliver unmatched quality and services. Revenue for Hyder Consulting Middle East Limited for March 2010 is £93.9m (2009: £106.9m). Our business focuses on services within three key sectors:
Transportation and Infrastructure Property Utilities and Environment
6 Middle East General Capability
HYDER CONSULTING GROUP PLC
Global Operations UK & Europe Staff: 1,719 Revenue 2010: £119.9m Middle East Staff: 1,227 Revenue 2010: £93.9m Asia Pacific Staff: 1,236 Revenue: £94.8
Middle East General Capability
7
1. United Kingdom 2. Ireland 3. Germany 4. Romania 5. Latvia 6. Cyprus 7. GCC countries 8. China 9. Vietnam 10. Philippines 11. Australia 12. New Zealand
Middle East Operations 1. Bahrain 2. Qatar 3. Abu Dhabi, UAE 4. Al Ain, UAE 5. Dubai, UAE 6. Oman 7. Al Khobar, Saudi Arabia 8. Jeddah, Saudi Arabia 9. Riyadh, Saudi Arabia
Middle East General Capability
8
Recent International and Middle East Awards 2010
Middle East General Capability
9
Construction Week GCC Civil Engineer of the Year Construction Week GCC Consultancy of the Year (highly commended) Construction Week Lifetime Achievement Award (John Mill’s Hyder’s Project Director for Burj Khalifa highly commended) Construction Week Power 100 (Wael Allan, Middle East Regional Managing Director ranked 27th) Cityscape Mixed Use Project Award (Burj Khalifa)
2009
2008
2007
ITP Publishing MEP Consultancy of the Year ITP Publishing MEP Project Manager of the Year (Alastair Mitchell responsible for mechanical engineering activity for Burj Khalifa highly commended) ITP MEP Young Consultant of the Year (Ben James, MEP Group Leader Northern Gulf) British Expertise Innovation of the Year (Burj Khalifa) British Expertise Young Consultant of the Year (Robert Baker, Highways Function Manager Global Design Centre Manila)
Queen’s Award for Enterprise – International Trade Ground Engineering Awards (highly commended for work on Burj Khalifa foundations)
NCE/ACE International Firm of the Year Quality in Construction Award, International (Ski Dubai) British Construction Industry Award, International (Ski Dubai) British Expertise International, Built Project (Ski Dubai)
Awards Timeline
2010
2007
2009
10 Middle East General Capability
2008
Middle East General Capability
11
TRANSPORTATION AND INFRASTRUCTURE
Middle East General Capability
12
01
Capabilities and Services We partner with our clients to really understand their vision and deliver for them. We use the best international experts for each project to prepare land, strategically plan for development and obtain relevant approvals within required timeframes and budgets. We provide strategic advice, master planning, design, construction supervision and the skills to manage existing assets. Most importantly, we use our relationships with stakeholders including regulators, contractors, financiers, government and the community to maximise project opportunities for all, particularly for our clients.
Middle East General Capability
13
What makes us different? We focus on integrated solutions. By combining expertise in urban design, landscape architecture, rail and tunnelling with traditional highways and infrastructure services, we realise efficiencies and maximise effectiveness. These advantages are passed on to our clients. We have proven we deliver. Previous projects demonstrate our ability to provide real solutions through a partnering approach. We have designed major developments, cities and regions in the Middle East and internationally. Evidence such as Burj Khalifa in Dubai, Lusail and Education City in Qatar, developments on Reem Island and the Corniche in Abu Dhabi as well as the North Manama Causeway in Bahrain are proof of our success in making our clients’ visions a reality.
Transport Planning Transportation in the region is evolving and so have we. Dependence on the car is moving towards multi-modal solutions, particularly the integration of rail transit. Our specialists have successfully delivered these solutions for cities, regions and countries throughout the world. Our expertise and local knowledge will assist in shaping the future of the Middle East. We work in partnership with our clients to ensure that the needs of those who live, work and visit the region are met. The short-term challenge is to manage congestion and provide transport solutions as multi-modal systems are introduced around the region. We can deliver this through our knowledge of intelligent transport systems; incident detection for emergency services and toll and computerised parking systems that respond to fluctuating transport demands.
Capabilities include:
Policy development Strategy development Transportation modelling Feasibility studies and business cases for transport investments Transport assessments and traffic modeling and impact studies Intelligent transport systems Travel planning Traffic management Road safety assessments
TRANSPORTATION AND INFRASTRUCTURE
Middle East General Capability
14
Middle East General Capability
01
15
TRANSPORTATION AND INFRASTRUCTURE
Master Planning and Infrastructure Design
Optimum project outcomes are achieved through our specialist discipline expertise and the ability to work as a team. As part of integrated project teams, our highways designers work alongside transport planners, urban designers, landscape architects, infrastructure engineers and specialist tunnel and rail experts where appropriate. The breadth and depth of this expertise means we deliver smart transport design services.
Our master planning and smart infrastructure designs bring developments to life. Locally experienced urban designers with international reputations work closely with industry recognised infrastructure engineers to maximise development opportunities. This integrated value engineering approach means a polished end product and authority approval. This allows our clients to meet budgets and programme commitments in a sustainable way.
Capabilities include:
Capabilities include:
Tunnelling Bridges Highways Ports Airports Rail Interchanges Multi-modal hubs
Landscape architecture Strategic planning Master planning Urban design Public open space design Graphic 3D modelling of design Cultural theming Sustainable design Potable water Irrigation Fire-fighting Sewage and storm water Gas District cooling Telecommunications Electric (LV and HV) Street lighting
16 Middle East General Capability
Transport Design
01
Abu Dhabi National Exhibition Centre (ADNEC) Tunnel Concept Design, Abu Dhabi Hyder’s in house urban planning and landscape team in conjunction with its highways and structural engineers has designed a cut and cover tunnel to increase the public open space along a prominent promenade of Abu Dhabi Island. The design accentuates the grandstand feature of ADNEC, which is of cultural significance to the Emirate, and promotes Abu Dhabi as a leader in hosting world class exhibitions with access to outdoor space and the sea.
Middle East General Capability
17
TRANSPORTATION AND INFRASTRUCTURE
Al Falah Community Development, Abu Dhabi Al Falah is a master planned community for UAE nationals and forms part of the Plan Abu Dhabi 2030 directive. The Al Falah site is 1,400 hectares and will provide 5,000 homes for middle-income UAE families. Hyder’s scope of work includes design review and adoption of existing concepts, development of the design, preparation of tender documentation and the utilisation of Civil 3-D software for the design of the sewerage network to ensure improved efficiencies.
18 Middle East General Capability
In the design review and adoption phase, Hyder invested time in adapting the software to the regulatory authority’s standards (ADSSC), and automated the design process to virtually eliminate the need for drafting in the latter stages of the project.
01
Al Raha Beach Interchange, Abu Dhabi ALDAR Properties PSJC is undertaking the development of Al Raha Beach, a major mixed-use waterfront development, creating a new gateway to Abu Dhabi. The area will become more accessible for the local residents due to the new interchanges, offering direct access to Abu Dhabi Island, the International Airport and the Abu Dhabi to Dubai highway. Hyder adopted a holistic approach to integrating the highway, traffic, bridge, rail and utility design disciplines to achieve significant improvements in constructability and value engineering while also enhancing the aesthetics of the landscaped setting.
Middle East General Capability
19
TRANSPORTATION AND INFRASTRUCTURE
Arabian Legends, Dubai Tanmiyat Group required infrastructure and highways design and supervision services for this US $ 300 million project encompassing an area of 25 million square feet. Arabian Legends will offer a family-oriented, leisure and entertainment resort with three world-class theme parks. Hyder provided the design of the infrastructure and utilities package for the entire development, which included a highway network for the entire development. The design and supervision of infrastructure and utility services to serve the development included 15 kilometres of new roads, a storm water drainage system, a sewerage network including pumping station, utilities, telecommunications, and an irrigation network.
Middle East General Capability
20
01
Bawabbat Development, Abu Dhabi Bawabbat Abu Dhabi, meaning “gateway”, is located next to Abu Dhabi International Airport. Hyder’s Infrastructure and Planning team was awarded the urban planning, design and supervision services for roads and infrastructure works for the project.
Middle East General Capability
21
Hyder was appointed to provide a fully integrated team in order to drive value at each stage of the project lifecycle by ensuring the required inputs were available for informed decision making at each stage. This approach was further enhanced through the introduction of a series of value and sustainability driven workshops to influence the course of the design in accordance with the client’s objectives. This approach has resulted in tangible savings to the client.
TRANSPORTATION AND INFRASTRUCTURE
Capital District Development, Abu Dhabi The Capital District is one of the major strategic initiatives of Plan Abu Dhabi 2030, and constitutes a mixed use development where government, academic and knowledge-based centres will be concentrated. Hyder was appointed to review both local and foreign practices in the provision of service utilities and utility corridor design to develop a series of viable, constructible and technically feasible options for use in Abu Dhabi’s Capital District. Bespoke options were developed to adapt to local environmental conditions.
Middle East General Capability
22
01
Central District, Plan Al Ain 2030, Al Ain The oasis city of Al Ain is due to undergo structured urban change. This process is driven by the Urban Planning Council (UPC). The Central District of Al Ain is planned to ensure that the environmental, land use, transportation and public needs of the city are provided for and that the Abu Dhabi Government’s vision for the year 2030 is achieved.
Middle East General Capability
23
Hyder was appointed to undertake the utilities infrastructure and transportation systems. The combined responsibilities include collection of system and network data relating to transportation and utilities infrastructure, whereby Hyder interacts with all relevant authorities and organisations. Assessment of current infrastructure systems, establishing benchmarks for future requirements, identifying infrastructure deficiencies and establishment of future requirements and associated impacts on the existing systems.
TRANSPORTATION AND INFRASTRUCTURE
City of Arabia, Dubai P&T Architects required infrastructure design and supervision services for the City of Arabia development. It is a mixed-use tourism project located in Dubailand. The AED 7.2 billion (US$ 1.96 billion) project will occupy a 20 million square foot site. Hyder provided design and supervision of infrastructure and utility services for the entire development including the design of a 17 kilometre road network, 5 footbridges, sewage network design, storm water drainage system, irrigation network from connection to existing municipality mains to irrigation tanks, street lighting, traffic signals and electricity assessment.
24 Middle East General Capability
Hyder also carried out the schematic design for the automatic people mover system - an internal monorail system to transport residents and visitors around the site. I & M Galadari Developers commissioned Hyder to conduct design studies and provide route alignment services, with provision for guide-ways and viaducts as well as rail operating schematic engineering for the automatic people mover system.
01
Deira Waterfront, Dubai The Deira Waterfront project located on a 98 hectare site is envisioned to be a tribute to Dubai, and the historic settlement of Deira in particular. It was developed in conjunction with financial consultants KPMG and theme consultants Creative Kingdom. Located along the existing Deira Corniche at the mouth of the historic Dubai Creek (Al Khor), the project aims to revitalise the waterfront, making it a thriving mixed use trading hub, leading cultural and tourist destination and residential community.
Middle East General Capability
25
The concept master plan translates the client’s vision into a viable mixed use urban development based on traditional Arabic architecture. The scheme will enhance the existing historic urban fabric of Deira and will relocate the fresh food market. The infrastructure and road design successfully accommodated the existing roads and utilities and the necessary diversions in the critical historic areas as well as the other proposed developments which will have an impact on the site.
TRANSPORTATION AND INFRASTRUCTURE
Diyaar Al Muharraq, Bahrain Hyder was appointed by Diyaar Al Muharraq Co Ltd to carry out the detailed design stage for this off-shore island development in Bahrain. The conceptual master plan is aimed at creating a sustainable world class urban development for a population of 200,000 people. The land area of the site is 1,683 hectares and the development is divided between land and sea at a ratio of 70:30. The land - sea split facilitated the creation of abstract island shapes, increased the amount of waterfront value added property and reduced the amount of reclamation required.
Middle East General Capability
26
01
Downtown Dubai Development, Dubai Emaar Properties PJSC required detailed masterplanning, design guidelines, infrastructure design and construction supervision services for the Downtown Dubai development. In addition to regulatory planning services, the scope involved the redesign of an extended third of the site area. The 219 hectare urban development is centered around the iconic 828 metre Burj Khalifa Tower, the tallest building in the world. The development showcases the contemporary image of Dubai, where the technological innovation of the tower sits comfortably alongside the traditional imagery of the Palace Hotel and the Old Town area.
Middle East General Capability
27
Hyder designed and supervised the construction of the roads and infrastructure elements of the 3.15 kilometre boulevard, the interlinked roads measuring 8.5 kilometres, the 12 hectare hardedged lake and three underground parking levels located beneath the main boulevard. The team also provided extensive property and environment services for the development and is the architect of record for Burj Khalifa tower.
TRANSPORTATION AND INFRASTRUCTURE
Dubai Marina Infrastructure and Utilities, Dubai Dubai Marina is a 700 acre development sited along a two-mile stretch of Arabian Gulf shoreline and is a mixed-use canal-city inspired by the Venetian tradition. Hyder was appointed by Emaar Properties PJSC to undertake the design and supervision of infrastructure and utility services to serve the whole development, including 17 kilometres of new roads, stormwater drainage system, sewage network including pumping station, irrigation network, irrigation pumping station and storage tank.
28 Middle East General Capability
The client also required design services for bridges crossing the Dubai marina. Hyder designed the slender, single span post-tensioned concrete structures (which are approximately 120 metres long) with multi-curved soffits to provide a subtle, yet interesting, feature for this waterside development. Our solution included the combination of a simple architectural form, efficient engineering design and constructible detailing that incorporated the findings of safety and environment studies. The bridges were delivered as an extension to Hyder’s existing scope of work as the infrastructure engineer for Dubai Marina.
01
Education City, Qatar Education City – a world renowned educational facility will host many of the world’s leading universities, including Weill Cornell Medical College, Texas A&M University, Carnegie Mellon University, RAND and Virginia Commonwealth University. The development will also accommodate a technology park, an equestrian academy, special teaching hospitals, residential facilities, a sports academy and a golf course. The total area of the project site is over 800 hectares partitioned into eleven zones. Qatar Foundation required consultancy services for the second stage of the Education City development.
Middle East General Capability
29
Hyder’s services covered primary infrastructure design in order to integrate all aspects of the existing infrastructure, provision for future requirements and aligning designs with the approved master plan and concept for the development. Drawings incorporate boundaries, utility interface borders, gates, earthworks, road and pavement designs, traffic arrangements, parking, signage, lighting, landscape design, planting, utility tunnels, IT, telecommunications, ducting, solid waste facilities and proprietary systems.
TRANSPORTATION AND INFRASTRUCTURE
Enpark, Dubai Enpark is a mixed use development with an area of over 74 hectares of land which includes hotels, residential apartments, villas, commercial offices and retail outlets.
The master plan provided the client with a highly marketable development and the infrastructure design complimented the sustainable design model to be applied to all buildings within the development.
30 Middle East General Capability
Hyder was appointed for the preparation of the master plan, traffic impact study, utilities and road design including the structural design of two underpasses and the associated retaining walls as well as site supervision. The client’s brief required the use of solar powered street lighting for all roads and the specification of materials to reduce the overall development’s contribution to the urban heat island effect.
01
Escape Equine Development, Ajman The Escape Equine Development in Ajman, is a freehold equestrian and family activity community. The 77 hectare development offers a unique rural equine feel within a residential development which consists of villas, townhouses, high rise apartments, a boutique hotel and spa, and equestrian centre.
Middle East General Capability
31
Hyder’s appointment as urban planners, infrastructure consultants and landscape architects allowed us to bring the client’s vision to fruition providing fully integrated design solutions. Key to ensuring this was a viable project that would attract investors was balancing the integration between the human and equine environments. Obtaining municipal and local authority approval was also an important element as this presented a significant risk to the project programme. Full integration between our teams ensured that a practical design was developed that would get timely approval from the regulatory authorities while maximising value for the client.
TRANSPORTATION AND INFRASTRUCTURE
Falconcity of Wonders, Dubai Falconcity of Wonders LLC required design and supervision services for the infrastructure of Falcon City of Wonders, which is a new mixed-use tourism development project under construction in Dubailand. The total area of the site covers 319 hectares. Hyder provided the design and supervision of the infrastructure for this landmark development. Hyder was also commissioned to design three lakes, including the provision for circulation, filtration and environmental control.
Middle East General Capability
32
01
Intelligent Transport System (ITS), Bahrain The Kingdom of Bahrain’s Ministry of Works and Housing’s (MOWH) Roads Directorate required improvements to its intelligent transport system. Hyder’s team built communication architecture from scratch, providing a comprehensive video based incident detection system for controlled speed limits which is backed by camera enforcement and an automatic number plate recognition (ANPR) system.
Middle East General Capability
33
The project involved developing an ITS vision; concepts and reference architecture; reviewing costs, benefits, risks and institutional issues; and the development of a strategic plan, for the short, medium and long-term. To implement robust architecture, a unique approach using a field hardened Ethernet over a fibre optic communications backbone was implemented.
TRANSPORTATION AND INFRASTRUCTURE
King Faisal Highway, Bahrain The Kingdom of Bahrain’s Ministry of Works and Housing’s (MOWH) Roads Directorate required a feasibility study, design, contract documentation, tendering and construction supervision services, for bypass roads in order to eliminate traffic congestion on the main King Faisal highway and provide relief network links for vehicles. Hyder’s design focused on schemes that cater for future traffic demand and includes road realignment and upgrading as well as grade separation underpasses at three intersections.
Middle East General Capability
34
01
Kingdom Land, Riyadh Kingdom Land is a significant development on a 2,100 hectare site in North East Riyadh undertaken by Kingdom Holding. The development will be a prime commercial and high density residential development, comprising of an iconic tower, significant retail and entertainment facilities as well as high quality public realm and public space. Hyder Consulting with Omrania Associates provided masterplan infrastructure concept design for water, sewage, irrigation, power and telecoms; and district cooling, water and utilities.
Middle East General Capability
35
TRANSPORTATION AND INFRASTRUCTURE
Lusail Development, Qatar Qatari Diar required primary infrastructure, traffic and transportation services, and assistance with multi-modal transport studies. This includes detail design of highways, highway structures, storm water, irrigation, utility tunnels, landscape utilities and investigating impacts of groundwater services for this mixed-use development with a resident population of 150,000. It is the first development of its kind in Qatar, and sets the benchmark for the new Doha. The development covers a total land area of twenty-two square kilometres.
Middle East General Capability
36
01
Nad Al Sheba, Dubai The Roads and Transport Authority (RTA) required design services for the roads at Nad Al Sheba. Nad Al Sheba in Dubai features a renowned racing track and golf course which hosts many of the world’s largest horse races, camel racing events and golf tournaments. Hyder’s services for the initial phase involved levelling and grading of 1,060 hectares of desert area, allowing for the placement of a dual 4-lane collector road, T-junctions and secondary arterial roads.
Middle East General Capability
37
TRANSPORTATION AND INFRASTRUCTURE
Najmat Abu Dhabi on Reem Island, Abu Dhabi Reem Developers required consultancy services for the strategic planning and design of the overall Najmat Abu Dhabi development; urban and landscape design for the public realm, a traffic impact study and construction supervision of infrastructure and marine works.
38 Middle East General Capability
Najmat Abu Dhabi is located on Reem Island and is envisaged as a signature community in Abu Dhabi. It has been planned with a vision of sustainability in mind. This self窶田ontained city will accommodate 85,000 residents and will offer world class shopping at Al Reem Mall, luxury hotels, and recreational and leisure activities within the numerous open space areas. Facilities will comprise K12 schools, mosques and health centres. The canals, marinas and waterfront properties will provide residents with a unique, but homely, place to live.
01
North Manama Causeway, Bahrain The Kingdom of Bahrain’s Ministry of Works and Housing’s (MOWH) Roads Directorate, required highway and bridge design services for the North Manama Causeway project which provides road access to Business Bay and the Financial Harbour from King Faisal highway. The project involved the development of a loop shaped, 2.4 kilometre long and 100 metre wide dual carriageway, two bridge crossings and a separate loop shaped flyover allowing for a free flow entrance to Business Bay.
Middle East General Capability
39
Hyder was responsible for supervision of the reclamation works needed to form the base of the proposed new highway as well as the structural design of two 45 metre single span bridges and a flyover.
TRANSPORTATION AND INFRASTRUCTURE
Reconstruction of Mafraq Interchange, Abu Dhabi Municipality of Abu Dhabi City (ADM) required consultancy services for highways, structural design, and construction supervision for the reconstruction of Mafraq Interchange in Abu Dhabi. This involved the demolition of the existing bridge built in 1976 and its replacement with a new high quality interchange. The purpose of the new interchange is to provide smooth traffic flow on the Abu Dhabi – Al Ain, and Dubai – Tarif highways and to accommodate traffic volumes for 25 years after opening. The three level interchange includes a bridge, two flyovers, two highways, four slip roads and two loop roads.
40 Middle East General Capability
Hyder’s scope of work involved a traffic analysis, environmental impact assessment, preparation of concept options, geotechnical investigation, as well as preliminary and detailed design and preparation of tender documents. The project also included construction supervision over a two-year construction period. The Hyder team worked closely with the contractor to fast track the works to meet the programme requirements with minimum disruption to traffic.
01
Redevelopment of Bateen Foreshore Landscape, Abu Dhabi The Abu Dhabi Government wished to develop the Al Bateen foreshore, whilst preserving its maritime character and integrating with the adjoining government and palace precincts. Hyder provided design and landscape services and an urban master planning study for the Al Bateen foreshore in Abu Dhabi. This involved identifying major precincts and promoting the expansion of land use development to accommodate commercial, residential, leisure and maritime activities.
Middle East General Capability
41
TRANSPORTATION AND INFRASTRUCTURE
Shams on Reem Island, Abu Dhabi Sorouh Real Estate Developments required infrastructure, highways and marine design services for this self-contained community and landmark development in Abu Dhabi. Located close to the city, the development will offer a lush green island setting in a unique urban location for 60,000 residents. The development includes 13 kilometres of roads, 17 road bridges, 11 pedestrian bridges, 3 kilometres of canals, 3 kilometres of sea wall protection, and a 200-berth marina.
42 Middle East General Capability
Hyder’s team reviewed the existing master plan, carried out a traffic study and environmental review, as well as the detailed design of all utilities, highways, bridges and marine structures. This included the detailed design of the storm water drainage system, the sewerage network (including pumping stations) and the irrigation network. District cooling liaison, telecommunications, electricity network distribution, gas distribution and tender documentation services were also provided.
01
Sheikh Khalifa Bin Salman Bridge The Kingdom of Bahrain’s Ministry of Works and Agriculture required design and construction supervision services for the Sheikh Khalifa Bin Salman Bridge. The bridge structure connects the peninsula with the mainland of Bahrain and is required to carry power transmission cables and water mains from the new electricity and water distribution plants which were under construction at the same time as the bridge project.
Middle East General Capability
43
Hyder carried out the concept, preliminary and detailed design for this project. The concept stage involved considering alternative structural forms, cost analysis and the assessment of constructability and life cycle maintenance.
Middle East General Capability
45
Middle East General Capability
PROPERTY
46
02
Capabilities and Services Our property sector is credited with landmark structures of international standing, bearing testimony to our innovative approach to design. Our Property services are: Architectural services: Architecture Façades Engineering services:
Middle East General Capability
47
Geotechnical Mechanical electrical and plumbing (MEP) Structures
Architecture
Facades
Our integrated service offering includes architecture and design services through Holford Associates, acquired in 2008 in the Middle East, and Acer Plan, based in Germany, which was acquired in 1987.
Façade engineering involves a synthesis of energy analysis, materials science, structural engineering, architectural and weathering design. A sound knowledge of production engineering is also required to achieve an appropriate product at the right cost. We provide combined specialist skills and experience from a team that delivers efficient and workable solutions for buildings.
Hyder’s architecture team has a proven record of accomplishment in successful project delivery on time and budget, which is complimented by a well-established presence in the Middle East and internationally. The design studio focuses on producing original concepts which are unique to the requirements of individual projects. We believe the design concept should be fully integrated throughout the project, not limited to the exterior. With this in mind, we have cultivated proactive relationships with various specialists who contribute to the successful outcome of a development, and we have gained a clear understanding of when and how to coordinate these services, including interior design, landscape design and specialist lighting. Capabilities include: Architecture Master planning Feasibility studies Sustainability Interior design Landscape
The design of building façades requires an appreciation of the entire facade life cycle. Careful analysis of energy transfers and the optimisation of performance requirements provide significant benefits during operation of the building, including increased occupant comfort. Capabilities include: Definition of performance requirements Evaluation of occupant comfort Value engineering Evaluation and selection of facade systems Design, development and documentation Monitoring prototypes and component testing Fabrication and site installation audits Asset inspections and condition assessment Failure investigation/diagnostics Regeneration Performance audits Development of remedial strategies
PROPERTY
Geotechnical services range from desk studies, investigation, and design through to site supervision and post-construction analysis for a wide portfolio of industrial, water and wastewater, infrastructure, commercial and residential schemes. Our experienced geotechnical engineers and geologists work closely with clients to develop innovative solutions using specialised software, in-house design aids and a knowledge database to control ground constraints, improve land conditions and offer efficient designs, in order to reduce the construction associated risks with regards to the ground conditions. This provides financial savings, avoids unnecessary delays and ensures the project is delivered within programme. Projects undertaken include road construction; shallow foundations, deep foundations, and basement design for prestigious high-rise structures; rail projects; ground improvement; earthworks; retaining structures; groundwater control; water and wastewater projects.
Structures Capabilities include:
Preliminary site appraisal Geotechnical investigations Foundation engineering Earthworks design Ground stabilisation Site reclamation, design and improvement Geotechnical monitoring Field and laboratory testing Shaft and tunnel engineering Forensic engineering Hydrogeology
Our structures function is involved in many of the region’s commercial, leisure and residential property developments. We are pioneers in tall building design having been the structural engineer for the iconic Emirates Towers and Burj Khalifa, as well as undertaking numerous highly prestigious structural projects for retail, residential, institutional, business, entertainment and industrial sector clients. Recent commissions involve the design of hybrid and high-rise towers such as the Burj Khalifa, Pentominium tower and Jumeirah Beach Residence in Dubai, Shams Towers in Abu Dhabi, Doha Convention Centre and Tower in Qatar, and the CMA Tower in Saudi Arabia. Capabilities include:
Feasibility Project planning Value engineering Construction engineering, including heavy lifting Construction supervision 3D modeling Structural design from concept through to construction stage Super high-rise, and tall buildings design, global best practice Expert advice on building dynamics and movement perception Seismic and wind expertise
50 Middle East General Capability
Geotechnical
02
Mechanical Electrical and Plumbing (MEP) Our MEP team has extensive local and international experience. The team has delivered some of the most prestigious and technically complex projects in the region such as Burj Khalifa. It includes a number of highly talented individuals with expert knowledge in specialisms such as super tall buildings, complex mixed use developments, retail malls, low carbon design, sustainable engineering, fire and life safety and extra low voltage services. We service the retail, commercial, residential, leisure, and education sectors and government institutions across the Middle East region.
Middle East General Capability
51
We believe a sustainable, low carbon approach and the use of renewable technologies are essential for the construction of modern buildings. We are familiar with the region’s sustainability assessment methods such as BREEAM, LEED, Estidama and the engineering implications of meeting the various rating measurements. We provide advice from initial concept through design, project management and project completion.
Capabilities include: Hard engineering
Mechanical, electrical, plumbing Extra low voltage High voltage Fire and life safety Standby power and generation UPS systems District cooling Utility connection
Soft engineering
LEED, BREEAM, Estidama assessment Acoustics/vibrations Sustainable engineering design Renewable energy/technology Low carbon design Energy/indoor air quality auditing Energy/daylight modelling Building information modelling
02
Al Fardan Residence, Qatar Al Fardan Residence is an addition to the opulent Doha skyline; with 64 floors, this soaring 254 metre high architectural masterpiece is currently the tallest constructed tower in Qatar. Hyder was appointed as structural and geotechnical engineer to carry out the piled foundation design for the building and to provide an environmentally friendly and a sustainable approach to the various disciplines involved in the design. This tower is unique in being amongst the first to adopt the district cooling system method in Qatar, along with the application of state of the art curtain wall systems.
Middle East General Capability
53
PROPERTY
Burj Khalifa, Dubai Emaar Properties PJSC required the services of an architect of record and supervision consultant to meet the challenges, complexity and enormity of construction of the world’s tallest building.
As the architect of record and supervision consultant for Burj Khalifa, Hyder was responsible for certification and adoption of SOM’s design, with full responsibility for all architectural, structural, MEP, geotechnical, and facades design, as well as peer review and construction supervision.
54 Middle East General Capability
Burj Khalifa is the world’s tallest man-made structure soaring to a height of 828 metres (2,716 feet). The tower stands over 200 levels with 154 floors of occupiable space. It is a mixed use building which includes an Armani hotel with 160 rooms and 144 serviced apartments; 894 residential apartments; boutique offices; and restaurants as well as a four-storey fitness and recreation annex. There is an observation deck called ‘At the Top’ on level 124 which is open to the public.
02
Capital Market Authority (CMA) Tower, Riyadh Capital Market Authority (CMA) required structural engineering consultancy services for the CMA tower which is the tallest ‘crystalline’ structure in King Abdullah Financial District (KAFD), Riyadh, Saudi Arabia. The tower will stand over 80 floors, covering 185,000 square meters, with an associated multilevel podium structure to accommodate a two storey state-of-the-art auditorium. The building will incorporate energy efficient design to the very best Leadership in Energy and Environmental Design (LEED) credentials.
Middle East General Capability
55
Under the joint venture between US based HOK Group and KSA based Omrania Associates; Hyder is providing a full structural engineering consultancy service to this prestigious project. Hyder’s scope of work includes the optimisation of the current structural schematic design, and execution of the remaining design stages for the CMA Tower project.
PROPERTY
Doha Bank Headquarters, Qatar Structural engineering, infrastructure and geotechnical investigation services were required by Dubai International Properties (DIP) for the Doha Bank headquarters. The development comprised a 25-storey tower seated on a 3-storey basement car park with the mezzanine and ground floors designated for banking operations.
56 Middle East General Capability
Hyder provided geotechnical and structural design services. The geotechnical works involved ground investigations, which included standard and specialist laboratory testing, pressure meter and geophysical testing with a preliminary pile-testing programme. The structural design involved a combination of conventional and composite design to be used for the floor slabs and columns. Tower bracing of up to two faces of the structure mitigated the risks of lateral movement and crosswind accelerations.
02
Doha Convention Centre and Tower, Qatar The Doha Convention Centre and Tower (DCCT) is being designed by world renowned architect Murphy Jahn of Chicago, famous for the Deutsch Post Building in Bonn and the Sony Centre in Berlin. Murphy Jahn appointed Hyder to provide detailed design, documentation and construction supervision of the structural, MEP and civil engineering works, as well as waste management and traffic impact assessment.
Middle East General Capability
57
Due for completion in 2011, DCCT will consist of a 105 floor tower that comprises of a hotel, serviced apartments, and retail outlets. It will also include a 100,000 square metre convention center, which may be adapted to accommodate a full range of events as well as associated car parking facilities.
PROPERTY
Dubai Tower, Doha Dubai International Properties (DIP) required structural engineering, infrastructure and geotechnical investigation services for Dubai Tower in Doha. This is an 88 storey mixed-use tower that offers high-end retail, state of the art offices and a five star hotel as well as top quality apartments, and covers an area of 2.35 million square metres.
58 Middle East General Capability
Hyder provided geotechnical and structural design services. The geotechnical works involved ground investigations. The structural design involved a combination of composite and conventional design to be used for the floor slabs, to save construction time and achieve cost benefits.
02
Eastern Mangrove Resort, Abu Dhabi The Eastern Mangrove Resort, which is located on the eastern fringe of Abu Dhabi city, is one of a group of hospitality projects developed across the Emirate by the Tourism Development and Investment Company (TDIC) in order to increase the number of tourist bed spaces available. The resort includes a 5 star business style hotel with three restaurants, extensive spa, health club, and 220 luxury apartments arranged along a new promenade, with extensive landscaping and a 50 berth marina.
Middle East General Capability
59
Hyder provided architectural design from schematic through construction supervision, including architect of record and lead consultant services.
PROPERTY
Emirates Towers,Dubai H H General Sheikh Mohammed bin Rashid Al Maktoum required a lead consultant, as well as structural and civil engineering design services for the infamous Emirates Towers in Dubai. The twin towers comprise of an office and hotel which are amongst the 20 tallest buildings in the world. The services provided by Hyder included a comprehensive programme of wind tunnel testing as part of the design development. The design was prepared by teams located across the globe, and delivered 2 months ahead of construction schedule.
Middle East General Capability
60
02
King Abdul Aziz International Airport Tunnel, Saudi Arabia Saudi Oger Murray Roberts JV required MEP and structural design services for King Abdul Aziz International Airport Tunnel in Jeddah. King Abdul Aziz International Airport is Saudi Arabia’s third largest air facility, with an occupied area of 105 square kilometers. The Saudi Oger/ Murray Roberts JV appointed Hyder’s structural and MEP teams for works on a 710 metre cut and cover tunnel which runs underneath a runway and two taxiways and provides access across the airport for all airside vehicles.
Middle East General Capability
61
PROPERTY
Kingdom Jeddah, Saudi Arabia In 2006, Kingdom Holding Company commissioned an international team of the world’s leading architecture and engineering consultants to begin the design of Kingdom Jeddah. Hyder Consulting worked with Pickard Chilton International and Omrania Associates in the development of the concept for the project. The site area comprises 650 hectares (1,600 acres), and will feature a broad range of commercial, residential, entertainment, retail and hotel facilities.
62 Middle East General Capability
Hyder undertook parallel design approaches in the preliminary design study, performing engineering research to understand the architectural drivers for the design of the tower. These also contributed to Hyder’s entry in the design competition for the Concept and Schematic Design in 2009, which presented a new paradigm for tall tower construction. Hyder’s solution offered advantages that include maximisation of views, flexibility of programme to permit a phased construction strategy, operational cost reductions and innovative power generation methods.
02
Liberty House, Commercial and Residential Tower, Dubai ETA Star required architectural services to produce one of the first projects offering freehold residential and office accommodation. Liberty House is located in the Central Park District of Dubai International Finance Centre (DIFC). The project consists of a 42 storey mixed-use tower with an integral 6 storey car parking podium. The L-shaped upper podium contains 23,000 square metres of commercial office space and features a central atrium with retail and restaurant outlets at the landscaped concourse level.
Middle East General Capability
63
Hyder was appointed as lead consultant to carry out full architectural services from concept stage through to site supervision.
PROPERTY
Mall of the Emirates, Ski Dubai and the Kempinski Hotel Majid Al Futtaim Investment LLC required lead consultancy and structural engineering services for the design of the 20 storey, 400 room Kempinski Hotel at the Mall of the Emirates development. The mall includes a 14 screen cinema complex, theatre gallery, 420 retailers, and a 400 metre long indoor snow centre, providing a year round skiing experience.
64 Middle East General Capability
Hyder’s architectural function was appointed as lead consultant / architect of record from schematic design right through to completion of construction. We managed and coordinated the interfaces of the hotel with those of the mall and the snow centre and resolved the technical issues associated with the hotel interface with the snow centre.
02
Marina Motor Yacht Club, Dubai Emaar required design services for a signature yacht club building to act as a key attraction within the Dubai Marina area, and to serve the boat berthing area. Hyder’s architectural team provided a full design service from inception through to delivery at site, as well as managing the entire design team and specialist consultants involved in the project. The design draws upon nautical elements and the use of materials in the form of timber structure and large glazed areas aids in maximising the view potential of the large landscape area and marina waterways.
Middle East General Capability
65
PROPERTY
Mirdif City Centre, Dubai Mirdif City Centre required architectural services for the design of a combined retail and leisure development which is a key part of the Mirdif residential community in Dubai. The centre comprises 450 shops with parking for over 7,000 cars. This large retail destination provides access to major brands, a Magic Planet entertainment zone containing the Middle East’s first indoor sky diving experience, indoor 5-aside football pitches, cinemas as well as other attractions.
66 Middle East General Capability
Hyder was appointed as the lead consultant for the design team, and performed architect of record services, from concept stage to completion, including site supervision.
02
Museum of Islamic Art, Qatar The Museum of Islamic Art appears to float on the waters of Doha Bay and is built on piles up to 100 metres offshore. Hyder was appointed by Turner Construction to supervise the construction of this iconic structure on the Doha skyline. It houses exhibitions, galleries, an auditorium, library, conservation laboratories and artefacts including weapons, carpets and calligraphy. The museum’s collection provides a reflection of the unique history of Islam.
Middle East General Capability
67
PROPERTY
Palm Jumeirah District Cooling, Dubai Palm District Cooling required design and supervision services for the installation of approximately 327 MW (93,000 tons) cooling capacity for the entire multi-purpose Palm Jumeirah development.
68 Middle East General Capability
Hyder’s team was responsible for providing design and supervision services for a network consisting of three chilled water plants, applied with the chiller pipes and installed in series and counter flow arrangements. A low flow high enthalpy chilled water design was implemented for maximum efficiency. The pipe network is 10 kilometres long and has a ring network installation that will adapt to the island’s circular form to improve resilience.
02
Pentominium Tower, Dubai Pentominium Tower, with a height of 516 metres, will be the world’s tallest residential tower and the second tallest tower in the word upon completion in December 2012. Trident International Holdings appointed Hyder as the lead consultant and engineer of record for the tower with responsibility for structural, geotechnical, MEP and façade engineering.
Middle East General Capability
69
Pentominium Tower is located in Dubai Marina and will take apartment living to new heights of luxury. The tower has been named Pentominium because it combines the concepts of penthouse and condominium - each apartment will occupy one complete floor level in a similar manner to a penthouse. The top floors include a Sky Lounge, Sky Pool, a business centre, health clubs, a cigar lounge, banquet hall, theatre and observation deck. The tower will also house high-end retail brand stores.
PROPERTY
Ritz Carlton Hotel, Dubai Union Properties required civil, structural, faรงade, geotechnical and MEP design services for this 15 storey hotel and apartment building. It is located in a prime business zone in Dubai and was built to compliment the Dubai International Financial Centre (DIFC). The development provides a five star Ritz Carlton hotel with 350 rooms and 125 serviced apartments, 300 unfurnished apartments to be offered for sale, and a podium building with restaurants, the largest ballroom in Dubai, retail units, leisure facilities, basement car parking and extensive landscaping.
70 Middle East General Capability
Hyder was appointed to provide a raft and piling foundation study, preliminary geotechnical reviews, architectural and MEP drawings, podium landscape decking, faรงade support, scheme designs, and construction design and supervision services.
02
Sheikh Zayed Bin Sultan Al Nahyan Mosque, Abu Dhabi The Abu Dhabi Department of Municipalities and Agriculture required enhancement of MEP design including architectural lighting for the Sheikh Zayed Bin Sultan Al Nahyan Mosque named after the former Ruler of the United Arab Emirates.
Middle East General Capability
71
Hyder initiated the re-design of the MEP finishes to enhance the overall aesthetic appearance, with the objective of improving efficiency and performance for the entire complex. A dedicated water cooler centrifugal chiller plant was originally designed for the area but was later replaced with a district cooling distribution system provided by Tabreed. The team used a technique called Computational Fluid Dynamics (CFD) modelling to perform a theoretical analysis of the airflow patterns within the main prayer hall. The results of the CFD analysis were used to design the air distribution systems.
PROPERTY
Sky Tower and Sun Tower, Abu Dhabi Hyder was appointed by Sorouh’s project managers RW Armstrong to provide structural, façade and geotechnical design services for the landmark buildings Sky Tower and Sun Tower. They are located at the entrance of Shams Abu Dhabi on Reem Island, a new mixed use development offering residential, office, retail and entertainment facilities.
Sky Tower’s structural design involved a combination of conventional and composite design used for the floor slabs and columns. This saved on construction time and provided cost benefits in order to meet the client’s requirements for an economical structure to be built within a specified timeframe.
72 Middle East General Capability
The towers are iconic additions to the skyline of the UAE’s capital city with Sky Tower rising 76 storeys and 299 metres in height while Sun Tower stands 61 storeys tall at a height of 241 metres. Sky Tower features state-of-the–art offices and top quality apartments. Sun Tower is entirely residential with a conventional reinforced concrete structural design.
02
Tameer Towers, Abu Dhabi Tameer Holding Investment appointed Hyder to undertake the design adoption, value engineering and site supervision for stage 1 of Tameer Towers. The towers will comprise two blocks of 62 and 42 storeys, with the associated podium structure. Hyder is the engineer under the FIDIC contract, architect of record, project engineer and lead consultant.
Middle East General Capability
73
Deemed one of the most iconic projects planned in Abu Dhabi, the development’s central commercial tower will rise 300 meters high, making it the tallest structure to be built on Reem Island. This tower will have an external structural skeleton and a canal flowing through its base and out to the marina.
PROPERTY
The Dubai Fountain, Dubai The Dubai Fountain is the world’s tallest performing fountain, located adjacent to the world’s tallest structure, Burj Khalifa. Under the appointment of Emaar Properties, Hyder defined and designed the perimeters of The Dubai Fountain working alongside ‘WET’, the California-based fountain designers, and provided structural and MEP design as well as design coordination for this unique attraction.
74 Middle East General Capability
The Dubai Fountain provides an astonishing musical and visual water centerpiece to the lake in the Downtown Dubai development, whereby the devices are choreographed in sequence to music, shooting water jets as high as 130 metres and across an impressive 300 metre x 80 metre footprint of the lake.
02
The Gate, Dubai Dubai International Financial Centre (DIFC) required civil and structural engineering consultancy services for the scheme comprising of two 11-storey towers connected at a high level by a four-storey bridge link. The development consists of an extensive ground level podium of three basement-parking levels. The towers are rectangular on plan, with a base size of approximately 70 metres in length and 18 metres in width. The bridge level structure covers the full building footprint.
Middle East General Capability
75
Hyder was initially appointed to provide civil and structural design services. The team was later appointed to provide master planning services for district cooling, chilled water circulation and the implementation of energy transfer stations for the building.
Middle East General Capability
77
Middle East General Capability
UTILITIES AND ENVIRONMENT
78
03
Capabilities and Services Utilities Services
Environmental Services
Hyder’s multi-disciplinary approach to water management identifies and uses a variety of specialist staff from our in-house scientific and technical disciplines, including environmental scientists, ecologists, biologists, numerical modellers, water quality experts, hydrologists, hydro-geologists and process scientists.
Hyder provides environmental advice and design services to public and private sector clients. Our projects vary from major strategic and policy studies to detailed assessments and design work on individual schemes. Our regional environment team helps clients meet their business objectives whilst promoting sustainable principles, environmental compliance and improved environmental standards.
We offer extensive experience in all aspects of water resource assessment, development and protection, and a complete service package, ranging from initial desk studies to complex groundwater modelling.
Middle East General Capability
79
Capabilities include: Potable water supply Pipelines Irrigation networks Wastewater networks Wastewater treatment Treated sewage effluent (TSE) irrigation systems Storm water drainage networks Storage facilities Pumping stations Desalination systems Hydrolic modeling Power distribution Gas distribution networks Supervision and project management
Capabilities include: Strategic environmental planning Assisting clients through the environmental permitting process Reducing risk through due diligence, contaminated land assessment, corporate environmental governance and environmental management advice Providing solid waste management solutions Defining sustainable design results
Middle East General Capability
UTILITIES AND ENVIRONMENT
80
03
ALBA Water Transmission, Kingdom of Bahrain ALBA required design and supervision services for a water transmission scheme to remove surplus water from the newly constructed desalination plant at the ALBA Coke Calciner facility, located approximately 5 kilometres off the east coast of Bahrain.
Middle East General Capability
81
Hyder was awarded the design and supervision services project. Construction of pipelines commenced in late 2002 and was completed in May 2005. Ground storage tanks were completed in May 2006. Two out of the three main pumping stations were in service by end of September 2005 and the last station started its pre-commissioning stage in June 2006.
UTILITIES AND ENVIRONMENT
Al Ain Water Supply, UAE Abu Dhabi Water and Electricity Authority (ADWEA) required design, tender and construction supervision services to improve the operation of the water transmission and distribution systems, implement a development programme to meet future demands, and provide a continuous supply of water to consumers.
82 Middle East General Capability
Hyder assessed the demand for future development in the area and losses in the existing systems. Leakage detection and customer water audits were assessed to confirm levels of water usage and losses incurred. Advantica SynerGEE software was used to analyse the operation of the existing water supply systems and to plan their future development.
03
Doha South STP, Qatar Since 1960s, and originally under the trading name of John Taylor and Sons, Hyder has been involved with the planning and development of Doha South Sewage Treatment Works for The Public Works Authority in Qatar. In 1960, a biological filtration process was used on the plant, which was eventually replaced by aerated activated sludge process in 1982. An extension was carried out in 1986 with the addition of a third process stream.
Middle East General Capability
83
In 2004, Qatar’s Ministry of Municipal Affairs and Agriculture (now known as the Public Works Authority) commissioned Hyder to provide a preliminary design and tender documentation for additional extension work.
UTILITIES AND ENVIRONMENT
Dubai Sports City Sewerage Treatment Plant, UAE Dubai Sports City LLC required a consultant to carry out the design review and construction supervision of a sewage treatment plant for the entire development, bearing a capacity of 25,000 cubic metres per day and a design life of a minimum of 30 years.
84 Middle East General Capability
The scope of services provided by Hyder included an analysis of tenders received for procurement of the sewage treatment plant under a design-build contract, and submission of a recommendation on the preferred tenderer. Hyder also assisted with the award of the contract; review of the contractor’s design submissions; obtaining licenses and permits, including liaison with the local authorities; supervision of construction of the sewage treatment plant, including acting as the engineer under a FIDIC based contract; supervision of testing and commissioning and final handover of the plant.
03
Mafraq Wastewater Treatment Plant and Effluent Utilisation, Abu Dhabi In 1974, Hyder was commissioned to investigate problems associated with the existing sewerage system and treatment works, and to make recommendations for new works as part of the overall master plan for Abu Dhabi. From the scheme’s inception, purified effluent utilisation was considered to be a major potential benefit and for this reason Mafraq’s sophisticated wastewater treatment plant includes sand filters, chlorination and ozonation to ensure adequate disinfection against virus borne diseases.
Middle East General Capability
85
The treated wastewater is used to irrigate forests, public gardens and central road and roundabout reservations in Abu Dhabi.
UTILITIES AND ENVIRONMENT
SCADA Automation of Treated Sewage Effluent (TSE) System, Qatar Doha’s treated sewage effluent (TSE) network system is undergoing rapid expansion to keep pace with the city’s phenomenal growth. With a substantial increase in capacity and expansion in network coverage planned, a centralised facility for monitoring has been recommended. Hyder was appointed by Ashghal (Qatar’s Public Works Authority) to carry out data collection and investigation, preliminary design, detailed design and site supervision for the SCADA automation project.
86 Middle East General Capability
The proposed centralised SCADA system will acquire operational data from the source stations, towers, valve chambers and other designated network points to efficiently control the process. It will allow the entire TSE network of Doha to be monitored in real time as well as providing stakeholders with lower total cost of ownership.
03
Water PPP Framework, Saudi Arabia Ministry of Water and Electricity (MoWE, and now named National Water Company, NWC) appointed Hyder Consulting along with Charles Rivers Associates International (CRAI) and Ernst & Young (E&Y SA) to provide transaction advisory services for the water and wastewater services PPP contracts to be procured for Jeddah. MoWE has embarked on an aggressive strategic transformation plan to dramatically improve the provision of water related utility services across the Kingdom through the involvement of the international private sector applying PPP models.
Middle East General Capability
87
Hyder worked with the Ministry and other advisors to determine the appropriate scope of a long term (30 year) wastewater treatment concession that would enable the phasing out of those works reaching the end of their useful lives as new works were commissioned with a performance based concession contract designed to treat wastewater to standards suitable for effluent and sludge reuse. Hyder carried out technical due diligence and determined the performance regime and payment mechanism to be applied as part of the production of the technical appendices to the concession agreement.
UTILITIES AND ENVIRONMENT
Water and Wastewater Management Advisory, Saudi Arabia The National Water Company in Saudi Arabia appointed Hyder as lead and technical transaction adviser for a major procurement exercise following Hyder’s previous successful delivery of the Jeddah public private partnerships (PPPs). This next phase involved three separate management contracts for water and wastewater services in five locations – Dammam/Al Khobar, Madinah, Makkah/Taif – with a total population circa 4 million, to be awarded to international operators.
88 Middle East General Capability
Principal responsibilities include management of data capture, identification of technical objectives; the development of performance regimes; incentivisation; mechanisms to drive the private sector to deliver the required services; and performance improvements.
03
Bahrain Health Oasis, Bahrain The Bahrain Health Oasis is a mixed use development which will include a hospital, hotels, commercial, residential, retail and recreational facilities.
Middle East General Capability
89
The development will be located on 37 hectares of newly reclaimed land in the Bandar Al Seef Area of Bahrain. Hyder was commissioned to provide environmental and sustainability advice during the development of the masterplan. This included micro-climate, facade and building envelope design, energy conservation, renewable resources, marine hydrodynamics, environmental permitting and attaining the relevant environmental approvals and the application of international best practice.
UTILITIES AND ENVIRONMENT
Downtown Dubai Environmental Impact Assessment, UAE Emaar Properties PJSC required an environmental impact assessment (EIA) of the Downtown Dubai development, a 1 kilometre square ‘city within a city’, located off Sheikh Zayed Road, in Dubai.
90 Middle East General Capability
Hyder led the environmental impact assessment, ecology and archaeology surveys, and the development of environmental impact mitigation options for the project. The nature and scale of the development introduced interesting potential environmental issues, such as building reflectivity impacts, wind impacts on pedestrian comfort and safety, aeronautical impacts, and more traditional EIA issues such as, traffic impacts in relation to noise and air quality.
03
Jumeirah Lake Towers, UAE Nakheel required an environmental impact assessment (EIA), scoping and planning study for the Jumeirah Lake Towers project, which is a mixeduse residential, leisure, tourism and commercial development featuring a lake system. The EIA project carried out by Hyder contributed significantly to the optimum and sustainable design of the development.
Middle East General Capability
91
An environmental management plan (EMP) was developed as part of the EIA, recognising that multiple contractors and sub-development level operators required an integrated EMP with clear roles and responsibilities to ensure the sustainable environmental construction and operation of the overall facility.
UTILITIES AND ENVIRONMENT
Manama Muharraq, Bahrain The Bahrain Government required environmental impact assessment, scoping and planning for the Manama Muhrraq development, which includes numerous small marinas, landmark hotels, and mixed residential and commercial properties.
92 Middle East General Capability
Hyder carried out the technical concept refinement and environmental planning for this largescale lagoon reclamation site in Bahrain. The project involved identifying early environmental constraints and opportunities to assist in the development of the design concept. Models were used to assess potential environmental impacts and mitigation alternatives.
03
MASDAR, Abu Dhabi As its environmental consultant, Hyder Consulting helped Masdar deliver its goals for a low carbon, zero waste city.
Middle East General Capability
93
Our services included the development and implementation of an environmental baseline monitoring strategy for all delivery phase environmental impact assessments (EIAs) for the Masdar Development. We also provided a preliminary environmental review (PER) for Masdar’s exploratory geothermal pilot project which involved ENVID/HAZID workshops with Masdar and geothermal experts to identify environmental impacts and health and safety risks and the necessary controls. A construction environmental management plan (CEMP) for early works was prepared to meet Masdar’s tight timescales prior to completion of the first phase (Delivery Phase 1) EIA.
UTILITIES AND ENVIRONMENT
Shams Abu Dhabi on Reem Island, Abu Dhabi Sorouh Real Estates PJSC required an environmental impact assessment (EIA) for the Shams Abu Dhabi residential and commercial mixed land use development on Reem Island. The proposed development will provide units for 80,000 to 100,000 residents and incorporate retail, office, entertainment and recreational facilities.
94 Middle East General Capability
Hyder carried out the EIA for the project. It identified some interesting potential environmental issues such as the impact on the existing ecological habitats and biodiversity, both marine and terrestrial, the affect on coastal processes, and the noise and visual impacts of the completed development. An environmental management plan was also developed as part of the EIA.
Middle East General Capability
95
GLOBAL DESIGN CENTRES MANILA AND BANGALORE
Middle East General Capability
96
Global Design Centre, Manila
Middle East General Capability
97
Hyder is committed to providing project excellence to its civil engineering service clients in the Middle East Region. This requires human resources with the right skills and experience to help us provide a quality service. We are continually working hard to recruit, train and retain the most talented individuals in the market place. We recognise qualified technical resources are in short supply in the engineering sector, and to address this challenge, Hyder has developed its own global design centre in Manila where resources are more readily available. Our global design centre in Manila also provides financial advantages in terms of staff costs. With over 200 staff, the team in Manila provides a centralised resource for our world-wide offices. The teams are capable of servicing large and complex projects in the fields of structural engineering, architecture, MEP, highways and infrastructure.
Global Design Centre, Bangalore Staff are managed by senior design managers who are not only experienced in managing large projects internationally, but also have the knowledge of managing delivery from a global design centre. There are several key aspects involved in ensuring quality work is delivered; recruiting the right people, bridging communication and cultural gaps and effective management of projects. The design teams at the global design centre form a part of the wider team in the Middle East Region which ensures high design quality and productivity. Our design centre has IT links with the Middle East Region and the UK, and staff can access sites over our dedicated Wide Area Network server. To ensure full security, all data is backed up in real time on Hyder’s dedicated servers both in Manila and the Middle East offices.
Hyder’s global design centre in India is located in the Export Promotion Industry Park (EPIP) at Whitefield, a suburb of Bangalore in the state of Karnataka. The EPIP at Whitefield is one of the country’s first information technology parks which houses offices of IT and R&D giants. Bangalore is known as the Silicon Valley of India because of its position as the nation’s leading IT exporter. Demographically diverse, Bangalore enjoys a moderate climate throughout the year and is home to many talented and experienced professionals from all over the world. This strategic location was selected for Hyder’s India-based operations with a view to expanding our design capabilities and delivering professional excellence to our clients. The design centre includes a multi-disciplinary team comprising of civil and structural engineers, clean water modellers, wastewater modellers,
GLOBAL DESIGN CENTRES
mechanical engineers, GIS experts and CAD technicians, including CADS RC. The team has worked on projects in the UK, Europe, USA, Australia and Africa. Bangalore GDC supports Hyder’s UK, Middle East and Australian water sector, provides any drainage work within the transportation and land development sectors; and rail work for all regions. Within this framework, the teams objectives are to:
The Bangalore GDC has developed a reputation for delivering high quality work in a cost-effective manner to agreed deadlines.
98 Middle East General Capability
Deliver quality design within time and budget Develop technical competence and leadership capabilities Provide commercial advantage for the lead offices and their clients
Middle East General Capability
99
QUALITY ASSURANCE, SYSTEMS AND PROCEDURES
Middle East General Capability
100
Quality Assurance, Systems & Procedures Quality Assurance, Systems and Procedures Hyder operates a fully integrated management system, based on Share Point technology, and incorporating our quality assurance systems and procedures. Hyder Sys is the front end interface to access policies and procedures and is a fully interactive, searchable web browser-based system accessed through the company’s intranet site and is operational across all our offices world-wide.
Middle East General Capability
101
This management system is crucial to the running of the business with emphasis on projects, business and people. Areas such as quality, health, safety and environment are integrated at strategic and tactical levels. The system covers everything from our global company policies to our approach to sick leave. Hyder Sys provides linkages to Project Workflow - an intuitive electronic interface, which brings together our project lifecycle information and process into a single easily accessible online form. Project Workflow manages the lifecycle of a project; from the early stages of opportunity tracking and bidding, to project setup, project and technical
reviews, and change management. To the end user, the connections between these various levels are automatic and seamless, even to the extent that any financial thresholds are automatically quoted in the local currency of the staff member interrogating the system. Effective communications and business practices are driven through the Share Point based technology, and it is accessible to all offices as well as clients. Share Point allows us to facilitate the company’s day-to-day operations through:
Project planning and programming; Project management; Accounting and financial management; Billing; Personnel management; and Providing access to project information for both our clients and staff at any time and even when away from the office.
Hyder Sys meets the requirements of ISO 9001, ISO 14001, OSHAS 18001and BS8800. Registration is maintained against these standards using BSI as the certification body for our offices in the UK and the other regions in which we operate. The system includes mechanisms for continuously seeking improvement, which complement the processes of auditing and management review.
Health and Safety
Designing for Safety – All Hyder designers are in a position to influence early health and safety decisions which can affect safety during the construction phase. Our expertise capitalises on balancing risk against agreed budget and programme deliverables.
Health and Safety Assessment of Contractors and Sub-Contractors – As part of our technical evaluation process on behalf of our clients, we offer the ability to undertake a comprehensive review of the contractor’s tender submission and the company’s recognition and implied control of significant risks it will face during the construction phase of a project.
Site Investigators and Surveyors – Where Hyder assumes the architect or engineer of record role as lead consultant and is asked to monitor the contractors work on behalf of the client, we provide assurance that the physical standards on site meet the legislative requirements and that the contractor delivers in line with its approved construction phase health and safety plan.
102
HEALTH & SAFETY
Hazard Analysis and Risk Assessment - Where our designers identify significant hazards during the design development, mitigation measures are discussed and remaining residual risk is captured and communicated through to the construction phase. HAZARD ANALYSIS / RISK MANAGEMENT
H & S ASSESMENT FOR CONTRACTOR & SUBCONTRACTOR
DESIGNING FOR SAFETY
SITE INVESTIGATORS & SURVEYORS
Middle East General Capability
From a health and safety perspective, Hyder is committed to continuous improvement, assuring clients of high standards. The services we provide comply with guidelines set by BS 8800 and OSHAS 18001. Hyder’s health and safety manual concentrates on four areas during the project phase:
Environment Hyder has a company-wide environmental policy that is designed to encourage sustainable planning, design and construction that complies with ISO 14001. The objectives of the policy include: Maintenance of good environmental practice in relation to all operations and services; Compliance with relevant environmental legislation and regulations; Prevention of pollution; and Improvement of environmental performance.
Middle East General Capability
103
While environmental practices are usually combined with work practices, Hyder has invested in resources to operate an environmental division within the organisation. All staff whose work may create a significant impact on the environment, including non-office based staff are trained on appropriate practices. All employees are assigned with environmental responsibilities combined with their daily work activities.
Hyder Consulting Middle East Ltd. Abu Dhabi
PO Box: 2774 United Arab Emirates Tel: +971 (0) 2 6333 400 Fax: +971 (0) 2 6330 746
Al Ain
PO Box: 15205 United Arab Emirates Tel: +971 (0) 3 7642917 Fax: 971 (0) 3 7657760
Bahrain
PO Box: 26073 Kingdom of Bahrain Tel: +973 17564 755 Fax: +973 1 756 4929
Dubai
PO Box: 52750 United Arab Emirates Tel: +971 (0) 4 3242 532 Fax: +971 (0) 4 3242 531
Qatar
PO Box: 1854 Doha Tel: +974 4429 555 Fax:974 442 8874