Package Items List
1.0 Project Timeline + Management Schedule
2.0
Tender Drawing Set
2.1 Full Drawing List 2.2 Construction Documentation Set 2.3 Window and Door Schedule 2.4 Master Schedule
3.0
Design Option Detail Drawings
4.0
NATSPEC Items
Foreshore House Tender Set quattro Alex Zeng 14 November, 2020
quattro L2, 42 Derwent Street, Glebe NSW 2037 Australia. T +61 2 9567 8533 E studio@quattro.com.au w www.quattro.com.au Quattro Pty. Ltd. ABN 70 004 999 400 Nominated Architect Ryan Silang Cai NSWARB 10253
Ryan Cai
Jack Dumanat
Leo Pan
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
Project Timeline and Management Contact and Partners Project Role Project Lead
Team Member
Name
Contact Email
Ryan Cai
r.cai@Quattro.com
Alex Zeng
a.zeng@Quattro.com
Leo Pan
l.pan@Quattro.com
Jack Dumanat
j.dumanat@Quattro.com
Project Name: Foreshore House Stages Briefing and Documentation
Team Members
Contact Emails
Ryan Cai, Alex Zeng, Leo Pan, Jack Dumanat
As per above.
TIMELINE STAGE
TRADE-BASED SPECIFICATIONS
DESIGN OPTIONS
TASK TITLE
WEEK 9
WEEK 10
WEEK 11
WEEK 12
w/c 12 Oct
w/c 19 Oct
w/c 26 Oct
w/c 2 Nov
w/c 9 Nov
w/c 16 Nov
Alex
x
Ryan
x
1.3 0451b_Windows and glazed doors (NATSPEC)
Jack
x
1.4 0573_Extinguishers and blankets (NATSPEC)
Leo
x
1.5 Suite of Design Options
Ryan
x
Alex
x
x x
2.01 Grid Setout/ Site Plan
Alex
x
x
2.02 Demolition Plan (Street Level)
Alex
x
x
2.03 Demolition Plan (Ground Level)
Alex
x
x
2.04 Demolition Plan (Basement)
Alex
x
x
2.05 Proposed Roof Plan
Leo
x
x
2.06 Proposed Street Level Plan
Leo
x
x
2.07 Proposed basement/ foundation
Leo
x
x
2.08 Reflected Ceiling Plan (Street Level)
Jack
x
x
2.09 Reflected Ceiling Plan (Grould Level)
Jack
x
x
2.1 Reflected Ceiling Plan (Basement)
Jack
x
x
2.11 Section (Long-Demo)
Alex
x
x
2.12 Section (Short-Demo)
Alex
x
x
2.13 Proposed Section (Long)
Ryan
x
x
2.14 Proposed Section (Short)
Ryan
x
x
2.15 Elevation (Demo) (N)
Leo
x
x
2.16 Elevation (Demo) (S)
Leo
x
x
2.17 Elevation (Demo) (E/W)
Leo
x
x
2.18 Proposed Elevation (N)
Jack
x
x
2.19 Proposed Elevation (S)
Jack
x
x
Jack
x
x
2.21 New Bathroom Works (Plan/RCP)
Alex
x
x
2.22 New Bathroom Works (Elevation I)
Alex
x
x
2.23 New Bathroom Works (Elevation II)
Alex
x
x
2.24 Proposed Kitchen Upgrade Plan
Ryan
x
x
x
2.25 Proposed Kitchen Upgrade RCP
Ryan
x
x
x
2.26 Kitchen Island Elevation
Ryan
x
x
x
2.27 Kitchen Upgrade Elevation
Ryan
x
x
x
2.28 Window and Shutter Details Set
Jack
x
x
x
x
2.29 Overall Section Details Set
Ryan
x
x
x
x
Leo
x
x
x
x
Leo
x
x
x
x
2.3 Balustrade Details Set 2.31 Wall Types Set Materials (part of Master Schedule file)
Alex / Jack
Finishes 3.2 (part of Master Schedule file)
Alex / Jack
Fixings 3.3 (part of Master Schedule file)
Leo / Ryan
3.3 Window
Alex
x
3.3 Door
Alex
x
4.1 Drawing Check (consistencies, errors etc.)
Alex/Leo /Ryan/ Jack
3.1
TASKS
WEEK 8
1.1 0383b_Flooring and decking (NATSPEC)
2.2 Proposed Elevation (E/W)
SCHEDULE OF RELATED ITEMS
WEEK 7
1.2 0421_Roofing (combined package / NATSPEC)
2 Full Drawing List / Cover Page
CONSTRUCTION DRAWINGS
TASK OWNERS
x x x
x
foreshore house Proposed Construction Documentation Set 51 Foreshore Dr, Crawford River NSW 2423.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
MARC5102 Contract Documentation / Group Quattro Alex Zeng Leo Pan
(460 373 669) (500 073 489)
Tutor:
Brad Inwood
Ryan Cai Jack Dumanat
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
(460 355 595) (460 174 871)
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
Drawing List Sheet Number
Sheet Name
Drawing List Sheet Status
Sheet Number
Sheet Name
1. Quattro shall retain all common law and statutory law rights including all intellectual property rights in the files. The information and the intellectual property is released to the Client for their use and those of their consultants, on the PROJECT ADDRESS Project only.
Sheet Status
2. This model is issued For Information Only and Quattro does not warrant the accuracy or completeness of the information, text, graphics, links or other items contained in the file.
CD0 - COVER CD0.000
Cover Page
CD8 - JOINERY FOR TENDER
CD1 - GRID CD1.000
Grid Setout / Site Plan
FOR TENDER
CD2 - DEMO
3. Any defects irregularities and inconsistencies shall be reported immediately to Quattro.
CD8.001
Proposed Kitchen Upgrade Plan
FOR TENDER
4. The Model file is not to be used in whole or in part for any purpose other than the project members for this project.
CD8.002
Proposed Kitchen Upgrade RCP
FOR TENDER
5. No claims shall be made against Quattro resulting in any way from any use of the files, including the creation of three dimensional representations, any unauthorized changes or any reuse of the files.
CD8.003
Kitchen Island Elevations
FOR TENDER
CD8.004
Kitchen Upgrade Elevations
FOR TENDER
6. The data provided may have been prepared by us or wholly or in part by third parties and although we will use our best endeavours to ensure no inaccuracies or defects exist in the physical media, data or software we make no representations or warranties of any kind relating to its merchantability or fitness for a particular purpose.
CD2.001
Demolition Plan (Street Level)
FOR TENDER
CD9 - DETAIL (FACACDE)
CD2.002
Demolition Plan (Ground Level)
FOR TENDER
CD9.001
Vertical Shutter Section
FOR TENDER
CD2.003
Demolition Plan (Basement)
FOR TENDER
CD9.002
Vertical Shutter Plan (Detail)
FOR TENDER
CD9.003
Horizontal Shutter Section
FOR TENDER
Horizontal Shutter Plan
FOR TENDER
CD3 - GA CD3.001
Proposed Roof Plan
FOR TENDER
CD9.004
CD3.002
Proposed Street Level Plan
FOR TENDER
CD10 - DETAIL (MAIN)
CD3.003
Proposed Ground Level Plan
FOR TENDER
CD10.001
Overall Section (detail)
FOR TENDER
CD3.004
Proposed Basement / Foundation
FOR TENDER
CD10.002
Roof to External Wall Section (detail)
FOR TENDER
CD10.003
Street Level Floor to External Wall Detail
FOR TENDER
CD4 - RCP CD4.001
Reflected Ceiling Plan (Street Level)
FOR TENDER
CD10.004
Ground Level to External Wall Detail
FOR TENDER
CD4.002
Reflected Ceiling Plan (Ground Level)
FOR TENDER
CD10.005
External Wall to Floor Detail
FOR TENDER
CD4.003
Reflected Ceiling Plan (Basement)
FOR TENDER
CD5 - SECTIONS
CD10.006
New Balustrade Section / Elevation
FOR TENDER
CD10.007
Wall Junction / Cornering Detail
FOR TENDER
CD5.001
Section (Long - Demo)
FOR TENDER
CD10.008
Eave Details
FOR TENDER
CD5.002
Section (Short - Demo)
FOR TENDER
CD10.009
Decking Details
FOR TENDER
CD5.003
Proposed Section (Long)
FOR TENDER
CD10.010
Proposed External Wall Details
FOR TENDER
CD5.004
Proposed Section (Short)
FOR TENDER
CD10.011
Decking Detail II
FOR TENDER
CD6 - ELEVATIONS
7. We assume no liability in connection with the supply or transfer of the data by electronic means or any use of it by yourself or any third parties that we would not have incurred if the data had been transferred in the form of documents on paper. 8. For QS calculations quantities are not to be taken directly from the BIM. Refer to printed documentation.
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
SYDNEY | THE BAHAMAS
Elevations (Demo) (N)
FOR TENDER
CD11.001
Window Schedule
FOR TENDER
CD6.002
Elevations (Demo) (S)
FOR TENDER
CD11.002
Door Schedule
FOR TENDER
CD6.003
Elevations (Demo) (E/W)
FOR TENDER
CD11.003
Master Schedule (Material)
FOR TENDER
CD6.004
Proposed Elevation (N)
FOR TENDER
Grand total: 47
CD6.005
Proposed Elevation (S)
FOR TENDER
CD6.006
Proposed Elevations (E/W)
FOR TENDER
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
CD11 - SCHEDULES
CD6.001
Sydney Office 277 Trafalgar St, Petersham NSW 2049
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
Cover Page
CD7 - WET AREA CD7.001
New Bathroom Works (Plan / RCP)
FOR TENDER
CD7.002
New Bathroom Works (Elevations I)
FOR TENDER
CD7.003
New Bathroom Works (Elevations II)
Status
CD
Scale Drawn
FOR TENDER
Project No. Plot Date
@ A3 AZ
QUATTRO
QTR_2423
14/11/2020 10:16:06 AM
Drawing no.
FOR TENDER
Checked
CD0.000
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY
21 A - 3 2 FORESHORE DRIVE
SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
2
3
4
Site Plan Legend:
5
Overall property line
3915
19555
W ES T E RN
P I T C H (L) 2 - 2.5 D E G
OF - R
FOR
OF RO
6105
BELOW
E D GE
P I T C H (R) 2.5 D E G
L 35.0 5
ESH
BALCONY BELOW RL 32.30
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
B
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
945
RE
SH
OR
E
DR
900
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
FO
14000
15000
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
53
VE
0 1700
DRI
7240
0 1600
12700
1660
100 00
4680
11000
5130
12000
1225
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
0
ORE
BALCONY BELOW RL 24.90
13000
RAMPS
1310
1030
A
E
6640
1050
Extg. Colorbond roof.
8005
Extg. Colorbond roof.
Neighbouring building envelopes
900
905
Extg. 1/12 driveway ramp to residence below.
900
4845
4000
5675
RIDGE - RL 35.40
Extg. 1/20 driveway ramp to street level.
1225
EASTERN EDGE OF ROOF - RL 35.05
6850
Contours (at 1000 mm intervals)
IV
1
Grid Setout / Site Plan Status Scale Drawn Project No. Plot Date
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:11 AM
Drawing no.
FOR TENDER
Checked
CD1.000
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1 CD5.002
THE UNIVERSITY OF SYDNEY
2
SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
CD5.002
4
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
CD6.001
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
1
2
CD6.004
3
4
5 Legend - Extg / Demolition Drawings:
Proposed demolition works.
1225
5675
11985
2
CD5.004
CD5.004
4000
900
120
185
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
200
1
RL. XX.XX Relative level.
A
NOTE:
Extg. 120 mm wide recessed drainage.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
1
CD5.001
CD5.003
RM _ 01
RM_02
Garage and Entry (RL 32.30) 29.75m²
Home Office (RL 32.30) 22.65m²
1
1
CD5.003
CD5.001
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
6105
1
4645
q u a t t r o
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
1260
B
5680
2
10765
4135
foreshore house
945
51 Foreshore Dr, Crawford River NSW 2423
CD5.002
Demolition Plan (Street Level) 1
2
CD5.002 CD5.004
CD5.004
Demolish all extg glazed balustrade only. Retain extg. balcony and floor.
Status Scale Drawn Project No.
1
Plot Date
Street Lvl. Demolition Plan
1 : 50
FOR TENDER
CD As indicated AZ
Checked
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:15 AM
Drawing no.
Rev.
CD2.001
A
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1
2
3
5
4
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
11800 5675
1225 900
Tutor: Brad Inwood.
1000
3200
4000 1000
900
800
Legend - Extg / Demolition Drawings:
Proposed demolition works.
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
Demolish extg. glazed panel. Retain wall penetration for new frosted glazing.
A
RL. XX.XX Relative level.
1025
NOTE:
Demolish all extg amenities for new bathroom layout.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
16
q u a t t r o
4845
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
RM_04
Remove extg. kitchen / storage as per new interior upgrades.
7100
Studio (RL 24.90) 51.34m²
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
Expansion joints to eng. spec. as per new balcony extension.
Remove all extg. glazed balustrades ONLY.
765
4000
365
Remove all extg. glazed balustrades ONLY.
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
995
Expansion joints to eng. spec. as per new balcony extension.
1260
B
Demolition Plan (Ground Level) Status
5130
4735
Scale
1610
Drawn
11470 1
Project No. Plot Date
Ground Lvl. Demolition Plan
CD As indicated Author
FOR TENDER
@ A3 Checker
QTR_2423
14/11/2020 10:16:17 AM
Drawing no.
1 : 50
Checked
CD2.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1
2
3
4
5
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
Extg. blockwork wall support to driveway ramp above.
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
12550 1225
5325
Tutor: Brad Inwood.
300
4050
900
750 Legend - Extg / Demolition Drawings:
Proposed demolition works.
1000
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
A
RL. XX.XX Relative level. NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
q u a t t r o
4845
42 Derwent Street, Glebe NSW 2037 Australia.
RM_06
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
8100
Basement / Foundation 30.94m²
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
1260
930
B
75
foreshore house
1000
Demolish part of wall for new door opening.
6050
300
4685
51 Foreshore Dr, Crawford River NSW 2423
Demolition Plan (Basement)
765
900 Status
12700
Scale Drawn Project No.
1
Plot Date
Basement Demolition Plan
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:19 AM
Drawing no.
1 : 50
Checked
CD2.003
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
2
3
4
5
CD3 Series Legend:
Refer to Materials and Products schedule for code references.
XX-XX DXX
Door Type
RL.XX.XX
W ES T E RN OF RO OF - R L 35.0
P I T C H (L) 2 - 2.5 D E G
RF-100
P I T C H (R) 2.5 D E G
W indow Type
A
Downpipe Hot and cold water
W all finishes: XX-XX to all externally-exposed walls unless otherwise specified XX-XX to all interior corridor walls unless otherwise specified q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
FM-02
5
---
FM-02
RIDGE - RL 35.40
E D GE
-
W XX
DP EASTERN EDGE OF ROOF - RL 35.05
DP
Relative Level
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
B
foreshore house
BALCONY BELOW RL 24.90
New soffit to underside of extg. roof at western ridge.
NEW
FM-01 BA-01
BALCONY BELOW RL 24.90
---
New roof / gutter extension (highlighted in blue) to cover existing balcony at street level.
51 Foreshore Dr, Crawford River NSW 2423
Proposed Roof Plan
Status Scale Drawn Project No.
1
Plot Date
Proposed Roof Plan Plan
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:24 AM
Drawing no.
1 : 50
Checked
CD3.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1 CD5.002
THE UNIVERSITY OF SYDNEY
2
SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
CD5.002
4
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
CD6.001
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
1
2
CD6.004
3
4
5
CD3 Series Legend:
6900 1225
Refer to Materials and Products schedule for code references.
XX-XX
11985 4000
1
2
CD5.004
CD5.004
900
DXX
135
Door Type
RL.XX.XX
Relative Level
W XX
W indow Type
A 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Downpipe Hot and cold water
FM-01
16
W all finishes:
FL-20 New tongue and groove blackbutt flooring - refer to finishes schedule. FM-01 WN 22
D-05 1
CD5.001
RM _ 01
RM_02
Garage and Entry (RL 32.30) 29.75m²
Home Office (RL 32.30) 22.65m²
FL-10
FL-20
1 CD5.001
42 Derwent Street, Glebe NSW 2037 Australia.
1 CD5.003
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
6105
CD5.003
1
q u a t t r o
4845
1
XX-XX to all externally-exposed walls unless otherwise specified XX-XX to all interior corridor walls unless otherwise specified
FM-01
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
FM-01
B D-01 1
D-02 1
Provide IL-50 to all externally exposed surfaces except for basement blockwork walls.
1 CD5.002 CD5.004
D-06 1
FL-21
2
1260
WN 29
BA-01
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
FM-01
CD5.002
Proposed Street Level Plan 2
Status
CD5.004
Scale Drawn Project No. Plot Date
2
Proposed Street Level Plan
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:27 AM
Drawing no.
1 : 50
Checked
CD3.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1
2
3
5
4
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
CD3 Series Legend:
11800 900
325
675 95
2015
1090
1000
Refer to Materials and Products schedule for code references.
XX-XX
800
4000
900
DXX
Door Type
RL.XX.XX
FM-01
WN 39
Relative Level
W XX
WN 28
W indow Type
A
Downpipe Hot and cold water
IL-10
1 1 KT-201 2
D-04 1
New bathroom / shower (see CD7.001)
CD7.001
D-03 1
FM-01
1690
1 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
W all finishes:
16
XX-XX to all externally-exposed walls unless otherwise specified XX-XX to all interior corridor walls unless otherwise specified q u a t t r o
RM_04 KT-201 KT-101 New kitchen / dining area upgrade.
ST-01 KT-201
ST-01
WN 31
Studio (RL 24.90) 51.34m² FL-20
1
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
1
2
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
Decking outdoor (RL 24.88)
3
KT-101
FL-21
42 Derwent Street, Glebe NSW 2037 Australia.
7110
D-07 1
4705
IL-10
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
CD8.001
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
FM-01
N.B: All exposed external walls to be reclad in 6mm fc sheeting on 40mm timber battening. Edges are butt-joint, (to BAL-29 / AS 3959).
WN 29
1130
IL-50
D-06 1
Decking outdoor (RL 24.88)
FL-21
FL-21
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
1000
4
IL-501
1405
1060
B
IL-50
Proposed Ground Level Plan
line of new balcony extension.
FM-01
BA-01
Status
765
4000
360 550
4000
185
1630
Scale Drawn
11490
Project No.
1
Plot Date
Proposed Ground Level Plan
CD As indicated Author
FOR TENDER
@ A3 Checker
QTR_2423
14/11/2020 10:16:33 AM
Drawing no.
1 : 50
Checked
CD3.003
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
2
3
4
5
CD3 Series Legend:
Refer to Materials and Products schedule for code references.
XX-XX
12700
DXX
1225
5675
4000
900
900
Door Type
RL.XX.XX
Relative Level
W XX
W indow Type
A
Downpipe Hot and cold water
W all finishes: XX-XX to all externally-exposed walls unless otherwise specified XX-XX to all interior corridor walls unless otherwise specified
RM_07
Basement / Foundation 30.94m²
Basement / Foundation 28.44m²
FL-10
FL-10
42 Derwent Street, Glebe NSW 2037 Australia.
4845
D-08 1
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
6105
RM_06
4240
4500
q u a t t r o
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
new roller door to basement storage
1260
D-02 2
75
new door to connect all basement areas
930
B
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
extg. balcony slab above.
new balcony extension above.
Proposed Basement / Foundation Status Scale Drawn Project No. Plot Date
1
Prop. Basement Plan Plan
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:35 AM
Drawing no.
1 : 50
Checked
CD3.004
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
2
3
4
5
Legend - Reflected Ceiling Plans
CL-XX
Refer to Master Schedule code reference descriptions
XXXX AFFL
Height of ceiling above finished floor level.
11985 175
605
605
EQ2
EQ2
EQ8
EQ8
EQ8
135
EQ8
Switch 100 mm dia. recessed downlight W all fan D1
GPO
EQ9
D1
EQ9
EQ3
A
D1
-Refer to CD11-series for Master Schedule code reference descriptions.
FM-01
q u a t t r o
EQ10
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
CL-01 2600 AFFL
1260
D1
EQ5
D1
B
foreshore house
FM-01
5675
4900
185
51 Foreshore Dr, Crawford River NSW 2423
875
Reflected Ceiling Plan (Street Level)
12860
new soffit covering to extg. u/s of western facade/gutter
make good of extg. soffit covering
Status Scale Drawn
2
Project No.
SL (RCP) Reflected Ceiling Plan
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
GPO
D1
1225
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
EQ11 EQ11
EQ5
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
EQ6
EQ3
D1
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
6105
CL-01 2600 AFFL
GPO
CL-01 2600 AFFL GPO
CL-01 2653 AFFL
42 Derwent Street, Glebe NSW 2037 Australia.
4845
EQ10 EQ6
EQ4
EQ4
EQ6
-Refer to Electrical Documentation for lighting details, and electrical legend.
Plot Date
1 : 50
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:39 AM
Drawing no.
FOR TENDER
Checked
CD4.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
2
3
4
5
Legend - Reflected Ceiling Plans
11800 4000
CL-XX
Refer to Master Schedule code reference descriptions
XXXX AFFL
Height of ceiling above finished floor level. Switch
A
D1
GPO
Staircase void
-Refer to CD11-series for Master Schedule code reference descriptions.
EQ2
CL-02 2600 AFFL
W all fan
1225
D1
1690
D1
EQ2
GPO
100 mm dia. recessed downlight
-Refer to Electrical Documentation for lighting details, and electrical legend. q u a t t r o
CL-01 2600 AFFL
D1
CL-103 2600 AFFL
EQ5
D1
D1
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
3620
1675
GP O
D1
42 Derwent Street, Glebe NSW 2037 Australia.
EQ1
720
GP O
EQ4 EQ4
D1 Bahamas BB+D
D1
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
D1
1445
1010
1010
EQ
EQ
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
EQ1
EQ5
1445
D1
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
B
D1
1135 GPO GPO
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
1225
765
4000
910
4000
900 Reflected Ceiling Plan (Ground Level)
make good of extg. soffit covering
Status Scale Drawn Project No.
1
GL (RCP) Reflected Ceiling Plan
Plot Date
CD As indicated Author
FOR TENDER
@ A3 Checker
QTR_2423
14/11/2020 10:16:43 AM
Drawing no.
1 : 50
Checked
CD4.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1
2
3
4
5
Legend - Reflected Ceiling Plans
12700 300
2105
1945
900
Refer to Master Schedule code reference descriptions
XXXX AFFL
Height of ceiling above finished floor level.
900
Switch
A
350
2810
CL-XX
100 mm dia. recessed downlight W all fan
GPO
GPO
1150
1150
GPO
-Refer to CD11-series for Master Schedule code reference descriptions. -Refer to Electrical Documentation for lighting details, and electrical legend.
D1
42 Derwent Street, Glebe NSW 2037 Australia.
4845
4110
1600
1600
q u a t t r o
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
1600
CL-01 2500 AFFL
1600
CL-01 2500 AFFL
7100
D1
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
380
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
B
1265
D1
2260
foreshore house
1000
FL-20
450
u/s of extg. cantil. balcony conc. slab. 1220
4830
51 Foreshore Dr, Crawford River NSW 2423
300
new 200 pfc beam to eng. spec. FM-03
6350
Reflected Ceiling Plan (Basement)
new 45 x 200 mm blackbutt floorboard joists @ 450 mm cts.
Status Scale
12700
Drawn
1
Project No.
BSMT / SUBT RCP Reflected Ceiling Plan
Plot Date
1 : 50
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:46 AM
Drawing no.
FOR TENDER
Checked
CD4.003
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
1
2
3
4
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
5
All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
ROOF & ROOF U/S 21.245 m
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
D-05 1
Legend - Extg / Demolition Drawings:
RM _ 01
RM_02
Garage and Entry (RL 32.30) 29.75m²
Home Office (RL 32.30) 22.65m²
Proposed demolition works.
WN 22
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface. RL. XX.XX Relative level. STREET 18.495 m
NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
WN 36
RM_04
WN 31
Studio (RL 24.90) 51.34m²
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
GROUND 15.595 m
Remove kitchen as per new interior works.
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
Demolish extg. glazed panel.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
RM_06
Demolish all extg amenities for new bathroom.
Basement / Foundation 30.94m² Natural g
BASEMENT 12.795 m
round lin
e.
COMPL. BOTTOM 12.392 m
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
Section (Long Demo) Status Scale Drawn Project No.
1
Existing Long Section Section
Plot Date
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:16:54 AM
Drawing no.
1 : 50
Checked
CD5.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
B
A
A
B
All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
ROOF & ROOF U/S 21.245 m
Tutor: Brad Inwood.
Legend - Extg / Demolition Drawings:
Proposed demolition works. WN 22
RM _ 01
RM_02
Garage and Entry (RL 32.30) 29.75m²
Home Office (RL 32.30) 22.65m²
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
Remove all extg. glazed balustrades ONLY. STREET 18.495 m
Remove kitchen / storage as per new WN interior works.
RM_04 Studio (RL 24.90) 51.34m²
29
Demolish all extg amenities for new bathroom layout.
NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
q u a t t r o
WN 31
42 Derwent Street, Glebe NSW 2037 Australia.
RM_04
WN 28
RL. XX.XX Relative level.
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
Studio (RL 24.90) 51.34m²
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
GROUND 15.595 m
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
Remove all extg. glazed balustrades ONLY.
RM_06
RM_07
Basement / Foundation 30.94m²
Basement / Foundation 28.44m²
foreshore house
BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
51 Foreshore Dr, Crawford River NSW 2423
Section (Short Demo) Status Scale Drawn Project No.
1
Short Section (West) Section
2 1 : 50
Plot Date
Short Section (East) Section
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:17:01 AM
Drawing no.
1 : 50
Checked
CD5.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1
2
3
4
5 THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
RF-100 MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro:
ROOF & ROOF U/S 21.245 m
CL-01 2653 AFFL
CL-01 2600 AFFL
Tutor: Brad Inwood.
CL-01 2600 AFFL
CL-01 2600 AFFL
RM _ 01
RM_02
Garage and Entry (RL 32.30) 29.75m²
D-05 1
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
IL-501
IL-501
WN 22
Home Office (RL 32.30) 22.65m²
FM-01
STREET 18.495 m
FM-01 CL-01 2600 AFFL q u a t t r o
IL-10
RM_04 Studio (RL 24.90) 51.34m²
WN 28
IL-501
WN 31
BA-01
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
GROUND 15.595 m Bahamas BB+D
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
RM_06 Basement / Foundation 30.94m²
D-08 1
foreshore house BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
51 Foreshore Dr, Crawford River NSW 2423
Proposed Section (Long) Status Scale Drawn Project No.
1
Plot Date
Proposed Long Section Section
CD 1 : 50 AZ
FOR TENDER
QUATTRO
QTR_2423
14/11/2020 10:17:09 AM
Drawing no.
1 : 50
@ A3 Checked
CD5.003
Rev.
B
A
A
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
B
RF-100
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
RF-100 ROOF & ROOF U/S 21.245 m
Tutor: Brad Inwood.
CL-01 2600 AFFL
RM_02 Home Office (RL 32.30) 22.65m²
RM _ 01 Garage and Entry (RL 32.30) 29.75m² D-05 1
D-01 1
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
FM-01
CL-01 2600 AFFL
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
WN 29
BA-01
IL-50
BA-01
CL-01 2600 AFFL
FM-01 BA-01
CL-01 2600 AFFL
FM-01 RM_04 Studio (RL 24.90) 51.34m²
WN 29
STREET 18.495 m
WN 28
WN 31
D-03 1
RM_04 Studio (RL 24.90) 51.34m² q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
GROUND 15.595 m
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
RM_06 Basement / Foundation 30.94m² BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
Proposed Section (Short) Status Scale Drawn Project No. Plot Date
1
Short Section W (Prop) Section
2 1 : 50
Short Section E (Prop) Section
CD 1 : 50 AZ
FOR TENDER
QUATTRO
QTR_2423
14/11/2020 10:17:18 AM
Drawing no.
1 : 50
@ A3 Checked
CD5.004
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
5
4
3
2
1
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro:
Extg. ridge RL 35.30
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
Max. bldg. height RL 35.30.
Tutor: Brad Inwood.
ROOF & ROOF U/S 21.245 m Legend - Extg / Demolition Drawings:
Proposed demolition works.
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface. RL. XX.XX Relative level. NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
STREET 18.495 m
WN 28
Remove all extg. glazed balustrades only.
q u a t t r o
WN 36
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
GROUND 15.595 m
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
Demolish extg. glazed panel.
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
Elevations (Demo) (N) Status Scale Drawn Project No.
4 -
North Elevation Elevation
Plot Date
1 : 50
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:17:25 AM
Drawing no.
FOR TENDER
Checked
CD6.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY
1
2
3
4
5
SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
Max. bldg. height RL 35.30.
Extg. ridge RL 35.30 ROOF & ROOF U/S 21.245 m
Legend - Extg / Demolition Drawings:
Proposed demolition works.
WN 29
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
WN 29
RL. XX.XX Relative level.
Demolish all extg glazed balustrade only.
STREET 18.495 m
945 WN 29
Na
tur
NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia.
WN 29
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
al
gr
ou
nd
lin
Bahamas BB+D
e.
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
GROUND 15.595 m
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
Remove all extg. glazed balustrades only.
foreshore house
Demolish all extg glazed balustrade only.
51 Foreshore Dr, Crawford River NSW 2423 BASEMENT 12.795 m
Natur
a l gr o
COMPL. BOTTOM 12.392 m
und li
ne.
Elevations (Demo) (S) Status Scale Drawn Project No.
1 -
South Elevation Elevation
Plot Date
1 : 50
CD As indicated Author
@ A3 Checker
QTR_2423
14/11/2020 10:17:34 AM
Drawing no.
FOR TENDER
Checked
CD6.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
B
A
A
B
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro:
ROOF & ROOF U/S 21.245 m
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
Legend - Extg / Demolition Drawings:
WN 22
Proposed demolition works.
D-05 1
Existing walls, slabs, floors: no new works. Make good any joint to demolished surface.
D-01 1
RL. XX.XX Relative level. STREET 18.495 m
NOTE: Refer to survey for existing conditions to exterior and interior of site. Read in conjunction with existing structural engineers drawings and refer to relevant structural details for information.
Demolish all glazed balustrades ONLY.
q u a t t r o
WN 31
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
GROUND 15.595 m
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
foreshore house BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
51 Foreshore Dr, Crawford River NSW 2423
Elevations (Demo) (E/W) Status Scale Drawn
1 -
East Elevation Elevation
1 : 50
2 -
Project No.
West Elevation Elevation
Plot Date
1 : 50
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:17:42 AM
Drawing no.
FOR TENDER
Checked
CD6.003
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
5
4
3
2
1
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
RF-100
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
IL-50
Tutor: Brad Inwood.
ROOF & ROOF U/S 21.245 m
FM-01
STREET 18.495 m
FM-01
FM-01 q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
BA-01
Bahamas BB+D
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
GROUND 15.595 m
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
foreshore house
51 Foreshore Dr, Crawford River NSW 2423 BASEMENT 12.795 m
Proposed Elevation (N) Status Scale Drawn Project No.
1 -
North Elevation (Prop) Elevation
Plot Date
CD 1 : 50 AZ
FOR TENDER
QUATTRO
QTR_2423
14/11/2020 10:17:50 AM
Drawing no.
1 : 50
@ A3 Checked
CD6.004
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
1
2
3
4
5
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
IL-50
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
RF-100
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
ROOF & ROOF U/S 21.245 m
FM-01
FM-01
FM-01 STREET 18.495 m
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia.
BA-01
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
GROUND 15.595 m
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
foreshore house
BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
51 Foreshore Dr, Crawford River NSW 2423
Proposed Elevation (S) Status Scale
1 -
South Elevation (Prop.) Elevation
Drawn
1 : 50
Project No. Plot Date
CD 1 : 50 Author
Checker
QTR_2423
14/11/2020 10:18:00 AM
Drawing no.
FOR TENDER
@ A3 Checked
CD6.005
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
B
A
A
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
B
All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
RF-100
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
ROOF & ROOF U/S 21.245 m
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
FM-01 BA-01 FM-01 STREET 18.495 m
BA-01
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
GROUND 15.595 m
New 200 PFC strengthening beam to eng. spec.
Bahamas BB+D
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
foreshore house
BASEMENT 12.795 m COMPL. BOTTOM 12.392 m
51 Foreshore Dr, Crawford River NSW 2423
Proposed Elevations (E/W)
1 -
East Elevation (Prop.) Elevation
1 : 50
2 -
West Elevation (Prop.) Elevation
Status Scale
1 : 50
Drawn Project No. Plot Date
CD 1 : 50 AZ
QUATTRO
QTR_2423
14/11/2020 10:18:11 AM
Drawing no.
FOR TENDER
@ A3 Checked
CD6.006
Rev.
1
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
2
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
4010
All drawings may not be reproduced or distributed without prior permission from the architect.
1225
2785
900
2110
1000
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
WN 39
IL-50
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
A
Group Quattro:
265
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
795
Tutor: Brad Inwood.
Notes: • •
EQ
• •
SA-10 CT-10
CT-10
1 2
D-03 1
D-04
•
930
TL-301
2 1
•
1890
TP-01
EQ
•
1
165
CT-20
Prop. WC/Bath Plan
All dimensions in mm. All dimensions to be checked on site prior to manufacture. Do not scale from drawing. All finishes, fixtures and fittings to be installed to manufacturers recommendations. Dimensions of all fittings, fixtures and appliances are to be checked against dimensions given on the drawings prior to installation. Clarification to be sought from the architect in the event of any discrepancies in the documentation or if further information is required. All work to be in accordance with the National Construciton Code and relevant Australian Standards.
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia.
IL-10
1 : 20
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
EQ FM-01
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
EQ
Bahamas BB+D
IL-50
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
A
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
CT-20
EQ1
foreshore house
CL-02 2600 AFFL
EQ1
CL-02 2600 AFFL
D1
1875
D1
D-03 1
51 Foreshore Dr, Crawford River NSW 2423
New Bathroom Works (Plan / RCP)
930
WN 39
CT-20
Status Scale
2
150
Drawn
Prop. WC/Bath RCP Reflected Ceiling Plan
Project No. Plot Date
1 : 20
CD As indicated AZ
FOR TENDER
@ A3 QUATTRO
QTR_2423
14/11/2020 10:18:14 AM
Drawing no.
IL-10
Checked
CD7.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
2
A
Tutor: Brad Inwood.
Notes:
1570 965
• •
2020
835
610
• •
50
600
3465
350
340
790
•
175
955
•
•
WN 39
All dimensions in mm. All dimensions to be checked on site prior to manufacture. Do not scale from drawing. All finishes, fixtures and fittings to be installed to manufacturers recommendations. Dimensions of all fittings, fixtures and appliances are to be checked against dimensions given on the drawings prior to installation. Clarification to be sought from the architect in the event of any discrepancies in the documentation or if further information is required. All work to be in accordance with the National Construciton Code and relevant Australian Standards.
42 Derwent Street, Glebe NSW 2037 Australia.
1525
2210
TL-301
D-04
2650
CT-20
710
D-04
2650
CT-20
TL-301
1400
q u a t t r o
SA-10
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
140
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
TP-01
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
485
500
795
415
SA-10
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
50
50
50
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
1 -
Prop. WC/Bath C Elevation
1 : 20
2 -
New Bathroom Works (Elevations I)
Prop. WC/Bath D Elevation
1 : 20
Status Scale Drawn Project No. Plot Date
CD As indicated Author
@ A3 Checker
QTR_2423
14/11/2020 10:18:22 AM
Drawing no.
FOR TENDER
Checked
CD7.002
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
2
A
Tutor: Brad Inwood.
3470 1920
1570
1550
945
30
1730
• •
795
• • •
340
400
50
555
Notes:
•
1800
•
All dimensions in mm. All dimensions to be checked on site prior to manufacture. Do not scale from drawing. All finishes, fixtures and fittings to be installed to manufacturers recommendations. Dimensions of all fittings, fixtures and appliances are to be checked against dimensions given on the drawings prior to installation. Clarification to be sought from the architect in the event of any discrepancies in the documentation or if further information is required. All work to be in accordance with the National Construciton Code and relevant Australian Standards.
IL-50 q u a t t r o
2650
42 Derwent Street, Glebe NSW 2037 Australia.
2650
1400
IL-10
TP-01
D-04
2210
IL-10 D-03 1 IL-10
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
500
850
300
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
50
50
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
1 -
Prop. WC/Bath A Elevation
1 : 20
2 -
New Bathroom Works (Elevations II)
Prop. WC/Bath B Elevation
1 : 20
Status Scale Drawn Project No. Plot Date
CD As indicated Author
@ A3 Checker
QTR_2423
14/11/2020 10:18:29 AM
Drawing no.
FOR TENDER
Checked
CD7.003
Rev.
Key: KT-101 KT-201 TR-01
2
Kitchen Type 1 Kitchen Island Bench Skirting
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
900
2545
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
1045
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro:
600
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
IL-10
225
Notes: • •
60
• •
70
600
•
600
•
35
600
•
42 Derwent Street, Glebe NSW 2037 Australia.
3810
3885
1
q u a t t r o
3
2340
900
600
FL-20
2955
15
25
KT-101
2
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
550
KT-201
25
685
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
35
350
855
350
foreshore house
51 Foreshore Dr, Crawford River NSW 2423
11° nom.
500
Proposed Kitchen Upgrade Plan
900 Status
1045 600
Scale
2545
Drawn Project No.
Prop. Kitchen Upgrade Plan
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
B
4
1
All dimensions in mm. All dimensions to be checked on site prior to manufacture. Do not scale from drawing. All finishes, fixtures and fittings to be installed to manufacturers recommendations. Dimensions of all fittings, fixtures and appliances are to be checked against dimensions given on the drawings prior to installation. Clarification to be sought from the architect in the event of any discrepancies in the documentation or if further information is required. All work to be in accordance with the National Construciton Code and relevant Australian Standards.
Plot Date
1 : 20
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:18:32 AM
Drawing no.
FOR TENDER
Checked
CD8.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
2
All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
2785
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
1135
1650
Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
720
Legend - Reflected Ceiling Plans
480 480 1135
CL-XX
Refer to Master Schedule code reference descriptions
XXXX AFFL
Height of ceiling above finished floor level. Switch
D1 100 mm dia. recessed downlight
D1
W all fan GPO
EQ
-Refer to CD11-series for Master Schedule code reference descriptions.
3025
-Refer to Electrical Documentation for lighting details, and electrical legend.
D1
42 Derwent Street, Glebe NSW 2037 Australia.
2235
CL-01 2600 AFFL
q u a t t r o
D1
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
EQ
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
B 70
D1 D1
foreshore house
665 51 Foreshore Dr, Crawford River NSW 2423
Proposed Kitchen Upgrade RCP Status Scale Drawn Project No.
1
Prop. Kitchen RCP Reflected Ceiling Plan
Plot Date
1 : 20
CD As indicated Author
@ A3 Checker
QTR_2423
14/11/2020 10:18:35 AM
Drawing no.
FOR TENDER
Checked
CD8.002
Rev.
Key: KT-101 KT-201 TR-01
Kitchen Type 1 Kitchen Island Bench Skirting
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
2600
1715
Tutor: Brad Inwood.
q u a t t r o
TP-03
42 Derwent Street, Glebe NSW 2037 Australia.
TP-03 TP-03
ST-01
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
255 20
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
255
SYDNEY | THE BAHAMAS
Sydney Office 277 Trafalgar St, Petersham NSW 2049 The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
355
885
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
720
900
foreshore house
720
2340
2 -
51 Foreshore Dr, Crawford River NSW 2423
Prop. Kitchen Island Elevation
1 : 20
3 -
Kitchen Island Elevations
Kitchen Island (Rear) Elevation
1 : 20 Status Scale Drawn Project No. Plot Date
CD 1 : 20 Author
Checker
QTR_2423
14/11/2020 10:18:39 AM
Drawing no.
FOR TENDER
@ A3 Checked
CD8.003
Rev.
Key: KT-101 KT-201 TR-01
Kitchen Type 1 Kitchen Island Bench Skirting
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification. All drawings may not be reproduced or distributed without prior permission from the architect.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020.
2540 600
Group Quattro:
3765
1045
500
895
700
600
Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489)
600
600
765
Tutor: Brad Inwood.
• •
Refer to KC-01 in the master schedule for all kitchen joinery.
455
455
Notes:
• • •
700
700
•
KT-201
2600
IL-10
q u a t t r o
580
560
KT-101
42 Derwent Street, Glebe NSW 2037 Australia.
KT-101
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
20
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
720
865
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
100 skt.
2600
•
All dimensions in mm. All dimensions to be checked on site prior to manufacture. Do not scale from drawing. All finishes, fixtures and fittings to be installed to manufacturers recommendations. Dimensions of all fittings, fixtures and appliances are to be checked against dimensions given on the drawings prior to installation. Clarification to be sought from the architect in the event of any discrepancies in the documentation or if further information is required. All work to be in accordance with the National Construciton Code and relevant Australian Standards.
TR-01
foreshore house 4 -
Prop. Kitchen (Side) Elevation
1 : 20
1 -
Proposed Kitchen Elevation
51 Foreshore Dr, Crawford River NSW 2423
1 : 20
Kitchen Upgrade Elevations Status Scale Drawn Project No. Plot Date
CD As indicated Author
@ A3 Checker
QTR_2423
14/11/2020 10:18:42 AM
Drawing no.
FOR TENDER
Checked
CD8.004
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components.
NOTES : 1. 2. 3. 4. 5. 6. 7.
Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
EXTERNAL DOOR & WINDOW MANUFACTURER TO PROVIDE THE FOLLOWING: • •
Not true elevation. For ease of representation refer to GA for true setout. Provide shop drawings for all windows and doors shop drawings to be approved by the architect prior to fabrication. Dimensions shown are for nominal openings. Confirm all opening dimensions on-site prior to fabrication allowance should be made for necessary packing etc. Confirm all dimensions on site prior to commencement of construction. Comply applicable Australian standards i.e. standards for windows glazing etc. Comply also to BCA 2014. Samples of hardware to be provided to architect for approval prior to fabrication.
• •
All drawings may not be reproduced or distributed without prior permission from the architect.
Nominate suitable hardware for doors and windows, submit sample to architect for approval. Provide suitable locks to all external windows and doors, Locks to be able to restrict child access to balconies. All hardware to match frame colour and finish. Door and window seals to provide weatherproofing and acoustic requirements as specified in acoustic report.
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
Window Schedule (Window Types):
1500 min.
3000 min.
4000 total. (street/ground)
4000 overall. (ground level)
1340
2840
1000
1000
840
840
W INDOW SCHEDULE IS TO BE READ IN CONJUNCTION WITH ARCHITECTURAL GENERAL ARRANGEMENT PLANS (GA's - CD3 SERIES). FOR LOCATIONS. FINISHES REFER TO MASTER SCHEDULE CD11.003. DRAW INGS TAKE PRECEDENTS TO SCHEDULES AS TO QUANTITY (QTY). SCALE - 1 : 50 @ A3 All operable windows, above ground floor, to be fitted with adjustable restricted openers to restrict opening to max 125mm. Colour to match frame.
1600
1440
Glass types: Refer to Acoustic + BASIX Report for requirements.
2600 max.
2440
2800 max.
2640
2600
2440
2650 AFFL
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
FFL EQ
EQ
EQ
EQ
EQ Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
D-06 / W-29
D-07 / W-31
W-28
W-39
SLIDING DOOR TO BAL-29 / AS3959
SLIDING DOOR TO BAL-29 / AS3959
SINGLE FIXED GLAZING PANEL
SINGLE FIXED BATHROOM GLAZING PANEL
ALUMINIUM FRAME W/ TOUGHENED GLASS
ALUMINIUM FRAME W/ TOUGHENED GLASS
ALUMINIUM FRAME W/ TOUGHENED GLASS TO BAL-29 / AS3959
SHGC: 0.44
SHGC: 0.44
ALUMINIUM FRAME W/ TOUGHENED FROSTED GLASS TO BAL-29 / AS3959
U-VALUE: 5.71
U-Value: 5.71
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
SHGC: 0.44 SHGC: 0.44
U-VALUE: 5.71 SINGLE PYROLYTIC LOWE GLASS
SINGLE PYROLYTIC LOWE GLASS
ALL BALCONY ENTRY AREAS
SPECIAL: EAST FACADE (GROUND FLOOR). EAST FACADE AS FIXED WINDOW (STREET LEVEL).
foreshore house
U-VALUE: 5.71
SINGLE PYROLYTIC LOWE GLASS GROUND FLOOR / STREET LEVEL STAIRWELL AREA
SINGLE PYROLYTIC LOWE GLASS
51 Foreshore Dr, Crawford River NSW 2423
NEW SHOWER AREA
Window Schedule
Status Scale Drawn Project No. Plot Date
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:18:44 AM
Drawing no.
FOR TENDER
Checked
CD11.001
Rev.
Check all dimensions and site conditions prior to commencement of any work, the purchase or ordering of any materials, fittings, plant, services or equipment and the preparation of shop drawings and or the fabrication of any components. Do not scale drawings - refer to figured dimensions only. Any discrepancies shall immediately be referred to the architect for clarification.
NOTES : 1. 2. 3. 4. 5. 6. 7. 8.
INSIDE
Contractor to provide control samples of all materials, finishes and fittings for Quattro approval prior to ordering and manufacture. Ensure all finishes are ordered with adequate allowance for lead times - substitutions will not be accepted. Fabrics to be scotch guarded and FR treated where required, to meet specs as provided and relevant Australian Standards and Codes. Check all dimensions on site and notify Quattro of any discrepancies. All schedules to be read in conjunction with architectural drawings. All quantities are indicative. Contractor is responsible to confirm all quantities and sizes against drawings. Lead times & pricing is indicative. Contractor is responsible to confirm. All prices exclude GST.
All drawings may not be reproduced or distributed without prior permission from the architect.
DOOR # DXX
THE UNIVERSITY OF SYDNEY SCHOOL OF ARCHITECTURE, DESIGN AND PLANNING
OUTSIDE GENERAL RULE FOR FINISHES + DOOR FURNITURE
MARC5102 Contract Documentation | Semester 2 (Online), 2020. Group Quattro: Alex Zeng (460 373 669), Ryan Cai (460 355 595) Jack Dumanat (460 174 871), Leo Pan (500 073 489) Tutor: Brad Inwood.
1110
1010
975
1040
940
1525 590
4400
Door Schedule (Door Types):
930 115
2650 AFFL
1045
2090
2020
1850
2270
2230
2325
2290
60
DOOR SCHEDULE IS TO BE READ IN CONJUNCTION W ITH ARCHITECTURAL GENERAL ARRANGEMENT PLANS (GA's - CD3 SERIES). FOR LOCATIONS AND FINISHES REFER TO MASTER SCHEDULE CD11.003. DRAW INGS TAKE PRECEDENTS TO SCHEDULES AS TO QUANTITY (QTY) SCALE - 1 : 50 @ A3
FFL D-01
D-02
D-03
D-04
D-05
FIRE RATED DOOR ENTRY DOOR TO BAL-29 AS3959.
PLYWOOD INTERIOR DOOR
PLYWOOD W ET-AREA DOOR
GLAZED SLIDING SHOWER DOOR
FRONT GARAGE DOOR
SOLID CORE TIMBER W/ TIMBER FRAME
SOLID CORE TIMBER + TIMBER FRAME & MOISTURE RESISTANT VENEER
q u a t t r o 42 Derwent Street, Glebe NSW 2037 Australia.
STEEL ROLLER PROFILE TO BAL-29 / AS3959.
SOLID CORE TIMBER W/ TIMBER FRAME (BAL-29 AS3959)
INTERNAL THROUGHOUT EXCEPT FOR W ET AREAS.
STREET LEVEL - RAMP ENTRY ONLY.
GROUND LEVEL PROPOSED BATHROOM.
STANDARD GLAZING PANEL
T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
STREET LEVEL FRONT ENTRY
ABN 70 004 999 400 Nom. Architect Ryan Silang Cai NSWARB 10253
GROUND LEVEL PROPOSED BATHROOM SHOW ER AREA
1500 min.
3000 min.
4110
4000 total. (street/ground)
4000 overall. (ground level)
4050
Bahamas BB+D
Sydney Office 277 Trafalgar St, Petersham NSW 2049
NO-FUSS BUILDING. QUALITY ON-TIME, ALL THE TIME.
The Bahamas (Main) 1 Bay St, Downtown Nassau, The Bahamas
SYDNEY | THE BAHAMAS
T 02 9267 8530 E admin@bahamasbbd.com W www.holidaytimebbd.com
foreshore house
2495
2460
2800 max.
2720
2600 max.
2520
2650 AFFL
51 Foreshore Dr, Crawford River NSW 2423
FFL
Door Schedule D-06 / W-29
D-07 / W-31
D-08
SLIDING DOOR TO BAL-29 / AS3959
SLIDING DOOR TO BAL-29 / AS3959
BASEMENT STORAGE ACCESS DOOR
Status Scale
ALUMINIUM FRAME W/ TOUGHENED GLASS ALL BALCONY ENTRY AREAS
ALUMINIUM FRAME W/ TOUGHENED GLASS SPECIAL: EAST FACADE (GROUND FLOOR). EAST FACADE AS FIXED W INDOW (STREET LEVEL).
STEEL ROLLER TO BAL-29 / AS3959.
Drawn Project No.
REAR BASEMENT ENTRY (EAST FACADE).
Plot Date
CD As indicated AZ
@ A3 QUATTRO
QTR_2423
14/11/2020 10:18:46 AM
Drawing no.
FOR TENDER
Checked
CD11.002
Rev.
Project Name
FORESHORE HOUSE Project Address
51 Foreshore Dr, Crawford River NSW 2423 Schedule
Master Schedule (Materials, Finishes, Fixings) Document No.
Revision
CD11.003 A
Code
Revision By AZ A Checked RC JD LP Project No QTR_2423 Status FOR CONSTRUCTION Issue Date 12 / 11 / 2020 Plot FIle A11.003_A.PDF
Item
Date
Description
Initial
Checked
12.11.20
FOR TENDER
AZ
JD / RC / LP
Spec Section
42 Derwent Street, Glebe NSW 2037 Australia. T 02 9567 8533 E studio@quattro.com.au W www.quattro.com.au
Spec Description
Supplier
FM SERIES
FAÇADE METAL COMPONENTS
FM-01
Bushfire Horizontal Shutters
452B
Nominal 100 x 50mm front glazed captured aluminium window wall system equal to Capral 419 Flushline or to match existing aluminium window frame Finish: Powder Coat Colour: to match existing aluminium window frame Location: See architectural drawings. Street and ground level.
Louvretec Location: Sydney North and Northern Beaches Address: Phone:0413 886 674 Email: info@louvreland.com.au
FM-01
Bushfire Horizontal Shutters
452B
Nominal 100 x 50mm front glazed captured aluminium window wall system equal to Capral 419 Flushline or to match existing aluminium window frame Finish: Powder Coat Colour: to match existing aluminium window frame. Location: See architectural drawings. Street and ground level.
Louvretec Location: Sydney North and Northern Beaches Address: Phone:0413 886 674 Email: info@louvreland.com.au
FM-02
Metal Guttering
432
Nominal 50mm wide x 30mm aluminium skylight frame with guttering system concealed fixed to AM-203 Finish: Powder Coat Colour: to match existing roofing. Location: West and east facades
Builder Supplied Item
FM-03
200 PFC Strengthening Beam
341B
Nominal 75 mm wide x 200 mm deep Builder supplied item. welded steel parallel flange channel; refer to architecture detail and structural drawings Finish: External paint system equal to Dulux Acrathane Colour: Dulux Epoxy Location: See architectural drawings. New 200 PFC to new balcony extension only.
BA SERIES
BALUSTRADES / HANDRAILS
.
Notes / Photos
. Refer to Architecture Details.
BA-01
Powder-Coated Steel Balustrade
552B
Structurally / circular-perforated steel balustrade with to meet AS1288 + BAL-29 / AS3959. Steel stanchions + rails 12PL x 50mm nominal with welded 4PL x 25mm panel fixing tab. All visible weld joint shall be ground back smooth and painted not visible All visible mechanical fixings shall be counter sunk fixings colour to match steel paint colour Finish: Powder-coated paint. Location: Street and ground level balconies.
Weland AB Box 503 333 28 Smålandsstenar, Sweden C: Jonas Holmgren P: +46 (0) 371 344 00 M: 0418 180 187 (Sydney Based Only) E: https://www.weland.com/engb/produkter/raecken/sektionsraecke/
Refer to Architecture Details.
BA-01
Metal Handrail
552B
40mm diamater handrail welded to 10mm diamater bent rod and 50mm diamater disk with countersunk fixings to wall structure All visible weld joint shall be ground back smooth and painted not visible All visible mechanical fixings shall be counter sunk fixings colour to match adjacent surface OPTION 1: Painted steel Colour: Black OPTION 2: Stainless steel Fimish: linish OPTION 3: To match BA-01 colour/finish. Location: Street and ground level balconies.
Weland AB Box 503 333 28 Smålandsstenar, Sweden C: Jonas Holmgren P: +46 (0) 371 344 00 M: 0418 180 187 (Sydney Based Only) E: https://www.weland.com/engb/produkter/raecken/sektionsraecke/
Refer to Architecture Details.
CL SERIES
CEILINGS
CL-01
Plasterboard ceiling
0531
Suspended flush plasterboard lining on Builder supplied item concealed suspended ceiling system. Plasterboard: 13mm flush plasterboard. Finish: Painted Wall junctions: Provide Rondo P50 shadow stopping angles. Acoustic Insulation: As per Acoustic Consultant Specification Thermal Insulation: As per Section J requirements Colour: Dulux Vivid White Wash and Wear Location: Provide to all interior areas. Soffit alternative TBC with builder/supplier.
CL-02
Moisture resistant plasterboard ceiling
0531
Suspended flush moisture resistant Builder supplied item plasterboard lining on concealed suspended ceiling system. Plasterboard: 13mm flush moisture resistant plasterboard. Finish: Painted. Wall junctions: Provide Rondo P50 shadow stopping angles. Acoustic Insulation: As per Acoustic Consultant Specification Thermal Insulation: As per Section J requirements Colour: Dulux Vivid White Wash and Wear. Location: Provide to all interior areas. Soffit alternative TBC with builder/supplier.
FL SERIES
FLOORING
FL-10
Concrete Flooring
.
. 0652
As per existing concrete flooring. Make good of any surfaces.
FL-20
FL-21
Indoor Timber Tongue and Groove Flooring
0655
Outdoor decking
0655
Blackbutt timber tongue and groove flooring FInish: WOCA Hardwax oil
Floor Torque C: Jocelyn Lee P: 02 9590 2553 M: 0450 221 482 E: infor@floortorque.com.au http://www.floortorque.com.au/
Blackbutt timber decking FInish: Cabots natural decking oil Builder supplied item
CT SERIES
TILES / CERMAIC TILES
CT-10
Vitrified Ceramic Floor Tiling
0631
. Manufacturer/reference: Classic Ceramics Product: November Colour: Warm Dimensions: 600 x 600 mm Slip Ratings: Wet Pendulum Test P3 Finish: Grip Joint width: Nominal 1mm Joint: 2mm Grout Colour: TBC Note: Also used for walls, align edges.
Classic Ceramics C: Kristie Mcdonald P: 02 9560 6555 M: 0418 221 482 E: kmcdonald@classicceramics.com.au
CT-20
Ceramic Wall Tiling
0631
Classic Ceramics C: Kristie Mcdonald P: 02 9560 6555 M: 0418 221 482 E: kmcdonald@classicceramics.com.au
FX SERIES
FIXTURES
FX-10
Counter Mounted Soap Dispenser
0572
FX-20
Toiler Paper Holder
0572
Manufacturer/ reference: Classic Ceramics Product: Hyper Colour: Taupe Dimensions: 100 x 100 mm Slip Ratings: Wet Pendulum Test P3 Finish: Natural Joint width: Nominal 1mm Joint: 2mm Grout Colour: TBC Manufacturer: Caroma Product: G Series Electronic Hands Free Soap Dispenser Code: G16010E6A Finish: Chrome Dimensions: 104mm H (Above Counter) x 120mm L (Projection) x 90mm W Capacity: 1000ml refillable Manufacturer: Astra Walker Product: Icon Toilet Roll Holder Code: A67.61.V2 Finish: Satin Finish
FX-30
Bottle Trap
0572
Manufacturer: Caroma Product: Modina - 40mm Bottle Trap Code: 687290C Finish: Chrome
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
FX-40
Coat Hook
0572
Manufacturer: Lawson Product: Coat Hook Metlam Code: ML6036PSS T: 1300 638 526 Finish: Polished Stainless Steel Dimension: 48mm D x 20mm dia
FX-50
Stainless Steel Framed Mirror
0572
Supplier: Metlam Description: Stainless Steel Framed Mirror Colour: Satin Stainless Steel Code: ML771_5 Note: Refer to drawings for installation setouts. Installation to comply with AS1428. 1-2009
FT SERIES
FITTINGS
.
.
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
Astra Walker C: Daniel Shirtliff P: 02 8838 5100 M: 0439 202 230 E: daniel@astralwalker.com.au
Metlam P: 1300 638 526
FT-10
Door Handle
0572
Manufacturer: Pitella Pitella Product: Arnaldo DDA Door Handle T: 03 9818 0311 Code: 6820-SN Finish: Satin Chrome Fixing: Through bolt fixing, fullly concealed. * To comply with AS1428.1. Location: To all doors.
GL SERIES
GLAZING
GL-40
Mirror
0572
Supplier: Reece Description: Mirror Colour: Clear Edge treatment: Polished Fixing Method: Concealed Thickness: 6mm or otherwise where noted Size: As indicated on the drawings confirm joints with architect prior to manufacture
GL-45
Glazing units
0461
Supplier: Stegbar Description: Toughened Glass 6mm Frame type : Aluminium Fixing Method: concealed Thickness: 6mm SGHC: 0.44 U VALUE: 5.71
IL SERIES
PLASTERBOARD WALL LININGS
IL-10
Plasterboard - 13mm
0511
13mm plasterboard lining. Manufacturer/ reference: CSR Gyprock/ Plasterboard CD, or acceptable equivalent
CSR Gyprock T: 1300 306 556
IL-20
Moisture resistant plasterboard 13mm
0511
13mm moisture resistant plasterboard lining. Manufacturer/ reference: CSR Gyprock/ Aquachek, or acceptable equivalent
CSR Gyprock T: 1300 306 556
IL-30
Fire resistant plasterboard - 13mm
0511
13mm fire resistant plasterboard lining. Manufacturer/ reference: CSR Gyprock/ FyrChek, or acceptable equivalent
CSR Gyprock T: 1300 306 556
IL-50
Fibre cement board - 6mm
431B
6mm fibre cement board. Manufacturer / reference: CSR Cemintel Barestone, or acceptable equivalent. Finish: manufacturers finish
CSR Cemintel T: 1300 236 468
IN SERIES
THERMAL INSULATION
IN-01
Reinsulate with R4.0 Knauf Earthwool Ceiling insulation
Performance Energy: R4 Dimension: 195x430x1160mm Area/Pack: 9
Builder Supplied item
PA SERIES
INTERNAL PAINT SCHEDULE
PA-01
Paint to internal ceilings
0671
Finish: Dulux Wash and Wear Colour: Vivid White
Builder item
PA-02
Paint to wet area ceilings
0671
Finish: Dulux Wash and Wear Colour: Vivid White
Builder Supplied item
. Reece T: 1800 847 434
Refer to Architecture Details.
.
. 0471
.
See Drawing Specs
PA-03
Paint to internal walls
0671
Finish: Dulux Wash and Wear Colour: Vivid White
Builder Supplied item
SA SERIES SA-10
BASINS / SINKS Kitchen Sink
. 0555
Manufacturer: Artinox Product: Artinox Layer Double Code: 1284891 Finish: Stainless steel Dimensions: 530mm W x 330mm D x 160mm H (incl. 70 above vanity) Tap Holes: 0
Artinox C: Jeremy Lin P: 12434124 M: 0418 180 187 E: info@artinox.com.au
SA-20
Inset Vanity Basin
0555
Manufacturer: Caroma Product: Care 700 Wall Basin with Right Hand Shelf Code: 873300W Finish: White Ceramic Dimensions: 700mm W x 405mm D x 385mm H Tap Holes: 0
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
TP SERIES
TAPWARE
TP-01
Toilet Basin Mixer
0555
Manufacturer: Caroma Product: G Series Electronic Touch Basin Mixer (Adjustable Temp) Code: G16000E6A Finish: Chrome Dimensions: 170mm H x 44mm D x 94mm H (Basin to Tap) WELS: 6 Star Rated
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
TP-02
Rain shower
0555
Manufacturer: Caroma Product: Cube Rainshower with mixer (Adjustable Temp) Code: G16000E6A Finish: Chrome Dimensions: 105mm H x 300mm D x 94mm H (Basin to Tap) WELS: 6 Star Rated
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
TP-03
Basin Mixer
0555
Manufacturer: Caroma Product: Gooseneck Pullout tap Code: 4567.045A Finish: Chrome Dimensions: 300 H x 44mm D x 94mm H (Basin to Tap) WELS: 5 Star Rated
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
SA SERIES
WC / URINALS
.
SA-10
WC Toilet Suite
0555
Manufacturer: Caroma Product: Liano Invisi Series II Easy Height Wall Faced Suite Code: 766500W Finish: Vitreous China Dimensions: 435mm H x 610mm D WELS: 4 Star Rated Note: Complies with AS1428.1 for Ambulant WC Flush Plate Specification: Product: Invisi Series II Oval Dual Flush Plate & Buttons Code: 237078C Finish: Chrome
Caroma C: Anthony Carulli P: 131416 M: 0418 180 187 E: acarulli@gwagroup.com.au
ST SERIES
STONE
.
.
ST-01
Marble
TR SERIES
SKIRTINGS & TRIMS
TR-01
Painted timber skirtings
TR-02
0551
Manufacturer: CDK Product: Grigio Carnico Marble Finish: Polished Thickness: 20mm thick or moulded where noted Substrate & fixing: Refer to details Notes: Refer to joinery drawings for edge finish Bates Smart to select and approve slabs
CDK Stone C: Dalia Aboud P: 9822 5155 M: 0467 606 398 E: dalia.aboud@cdkstone.com.au
0522
100mm high x 20mm timber skirting. Finish: Dulux Wash and wear Colour: Vivid White
Builder supplied Item
Window reveals
0522
FInished Blackbutt timber Finish: Woca Hardwax oil satin finish
Builder supplied Item
TR-03
External Trims and Moldings
0522
Oiled Blackbutt timber Moldings and Trims Finish: Cabots Natural Decking Oil
Builder supplied Item
KC SERIES
KITCHEN JOINERY
KC-01
Kitchen Joinery & Cabinetry
MC SERIES
MISC
MC-01
Fire extinguisher
.
. 0522
Hardware: Blum Tandembox Antaro Finish: Blackbutt Crowncut timber veneer. carcasses to be from timber laminate E1 moisture resistant melamine board with adjustable shelves. Doors and other exterior visible faces and edges to be Blackbutt veneer with matching edges. hinges to be soft closing blum cliptop. drawer system to be soft closing Blum Tandembox Antaro series with orgaline dividers. drawer depth to be maximised in carcass. Handles to be 150mm Index & Co. galaxy Satin Stainless Steel Handles. Handles to be beveled edges.
Joiner supplied Item
. 0573
Fire pro 2.5kg fire extinguisher
Bunnings
Foreshore House Design Options quattro Alex Zeng 15 October, 2020
Ryan Cai
Jack Dumanat
Leo Pan
Contents
1.0
Design Options
1.1
Eave / Soffit Detail A
1.2
Eave / Soffit Detail A
1.3
Balustrade / Railing Detail A
1.4
Balustrade / Railing Detail B
1.5
Balcony Detail A
1.6
Balcony Detail B
1.7
Window Covering A
1.8
Window Covering B
quattro L2, 42 Derwent Street, Glebe NSW 2037 Australia. T +61 2 9567 8533 E studio@quattro.com.au w www.quattro.com.au Quattro Pty. Ltd. ABN 70 004 999 400 Nominated Architect Ryan Silang Cai NSWARB 10253
2
quattro
ZENG
CAI
DUMANAT
PAN
foreshore house /
CONTENTS
1.0 Design Options Foreshore House
1.1 Eave / Soffit Detail A
1.2
Eave / Soffit Detail B
1.3
Balustrade / Railing Detail B
1.4
Balustrade / Railing Detail B
1.5
Balcony Detail A
1.6
Balcony Detail B
1.7
Window Covering Detail A
1.8
Window Covering Detail B
STRUCTURE
0383b FLOORING AND DECKING
0383B FLOORING AND DECKING
1
GENERAL
1.1
CROSS REFERENCES
General General: Conform to the General requirements worksection. Associated worksections Associated worksections: Conform to the following: - Timber Framing and Flooring 1.2
STANDARD
General Flooring and decking: To AS 1684 Parts 2, 3 or 4, as appropriate. 1.3
INSPECTION
Notice Inspection: Give notice so that inspection may be made of the following: - Substrate before laying flooring, decking or underlay. 1.4
TOLERANCES
Tolerances General: Maximum deviation of the finished floor surface under a 3 m straight edge laid in any direction: 3 mm. 2
PRODUCTS
2.1
GENERAL
Storage General: Deliver timber decking to site and store so that its moisture content is not adversely affected. Do not store on the sub-floor until the moisture content of the sub-floor is suitable for the installation of the floor. 2.2
TIMBER
Recycled timber decking Type or species: Blackbutt Source: AusTimber Pty Ltd Appearance: To be re-sawn and finished to eliminate weathering stains and expose fresh timber. New timber decking Standard: - Hardwood to AS 2796.1 Section 4. . Grade to AS 2796.2: Select.
© NATSPEC (Apr 05 – Amdt Oct 06)
1
"[insert date]"
STRUCTURE
3
EXECUTION
3.1
PREPARATION
0383b FLOORING AND DECKING
Substrates General: Ensure support members are in full lengths without splicing. Flatness: < 3 mm deviation of the substrate under a 3 m straight edge laid in any direction with no abrupt variations greater than 1 mm over 250 mm. Battens on concrete slabs Framing fixed direct: Fix seasoned battens to the concrete slab in conformance with the Battens table so that their top surfaces are aligned. - Spacing of fasteners: 600 mm. Moisture content General: Do not commence installation of flooring unless: - Concrete substrate: The moisture content of the concrete has been tested to AS/NZS 2455.1 Appendix C and values obtained as follows: .
5.5% when tested by the electrical resistance test.
. 70% when tested by the hygrometer test. - Plywood underlays or timber flooring products: The moisture content has been tested to AS 1080.1 and values obtained as follows: . Airconditioned buildings: 8 to 10%. . Intermittently heated buildings: 10 to 12.5%. . Unheated buildings: 12 to 15%. Acclimatisation: If the timber moisture content values are not achieved acclimatise the timber flooring products. Decking on steel joists General: Screw fix seasoned battens to the steel joists in conformance with the Battens table so that their top surfaces are aligned. Battens table Decking timber Standard Flooring Batten spacing for flooring type (average species density) thickness Butt jointed End matched Cypress
AS 1810
20
450
450
Hardwood density 560 kg/m3 or more
AS 2796.1
19
600
450
25
600
450
30
600
600
19
450
390
25
600
450
30
600
600
19
450
450
35
600
450
19
450
390
35
600
450
Hardwood density less than 560 kg/m3
AS 2796.1
Softwood density 560 kg/m3 or more
AS 4785.1
Softwood density less than 560 kg/m3
AS 4785.1
© NATSPEC (Apr 05 – Amdt Oct 06)
2
"[insert date]"
STRUCTURE
3.2
0383b FLOORING AND DECKING
FIXING
Adhesive General: Use a urethane elastomer adhesive in addition to nails as follows: - Continuously supported flooring: 4 mm beads at 300 mm spacing at right angles to run of flooring. - Intermittently supported flooring: 6 mm bead along each joist or batten. Nailing General: Ensure the boards are in contact with the joists at the time of nailing, particularly where boards are machine nailed. Skew nail in a uniform pattern. If nails are to be less than 10 mm from ends of sheets or boards, pre-drill nail holes 0 – 1 mm undersize. Sinking: Punch nails 3 mm below finished surfaces and fill the sinking flush with a material tinted to match the flooring which is compatible with the floor finish. Top nailing: For boards more than 65 mm cover width, use two nails skewed 10° in opposite directions. Platform flooring Installation: Lay the length of the sheets at right angles to the supports. Stagger the end joints and locate them centrally over joists. If panels are not tongue and grooved provide noggings or trimmer joists to support the edges. Sheet flooring fixing centres: Maximum 300 mm on each support. - Fibre-cement flooring: Fix sheeting to the supports with adhesive and non-corrosive countersunk screws. Fill the screw holes with sealant before fixing. After fixing, stop the screw heads with the same sealant, finished slightly below the sheet surface. - Particleboard and plywood flooring: Fix sheeting to the supports with adhesive and nail. Membranes: If sheet flooring is the substrate for a wet area membrane or an external roofing membrane, fix with stainless steel countersunk head screws. Timber decking Installation: Lay in long lengths (minimum 3 spans) double nailed at each bearing with fixings finished flush. Stagger joints and make them over joists. Leave 4 mm between edges of boards. Fixings: Galvanised Screws onto batten Arrises: Chamfered or rounded. Finishing: Apply the first 2 coats all round before fixing.
4
SELECTIONS
4.1
SCHEDULES
Flooring and decking schedule Property
Code A
B
C
Timber decking Profile Size (width x thickness, mm)
120x19x3200
Species or group
Blackbutt
Recycled
yes
© NATSPEC (Apr 05 – Amdt Oct 06)
3
"[insert date]"
STRUCTURE
0383b FLOORING AND DECKING
Property
Code A
B
C
Ends: - Butt - End joined T&G Preservative treatment Spacing (mm)
5mm
Surface finish
sanded
Coating system
Lacquered
Platform floors Material
Blackbutt
Thickness
120x22
© NATSPEC (Apr 05 – Amdt Oct 06)
4
"[insert date]"
0421 ROOFING – COMBINED
ENCLOSURE
0421 ROOFING – COMBINED
1
GENERAL
1.1
AIMS
Responsibilities Provide a roofing system and associated work which: - Satisfies the product performance requirements. 1.2
CROSS REFERENCES
General General: Conform to the General requirements worksection. Associated worksections Associated worksections: Conform to the following: conform to AS 3959 and the NCC for bushfire protection. 1.3
PERFORMANCE CRITERIA
Ambient climatic conditions Design rainfall intensity (mm/h) to AS/NZS 3500.3: Roof Can handle 219 mm/hr Location exposure severity Exposure severity category: Benign Tropical Inland
© NATSPEC (Jan 06 – Amdt Oct 07)
1
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
Bushfire prone areas Level of construction to AS 3959: BAL40 Roof access Type: Normal Roof Maintenance 1.4
INSPECTION
Notice Inspection: Give sufficient notice so that inspection may be made of: - Roof supports. - Those parts of the roofing, sarking, vapour barrier, insulation and roof plumbing installation which will be covered up or concealed. 1.5
SUBMISSIONS
Tests Submit results of type tests as follows: - Metal roofing general tests: Roof sheeting and fastenings to AS 1562.1 for resistance to concentrated load and to wind pressure. - Metal roofing in cyclonic regions AS/NZS 1170.2: Roof sheeting and fastenings to AS 1562.1 clause 5.6. - Fibre cement roofing: Type test the roof sheeting and fixings to AS/NZS 1562.2 for resistance to wind forces. Internal downpipes: Submit results of site tests to each stack hydrostatically in stages 2 storeys high for two hours. Remedy defects and retest if necessary. Samples Submit samples of the following showing the range of variation available: - Sheet metal finishes showing the range of variation available. - Custom profiled flashings and cappings. - Tiles. - Slates. - Bedding and pointing mortar. - Shingles or shakes. - Pre weathered finish to sheet metal. Installation Seamed roofing: Submit evidence of experience with non-ferrous roof installation. Shop drawings General: Submit shop drawings showing the following information: See CD09.001 and CD09.002 for detailed drawings of the roof. Trimwall screwed on to battens with Kingspan aircell foil backed blanket underneath. Colorbond flashing barge capping profile is added on the edges. 2
PRODUCTS
2.1
COMPONENTS
Fasteners Finish: Prefinish exposed fasteners with an oven baked polymer coating to match the roofing material. Fastenings to timber battens: Provide fastenings just long enough to penetrate the thickness of the batten without piercing the underside. Profiled fillers Provide: Purpose-made closed cell polyethylene foam profiled to match the roofing profile. Locate profiled fillers under flashings to: - Ridges. - Eaves. - Lapped joints in roof sheeting. © NATSPEC (Jan 06 – Amdt Oct 07)
2
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
Safety mesh Standard: To AS/NZS 4389. 2.2
SHEET METAL ROOFING
Standards Design and installation: To AS 1562.1. Prepainted and organic film/metal laminate products: To AS/NZS 2728. Roofing product Product brand: Lysaught Profile: Colorbond Lysaught Trimwall profile Product material type: Aluminium Thickness (base metal) (mm): 2mm Colour: red 2.3
ROOF PLUMBING
General Standard: To AS/NZS 3500.3. General: Provide the flashings, cappings, gutters, rainwater heads, outlets and downpipes necessary to complete the roof system. Materials Metal rainwater goods: To AS/NZS 2179.1. Metal: Roof ,Gutter, Down Pipes PVC rainwater goods and accessories: To AS/NZS 3500.3. Proprietary flashings and cappings Standard: To AS/NZS 2904. Product: Colorbond flashing barge capping profile Material and colour: Match roof sheeting. Rib notching: Match roof sheeting. Flashing and capping types: Vertical Wall overlapped type see CD09.002 Proprietary ridge and barge cappings Product: Stramit® Ridge Capping Material and colour: Match roof sheeting. Capping types: Spring-curved-ridge roof Box gutters Cross section dimensions: 103x175x97mm Material and base metal thickness: 1.5mm Downpipes Product: Lysaght Zincalume Downpipe Material: Aluminium Profile: rectangle Size: 0.4 x 100 x 75mm
© NATSPEC (Jan 06 – Amdt Oct 07)
3
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
2.4 INSTALLATION Protection General: Keep the roofing and rainwater system free of debris and loose material during construction, and leave them clean and unobstructed on completion. Repair damage to the roofing and rainwater system. Touch up: If it is necessary to touch up minor damage to prepainted metal roofing, do not overspray onto undamaged surfaces. Thermal movement Provide for thermal movement in the roof installation and the structure, including movement in joints and fastenings. Pan type sheets Removal: Capable of being de-indexed and removed without damage. Curved corrugated sheet General: Form by rolling from material recommended for curving or bullnosing. Minimise crimping or creasing across the face of the sheet. Trim off crimped or creased edges and ends. Metal separation Prevent direct contact between incompatible metals, and between green hardwood or chemically treated timber and aluminium or coated steel, by either: - Applying an anti-corrosion, low moisture transmission coating to contact surfaces. - Inserting a separation layer. Tolerances Conform to the Tolerances table. Tolerances table Property Tolerance criteria: Permitted deviation (mm) Spacing of supporting members
± 5 mm on the nominated support member spacing
Vertical or horizontal misalignment at the abutting 2 mm ends of sheets Tops of supporting members in a plane parallel to 7 mm smooth deviation per metre length of the nominated roof slope supporting member 2.5
SHEET METAL ROOFING
Roof sheet installation Eaves: Treat ends of sheets as follows: - Generally: Close off ribs at tops and bottoms of sheets by mechanical means or with purpose-made fillers or end caps. - At gutters: Project sheets 50 mm into gutters. Swarf: Remove swarf and other debris as soon as it is deposited. Accessories: Provide material with the same finish as roofing sheets. 2.6
BUILDING ELEMENTS
Ridges and eaves Treat ends of sheets as follows: - Project sheets 50 mm into gutters. - Close off ribs at bottom of sheets using mechanical means or with purpose-made fillers or end caps. - Turn pans of sheets up at tops and down into gutters by mechanical means. - Provide pre-cut notched eaves flashing and birdproofing where necessary. - Close off ridges with purpose-made ridge fillers of closed cell polyethylene. Ridge and barge Capping: Finish off along ridge and verge lines with purpose-made ridge capping or barge rolls. © NATSPEC (Jan 06 – Amdt Oct 07)
4
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
Sprung curved ridge General: Lay the roofing sheets in single lengths from eaves to eaves by naturally curving the sheets over the ridge. Ridge: Seal side laps at the ridge and extend the sealant to the point where the roof pitch equals the recommended pitch of the roofing profile. End laps General: Where end laps are unavoidable, and the sheet profile is not suitable for interlocking or contact end laps, construct a stepped type lap. Length of lap (mm): 150mm 2.7
TILING
Installation Standard: To AS 2050. Setting out: Set out the roof to give an even tile gauge in each course, with full or saw cut tiles at verges. Bedding and pointing: Bed and point accessories, including ridges, hips and verges, in coloured mortar. - Colour: To match the tiles and accessories. Tile verge: Finish the verge with cover tiles pointed to the roof tiles. Screw fix to the barge board with round head galvanized screws. Pointed verge: Bed and point tiles on 100 x 5 mm fibre cement pointing strip. 2.8
SLATE ROOFING
Installation Standard: To AS 4597. 2.9
FIBRE CEMENT CORRUGATED ROOFING
Installation Standard: To AS/NZS 1562.2. 2.10 FIBRE CEMENT SHINGLE ROOFING Installation Standard: To AS 4597. Bottom course: Overhang 50 mm into eaves gutter. Verges: Overlap barge boards minimum 35 mm. 2.11 TIMBER SHINGLE AND SHAKES ROOFING Installation Timber shingles: To AS 4597. 2.12 SEAMED SHEET METAL ROOFING Plywood decking Installation: Lay the length of the sheets at right angles to the supports. Stagger the end joints and locate them centrally over framing members. If panels are not tongue and grooved provide noggings or trimmer joists to support the edges. Fixing, 300 mm centres to each support: - Timber: Adhesive and nail. - Steel: Metal coated self drilling/tapping screws with the heads finishing below the surface. Movement control joints: 12 mm gap at abutting building elements. Fabrication Off site: Basic trays. Minimum bending radius: 1.75 mm.
© NATSPEC (Jan 06 – Amdt Oct 07)
5
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
Fixing Fix pans to the deck with concealed clips at 250 mm maximum centres. Seams Roof pitch< 25°: Double standing seam. Walls and roof pitches > 25°: Roll cap seam. Method: Mechanically form and welt seal in situ using a self propelled seaming machine, to stand 25 mm high on completion. Dress seams flat at gutters, ridges and hips, and fold both pan and seam down into gutters and up to form stop ends at ridges and hips. Ridge and hip capping Lock welt to the upturn of the roofing. 2.13
ROOF PLUMBING
Jointing sheet metal rainwater goods Butt joints: Make joints over a backing strip of the same material. Soldered joints: Do not solder aluminium or aluminium/zinc-coated steel. Sealing: Seal fasteners and mechanically fastened joints. Fill the holes of blind rivets with silicone sealant. Jointing system: Stainless steel blind rivets with stainless steel mandrills Flashings Installation: Flash roof junctions, upstands, abutments and projections through the roof. Preform to required shapes where possible. Notch, scribe, flute or dress down as necessary to follow the profile of adjacent surfaces. Mitre angles and lap joints 150 mm in running lengths. Provide matching expansion joints at 6 m maximum intervals. Upstands: Flash projections above or through the roof with two part flashings, consisting of a base flashing and a cover flashing, with at least 100 mm vertical overlap. Provide for independent movement between the roof and the projection. Wall abutments: Provide overflashings where roofs abut walls, stepped to the roof slope in masonry and planked cladding, otherwise raking. - In masonry: Build into the full width of the outer leaf. Turn up within cavity, sloping inward across the cavity and fixed to or built in to the inner leaf at least 75 mm above. - In concrete: Turn 25 mm into joints or grooves, wedge at 200 mm centres with compatible material and point up. Fixing to masonry or concrete: Step in courses to the roof slope. Interleave with damp proof course, if any. Fixing to pipes: Solder, or seal with neutral cured silicone rubber and either of the following: - Secure with a clamping ring. - Provide a proprietary flexible clamping shoe with attached metal surround flashing. Gutters General: Prefabricate box gutters. Form stop ends, downpipe nozzles, bends and returns. Dress downpipe nozzles into outlets. Provide overflows to prevent back-flooding. Gutter and sump support: Provide framing and lining to support valley gutters, box gutters and sumps. Line the whole area under the gutters and sumps. Support: Proprietary metal adjustable strap and channel system. Valley gutters: Profile to suit the valley boarding. Turn back both edges 180 x 6 mm radius. Nail or screw to the valley boarding at the top end to prevent the gutter creeping downwards. Expansion joints: Provide expansion joints in guttering longer than 30 m: - Type: As detailed or proprietary elastic expanding adhesive fixed type Downpipes General: Prefabricate downpipes to the required section and shape where possible. Connect heads to gutter outlets and, if applicable, connect feet to rainwater drains. © NATSPEC (Jan 06 – Amdt Oct 07)
6
7 November 2020
0421 ROOFING – COMBINED
ENCLOSURE
Access cover: Provide a removable watertight access cover at the foot of each downpipe stack. Downpipe support: Provide supports and fixings for downpipes. Internal downpipes Jointing method: Caulked joint Access: Provide access openings as follows: - At each junction and bend. - At the foot of each stack. - At every second floor level. Sound insulation: Mineral fibre pipe insulation 50 mm thick, spirally bound on with 1.5 mm wire at 150 mm pitch. Building in: Where pipes are built into masonry or concrete, spiral wrap the pipe (and insulation, if any) with building paper. Rainwater disposal System: Rainwater pipe connected to stormwater drain 2.14 COMPLETION Warranties Submit the roofing materials manufacturer’s published product warranties. Maintenance manual On completion submit a manual of recommendations from the roof manufacturer or supplier for the maintenance of the roofing system including, frequency of inspection and recommended methods of access, inspection, cleaning, repair and replacement.
© NATSPEC (Jan 06 – Amdt Oct 07)
7
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
0451b WINDOWS AND GLAZED DOORS
1
GENERAL
1.1
AIMS
Responsibilities Conform to the Selections. Maintenance Product design: Provide windows with sashes capable of being opened to satisfy the documented maintenance requirements. 1.2
CROSS REFERENCES
General General: Conform to the General requirements worksection. Associated worksections Associated worksections: Conform to the following: AS 3959 and NATSPEC TECHnote DES 018 1.3
STANDARDS
General Selection and installation: To AS 2047. - Building classification: Class 1A Glazing Glass type and thickness: To AS 1288, where no glass type or thickness is nominated. Materials and installation: To AS 1288. Quality requirements for cut-to-size and processed glass: To AS/NZS 4667. Terminology for work on glass: To AS/NZS 4668. 1.4
INSPECTION
Notice Inspection: Give notice so that inspection may be made of the following: - Openings prepared to receive windows (where windows are to be installed in prepared openings). - Fabricated window assemblies at the factory ready for delivery to the site. - Fabricated window assemblies delivered to the site, before installation. - Commencement of window installation. 1.5
SUBMISSIONS
Samples Submit samples of window and door framing as follows: - Accessory and hardware items documented descriptively or by performance (i.e. not documented as proprietary items) including locks, latches, handles, catches, sash operators, anchor brackets and attachments, masonry anchors and weather seals (pile or extruded). - Colour samples of prefinished production material (e.g. anodised or organic coated extrusions and sheet) showing the limits of the range of variation in the selected colour. - Joints made by proposed techniques. - Sections proposed to be used for frames, sashes, louvres and slats. - Label each sample, giving the Series code reference and date of manufacture. Submit samples of glazing materials, each at least 200 x 200 mm, showing documented visual properties and the range of variation, if any, for each of the following types of glass or glazing plastics: - Tinted or coloured glass or glazing plastics. © NATSPEC (Jan 06 – Amdt Oct 07)
1
7 November 2020
ENCLOSURE
-
0451b WINDOWS AND GLAZED DOORS
Surface modified or surface coated glass. Patterned or obscured glass or glazing plastics. Ceramic coated glass. Wired glass. Mirror glass.
Shop drawings Submit shop drawings showing the following information: - Full size sections of members. - Hardware, fittings and accessories including fixing details. - Junctions and trim to adjoining surfaces. - Layout (sectional plan and elevation) of the window assembly. - Lubrication requirements. - Methods of assembly. - Methods of installation, including fixing, caulking and flashing. - Provision for vertical and horizontal expansion. - Method of glazing, including the following: . Rebate depth. . Edge restraint. . Clearances and tolerances. . Glazing gaskets and sealant beads. Certification: Submit an engineers’ certificate confirming compliance with AS 2047. Subcontractors General: Submit names and contact details of proposed manufacturers and installers. Have windows and glazed doors installed by their manufacturer or by a subcontractor recommended by the manufacturer. Type-test reports General: Submit type-test reports verifying conformance to AS 2047 and the Window and glazed door performance schedule as follows: - Fire resistance level: To AS 1530.4. - Weighted sound reduction index: To AS/NZS 1276.1 or AS/NZS ISO 717-1. Opacified glass General: Submit a statement by the manufacturer certifying that the proposed method of opacifying the glass will not be detrimental to the glass or detract in any way from the glass product warranty. 2
PRODUCTS
2.1
GENERAL
Standards Flashings: To AS/NZS 2904. Aluminium extrusions: To AS/NZS 1866. 2.2
GLASS
Glass types and quality Standard: To AS/NZS 4667. Glazing plastics General: Free from surface abrasions, and warranted by the manufacturer for 10 years against yellowing or other colour change, loss of strength and impact resistance, and general deterioration. Safety glasses Standard: To AS/NZS 2208. © NATSPEC (Jan 06 – Amdt Oct 07)
2
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
StandardsMark: Required. Type: Grade A when used in curtain walls. Heat soaking: Required for toughened glass in curtain walls. Ceramic coated glass Heat strengthened or toughened glass with a coloured ceramic coating fused to and made an integral part of the surface: To ASTM C1048, Condition B. Opacified glass Glass with an opacifier permanently bonded to the inner face. Unacceptable blemishes in heat-treated flat glass (including tinted and coated glass) Standard: To AS/NZS 4667. Insulating glass units (IGU’s) Selection and installation: To AS/NZS 4666. 2.3
GLAZING MATERIALS
General Glazing materials (including putty, glazing compounds, sealants, gaskets, glazing tapes, spacing strips, spacing tapes, spacers, setting blocks and compression wedges): Appropriate for the conditions of application and the required performance. Jointing materials Provide recommended jointing and pointing materials which are compatible with each other and with the contact surfaces and non staining to finished surfaces. Do not provide bituminous materials on absorbent surfaces. Priming Apply the recommended primer to the surfaces in contact with sealant materials. Movement joints Depth of elastomeric sealant: One half the joint width, or 6 mm, whichever is the greater. Foamed materials (in compressible fillers and backing rods): Closed-cell or impregnated types which do not absorb water. Bond breaking: Provide backing rods, and other back-up materials for sealants, which do not adhere to the sealant. 2.4
GLASS IDENTIFICATION
Safety glazing materials Identify each piece or panel, to AS 1288. Noise reducing glazed assemblies Label each panel with a legible non-permanent mark, self-destroying when removed, stating and certifying the Rw rating, and identifying the testing authority. Remove when directed. 2.5
LOUVRE WINDOW ASSEMBLIES
General Description: Provide louvre blades mounted in a metal surround frame or subframe and able to withstand the permissible-stress-design wind pressure for that location without failure or permanent distortion of members, and without blade flutter. Adjustable louvres Description: Provide louvre blades clipped into blade holders pivoted to stiles or coupling mullions, linked together in banks, each bank operated by an operating handle incorporating a latching device, or by a locking bar. 2.6
VENTILATING LOUVRE ASSEMBLIES
General Description: Provide metal louvre blades mounted in a metal surround frame or subframe and able to withstand the permissible-stress-design wind pressure for that location without failure or permanent distortion of members, and without blade flutter.
© NATSPEC (Jan 06 – Amdt Oct 07)
3
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
Expansion joints Provide for expansion and contraction in continuous sections (e.g. continuous louvres, interlocking mullions) at spacings not exceeding those recommended by the manufacturer, or 6 m, whichever is the lesser. Adjustable louvres Description: Provide louvre blades clipped into blade holders pivoted to stiles or coupling mullions, linked together in banks, each bank operated by an operating handle incorporating a latching device, or by a locking bar. Framed adjustable louvres Description: Provide louvre blades beaded into steel blade surround frames (sash) pivoted to pressed steel main frames, linked together in banks, each bank controlled by a proprietary sash operator. Fixed metal louvres Provide metal louvre blades mounted in a metal surround frame or subframe, installed as for metal window installations. Screens Provide metallic coated steel wire or UPVC mesh screens behind louvres to prevent the entry of vermin, birds, rodents and wind blown leaves and papers. 2.7
INSECT SCREENS
Aluminium framed screens Provide aluminium extruded or folded box frame sections with mesh fixing channel, mitred, staked and screwed at corners. Provide an extended frame section where necessary to adapt to window opening gear. - Mesh: Bead the mesh into the frame channel with a continuous resilient gasket, so that the mesh is taut and without distortion. Fixed screens Provide fixed screens to the window frames with a clipping device which permits removal for cleaning. Hinged screens Hinge at the top to give access to opening sash. Roll up screens Provide a proprietary retractable insect screen comprising aluminium frame with baked enamel finish, fibreglass mesh beaded into the frame, and a retraction system including tension spring, nylon bearings, positive self-locking device, and plastic sealing strip at sill. Sliding screens Provide a matching aluminium head guide, sill runner, and frame stile sections for screens not part of the window frame. - Hardware: Nylon slide runners and finger pull handle. Provide pile strip closers against sash where necessary to close gaps. 2.8
BUSHFIRE SCREENS AND SEALS
Requirement Protection: Protect glazed windows and doors from the ingress of embers. Standard: To AS 3959. 2.9
SECURITY WINDOW GRILLES
General Description: Provide proprietary metal security grille screens, or operable screen and frame, fixed to the building structure with tamper resistant fastenings. Security window grilles: To AS 5040. Installation: To AS 5039. 2.10 ALUMINIUM FRAME FINISHES Powder coatings Standard: To AS 3715. Grade: Architectural coating. © NATSPEC (Jan 06 – Amdt Oct 07)
4
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
Product: Bradnam Windows and Doors Signature 100mm Series Type: Fixed Casement Window Colour: Black 3
EXECUTION
3.1
GLASS PROCESSING
General Processing: Perform required processes on glass, including cutting, obscuring, silvering and bending. Form necessary holes, including for fixings, equipment, access holes and speaking holes. Process exposed glass edges to a finish not inferior to ground arrised. Glass processing schedule Glass element Location Type of process Finish 6mm
WN39
6mm
WN28
3.2
Acid Etched, Toughened Fixed in Series 466 Glass Window frame. With Shutter in front of window Toughened Glass Fixed in Series 466 Window frame. With Shutter in front of window
INSTALLATION
Glazing General: Install the glass so that: - Each piece is held firmly in place by permanent means which enable it to withstand the normal loadings and ambient conditions at its location without distortion or damage to glass and glazing materials. - Building movements are not transferred to the glass. - External glazing is watertight and airtight. Temporary marking: Use a method which does not harm the glass. Remove marking on completion. Toughened glass: Do not cut, work, or permanently mark after toughening. Use installation methods which prevent the glass making direct contact with metals or other non-resilient materials. Heat absorbing glass: In locations exposed to direct sunlight, provide wheel cut edges free from damage or blemishes, with minimum feather. Preglazing Window assemblies and glazed doors: Supply inclusive of glazing, shop preglazed. Site glazing External timber framed glazing: Glaze with putty. Windows and glazed doors General: Install windows and glazed doors so that the frames: - Are plumb, level, straight and true within acceptable building tolerances. - Are fixed or anchored to the building structure in conformance with the wind action loading requirements. - Will not carry any building loads, including loads caused by structural deflection or shortening. - Allow for thermal movement. Weatherproofing Flashing and weatherings: Install flashings, weather bars, drips, storm moulds, caulking and pointing so that water is prevented from penetrating the building between the window frame and the building structure under the prevailing service conditions, including normal structural movement of the building. © NATSPEC (Jan 06 – Amdt Oct 07)
5
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
Fixing Fasteners and fastener spacing: Conform to the recommendations of the manufacturer. Fasteners: Conceal fasteners. Packing: Pack behind fixing points with durable full width packing. Prepared masonry openings: If fixing of timber windows to prepared anchorages needs fastening from the frame face, sink the fastener heads below the surface and fill the sinking flush with a material compatible with the surface finish. Joints General: Make accurately fitted tight joints so that neither fasteners nor fixing devices such as pins, screws, adhesives and pressure indentations are visible on exposed surfaces. Sealants: If priming is recommended, prime surfaces in contact with jointing materials. Operation General: Ensure moving parts operate freely and smoothly, without binding or sticking, at correct tensions or operating forces and are lubricated. In situ touch up Polyester or fluoropolymer coatings: Contact supplier for approval to apply touch up products otherwise replace damaged material. Trim General: Provide mouldings, architraves, reveal linings, and other internal trim using materials and finishes matching the window frames. Install to make neat and clean junctions between frames and the adjoining building surfaces. 3.3
LOUVRE ASSEMBLIES
Installation General: Screw fix stiles and mullions to the building structure. Provide weather strips to heads and sills. Framed adjustable louvres Installation: Screw fix the main frame to the building structure with monel or stainless steel screws or masonry anchors of the type recommended by the louvre manufacturer. Metal louvres General: Provide metal louvre blades mounted in a metal surround frame or subframe, installed as for metal window installations. 3.4
COMPLETION
Trade clean Method: Clean with soft clean cloths and clean water, finishing with a clean squeegee. Do not use abrasive or alkaline materials. Extent: All frames and glass surfaces inside and out. Maintenance manual General: Submit the window and glazed door manufacturer’s published instructions for operation, care and maintenance. Warranty Window and door assemblies: - Form: Against failure of materials and execution under normal environment and use conditions. - Period: As offered by the manufacturer. - Powdercoating: As offered by the manufacturer for the selected finish. - Hardware: As offered by the manufacturer.
© NATSPEC (Jan 06 – Amdt Oct 07)
6
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
4
SELECTIONS
4.1
PERFORMANCE
Window and glazed door performance schedule Type Quality
Value/description
WN39 & WN28
5.71
U-value (thermal transmittance, W/m2°C) Solar heat gain coefficient (SHGC) Weighted sound reduction index, Rw Reflectance %
0.44 -
WERS Energy rating% – Heating 38% WERS Energy rating% – Cooling 38%
4.2
AWA Compliance Certificate
-
Water resistance, Pa
600
Fire resistance level, FRL
-
Bush fire protection
BAL40
Design wind pressure
4500Pa ULS
WINDOWS AND GLAZED DOORS
Window and glazed door construction schedule Type Description Value/description Glazing Product name
Proprietary suite
Signature Fixed Window 100 External Glazed Single Glazed -
Suite description
-
Toughened Glass
Hardware -
Generic description Fixed Casement Window Material Aluminium
4.3
Finish
Powder Coated
Insect screen: Material and finish Mesh type
None None
GLAZING
Annealed glasses schedule Generic term
Integral properties
Value/description
Colour
Glazing generally (i.e. if not otherwise shown or documented) Clear
Clear float, general quality
Body tinted float © NATSPEC (Jan 06 – Amdt Oct 07)
7
7 November 2020
ENCLOSURE
0451b WINDOWS AND GLAZED DOORS
Generic term
Integral properties
Value/description
Surface modified float
Colour
Clear and Acid Etched
Surface coated (reflective) float
% reflectance
-
Base glass
-
Base glass colour
-
Patterned, clear
Pattern
-
Patterned, body tinted
Pattern
-
Colour
-
Wired cast (clear)
Pattern
-
Wired cast (body tinted)
Pattern
-
Colour
-
Wired polished (clear) Wired polished (body tinted) Processed glasses schedule Generic term Obscured glass
© NATSPEC (Jan 06 – Amdt Oct 07)
Colour
-
Glass type (base glass) and other properties Type
Value/description
Process
Acid Etched
Texture
rough
8
Frosted glass
7 November 2020
INTERIOR
0573 EXTINGUISHERS AND BLANKETS
0573 EXTINGUISHERS AND BLANKETS
1
GENERAL
1.1
CROSS REFERENCES
General General: Conform to the General requirements worksection. 1.2
AUTHORISED PRODUCTS
General General: Provide equipment listed in the SSL ActivFire Register of Fire Protection Equipment. 2
PRODUCTS
2.1
EXTINGUISHERS
Standards General: Provide portable fire extinguishers and location signs as follows: - General requirements: AS/NZS 1841.1. - Water: AS/NZS 1841.2. - Wet chemical: AS/NZS 1841.3. - Foam: AS/NZS 1841.4. - Powder: AS/NZS 1841.5. - Carbon dioxide: AS/NZS 1841.6. - Non-rechargeable: To AS/NZS 1841.8. Selection and location: To AS 2444. StandardsMark: Required. Fire extinguishers schedule Designation FE1 FE2 Location
Kitchen (KT201)
Number
1
Unit type
Dry Powder
Classification and rating
Nozzle type
AS Rated 10A:40B:E Non-aerosol -
Maximum force to operate lever
-
Maximum force to frangible seal
-
Cabinet: - Type Security
Hung
Waterproof cover
-
© NATSPEC (Oct 07)
FE3
Safety pin
1
"[insert date]"
INTERIOR
2.2
0573 EXTINGUISHERS AND BLANKETS
BLANKETS
Fire blankets General: To AS/NZS 3504. StandardsMark: Required. Selection and location: To AS 2444. Fire blankets schedule Location Number
Size
Kitchen(KT201)
1.2x1.8 m
3
EXECUTION
3.1
COMPLETION
1
Maintenance Fire extinguishers: To AS 1851. Fire blankets: To AS 1851.
© NATSPEC (Oct 07)
2