Blue Valley Unified School District Overland Park, Kansas
Center for Advanced Professional Studies Facility Design Guidelines April 2008
table of contents
CAPS project overview purpose of facility design guidelines location blue valley school district introduction education and financial feasibility report project overview process project goals and ideas steering commitee workshop participants
1 2 4 5 8 34 35 41 44 45
project context sustainable strategies sustainable case studies local climate site analysis
47 51 60 64
planning concepts planning concepts technology concepts safety and security concepts flexibility and agility concepts
65 66 69 71
facility program overview of program format facility program building diagram site diagram 1 student learning strands 2 administration and staff spaces 3 community and stakeholder spaces 4 facility management and support spaces
74 75 81 82 83 121 139 146
appendix glossary planning planning planning planning planning
meeting meeting meeting meeting meeting
one presentations two presentations two - visual listening two - culture, experience, brand three presentation
i A1 A17 A26 A31 A40
April 2008 Š Perkins+Will
i
project overview
CAPS
purpose of facility design guidelines The Facility Design Guidelines document is a guide for architects, educators, administrators, parents, and community members that identifies instructional, technological, and space requirements for Blue Valley Center for Advanced Professional Studies. After the collaborative workshops, this document is produced to represent the process of long term facility analysis, design and construction. There will be opportunities for the information presented in these pages to be further refined with user input during the next steps of the process. The document is designed to: 1. Present an understanding of the basic philosophy and design parameters for Blue Valley Center for Advanced Professional Studies in Overland Park, Kansas. 2. Indicate spatial adjacencies and general performance requirements. 3. Identify programmatic needs and establish a base line for the scope of the project. 4. Present a snapshot in the development of the project process. 5. Serve as a working document that is compiled in a binder for ease in adding or replacing information as additional needs and changes occur. The document is not intended to: 1.
Limit design opportunities within the facility.
2.
Standardize the building via implementation of component parts.
Over the course of the design phases, deviations may be necessary that do not meet the requirements of this document and need to be discussed with the project leadership for waiver. As a guideline, an acceptable range of deviation from the areas indicated in the space program is 2-3% for spaces smaller than 2000 sf and 1-2% for larger spaces. Classrooms should not be smaller than areas indicated.
April 2008 Š Perkins+Will
2
2
project overview
CAPS
location
About Overland Park, Kansas Overland Park is located about 12 miles southwest of Kansas City. It’s current population of approximately 177,000, represents about 1/3 of Johsnson County’s population. It is the second largest city in Kansas, comprised of 75.33 square miles. (information from: http://www.opkansas.org)
April 2008 © Perkins+Will
3
3
project overview
CAPS
blue valley school district Blue Valley Mission Statement The Blue Valley School District’s mission is unprecedented academic success and unparalleled personal growth for every student.
Overview of Blue Valley School District The Blue Valley School District (USD 229) is committed to giving students an Education Beyond Expectations - an education filled with opportunities. This K-12 district encompasses 91 square miles in southeastern Johnson County, Kansas. More than 20,000 students attend Blue Valley’s 33 schools, and the district is committed to providing a personalized learning experience to every one of them. The district has five high schools (grades 9-12), eight middle schools (grades 6-8) and 20 elementary schools (grades K-5). Special programs include: Advanced Placement (AP) and other college credit courses K-12 enrichments programs Intervention programs for reading and math The Blue Valley Academy, a non-traditional program for high school students Mentoring programs, and ACCESS, a program teaching independent living skills for students with moderate to severe disabilities. The district’s Wilderness Science Center offers students of all ages hands-on environmental education in a 30-acre nature preserve adjoining an elementary school on the Blue River. The Blue Valley School District provides not only a high quality education based on the mission and strategic plan goals of unprecedented academic success and unparalleled personal growth for every student, but it also allows opportunities for students to grow outside the classroom as well through a variety of extra- and co-curricular activities. Blue Valley staff members are committed to helping students find their path to success. Together, we will enable each child to become more than he or she ever hoped to be.
(the above information is from http://www.bluevalleyk12.org/)
April 2008 © Perkins+Will
4
4
project overview
CAPS
introduction Project Introduction Blue Valley School District is preparing students to become citizens of a twenty-first century diverse and global society. The school district is planning a unique new facility with a 250 student capacity, 11th and12th grade Center for Advanced Professional Studies of approximately 66,000 gross square feet. In February through April of 2008, Perkins+Will, with NSP Architecture, facilitated a project programming phase. Collaborative workshops were held with a group comprised of administrators, teachers, board members and community members. Throughout the interactive meetings, the architects presented to the group and facilitated large and small group discussions. Concepts were developed by the participants during these planning meetings to create a program that will support the unique curriculum being developed. Perkins+Will and NSP Architecture are pleased to be working with Blue Valley School District in the programming of their new Center for Advanced Professional Studies. To provide a conceptual foundation for the architectural design phases, the following document incorporates concepts explored in the collaborative workshops and provides a guideline for flexible facility models to support and enhance the forward thinking educational ideas developed by Blue Valley School District and the community of Overland Park, Kansas.
April 2008 Š Perkins+Will
5
5
project overview
CAPS
why CAPS? The Blue Valley School District was unified in 1965. Since that time, the district has grown between 3 and 20 percent each year. The Blue Valley School District’s mission is unprecedented academic success and unparalleled personal growth for every student. • The Blue Valley School District encompasses 91 square miles in southeastern Johnson County. • The district is located in south Overland Park, KS, which was rated as the #1 suburb in the greater metropolitan Kansas City area by the Kansas City Star in November 2005. Facilities • In Newsweek’s Top U.S. Schools list for 2007, Blue Valley accounted for 4 of 6 Kansas high schools making the list • In the 2007 – 2008 school year our students earned the highest ACT score in district history (34) and the top score in the KC metro area (24.4). • For the sixth year in a row all Blue Valley Schools and the District made Academic Yearly Progress (AYP) as mandated by the No Child Left Behind legislation. To substantially improve the skills and ignite the interest level of high school graduates selecting life sciences research as a career path so they can be highly successful in contributing to this changing scientific field. Fewer graduating seniors are selecting the field of science as a career than were 20 years ago. While the field of science and research is increasing in the greater KC area, the graduates are not meeting the demand. In the recent issue of Business Facilities magazine, the nation’s premier site relocation resource, Kansas ranked in the Top 10 states in the nation in several key categories: •
4th in bioscience investments
•
5th in bioscience research funding
•
10th in education climate
•
13th in educated work force
•
And the highest concentration of employment in research, testing and medical laboratories
April 2008 © Perkins+Will
6
6
project overview
CAPS
what is CAPS? Innovation is what will grow our economy and ensure that every family prospers in an increasingly competitive global market. Our students must acquire 21st century skills to be successful in the "Innovation Generation." Blue Valley's Center for Advanced Professional Studies (CAPS) will inspire students to succeed in the critical areas of Bioscience, Business, Engineering and Human Services.
CAPS is an example of how industry and our educational system can work together to produce personalized learning experiences that prepare the next generation of professionals for 21st century opportunities. Junior and senior level students from all Blue Valley high schools will join together in a unique learning opportunity to deeply explore their interests in a profession-based learning approach. Learning is student driven; teachers facilitate the learning process through problem-based projects comprised of authentic and relevant work assignments.
Students learn the professional skills necessary to succeed in today's fast-paced world, all before entering college or other post-secondary educational opportunities. CAPS is all about students solving real problems, with real tools (used by real professionals), being mentored by real employers, leading to real contribution.
(the above information is from http://www.bluevalleyk12.org/)
April 2008 Š Perkins+Will
7
7
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
CENTER BASED PROGRAM EDUCATION AND FINANCIAL FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY AND ADMINISTRATIVE RECOMMENDATION During the summer of 2006, the Blue Valley Board of Education charged the superintendent to study the feasibility, both educationally and financially, of a program that would be targeted to provide unique student learning opportunities that currently do not exist in the school district. This charge was born out of the Strategic Plan’s commitment to investigate innovative programs that would aid in student achievement. From that original charge and the numerous focus groups, discussions, and committee meetings that followed, the idea of a Center Based Program (CBP) emerged and is presented in this report. The purpose of this report is to address the questions raised by the BOE in its charge to the superintendent, and to surface other issues that will need discussion and resolution prior to full implementation of the CBP. The report describes the process followed for identifying areas of study, as well as perceived needs and concerns of offering a CBP. Details of identified program strands, rationale for selection of those strands and feedback from staff, students and parents will be addressed later in the document. Two task forces led the research effort into a CBP. Dennis King led an educational task force (ETF) formed to review the curricular and interest area aspects of a CBP, as well as to develop a timeline for implementation. The ETF was comprised of district teachers from all curricular areas, as well as administrators and district coordinating teachers. A total of 37 people served on the committee. Once that committee finished its work regarding the curricular interest areas, Mike Slagle led an educational-business task force (BTF) to investigate the feasibility aspects of the CBP. The BTF was comprised of administration from the areas of human resources, business and finance, and planning and facilities. It is believed, based on the analysis of the ETF, that a CBP would provide the following benefits to Blue Valley students: x x x x x x x
increase opportunities to explore different interest paths prepare for lifelong learning increase options for non-college bound students provide authentic educational opportunities within the community allow for relevant and rigorous course of study within an interest area experience hands-on learning for all students integrate 21st century skills into the curricula
1
April 2008 Š Perkins+Will
8
8
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
Based on the analysis and discussion in this report, moving forward with a CBP is recommended. The CBP is recommended to be located in a free-standing building on the District Office Campus. It is recommended that the CBP consist of upper level (grades 11-12) courses in four interest areas – business, bio-science, human services and engineering. The CBP is recommended to be coordinated with entry level classes at the building level. Potential opportunities with the CBP include collaboration with professionals in the field, corporate collaboration, and career interest shadowing. A timeline for the opening of a CBP in the fall of 2010 is recommended, though with the opening of Blue Valley Southwest also scheduled for the fall of 2010, it is recommended that this issue be discussed further. Financial analysis suggests that the CBP can be operated by the district with little general operating fund impact on the system for the first two years. After that two year period, actual financial impact on the district will depend on program enrollment and level of corporate partnership/sponsorship.
2.0 CHARGE FROM THE BOARD OF EDUCATION AND WORK TO DATE As part of the Strategic Plan commitment to investigate innovative programs that would aid in student achievement, the Board of Education (BOE) charged the superintendent to develop a study around the concept of a Center Based Program (CBP). Specifically, the charge the BOE gave to the superintendent was: “By the end of January 2007, a preliminary report will be provided to the Board of Education regarding the interest on the part of students and parents in a school such as the Center Based Program. A final report, including administrative recommendations, will be provided to the Board of Education by April 1, 2007. The final report will include potential funding sources, potential corporate partners, cost, potential site, program initiatives/educational consideration and timeline for implementation.” In November 2006, the Strategic Plan Oversight Committee 1 recommended to the Board of Education that the district move forward with the exploration of a CBP. In December 2006, district administration presented the BOE with a preliminary report regarding the interest of students and parents in a school such as the Center Based Program. Twenty-five parent focus groups were facilitated by an outside consulting firm. Approximately half of the group included parents with no exposure to the district’s current, similar programs (such as BVTV and Health Careers). Parents with little or no exposure to these programs were cautiously apprehensive about the idea of a CBP, while parents who were familiar with the current programs were very supportive. The BOE gave its approval at the December workshop to continue with the exploration of a CBP. In December 2006, under the leadership of Dennis King, a second committee was formed to review the curricular and interest area aspects of a CBP, as well as to develop a timeline for implementation. This committee was comprised of district teachers from all 1 This committee has the role of reviewing many of the initiatives of the Strategic Plan prior to review at the BOE level. This committee includes two BOE members, the superintendent’s cabinet, and representatives from the BVNEA and Communications Department.
2
April 2008 © Perkins+Will
9
9
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
curricular areas, as well as administrators and district coordinating teachers. A total of 37 people served on the committee. Once that committee finished its work regarding the curricular interest areas, Mike Slagle led an effort to investigate the feasibility aspects of the CBP.
3.0 FORMAT OF THIS REPORT This report presents the work of various committees and workgroups throughout the past year. Section 4.1-7 presents the feasibility study of the CBP, organized around the central questions to which the BOE is seeking answers, as evidenced by its charge to the superintendent. Throughout committee discussions this past year on the CBP, several other issues were raised that at some point will need further dialogue and resolution. Those issues are presented in section 4.8.
4.0 FEASIBILITY STUDY The BOE has asked, by virtue of its charge, for information regarding the CBP. The information requested includes potential funding sources, potential corporate partners, cost, potential site, program initiatives and timeline for implementation. The purpose of this section is to provide information related to each of those topics.
4.1 Program Initiatives/Educational Considerations 4.1a Introduction The process followed for identifying areas of study as well as perceived needs and concerns offering a CBP is presented in section 4.1. A brief review of literature as well as brief descriptions of what high schools across the country are providing in this area for their learners is discussed. Details of identified program strands, rationale for selection of those strands and feedback from staff, students and parents is also presented.
4.1b Overview High school reform has long been a topic of study for educational researchers. Many are looking to find how schools can better prepare students for post-secondary education and entrance into the workforce. Much research has gone into identifying skills necessary to be successful in the 21st century. These “21st Century Skills” include digital age literacy, inventive thinking, effective communication and high productivity. North Central Regional Educational Laboratories suggests that schools embrace new designs for learning based on these 21st century skills in the context of rigorous academic content (Lemke 2003). These new designs come in many forms, but there are components that each have in common. First, authentic experiences for students are
3 April 2008 © Perkins+Will
10
10
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
necessary. Breaking Ranks II suggests connecting “real-life applications of knowledge and skills to help students link their education to their future” (2004). A second critical component for enhancing student learning is removing the artificial dividing line between curricular areas. Interdisciplinary learning allows students to infuse information from a wide variety of sources into their learning, evaluate the information, and synthesize it into a solution to a complex problem. Howard Gardner, renown for his multiple intelligences theory, gave the following reply when asked what the context of the substance of education should be: “…something which is a bit more eccentric: The necessity of being able to at least participate in interdisciplinary activity; That is, activity, which calls on you to bring together different sources of knowledge, to be able to synthesize them, judge them and so on” (Larsen 2002). Lastly, the idea of personalizing the learning experience for the student is important. Another suggestion from “Breaking Ranks II” requires the school to actively involve the student in his or her own learning (Lemke 2003). The challenge for schools is to effectively implement these general principles in the most effective method possible. It has been suggested that using workplace connections to structure learning experiences that contribute to the intellectual, social, academic, and career development of students will develop positive attitudes, knowledge, skills, insights, and habits (Lynch & Harnish, 1998). The advantages for the student reach beyond purely academic gains. Research indicates “that a career-focused secondary education experience facilitates adolescent identity achievement” enabling teenagers to develop a sense of purpose and identity that is beneficial (Allen, 1999). Breaking Ranks II also suggests taking advantage of learning opportunities which extend beyond the walls of the high school. Howard Gardner summed it up well when he stated the following: “Students will have had opportunities to develop more targeted skills-those literacy, numeracy, and scientific skills that will allow them to probe more deeply into the disciplines. Rather than learning these in a rote manner, however, they will have had the opportunity to engage in a number of apprenticeships, where they beheld the most developed versions of these skills being usefully deployed. They will have participated in projects in which they could themselves draw on and cultivate these skills” (Gardner 1991). It is that type of authentic, interest-based learning that the CBP is attempting to afford students in Blue Valley. 4.1c Goals and Objectives of the Center Based Programs (CBP) The broad goals of the CBP are to increase student achievement and personalize student learning. The following objectives have been developed for the CBP to achieve those goals:
4
April 2008 © Perkins+Will
11
11
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
1. Increase the rigor, relevance and relationships of each student in the CBP. 2. Provide authentic “hands-on” learning experiences for all students. 3. Integrate 21st Century learning skills into the curricula. 4. Challenge each student in a way which requires him to evaluate and synthesize information from a variety of disciplines to solve a problem. 5. Provide authentic, educational internships and mentoring within the community. 6. Promote enthusiasm for lifelong learning through student interests. The CBP will serve as an exemplar for high school reform nationwide, as well as within Blue Valley. 4.1d Process for Developing Program Strands In January, a task force comprised of educational professionals within the district was convened to assess the district and community’s needs and resources in order to make recommendations for areas of study that would be effective within a CBP. National programs were investigated to develop the types of programs that were available nationally as well as effective methods for implementing these programs. Although there are many different examples of interest-based programs, they generally fall into one of the following categories: magnet schools, magnet programs, academies or centers. The programs researched include the following: x
x
x
x
A magnet program in the Pinellas County School District was discussed. They have schools within the district that address the following interest areas: health science, advanced technology, criminal justice, performing arts, and 21st century learning. These magnet schools were built with specialized facilities to meet the unique needs of their programs. Glen Oaks High School in Canton, Ohio is an example of career academies which have been effectively integrated into their school. They have the following academies available for students to choose from: arts and communication, business and marketing, human services, engineering and industrial, health science, and environmental science. All students are in a career academy with individual academies functioning as small schools within the school. Milliard School District outside of Omaha, Nebraska is in the process of developing a center where students can receive their core education around an interest theme as well as specialized classes in their chosen area. The three broad themes in Milliard’s center are business and finance, health and hospitality service. The Olathe School District is a neighboring district which has used the concept of magnet programs to engage students in specialized learning. They have programs at their various high schools in aerospace
5
April 2008 © Perkins+Will
12
12
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
x
engineering, biotechnology, e-communication, geosciences and sports medicine. Montgomery County Schools in Rockville, Maryland, incorporates both academies as well as magnet programs within their district.
The task force outlined the benefits and concerns of all of these programs in relation to the characteristics of Blue Valley. In addition to the national models, local data was analyzed by the task force. They examined student career interest data from Johnson County Community College (JCCC) and American College Testing (ACT), as well as focus group data from Blue Valley parents and students. ACT data showed student interests in health sciences, business, social sciences, arts, engineering and science. Although responses were wideranging in district focus groups, the areas students listed most frequently were health care, business, education and journalism. The most comprehensive data set was from JCCC, which surveyed every Blue Valley senior. The following interest pathways were identified most often: human services, business, engineering, bioscience and arts. A more complete summary of data from these sources is in Appendix B. From the data available, the taskforce was able to develop several options for themes of study for the CBP. Those options were narrowed down in subsequent meetings after input was solicited from the educational staff of the high schools. A summary of the strengths and concerns produced by the educational staffs of the four high schools is listed in Appendix C. Community resources were then evaluated and different possibilities and philosophies for the CBP were discussed. Consensus was developed for the following themes by the taskforce: biosciences, business, engineering and human services. Minutes of individual meetings of the taskforce are included in Appendix A.
4.1e Local Basis for the Center Based Programs In Blue Valley, we share many of the same concerns as the nation for the education of our children. We have concerns about college readiness and the ability of our students to sustain their education once they are admitted into college. As the world changes, so do the skills that promote success, both educationally and professionally. Our desire is to stay ahead of the curve by preparing our students and implementing innovative programs which are founded in current research. The BOE established the charge, but feedback from parents, students and our community has solidified the vision. Feedback from various focus groups indicates that students want more relevance in their education as well as authentic and challenging work. They believe they are being adequately prepared for college, but maybe not for life. Some feel disengaged from their studies. Parents want positive connections for their students and the best preparation possible to enhance their students’ opportunities to be successful. Our community values education. Area businesses, as well as the Kauffman Foundation, have made
6
April 2008 Š Perkins+Will
13
13
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
commitments to support efforts to improve the skills of tomorrow’s workforce. They believe there is a need, yet see the potential for a bright future in the Kansas City area. It is believed that a CBP would provide the following benefits to Blue Valley students: x x x x x x x
increase opportunities to explore different interest paths prepare for lifelong learning increase options for non-college bound students provide authentic educational opportunities within the community allow for relevant and rigorous course of study within an interest area experience hands-on learning for all students integrate 21st century skills into the curricula
4.1f Strand Details and Program Philosophy At this juncture in the process, details have not been fully developed, but many exciting possibilities have been discussed. The opportunity for interdisciplinary work is nearly limitless. It has been conceptualized that a wide variety of foundational skills, including the ability to present, collaborate, problem-solve, and appropriately use technology, will be woven through the fabric of each of the themed programs. A graphic depicting this “tapestry” of skills integrated into the strands is in Appendix C. The opportunities are available to personalize a student’s learning in ways never before possible. While the skills and knowledge developed in a particular theme may be similar for two students, their experience while acquiring their learning can be tailored to suit the needs of each individual student. Student experiences, which may be different for each student, may include working in teams with students across themes. Although students may work on research in the biosciences, design projects in engineering and marketing in business, they may work together, interdependently, on a common project. Students would begin these unique experiences during their 11th or 12th grade years, after establishing a foundation in their home high school. This foundation, as well as continued learning at their home high school, would ensure a well-rounded education and a successful future. Examples of the articulation between the home high school courses and the CBP are provided in Appendix D. It is also possible that the CBP serves as a place where a student can take a single specialized class which may not be feasible to offer at the comprehensive high schools. Within each of the broad themes at the CBP, there are many opportunities for students to customize their learning. A student with an interest in biosciences may choose a healthrelated path, while another chooses biotechnology or genetic and molecular biology or bioscience research. Strands within the human services theme may include education, law, public safety, social services, or hospitality and culinary arts. Engineering strands could include computer engineering, mechanical & industrial engineering, chemical engineering or engineering design. Business opens the door to specializing in international business, marketing and advertising, business technology or
7
April 2008 © Perkins+Will
14
14
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
entrepreneurship. The idea is that the door is open to personalize the students’ learning in a way that increases their achievement.
4.1g Recommendations In an effort to increase student achievement and to personalize learning for our students, we believe that it is necessary to further investigate CBP in order to develop an exemplar for high school reform. Once developed, it is our belief that the CBP will allow for unprecedented success for its students.
4.2 Potential Costs Several potential costs were identified in the research phase of this project. Specifically, the following items as they relate to the CBP were discussed: certified staffing costs; classified staffing costs; building construction costs; on-going building costs; and administrative costs. Each of those items will be addressed individually.
4.2a Certified Staffing Costs The CBP is expected to serve approximately 250 students in the morning session and 250 students in the afternoon session. This results in a full-time equivalency (FTE) enrollment of 250 students. Because of the unique enrollment nature of special courses 2 , we anticipate low student-to-staff ratios in these CBP classrooms. We have made the assumption to base a certified staffing cost on 15 students per classroom, which equates to 17 FTE teaching positions at the CBP. Thus, projected certified staffing costs 3 for the CBP with a student enrollment of 250 FTE would be $1,105,000. The 17 FTE teaching positions would allow for 85 teaching sections 4 at the CBP.
4.2b Support Staffing Costs It is estimated that a CBP will need a nurse, custodial staff, at least a ½ time bookkeeper, and two office support personnel. The total annual estimated cost 5 for this staff is approximately $200,000. 2
Experience with our career technical education classes suggest that an assumption of 12 to 18 students per class is appropriate for cost estimates. We have used the midpoint of 15 students per class for the feasibility study. 3 This is estimated to be 250 FTE students divided by 15 students per class for a total need of 17 FTE teachers. Multiply 17 FTE teachers by a projected average teacher salary for 2010 of $65,000. 4 This is calculated by taking the 17 FTE teaching positions and multiplying that by 5, which is the number of teaching sections each teacher is involved in each day. 5 This is calculated by assuming an annual salary of $25,000 for custodial and office support persons, $65,000 for a nurse, and $35,000 for a bookkeeper. 8
April 2008 © Perkins+Will
15
15
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
4.2c Building construction The actual footprint and design of a building for the CBP will be determined at a later date. For now, cost estimates were arrived at by assuming construction costs on a 75,000 square foot, 25-classroom building on five acres with no cafeteria, auditorium or gym space. According to the Facilities and Operations Department, such a facility could be expected to cost between $16,000,000 and $18,000,000, depending on variables such as the number of highly specialized areas, the amount of equipment and technology, and the year the project is bid.
4.2d Building On-going Costs On-going costs include utilities and insurance. According to cost estimates from the Business and Finance Department on similarly sized facilities, on-going costs are estimated to be about $100,000 annually.
4.2e Administrative Costs The individual who would be charged with administering the CBP also may have significant other duties related to the CBP including, but not limited to fundraising, corporate contact and program development. Based on discussions with Human Resources about the administrative costs associated with a CBP, it is estimated that an annual cost of $100,000 would be appropriate for a qualified person capable of handling the above mentioned duties. 4.2f Discretionary Costs Every school is allotted a budget for discretionary costs for items such as staff development, supplies, materials and postage. Using the Blue Valley Academy as a guide, a cost of $45,000 per year is assumed for the CBP.
4.3 Potential Funding Sources
4.3a General Operating Funds The primary method of funding schools in Kansas is through the general operating fund. For every student, the state allocates a certain amount of money for education. For FY 2007, that amount is $4,316. This is a funding source that would be available to the CBP. However, using general operating funds for the CBP would require the district to make cuts or reductions in other areas to move money from those programs to the CBP. Making cuts in other areas for the CBP may be something the district may want to avoid as long as there are other funding sources available.
9
April 2008 Š Perkins+Will
16
16
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
4.3b New Facilities Weighting Money 6 Per current state finance law, school districts are eligible for state funding beyond the base amount, for students enrolled in a new facility. Such funding is calculated to be 25 percent of the FTE of the students enrolled at the new facility. In a simple illustration, if the base aid per pupil is $4,000 for every one FTE student enrolled at the CBP, an additional $1,000 per student would be generated from new facilities revenue. There is no direct tax impact to the residents of Blue Valley with this funding stream for years 1 and 2, as all monies under new facilities weighting come from the state7 . 4.3c Board of Tax Appeals (BOTA) Funding8 Per current state finance law, school districts which qualify 9 may appeal for the costs of operating a new facility that are above what the new facilities money would provide. For example, if the cost of operating a new program in a new facility was calculated to be $1,000,000, and the new facilities weighting money was able to provide $250,000, a school district could appeal for the additional $750,000 of costs. Such an appeal is heard by the BOTA review panel in Topeka. The district has done this in the past with all of the new facilities it has opened. There is a direct tax impact on the taxpayers of the district, as all funds raised in support of the BOTA revenue stream are raised via local property taxation.
4.3d Capital Outlay Per current state finance law, the district has the ability to raise local funds for capital construction projects. This fund cannot be used for operating expenditures. For example, capital outlay funds can be raised for the construction of a new facility, but not for the operation of the new facility. The current capital outlay authority that districts can work with is capped at eight mills of assessed value. There is a direct tax impact of the capital outlay funding source, as all monies are raised through property taxes. However, because school districts are capped at 8 mills, and the Blue Valley School District is 6
This weighting is allowed for costs associated with opening new school facilities. The weighting is determined by multiplying the enrollment in the new facility by a specified numerical factor (currently 0.25). In order to qualify for this weighting, the district must have utilized the full amount of its local option budget (LOB) authority authorized for the school year. The weighting is only available for the year in which facility operations are commenced and the following year. This weighting is capped to be 75% of year 2 cost in year 3, 50% of year 2 cost in year 4 and 25% of year 2 cost in year 5 of the facility. 7 After years 1 and 2, all new facilities revenue is generated from local property tax. 8 This weighting is allowed for additional costs incurred in staffing and operations in new facilities by rapidly growing districts that cannot be recovered from any other source. It is entirely raised locally and is obtained by an appeal to the State Board of Tax Appeals. 9 Qualification for BOTA funding includes school districts who meet the extraordinary growth criteria, which Blue Valley current does. This criterion includes school districts who have an enrollment increase of greater than 1,200 FTE students over the past three years, or that have an average three year increase of at least 6 percent in FTE enrollment. Blue Valley meets the first criteria. 10
April 2008 Š Perkins+Will
17
17
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
currently levying the full 8 mills, the CBP would be funded from existing authority which may limit the revenue for other capital projects during the same period.
4.3e Staff savings Because enrollment at the CBP will reduce the FTE enrollment at the sending high schools, there is an opportunity to offset some of the costs of operating the CBP by reducing staffing levels at the high schools. This is similar to what is currently being done at BV Academy. It is estimated that about 55 percent of the cost of staffing the CBP could be provided by the opportunity for staff savings at the sending high schools 10 .
4.3f Corporate Partnerships/Grants Because of the uniqueness of the CBP, it may be possible to gain monetary support from corporate organizations. Additionally, the district will want to pursue potential grant opportunities for support of the CBP. Work in this area will intensify if the BOE gives direction for staff to move forward with the development of a CBP.
10 This is calculated by taking the 250 student FTE from each the five high schools (5 x 50) at a rate of 18 FTE students per teacher (250/18 = 13.8 = rounded to 13). Assuming that a 1-to-1 staff reduction will likely not be possible, the assumption is made that a 10 FTE staff savings is actually realized. Given the need in the previous section for 17 FTE teachers at the CBP, a staff reduction of 10 FTE at the building level allows for a 58% (10/17) economic opportunity gain.
11
April 2008 Š Perkins+Will
18
18
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
4.4 Operational Feasibility Analysis Based on the costs and revenue streams described above, a feasibility plan for the operation of the CBP in the first four years of operation is presented. Year 1 $1,105,000 $200,000 $100,000 $100,000 $45,000 $1,550,000
Year 2 $1,279,200 $208,000 $104,000 $104,000 $46,800 $1,742,000
Year 3 $1,460,368 $216,320 $108,160 $108,160 $48,672 $1,941,680
Year 4 $1,648,782 $224,972 $112,486 $112,486 $50,618 $2,149,344
Primary Revenue Streams
BOTA NFW FTE Saving
BOTA NFW FTE Saving
Financial Impact on General Operating Revenues of District
Low
Low
75% BOTA 75% NFW FTE Saving GO Corp/Grant Moderate
50% BOTA 50% NFW FTE Saving GO Corp/Grant Moderate/High
Certified Staffing Cost Support Staffing Cost Building Ongoing Cost Administrative Cost Discretionary Cost Total Costs 11
4.5 Potential Site After discussions with planning staff, and after considering the situational relationships of other potential sites, it is recommended that if a CBP is pursued by the district, that the site for such a program be located on the current District Office Campus. Transportation links to the site are outstanding 12 , the site is centrally located in the district, and the district already owns the land, thereby saving on land purchase costs. Planning staff has indicated that a site plan, complete with parking and area for future CBP expansion, could be developed to incorporate a CBP into the environs of the current campus. 4.6 Potential Corporate Partners Because the curriculum and other details of offering instruction at the CBP has yet to be more fully determined, the identification of specific corporate partners can not be discussed in detail at this time. However, based on informal conversations with business and philanthropic organizations, there is great interest in the possibility of a CBP 11 An inflationary factor of 4% is added to each of the cost items beginning in year 2. Additionally, expansion of the CBP is anticipated in year 2, with 2 FTE staff members being added each year through year 4. This is done for illustrative purposes only, and does not necessarily presuppose that level of growth at the CBP in years 2, 3, and 4. 12 151st Street, Metcalf Avenue and Highway 69 would serve as major arterials for transportation to and from the site.
12
April 2008 Š Perkins+Will
19
19
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
in Blue Valley. Work in this area will intensify if the BOE gives direction for staff to move forward with the development of a CBP. 4.7 Timeline for Implementation A timeline for implementation has been prepared to allow the BOE to view what work has been completed and what work is left to develop a CBP. Items checked have been completed. Items with an open o have yet to be addressed. 9 9 9 9 9
July 2006 November 2006 December 2006 January 2007 April 2007
o Summer 2007 o Fall 2007 o Spring 2008 o Fall 2008 o o o o o
December 2008 Spring 2009 Summer 2009 Fall 2009 Fall 2010
Initial charge from BOE to explore possibility of CBP Strategic Plan Oversight Committee recommendation Develop advisory study teams Research career pathway programs Recommend 2-4 programs to BOE for fall 2008 Complete research on budget, sponsorship, site location, and timeline Curriculum development/training on initial pathways CBP facility design started CBP facility design completed/construction process begins Research additional pathways; report to BOE Implementation of initial career pathways at the high schools Study additional career pathways Recommend additional career pathways to BOE CBP construction continues Develop curriculum and training Implement additional pathways at the high schools Open CBP
4.8 Other Issues to Consider 4.8a Transportation In all likelihood, because students going to the CBP would be juniors and seniors, transportation to and from the CBP would be via student vehicle. Experience with similar programs suggests that upper level students do not avail themselves of school provided transportation when private transportation is possible.
4.8b Certification Issues The CBP will likely offer special classes that will require special expertise from a variety of areas. The district’s Human Resources Department is cognizant of the need for highly qualified individuals in the classroom, and that the development of coursework in a CBP will be coordinated with efforts to locate professionals with the proper certifications.
13
April 2008 Š Perkins+Will
20
20
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
4.8c What does this look like in the classroom? Relative to the above point is what will the CBP model look like in a classroom? As an answer, it may be possible for a teacher to have primary teaching responsibilities in a classroom, but for other professionals in certain fields, such as medicine or business, to teach certain sections of a class for brief period of time. This is a detail that has yet to be worked out as the CBP comes in to clearer focus, but the opportunities for such symbiotic relationships are exciting, and may provide our students with unique learning opportunities.
4.8d Tax Impact of BOTA The BOE will need to be cognizant of the tax impacts that may be necessary for support of the CBP. If one of the funding strategies is to support the CBP through BOTA appeal, a minor tax impact could be expected. This impact, coupled with the impact of a BOTA appeal for BV Southwest, may be an issue the BOE will want to consider. As of now, it is far too early for a projection of what those tax impacts may be. However, as a historical reference, when BV West opened, there was an approximate tax impact of 2 mills 13 .
4.8e State Finance Law A couple of significant areas discussed in this study are predicated on the belief that state finance law will be similar between now and 2010, when the CBP is scheduled to open. Any changes in school finance laws could change the feasibility of opening a CBP.
4.8f Impact on Elective Areas A common concern voiced by teachers during the research phase of this study is the impact the CBP may have on elective courses at the high schools. There is a possibility that implementing a new program in the district with additional elective offerings, such as the CBP, could affect enrollment in other elective areas. The Education Services Department is aware of this concern.
4.8g Timing With The Opening of BV Southwest It was noted throughout many of the discussions that opening the CBP the same year as opening BVSW may cause stress on the system. Activities such as the ability to handle construction coordination, supply and equipment ordering and the general 13
On a $250,000 home, the tax impact of 2 mills is $52.90 per year. 14
April 2008 Š Perkins+Will
21
21
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
activities that go into opening a new facility are stretched whenever a facility the size of a new high school opens. Opening an additional facility the same year as a new high school may serve to stress the system. Additional discussion is recommended to determine if 2010 is the most optimal time for the CBP to open.
4.8h Consistency among the High School Schedules Currently, all four high schools operate with a slightly different schedule. A CBP may require all schools operate from a common schedule, though this detail has not been completely explored and will require more discussion.
5.0 SUMMARY It is believed that a CBP would provide the following benefits to Blue Valley: x x x x x x x
increase opportunities to explore different interest paths prepare for lifelong learning increase options for non-college bound students provide authentic educational opportunities within the community allow for relevant and rigorous course of study within an interest area experience hands-on learning for all students integrate 21st century skills into the curricula
Based on the analysis and discussion in this report, moving forward with a CBP is recommended. The CBP is recommended to be located in a free-standing building on the District Office Campus. The CBP will house upper level (grades 11-12) courses in four interest areas – business, bio-science, human services and engineering. The CBP will be coordinated with entry level classes at the building level. Potential opportunities with the CBP include collaboration with professionals in the field, corporate collaboration and career interest shadowing. A timeline for the opening of a CBP in the fall of 2010 is recommended, though with the opening of Blue Valley Southwest also scheduled for the fall of 2010, it is recommended that this issue be discussed further. Financial analysis suggests that the CBP can be operated by the district with little impact on the system for the first two years. After that two year period, actual financial impact on the district will depend on program enrollment and level of corporate partnership.
6.0 ACKNOLWEDGEMENTS This report would not have been possible without the hard work and commitment of many individuals. The Blue Valley School District has outstanding people who are dedicated to improving student achievement. Their contributions and expertise to this report is gratefully acknowledged.
15
April 2008 Š Perkins+Will
22
22
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
Reference Page
Allen, A. (1999, May 18). Graduates of high school career magnets succeed at high rates [On line]. Available: http://vocserve.berkeley.edu/CW83/ExeSummary.html Breaking Ranks II: strategies for leading high school reform (2004). Reston, VA: National Association of secondary school principals. Gardner, H. (1991). The Unschooled Mind:How Children Think and How Sch. New York, NY: Basic Books. Larsen, S. (June 5, 2002). HG_Larsen. Retrieved March 26, 2007 from Project Zero. http://www.pz.harvard.edu/PIs/HG_Larsen.pdf. Lemke, C. (2003). enGauge 21st Century Skills. Retrieved March 26, 2007 from The Metiri Group/McREL. http://www.metiri.com/21/21%20Century%20Skills%20Final.doc. Lynch, R.L., & Harnish, D. (1998). Preparing pre-service teacher education students to use work-based strategies to improve instruction. In Contextual teaching and learning: Preparing teachers to enhance student success in the workplace and beyond (pp. 127158). Columbus, OH: ERIC Clearinghouse on Adult, Career, and Vocational Education, Center on Education and Training for Employment and Washington, DC: ERIC Clearinghouse on Teaching and Teacher Education, American Association of Colleges for Teacher Education
16 April 2008 Š Perkins+Will
23
23
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
APPENDIX A Process An initial committee charged with exploring the concept of Center Based Programs first met in July 2006. At that time, five primary tasks were identified including: gauging parent/student interest; determining the concept; investigating possible funding and costs; determining the location; and determining curriculum and college connections. The first task was gauging student and parent interest in a CBP. If there was no interest in a CBP on the part of the parent and student community, then the BOE needed to know that. To that end, twenty-five parent focus groups were facilitated by an outside consulting firm. Approximately half of the group included parents with no exposure to our current, similar programs (BVTV and Health Careers). Parents with little or no exposure to these programs were cautiously apprehensive about the idea of a CBP, while parents who were familiar with our current programs were very supportive. Students surveyed said they were very interested in the possibility of a CBP, as long as scheduling issues could be worked out. Students who were familiar with current similar offerings (BVTV and Heath Careers) commented that expanding course offerings in this manner would be good for students. In November 2006, the Strategic Plan Oversight Committee recommended to the Board of Education that we move forward with the exploration of a CBP. In December 2006, under the leadership of assistant superintendent Dennis King, a second committee was formed to review the curricular aspects of this type of program, as well as to develop a timeline. This committee was comprised of district teachers from all curricular areas, as well as administrators and district coordinating teachers. A total of 37 people served on the committee. At its initial meeting on January 11, the committee was presented with examples of other Center Based Programs from around the nation and was asked to comment on their interests and concerns. Examples of Center Based Programs in Rockville, MD., Millard, NE., Pinellas County, Florida, and Canton, Ohio were reviewed. Among other things, the committee was impressed with the variety of career choices made available to students, as well as the hands-on opportunities, the interdisciplinary coursework being taught and facilities provided by some of the districts. Some of the concerns raised at the meeting included: scheduling; early identification; staffing; cost; admission process; accessibility for all students; and process for students to change pathways. Other questions raised during this meeting included: x x x x x
Do larger numbers of students make it easier to execute the program? How can the program be managed to appeal to all levels of students? What do Blue Valley parents want in terms of structure? What would be the implementation process? How do you get the community involved?
17
April 2008 Š Perkins+Will
24
24
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
x x x x x
What are the long-term benefits? What grade levels would be allowed to participate? In order to fund this program, would other programs have to suffer? Once the core pathways have been established, can they be change? How will teachers adjust to “teaching out of the box?”
At the next meeting, held on January 31, the committee was charged with identifying six to eight programs to explore more in-depth. Information regarding student interest surveys, workforce needs, current programs and community resources was shared with the group. The committee was also provided with regional, state and national occupational outlook; career choice responses from the ACT for 2006 graduates; and a 2004 JCCC student interest survey. The committee narrowed the scope of the potential programs to the following: 1. 2. 3. 4. 5. 6.
Health Care Computer Technology/IT Networking Business/International Studies Engineering & Architecture Human Services (law, education and hospitality) Arts (graphic, communications, performing, visual, etc.)
A third meeting, held on February 20, presented the group with various pathway models to consider including an integrated model, specialization model, human services model, research and internship model and hybrid model. The group was charged with narrowing the selection to four pathways. After much discussion regarding strands and areas of interest, the following four pathways were selected: 1. 2. 3. 4.
Engineering Human Services Bio Science Business
Following the February 20 meeting and prior to the meeting on March 6, a group of committee members led by Dennis King visited each of the high schools during lunch to visit with classroom teachers and to gather their thoughts and concerns about the possibility of a Center Based Program. Some of the common themes that surfaced from these discussions include the following strengths and concerns: Strengths x Could offer courses not available at the regular high schools x Would facilitate positive interaction between schools and community businesses x Would encourage individualized learning x Would help keep students engaged x Would expose students to different career options x Could help provide specialized equipment that might not be accessible otherwise. 18
April 2008 © Perkins+Will
25
25
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
Concerns x Staffing x Funding x Transportation x Possible decrease in enrollment in high school elective courses x Might force kids to choose to specialize to early In addition to the four basic career pathways that have been identified (human services, engineering, bioscience and business), the following “strands,� which are interwoven through each of the pathways, have also been identified: communication and presentation skills; international perspectives; creativity and artistic skills; authentic projects; problem solving and research skills; digital literacy and technology integration; teamwork and collaboration; internships and job shadowing; curiosity and inventive thinking; ethics and environment; and analytical and evaluative thinking. These strands were woven into each of the pathways to effectively integrate the 21st century skills required to maximize academic achievement in the areas of digital-age literacy, inventive thinking, effective communication and high productivity. According to Partnership for 21st Century Skills, The No Child Left Behind Act of 2001, which reauthorizes the Elementary and Secondary Education Act of 1965, identifies the core subjects as English; reading or language arts; mathematics; science; foreign language; civics; government; economics; arts; history; and geography. Framework for 21st century learning suggests that several significant, emerging content areas are critical to success in communities and the workplaces. These content areas are typically not emphasized in schools today and include: global awareness; financial, economic business and entrepreneurial literacy; civic literacy; and health and wellness awareness. Additionally, in order for 21st century assessment to be effective, it must measure core subjects; content; learning and thinking skills; ICT literacy; and life skills. Assessment should not be left to standardized tests alone. During the March 6 meeting, the committee identified the following sub-fields for each of the four, designated career pathways. Bio-Science Health Science Biotechnology Research and Development Biomedical Engineering Agriculture, Food and Natural Resources Pharmaceuticals Animal Science Business Marketing, Sales and Services Business Management and Administration Hospitality and Tourism
19
April 2008 Š Perkins+Will
26
26
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
Business con’t Culinary Arts Finance International Business Information Technology Entrepreneurship Foreign Language and Culture
:
Human Services Law Public Safety and Security Govt. and Public Administration Education and Training Consumer Services Foreign Language and Culture Engineering Architecture and Design Engineering Technology Communication Systems Research and Development Mechanical Engineering Chemical Engineering Electrical Engineering Computer Engineering Environmental Engineering Bio-engineering Aerospace Engineering Civil Engineering
20 April 2008 Š Perkins+Will
27
27
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
APPENDIX B Student Interest Data Johnson County Community College Survey Summary 800
700
600
500
400
300
200
100
0 Human Services
Business
Engineering
BioSciences
Arts AV Tech
Military
Information Technology
Transportation
2006 ACT Data Summary Blue Valley Students Career Choice Response from ACT for 2006 Graduates Source: 2006 ACT Report
Undecided Visual & Performing Arts Trade & Industrial Social Sciences Sciences (Biological & Physical) Philosophy, Religion & Theology Mathematics Letters Human, Family & Consumer Sciences Health Sciences & Allied Health Fields Foreign Languages Engineering-Related Technologies Engineering Teacher Education Education Cross-Disciplinary Studies Computer & Information Sciences Community & Personal Services Communications & Comm. Technologies Marketing & Distribution Business & Office Business & Management Architecture & Environmental Design Agriculture Sciences & Technologies
0
20
40
60
80
100
120
140
21 April 2008 Š Perkins+Will
28
28
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
Student Focus Group Data Report There were 16 student focus groups. The total participants of the student focus group were approximately 330. Students were asked to note on an index card, what career, job or profession they were interested in, or what college major they were considering. The following is a list in chronological order of their choices. Health Care (most just wrote “health care”, but some were specific: physician, psychologist, nutritionist, nurse, physical therapist, dentist, pharmacist) Business (include accounting, marketing, advertising) Education Journalism/Writing Architecture Law Music/Production Broadcast/Film Arts Biosciences Interior/Fashion Design Veterinary Graphic Design Social sciences Engineering Culinary Sports Management Construction Science Cosmetology Pilot Auto mechanics Law Enforcement Wedding Planning
22 April 2008 © Perkins+Will
29
29
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
APPENDIX C Summary of Strengths and Concerns from Teacher Meetings
Common Concerns Staffing- Certification Funding Specializing and selection too early Elective decrease Elective / Enrollment in current classes Transportation issues Impact on activities and sports
Strengths Offer courses not available at individual schools. Interaction w/ community and business Individualizing learning Keep students engaged during HS (keep seniors in school) Exposure to career options Provide specialized equipment and facilities – available at individual schools.
Tracking Transportation / logistics
23 April 2008 Š Perkins+Will
30
30
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
APPENDIX D Tapestry of Integrated Skills
24 April 2008 Š Perkins+Will
31
31
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
APPENDIX E Examples of High School Course Articulation to the Center
25 April 2008 Š Perkins+Will
32
32
project overview
CAPS
education and financial feasibility report Center Based Program Education and Financial Feasibility Report
April 2008 Š Perkins+Will
33
33
project overview
CAPS
project overview Project Overview In April of 2008, Blue Valley School District completed the programming process for it’s new Center for Advanced Professional Studies, with a capacity of 250 students. at approximately 56,000 square feet. Over 35 administrators, teachers, community members and stakeholders participated in the collaborative planning meetings. Through these interactive meetings, the group developed the framework for a unique learning environment that will support engaged learning and multiple learning styles. Collaboration and innovation were major themes during the programming process. A major idea behind CAPS is to collaborate in a hands-on environment with professionals, peers and teachers in order to facilitate learning. This unique collaboration at a high school level, will lead to innovation. Therefore, it was important that an innovative facilitye support these ideas. Flexibility of all spaces was also major theme during the programming process, to allow for different uses for different needs and at different times of the day. Also, it was important to take into account flexibility of the entire facility to account for future unknown professions that the building might need to accomodate. By creatively thinking about scheduling and planning for flexibility of spaces, the workshop participants were able to successfully program the school to support the curriculum, students and learning facilitators of Blue Valley School District. Transparency is another important feature of the program. Linking the strands together is a centralized commons area, open to all the strands via an atrium space. Surrounding the atrium are informal student areas, as well as project areaas for small group work. These innovation project areas are visible from the atrium, so all strands are connected visually. Finally, the lab spaces themselves have a transparent connection to the project areas. Incorporating natural daylight via a transparent connection to the outside from all spaces is makes for a desirable learning environment. In the building diagram that was derived from the workshops, all strands face either north or south, the best and most easily controlled daylight. The centralized commons area maximizes daylight and views to the outdoors as well.
April 2008 Š Perkins+Will
34
34
project overview
CAPS
process The Programming Committees The first and initial committee that was formed was the Steering Committee. The Steering Committee was charged with project oversight and was directly involved with the Perkins+Will and NSP Architecture team in developing a calendar of programming workshop sessions, providing an understanding of critical project issues, project history, establishing the project goals and bringing together a workshop committee. The second committee that was formed was the Planning Committee. This was the group that participated in a series of planning meetings/charrettes designed to develop a facility program solution for the Center for Advanced Professional Studies and build consensus behind the solution. The Plannning Committee consisted of the administrators, board members, teachers, community members and stakeholders. Planning Committee operated by consensus, and served as project ambassadors who brought the meeting decisions to the larger school and community population.
April 2008 Š Perkins+Will
35
35
project overview
CAPS
process Programming Planning Meetings The programming planning participants were led through a series of meetings designed to develop a facility program solution and build community consensus. During the workshops, the participants explored planning models for CAPS that carefully evaluated educational goals, space requirements and relationships. Each meeting focused on articulating, through small and large group discussions, the facility goals as they relate to its educational mission. Initial presentations were made by Perkins+Will and NSP Architecture on various related topics followed by small group work sessions that allowed specific topics to be explored in greater detail (All presentations can be found in the appendix of this document). The smaller groups were then asked to present their findings back to the whole group for discussion and consensus.
February 29, 2008 • CAPS Report
April 4, 2008
April 18, 2008
TBD
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
• CAPS Planning • Program g Review & Diagrams
• Large and Small Group Discussions • Draft Conceptual Program • Program Review & Diagrams
Feb 22
• Site Analysis and Options p
• Site Diagrams
• Large and Small Group Discussions
• Large and Small Group Discussions
Meeting 3
Meeting 2
Meeting 1
• Review Building Diagram Options
March 29
7
April 14
21
28
4
11
18
April 2008 © Perkins+Will
36
36
project overview
CAPS
process Planning Meeting One - Looking to the Future The intention for this planning meeting was threefold. First, it gave all participants an opportunity to meet each other, understand the magnitude of this effort and its schedule, and appreciate that numerous voices need to be heard and accommodated to reach consensus. Secondly, this meeting was geared toward establishing a common vision, mission, and set of goals for the project. Thirdly, this meeting established the types of programmatic spaces that were desired, to allow Perkins+Will to generate a draft program for Planning Meeting Two. During the first workshop session, Superintendent, Dr. Tom Trigg, PhD. and Deputy Superintendent, Dr. Sue Dole, PhD., spoke to the group to summarize the history of events that lead to the process that the group was about to undertake and share the overall vision Blue Valley School District. Local industry professionals then presented trends in their careers, and how those trends might manifest themselves into a career pathway/strand system. Expanding on that topic, Perkins+Will illustrated current societal, workforce, economic trends and highlighted some of the challenges facing the U.S. today and how they might impact the design of career based educational facilities. Along with this, images of other sample projects and ideas were presented of other career based schools as well as professional environments. This enabled the participants to evaluate what other facilities around the country and internationally are doing as well as the direction of 21st century facility design. A large group discussion followed the presentations, to provide an opportunity for the group to react to issues and ideas presented. The participants were then asked to have small group discussions about what is currently happening in community businesses, what facilities, resources and organizations exist and what community business groups need to get engaged in the process. Then, the groups were asked to provide initial thoughts on the types of spaces that might be needed for the major strand areas and building amenities and support spaces. All workshops ended with a recap of the results of that meeting and a “look ahead� at the next steps and meeting dates. This process established the vision for the project, generated excitement, and provided the necessary launching pad for the subsequent work of the programming committee.
April 2008 Š Perkins+Will
37
37
project overview
CAPS
process Planning Meeting Two – Facility Space Programming The second planning meeting commenced with a brief review of the goals articulated during Planning Meeting One and a presentation of the agenda for Workshop Two. To determine the big ideas behind the CAPS facility, Eileen Jones of Perkins+Will introduced a “Visual Listening” exercise to determine the the groups response to images that portrayed various potential ideas for the CAPS model. The group placed dots on images they thought were relevant, and then explained why they chose that image. The purpose of the exercise was to discover qualities about the built environment, both visually and verbally, that might not easily be described in other ways. In other words, painting a picture of the future. (Details of this exercise can be found in the appendix of this document.)
At the meeting prior, the programming committee was asked to complete a homework assigment for this workshop. The homework focused on “Culture, Experience and Brand”. The pupose of the exercise was to discover the values that the space must portray or encourage, and begin to understand how the built environment can support these values. Each participant brought in an image or an object that answered questions about what they wanted the culture, experience and brand of CAPS to be. (Details of this exercise can be found in the appendix of this document.)
April 2008 © Perkins+Will
38
38
project overview
CAPS
process As a follow up to the visual exercises, Steve Turckes and Aimee Eckmann presented examples of innovative work environments to the group. The committee was then asked to react to the presentation and the morning activities to summarize the vision of the CAPS facility. Next, Aimee Eckmann presented ‘Bubble Diagramming 101’ and Workshop Participants were lead through a series of exercises to enable them to articulate space needs visually through diagrams and begin to indicate desired relationships between major building components and the individual spaces contained in those components. To begin to move the vision of the facility to a reality, Steve Turckes gave an introduction to the draft space program. This included describing the types of spaces to support the reseach/project based strands as well as all other support spaces in the facility. Small groups representing each strand reviewed the draft space program to determine if the right spaces were included, and their relationship to other spaces. Discussion included opportunities for sharing spaces, strategies for increasing usage and flexibility, verification of the types and quantity of spaces allocated, etc. It was during this time that the participants explored important issues that impacted the desired types of spaces and configuration, and bubble diagrams of the spatial relationships were produced. At the end of the day, the meeting participants reconvened into the large group, and presented back their ideas from their small group discussions. As a group, they articulated the common goals, desires and space needs for the project for the design team to gain a general understanding of the key programmatic components and relationships for the project. The Perkins+Will and NSP team left with enough information to prepare a more detailed draft program of spaces including how programmatic areas needed to relate to each other.
April 2008 © Perkins+Will
39
39
project overview
CAPS
process Workshop Three – Facility Space Program Refinement During the third planning meeting, Steve Turckes of Perkins+Will did a recap of planning meeting two and presented the final draft space program. The next presentation covered site analysis and site diagrams showing possible site layouts, overall building diagrams, and detailed diagrams of each strand and support spaces. After the presentation, the large group discussed initial thoughts on the diagrams. Then, the small groups met to discuss the detailed planning diagrams. They were charged with validating and challenging relationships between the spaces, possible improvements, opportunities for sharing space and the location of the spaces. Each of these groups, reported a summary of their discussion back to the large group. To conclude, the large group finalized their diagram preferences and the space program while reflecting on the importance of the programming committee’s effort and the unique facility that would come from it.
Building Diagram – Linear 2 Story Scheme
Building Diagram – Finger 2 Story Scheme
project/student area
toilets
bioscience 1st floor business 2nd floor
toilet
staff
stair
commons 1st floor human services 2nd floor
outdoor workspace pottential add dition
engineering 1st floor human services 2nd floor
receiving/ mech
admin 1st floor dist lobby mp room 2nd floor admin outdoor td workspace k
project/student area
admin 1st floor human services 2nd floor
engineering 1st floor human services 2nd floor
potential addition
lobby
toilets
outdoor td workspace k
Building Diagram – Atrium 2 Story Scheme
dist admin
coommons 1st flooor mp room 2nd flooor m
outdoor space
stair
stair
stair
bioscience 1st floor business 2nd floor
receiving/mech
Building Diagram – Atrium 3 Story Scheme
outdoor workspace
outdoor workspace stair
receiving/mech
dist admin outdoor space
stair
dist admin
bioscience 1st floor business 2nd floor
project/student area 2 story commons/ resource area project/student area
toilets
admin 1st floor mp room 2nd floor
engineering 1st floor human services 2nd floor
receiving/mech
potential t ti l addition
toilets stair
outdoor space
stair
lobby
project/ student area 3 story commons/ resource area
dist admin proj area 2ndd floor
potential addition
stair
stair
engineering 1st floor human services 2nd floor
human services 2nd floor
mp room 1st floor human services 2nd floor
admin 1st floor business 2nd floor
lobby
business 2nd floor
outdoor workspace
April 2008 © Perkins+Will
40
40
project overview
CAPS
project goals and ideas During the programming phase of the project, recurring goals and ideas helped to shape the development of the Facility Design Guidelines. These ideas are intended to carry forward, guiding the decision-making process during the design of the new high school:
Presentation space Reception area Outdoor learning space Organic, sensory experience Transparency T – outside t id
inside i id
Electronic media display Height/openness g p Cyber café/technology Collaboration
Symbol of strand Meeting space/resource area Flexibility Transparency Non-traditional N t diti l Inspirational Warm,, intimate Collaboration Fun! Team-building Unique
April 2008 © Perkins+Will
41
41
project overview
CAPS
project goals and ideas Open ceiling - expose building systems, teaching tool, flexibility Transparency Comfort helps with creativity Multi-level, unexpected Color, light, bright Different types of furniture Lighting defines spaces Place to relax A place where creativity happen Openness Outdoor seating, outdoor space
CAPS will have its own culture of 5 schools coming together, strands coming together Clients are the kids, capture different kinds of learners, attainable tt i bl b by everyone Students can personalize their learning One of the most innovative schools, creative, out-of the-bo Relevant learningg through g professional experiences Multiple-uses, flexibility
April 2008 © Perkins+Will
42
42
project overview
CAPS
project goals and ideas Spirit of innovation and discovery Interdisciplinary Collaborative, personalized The experience and how it is d li delivered d will ill make k it unique i Prepare students for a global society Professional Symbol for the future Community/professional involvement
April 2008 © Perkins+Will
43
43
project overview
CAPS
steering committee Blue Valley School District Dr. Tom Trigg, Superintendent Dr. Sue Dole, Deputy Superintendent – Education Services Verneda Edwards Executive Director – Curriculum & Instruction Donna Deeds, Executive Director - CAPS Dave Hill, Executive Director – Facilities & Operations Jeff Christian, Design and Construction Manager 15020 Metcalf Ave Overland Park, KS 66223 913.239.4000 phone 913.239.4150 fax www.bluevalleyk12schools.org Perkins+Will - Chicago Steven Turckes, Principal, AIA, LEED AP, REFP Jerry Johnson, Principal, AIA, LEED AP Eileen Jones, Principal, NCIDQ, LEED AP Aimee Eckmann, Associate, AIA, LEED AP 330 N. Wabash, Suite 3600 Chicago, IL 60611 312.755.0770 phone 312.755.0775 fax www.perkinswill.com NSP Architecture - Overland Park Gary Nevius, Principal, AIA Craig Serig, Principal, AIA 11011 Cody Street, Suite 175 Overland Park, KS 66210 913.317.6772 phone 913.469.0630 fax www.nsp-a.com
April 2008 © Perkins+Will
44
44
project overview
CAPS
programming committee Over 35 people participated in the collaborative programming workshops. The following pages list these participants: Affholder, Linda
DCT – Career & Technical Education
Bacon, Scott
Principal
Burns, Carter
Principal
Christian, Jeff
Design & Construction Manager
Deeds, Donna
Executive Director - CAPS
Dehart, Donna
Family & Consumer Science Teacher
Dole, Sue
Deputy Superintendent – Education Services
Eckmann, Aimee
Architect, Perkins+Will
Edwards, Verneda
Executive Director – Curriculum & Instruction
Feuerborn, Damon
Industrial Technology Teacher
French, Dan
Board of Education Member
Gold, Marilyn
Health Careers Teacher
Hanna, Al
Deputy Superintendent – Administrative Services
Hansen, Stacy
Administrative Assistant – Deputy Superintendent, Education Services
Hill, Dave
Executive Director – Facilities & Operations
Jones, Eileen
Branded Enviroments Principal, Perkins+Will
Kessler, Eric
Science Teacher
King, Dennis
Assistant Superintendent – School Improvement
Kokoruda, Russ
Executive Director – School Administration
Kreps, Angela
CEO & PresidentKansasBio
Lake, Tony
Principal
LaTerza, Perri
Career Pathways Coordinator
Matson, Sue
Board of Education Member
McBride, Diana
Business Teacher
McNerlin, Kristi
Communications Manager
Moore, Bob
Executive Director - Technology
continued on next page April 2008 © Perkins+Will
45
45
project overview
CAPS
programming committee Mosier, Mark
Art Teacher
Murphy, Amy
Principal
Nelson, Mike
Industrial Technology Teacher
Nevius, Gary
Architect, NSP Architecture
Robinson, Pam
Board of Education Member
Sutcliffe, Trevor
Computer Science Teacher
Trigg, Tom
Superintendent of Schools
Turckes, Steven
Architect, Perkins+Will
Willson, Brad
Administrative Intern
Woods, Julia
Director of Patient Care Services St. Lukes South
April 2008 Š Perkins+Will
46
46
project context
CAPS
sustainable strategies Demands for improved student performance, concerns about student health and a continuing need for costeffective facilities have focused attention on the integrated design approach known as green building. Integrating green building techniques into school design can result in a demonstrated improvement in student performance, increased teacher satisfaction, reduced operating costs and a healthier indoor environment. For the planet, green building offers the promise of dramatically lowered air pollution, improved surface water quality, and the preservation of habitat and natural resources for future generations. Green buildings do not necessarily cost more to design or build than conventional buildings. Sustainable design involves a range of choices that can be evaluated against the project criteria. Some strategies, like the use of recycled materials or native plant landscaping, cost the same or less than conventional choices, and can easily be incorporated. Other strategies, such as improved mechanical system efficiency, may involve higher capital costs, but will have significant long-term strategic or operational paybacks, and can be evaluated on that basis. This evaluation is known as life-cycle cost analysis. Taking sustainable design one-step further, facilities can double as a teaching tools. Students learn through their school about native plant life, the power of sunlight, and the efficiency of building systems. Sustainable design strategies such as—siting buildings with classrooms facing north and south to maximize energy efficiency and daylighting, using bioretension gardens (landscaping that minimizes stormwater runoff and provides natural filtration) and riparian buffers for storm water management, using natural ventilation, specifying recycled materials—are sensible design strategies. The following pages include strategies for sustainable design, benefits of sustainable design, and examples of projects that incorporate sustainable ideas.
April 2008 Š Perkins+Will
47
47
project context
CAPS
sustainable strategies Relevance of Sustainability “Sustainable design provides for the demands of today whilst protecting the ability of future generations to meet their own needs.� [Brundtland Report] A sustainable school not only embraces the concept of sustainability but is, in itself, a teaching tool for sustainability. Its design addresses the Triple Bottom Line, namely environmental impacts, social concerns and economic performance. Globally, buildings consume large amounts of resources and emit different types of pollution. It is very crucial that buildings are made sustainable so as to reduce the damage caused to the environment. The utilization of resources by buildings and the impact they generate is illustrated in the diagram below. Resource flow through typical buildings
INPUTS
OUTPUTS
Materials 50% of all global resources 70% of global timber
Social impacts
Energy 50% global energy [45% to operate 5% to construct]
Construction
Emissions to air, water and soil.
Use
Water 40% of water used globally
Land 60% of prime agricultural land lost to farming is used for building purposes
Investment & cash
Maintenance
Noise
Renovation Demolition
Waste
Financial returns
April 2008 Š Perkins+Will
48
48
project context
CAPS
sustainable strategies Buildings over their lifetime impact two main issues, environmental and socio-economic. Within a sustainable building these impacts will be reduced substantially. Environmental impact: Buildings impact the environment during construction, use and demolition. The major impacts are listed below:
Ozone depletion
Ecological loss
Fuel depletion
Land depletion
Climate Change
Waste
Water Depletion
Acid Rain
Socio-economic impact: There are many social and economic issues that are a by-product of the design of the built environment. Sustainable buildings will attempt to address these issues during the design stage. Socio-economic impacts include the following: 1.
Indoor air quality
2.
Student performance
3.
Visual and thermal comfort
4.
Ease of operation/maintenance
5.
Ecological literacy/building as a teaching tool
April 2008 Š Perkins+Will
49
49
project context
CAPS
sustainable strategies Additional socio-economic benefits of sustainable learning center design Higher Test Scores A recent study of some schools in California, Washington, and Colorado indicates a strong correlation between increased daylighting and improved student performance. For example, students in classrooms with the most daylighting progressed 20% faster on math tests and 26% faster on reading tests in one year than those in classrooms with the least amount of daylight. (See Daylighting Report on Office of Energy Website: www.energy.state.or.us/ school/highperform.htm) Increased Average Daily Attendance Improving indoor air quality by controlling sources of contaminants, providing adequate ventilation, and preventing moisture accumulation can reduce the number of sick days for students and teachers, especially those suffering from asthma or other respiratory problems. Reduced Operating Costs By using less energy and water than standard schools, overall operating costs can be reduced. School districts can save 20–40% on annual utility costs for new schools and 20–30% for renovated schools by applying high performance design concepts. Savings can be used to supplement other budgets, such as maintenance, computers, books etc. Increased Teacher Satisfaction and Retention High visual & thermal comfort, good acoustics, and fresh indoor air become positive factors in recruiting and retaining teachers and in increasing their overall satisfaction with work. A sustainable learning center design will follow an integrated design approach. This is summarized in the diagram below:
April 2008 Š Perkins+Will
50
50
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Woodward Academy Middle School Campus. Sustainable strategies provide outdoor environmental learning opportunities. Perkins + Will created a new middle school campus for 550 students at Woodward Academy in College Park, Georgia with a classroom building, dining hall and arts building enclosing a middle school quadrangle. The facility is LEED Certified-Silver for sustainable design. It is heated and cooled by a geothermal field of piping extending under the courtyard in front of the building. The building is oriented for north-south exposure maximizing energy efficiency. Many recyclable finish materials (i.e., linoleum and wood) were used. Storm water management strategies include bioretention gardens in the landscape design which clean the water and serve as detention facilities as well as the use of a green roof on the art building. The dining hall opens onto the quad with a tree covered patio to accommodate outdoor dining. All of the arts classrooms face north and have full glass walls to flood the space with natural light. Daylighting strategies such as building orientation and sunscreens reduce heat gain and glare while allowing natural light and reducing energy costs. The bioretention gardens lessen storm water to the municipal drainage system and also provide outdoor learning spaces for students.
April 2008 Š Perkins+Will
51
51
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Woodward Academy Middle School Campus College Park, GA Storm Water Management
To clean the rain water coming off building roofs and parking lots, Perkins+Will has designed bioretention gardens which collect the rain water from roof drains and pavement areas. These gardens are designed to hold water for a 24 hour period and allow it to slowly percolate through the soils where it is cleaned before returning to the natural stream system. The gardens are designed with plants which tolerate standing water well.
Sun Angles and Daylighting
When siting the building, Perkins+Will oriented classrooms with a north/south exposure for energy efficiency, minimizing heat gain from the hot west afternoon sun. On the south side of the building, sun screens and patterned glass are used to shade the direct overhead sun. Also taken into account wherever possible are the use of deciduous trees. These trees offer shade in the summer when the southern sun is high in the sky. In the winter when the trees loose their leaves, they allow the low winter sun to provide warmth in the building. All classrooms have natural daylight reducing the need for artificial lights in the building. Art rooms are located on the northern side of the facility where they get north light which is most consistent and glare free.
Conserving Natural Resources
To help reduce the draw down of finite resources and construction waste, recycled wood from the trees on site were used for the stairs in the middle school. lobby. Similarly brick and stone pavers from the existing middle school complex were reset in this middle school courtyard. Existing trees were also relocated and transplanted on site. April 2008 Š Perkins+Will
52
52
project context
CAPS
sustainable case studies
examples to be considered for Round Rock ISD High Schools
Woodward Academy Middle School Campus College Park, GA Geothermal Heating And Cooling
Geothermal heating and cooling has been used at all our projects at Woodward Academy. Water source heat pumps are supplied with water circulated through pipes in the ground. Since the earth remains at a fairly constant temperature, less energy is needed to warm or cool the water which is used to condition the space, hence saving considerable energy. A geothermal system also reduces the need for mechanical equipment and mechanical space in the building, thus saving square footage.
Green Roofs
Green roofs provide a means for storm water management and provide insulation for buildings. Roof plantings collect rain water reducing the need for on site detention. They also can provide learning environments for students.
April 2008 Š Perkins+Will
53
53
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Hector Garcia Middle School. Building planning responds naturally to the surrounding environment and climate. Hector Garcia Middle School, one of three new middle schools in Dallas Independent School District’s 2002 Bond Program, provides a broad selection of learning opportunities and services planned to meet the developmental needs of the whole child. The building’s layout nurtures social and academic development in a safe and secure environment. Supporting the neighborhood and community beyond school hours, the building is zoned to allow public access to the gymnasium, library, and performing arts areas. The site location provided the opportunity to create a neighborhood and community asset. The North Oak Cliff neighborhood is a vital area within the city and offers many opportunities for synergy relationships with the new middle school. Downtown amenities, city parks, and the Dallas Zoo with a dart rail stop are located near the school site. The school’s planning responds naturally to the site’s climate. North facing classrooms offer stunning views to the skyline, take advantage of indirect north light for optimal daylighting, and minimize cooling demand by facing classrooms away from Texas’ harsh sun exposure. Grouping general sciences and classrooms along one exposure also allows a similar temperature demand for similar academic spaces. The building’s exposure to the east and west sun are minimized to further assist with cooling demand. The south façade is planned to buffer to the southern sun. Program spaces organized to the south require minimal natural light and are situated with the ability to control the southern exposure. Large volume and shared instructional spaces are located toward the south, allowing a direct connection to the school’s outdoor play areas. As specified in the school’s program, art rooms are located with exterior access, allowing the opportunity for creating outdoor art projects and display.
April 2008 © Perkins+Will
54
54
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Central Middle School. The school's landscape design acts as a demonstration of sustainability principles making it a symbol of the school's relationship with the wider surrounding environment. The new Central Middle School is a replacement facility for a 100-year old school located on the same site in Columbus, Indiana's architecturally significant downtown district. Designed to serve 900 students in grades 6 through 8, the school demonstrates Bartholomew Consolidated School Corporation’s commitment to a middle school educational model. Perkins+Will incorporated several sustainable features into the school's design. The classroom areas are designed to incorporate the optimal amount of daylighting opportunities. Immeasurable positive qualities are gained in the learning spaces through the effective daylight manipulation. Daylight harvesting became a major form generator for the building. Extensive studies were conducted to ensure that the natural light would be reflected and bounce further into the spaces, greatly reducing the amount of artificial lighting required. The school is oriented in order to take advantage of the prevailing winds. The wind forces are harvested to naturally ventilate and cool the interior spaces. Wind towers on the roof were coordinated to exhaust air from the inside of the building while louvers allow natural air to circulate and replace the exhausted air. The landscape design consists of outdoor classrooms, a typical recreational landscape, and an outdoor ecology laboratory. These components were designed with recycled and low embodied energy materials creating a "learning landscape" for the students.
April 2008 Š Perkins+Will
55
55
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Blue Valley Southwest High School. The District's fifth high school strives to become LEED® Certified - Silver for sustainable design. Located in Overland Park, Kansas, a southern suburb of Kansas City, Blue Valley Unified School District 229 serves over 20,000 students in grades Pre-K to 12. In the fall of 2006, Perkins+Will with HTK Architects and NSP Architects facilitated a series of participatory workshops resulting in a facility program statement for the District’s fifth High School to be ready for the 2010/2011 academic year. The purpose of the programming and planning process, and the resulting space program, was to translate the educational goals and objectives of Blue Valley Schools into a flexible teaching and learning environment. The exciting new 300,000 square-foot, 9th through 12th grade comprehensive high school will provide spaces and functional relationships that reflect and support the curricular, instructional, and developmental needs of the district’s students both now and well into the future. Some sustainable strategies that will be incorporated to gain LEED Silver Certification include a courtyard to provide a safe outdoor learning space, maximizing natural daylight throughout the building, a displacement ventilation mechanical system, bioswales, and using limestone found on the site as a building material.
April 2008 © Perkins+Will
56
56
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Alpharetta High School Alpharetta, Georgia
Stretching across a ridge in the foothills of the north Georgia Mountains, Alpharetta High School is a jewel of academic design excellence. In addressing a concern for the impersonal culture of large schools, Alpharetta High School is designed to support a “school within a school” concept. The 1,850 student school population is divided between three classroom wings (or “houses”), where each wing is served by a core group of teachers. This smaller community, sharing the resources and benefits of a larger high school, allows faculty to personally know and guide the same group of students for their entire high school career. Students leave their houses for athletics, art, music and career technology classes, and may switch houses for some language and science courses. However, the classroom wings were designed with the flexibility to support a variety of other organizational models as well. The classroom wings open to a linear spine connecting the building’s shared facilities: the media center, cafeteria, career tech components, arts and athletic facilities. In response to the client’s desire for a campus atmosphere, the arts and athletic facilities are located in separate buildings near the front door to facilitate public access during and after school hours. Sustainable design is an essential part of Perkins+Will’s design philosophy, thus every effort was made to be environmentally responsible at Alpharetta High School. Nearly all instructional areas receive natural daylight, building materials include recycled content and trees removed from the site were harvested through timber companies. In an effort to limit impact on the Big Creek basin and surrounding neighbors, site storm water is controlled through a series of shallow rain gardens intended to help clean storm water run-off from the building and parking lots and rehydrate the water table prior to leaving the site.
April 2008 © Perkins+Will
57
57
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Blythewood High School
Richland School District Two Columbia, South Carolina
Blythewood High School. New high school emphasizes a flexible, learner-centered facility designed to serve both the student population and the community-atlarge. Facility Guidelines were created for Blythewood High School through a collaborative, participatory process with the school district community. The guidelines put emphasis on the school being a flexible, learner-centered facility designed to serve both the student population and the community. The building is broadly organized into academic and arts/wellness areas, connected by a cluster of central community spaces. The academic areas contain classroom space for both core and specialty curriculum, including science and vocational technology labs. The core classrooms are clustered into four student academic houses, each supported by its own grouping of satellite administration, resource, and breakout areas. The house concept reinforces smaller groups of students and encourages stronger student/staff interaction. The central community spaces include the media center, commons/cafeteria, and cyber cafe; all located at the heart of the school near the main lobby making them easily accessible for daily student use as well as after-school, evening, or weekend events. The central administration and student activities center are also located here enabling school administrators to efficiently supervise student activity and ensure safety. Beyond the central community spaces are arts and wellness areas that include a 500-seat auditorium, music/art/drama classrooms, a 2,000-seat basketball gymnasium, auxiliary gym and locker rooms. The school’s 140-acre site is geographically rich, with natural amenities such as a 10-acre lake, wetlands, and densely wooded areas. Facilities on the site include a 6,000-seat football stadium and play fields for baseball, football, softball, tennis, and track & field. Every element of the facility was carefully sited to preserve as much of the existing forest and wetlands as possible, while taking advantage of the views across the lake, the topography, the prevailing wind and solar orientations, and natural interactive opportunities afforded by the unique location.
April 2008 Š Perkins+Will
58
58
project context
CAPS
sustainable case studies
examples to be considered for Blue Valley Center for Advanced Professional Studies
Mint Hill Middle School Charlotte-Mecklenburg Schools
Mint Hill, North Carolina
Mint Hill Middle School. Learning communities for each grade and natural lighting for classrooms. Phase I of this 64-acre suburban site accommodates a new middle school fronting Idlewild Road in the town of Mint Hill. An elementary school will share the site in the next phase. The program total square footage for the 1200-student middle school is 152,143 square feet. The site was master planned to accommodate the future elementary school, parking, service, and playfield requirements. Drawing on the suburban nature of the site, a spacious oval lawn connects the two schools. Bus and automobile parking surfaces will be shared between them, preserving green spaces for school activities. The school's “finger-plan” design is organized around three daylighted grade houses for grades 6-8. A major daylighted circulation corridor, or “street,” connects the grade houses to the shared spaces of the program. The design takes full advantage of natural daylighting techniques via clerestory windows and lightshelves at the window wall. This strategy provides superior lighting for the individual classrooms as well as the shared common areas in each grade house. April 2008 © Perkins+Will
59
59
project context
CAPS
local climate To design a sustainable school building it is crucial to understand the local environment, the climate and analyze the temperatures, humidity levels, available daylight etc. Data for the Overland Park area is provided below.
Degrees (F)
Temperature 100 Max. °F 90 Ave. °F 80 73 Min. °F 70 64 60 54.5 50 42.6 40 31.3 30 25.7 20 10 (0information from: http://www.worldclimate.com/) Jan
Feb
Mar
Apr
May
78.4
76.1 67.5 56.5 43 30.6
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Heating and cooling degree days • Heating degree day: The cumulative number of degrees in a month by which the mean temperature falls below 65°F. • Cooling degree day: The cumulative number of degrees in a month by which the mean temperature is above 65°F. 1200 0
Degrees (F)
1000
1073
1217
800
945 657
600 689
0
0 Jan
Feb
0 Mar
9 Apr
349
252
324
200
279
418
400 106 135
0
5 May
5
Jun
Jul
130 56 Aug
18 Sep
0 Oct
0 Nov
Dec ,
(information from: http://www.worldclimate.com) April 2008 © Perkins+Will
60
60
project context
CAPS
local climate Wind Rose Diagrams The wind in the Overland Park area is predominately from the south in the summer and predominately from the north and south in the winter months.
April 2008 Š Perkins+Will
61
61
project context
CAPS
local climate
seasonal conditions and response Spring
In the Overland Park area, the spring season is a mild time of year with more precipitation than any of the other seasons. Average springtime temperatures range from the low 40°s to the low 80°s Farenheit. Wind is predominantly from the south. Response to climate: • Heating is not typically required; internal heat gain from electric lights and people can increase the internal temperature bringing internal temperature within the comfort range on cooler days • Controlled natural ventilation can be provided during early to mid spring to provide a comfortable internal environment • Mechanical cooling may be required for some of spring • Building may utilize shading from the high south and low east & west sun to avoid overheating • Horizontal sun shading devices placed externally are recommended Summer The summer season is a hot and humid time of year. Average summertime temperatures range from average highs in the mid to upper 80’s to average lows in the 60’s (degrees Fahrenheit). Wind is predominantly from the south. Response to climate: • Mechanical cooling will be required for most of the summer • Building may utilize shading from the high south and low east & west sun to avoid overheating • Horizontal sun shading devices placed externally are recommended Autumn From the late September into early November, the average temperature ranges from mid 40°s to high 70°s Farenheit. Wind direction is predominantly from the north and south. Autumn has almost as much precipitation as spring. Response to climate: • Controlled natural ventilation can be provided during most of autumn to achieve daytime comfort cooling • Internal heat gain from electric lights and people can increase the internal temperature bringing internal temperature within the comfort range on cooler days
April 2008 © Perkins+Will
62
62
project context
CAPS
local climate
seasonal conditions and response Winter
During the winter, daily average temperatures range from mid 20°s to 30°s Farenheit. Wind is predominantly from the northwest direction. Response to climate: • Active heating is required • Building enclosure system should be well insulated. • Maximize passive solar heat gains from the low sun along the south facade. • Building may maximize protection from the cold southern/northern winds through its orientation and through utilization of coniferous vegetation.
April 2008 © Perkins+Will
63
63
project context
CAPS
site analysis
West 149th Terrace
Predominant Winter Winds
High Point 1010
Summer Sun Martyy Street
In Line Detention Setback
Winter Sun
Low Point 995
Predominant Summer Winds
Low Point 985
West 151st Street
April 2008 Š Perkins+Will
64
64
planning concepts
CAPS
planning concepts Key areas that are experiencing dramatic changes in educational facilities are technology, safety and security, and flexibility in the performance of spaces. The space concepts included within this document are planned to accommodate spatial relationships necessary to support a contemporary educational facility. To further strengthen these relationships, planning concepts have been provided to offer guidance in the planning, design and decision making process for Blue Valley Center for Advanced Professional Studies.
April 2008 Š Perkins+Will
65
planning concepts
CAPS
technology concepts Technology is a key element in the creation of a contemporary high school. Just as technology is reshaping other institutions, it offers the high school exciting new ways not only to meet student and community needs but also to manage facility operations. Technology’s impact on the instructional environment should be reflected in the design of the facilities by accommodating technology infrastructure systems that account for advancements in both wired and wireless technologies. New technology and interactive tools supporting collaborative activities over the internet are impacting facility power and data requirements. As educators, teachers, and students are developing new internet resources, facilities must be prepared to accommodate instant access to the internet. To accommodate this growing use of technology, each and every space–not just classrooms–in the new facility should be considered a potential learning environment. Access to areas of technology concentration for after hours use by students and community should also be a consideration in planning the campus. New technology implies the need for comprehensive staff development programs, student access to technology applications, home-to-school access, technical support personnel, and a “positive” security system that encourages use and protects the learning center’s investment in technological tools. Other opportunities include provisions within the building for students to serve as informal “teachers” of technology. These spaces foster better student/teacher relationships while taking advantage of the student’s knowledge of technology. Informal spaces–even exterior spaces–should also be equipped with the potential for network connections and support impromptu learning opportunities. As the facility is designed, it will be important for the design team to coordinate with Blue Valley’s Executive Director, working closely to identify facility design opportunities that support the use of instructional technologies. Examples of areas to discuss with the Executive Director are: access to power and data, controllable light levels, spaces equipped for independent and/or self directed instruction, and mechanical systems that will accommodate a potential heat gain from increased number of sources (computers, monitors, etc.). To further the idea that the entire facility is a learning environment, the design of the building should also allow the possibility for digital expression, both audio & digital. While it is customary for classrooms to have a large format monitor, TV (not recommended), interactive white board or LCD projector, other opportunities include monitors or projection capabilities in conference rooms, informal student spaces, the cafeteria/multi-purpose room/gymnasium, and public lobbies. The challenge with integrating instructional technologies into the design of an educational facility is directly linked to the magnitude of technological changes likely to occur over the next 25 years. Blue Valley Schools will successfully meet this challenge by acknowledging the many possibilities of technology and providing an agile infrastructure to accommodate them.
April 2008 © Perkins+Will
66
planning concepts
CAPS
technology concepts Blue Valley School District is considering forward-looking technology strategies for implementation in the initial stages of the programming process. As the process moves into detailed design, additional detail and verification needs to occur with the administrators, educators, community stakeholders and the Executive Director to assure technology is up-to-date at the time of implementation. While meetings with the Executive Director are needed to further define the district’s direction for technology, the below assumptions were made for the programming phase. Over the course of the design phases, deviations that do not meet the requirements defined below should be discussed with the Executive Director and other project leadership. The Center for Advanced Professional Studies is planning a wired and wireless network to support a variety of connectivity needs. The network will contain a local data network, an intranet for use by students and faculty, and accessibility to the internet from any space on campus. The system should also provide the flexibility to transmit television or cable information via the digital network. Wired connections are envisioned for uses that need fast access to large amounts of data, for example multi-media and video functions. Wireless connections are envisioned to allow general connections to large amounts of users, for example a general classroom receiving instruction. Wireless technology also provides flexibility for mobile users and provides greater opportunities for formal and informal teaching and learning in spaces outside of the classroom, including the library, cafeteria/multi-purpose room, gymnasium, and other indoor and outdoor spaces. Presentation should be a critical component to the technology plan at the The Center for Advanced Professional Studies. Spaces should be planned for digital projectors to allow images to be large enough for meaningful presentation of videos and images. Sound systems in learning spaces should also be planned for multi-media functions. Network connections for cameras will allow classrooms and other spaces to broadcast, receive, and participate in educational activities around the district’s campuses, the region, and the world. To provide flexibility in room assignments, all classrooms are planned to have similar technology features. Wired network connections as well as wireless connections are planned for each classroom. The individual labs are planned to accommodate ceiling mounted projectors and a phone for inter-campus communication, with additional provision for their respective functions. In planning the technology systems at The Center for Advanced Professional Studies, constant attention should be given towards flexibility to accommodate a variety of interactive activities as well as the agility to accommodate rapidly changing equipment and performance requirements.
April 2008 Š Perkins+Will
67
planning concepts
CAPS
technology concepts Technology mixed with other activities Technology is only one aspect of projects and research for interdisciplinary curriculums. At the International School of Beijing, technology is integrated with other activities such as conference space, books, copy machines allowing the opportunity for self directed learning and working with project teams. Arrangements like this photo also allow students to multi-task: research, read, discuss, work, and meet with others. At Blythewood High School in South Carolina, seen in the photo to the right, students spend time in a “cyber-cafe� that is located adjacent to the library. It is a common area in which the students can access the internet, read, eat, drink, or just hang out, much like what is offered at many contemporary bookstores.
Technology is getting smaller Students can use palm devices, smart phones or laptop computers that provide access to information in remote locations, or perhaps more importantly, in locations where they are working on instructional projects. Although technology is getting smaller and access is becoming remote, power is still an issue as devices need to be charged or plugged into the electric system.
Access to a variety of technology At this public school in Aurora, Illinois students work in project teams. The students at the table in the foreground are working together on a presentation and viewing their collective efforts on the wall via a projection device. Other students in the room are working individually with the teacher serving as a guide. Interactive electronic whiteboards, as seen in this classroom, can engage students through energized presentations and active learning. The touch-senstive display is connected to a computer and a digital projector. Teachers or students can use interactive programs and write digital notes on the electronic whiteboard which can be saved, printed or e-mailed. April 2008 Š Perkins+Will
68
planning concepts
CAPS
safety and security concepts The successful creation of a safe and secure learning environment depends on the integration of “active” and “passive” design strategies. The active approach uses hardware security systems such as cameras or motion detectors. Passive security is based on program and facility design, building and site configuration, and community participation. Passive measures for program and building configuration can be the primary means to foster safety and security while active security measures are applied where and when they are deemed necessary as a secondary precaution. Further, The Center for Advanced Professional Studies can take advantage of building technology, signage and landscaping to further enhance campus security. Passive Security Concepts Classroom organization that minimizes student travel time Well defined entry sequence with a visitor check-in desk similar to entrances at libraries, museums, or other public facilities. Planning that avoids blind spots, unnecessary corners, and corridor recesses greater than one foot. Locating administrative and teacher preparation areas or offices with good visual contact of major circulation areas [i.e., corridors, cafeteria, parent and bus drop-off, parking]. Locating actively programmed elements around the periphery of the school building so that there is “natural surveillance” from within the school to outdoor areas such as parking lots and playgrounds. Minimizing windowless, blank walls at the periphery of the building, particularly when these uses face residential, play areas, courtyards and parking lots. Planning spatial relationships in such a manner that there are natural transitions from one location to another. Locating restrooms in close proximity to classrooms to minimize students wandering the halls. Locating areas likely to have significant community [before/after school] uses close to parking and appropriately zoned so these areas can be closed off from the rest of the building. Providing for natural integration of students and staff during class changes. Providing a high degree of ‘transparency’ within the building. Active Security Concepts A security consultant can help with system design and device location and should be consulted during schematic design. When planning a security system, it is recommended to include a provision for accessing cameras and recorded data remotely in the event the building should become inaccessible. Auto-connecting systems to police and fire authorities when an alarm is tripped should be considered.
April 2008 © Perkins+Will
69
planning concepts
CAPS
safety and security concepts Uses of Technology for Security Providing phones in every instructional and support area. Building-wide public address system designed to be heard throughout the school and on the play fields when needed. Motion or infra-red detectors which can also be configured to conserve lighting costs. Video cameras that are used for instructional purposes could also be used for security and risk management purposes during non-school hours. Site Planning, Vehicular and Pedestrian Traffic The bus drop-off area may be at the curb or in a public right-of-way and should be ‘connected’ to the building entries by wide, well illuminated open walkways. The building envelope should be sensitive to how it responds to the proximity of pedestrian walkways. (Consider window size and location, climbing access to the roof, etc.) Exterior play areas and open space should minimize ‘blind’ spots. Clear signage to indicate public entries with easily controllable entry lobbies. A bus drop-off area separated from other vehicular traffic. Separate faculty/staff and community parking areas. Separate student [pedestrian] site circulation flow from roadways. Landscaping and Lighting The use of high branching trees and low bushes to deter hiding. The use of an aesthetically pleasing–yet secure–perimeter fence around the site. Building placement along the site perimeter to protect on site open space. General, non-intrusive site lighting of all parking, pedestrian and entry areas. General exterior building lighting and illuminate public areas, window areas and potentially dark corners or surfaces. Security lighting at selected building and parking lots with photocell timer with on/off capacity. Separate athletic fields from informal gathering areas. Locate athletic facilities used for after school events away from building and consider perimeter fencing.
April 2008 © Perkins+Will
70
planning concepts
CAPS
flexibility and agility concepts Understanding that change is a constant for school and community facilities, these learning environments should be comprised of flexible, agile spaces equipped with the necessary tools and furniture to support the many varieties of teaching–including collaboration and self-directed learning, exploration and discovery–that are the trademark of superior and healthy educational environments. To accommodate an ever changing world of educational practice, these environments should be equipped to change not just year-to-year but dayto-day, even performing differently at different times during the day. During meetings with workshop participants, concepts were explored that will create a flexible building to support changing program needs. In addition to supporting the demands of the unique program, the facility needs to accommodate learning in labs as well as hallways, the atrium, and other community spaces and shared areas. Dynamic and agile learning environments that accept and respond to change, necessitate facilities to be designed to support multiple uses. In planning multi-functional spaces, recognition needs to be made that–while more cost effective to build fewer spaces–as the performance expectations of individual spaces increase, budgets need to be allocated to accommodate the needs of all of the multiple uses. Strategies that support flexible and agile environments at The Center for Advanced Professional Studies include: Creating spaces that can adapt to a variety of teaching and learning styles (lecture, team work, self directed, individual, etc.) Providing movable and mobile storage and technology for building users to accommodate needed room changes. Accommodating re-configurations of interior space by providing partitions that are demountable, movable, or at least non-load bearing.
April 2008 © Perkins+Will
71
planning concepts
CAPS
flexibility and agility concepts
Spaces that behave differently at different times One strategy to creating a flexible school facility is to provide spaces that are able to change their use during different times of the day. This cafe at a train station in Setagawa-Ku in Tokyo is a good example of a space that has the ability to change uses over the course of a day. In the first diagram, a serving area is open to a cafe, providing a traditional service arrangement for a cafe. Visitors select their order and proceed to the dining area. In the second diagram, the dining area is separated from the serving area. The dining area is available for meeting functions, while the serving area still operates for snacks. In the final diagram, the serving area is closed completely and the dining area is opened to the adjacent spaces allowing a larger public space and opportunities for informal conversation.
April 2008 Š Perkins+Will
72
planning concepts
CAPS
flexibility and agility concepts
Learning environments equipped for flexible layouts Classrooms that are ready to meet the educational demands for the coming years will respond quickly and easily to a variety of teaching methods. Various strategies allow furniture to be grouped for lectures, seminars, small groups and project teams. In each configuration, teams need access to technology and presentation equipment. Teachers’ furniture can be mobile to allow the desk to also be a conference table and storage to move from room to room. Science rooms and technology labs also need to be planned for changing configurations. Like general classrooms, science and research rooms need to accommodate lectures, small groups, seminars, experimental labs, and research activities.
April 2008 Š Perkins+Will
73
facility program
CAPS
overview of program format The programming section of the Facility Design Guidelines is organized into four interrelated sections. Individual sections identify spaces that are programmatically similar and strongly related to each other. Each space within the facility is identified in one of the following sections: 1
Student Learning Strands
2
Administration and Staff Spaces
3
Community and Stakeholder Spaces
4
Facility Management and Support Spaces
The beginning of each section provides a space program that indicates the name of each space, the quantity of the spaces and the size of the space. Following the space program are relationship diagrams that show how spaces within each section relate to each other. The program describes the net area which is the space required for specific activities; the grossing factor, which provides an allowance for circulation, restrooms, mechanical spaces, etc; and the total gross area which represents the required buildable area. After the relationship diagrams are informational data sheets provided for each major space within the section. The data sheets are comprised of three types of information: a text section providing room data specific to the space; a room diagram showing a representative diagram that provides programmatic direction and adjacencies; and a relationship diagram that shows the interconnection of the space to related spaces. Listed furniture and equipment is as requested by users and will need to be coordinated with final space constraints and budget. To begin the programming section, a program summary provides an overview of the space program and a diagrammatic overview of how the pieces of the Center for Advanced Professional Studies combine to form a complete environment.
April 2008 Š Perkins+Will
74
74
facility program
CAPS
program summary
04/24/2008 DRAFT
250 planned students, grades 11-12 0
A. 1. 2.
Area Summary Total area Target area Difference
B. 1. 2. 3.
Capacity Summary Teaching Stations Utilization Factor Effective Student Capacity
1. 2.
Area Analysis Square feet per student: Planned Square feet per student: Actual
D. 1. 2. 3. 4.
Student Learning Strands Administration Community Facility support
NET SQUARE FEET GROSSING total factor
38,890 nsf 38,483 nsf 407 nsf
15 85%
GROSS SQUARE FEET total
1.45
56,391 gsf * 55,800 gsf * 591 gsf
305 students 259 students
250 students 259 students
223 gsf 218 gsf
Area Comparison
Total GSF E.
CAPACITY students
0
78% 7% 12% 3% 100%
30,300 nsf 2,650 nsf 4,800 nsf 1,140 nsf 38,890 nsf
43,935 gsf 3,843 gsf 6,960 gsf 1,653 gsf 56,391 gsf
Area Chart
Student Learning Strands 78% Administration 7%
Community 12%
Facility support 3%
* - does not include area for shelled space
April 2008 Š Perkins+Will
75
facility program
CAPS
1
04/24/2008 DRAFT SPACE DESCRIPTION 250
1
Programmed Area
planned students, grades 11-12
student learning strands NOTES
teaching
SPACES total
each
STUDENTS total
each
NET SQUARE FEET total
1
1
20
20
3,000
3,000
12' clear ceiling, overhead door to CAD Lab
STUDENT LEARNING STRANDS
A.
Engineering
1.
CNC Lab ("Dirty" Lab)
2.
Welding/Spray Area
-
-
-
-
-
area with curtain, part of CNC lab
3.
Project Storage - CNC
1
-
-
600
600
adjacent to CNC lab and exterior
4.
CAD Lab ("Clean" Lab)
1
20
20
1,200
1,200
5.
Print Room
-
1
-
-
150
150
6.
Digital Electronics Lab ("Clean" Lab)
1
1
20
20
1,200
1,200
closest to Bioscience, overhead doors, outdoor access
1
connect to CAD/Digital Elec labs
7.
Project Storage - Clean Labs
1
-
-
150
150
connect to CAD/digital electronics
8.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
-
-
-
-
1 large storage room for CNC lab
-
-
150
150
1 small group room goes to storage hooks/shelves in hallway for coats/backpacks
9.
Project Area Storage
10.
Small Group/Resource Room
1
11.
Student Storage
1
50
50
12 12.
Informal student area
1
400
400
13.
Toilets Sub-Total:
-
-
see community spaces
10
2
20
40
1,500
3,000
1
20
20
1,500
1,500
senior lab
2
-
-
300
600
share with project area storage and project area auxiliary building
B.
Bioscience
1.
Bioscience/Animal Science Learning Lab
2
2.
Bioscience/Animal Science Learning Lab
1
3.
Prep/Storage
60
-
3
8,100 include outdoor lab
4.
Greenhouse
1
-
-
5.
Outdoor Learning Lab
1
-
-
junior labs - moveable walls? Storage along moveable wall?
6.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
7.
Project Area Storage
1
-
-
-
-
share with prep/storage
8.
Small Group/Resource Room
2
-
-
150
300
moveable walls?
9.
Student Storage
1
100
100
hooks/shelves in hallway for coats/backpacks
10.
Informal student area
1
500
500
incl. project display/presentation/digital capabilities
11.
Toilets
-
-
-
see community spaces
Sub-Total:
3
13
60
7,200
continued on next page April 2008 Š Perkins+Will
76
facility program
CAPS
1
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12
student learning strands NOTES
teaching
SPACES total
each
STUDENTS total
each
NET SQUARE FEET total
C.
Business
1.
Interactive Media Lab
1
1
20
20
1,200
1,200
Combined 2100sf space, glass moveable wall between
1.
Interactive Media Lab
1
1
20
20
900
900
Combined 2100sf space, glass moveable wall between
2.
Video Production Lab
-
-
-
-
-
-
next to human services, 2nd floor
3.
Business Lab
1
1
25
25
1,200
1,200
door into 1200sf Interactive Media Lab
4.
IT Lab
1
1
20
20
1,200
1,200
glass moveable wall next to 900sf Interactive Media Lab
5.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
6.
Project Area Storage
1
-
-
100
100
7.
Small Group/Resource Room
2
-
-
150
300
moveable walls?
8.
Student Storage
1
100
100
hooks/shelves in hallway for coats/backpacks
9.
Informal student area
1
400
400
combine between business and human services
10.
Toilets
-
-
-
see community spaces
Sub-Total:
4
10
85
6,600
D D.
Human Services
1.
Human Services (Law) Lab
1
1
25
25
900
900
moveable wall with pre-teacher ed lab
2.
Pre-Teacher Education Lab
1
1
25
25
900
900
moveable wall with human services lab
3.
Pre-School/Daycare
-
-
-
-
-
-
practicum (outside of school)
4.
Health Professions Lab
1
1
10
10
1,200
1,200
CNA/CMA/EMT
5.
Health Professions Room
1
1
25
25
900
900
6.
Health Professions Storage
-
1
-
-
150
150
7.
Sports Medicine Lab
1
1
15
15
1,200
1,200
athletic training room function
8.
Sports Medicine Storage
-
1
-
-
150
150
between Sports Med Lab and Health Professions Room
between CNA Lab and Health Professions Room
9.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
10.
Project Area Storage
1
-
-
-
-
share stor. for health prof./sports medicine - door to proj. area?
-
-
150
150
11.
Small Group/Resource Room
1
12.
Student Storage
1
50
50
13.
Informal student area
1
400
400
14.
Toilets Sub-Total:
Total student learning spaces:
-
-
-
5
12
100
7,200
15
23
305
30,300
hooks/shelves in hallway for coats/backpacks
see community spaces
continued on next page April 2008 Š Perkins+Will
77
facility program
CAPS
2
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
2
administration and staff spaces
SPACES total
NOTES STUDENTS total
each
NET SQUARE FEET total
1
-
150
150
each
ADMINISTRATION AND STAFF SPACES
A.
Offices
1.
Waiting Area
adjacent to commons, close to the strands
2.
Exec. Director's Office
1
-
150
150
3.
Security Office
1
-
150
150
4.
IT Office
1
-
100
100
5.
Career Counselor Office
1
-
150
150
6.
Conference room
1
-
200
200
7.
Copy Room
1
-
100
100
8.
Storage
1
-
100
100
9.
Toilet
1
-
50
50
Sub-Total:
9
-
B.
Distributed Professional Areas
1.
Learning Facilitator/Visitors Workspace
2
2.
Shared Private Phone Call Space
3.
closet
4.
Faculty toilet Sub-Total:
1,150 locate between strands
-
-
500
1,000
2
-
30
60
2
-
20
40
2
-
50
100
8
-
-
-
-
1,200
C.
Clinic
1.
Clinic Office/Reception
1
-
150
2.
Office
1
-
-
-
3.
Cot area
1
-
100
100
4.
Toilet
1
-
50
50
Sub-Total:
4
-
300
13
-
2,650
Total admin. and staff spaces:
near commons/entry
"flight lounge", hoteling spaces (4 teachers, 2 visitors)
near strands? Close to visitors/faculty office
150
April 2008 Š Perkins+Will
78
facility program
CAPS
3
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
3
community and stakeholder spaces
SPACES total
NOTES each
STUDENTS total
each
NET SQUARE FEET total
900
900
COMMUNITY AND STAKEHOLDER SPACES
A.
Lobby
1.
Lobby/Reception/Welcome Desk
1
-
Sub-Total:
1
-
B.
Commons/Café
1.
Commons/Café (Retail)
1
2.
Career Research Center/Resource Area
1
3.
Vending
4.
Catering area
5.
Storage Sub-Total:
receptions/presentation/display
900
-
1,800
1,800
include vending, retail compontent
-
600
600
lower ceiling with projection?
-
-
-
-
alcove in commons area
1
-
150
150
1
-
150
4
-
-
150
area from multi-purpose room storage
2,700
C C.
Community Spaces
1.
Community/Visiting Personnel Office
-
-
-
-
2.
Multi-Purpose Room
-
-
-
-
3.
Multi-Purpose Room Storage
-
-
-
-
4.
Toilets
4
-
300
1,200
Sub-Total:
4
-
1,200
Total community spaces:
8
-
4,800
moved into learning facilitator office
moved adjacent to commons
April 2008 © Perkins+Will
79
facility program
CAPS
4 facility management and support spaces
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
4
SPACES total
NOTES each
STUDENTS total
each
NET SQUARE FEET total
300
FACILITY MANAGEMENT AND SUPPORT SPACES
A.
Property Control
1.
Central receiving / office
1
300
2.
Storage
1
150
150
3.
Recycling Storage/Collection Area
1
100
100
4.
Toilet / locker
1
50
50
Sub-Total: B.
Facility Support
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
Custodial Closets Distributed Mechanical Rooms Chiller Room Main Electrical Electrical Closets Water Heater/Boiler Room Fire Pump Fire Riser MDF/Demark IDF Elevator & machine room Freight elevator & machine room
600 displacement ventilation/underfloor air - size req?/LEED Gold Certification 4 1 1
60 150 150
Sub-Total: C.
Exterior Facilities
1.
Outdoor learning lab
2.
Staff Parking
3.
Vistor Parking
4.
Parent Queing Length
5.
Buses
in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor near main stairs for disabled students near loading? For large equipment. One shared elevator?
540
see Bioscience Strand
Sub-Total:
-
-
1,140
Total facility management and support spaces: TOTAL NSF
240 150 150
15
305
38,890
April 2008 Š Perkins+Will
80
facility program
CAPS
building diagram
building diagram The building diagram that was derived throughout the workshops and subsequent discussions is an atrium scheme. It provides exterior spaces accessed easily from the strands and the commons. The atrium connects all three floors and has project areas surrounding it, directly outside of each strand. The diagram is zoned with the shared atrium easily accessible to students and the public with a secure entry point at the main administration area. The easily accessible outdoorsspaces can be used for outdoor projects. This diagram maximizes daylighting potential, especially north/south daylight, which is the most easily controlled natural light. This building diagram will be used to explain adjacencies in the following facility program sections.
outdoor workspace
engineering
stair
project/student area toilets/ support
stair
potential addition add to
3 story commons/ resource area
dist admin stair
lobby receiving/ mech
admin
first floor diagram
bioscience
project/student area toilets/ support
stair
3 story commons// resource area
potential addition add to
stair
dist admin project/student area
stair
human services
second floor diagram
business
project/student area toilets/ support
stair
3 story commons// resource area
potential addition add to
stair
dist admin project/student area
stair
shelled space
third floor diagram April 2008 Š Perkins+Will
81
81
facility program
CAPS site diagram
site diagram West 149th Terrace
The site includes an area for possible future expansion of the facility to the east. Additional parking can be added to the south in the future, if needed.
Marty Stre eet
Throughout the workshops, the site plan was discussed and refined. There is one main access point onto the site. The main entry is from West 151st, which will provide a view of the building upon entering the site. Visitor and teacher traffic can enter or exit from Marty Street or West 149th Terrace. The two access points help alleviate traffic congestion and allow for safe traffic flow throughout the campus. Drop-off and parking are located directly south of the building, with easy access to the main building entry. West 151st Street
April 2008 Š Perkins+Will
82
facility program
CAPS
1
04/24/2008 DRAFT SPACE DESCRIPTION 250
1
Programmed Area
planned students, grades 11-12
student learning strands NOTES
teaching
SPACES total
each
STUDENTS total
each
NET SQUARE FEET total
1
1
20
20
3,000
3,000
12' clear ceiling, overhead door to CAD Lab
STUDENT LEARNING STRANDS
A.
Engineering
1.
CNC Lab ("Dirty" Lab)
2.
Welding/Spray Area
-
-
-
-
-
area with curtain, part of CNC lab
3.
Project Storage - CNC
1
-
-
600
600
adjacent to CNC lab and exterior
4.
CAD Lab ("Clean" Lab)
1
20
20
1,200
1,200
5.
Print Room
-
1
-
-
150
150
6.
Digital Electronics Lab ("Clean" Lab)
1
1
20
20
1,200
1,200
closest to Bioscience, overhead doors, outdoor access
1
connect to CAD/Digital Elec labs
7.
Project Storage - Clean Labs
1
-
-
150
150
connect to CAD/digital electronics
8.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
-
-
-
-
1 large storage room for CNC lab
-
-
150
150
1 small group room goes to storage hooks/shelves in hallway for coats/backpacks
9.
Project Area Storage
10.
Small Group/Resource Room
1
11.
Student Storage
1
50
50
12 12.
Informal student area
1
400
400
13.
Toilets Sub-Total:
-
-
see community spaces
10
2
20
40
1,500
3,000
1
20
20
1,500
1,500
senior lab
2
-
-
300
600
share with project area storage and project area auxiliary building
B.
Bioscience
1.
Bioscience/Animal Science Learning Lab
2
2.
Bioscience/Animal Science Learning Lab
1
3.
Prep/Storage
60
-
3
8,100 include outdoor lab
4.
Greenhouse
1
-
-
5.
Outdoor Learning Lab
1
-
-
junior labs - moveable walls? Storage along moveable wall?
6.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
7.
Project Area Storage
1
-
-
-
-
share with prep/storage
8.
Small Group/Resource Room
2
-
-
150
300
moveable walls?
9.
Student Storage
1
100
100
hooks/shelves in hallway for coats/backpacks
10.
Informal student area
1
500
500
incl. project display/presentation/digital capabilities
11.
Toilets
-
-
-
see community spaces
Sub-Total:
3
13
60
7,200
continued on next page April 2008 Š Perkins+Will
83
83
facility program
CAPS
1
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12
student learning strands NOTES
teaching
SPACES total
each
STUDENTS total
each
NET SQUARE FEET total
C.
Business
1.
Interactive Media Lab
1
1
20
20
1,200
1,200
Combined 2100sf space, glass moveable wall between
1.
Interactive Media Lab
1
1
20
20
900
900
Combined 2100sf space, glass moveable wall between
2.
Video Production Lab
-
-
-
-
-
-
next to human services, 2nd floor
3.
Business Lab
1
1
25
25
1,200
1,200
door into 1200sf Interactive Media Lab
4.
IT Lab
1
1
20
20
1,200
1,200
glass moveable wall next to 900sf Interactive Media Lab
5.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
6.
Project Area Storage
1
-
-
100
100
7.
Small Group/Resource Room
2
-
-
150
300
moveable walls?
8.
Student Storage
1
100
100
hooks/shelves in hallway for coats/backpacks
9.
Informal student area
1
400
400
combine between business and human services
10.
Toilets
-
-
-
see community spaces
Sub-Total:
4
10
85
6,600
D D.
Human Services
1.
Human Services (Law) Lab
1
1
25
25
900
900
moveable wall with pre-teacher ed lab
2.
Pre-Teacher Education Lab
1
1
25
25
900
900
moveable wall with human services lab
3.
Pre-School/Daycare
-
-
-
-
-
-
practicum (outside of school)
4.
Health Professions Lab
1
1
10
10
1,200
1,200
CNA/CMA/EMT
5.
Health Professions Room
1
1
25
25
900
900
6.
Health Professions Storage
-
1
-
-
150
150
7.
Sports Medicine Lab
1
1
15
15
1,200
1,200
athletic training room function
8.
Sports Medicine Storage
-
1
-
-
150
150
between Sports Med Lab and Health Professions Room
between CNA Lab and Health Professions Room
9.
Project Area
1
-
-
1,200
1,200
incl. project display/presentation/digital capabilities
10.
Project Area Storage
1
-
-
-
-
share stor. for health prof./sports medicine - door to proj. area?
-
-
150
150
11.
Small Group/Resource Room
1
12.
Student Storage
1
50
50
13.
Informal student area
1
400
400
14.
Toilets Sub-Total:
Total student learning spaces:
-
-
-
5
12
100
7,200
15
23
305
30,300
hooks/shelves in hallway for coats/backpacks
see community spaces
April 2008 Š Perkins+Will
84
84
strands
facility program
CAPS
1
student learning strands
Student Learning Strands The student learning strand spaces are planned to provide flexible and agile, learning areas for 250 students in grades 11 and 12. The student learning strands are broken down into the following groups: 1. Engineering 2. Bioscience 3. Business 4. Human Services To provide flexibility and agility in the strand areas, raised access floors will be used wherever possible.
Participant drawn building diagram from planning meeting two.
April 2008 Š Perkins+Will
85
85
strands
facility program
CAPS
1
student learning strands outdoor workspace
engineering
stair
project/student area toilets/ support
stair
potential addition add to
3 story commons/ resource area
dist admin stair
lobby receiving/ mech
admin
first floor diagram
bioscience
project/student area toilets/ support
stair
3 story commons// resource area
potential addition add to
stair
dist admin project/student area
stair
human services
second floor diagram
business
project/student area toilets/ support
stair
3 story commons// resource area
potential addition add to
stair
dist admin project/student area
stair
shelled space
third floor diagram April 2008 Š Perkins+Will
86
86
engineering CNC lab (“dirty” lab) 3,000 sf
facility program
CAPS
1
program Flexible, utility-instensive lab space for fabrication using CNC (computer numerical control) machines. Provide a clean area for CNC and “dirty” area for fabrication with power tools. special considerations • specially ventilated areas where required requested furniture and equipment • floor drains • workstation tables • locked storage • compressed air • sinks • welding area • power tools • CNC machines • tack board • marker board • AED and first aid kit
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
requested technology/power/communications • wireless capability • wired computer connection • ample outlets for power tools and CNC equipment • overhead, retractable outlets • clock • telephone/intercom system • interactive white board room finishes • exposed painted structure • high output fluorescent lighting • painted CMU walls • polished concrete floor
April 2008 © Perkins+Will
87
87
engineering project storage - CNC 600 sf
facility program
CAPS
1
program Secure project storage space to support CNC lab.
outdoor workspace
welding cnc lab 2 story space
special considerations • provide direct access to lab space requested furniture and equipment • floor to ceiling heavy duty shelving • lockable base cabinets requested technology/power/communications • ample wall outlets
student learning strands
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
room finishes • acoustical ceiling tile • painted CMU walls • high output fluorescent lighting • polished concrete floor
April 2008 © Perkins+Will
88
88
engineering CAD lab (“clean” lab) 1,200 sf
facility program
CAPS
1
program A flexible learning environment for CAD instruction designed to support a variety of teaching disciplines and styles (i.e. lectures, group projects and individual instruction). special considerations • capability for digital display requested furniture and equipment • moveable computer drafting tables • chairs • marker boards • tack boards • mobile demo station
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
administration i i i
requested technology/power/communications • wireless capability • wired computer connections • clock • ample wall outlets • interactive white board • telephone/intercom system room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • rubber floor tile
April 2008 © Perkins+Will
89
89
engineering print room 150 sf
facility program
CAPS
1
program Secure print room and storage area for CAD lab. requested furniture and equipment • plotters • large work table • heavy duty shelving • storage for different sizes of paper, including rolls, and ink • flat file storage
outdoor workspace
welding cnc lab 2 story space
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
room finishes • acoustical ceiling tile • rubber floor tile
student learning strands
administration
administration i i i
April 2008 © Perkins+Will
90
90
engineering digital electronics lab (“clean” lab) 1,200 sf
facility program
CAPS
1
program A flexible learning environment for digital electronics instruction designed to support a variety of teaching disciplines and styles (i.e. lectures, group projects and individual instruction). special considerations • capability for digital display requested furniture and equipment • moveable tables • chairs • marker boards • tack boards • mobile demo station • plotter • upper and lower cabinet s with worksurface and area for digital equipment
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
requested technology/power/communications • wireless capability • wired computer connections • clock • ample wall outlets • interactive white board • telephone/intercom system room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • rubber floor tile
April 2008 © Perkins+Will
91
91
engineering project storage - clean labs 150 sf
facility program
CAPS
1
program Secure project storage area for clean labs.
student learning strands outdoor workspace
welding
requested furniture and equipment • heavy duty shelving
cnc lab 2 story space
storage
cad lab
digital elec lab
print room
room finishes • acoustical ceiling tile • rubber floor tile
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
April 2008 © Perkins+Will
92
92
engineering project area 1,200 sf
facility program
CAPS
1
program Space immediately accessible from each strand that can be used as a break-out area for small group work or informal interaction.
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
special considerations • include display area for project work requested furniture and equipment • lower cabinets with lockable, solid doors • tables • chairs • marker board
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
93
93
engineering small group/resource room 1 @ 150 sf
facility program
CAPS
1
program Small group rooms to provide an unscheduled break-out space for small groups of students and informal meetings. special considerations • locate near learning facilitators and commons • provide glass into small group rooms for natural supervision requested furniture and equipment • table • chairs • marker board
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
94
94
engineering student storage 50 sf
facility program
CAPS
1
program Storage area in each strand for student coats and backpacks.
outdoor workspace
welding cnc lab 2 story space
requested furniture and equipment • hooks • shelving room finishes • acoustical ceiling tile • carpet tile
student learning strands
storage
cad lab
digital elec lab
print room
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
April 2008 © Perkins+Will
95
95
engineering informal student area 400 sf
facility program
CAPS
1
program Area for informal student gathering. Moveable tables, chairs and lounge seating should be provided for comfortable and informal interaction.
student learning strands outdoor workspace
welding cnc lab 2 story space
storage
digital elec lab
print room
special considerations • open and accessible near strands requested furniture and equipment • tables and chairs • soft seating
cad lab
learning facilitator/visiting personnel office
sm grp
student area
sm grp
project area/ display
student storage project storage
commons/resource area
stair
administration
i i i administration
requested technology/power/communications • wireless capability • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
96
96
bioscience bioscience/animal science learning lab 2 @ 1500 sf - junior labs 1 @ 1500 sf - senior lab
facility program
special considerations • consider moveable walls between rooms if possible with casework needs • capability for digital display requested furniture and equipment • professional lab style tables with sinks • flexible height chairs • large demo table with sink • bio safety cabinets • fume hoods • areas for moveable equipment • upper and lower cabinets with lockable, solid doors • chemical resistant countertops • marker board • tack boards
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
moveable wall
teaching g wall
bi i bioscience llab b
student learning strands
casework
casework prep/sstorage
program Highly flexible labs modeled after professional lab spaces focusing on bioscience and animal science.
1
moveable e wall
CAPS
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area below human services
human services
requested technology/power/communications • wireless capability • wired computer connection • clock • interactive white board • telephone/intercom system • water/gas/electric • compressed air at demo station • overhead power • interactive white board room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • rubber floor tile
April 2008 © Perkins+Will
97
97
bioscience prep/storage 2 @ 300 sf
facility program
special considerations • provide ventilation for chemical storage requested furniture and equipment • upper and lower cabinets with lockable, solid doors • chemical resistant countertops • sink • refrigerator • ice maker • freezer • dishwasher (fits under countertop) • mobile wardrobe cabinet • chemical storage cabinet • autoclave
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
moveable wall
teaching g wall
bi i bioscience llab b
student learning strands
casework
casework prep/sstorage
program Prep room connected to two labs to share storage, equipment and preparation of in class experiments.
1
moveable e wall
CAPS
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area below human services
human services
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock • telephone/intercom system • gas/compressed air connection room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • rubber floor
April 2008 © Perkins+Will
98
98
bioscience project area 1,200 sf
facility program
special considerations • include display area for project work requested furniture and equipment • lower cabinets with lockable, solid doors • tables • chairs • marker board
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
moveable wall
teaching g wall
bi i bioscience llab b
student learning strands
casework
casework prep/sstorage
program Space immediately accessible from each strand that can be used as a break-out area for small group work or informal interaction.
1
moveable e wall
CAPS
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area below human services
human services
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
99
99
bioscience small group/resource room 2 @ 150 sf
facility program
special considerations • locate near learning facilitators and commons • provide glass into small group rooms for natural supervision
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
moveable wall
teaching g wall
bi i bioscience llab b
student learning strands
casework
casework prep/sstorage
program Small group rooms to provide an unscheduled break-out space for small groups of students and informal meetings.
1
moveable e wall
CAPS
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
requested furniture and equipment • table • chairs • marker board
commons/resource area below human services
human services
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
100
100
bioscience student storage 100 sf
facility program
room finishes • acoustical ceiling tile • carpet tile
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
bi i bioscience llab b
moveable wall
teaching g wall
requested furniture and equipment • hooks • shelving
student learning strands
casework
casework prep/sstorage
program Storage area in each strand for student coats and backpacks.
1
moveable e wall
CAPS
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area below human services
human services
April 2008 © Perkins+Will
101
101
bioscience informal student area 500 sf
facility program
bioscience lab
prep/sstorage
bi i bioscience llab b
casework teaching wall
moveable wall
teaching g wall
bi i bioscience llab b
student learning strands
casework
casework prep/sstorage
program Area for informal student gathering. Moveable tables, chairs and lounge seating should be provided for comfortable and informal interaction.
1
moveable e wall
CAPS
teaching wall
special considerations • open and accessible near strands requested furniture and equipment • tables and chairs • soft seating
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area below human services
human services
requested technology/power/communications • wireless capability • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
102
102
business interactive media lab 1 @ 1200 sf 1 @ 900 sf
facility program
CAPS program Flexible learning environment to support interactive media. Lab will support lectures, group projects and individual instruction. special considerations • consider a moveable wall between the labs requested furniture and equipment • computers • computer desks and chairs • modular tables and seating • marker boards • tack boards • mobile storage carts • mobile demo tables
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
requested technology/power/communications • wireless capability • wired computer connections • interactive white boards • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
103
103
business business lab 1,200 sf
facility program
CAPS program Flexible learning environment to support business curriculum. Lab will support lectures, group projects and individual instruction. special considerations • include display area for project work requested furniture and equipment • computers • computer desks and chairs • modular tables and seating • marker boards • tack boards • mobile storage carts • mobile demo tables • copier
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
requested technology/power/communications • wireless capability • wired computer connections • interactive white board/LCD’s • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
104
104
business IT lab 1,200 sf
facility program
CAPS program Flexible learning environment to support IT instruction. Lab will support lectures, group projects and individual instruction. special considerations • consider a moveable wall between the labs • include display area for project work
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
requested furniture and equipment • computers • computer desks and chairs • modular tables and seating • individual soft seating with laptop arm • marker boards • tack boards • mobile storage carts • mobile demo tables
commons/resource area below
requested technology/power/communications • wireless capability • wired computer connections • interactive white board/LCD’s • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • rubber floor tile
April 2008 © Perkins+Will
105
105
business project area 1,200 sf
facility program
CAPS program Space immediately accessible from each strand that can be used as a break-out area for small group work or informal interaction.
1 Business
exterior
interactive media lab
iinteractive t ti media di lab
special considerations • include display area for project work learning facilitator/visiting personnel office
requested furniture and equipment • lower cabinets with lockable, solid doors • tables • chairs • marker board
student learning strands
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
106
106
business project area storage 100 sf
facility program
CAPS program Secure storage for media technology equipment such as cameras and portable equipment. requested furniture and equipment • extra wide doors • shelving requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
room finishes • acoustical ceiling tile • carpet tile
April 2008 © Perkins+Will
107
107
business small group/resource room 2 @ 150 sf
facility program
CAPS program Small group rooms to provide an unscheduled break-out space for small groups of students and informal meetings. special considerations • locate near learning facilitators and commons • provide glass into small group rooms for natural supervision
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
requested furniture and equipment • table • chairs • marker board
commons/resource area below
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
108
108
business student storage 100 sf
facility program
CAPS program Storage area in each strand for student coats and backpacks. requested furniture and equipment • hooks • shelving room finishes • acoustical ceiling tile • carpet tile
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
April 2008 © Perkins+Will
109
109
business informal student area 400 sf
facility program
CAPS program Area for informal student gathering. Moveable tables, chairs and lounge seating should be provided for comfortable and informal interaction. special considerations • open and accessible near strands requested furniture and equipment • tables and chairs • soft seating
1
student learning strands
Business
exterior
interactive media lab
learning facilitator/visiting personnel office
iinteractive t ti media di lab
IT lab l b
sm grp sm grp
student area
project area/ display
b i business l b lab
student storage project storage
stair
commons/resource area below
requested technology/power/communications • wireless capability • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
110
110
human services human services (law) lab 900 sf
facility program
CAPS
requested furniture and equipment • modular tables and seating • marker boards • tack boards • mobile storage carts • mobile workstations
bioscience commons/resource area below
stair
health professions room
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
health professions lab
sm grp
student area sm grp
additional human n services rooms
learning facilitator/visiting personnel office
sttorage
special considerations • consider a moveable wall between the human services and pre-teacher ed lab
student learning strands
bioscience
sttorage
program Flexible learning environment to support human services/law curriculum. Lab will support lectures, group projects and individual instruction.
1
human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • wired computer connections • interactive white board • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
111
111
human services pre-teacher education lab 900 sf
facility program
CAPS
requested furniture and equipment • modular tables and seating • marker boards • tack boards • mobile storage carts • mobile workstations
bioscience commons/resource area below
stair
health professions room
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
health professions lab
sm grp
student area sm grp
additional human n services rooms
learning facilitator/visiting personnel office
sttorage
special considerations • consider a moveable wall between the human services and pre-teacher ed lab
student learning strands
bioscience
sttorage
program Flexible learning environment to support pre-teacher education. Lab will support lectures, group projects and individual instruction.
1
human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • wired computer connections • interactive white board • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
112
112
human services health professions lab 1,200 sf health professions room 900 sf
facility program
CAPS
bioscience commons/resource area below
stair
health professions room
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
health professions lab
sm grp
student area sm grp
additional human n services rooms
learning facilitator/visiting personnel office
sttorage
special considerations • provide a door in between labs • direct access to storage room from health professions lab
student learning strands
bioscience
sttorage
program Flexible learning environment to support health professions curriculum such as CNA, CMA and EMT. Labs will support lectures, group projects and individual instruction.
1
human services lab
pre-teacher ed lab
exterior
requested furniture and equipment • modular tables and seating • marker boards • tack boards • mobile storage carts • mobile workstations • sink in health professions lab
exterior
requested technology/power/communications • wireless capability • wired computer connections • interactive white board • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
113
113
human services health professions storage 150 sf
facility program
CAPS stair
health professions lab
sm grp
health professions room
student area sm grp
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
learning facilitator/visiting personnel office
additional human n services rooms
room finishes • acoustical ceiling tile • carpet tile
bioscience commons/resource area below
sttorage
requested furniture and equipment • heavy duty shelving
student learning strands
bioscience
sttorage
program Secure storage area for the health professions lab.
1
human services lab
pre-teacher ed lab
exterior exterior
April 2008 © Perkins+Will
114
114
human services sports medicine lab 1,200 sf
facility program
CAPS
requested furniture and equipment • ice machine • refrigerator • freezer • sink • water cooler • extremity whirpool • taping tables • cardio equipment, resistance equipment and weights • slat wall • moveable marker board • full height wall mirror on one wall
bioscience commons/resource area below
stair
health professions room
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
health professions lab
sm grp
student area sm grp
additional human n services rooms
learning facilitator/visiting personnel office
sttorage
special considerations • provide direct access to storage room • locate near a toilet room with a shower
student learning strands
bioscience
sttorage
program Flexible learning environment to support sports medicine curriculum such as physical therapy treatment and exercise. Lab will support hands on sports medicine instruction.
1
human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • rubber floor tile
April 2008 © Perkins+Will
115
115
human services sports medicine storage 150 sf
facility program
CAPS stair
health professions lab
sm grp
health professions room
student area sm grp
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
learning facilitator/visiting personnel office
additional human n services rooms
room finishes • acoustical ceiling tile • rubber floor tile
bioscience commons/resource area below
sttorage
requested furniture and equipment • heavy duty shelving
student learning strands
bioscience
sttorage
program Secure storage area for the sports medicine lab.
1
human services lab
pre-teacher ed lab
exterior exterior
April 2008 © Perkins+Will
116
116
human services project area 1,200 sf
facility program
CAPS program Space immediately accessible from each strand that can be used as a break-out area for small group work or informal interaction.
1
student learning strands bioscience
bioscience commons/resource area below stair
learning facilitator/visiting personnel office
sm grp
student area sm grp
project storage
project area/ display
student storage g
sports medicine lab
moveable wall m
health professions room
additional human n services rooms
health professions lab
sttorage
requested furniture and equipment • lower cabinets with lockable, solid doors • tables • chairs • marker board
sttorage
special considerations • include display area for project work human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • zoned indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
117
117
human services small group/resource room 150 sf
facility program
CAPS
requested furniture and equipment • table • chairs • marker board
bioscience commons/resource area below
stair
health professions room
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
health professions lab
sm grp
student area sm grp
additional human n services rooms
learning facilitator/visiting personnel office
sttorage
special considerations • locate near learning facilitators and commons • provide glass into small group rooms for natural supervision
student learning strands
bioscience
sttorage
program Small group rooms to provide an unscheduled break-out space for small groups of students and informal meetings.
1
human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • wired computer connection • ample wall outlets • clock room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
118
118
human services student storage 50 sf
facility program
CAPS stair
health professions lab
sm grp
health professions room
student area sm grp
sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
learning facilitator/visiting personnel office
additional human n services rooms
room finishes • acoustical ceiling tile • carpet tile
bioscience commons/resource area below
sttorage
requested furniture and equipment • hooks • shelving
student learning strands
bioscience
sttorage
program Storage area in each strand for student coats and backpacks.
1
human services lab
pre-teacher ed lab
exterior exterior
April 2008 © Perkins+Will
119
119
human services informal student area 400 sf
facility program
CAPS
student learning strands bioscience
bioscience commons/resource area below stair
sm grp
student area sm grp
health professions room
sttorage
requested furniture and equipment • tables and chairs • soft seating
health professions lab
sttorage
special considerations • open and accessible near strands sports medicine lab
project storage
project area/ display
student storage g
moveable wall m
learning facilitator/visiting personnel office
additional human n services rooms
program Area for informal student gathering. Moveable tables, chairs and lounge seating should be provided for comfortable and informal interaction.
1
human services lab
pre-teacher ed lab
exterior exterior
requested technology/power/communications • wireless capability • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • carpet tile
April 2008 © Perkins+Will
120
120
programming
CAPS
2
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
2
administration and staff spaces
SPACES total
NOTES STUDENTS total
each
NET SQUARE FEET total
1
-
150
150
each
ADMINISTRATION AND STAFF SPACES
A.
Offices
1.
Waiting Area
adjacent to commons, close to the strands
2.
Exec. Director's Office
1
-
150
150
3.
Security Office
1
-
150
150
4.
IT Office
1
-
100
100
5.
Career Counselor Office
1
-
150
150
6.
Conference room
1
-
200
200
7.
Copy Room
1
-
100
100
8.
Storage
1
-
100
100
9.
Toilet
1
-
50
50
Sub-Total:
9
-
B.
Distributed Professional Areas
1.
Learning Facilitator/Visitors Workspace
2
2.
Shared Private Phone Call Space
3.
closet
4.
Faculty toilet Sub-Total:
1,150 locate between strands
-
-
500
1,000
2
-
30
60
2
-
20
40
2
-
50
100
8
-
-
-
-
1,200
C.
Clinic
1.
Clinic Office/Reception
1
-
150
2.
Office
1
-
-
-
3.
Cot area
1
-
100
100
4.
Toilet
1
-
50
50
Sub-Total:
4
-
300
13
-
2,650
Total admin. and staff spaces:
near commons/entry
"flight lounge", hoteling spaces (4 teachers, 2 visitors)
near strands? Close to visitors/faculty office
150
April 2008 Š Perkins+Will
121
121
administration and staff spaces
programming
CAPS administration spaces
2
administration and staff spaces
g
Located at the main public entry to the building, the suite provides an administration and check-in area and provides a security checkpoint for the building. The main office is the first point of contact for visitors to the school. The area should be inviting and have a clear line of sight into the building.
Building diagram illustrating administration spaces, resulting from discussions during planning meeting two.
April 2008 Š Perkins+Will
122
122
offices waiting area 150 sf
programming
CAPS
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • secure vestibule entry into this area for visitor check-in
administration and staff spaces
toilet
program The waiting area is the first point of contact for visitors to the building. The area should also be inviting and allow a clear line of site to the main building.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested furniture and equipment • soft seating • coffee tables or side tables • reception desk and chair • file cabinets • bookcases and display cases • tack board requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets • provide infrastructure for flat panel technology room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
123
123
offices executive director’s office 150 sf
programming
CAPS
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide flexibility in office arrangement • provide acoustical treatment to maximize privacy
administration and staff spaces
toilet
program Private office also used to hold formal meetings, small group discussions and informal gatherings.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested furniture and equipment • flexible, moveable furniture • desk with chair • small table with 4 chairs • file cabinet • bookcases • tall, lockable wardrobe cabinet • tack board requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
124
124
offices security office 150 sf
programming
CAPS
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide acoustical treatment to maximize privacy • locate within main office area, with a view to the building entry/commons • provide control area for building security systems • provide view to hallway or commons
administration and staff spaces
toilet
program Private office also used to hold formal meetings, small group discussions and informal gatherings.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested furniture and equipment • flexible, moveable furniture • desk with chair • small table with 4 chairs • file cabinet • bookcases • tall, lockable wardrobe cabinet • tack board requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board or CMU walls • carpet tile
April 2008 © Perkins+Will
125
125
offices IT office 100 sf
programming
CAPS
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide flexibility in office arrangement • provide acoustical treatment to maximize privacy • locate near MDF room
administration and staff spaces
toilet
program Private office also used to hold formal meetings, small group discussions and informal gatherings.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested furniture and equipment • flexible, moveable furniture • desk with chair • small table with 4 chairs • file cabinet • bookcases • tall, lockable wardrobe cabinet • tack board requested technology/power/communications • wireless capability • multiple wired computer connections • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
126
126
offices career counselor office 150 sf
programming
CAPS
requested furniture and equipment • flexible, moveable furniture • desk with chair • small table with 4 chairs • file cabinet • bookcases • tall, lockable wardrobe cabinet • tack board
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide acoustical treatment to maximize privacy
administration and staff spaces
toilet
program Private office used also for small team and individual meetings with students and parents.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
127
127
offices conference room 200 sf
programming
CAPS
requested furniture and equipment • marker board • tack board • conference table • chairs • credenza with closed storage
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide acoustical treatment to maximize privacy
administration and staff spaces
toilet
program A location for formal meetings and presentations.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested technology/power/communications • wireless capability • wired computer connection • ceiling mounted projection system with screen (provide conduit) • telephone/intercom system • clock • ample wall outlets • provide infrastructure for flat panel technology room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
128
128
offices copy room 100 sf
programming
CAPS
requested furniture and equipment • marker board • tack board • copier • fax machine • mail slots
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • located within administrative office area
administration and staff spaces
toilet
program Centralized mail and photocopy room for staff.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested technology/power/communications • wireless capability • wired computer connection • telephone • clock • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
129
129
offices storage 100 sf
programming
CAPS
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
requested furniture and equipment • storage shelves • locked file cabinets
administration and staff spaces
toilet
program General storage located within the administrative area for storage of office supplies.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
room finishes • acoustical ceiling tile • fluorescent lighting (with occupancy sensors) • painted gypsum board walls • sealed concrete
April 2008 © Perkins+Will
130
130
offices toilet 50 sf
programming
CAPS
requested furniture and equipment • floor drain • automatic flush toilet • lavatory (with hot/cold water) • soap dispenser • mirror above lavatory • paper towel dispenser
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • extend walls to the bottom of the deck
administration and staff spaces
toilet
program Faculty restrooms located within the the main administrative area.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
room finishes • lighting with occupancy sensors • full height glazed tile on all walls • ceramic tile floor • painted plaster ceiling
April 2008 © Perkins+Will
131
131
distributed professional areas learning facilitator/visitors workspace 500 sf
programming
CAPS
2
administration and staff spaces
program Centralized location for learning facilitator and visitor collaboration and production. special considerations • adjacent to toilet and private area for phone calls requested furniture and equipment • marker board • tack board • moveable tables/chairs for collaboration and as a worksurface • printer
visiting p personnel
exterior
learning facilitator workspace private fac phone toilet corridor
requested technology/power/communications • wireless capability • wired computer connection • telephone • clock • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
132
132
distributed professional areas shared private phone call space 2 @ 30 sf
programming
CAPS
2
administration and staff spaces
program Room within learning facilitator/visitor workspace for private phone calls requested furniture and equipment • small table and chair requested technology/power/communications • wireless capability • wired computer connection • telephone • clock • ample wall outlets
visiting p personnel
exterior
learning facilitator workspace private fac phone toilet corridor
room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
133
133
distributed professional areas closet 2 @ 20 sf
programming
CAPS
2
administration and staff spaces
program Closet to support the learning facilitator’s and visitors special considerations • to be located within the learning facilitator/ visitor workspace requested furniture and equipment • storage shelves • hanging storage area
visiting p personnel
exterior
learning facilitator workspace private fac phone toilet corridor
room finishes • acoustical ceiling tile • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
134
134
distributed professional areas toilet 2 @ 50 sf
programming
CAPS
2
administration and staff spaces
program Centrally located staff toilet within the learning facilitator/visitor workspace. special considerations • provide adequate ventilation requested furniture and equipment • floor drain • automatic flush toilet • lavatory (with hot/cold water) • soap dispenser • mirror above lavatory • paper towel dispenser
visiting p personnel
exterior
learning facilitator workspace private fac phone toilet corridor
room finishes • fluorescent lighting (with occupancy sensors) • full height glazed tile on all walls • ceramic tile floor • painted plaster ceiling
April 2008 © Perkins+Will
135
135
clinic clinic office/reception 150 sf
programming
CAPS
requested furniture and equipment • brochure display • upper and lower cabinets with undercounter refrigerator and sink • soft seating • nurses desk and chair • file cabinet • bookcases • tack board • tall, lockable wardrobe cabinet
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide a comfortable environment
administration and staff spaces
toilet
program Clinic waiting area for students waiting to see the nurse for medical treatment or distribution of prescription medicine. Also serves as an office area for the nurse.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • rubber floor tile
April 2008 © Perkins+Will
136
136
clinic cot area 100 sf
programming
CAPS
requested furniture and equipment • ceiling hung curtains • cots
IT office
clinic office
couns office
conf room
cop py
cot room
toilet
corridor
sto or
special considerations • provide acoustical treatment to maximize privacy
administration and staff spaces
toilet
program Cot area for students visiting the clinic that need prolonged supervision.
2
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustical ceiling tile • indirect lighting (with occupancy sensors) • painted gypsum board walls • rubber floor tile
April 2008 © Perkins+Will
137
137
clinic toilet 50 sf
programming
CAPS
2
administration and staff spaces
program Toilet to support clinic area.
requested furniture and equipment • floor drain • automatic flush toilet • lavatory (with hot/cold water) • soap dispenser • mirror above lavatory • paper towel dispenser • grab bars
couns office
conf room
cop py
sto or
IT office
clinic office
toilet
cot room
toilet
special considerations • provide adequate ventilation
corridor
security
director’s office
waiting area
lobby
vestibule
exterior main entry
room finishes • fluorescent lighting (with occupancy sensors) • full height glazed tile on all walls • ceramic tile floor • painted plaster ceiling
April 2008 © Perkins+Will
138
138
programming
CAPS
3
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
3
community and stakeholder spaces
SPACES total
NOTES each
STUDENTS total
each
NET SQUARE FEET total
900
900
COMMUNITY AND STAKEHOLDER SPACES
A.
Lobby
1.
Lobby/Reception/Welcome Desk
1
-
Sub-Total:
1
-
B.
Commons/Café
1.
Commons/Café (Retail)
1
2.
Career Research Center/Resource Area
1
3.
Vending
4.
Catering area
5.
Storage Sub-Total:
receptions/presentation/display
900
-
1,800
1,800
include vending, retail compontent
-
600
600
lower ceiling with projection?
-
-
-
-
alcove in commons area
1
-
150
150
1
-
150
4
-
-
150
area from multi-purpose room storage
2,700
C C.
Community Spaces
1.
Community/Visiting Personnel Office
-
-
-
-
2.
Multi-Purpose Room
-
-
-
-
3.
Multi-Purpose Room Storage
-
-
-
-
4.
Toilets
4
-
300
1,200
Sub-Total:
4
-
1,200
Total community spaces:
8
-
4,800
moved into learning facilitator office
moved adjacent to commons
April 2008 © Perkins+Will
139
community areas
programming
CAPS community areas
3
community and stakeholder spaces
g
T he s e sp a ce s a c tiv a te the building, providing places for students, parents, faculty, staff and community members to eat, meet and learn. In addition, these spaces provide a place to exhibit and celebrate the success of students.
Building diagram illustrating community spaces, resulting from discussions during planning meeting two.
April 2008 Š Perkins+Will
140
lobby lobby/reception/welcome desk 900 sf
programming community and stakeholder spaces
IT office
clinic office
couns office
conf room
special considerations • locate lobby adjacent to commons
sto or
cot room
cop py
corridor
toilet
program The lobby serves as an entry into the school and an area to display student work and achievement to the community. The lobby should be linked to the major shared spaces.
3
toilet
CAPS
security
director’s office
waiting area
lobby
vestibule
exterior main entry
requested furniture and equipment • display cases requested technology/power/communications • wireless capability • wired computer connections • clock • ample wall outlets room finishes • acoustical ceiling tile • painted gypsum board walls • carpet tile
April 2008 © Perkins+Will
141
commons/cafe commons cafe 1,800 sf career research center/resource area 600 sf
programming
CAPS
special considerations • atrium space, central to strands
community and stakeholder spaces strand
sm grp
stair
learning facilitator/visiting personnel office
project area/ display
sm grp
student storage t project storage caterin ng kitchen
sm grp student area moveablee wall
learning facilitator/visiting personnel office exterrior outdoor sspace
program An informal area to gather, connect with technology and purchase food/drink items throughout the day. The space can be utilized throughout the day and evening to accommodate a variety activities.
3
commons/resource area
project area/ display
student t d t area sm grp
project storage t student storage
strand
requested furniture and equipment • soft seating • modular tables and seating requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets room finishes • acoustically absorbent wall surface • access floor tile
April 2008 © Perkins+Will
142
commons/cafe catering area 150 sf
programming
CAPS
requested furniture and equipment • grab and go kitchen area • secure food/drink storage • sink(s) • work surface • checkout counter • vending area
sm grp sm grp
student area
stair
learning facilitator/visiting personnel office
project area/ display
sm grp
student storage t project storage caterin ng kitchen
learning facilitator/visiting personnel office
moveablee wall
special considerations • adjacent to the commons
community and stakeholder spaces strand
exterrior outdoor sspace
program An area to purchase food/drink items throughout the day, with an after hours vending area
3
commons/resource area
project area/ display
student t d t area sm grp
project storage t student storage
strand
requested technology/power/communications • wireless capability • wired computer connection • clock • telephone/intercom system • ample wall outlets/ outlets for special equipment room finishes • acoustically absorbent wall surface • access floor tile
April 2008 © Perkins+Will
143
commons/cafe storage 150 sf
programming
CAPS
3
program Storage area for commons seating and related items.
requested furniture and equipment • storage trolleys for tables/chairs
strand
sm grp
stair
learning facilitator/visiting personnel office
project area/ display
sm grp
student storage t project storage caterin ng kitchen
sm grp student area moveablee wall
learning facilitator/visiting personnel office exterrior outdoor sspace
special considerations • storage to have direct connection to commons
community and stakeholder spaces
commons/resource area
project area/ display
student t d t area sm grp
project storage t student storage
strand
room finishes • acoustical ceiling tile • fluorescent lighting (with occupancy sensors) • sealed concrete
April 2008 © Perkins+Will
144
community spaces toilets 4 @ 300 sf
programming
CAPS
3
program Multiple fixture toilet rooms for use by students and community
requested furniture and equipment • floor drains • automatic flush toilets • lavatories (with hot/cold water) • soap dispensers • mirrors above lavatory • paper towel dispensers
strand
sm grp
stair
learning facilitator/visiting personnel office
project area/ display
sm grp
student storage t project storage caterin ng kitchen
sm grp student area moveablee wall
learning facilitator/visiting personnel office exterrior outdoor sspace
special considerations • provide adequate ventilation
community and stakeholder spaces
commons/resource area
project area/ display
student t d t area sm grp
project storage t student storage
strand
room finishes • painted plaster ceiling • full height glazed tile on all walls • ceramic tile floor
April 2008 © Perkins+Will
145
programming
CAPS
4
04/24/2008 DRAFT SPACE DESCRIPTION 250
Programmed Area
planned students, grades 11-12 teaching
4
SPACES total
facility management spaces NOTES
each
STUDENTS total
each
NET SQUARE FEET total
300
FACILITY MANAGEMENT AND SUPPORT SPACES
A.
Property Control
1.
Central receiving / office
1
300
2.
Storage
1
150
150
3.
Recycling Storage/Collection Area
1
100
100
4.
Toilet / locker
1
50
50
Sub-Total: B.
Facility Support
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
Custodial Closets Distributed Mechanical Rooms Chiller Room Main Electrical Electrical Closets Water Heater/Boiler Room Fire Pump Fire Riser MDF/Demark IDF Elevator & machine room Freight elevator & machine room
600 displacement ventilation/underfloor air - size req?/LEED Gold Certification 4 1 1
60 150 150
Sub-Total: C.
Exterior Facilities
1.
Outdoor learning lab
2.
Staff Parking
3.
Vistor Parking
4.
Parent Queing Length
5.
Buses
in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor in grossing factor near main stairs for disabled students near loading? For large equipment. One shared elevator?
540
see Bioscience Strand
Sub-Total:
-
-
1,140
Total facility management and support spaces: TOTAL NSF
240 150 150
15
305
38,890
April 2008 Š Perkins+Will
146
146
programming
CAPS
4
facility management spaces Dedicated building services areas which house mechanical and electrical systems, provide areas for building maintenance and cleaning, and storage for supplies and equipment.
facility management spaces
outdoor workspace
engineering 1st floor human services 2nd floor
receiving/mech
toilets stair
outdoor space
stair
project/ student area 3 story commons/ resource area
dist admin proj area 2ndd floor
potential addition
stair
mp room 1st floor human services 2nd floor
admin 1st floor business 2nd floor
lobby
business 2nd floor
April 2008 Š Perkins+Will
147
147
mechanical & custodial central receiving/office 300 sf toilet/locker
programming
CAPS program Space for efficient shipping, receiving, storage, and distribution of goods throughout the facility. Work space and break room for facility management staff. special considerations • locate trash dumpsters adjacent to shipping/receiving • provide double doors • proper adequate ventilation
50 sf
4
facility management spaces
l di loading
storage ship/ receiving toilet
corridor special considerations • locate with direct access to storage and toilet requested furniture and equipment • mop sink • floor drain • washer and dryer • workbench • industrial shelving • desk and chair • marker board • tack board • file cabinet • lockers requested technology/power/communications • wireless capability • wired computer connection • ample electrical outlets • clock • telephone/intercom system room finishes • exposed, painted ceiling • painted CMU walls • slip-resistant, sealed concrete floor April 2008 © Perkins+Will
148
148
mechanical & custodial storage 150 sf
programming
CAPS program Secure storage area for items being shipped or received. Supply storage for building maintenance. special considerations • locate with direct access to shipping and receiving area • programmed spaces for maintenance are not to be utilized for electrical panels, data rooms, etc. requested furniture and equipment • industrial shelving
4
facility management spaces
l di loading
storage ship/ receiving toilet
corridor
requested technology/power/communications • ample wall outlets room finishes • exposed, painted ceiling • painted CMU walls • slip-resistant, sealed concrete floor
April 2008 © Perkins+Will
149
149
mechanical & custodial recycling storage/collection area 100 sf
programming
CAPS program Designated are for recycling to be collected and stored until picked up. special considerations • locate with direct access to shipping and receiving area • programmed spaces for maintenance are not to be utilized for electrical panels, data rooms, etc. requested furniture and equipment • bins for recyclables
4
facility management spaces
l di loading
storage ship/ receiving toilet
corridor
room finishes • exposed, painted ceiling • painted CMU walls • slip-resistant, sealed concrete floor
April 2008 © Perkins+Will
150
150
mechanical & custodial custodial closets 4 @ 60 sf each
programming
CAPS
4
program Custodial closets for cleaning and supplies distributed throughout the building
outdoor workspace
engineering 1st floor human services 2nd floor
receiving/mech
special considerations • provide adequate ventilation • programmed spaces for maintenance are not to be utilized for electrical panels, data rooms, etc. • floor drains requested furniture and equipment • floor mounted mop sink with pivoting faucet arm • floor drain • first aid kit • exhaust fan • kick plate on door • mop rack • tool storage
facility management spaces
toilets stair
outdoor space
stair
project/ student area 3 story commons/ resource area
dist admin proj area 2ndd floor
potential addition
stair
1st
mp room floor human services 2nd floor
admin 1st floor business 2nd floor
lobby
business 2nd floor
typical custodial closet location on each floor
room finishes • glazed tile on CMU walls • slip-resistant, sealed concrete floor
April 2008 © Perkins+Will
151
151
mechanical & custodial elevator/freight elevator & machine room 2 @ 150
programming
CAPS program Elevators and machines room for ease of equipment and people moving throughout the building special considerations • consider sharing one large elevator
4
facility management spaces outdoor workspace
engineering 1st floor human services 2nd floor
receiving/mech
toilets stair
outdoor space
stair
project/ student area 3 story commons/ resource area
dist admin proj area 2ndd floor
potential addition
stair
1st
mp room floor human services 2nd floor
admin 1st floor business 2nd floor
lobby
business 2nd floor
typical elevator locations
April 2008 Š Perkins+Will
152
152
appendix
CAPS
glossary Building Program A comprehensive document which presents building project requirements for use in subsequent building design phases. Information presented usually includes: project description, project goals or mission statement, site analysis, concept diagrams, facility space program, program relationship diagrams, and room data sheets. When Programming is combined with Master Planning, Master Plan Diagrams are also often included. Capacity (Effective Capacity) The number of students which can be comfortably accommodated by a facility at any given moment. To determine the capacity of a school, the number of teaching stations is multiplied times the number of students per teaching station which is then multiplied by the requested utilization factor. The effective capacity accommodates the desired degree of flexibility within a school facility. Efficiency A measure of scheduled teaching stations: more teaching stations occupied by a section of students for more periods per day results in a higher efficiency. The higher the utilization factor, the higher the facility’s efficiency. Gross Building Area Total building area, including areas of a building which are not assignable to programmatic functions. Gross area includes space for circulation corridors and stairs, wall construction, public toilets, mechanical rooms, closets, vestibules, lockers, etc. Grossing Factor A number, greater than one, which is multiplied by an established net building area to estimate the total size of a proposed building. The grossing factor is estimated based on actual net-to-gross calculations of completed projects of similar function, size, geographic region, budget, etc. Once the building is designed, the gross building area can be directly measured from the drawings. Master Plan Presents the idea and/or direction of the functional organization of the components of a campus on a site. Net Program Area The areas of a building which are usable and assignable to programmatic functions. Net area does not include space for circulation (corridors and stairs), public toilets, mechanical rooms, closets, lobbies, vestibules, etc. Program Relationship Diagram A graphic representation of optimal adjacencies of program components.
April 2008 Š Perkins+Will
i
i
appendix
CAPS
glossary Room Data A detailed description of program requirements of a room or space, often presented with a graphic representation or diagram. Information may include occupancy, furniture, equipment, technology requirements, and any special finishes, technology, millwork/builtins. School Schedule Organization of time - number and duration of periods in a school day or week. Site Analysis An objective, graphic examination of a project site which aids in the development of appropriate site utilization. Typically the analysis identifies existing conditions, main access roads, sun angles, topographic features, desirable and undesirable views, prevailing winds, noise, etc. The site analysis may indicate areas more suitable for building, distinguished from less suitable buildable areas. (Note: For the purpose of this process, the site diagrams and analysis provided are placed on a fictional site due to the unknown nature of the project sites.) Space Program A list of rooms and spaces required by a school to facilitate its defined educational objectives. This list usually evolves to indicate specifics about each room or space such as the net area required, number of occupants, and miscellaneous comments. Teaching Station Any space or place in which a group of students is gathered to learn. In middle schools and high schools that utilize a school schedule, teaching stations include not only classrooms, but also music rooms, science labs, art rooms, fitness rooms, gymnasiums, media center classrooms, theaters, etc. With the idea that each student can occupy only one place at a time, such “co-curricular” spaces relieve the quantity of general classrooms of a requirement to accommodate the entire student body at one time. In elementary schools, classrooms are counted as teaching stations, while music rooms, art rooms, and other pull-out programs are not counted, as students are not scheduled in classrooms when a class, or students, participate in special programs. Utilization Factor An estimated percentage of time less than 100% in traditionally scheduled schools that a teaching station is planned to be in use by a section of students during the cycle of the school schedule. The utilization factor is closely related to the desired schedule model and accommodates the desired degree of scheduling flexibility. Utilization factors vary according to the specific scheduling and practices of an individual school.
April 2008 © Perkins+Will
ii
ii
appendix
CAPS
planning meeting one
Ideas + buildings that honor the broader goals of society
¿ Blue Valley Schools
Gary Nevius AIA, LEED™ AP
Steve Turckes AIA, REFP, LEED™ AP
Principal
Principal, Perkins+Will
Craig Serig AIA, LEED™ AP
Aimee Eckmann AIA, LEED™ AP
Principal
Associate, Perkins + Will
Blue Valley Schools Center for Advanced Professional Studies – Workshop #1 February 29, 2008 02.15.07
Agenda – Planning Meeting 1, Day 1 8:00
Agenda – Planning Meeting 1, Day 1
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:00
Lunch
Small Group Reports
12:45
Small Group Discussion
1:30
2:15
Small Group Reports
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
3:00
Final Comments, Next Steps, Adjourn
12:45 1:30
Discussion
Small Group Reports Discussion
Small Group Discussion
Planning Process - Synopsis
Creating a Roadmap
February 29, 2008
April 4, 2008
April 18, 2006
TBD
• CAPS Report
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
• CAPS Planning • Program Review & Diagrams
• Large and Small Group Discussions • Draft Conceptual Program • Program Review & Diagrams
Feb 22
• Site Diagrams
• Large g and Small Group Discussions
• Large and Small G Group Discussions Di i
Meeting 3
Meeting 2
Meeting 1
• Review Building Diagram Options
• Site Analysis and Options
March 29
7
April 14
21
28
4
11
18
From building planning diagram arrived at in Programming Phase
To actual building floor plan arrived at in Schematic Phase
April 2008 © Perkins+Will
A1
A1
appendix
CAPS Considerations for Today
Considerations for Today (and future meetings) 1. 2. 3.
You will not agree with everything we say. Open your imaginations, be willing to “try on” ideas. Challenge your assumptions - your ideas about the “way things are” - and look toward the future. 4. Think about the impact of what is presented and discussed today. 5. Remember that understandingg future trends, while respecting the past leads to innovation. 6. There are no preconceived solutions. 7. Think about the students and what it will take to make them successful. 8. Be “on the court”. 9. Cell phones off or on Vibrate, please. 10. Have fun!
planning meeting one Agenda – Planning Meeting 1, Day 1 8:00
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:45 1:30
Small Group Reports Small Group Discussion
Discussion
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
Agenda – Planning Meeting 1, Day 1 8:00
Ideas + buildings that honor the broader goals of society
¿ Blue Valley Schools
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:45 1:30
Small Group Reports Discussion
Small Group Discussion
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
Trends/Direction/Future of Career Strands and Pathways 02.15.07
Agenda – Planning Meeting 1, Day 1 8:00
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:45
Small Group Reports
1:30
Discussion
Ideas + buildings that honor the broader goals of society
¿ Blue Valley Schools
Small Group Discussion
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
Trends and Planning Drivers/Image Survey of Projects and Ideas 02.15.07
April 2008 © Perkins+Will
A2
A2
appendix
CAPS
planning meeting one
Change – what’s different? 20th Century 1900 – Life expectancy 47 yrs. 1945 U.N. – 51 countries Early 20th – Agrarian Economy
“We can’t solve problems by using the same kind of thinking we used when we created them.”
What’s next for school facilities?
1900: 40% households farming
Mid 20th – Industrial Economy Employment – low or semi skilled Prepare students for agricultural and then industrial jobs Work was local, isolated Disconnected Low-tech Onslaught of Baby Boom United States as preeminent industrial power
Albert Einstein
21st Century Today - Life expectancy 77 yrs. 2006 U.N. – 192 countries Information Economy 2000: <2% households farming
Conceptual Age Economy Employment – highly skilled Prepare students to innovate and create Work is global, collaborative Connected High-tech Boomers retiring 8000/day Emergence of China and India NCLB
What’s next for school facilities?
Change
Change
Schools, are they changing?
Change
The World Employment Report
library/media center
Skills needed, how they are acquired, and the organization of work are all affected by digital globalization.
1.
Globalization
2.
Technological Change
Periods of rapid technological change give rise to innovation and creativity, the outcomes cannot be known in advance.
3.
Management Practices
Work is becoming independent of location and this will change management practices.
4.
Performance Driven
Evidence shows that major gains in enterprise performance only occur where use of the new technology has been combined with changes in work organization.
5.
Project-Based Teams
Transformation of enterprise, resulting in changes in the organizations toward project-based teams.
April 2008 © Perkins+Will
A3
A3
appendix
CAPS
planning meeting one
The World Employment Report 6.
7.
21st Century Skills
Wealth creation in the wealthiest countries relies less on physical inputs than on knowledge.
Knowledge Workers
Creativity / Innovation
In rapidly evolving technologies, creativity and innovation will matter more than the physical plant, physical raw materials and investment capital.
“The Creative Class now compromises more than thirty percent of the entire workforce. kf The Th choices h i these people make already have a huge economic impact, and in the future they will determine how the workplace is organized, what companies will prosper or go bankrupt, and even which cities will
Frans Johansson
“Disciplinary science is dead . . . most major advancements involve multiple disciplines” Alan Leshner, CEO American Association for the Advancement of Science
“World Flatteners” (Thomas Friedman’s)
Today’s students are likely to change careers 14-15 times during their lifetimes
analyze critical information planning skills
“When you step into an intersection of fields, disciplines, or cultures, you can combine existing concepts in to a large number of extraordinary new ones”
thrive or wither”
#1 11/9/89 #2 8/9/95 #3 Work Flow Software #4 Open-Sourcing #5 Outsourcing
Variety of skills required for the changing market self directed learning – at school and then work
utilize technical skills related to i f information ti and d communication i ti problem solving interpersonal skills- effectively communicate global awareness and literacy creativity and innovation
Directions in Education #6 #7 #8 #9 #10
Off-Shoring Supply Chaining Insourcing In-forming The Steroids
“ . . . America, as a whole, will do fine in a flat world with free trade – provided it continues to churn outt knowledge k l d workers k who h are able bl to t produce d idea-based goods that can be sold globally and who are able to fill the knowledge jobs that will be created as we not only expand the global economy but connect all the knowledge pools in the world.
Æ Æ Æ Æ Æ Æ Æ Æ Æ Æ Æ
Student-Centered, Personalized Flexible and Differentiated Learning Environments – for ALL learners Focus on Relationships, Rigor, and Relevancy Multi-use, Shared Spaces Professional Learning Communities Ubiquitous Technology – integration and implementation Informal Learning – places for students to “hang out” Safety & Security Shared Community and School Use Sustainability – high performance design Improved Student Performance
There may be a limit to the number of good factory jobs in the world, but there is no limit to the number of idea-generated jobs in the world”.
Improving Student Performance 1.
DAYLIGHTING:
better performance on standardized tests – as much as 20% in math and 26% in reading.1
2.
ACOUSTICS:
students in quieter schools score 20% higher on word recognition tests.2
3.
INDOOR AIR QUALITY:
poor IAQ reduces the ability to perform mental tasks requiring concentration, calculation or memory.3
4.
COLOR:
functional color schemes significantly reduce incidents of destructive behavior, aggressiveness.4
5.
ERGONOMICS:
furniture designed for active and dynamic movement improves short term memory and learning.5
6.
Small Learning Communities
small learning community high schools experienced 59% fewer drop-outs and 60% fewer missed days as compared to traditional high schools.6
¹ Pacific Gas and Electric report, www.h-m-g.com 2 John Lyons citing a Cornell University study, www.coe.uga.edu 3 United States Environmental Protection Agency 4 Harry Wohlfarth study of four elementary schools 5 Dr. Deiter Breithecker, ergonomic specialist 6 Bank Street College of Education, McKinsey analysis
Technology Technology Infusion
Anywhere anytime learning Smaller/portable Unencumbered Faster, Cheaper More Applications My Treo 750
Two classrooms full of inquisitive sixth- and seventh-graders were able to meet for the first time recently with the help of NASA -- an unlikely meeting as the two classes are more than 3,840 miles (approximately 7,100 kilometers) apart.
To obtain 25% penetration Ph Phone in U.S. homes it took: Contacts
– 35 Email Telephone years – 26 Windows Television years Messaging PC’s – 16 years Calendar Internet – 7 years Internet PDA’s – 3 years Camera Video Calculator And more
April 2008 © Perkins+Will
A4
A4
appendix
CAPS
planning meeting one
Sustainability
Sustainability Why be interested? Lots of good reasons but consider these three. . . Improved student performance Operational savings means dollars to the bottom line It It’ss simply the right thing to do We have not inherited the earth from our ancestors, we have only borrowed it from our children. -Kenyan Proverb
“…every day the “The US spends more on worldwide economy trash bags than ninety burns an amount of on other countries spend energy the planet EVERYTHING” Polly required LaBarre “How10,000 to Lead a days Rich Life,” Company (March (27 Fast years) to create.“ 2003) Paul Hawken
Sustainable Design Strategies immediate payback
orientation building massing window position efficient site usage
no cost
International School of Beijing long-term payback
glazing area and performance daylight controls light shelves solar shading nighttime ventilation mixed mode ventilation reflective roofs
low cost
medium cost
heat recovery desiccant cooling evaporative cooling wind towers / scoops green roofs
photovoltaics wind turbines geothermal double-skin facades
higher cost
Blythewood High School – Small Learning Communities
Blythewood High School – Curricular Flexibility lab lab
career-tech
building section diagram LEVEL 2 LEVEL 1
prep science
career tech
academic wing diagram
April 2008 © Perkins+Will
A5
A5
appendix
CAPS
planning meeting one
Blythewood High School – Program Integration
Blythewood High School
lab lab
career-tech
building section diagram
Cyber Cafe
Blythewood High School: Blythewood, SC
Curricular Flexibility and Small Learning Communities
Central Admin Science
Spec. Flex. Career Labs S Ed.
Cyber Café Media Center
Books/ Media
Wireless Access Casual Seating Daylight Views
Food
Culinary Arts Lab (or dining)
Cluster Commons
Sm. Cluster S Gp. Commons
Classrooms
Cluster Admin.
Environmental Sciences Cluster Diagram
Curricular Flexibility and Small Learning Communities Science 1500 sf Prep 250 sf Science 1500 sf
850 sf
Flex. Career Labs 1150 sf
Spec. Ed.
Classrooms
Academy @ 998 - Academic Teams Planned Programs Communications Global Issues Engineering Professional Science
1
2
3
4
Cluster Sm. Gp. Commons
Cluster Admin.
April 2008 © Perkins+Will
A6
A6
appendix
CAPS
planning meeting one
Academic Teams
group
A
Academic Teams
1
2
1
2
3
4
3
4
group
B group
group group
C group
Academic Teams
Academic Teams
1
2
1
2
3
4
3
4
2
1
2
4
3
Presentation Forum
Integral Administration
1
3
REALITY CENTER
REALITY CENTER
4 WELCOME CENTER
April 2008 Š Perkins+Will
A7
A7
appendix
CAPS
planning meeting one
Formal and Informal Interaction
1
3
Artifacts and Evidence of Learning
WORK
REALITY CENTER
EAT
2
4 WELCOME CENTER
Building Plan
academy @ 998 . buffalo ny
April 2008 Š Perkins+Will
A8
A8
appendix
CAPS Concept Sketch
planning meeting one
Academy @ 998
Waubonsee Academic Building Multi-Purpose Room
Concordia International School – Shanghai
Concordia International School – Shanghai
dining
dining
assemblies
assemblies
performances
performances
fundraisers
fundraisers
banquets
banquets
pre-function space
pre-function space
conferences
conferences
large groups
large groups
break-out area
break-out area
April 2008 © Perkins+Will
A9
A9
appendix
CAPS
planning meeting one
Concordia International School – Shanghai
Concordia International School – Shanghai
dining
dining
assemblies
assemblies
performances
performances
fundraisers
fundraisers
banquets
banquets
pre-function space
pre-function space
conferences
conferences
large groups
large groups
break-out area
break-out area
Concordia International School – Shanghai
Flexible Infrastructure
dining assemblies performances fundraisers banquets pre-function space conferences large groups break-out area
Round Rock High School #5 Electronics Lab
Round Rock High School #5 CAD Lab
display
display
moveable furniture overhead utilities 1400 sf
1400 sf
200 sf
140 sf
utilties along the wall, no floor boxes
April 2008 © Perkins+Will
A10
A10
appendix
CAPS
planning meeting one
Round Rock High School #5 Engineering Classrooms/Workroom
Northwestern University Ford Motor Company Engineering Design Center by Davis Brody Bond LLP
375 sf
850 sf
850 sf
glass walls
Round Rock High School #5 Health Sciences Lab
Michael Berry Career Center
by Fanning/Howey Associates, Inc.
Dearborn Heights, Michigan
850 sf
Dental Assisting
Open Research Area
Medical Assisting
Allied Health
1200 sf
moveable wall
Round Rock High School #5 Flexible Science Classrooms with Project Room
Flexible Science Labs
i.e. - 9th Grade Science, Earth Science
moveable tables
overhead utilities
perimeter sinks
adjustable height tables
140 sf
utilities at perimeter p and/or overhead
1000 sf 1000 sf
moveable furniture
400 sf
window to corridor
moveable walls
April 2008 Š Perkins+Will
A11
A11
appendix
CAPS
planning meeting one
Round Rock High School #5 Flexible Science Classrooms with Student Research Room
Powell Focht Bioengineering Building University of California, San Diego
i.e. - Physics, Biotechnology, Nanotechnology, Forensics display
moveable furniture
1400 sf
overhead utilities
350 sf
1400 sf
140 sf
perimeter sinks
shared small group room with utilities and glass into classrooms
Flexible Classroom
CART: Center for Advanced Research and Technology
Carl Wunsche Sr High School
by SHW Group
Carl Wunsche Sr High School
by SHW Group
Professional Tower
Technology Tower
Medical Tower First floor – career classes
Second floor – academic classes
April 2008 © Perkins+Will
A12
A12
appendix
CAPS
planning meeting one
Academy of Irving
by Powell/PSP Architects
Tribune Interactive Chicago, Illinois
Courtroom
American Red Cross
Digitas
Broadcasting
Bank of America
April 2008 Š Perkins+Will
A13
A13
appendix
CAPS
planning meeting one
Temple Hoyne Buell Hall
Temple Hoyne Buell Hall
University of Illniois, Champaign
University of Illniois, Champaign
Perkins+Will Office
American Hospital Association
Chicago, Illinois
Chicago, Illinois
DiamondCluster International Chicago, Illinois
Glen Oak High School Canton, Ohio
April 2008 Š Perkins+Will
A14
A14
appendix
CAPS Commons/Gallery Oakton Community College
planning meeting one
Teacher Center – Flight Lounge Model One square = One meter approx.
lounge seating
lounge seating
lounge seating
internet carrels
internet carrels
internet carrels
Infill existing window system with drywall partition to height of door head. Allow wood benches to remain. Same for all four bays. Provide display hanging system or forbo on walls for student artwork.
Teacher Center – Flight Lounge Model
kitchenette
café tables refrigerator sink microwave
café tables
island
café tables
copier
infill wall system (gray tiles)
work / dining counter
Drywall partition screen to the height of door heads (does not extend to ceiling).
Existing plaster ceiling and lighting system to remain.
University of Texas at Arlington Arlington, Texas
Digital Theater
Agenda – Planning Meeting 1, Day 1 8:00
Agenda – Planning Meeting 1, Day 1
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:00
Lunch
12:45
Small Group Reports
12:45
Small Group Discussion
1:30
2:15
Small Group Reports
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
3:00
Final Comments, Next Steps, Adjourn
1:30
Discussion
Small Group Reports Discussion
Small Group Discussion
April 2008 © Perkins+Will
A15
A15
appendix
CAPS Agenda – Planning Meeting 1, Day 1 8:00
planning meeting one Agenda – Planning Meeting 1, Day 1
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:15
Presentation
Greetings, Project Rationale and Educational Mission
8:45
Presentation
Overview of Programming Process
8:45
Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
11:00 Discussion
Small Group Discussion
12:00
Lunch
12:00
Lunch
Small Group Reports
12:45
Small Group Discussion
1:30
2:15
Small Group Reports
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
3:00
Final Comments, Next Steps, Adjourn
12:45 1:30
Discussion
Agenda – Planning Meeting 1, Day 1 8:00 8:15
Informal Interaction Presentation Presentation
Overview of Programming Process
9:00
Presentation
Trends/Direction/Future of Career Stands/Pathways
10:00
Break
10:15 Presentation
Trends and Planning Drivers, Image Survey of Proj. and Ideas
11:00 Discussion
Small Group Discussion
12:00
Lunch
1:30
Small Group Reports Discussion
Small Group Discussion
2:15
Small Group Reports
3:00
Final Comments, Next Steps, Adjourn
Small Group Discussion
Planning Process - Synopsis February 29, 2008
April 4, 2008
April 18, 2006
TBD
• CAPS Report
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
Greetings, Project Rationale and Educational Mission
8:45
12:45
Small Group Reports Discussion
• CAPS Planning • Program Review & Diagrams
• Large and Small Group Discussions • Draft Conceptual Program • Program Review & Diagrams
Feb 22
• Site Diagrams
• Large g and Small Group Discussions
• Large and Small G Group Discussions Di i
Meeting 3
Meeting 2
Meeting 1
• Review Building Diagram Options
• Site Analysis and Options
March 29
7
April 14
21
28
4
11
18
April 2008 © Perkins+Will
A16
A16
appendix
CAPS
planning meeting two Agenda – Planning Meeting 2 8:00
Ideas + buildings that honor the broader goals of society
¿ Blue Valley Schools
Informal Interaction
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
10:30
Break
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
Discussion
2:00 3:00
Small Group Reports Discussion
3:30
Large Group Discussion Final Comments, Next Steps, Adjourn
Blue Valley Schools Center for Advanced Professional Studies – Workshop #2 April 4, 2008 02.15.07
Agenda – Planning Meeting 2 8:00 8:15
Informal Interaction Presentation Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
10:30
Break
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
2:00
Small Group Reports
3:00
Large Group Discussion
Discussion
3:30
April 4, 2008
April 18, 2006
TBD
• CAPS Report
• Visual Listening
• CAPS Planning
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
• Large and Small Group Discussions
• Program Review & Diagramming
• Draft Conceptual Program
• Large and Small Group p Discussions
• Program Review & Diagrams
• Site Analysis/Diagrams •L Large and dS Smallll Group Discussions
Meeting 3
Meeting 2
Meeting 1 Feb 22
• Review Building Diagram Options
March 29
7
April 14
21
28
4
11
18
Final Comments, Next Steps, Adjourn
Small Group Discussions – Common Threads
February 29, 2008
Tom Trigg
8:30
Discussion
Planning Process - Synopsis
A “do” environment, project areas, “imagination labs” Flexibility to accommodate future changes Agility, mobile, transformational environment Large, multi-use, flexible presentation space Transparency Outdoor learning spaces Professional look look, welcome center Different sized spaces Inviting, engaging Community use Ubiquitous technology 24/7/365
Agenda – Planning Meeting 2 8:00
Informal Interaction
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
10:30
Break
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
Discussion
2:00 3:00 3:30
Small Group Reports Discussion
Large Group Discussion Final Comments, Next Steps, Adjourn
April 2008 © Perkins+Will
A17
A17
appendix
CAPS
planning meeting two
Agenda – Planning Meeting 2 8:00
Agenda – Planning Meeting 2
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Tom Trigg
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
9:00
Presentation
Visual Listening
10:30
Break
10:30
Break
10:45 Presentation
Innovative Work Environments
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:15 Discussion
Large Group Discussion
11:45
Lunch
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
1:00
Small Group Discussion
Small Group Reports
2:00
Large Group Discussion
3:00
Final Comments, Next Steps, Adjourn
3:30
Discussion
2:00 3:00
Discussion
3:30
Discussion
Small Group Reports Discussion
Large Group Discussion Final Comments, Next Steps, Adjourn
Planning Process - Synopsis
Innovative Professional Environments
February 29, 2008
April 4, 2008
April 18, 2006
TBD
• CAPS Report
• Visual Listening
• CAPS Planning
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
• Large and Small Group Discussions
• Program Review & Diagramming
• Draft Conceptual Program
• Large and Small Group p Discussions
• Program Review & Diagrams
Feb 22
• Site Analysis/Diagrams •L Large and dS Smallll Group Discussions
Meeting 3
Meeting 2
Meeting 1
• Review Building Diagram Options
March 29
7
April 14
21
28
4
11
Innovative Professional Environments - IDEO
18
Innovative Professional Environments - IDEO
April 2008 © Perkins+Will
A18
A18
appendix
CAPS
planning meeting two
Innovative Professional Environments - IDEO
Innovative Professional Environments – Bank of America
Communications
Innovative Professional Environments – Bank of America
Associates Hub
Innovative Professional Environments – Bank of America
Associates Hub Daylight and Views
Innovative Professional Environments – Bank of America
Innovative Professional Environments – Haworth
Plaza garden
Sky garden
April 2008 © Perkins+Will
A19
A19
appendix
CAPS
planning meeting two
Innovative Professional Environments – Haworth
Innovative Professional Environments – Haworth
Work | Restore
Integrated Technology + Messaging
Innovative Professional Environments – Haworth
Innovative Professional Environments – Haworth
Studio | Teaming | Touch Down
Teaming | Break-Out | Casual Meeting | Display
Innovative Professional Environments – Haworth
Innovative Professional Environments – Haworth
Refresh
Work Styles
Lounge | Studio | Refresh
Break-Out Space
April 2008 © Perkins+Will
A20
A20
appendix
CAPS
planning meeting two
Innovative Professional Environments – Cardinal Health
Innovative Professional Environments – Bloomberg
Flexible technology
Innovative Professional Environments – Bloomberg
Innovative Professional Environments – Bloomberg
Flexible teaming
Open “snack bar”
Innovative Professional Environments – REDBULL
Cultural place names
Real-time communications
Innovative Professional Environments – Mindlab
Transparency
Write-able surfaces
Group
Privacy act
Play
April 2008 © Perkins+Will
A21
A21
appendix
CAPS
planning meeting two
Innovative Professional Environments – Mindlab
Innovative Professional Environments
Objects as space and place Mobile work place
Project room
Innovative Professional Environments
Innovative Professional Environments
Teaming
Unconventional meeting space
Innovative Professional Environments
Computer Lab
Unconventional meeting space
Innovative Professional Environments – Hyatt Corporate HQ
Integrated technology
April 2008 © Perkins+Will
A22
A22
appendix
CAPS Innovative Professional Environments – P+W New York
Hoteling | Pin-Up
planning meeting two
Innovative Professional Environments – Resultech
Studio Concept
Innovative Professional Environments – Resultech
Innovative Professional Environments – Stanford Center for Innovations in Learning
Architecture as communication tool
Agenda – Planning Meeting 2 8:00
Agenda – Planning Meeting 2
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Tom Trigg
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
9:00
Presentation
Visual Listening
10:30
Break
10:30
Break
10:45 Presentation
Innovative Work Environments
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:15 Discussion
Large Group Discussion
11:45
Lunch
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
1:00
Small Group Discussion
Small Group Reports
2:00
Large Group Discussion
3:00
Final Comments, Next Steps, Adjourn
3:30
Discussion
2:00 3:00
Discussion
3:30
Discussion
Small Group Reports Discussion
Large Group Discussion Final Comments, Next Steps, Adjourn
April 2008 © Perkins+Will
A23
A23
appendix
CAPS
planning meeting two
Agenda – Planning Meeting 2 8:00
Diagramming 101
Informal Interaction
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
bubble diagrams
10:30
Break
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
Discussion
2:00 3:00
planning diagrams
Small Group Reports Discussion
3:30
from: concept (idea)
floor plans and sections
Large Group Discussion Final Comments, Next Steps, Adjourn
to details
Diagramming 101
From building planning diagram arrived at in Workshop Phase
Diagramming 101 – Examples
Diagramming 101 – How to Read/Draw a Bubble Diagram
To actual building floor plan arrived at in Schematic Phase (after site selection)
Diagramming 101 – Process BUILDING DIAGRAM
ACADEMIC
CLASSROOMS
SCIENCE AND VOCATIONAL TECHNOLOGY
April 2008 © Perkins+Will
A24
A24
appendix
CAPS
planning meeting two
Diagramming 101 – Plan View
Diagramming 101 – Building Section
Axon (axonometric)
Plan
Diagramming 101 – Building Section
Section
Agenda – Planning Meeting 2 8:00
lab
career-tech
building section diagram
Informal Interaction
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
lab
10:30
Break
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
Discussion
2:00 3:00
Small Group Reports Discussion
3:30
Agenda – Planning Meeting 2 8:00
Large Group Discussion Final Comments, Next Steps, Adjourn
Agenda – Planning Meeting 2
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Tom Trigg
8:15
Presentation
Tom Trigg
8:30
Presentation
Recap of Workshop 1
8:30
Presentation
Recap of Workshop 1
9:00
Presentation
Visual Listening
9:00
Presentation
Visual Listening
10:30
Break
10:30
Break
10:45 Presentation
Innovative Work Environments
10:45 Presentation
Innovative Work Environments
11:15 Discussion
Large Group Discussion
11:15 Discussion
Large Group Discussion
11:45
Lunch
11:45
Lunch
12:30 Presentation
Draft Conceptual Program / Diagramming 101
12:30 Presentation
Draft Conceptual Program / Diagramming 101
1:00
Small Group Discussion
1:00
Small Group Discussion
Small Group Reports
2:00
Large Group Discussion
3:00
Final Comments, Next Steps, Adjourn
3:30
Discussion
2:00 3:00
Discussion
3:30
Discussion
Small Group Reports Discussion
Large Group Discussion Final Comments, Next Steps, Adjourn
April 2008 © Perkins+Will
A25
A25
appendix
CAPS
workshop 2 - visual listening
April 2008 Š Perkins+Will
A26
appendix
CAPS
workshop 2 - visual listening
April 2008 Š Perkins+Will
A27
appendix
CAPS
workshop 2 - visual listening
April 2008 Š Perkins+Will
A28
appendix
CAPS
planning meeting two - visual listening
April 2008 Š Perkins+Will
A29
appendix
CAPS
planning meeting two - visual listening
April 2008 Š Perkins+Will
A30
appendix
CAPS
planning meeting two - culture/experience/brand The photographs and notes on the following pages are the result of the following homework assignment, given before Workshop 2: Please bring to the session an image or object that best describes the concepts listed below and be prepared to explain why you selected each item. 1. Culture What is the culture we are trying to create within the new CAPS school? How does this differ from other school cultures? What will make this culture unique? 2. Experience Who are your “clients”? What experience do you want them to have in this environment? How do we craft an experience along the entire range of contact points? 3. Brand What are the Blue Valley CAPS brand attributes? What is the voice and tone of the brand? What will differentiate this brand from any other?
April 2008 © Perkins+Will
A31
appendix
CAPS
planning meeting two - culture/experience/brand Photo Compilation Culture - Kids from all 5 schools coming together, different culture at CAPS because they will all be together Experience - Clients are the kids
Culture - Sweet grass basket from South Carolina African American traditional art form, unique to the US All of strands are coming together in different ways to make something solid, useful and beautiful Experience - 2nd Grade Class Photo These are the kids that we will be serving at CAPS Brand - Rock Blue Valley is solid and will continue to be a solid district
Culture/Brand/Experience - Critical Thinking Wheel Areas of comprehension, analysis performance and synthesis Moving learning on to higher levels of critical thinking Training kids for jobs that donâ&#x20AC;&#x2122;t exist Preparing for the world of work
April 2008 Š Perkins+Will
A32
appendix
CAPS
planning meeting two - culture/experience/brand Culture/Experience - Picture of Verneda’s Son For learners who we won’t always capture in a traditional high school Kids are the most precious commodity Brand - What is best for kids
Culture/Brand/Experience - Business Card Represents professionals Joe Brown photo Ready when he was 16 to take on the CAPS challenge
Culture - Nike Decided to be different, decided to personalize - student can personalize their own learning More investment in education = more meaningful education Experience - Magnets Clients are the students - Some may work individually, virtually, internationally, collaboratively Brand - “50 Best Companies” Goal is to be one of the 50 most innovative schools April 2008 © Perkins+Will
A33
appendix
CAPS
planning meeting two - culture/experience/brand Culture – Albert Einstein Didn’t fit in a traditional school Most creative person is the scientist Experimentation and depth of learning Experience – Clients Elizabeth - Kindergartner who loves school no matter what it looks like, will fit into High School and will fit into CAPS, loves the social part of school Zach – Uncanny, peculiar insatiable curiosity, loves learning, likes the experience, he needs something different Brand – Innovation in Education Relevant learning through professional experience
Culture - Gift from BVW industrial technology (pyramid paperweight) Links to the high schools, image is different Creative, out of the box – multiple uses, all kinds of reflections, refractions Experience - Bend-able Happy Face Smiling, happy, successful, moldable, changeable, will respond to stimulus Brand - Nike School has to be for everybody (attainable by everyone) Kids are proud of it, but maintain school spirit from their high school
April 2008 © Perkins+Will
A34
appendix
CAPS
planning meeting two - culture/experience/brand Culture – Globe Professional workplace, cross generational as well as global, everybody in the center is a learner (including the instructors) High energy, highly competitive Experience – Academic Beacon Students, business, faculty, community, state etc., empowering opportunities to achieve high expectations Spirit of innovation and discovery, crafted with business partners Branding – Pinnacle Award, Scales Pinnacle of secondary education, transparency
Culture - Flywheel Personalized student learning, to deliver an education beyond expectations Always turning, always changing, flexible Experience – Blue Valley Logo How we deliver education beyond expectations Brand - Global Corporate, personalized, visionary academics, inspirational teaching
April 2008 © Perkins+Will
A35
appendix
CAPS
planning meeting two - culture/experience/brand Culture - Treo Technology, innovation, future Can personalize, can download Experience - Magic wand Open possibilities will seem more like play than work
Culture and Experience – 3-Way Switch Turn the “light bulb” on from a couple different locations, interdisciplinary Takes wires to connect – acknowledge different types of learners kids get a great experience out of it
Culture – iPod nano A culture changing device Experience How we use an iPod vs. how kids use it i.e. - two kids both listening to same ipod – it’s a collaborative, personalized experience Branding Provides a different experience It’s the design that makes it different The experience and how it is delivered will make it unique April 2008 © Perkins+Will
A36
appendix
CAPS
planning meeting two - culture/experience/brand Leonardo DaVinci’s Vitruvian Man Culture - Measuring out knowledge, renaissance of learning for students, eye opening, new ways of learning Experience – Leonardo was a scientist and an artist – encourage interdisciplinary studies Brand – Students should be able to answer the question “What is this facility?” as they would a well know work of art Culture – Starbucks Provides an experience, creates focus, personalized, connects to every person Experience – Compass Charting a course, creating a path Brand – Globe Beyond Blue Valley, beyond Kansas prepare students for a global society Culture - Portfolio Professional environment Clients – The Kids Brand – Kirby Husker Has one finger up in the air - think of kids as one at a time, personalize education
April 2008 © Perkins+Will
A37
appendix
CAPS
planning meeting two - culture/experience/brand Culture/Experience/Brand - Piece of a Mountain Sense of pride, mountain as something to climb/accomplish, challenging, Design a space for a location Teamwork â&#x20AC;&#x201C; important for process but also to get it up and running and for students, part of learning
Eiffel Tower Culture/Experience - becomes a goal to see, image stays with you, enduring symbol, sits in a dynamic place accommodates lots of people, culture that has expanded to include many cultures, symbol for the future Brand - Self-descriptive of what it is, where it is
Open Hand Culture - Open, instructional, collaborative Experience - Clients could be anybody, reaching to anyone Brand - Peaceful, safe, invitational
April 2008 Š Perkins+Will
A38
appendix
CAPS
planning meeting two - culture/experience/brand Culture/Experience/Brand - Malcolm Baldridge National Quality Award Excellence in the program, quality, leadership, stewardship, mentorship Make everybody better – lift everything up External validation Symbol of quality, quest for excellence – continually striving to be better Not pictured: Eric Kessler Culture - Hand/Images of caves in Lascaux France Innovative, artistic, experiential, learn about the world, global – 1st generation to be competing globally Experience - Balance between professional/playful, youth/ adulthood Dan French Common thread: Partnerships of high school students coming together in common environment Partnerships of companies Brand education with the most touches into the community (noneducational institutions) Pam Robinson Telescope, focused instruction through a particular lens that sees the world beyond Tony Lake Culture/Experience/Brand Think to the future, be relevant to individual needs, attainable for all types of students, the best, cutting edge
April 2008 © Perkins+Will
A39
appendix
CAPS
planning meeting three Planning Process - Synopsis February 29, 2008
April 4, 2008
April 18, 2006
TBD
• CAPS Report
• Visual Listening
• CAPS Planning
• Draft Conceptual Program
• Final Draft Program Presentation and Edits
• User Group Meetings to discuss detailed room requirements
• Large and Small Group Discussions
Ideas + buildings that honor the broader goals of society
• Program Review & Diagramming
• Draft Conceptual Program
• Large and Small Group p Discussions
• Program Review & Diagrams
¿ Blue Valley Schools
Feb 22
• Site Analysis/Diagrams •L Large and dS Smallll Group Discussions
Meeting 3
Meeting 2
Meeting 1
• Review Building Diagram Options
March 29
7
April 14
21
28
4
11
18
Blue Valley Schools Center for Advanced Professional Studies – Workshop #3 April 18, 2008 02.15.07
Agenda – Planning Meeting 3 8:00 8:15
Workshop 2 Recap – Visual Listening
Informal Interaction Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:45 1:45
Small Group Reports Discussion
Large Group Discussion – Finalize diagrams and program, thoughts and reflections
2:45
Final Comments, Next Steps, Adjourn
Workshop 2 Recap – Visual Listening
Workshop 2 Recap – Visual Listening
Presentation space
Symbol of strand
Reception area
Meeting space/resource area
Outdoor learning space
Flexibility
Organic, sensory experience
Transparency
Transparency – outside
Non-traditional
inside
Electronic media display
Inspirational
Height/openness
Warm, intimate
Cyber café/technology
Collaboration
Collaboration
Fun! Team-building Unique
April 2008 © Perkins+Will
A40
A40
appendix
CAPS
planning meeting three
Workshop 2 Recap – Visual Listening
Workshop 2 Recap – Culture/Experience/Brand CAPS will have its own culture of 5 schools coming together, strands coming together
Open ceiling - expose building systems, teaching tool, flexibility Transparency Comfort helps with creativity
Clients are the kids, capture different kinds of learners, attainable by everyone
Multi-level, unexpected Color, light, bright
Students can personalize their learning
Different types of furniture Lighting defines spaces
One of the most innovative schools, creative, out-of the-box
Place to relax
Relevant learning through professional experiences
A place where creativity happens Openness
Multiple-uses, flexibility
Outdoor seating, outdoor space
Workshop 2 Recap – Culture/Experience/Brand Spirit of innovation and discovery
Workshop 2 Recap – Bubble Diagrams Engineering and Bioscience
Interdisciplinary Collaborative, personalized The experience and how it is delivered will make it unique Prepare students for a global society Professional Symbol for the future Community/professional involvement
Workshop 2 Recap – Bubble Diagrams Human Services and Business
Workshop 2 Recap – Bubble Diagrams Whole Building
April 2008 © Perkins+Will
A41
A41
appendix
CAPS
planning meeting three
Agenda – Planning Meeting 3 8:00
Agenda – Planning Meeting 3
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:00
Lunch
Small Group Reports
12:45
Large Group Discussion –
1:45
12:45 1:45
Discussion
Small Group Reports Discussion
Finalize diagrams and program, thoughts and reflections 2:45
Finalize diagrams and program, thoughts and reflections 2:45
Final Comments, Next Steps, Adjourn
Site Analysis
Large Group Discussion –
Final Comments, Next Steps, Adjourn
Site Analysis West 149th Terrace
Predominant Winter Winds
High Point 1010
Summer Sun Marty Street
In Line Detention Setback
Winter Sun
Low Point 995
Predominant Summer Winds
Low Point 985
West
Site Analysis – Building Placement
151st Street
Site Study With Streamway Relocation
West 149th Terrace
Parking
Martty
Street
Parking
West 151st Street
April 2008 © Perkins+Will
A42
A42
appendix
CAPS
planning meeting three Building Diagram – Linear 2 Story Scheme
Site Study Without Streamway Relocation
receiving/ mech
commons 1st floor human services 2nd floor
bioscience 1st floor business 2nd floor
toilet
staff
potential addition
outdoor space
engineering 1st floor human services 2nd floor
admin 1st floor dist lobby mp room 2nd floor admin outdoor workspace
Building Diagram – Finger 2 Story Scheme
stair
bioscience 1st floor business 2nd floor
project/student area
stair
Marty Street
outdoor workspace
project/student area
engineering 1st floor human services 2nd floor
West 151st Street
Site Diagram – Finger 2 Story Scheme
stair
receiving/mech
toilets
dist admin
commonss 1st floor mp room 2nd floor
West 149th Terrace
admin 1st floor human services 2nd floor
potential addition
lobby
toilets
stair
Site Diagram – Linear 2 Story Scheme
outdoor workspace
Building Diagram – Atrium 2 Story Scheme outdoor workspace
West 149th Terrace
stair
dist admin
Marty Street
outdoor space
stair
dist admin
bioscience 1st floor business 2nd floor
project/student area 2 story commons/ resource area project/student area
engineering 1st floor human services 2nd floor
West 151st Street
toilets
admin 1st floor mp room 2nd floor
potential addition
lobby
stair
receiving/mech
human services 2nd floor
outdoor workspace
April 2008 © Perkins+Will
A43
A43
appendix
CAPS
planning meeting three
Site Diagram – Atrium 2 Story Scheme
Building Diagram – Atrium 3 Story Scheme
West 149th Terrace
outdoor workspace
engineering 1st floor human services 2nd floor
receiving/mech
toilets stair
Marty Street
outdoor space
dist admin
project/ student area
stair
proj area 2nd floor
3 story commons/ resource area
p potential addition
stair
business 2nd floor
lobby
admin 1st floor business 2nd floor
mp room 1st floor human services 2nd floor
West 151st Street
Building Diagram – Atrium 3 Story Scheme – 3rd Floor
Site Diagram – Atrium 3 Story Scheme West 149th Terrace
bioscience 3rd floor
toilets stair
dist admin 2nd
floor proj area below
3 story commons/ resource area
potential addition Marty Street
project/ student area
2nd floor proj area below
stair
stair
potential greenhouse location
green roof/ outdoor workspace
West 151st Street
Bioscience
Business
outdoor workspace
bioscience lab
prep/storage
bioscience lab
teaching wall
moveable wall
prep/storage
teaching wall
bioscience lab
exterior
casework moveable wall
casework
casework
mass communications lab
video production
IT lab
business learning lab
teaching wall
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
learning facilitator/visiting personnel office
sm grp sm grp
student area
project area/ display
student storage project storage
stair
commons/resource area engineering
commons/resource area below engineering
human services
human services
April 2008 © Perkins+Will
A44
A44
appendix
CAPS
planning meeting three
Engineering
Human Services bioscience
bioscience
business
business commons/resource area below
stair
stair
commons/resource area
learning facilitator/visiting personnel office
student area
sm grp
project storage project area/ display
sm grp
student storage
learning facilitator/visiting personnel office
student area sm grp
sm grp
project area/ display
project storage student storage
storage
cnc lab 2 story space
digital elec lab
cad lab
health professions lab
cnc lab below
sports medicine lab
welding
outdoor workspace
pre-teacher ed lab
additional human services rooms
print room
exterior
Human Services - Continued
Administration
business corridor
project area/ display
p
student storage
IT office
couns office
toilet
conf room
copy
clinic office
stor
sm grp
cot room
project storage
toilet
mmons/resource area below
security
directorâ&#x20AC;&#x2122;s office
waiting area
lobby
vestibule
pre-teacher ed lab
health professions room
storage
sports medicine lab
moveable wall
s
additional human services rooms
exterior
human services lab
main entry
health professions room
exterior
Distributed Administration
Multi-Purpose Room
learning facilitator workspace
multi-purpose room
private fac phone toilet
moveable wall
exterior
storage
corridor
visiting personnel
corridor exterior
April 2008 Š Perkins+Will
A45
A45
appendix
CAPS
planning meeting three
Commons
Facility Management strand
student area
stair
learning facilitator/visiting personnel office
project area/ display
sm grp
student storage project storage
commons/resource area
project area/ display
student area sm grp
loading
storage ship/ receiving toilet
catering kitchen
sm grp sm grp
moveable wall
exterior outdoor space o
learning facilitator/visiting personnel office
project storage student storage
corridor
strand
Improving Student Performance
Sustainability/Building as a Teaching Tool Rain Garden Alpahretta High School
1.
DAYLIGHTING:
better performance on standardized tests – as much as 20% in math and 26% in reading.1
2.
ACOUSTICS:
students in quieter schools score 20% higher on word recognition tests.2
3.
INDOOR AIR QUALITY:
poor IAQ reduces the ability to perform mental tasks requiring concentration, calculation or memory.3
4.
COLOR:
functional color schemes significantly reduce incidents of destructive behavior, aggressiveness.4
5.
ERGONOMICS:
furniture designed for active and dynamic movement improves short term memory and learning.5
6.
Small Learning Communities
small learning community high schools experienced 59% fewer drop-outs and 60% fewer missed days as compared to traditional high schools.6
¹ Pacific Gas and Electric report, www.h-m-g.com 2 John Lyons citing a Cornell University study, www.coe.uga.edu 3 United States Environmental Protection Agency 4 Harry Wohlfarth study of four elementary schools 5 Dr. Deiter Breithecker, ergonomic specialist 6 Bank Street College of Education, McKinsey analysis
Sustainability/Building as a Teaching Tool Green Roof
Sustainability/Building as a Teaching Tool Green Roof
Woodward Middle School
April 2008 © Perkins+Will
A46
A46
appendix
CAPS Sustainability/Building as a Teaching Tool Wind Turbines Near North Apartments, Chicago, IL (Murphy/Jahn)
planning meeting three Sustainability/Building as a Teaching Tool Natural Ventilation – Gale School Community Center, Chicago, IL
A petite, modular design that can accommodate city rooftops of many sizes Continuous energy production in variable city winds Does not rotate in excess of 400 revolutions per minute (rpm) The first battery-free wind turbine Excerpts from GreenSource Magazine, October 2007
Sustainability/Building as a Teaching Tool Permeable Paving Morton Arboretum – Lisle, IL
Sustainability/Building as a Teaching Tool Bioswales Morton Arboretum – Lisle, IL
Sustainability/Building as a Teaching Tool Living Machine Darrow School – New Lebanon, NY
Sustainability/Building as a Teaching Tool Daylighting/Flexibility/Reduce Future Remodel
April 2008 © Perkins+Will
A47
A47
appendix
CAPS Sustainability/Building as a Teaching Tool Flexibility/Reduce Future Remodel
planning meeting three Sustainability/Building as a Teaching Tool Stormwater/Greywater – Lehman College Science Facility
Sustainability/Building as a Teaching Tool
Sustainability/Building as a Teaching Tool
Stormwater/Greywater – Lehman College Science Facility
Stormwater/Greywater – Lehman College Science Facility
Agenda – Planning Meeting 3 8:00
Agenda – Planning Meeting 3
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:00
Lunch
12:45
Small Group Reports
12:45
Large Group Discussion –
1:45
1:45
Discussion
Finalize diagrams and program, thoughts and reflections 2:45
Final Comments, Next Steps, Adjourn
Small Group Reports Discussion
Large Group Discussion – Finalize diagrams and program, thoughts and reflections
2:45
Final Comments, Next Steps, Adjourn
April 2008 © Perkins+Will
A48
A48
appendix
CAPS Agenda – Planning Meeting 3 8:00
planning meeting three Agenda – Planning Meeting 3
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:00
Lunch
Small Group Reports
12:45
Large Group Discussion –
1:45
12:45 1:45
Discussion
Small Group Reports Discussion
Finalize diagrams and program, thoughts and reflections 2:45
Final Comments, Next Steps, Adjourn
Agenda – Planning Meeting 3 8:00
Large Group Discussion – Finalize diagrams and program, thoughts and reflections
2:45
Final Comments, Next Steps, Adjourn
Agenda – Planning Meeting 3
Informal Interaction
8:00
Informal Interaction
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:00
Lunch
Small Group Reports
12:45
Large Group Discussion –
1:45
12:45 1:45
Discussion
Finalize diagrams and program, thoughts and reflections 2:45
Final Comments, Next Steps, Adjourn
Small Group Reports Discussion
Large Group Discussion – Finalize diagrams and program, thoughts and reflections
2:45
Final Comments, Next Steps, Adjourn
Agenda – Planning Meeting 3 8:00
Informal Interaction
8:15
Presentation
Recap of Workshop 2, Revised Space Program
8:45
Discussion
Large Group Discussion - Verify Space Program
9:15
Presentation
Planning Area, Building and Site Diagrams
10:00
Break
10:15 Discussion
Large Group Discussion - Thoughts on Diagrams
11:00 Discussion
Small Group Discussion – Reaction to Diagrams
12:00
Lunch
12:45 1:45
Small Group Reports Discussion
Large Group Discussion – Finalize diagrams and program, thoughts and reflections
2:45
Final Comments, Next Steps, Adjourn
April 2008 © Perkins+Will