ABC/WMC 2020 Excellence in Construction Awards

Page 1

2020



N

OT CANCELLED! Hosting the 2020 Excellence in Construction ( EIC ) Awards took on a sense of urgency as committee members were determined to keep the 44th annual event alive. Recognizing member accomplishments and preserving traditions are important. I am incredibly grateful for the effort and creativity of ABC members and staff who serve on the 2020 Excellence in Construction Awards Committee. From virtual judging to social distancing at the Getty Drive-In movie theatre – the committee has done an incredible job! My sincere thanks to the committee for their outstanding effort in what promises to be an unforgettable event. I am humbled by the service of our 60+ volunteers who work year-round to make the Excellence in Construction Awards happen. The Excellence in Construction Awards recognizes and celebrates outstanding projects built by ABC-Western Michigan Chapter (ABC/WMC) members. By focusing on the highest quality and innovation in merit shop construction, ABC/WMC calls attention to those outstanding projects and continues to raise standards throughout the construction industry. The EIC Awards also raise public awareness of the exceptional work our members perform as we directly impact the structure, design, and look of our communities where we live, work, and play. We have always understood that construction workers are essential. Special recognition will be given to the men and women behind these outstanding projects. The doers, problem solvers, and collaborators who brought these projects to life. Covid-19 has highlighted the fact that the industry is filled with men and women who step up and help each other and their communities in time of need. We salute the craft professionals who get up every day and make it happen - safely. In addition to the 90+ outstanding project entries this year, ABC Western Michigan will present two Safety Awards of Excellence to one trade contractor and one general contractor. The Safety Award of Excellence is sought after year over year and is difficult to win. ABC/WMC includes member surveys of safety performance, job site visits, peer review, and interviews with entrant’s senior leadership teams. Winners in these two categories will be announced live at the Excellence in Construction Awards. Safety is one of the highest priorities of ABC/WMC member companies and we’re delighted to recognize the accomplishments of member companies who go above and beyond to keep their teams safe. Wave to your friends and honk your horn! The 2020 Excellence in Construction Awards are coming to the Getty Drive-In Theatre in Muskegon, and we hope you will help us celebrate the people, projects and safety performance that make West Michigan commercial construction the best of the best!

Norm Brady, President & CEO ABC Western Michigan 580 Cascade West Parkway Grand Rapids, MI 49546 (616) 942-9960 nbrady@abcwmc.org

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  3


About Us One Mission for the Benefit of Many. We have the same interest in mind — your business. Associated Builders and Contractors, Inc., Western Michigan Chapter (ABC/WMC) is a chapter of ABC, a national association founded in 1950 to promote merit shop principles and free enterprise in America’s commercial construction industry. ABC/WMC firmly believes what benefits clients and the industry, supports those within it. For over 60 years, ABC/WMC’s objective has been to advance and defend the merit shop philosophy and open shop contractors. We do this by delivering a comprehensive range of programs and services, which include education and training, professional development and networking, political advocacy, and costsaving benefits. These value-added benefits strengthen our members and provide tools for success in this highly competitive marketplace. ABC is recognized as one of the leading organizations representing America’s business community and the merit shop construction industry. ABC/WMC helps members develop people, win work, and deliver that work safely, ethically, and profitably for the betterment of their communities.

Our Purpose Is To: ■ EDUCATE  We advance our members’ potential through cutting-edge educational programs from craft to high-performance safety, professional management, and executive leadership development. ■ CONNECT  We create open, energetic environments where best practices and insights can be shared and implemented to reinforce West Michigan’s reputation for excellence in merit shop construction. ■ ADVOCATE  We act as an influential voice for the industry as a whole, representing the collective voice of our members in the community, with the media, and with governmental/political entities. ■ SUPPORT  We deliver cost-saving programs from leading vendors and ABC business partners including wireless phone plans, fleet and vehicle discounts, and more. Learn more and join us by visiting abcwmc.org.

4  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Chapter Staff

Norm Brady President and CEO

Monica Kioshi Marketing & Events Specialist

Jen Schottke Vice President of Operations

Jasmine Weston Education and Training Coordinator

Board of Directors Brian Potter, Architectural Metals, Inc..............................................................................................Chair Ben Hammond, Hilger Hammond...........................................................................................Chair-Elect Chris Beckering, Pioneer Construction....................................................................................... Director Randy Boss, Ottawa Kent Insurance........................................................................................... Director Carroll Burgess, Burgess Concrete Construction...................................................................... Director Jerry Cardinal, HighPoint Electric................................................................................................ Director John DeBlaay, Dan Vos Construction.......................................................................................Ex-Officio Byrne Harmon, FCC Construction................................................................................................ Director Steve Huizinga, Allied Mechanical Services............................................................................... Director Steve Longstreet, Buist Electric.............................................................................. Director [2019 Chair] Tom McGovern, Rockford Construction...................................................................................... Director CJ McKenzie, First Companies....................................................................................................Director Curt Mulder, Wolverine Building Group....................................................................................... Director Nick Nykerk, Lakewood Construction......................................................................................... Director Jon Potvin, Colliers International................................................................................................. Director Tony Roussey, EV Construction...................................................................................................Director Kristin Ruud, S.A. Morman...........................................................................................................Director Jeff Schipper, Integrated Exteriors.............................................................................................. Director Justin Thrun, VanDyken Mechanical........................................................................................... Director Tony Vermaas, Sobie Company...................................................................................................Director Ben Wickstrom, Erhardt Construction......................................................................................Ex-Officio

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  5


Excellence in Construction Awards

Sponsors PLATINUM • ABC Self Insured Workers’ Compensation Program • Allied Mechanical Services • Pioneer Construction • Rockford Construction • Tradesmen International GOLD • Allied Electric • Architectural Glass and Metals • Architectural Metals • Buist Electric • Burgess Concrete Construction • Dan Vos Construction Company • Erhardt Construction • EV Construction • FCC Construction • Feyen Zylstra • Grand Valley Automation • Halyard • HighPoint Electric • Kent Companies • Ritsema Associates • Sobie Company • The Bouma Corporation • Triangle Associates • Van Dyken Mechanical • Vos Glass • Windemuller • Wolverine Building Group SILVER • a.j Veneklasen • Beckering Construction • Beene Garter • CD Barnes Construction • First Companies • Godwin Plumbing • Integrated Exteriors • Lighthouse Insurance Group • Miller Johnson • Ottawa Kent • Rehmann • S.A. Morman & Co. • Vanguard Fire & Security Systems • Vork Brothers Painting • Zeeland Lumber

Committee Members Rachael Martemucci, Committee Chair, Owen-Ames-Kimball Co. Kate Betts.................................................Rockford Construction Ken Bos................................................................................Hylant Alaina Ekdom......................................................EV Construction Arlen Gaddy.................................................Erhardt Construction Ross Geurink.............................................. Pioneer Construction Chris Hall...............................................Tradesmen International Landon Jones..................................... Wolverine Building Group Erin Maag...............................................The Bouma Corporation Doug Scott....................................... Dependable Fire Protection Kyle Siegert.........................................................First Companies E.B. Sonheim............................................................Feyen Zylstra Bethany Stover........................................ Town & Country Group Jenny Waugh.................................................................. Fishbeck

Safety Award of Excellence Finalists Sponsored by: GENERAL CONTRACTOR / CONSTRUCTION MANAGER

TRADE CONTRACTOR

BEVERAGE • DHE Plumbing & Mechanical TRIBUTE • Tradesmen International

6  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Pure and Simple Solutions

Advanced HVAC Solutions Direct-Fired Heating, Ventilating and Make-Up Air • Energy-Saving Building Pressurization • Advanced System Control Technologies AbsolutAire is right at home in West Michigan with almost 30 years of success providing innovation, quality and service excellence with advanced AbsolutAire® HVAC solutions for the region’s thriving business and industry community. We meet the exact building air-management needs of our numerous industrial, commercial, municipal and food-service customers with 100% direct gas-fired burner technology, and a broad range of system options: • High-efficiency direct-fired air turnover • Spray & bake paint booth heating systems • Indirect-fired heating and ventilating • Cooling and humidity-control solutions • Energy-saving heat-recovery systems

Learn more: www.absolutaire.com 5496 North Riverview Drive • Kalamazoo, MI 49004 • Phone: (800) 804-4000

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  7


ABC Western Michigan Safety Award of Excellence Sponsored by

ABC Western Michigan (ABC/WMC) is proud to recognize member companies who continually strive to maintain world-class safety training programs. In our continued efforts to raise the safety bar among ABC/WMC members, the Safety Award of Excellence application process involved: 1. ABC/WMC contractor members submitted a one-page entry form including information about the contractor’s safety policies and programs, injury/illness history, and ABC Safety Training and Evaluation Process (STEP) application. 2. ABC/WMC contractor members were surveyed regarding the safety performance of their peers. General Contractors and Construction Managers were asked to respond to Trade Contractors’ safety performance. Trade Contractors were asked to respond to General Contractor and Construction Managers’ performance. 3. The Safety Award of Excellence judging panel identified the top three General Contractors and Construction Managers, and the top three Trade Contractors. 4. The Safety Award of Excellence judging panel conducted on-site interviews with the top six finalists (three General Contractors / Construction Managers and three Trade Contractors) to determine the winner in each category. The winner in the General Contractor / Construction Manager category and the Trade Contractor category will be announced live at the Excellence in Construction Awards on Wednesday, September 30.

Meet the Finalists: GENERAL CONTRACTORS / CONSTRUCTION MANAGER FINALISTS

TRADE CONTRACTOR FINALISTS

8  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


And, the nominees are…

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  9


SINGLE ENTRY CATEGORIES

Single entry categories are categories in which one project was entered. Projects in these categories are required to meet an 80% judging score in order to receive an EIC award.

MASONRY

PRECAST CONCRETE

Integrated Exteriors

Kerkstra

PROJECT Stockbridge Apartments LOCATION Grand Rapids BUDGET $1,000,000 ARCHITECT Progressive AE COMPLETION October 2019 TEAM Project Manager: Jeff Schipper Superintendent: Scott Donze

PROJECT 601 Bond LOCATION Grand Rapids BUDGET $43,000,000 ARCHITECT Ghafari Associates COMPLETION June 2019 TEAM Project Manager: Chad VanKampen Superintendent: n/a

Stockbridge used masonry for all its worth! CMU stair, elevator, and mechanical shafts provided incredible strength and fire safety to the project. The exterior is clad in a timeless mix of brick and precast to provide a building that will look as good in fifty years as it does now.

601 Bond is a modern, 16-story, multi-family development comprised of precast concrete cladding panels consisting of red-blended brick to complement the surrounding buildings. In addition to the brick clad precast, acid-etched panels displaying a contemporary checkerboard pattern were used on the parking ramp and stair tower.

PROCESS PIPING

ROOFING SINGLE-PLY

Allied Mechanical Services

Langerak Roof Systems, Inc.

PROJECT Grand Haven-Spring Lake Wastewater Treatment Plant Improvements LOCATION Grand Haven BUDGET $1,967,000 ARCHITECT Prein & Newhof COMPLETION May 2020 TEAM Project Manager: Jeff Huizinga Superintendent: Curtis Leep

PROJECT Amway, Buildings #17 and #26 LOCATION Ada BUDGET $588,000 ARCHITECT n/a COMPLETION August 2019 TEAM Project Manager: Tim Remy Superintendent: Mike VanLoozenoord

Allied Mechanical Services worked throughout the entire Grand Haven wastewater plant. This consisted of work in three separate buildings: the new construction headworks building, the existing primary sludge building, and the existing activated sludge building. The new headworks building including a triplex pump station, screening system, and grit removal equipment.

10  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Amway partnered with Langerak Roof Systems to re-roof over 90,100 SF smoothly and effectively. Langerak Roof Systems equipped Amway with a robust and dependable roof system for the internationally influential company.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Workers’ Compensation Insurance For The Construction Industry

SAFETY HAS ITS REWARDS

$74 Million Returned to Members Since 1995

$12.6 Million 2020 Return to Members

Fund Administrator

To learn more about the Fund, contact:

RPS Regency 800.686.6640 extension 2754 | abcmifund.org

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  11


CONCRETE NOMINEES

Kent Companies, Inc. (2 projects)

CONCRETE

CONCRETE

Kent Companies, Inc.

Kent Companies, Inc.

PROJECT Studio Park(ing) LOCATION Grand Rapids BUDGET $10,935,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Andre Scott Superintendent: Troy Clinger

PROJECT The Exchange LOCATION Kalamazoo BUDGET $13,729,000 ARCHITECT Byce & Associates, Inc. COMPLETION May 2019 TEAM Project Manager: Andre Scott Superintendent: Randy Bergaaker

The Studio Park(ing) Ramp is a six-level, cast-in-place concrete parking ramp adding over 900 parking spaces for public and event parking in downtown Grand Rapids. A hybrid post-tension beam and flat plate system deliver engineered capability for future buildout to become a mixed-use structure.

The Exchange is a 15-story, mixed-use building in Kalamazoo, Michigan, offering commercial, retail and residential spaces. A cast-in-place helical ramp offers access to the mid-level parking. The striking cast-in-place façade and concrete monumental cap make this building stand out on the skyline.

12  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  13


ELECTRICAL

ELECTRICAL NOMINEES

Allied Electric, Inc. Buist Electric (2 projects) Kleyn Electric, Inc. Town & Country Group Windemuller

Buist Electric PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $1,922,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Aaron Cooper Superintendent: Ryan TenBroeke This new design/build project was roughly 60,000 SF. The schedule was complex and included coordination among other contractors. Additional difficult conditions included the unique architectural features and very high-end finishes. This project encompassed five different departments from Buist Electric, including, electrical, communications, outdoor utilities, testing, and audio/visual.

ELECTRICAL

ELECTRICAL

Town & Country Group

Windemuller

PROJECT Aquinas College, Albertus Magnus Hall of Science LOCATION Grand Rapids BUDGET Confidential ARCHITECT TowerPinkster COMPLETION December 2019 TEAM Project Manager: Jeff Jippling Superintendent: Troy Hop

PROJECT Ascension Borgess Surgery Addition & Renovation LOCATION Kalamazoo BUDGET $3,500,000 ARCHITECT HED Design COMPLETION April 2020 TEAM Project Manager: Pete Carlson Superintendent: Scott Beard

This project presented many challenges, including: working in an occupied building; adhering to a tight schedule; and completing extensive site and work scope, yet Town & Country Group prevailed. TCG installed the electrical and lighting control systems, the fire system, and they performed primary/medium voltage cabling, installation, testing and terminations.

Ascension Borgess Hospital was seeking to build a new secondfloor surgery center on top of a functioning first-floor surgery center. The expansion gives the hospital 12 new operating rooms, including eight fully-equipped standard ORs, two OR spaces intended for future build-outs, and two specialized endovascular hybrid ORs.

14  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


ELECTRICAL

ELECTRICAL

Buist Electric

Allied Electric, Inc.

PROJECT Stryker Instruments LOCATION Portage BUDGET $24,354,000 ARCHITECT HOK & TowerPinkster COMPLETION November 2019 TEAM Project Manager: Joe Westra Superintendent: Matt VanDyk

PROJECT Studio Park LOCATION Grand Rapids BUDGET $2,000,000 ARCHITECT Integrated Architecture COMPLETION November 2019 TEAM Project Manager: Paul Hansma Superintendent: Jarrod Bening

This design-assist project was a $154 million research and development facility for Stryker Instruments. The project included over 75 acres of site development, and a 485,000 SF, three-story facility with R&D commercial and leadership teams. The project greatly impacted the Kalamazoo area, cementing Stryker’s legacy in the community.

Allied Electric was honored to be the electrical contractor and a design-build partner for phase one of Studio Park in downtown Grand Rapids. The project entailed supplying power to all equipment, lighting, and lighting control systems, within the 44,546 SF building and 900-space parking garage.

ELECTRICAL

Kleyn Electric, Inc. PROJECT Van Andel Arena Locker Rooms and VIP Room Renovation LOCATION Grand Rapids BUDGET $250,000 ARCHITECT Pinnacle Construction Group COMPLETION March 2020 TEAM Project Manager: Nicholas Kleyn Superintendent: Jake Kamps & David Dijkstra Kleyn Electric was given the task to remodel Van Andel Arena’s Locker and VIP rooms, in a short time frame, while the Arena was still being used. With the help of special LED lighting, the results were outstanding, giving the customer a beautiful project and great looking product when completed.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  15


EXTERIOR FINISHES

EXTERIOR FINISHES NOMINEES

Architectural Glass & Metals, Inc.

Architectural Metals Inc. PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $750,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Drew Sifton Superintendent: Steve Ellison

The Bouma Corporation

AMI provided exterior finish work for this $24,000,000 new construction project. Unique details included: an angled-entrance canopy with high-pressure laminate Trespa (also fabricated by AMI), 500+ panels; added complexity of ACM colors including brushed stainless and natural reflect mirror; and a two-story vestibule installed with limited lift access.

EXTERIOR FINISHES

EXTERIOR FINISHES

Architectural Glass & Metals, Inc.

Integrated Exteriors

PROJECT Pokagon Band of Potawatomi Justice Center LOCATION Dowagiac BUDGET $900,000 ARCHITECT Seven Generations COMPLETION March 2020 TEAM Project Manager: Marty Yager Superintendent: Sanford McKenzie

PROJECT River Street Commons LOCATION Ada BUDGET $545,000 ARCHITECT Dixon Architecture COMPLETION May 2019 TEAM Project Manager: Jeff Schipper Superintendent: Joe Glass

AGM worked with the design and construction team to propose and implement product selection, material finishes and installation strategies that were capable of accommodating the complex geometry of the proposed design, as well as maintain the desired “natural wood” aesthetic.

This project marked another incredible brick and precast building oozing with detail as part of the Ada downtown redevelopment effort. Integrated Exteriors provided exterior craftsmanship.

Architectural Metals, Inc. (2 projects) Integrated Exteriors

16  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


EXTERIOR FINISHES

EXTERIOR FINISHES

Architectural Metals Inc.

The Bouma Corporation

PROJECT Stryker LOCATION Portage BUDGET $855,000 ARCHITECT TowerPinkster COMPLETION November 2019 TEAM Project Manager: Mike Blossom Superintendent: Cory Arp

PROJECT Western Michigan University Arcadia Flats LOCATION Kalamazoo BUDGET $3,800,000 ARCHITECT Stantec Architecture COMPLETION November 20 TEAM Project Manager: Austin Bender Superintendent: Jeff Russell & Jake Moomey

This Stryker project was an interesting example of AMI’s enclosure management capabilities. The team was challenged by the curvature of the walls and the design of the building. Working through methods of installation was an example of how AMI works to bring value to the building owner.

Bouma Corporation’s prefab division contributed to a streamlined schedule for Western Michigan University’s new residence hall by prefabricating exterior wall panels. The panels were able to be shipped to the jobsite ready for installation, which created a safer, less congested work environment.

Congratulations ABC Excellence in Construction Award Nominees

www.vanlaan.com

Together We’re Better!

Proud Nominee for the ABC Western Michigan

2020 SAFETY AWARD OF EXCELLENCE ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  17


FIRE PROTECTION

FIRE PROTECTION NOMINEES

Brigade Fire Protection Dependable Fire Protection, Inc. Total Fire Protection

Brigade Fire Protection PROJECT KL Outdoor LOCATION Muskegon BUDGET $804,000 ARCHITECT N/A COMPLETION April 2019 TEAM Project Manager: Jason Wohlford Superintendent: Rick Koepke KL Outdoor (formerly Hemisphere Design Works) built a new 490,000 SF storage facility for warehouse space. Brigade Fire Protection designed and installed a 2,000 gpm diesel fire pump, feeding 13 systems that included over 5,900 sprinklers and over 12 miles of pipe.

FIRE PROTECTION

FIRE PROTECTION

Dependable Fire Protection, Inc.

Total Fire Protection, Inc.

PROJECT Rivertown Ridge LOCATION Grandville BUDGET $594,000 ARCHITECT AG Arcitecture COMPLETION January 2020 TEAM Project Manager: Nick Annable Superintendent: Mike Groner

PROJECT Stryker Instruments LOCATION Portage BUDGET $1,534,000 ARCHITECT TowerPinkster COMPLETION December 2019 TEAM Project Manager: Jason Bowman Superintendent: Frank Serna

In this multi-story, senior-living care facility, a combination of steel and CPVC piping were used to install over 5,000 sprinkler heads, a Class I standpipe system, two roof hydrants, three dry systems, and multiple wet systems through a unique building construction and aggressive fourteen-month schedule.

The complex fire suppression systems designed and installed by Total Fire Protection included 15 wet sprinkler systems, one dry sprinkler system, three pre-action systems, six automatic standpipes, three FM 200 clean agent suppression systems, five CO2 fire suppression systems, a nitrogen generator, and fire pump.

18  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  19


GENERAL TRADES

GENERAL TRADES NOMINEES

D&D Building, Inc. EV Construction Nugent Builders Pioneer Construction Rockford Construction

Pioneer Construction PROJECT Celebration Cinema Studio Park LOCATION Grand Rapids BUDGET $9,500,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Matt Larsen Superintendent: Harvey Kiel Celebration Cinema Studio Park is a 10-screen indoor and outdoor downtown movie theater, constructed with 43,000 SF of conventional steel with a masonry wall exterior. Interior finishes included high-end custom millwork and cabinetry as well as glass handrails in the lobby. All the hallway carpeting was custom designed and made specifically for this project.

GENERAL TRADES

GENERAL TRADES

EV Construction

Nugent Builders

PROJECT Mercy Health Muskegon Campus Hospital Tower LOCATION Muskegon BUDGET $12,400,000 ARCHITECT HGA Architects & Engineers COMPLETION July 2019 TEAM Project Manager: Dan Jenema Superintendent: Brian Englishmen

PROJECT St. John Paul II Catholic Church LOCATION Cedar Springs BUDGET $420,000 ARCHITECT AMDG Architects COMPLETION December 2019 TEAM Project Manager: George Germain Superintendent: Roberto Bailon

General construction included a 380,000-SF, 10-story addition. The total general trades package had a $12,400,000 value and 24-month schedule. Self-performed work included all casework, millwork, wood veneer paneling, solid surface countertops and miscellaneous specialties.

20  2020 EXCELLENCE IN CONSTRUCTION AWARDS

This project displays Nugent Builders’ expertise in the general trades. The project architect designed an interior with high quality white birch woodwork that was custom-milled and installed with a superior fit and finish. It also included large custom oak doors and specialty trim finishes throughout the building.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


GENERAL TRADES

GENERAL TRADES

Rockford Construction

D&D Building, Inc.

PROJECT St. Stephen Parish LOCATION Grand Rapids BUDGET $591,000 ARCHITECT David B. Meleca Architects LLC COMPLETION April 2019 TEAM Project Manager: Patrick Wilhelm Superintendent: Evan Parker

PROJECT Warner Norcross + Judd LOCATION Grand Rapids BUDGET $470,000 ARCHITECT GMB Architects + Engineers COMPLETION October 2019 TEAM Project Manager: Dan Diem Superintendent: Paul Krebill

As a part of their Renew - Restore - Rejoice campaign, St. Stephen’s saw the church’s first major renovation since 1960. Inside, the narthex, nave and sanctuary feature hand-crafted furniture and Italian marbled flooring infused with symbolism and detail. Exterior improvements included new entrances and restoration of the east elevation.

Warner Norcross + Judd’s new offices are located on the 11th15th floors of the new Warner Building in downtown Grand Rapids. D&D Building provided general trades for the office build-out. The scope of work included both rough and finish carpentry, casework, stainless steel, doors & hardware, accessories, and fireplace. Challenges included utilizing a single elevator for all trades after the buck hoist was removed during the last months of construction.


GLAZING

Vos Glass

GLAZING NOMINEES

Architectural Glass & Metals, Inc.

PROJECT 601 Bond LOCATION Grand Rapids BUDGET $2,348,000 ARCHITECT Concept Design COMPLETION March 2019 TEAM Project Manager: Tim Audretsch Superintendent: Peter Kenny

Vos Glass (2 projects) 601 Bond consists of an innovative, 16-story envelope of precast concrete panels and a glass window wall system. Heavy upfront coordination and testing achieved a rapid building enclosure, allowing other trades to quickly follow behind on the interior build out.

GLAZING

GLAZING

Vos Glass

Architectural Glass & Metals, Inc.

PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $2,338,000 ARCHITECT Integrated Architecture COMPLETION July 2019 TEAM Project Manager: Tim Audretsch Superintendent: Paul Haynes

PROJECT Viking Corporate Headquarters LOCATION Caledonia BUDGET $1,600,000 ARCHITECT Byce & Associates COMPLETION September 2019 TEAM Project Manager: Bryan Dennis Superintendent: Tom Freiberg

ADAC Automotive boasts over 21,000 SF of exterior curtainwall and 7,000 SF of interior all glass systems. The complex exterior includes multiple bump outs in the 4-sided butt joint curtainwall, including a creative balcony where the curtainwall extends up past the floor slab to form a glass handrail.

AGM worked with the design and construction team in a designassist delivery on this project, to help develop and refine material selection and interface details as required to achieve design intent. This approach maintained a desirable balance between cost, performance and schedule constraints.

22  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


2020 Excellence in Construction Award Nominees!

Real Estate, CONSTRUCTION and Property Management all under one roof YOUR SPACE, OUR BUSINESS www.firstcompanies.com | 616.698.5000

CONGRATULATIONS TO ALL EIC NOMINEES!

LEADERS IN OUR INDUSTRY At HighPoint, we are a commercial and industrial contractor dedicated to providing the best in electric installations, automation, engineering, construction, controls and communications. Our goal is to exceed customer expectations by doing every job right the first time — everytime.

877.887.4248 • www.highpointelectric.us ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  23


HVAC

HVAC NOMINEES

Allied Mechanical Services DHE Plumbing and Mechanical Pleune Service Company Quality Air

Van Dyken Mechanical, Inc. PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $1,973,000 ARCHITECT Integrated Architecture COMPLETION December 2019 TEAM Project Manager: Mitch Raible Superintendent: Tom Rybiski VanDyken Mechanical provided a complete underfloor air distribution system and 7,800 SF of snowmelt for the new headquarters on Eagle East Drive. The system included roof top units, boilers, exhaust fans, split AC units, and humidification.

Van Dyken Mechanical, Inc. (2 projects)

HVAC

HVAC

DHE Plumbing and Mechanical

Allied Mechanical Services

PROJECT Portage North Middle School LOCATION Portage BUDGET $6,000,000 ARCHITECT Stantec COMPLETION August 2019 TEAM Project Manager: Eric Heyboer General Superintendent: Rick Parker

PROJECT Stryker Instruments LOCATION Portage BUDGET $32,192,000 ARCHITECT TowerPinkster COMPLETION December 2019 TEAM Project Manager: Mark Huizinga Superintendent: Don Reed

The school mechanical system consisted of multiple air handling units located in penthouses along with the boilers and chillers. Multiple shafts were needed to route all the ductwork and piping down through the multiple floors to serve all the classroom and common spaces.

Allied Mechanical Services (AMS) completed the plumbing and mechanical contract of Stryker’s new R&D, lab and office building. With an accelerated schedule and sheer size of the project, BIM and prefabrication were vital. A major milestone for AMS was setting 17 air handling units on various roofs by helicopter.

24  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


HVAC

HVAC

Pleune Service Company

Van Dyken Mechanical, Inc.

PROJECT Trinity Health PBS-K LOCATION Kentwood BUDGET $799,000 ARCHITECT Progressive AE COMPLETION October 2019 TEAM Project Manager: Chad Martindale Superintendent: Wayne Willemstein

PROJECT Van Dyken Mechanical Corporate Headquarters LOCATION Grandville BUDGET $475,000 ARCHITECT Mathison | Mathison Architects COMPLETION July 2019 TEAM Project Manager: Justin Thrun Superintendent: Nick Larsen

The project was a three-phase project with each phase requiring demolition and new installations. This is a VRF project, which is becoming more popular for mechanical solutions. VRF systems allow for installation in tighter spaces and allow for better control of temperature for individual spaces or rooms.

The mechanical systems for the VanDyken Office renovation were chosen based on the needs of the existing building and the goal of providing a better working environment for office staff. The constant volume, multi-zone VAV and VRF systems each fit the unique requirements for the area they serve.

HVAC

Quality Air PROJECT Viking Corporate Headquarters LOCATION Caledonia BUDGET $2,500,000 ARCHITECT BYCE and Associates Inc. COMPLETION June 2019 TEAM Project Manager: Mark Quartel Superintendent: Dave Selvius Quality Air was chosen to design-assist and construct the HVAC for Viking Group’s new headquarters. The 170,000 SF facility is fully conditioned with VAV systems, hot water heat, exposed and concealed ducting, lab hoods, DDC controls, and sound attenuation providing a dynamic, world class environment.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  25


INTERIOR FINISHING

INTERIOR FINISHING NOMINEES

Halyard (2 projects) Ritsema Associates (2 projects) Sobie Company, Inc. (2 projects)

Halyard PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $23,500,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: William Sloan Superintendent: Corey Hall ADAC Automotive’s corporate campus showcases commitment to detail from the exterior bump outs and the large entry overhang, to the exquisite ceilings and large atriums.

The Bouma Corporation

INTERIOR FINISHING

INTERIOR FINISHING

Ritsema Associates

Sobie Company, Inc.

PROJECT Cancer & Hematology Centers of West Michigan - Muskegon LOCATION Norton Shores BUDGET $594,000 ARCHITECT Craig Architects Inc. COMPLETION October 2019 TEAM Project Manager: Jason Welch Superintendents: Dan Meekhof

PROJECT LOCATION BUDGET ARCHITECT COMPLETION TEAM

Lakeshore Cancer Center is a beautiful and convenient new 40,000 SF building which brings care to those in need. Ritsema was chosen for both the initial project and the final finish build-out.

26  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Canopy by Hilton Hotel Grand Rapids $ 2,700,000 Valerio, DeWalt, Train and Associates April 2020 Project Manager: Cris Birdsong Superintendent: Tony Schweitzer

The 155-room, 124,000 SF hotel includes 2,400 SF of meeting space as well as a transfer lounge. The project is located in downtown Grand Rapids.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


INTERIOR FINISHING

INTERIOR FINISHING

Sobie Company, Inc.

Ritsema Associates

PROJECT Stockbridge Apartments LOCATION Grand Rapids BUDGET $1,650,000 ARCHITECT Progressive AE COMPLETION March 2020 TEAM Project Manager: Bill Nagelhout & Matt Boydston Superintendent: Rob Hall & Matt Boydston

PROJECT Studio Park LOCATION Grand Rapids BUDGET $1,913,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Wayne Monson Superintendent: Dan Meekhof

The 71,522 SF building contains 51 affordable and 13 market-rate apartments, ground-floor commercial space, a community space, exercise room, and kids room on the ground floor.

Downtown’s Studio Park offered Ritsema an opportunity to showcase their framing, drywall and acoustic work, as well as their flooring finishes talent. Thousands of square feet of beautiful theater LVT flooring and exquisite tile work in lobbies, along with wood flooring in specialty areas, makes Studio Park the showpiece of downtown Grand Rapids’ entertainment area.

INTERIOR FINISHING

INTERIOR FINISHING

The Bouma Corporation

Halyard

PROJECT Warner Norcross + Judd LOCATION Grand Rapids BUDGET $41,843,000 ARCHITECT GMB Architecture + Engineering COMPLETION November 2019 TEAM Project Manager: Tyler Bouma Superintendent: Paul Chrisman & Brian Dill

PROJECT West Michigan Sports Commission Headquarters LOCATION Grand Rapids BUDGET $300,000 ARCHITECT Progressive AE COMPLETION October 2019 TEAM Project Manager: William Sloan JR Superintendent: William Sloan III

Bouma completed the interior finishes in this state-of-the-art facility. Craftsmen installed perforated metal ceiling panels, acoustical ceiling panels, wooden slat ceilings, and drywall throughout the three-story, 29,500 SF academic building.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

West Michigan Sports Commission is a 2,500 SF open-concept office with multiple mobile work spaces. A combination of unique acoustical ceilings and exposed steel decking makes for a modern look. Glass partitions and a radius feature wall make this space unique.

2020 EXCELLENCE IN CONSTRUCTION AWARDS  27


LOW VOLTAGE

LOW VOLTAGE NOMINEES

Buist Electric (2 projects) Grand Valley Automation, Inc. (2 projects) Shareco Communications Town & Country Group

LOW VOLTAGE

Grand Valley Automation, Inc. PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $225,000 ARCHITECT Integrated Architecture COMPLETION December 2019 TEAM Project Manager: Matt Salvati Superintendent: Dan Benzin The ADAC Automotive Corporate Headquarters project was completed by implementing a complete Building Automation System including controls for boilers, RTU’s, mini-split systems, underfloor air dampers, heating valves, humidifiers, lighting, and window shades. Grand Valley Automation provided a custom WebBased Graphical Interface.

LOW VOLTAGE

Buist Electric

Town & Country Group

PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $1,922,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Bob Groteler Superintendent: Mike Reina

PROJECT Blain’s Farm and Fleet LOCATION Holland BUDGET Confidential ARCHITECT MJM Architects, LLC COMPLETION September 2019 TEAM Project Manager: Gregg Hill Superintendent: Chad Guy

This new design-build project was 60,000 SF. There was one Server Room, three IDFs, Category 6A Solution, Panduit Certified, and over 80,000 feet of wire under the floor in a basket tray. This project encompassed five different departments from Buist Electric, including, Electrical, Communications, Outdoor Utilities, Testing, and Audio/Visual.

28  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Blain’s Farm and Fleet features a large retail area, offices, warehouse, receiving area, and auto shop. Town & Country Group performed lowvoltage installation, which included four rooms with connectivity between them. TCG also installed data cables for communication systems, point-of-sales, computers, wireless access points, cameras, and HVAC units.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


LOW VOLTAGE

LOW VOLTAGE

Buist Electric

Grand Valley Automation, Inc.

PROJECT Stryker Instruments LOCATION Portage BUDGET $1,650,000 ARCHITECT HOK & TowerPinkster COMPLETION November 2019 TEAM Project Manager: Bob Groteler Superintendent: Dan Morris & Chad Moore

PROJECT Van Dyken Mechanical Corporate Headquarters LOCATION Grandville BUDGET $250,000 ARCHITECT Mathison | Mathison Architects COMPLETION July 2019 TEAM Project Manager: Scott Wiersma Superintendent: Cory Tate

This was the largest low voltage cabling project west of Detroit during the time of construction. Over 316 miles of Category 6 data cabling was installed to workstations, wireless devices, and supporting infrastructure! The work was warrantied to the customer for 25 years, parts and labor by Panduit, for all cabling and connectivity. This was due to the high quality of installation that Buist performed.

The office renovation project for Van Dyken Mechanical involved a complete renovation of the former office space and conversion of the adjacent warehouse into a streamlined office headquarters. Grand Valley Automation designed, programmed, and installed Schneider Electric EcoStruxure controls along with a plethora of Security interfaces, intercoms, sensors, and cameras.

LOW VOLTAGE

Shareco Communications PROJECT Viking Corporate Headquarters LOCATION Caledonia BUDGET $179,000 ARCHITECT Byce & Associates COMPLETION September 2019 TEAM Project Manager: Kyle Alber Superintendent: Drew Guy Shareco Communications was proud to serve as the lowvoltage communications provider for Viking’s brand new Global Headquarters building. Highlights of the 170,000 SF facility include over 23 miles of structured cabling, a build-out of their data center, and installation of paging and sound masking systems.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  29


MISC. STEEL NOMINEES

FCC Construction, Inc. Fence Consultants of West Michigan, Inc.

MISCELLANEOUS STEEL

MISCELLANEOUS STEEL

FCC Construction Inc

Fence Consultants of West Michigan, Inc.

PROJECT Ferris State University Katke Golf Learning Center LOCATION Big Rapids BUDGET $250,000 ARCHITECT TowerPinkster COMPLETION February 2019 TEAM Project Manager: Mark Deblaay Superintendent: Zach Hall

PROJECT Frederik Meijer Gardens & Sculpture Park Welcome Center & Site Improvements LOCATION Grand Rapids BUDGET $536,000 ARCHITECT Tod Williams Billie Tsien Architects & Progressive AE COMPLETION August 2019 TEAM Project Manager: Thomas Bement & Rob Spencer Superintendent: Rob Spencer

FCC Construction engineered, fabricated, and installed the stainless hand railing system at the main entrance, and the interior stairway and custom railings inside the learning center.

30  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Fence Consultants completed the bronze custom fabricated fence and gates among other temporary and permanent fence installations at Frederik Meijer Gardens & Sculpture Park. ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


VanDyken Mechanical, Inc. Grandville, MI

CONGRATULATIONS

TO ALL WEST MICHIGAN FIRMS FOR ACHIEVING EXCELLENCE IN CONSTRUCTION!

6160 E. FULTON | ADA, MI | 616.676.9169 | DANVOSCONSTRUCTION.COM | ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  31


PLUMBING NOMINEES

Allied Mechanical Services DHE Plumbing & Mechanical

PLUMBING

PLUMBING

DHE Plumbing and Mechanical

Allied Mechanical Services

PROJECT 601 Bond LOCATION Grand Rapids BUDGET $1,991,000 ARCHITECT Ghafari Associates COMPLETION April 2019 TEAM Project Manager: Jason DeWent Superintendent: TJ Hindenach

PROJECT Ascension Borgess Surgery Addition & Renovation LOCATION Kalamazoo BUDGET $6,750,000 ARCHITECT HED COMPLETION April 2020 TEAM Project Manager: Bill Smeda Superintendent: Eric Johnson

601 Bond is a 16-story, 202-unit apartment building. This building uses a HWAT heat trace system that keeps hot water warm in each unit in lieu of a hot water return system. DHE installed 885 fixtures throughout the building.

32  2020 EXCELLENCE IN CONSTRUCTION AWARDS

The Ascension Borgess Hospital project was a second floor surgical addition and sixth floor renovation for birthing cesarean sections. The project added twelve operating room units to a new second floor. The sixth floor renovation added two c-section operating rooms with recovery locating all the birthing needs on one floor.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  33


STRUCTURAL STEEL NOMINEES

FCC Construction, Inc. Pioneer Construction

STRUCTURAL STEEL

STRUCTURAL STEEL

FCC Construction, Inc.

Pioneer Construction

PROJECT Grand Rapids Public Schools Southwest Community Campus LOCATION Grand Rapids BUDGET $1,589,000 ARCHITECT C2AE COMPLETION March 2020 TEAM Project Manager: Mark Deblaay Superintendent: Rob Heers

PROJECT Grand Valley State University Daniel & Pamella DeVos Center for Interprofessional Health LOCATION Grand Rapids BUDGET $1,003,000 ARCHITECT Fishbeck COMPLETION September 2019 TEAM Project Manager: Scott Veine Superintendent: Matthew Toth

The Grand Rapids Public Schools’ Southwest Community Campus is a 68,000 SF Spanish-English dual immersion theme school. This campus is a part of the Plaza Roosevelt Development, a 5.5 acre, mixed use development including education, healthcare, affordable housing and more.

34  2020 EXCELLENCE IN CONSTRUCTION AWARDS

The project consisted of 1,350 tons of structural steel working with multiple cranes. Five floors of steel were erected off of a post-tension podium. All moment connections were welded on site. Structural elements included a large skylight frame, 1” brick wedge, and large cantilevers at the fifth and first floor. ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


CONGRATS to ABC/WMC’s Excellence in Construction Awards honorees

SERVING WESTERN MICHIGAN SINCE 1988

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

SUBSCRIBE: MIBIZ.COM/SUBSCRIBE ADVERTISE: MIBIZ.COM/ADVERTISE EDITORIAL: EDITOR@MIBIZ.COM 2020 EXCELLENCE IN CONSTRUCTION AWARDS  35


RENOVATION/ADDITION: LESS THAN $1 MILLION

Owen Ames Kimball Co.

RENOVATION/ADDITION:

LESS THAN $1 MILLION NOMINEES

FCC Construction Inc Lakewood Construction Owen-Ames-Kimball Co.

PROJECT Bodman PLC LOCATION Grand Rapids BUDGET $970,000 ARCHITECT Ghafari Associates, Andrew Eckart COMPLETION May 2020 TEAM Project Manager: Tim Marcus Superintendent: Dave DeShone This 10,000 SF office build-out is located on the third floor of 99 Monroe in downtown Grand Rapids. The new space features work spaces for 30 employees, several conference rooms, high-end finishes, and spectacular views of the city.

Triangle Associates

RENOVATION/ADDITION: LESS THAN $1 MILLION

RENOVATION/ADDITION: LESS THAN $1 MILLION

FCC Construction Inc

Lakewood Construction

PROJECT Oliver Healthcare Packaging Office Renovation LOCATION Grand Rapids BUDGET $815,000 ARCHITECT Integrated Architecture COMPLETION May 2019 TEAM Project Manager: Kevin Weadley Superintendent: Rick Colburn

PROJECT Schaendorf Brewing Company LOCATION Allegan BUDGET $900,000 ARCHITECT Wightman COMPLETION August 2020 TEAM Project Manager: Brad van Melle Superintendent: Todd Potter

This renovation transformed a late 1900s timber-framed space into a clean and bright modern corporate office. With a tight budget and schedule, this multi-phased project features a new board room, executive offices, open office space, huddle/phone rooms and new employee cafe/multipurpose area.

36  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Three buildings were transformed into the new farm-to-table brewpub, Schaendorf Brewing Company. Quickly becoming a local favorite, this space was designed to match the feel of the growing community in downtown Allegan while maintaining the old charm of the historic buildings, dating back to prohibition.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RENOVATION/ADDITION: LESS THAN $1 MILLION

Triangle Associates PROJECT Wayland Union High School Media Center LOCATION Wayland BUDGET $785,000 ARCHITECT TowerPinkster COMPLETION October 2019 TEAM Project Manager: Scott Jernberg Superintendent: Jim VanBeek This remodel to Wayland Union High School’s media center upgraded and expanded the space with the installation of a new curtainwall, a repurposed acoustical ceiling, flooring, and technology. The new space features interactive and dynamic spaces for all students to use in a warm, friendly learning environment.

CONSTRUCTION SERVICES

B U I LT A R O U N D P E O P L E

W W W. E V. C O N S T R U C T I O N


RENOVATION/ADDITION: $1-5 MILLION

Pioneer Construction

RENOVATION/ADDITION:

$1-5 MILLION NOMINEES

BCI Construction, LLC CD Barnes Construction Dan Vos Construction Co. Dykhouse Construction

PROJECT Amway Hotel IDC LOCATION Grand Rapids BUDGET $1,200,000 ARCHITECT Ghafari Associates COMPLETION September 2019 TEAM Project Manager: Dan Zaagman Superintendents: Nick Vandepanne IDC, a retro-themed speakeasy-inspired bar on the second floor of the Amway Grand Hotel’s historic Pantlind Wing, was a remodel of existing meeting rooms and an exterior roof area converting the space to indoor dining and an exterior patio area with a glass canopy roof.

Erhardt Construction First Companies, Inc. Lakewood Construction Pioneer Construction Rockford Construction (3 projects) Triangle Associates Wolverine Building Group

RENOVATION/ADDITION: $1-5 MILLION

Lakewood Construction PROJECT Chemical Bank Retail Branch and Corporate Office LOCATION Grand Rapids BUDGET $1,860,000 ARCHITECT GMB AE COMPLETION September 2019 TEAM Project Manager: Kyle Engbers Superintendent: Clark Causley The new Chemical Bank retail branch and corporate office space was designed to push the envelope on how personal transactions are performed. Customers and employees alike are welcomed into the new downtown location with a view into the future of banking.

38  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RENOVATION/ADDITION: $1-5 MILLION

RENOVATION/ADDITION: $1-5 MILLION

CD Barnes Construction

Triangle Associates

PROJECT Flexfab Corporate Headquarters LOCATION Hastings BUDGET $1,342,000 ARCHITECT Architectural Concepts COMPLETION October 2019 TEAM Project Manager: Tom Berry Superintendent: Pete Heinen

PROJECT Fox Honda LOCATION Kentwood BUDGET $3,200,000 ARCHITECT Ghafari Associates COMPLETION January 2020 TEAM Project Manager: Ken Pitchford Superintendent: Sam Verus

Flexfab is a manufacturer of high-performance silicone and polymer products. In a strategic move, the firm decided to invest in the renovation of their headquarter offices to attract young professionals. The goal was to provide a state-of-the-art, professional, work environment that encourages the teamwork, innovation and creative solutions that Flexfab has become known for. The renovation focused on an open office concept with an emphasis on windows that allow for natural light.

The entire Fox Honda facility in Grand Rapids was remodeled as part of the dealership’s brand enhancement program. Upgrades included a reskinned facade, new graphics, bathrooms, parking, roof, and MEP systems. Additions and upgrades also took place at the service bay and oil station to improve the customers rideup experience.

RENOVATION/ADDITION: $1-5 MILLION

RENOVATION/ADDITION: $1-5 MILLION

Rockford Construction

Erhardt Construction

PROJECT Herman Miller Building G Expansion LOCATION Zeeland BUDGET $2,857,000 ARCHITECT Integrated Architecture COMPLETION June 2019 TEAM Project Manager: Jeff Taggert Superintendent: Jason Passero

PROJECT HUB International LOCATION Grand Rapids BUDGET $1,500,000 ARCHITECT Ted Moudis Associates COMPLETION August 2019 TEAM Project Manager: Joe Kuhn Superintendent: Scott Rykse

As the first major main campus manufacturing expansion in years, the Building G addition stands as a testament to Herman Miller’s growing mission. The 21,000 SF one-story addition features an expansion to the existing manufacturing facility, shipping dock build-out, and parking lot improvements.

Erhardt Construction served as construction manager and selfperformed carpentry and demolition work for HUB International’s new office. The open layout includes various support spaces, offices, a kitchen and meeting rooms, all designed to fit a modern atmosphere.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  39


RENOVATION/ADDITION: $1-5 MILLION

RENOVATION/ADDITION: $1-5 MILLION

Rockford Construction

Wolverine Building Group

PROJECT Kalexsyn West Lab LOCATION Grand Rapids BUDGET $1,204,000 ARCHITECT Ghafari Associates COMPLETION October 2019 TEAM Project Manager: Scott Linder Superintendent: Charlie Walker

PROJECT Max’s South Seas Hideaway LOCATION Grand Rapids BUDGET $2,700,000 ARCHITECT Progressive AE COMPLETION June 2018 TEAM Project Manager: Dan Kowalski Superintendents: Jim Malthaner, Eric Balkon

Originally an empty, unutilized space, the Kalexsyn West Lab is now an ISO-008 certified cleanroom providing chemistry services to the global pharmaceutical industry. The 3,000 SF lab features cleanroom wall and ceiling panels, epoxy electrostatic resistant flooring, and state-of-the-art pharmaceutical equipment.

Wolverine Building Group transformed a former event venue in downtown Grand Rapids, Michigan into Max’s South Seas Hideaway, a world-class Tiki bar and restaurant. The renovation had a fast-track construction schedule and was completed in just five months, coming in under budget.

RENOVATION/ADDITION: $1-5 MILLION

RENOVATION/ADDITION: $1-5 MILLION

First Companies, Inc.

Dykhouse Construction

PROJECT Mercy Health Physician Partners Concierge Medicine LOCATION Grand Rapids BUDGET $1,137,000 ARCHITECT AMDG Architects COMPLETION September 2019 TEAM Project Manager: Jason Beeke Superintendent: Chris Barnes

PROJECT Mill Steel Office Renovation LOCATION Grand Rapids BUDGET $3,204,000 ARCHITECT Ken Dixon/r.o.i. Design COMPLETION January 2019 TEAM Project Manager: Alex Grosvenor Superintendent: Rod Koster

First Companies’ 2019 EIC award-winning, New Vista Class-A medical facility welcomes Mercy Health Physicians Partner Concierge Medicine. This 5,331 SF build-out includes 34 rooms comprised of administrative spaces, exam rooms, consultation suites, a large conference room, a staff breakroom, and a private, executive waiting room with an outdoor patio.

40  2020 EXCELLENCE IN CONSTRUCTION AWARDS

This project involved the transformation of a 1980s office building into a sophisticated Class-A office space for Mill Steel’s growing company. The team delivered a space that reflects the company culture and provides room to grow into the future.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RENOVATION/ADDITION: $1-5 MILLION

RENOVATION/ADDITION: $1-5 MILLION

Rockford Construction

Dan Vos Construction Co.

PROJECT The Potter’s House LOCATION Grand Rapids BUDGET $1,847,000 ARCHITECT Integrated Architecture COMPLETION August 2019 TEAM Project Manager: Dan Buskirk Superintendent: Sam Pobst

PROJECT Van Dyken Mechanical Corporate Headquarters LOCATION Grandville BUDGET $2,359,000 ARCHITECT Mathison | Mathison Architects COMPLETION July 2019 TEAM Project Manager: Scott Walters Superintendent: John Serba

The Potter’s House church’s main floor renovation and connector bridge served to accommodate the evolving needs of the growing student population. Featuring new classrooms, secure entrances, faculty spaces, and one-on-one learning rooms, the project opened doors to enriching, safe and contemporary learning environments.

This project involved a complete renovation of the company’s former office space and a conversion of adjacent warehouse into a streamlined office headquarters. Van Dyken Mechanical, Grand Valley Automation and Mechanical Testing Services Inc. are three businesses that occupy the building, allowing them to collaborate between services while optimizing space.

RENOVATION/ADDITION: $1-5 MILLION

BCI Construction, LLC PROJECT View Point LOCATION Allendale BUDGET $1,300,000 ARCHITECT r.o.i. Design COMPLETION August 2019 TEAM Project Manager: Brandon Britton Superintendent: Scott Lamaire This project consisted of converting a 20-year-old, 10,000 SF retail building into an apartment complex that offers 24 private suites connected to shared space featuring a lounge, kitchen, laundry room, and exercise room. This project had aggressive goals, a complex schedule, and a fixed completion date.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  41


RENOVATION/ADDITION: $5-10 MILLION

The Christman Company

RENOVATION/ADDITION:

$5-10 MILLION NOMINEES

Dan Vos Construction Co. EV Construction

PROJECT Allegan District Library Addition and Renovation LOCATION Allegan BUDGET $6,500,000 ARCHITECT Quinn Evans Architects COMPLETION March 2019 TEAM Project Manager: Jamie Cardinal Superintendent: Chip Mast

Triangle Associates

Originally constructed in 1914, the Allegan District Library was renovated and expanded to provide a variety of new opportunities for its users. The project included additional space for children’s activities, a teen room, business center, updated technology, new study rooms, and reading areas with comfortable seating overlooking the Kalamazoo River.

RENOVATION/ADDITION: $5-10 MILLION

RENOVATION/ADDITION: $5-10 MILLION

Triangle Associates

EV Construction

PROJECT Mona Shores Public Schools Athletic Complex LOCATION Norton Shores BUDGET $6,167,000 ARCHITECT TowerPinkster COMPLETION November 2019 TEAM Project Manager: Scott Jernberg Superintendent: Cris Brown

PROJECT Trinity Health PBS-K LOCATION Kentwood BUDGET $7,700,000 ARCHITECT Progressive AE COMPLETION October 2019 TEAM Project Manager: Brett Lesiewicz Superintendent: Ryan Guerink

Construction took place at Mona Shores Public Schools’ high school athletic complex and included a new state-of-the-art competitive soccer field and adjacent practice softball and soccer fields. A new ticket booth, concession stand, and bleachers were also installed, as well as a new vestibule at the “Sailor Center” athletic wing.

The project was an occupied, multi-phased, 110,000 SF renovation of which 90,000 SF included major renovations and a complete interior demolition and re-build. The remaining 20,000 SF consisted of minor finish upgrades (paint, door replacements, security, and IT).

Rockford Construction The Christman Company

42  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RENOVATION/ADDITION: $5-10 MILLION

RENOVATION/ADDITION: $5-10 MILLION

Dan Vos Construction Co.

Rockford Construction

PROJECT Warner Norcross + Judd LOCATION Grand Rapids BUDGET $9,338,000 ARCHITECT GMB AE COMPLETION October 2019 TEAM Project Manager: Scott Walters Superintendents: Ron Burrows, Arley Parson, and Tim Kaza

PROJECT Wolverine Worldwide Fitness & Daycare Center LOCATION Rockford BUDGET $7,632,000 ARCHITECT Andrus Architecture COMPLETION August 2019 TEAM Project Manager: Clayton Martin Superintendent: Bryan Chisholm

Warner Norcross + Judd LLP project was a five-story office buildout in downtown Grand Rapids on floors 11 through 15. Built to meet the needs of West Michigan’s largest law firm, the Warner office features work spaces that bring the outdoors in, collaborative technology, and enhanced workflow and communication.

The three-facility expansion of Wolverine Worldwide’s global headquarters invests in a strong workforce by addressing the challenges employees face outside of the 9 to 5. The 82,000 SF expansion includes a fitness facility, mezzanine, child care center, and doggy daycare

CONGRATULATIONS TO EACH OF THE NOMINEES OF THE

Fire Sprinklers

Save Lives!

34th Annual

EXCELLENCE IN CONSTRUCTION AWARDS

brigadefire.com 5 7 01 S a f e t y D r i v e , B e l m o n t, M I 4 9 3 0 6 P h o n e : 6 16 -78 4 - 16 4 4 | Fa x : 6 16 -78 4 - 1 14 0 ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

5402 Rusche Dr NW Comstock Park MI 49321 rivercitymech.com 2020 EXCELLENCE IN CONSTRUCTION AWARDS  43


RENOVATION/ADDITION: MORE THAN $10 MILLION

Owen-Ames-Kimball Co.

RENOVATION/ADDITION:

MORE THAN $10 MILLION NOMINEES

Granger Construction Owen-Ames-Kimball Co. Pioneer Construction Rockford Construction

PROJECT AC Hotel + 37 Ottawa LOCATION Grand Rapids BUDGET $31,000,000 ARCHITECT DLR Group COMPLETION March 2019 TEAM Project Manager: Bob Byrne Superintendent: Jerry Moomey This high-profile, downtown Grand Rapids project transformed two twentieth century buildings into an AC Hotel by Marriott and “37 Ottawa” . Renovations included the demolition of a “connector” to divide the buildings into their original separate facilities, removing the 1980s exterior “skin”, restoring the original brick facade, and extensive interior renovations.

RENOVATION/ADDITION: MORE THAN $10 MILLION

RENOVATION/ADDITION: MORE THAN $10 MILLION

Rockford Construction

Pioneer Construction

PROJECT ADAC Automotive Corporate Headquarters LOCATION Grand Rapids BUDGET $13,800,000 ARCHITECT Integrated Architecture COMPLETION July 2018 TEAM Project Manager: Dan Kowalski Superintendents: Tom Dora and Phil Heintzelman

PROJECT Aquinas College Albertus Magnus Hall of Science LOCATION East Grand Rapids BUDGET $23,900,000 ARCHITECT TowerPinkster COMPLETION December 2019 TEAM Project Managers: Scott Veine and Eric Olson Superintendent: Mike Bartz

With associates and operations previously divided among four locations, the new ADAC Automotive Corporate Campus convenes all teams in a new state-of-the-art, 56,000 SF headquarters with a renovated 30,000 SF Innovation Center.

44  2020 EXCELLENCE IN CONSTRUCTION AWARDS

This multi-phase effort to Aquinas College’s Albertus Magnus Hall of Science entailed a 46,677 SF addition featuring a main entrance with open atrium, lecture hall, geography, physics, biology, chemistry, and research laboratories. The 42,518 SF renovation included faculty offices, general classrooms, nursing simulation, and a loading dock. ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RENOVATION/ADDITION: MORE THAN $10 MILLION

Granger Construction PROJECT Kent County Juvenile Detention Center Expansion and Renovation LOCATION Grand Rapids BUDGET $19,400,000 ARCHITECT DLZ Michigan COMPLETION February 2019 TEAM Project Manager: Todd Butler Superintendent: Tom Theis This expansion project involved replacing the 1960s portion of the existing facility with a new 45,000 SF addition comprised of seven housing units, along with approximately 10,000 SF of renovations and small additions to the existing facility, to provide a more modern, comfortable, and safe facility for youth offenders.

ai15958808199_2020 Excellence in Construction.pdf 1 7/27/2020 4:14:07 PM

CONGRATULATIONS

“EXCELLENCE IN CONSTRUCTION” AWARD WINNERS!

We’re proud to be partners in your success.

C

M

Y

CM

MY

CY

CMY

K

Open your smart phone camera! Hover over this image above. Click the YouTube link, that’s it!

WINDEMULLER

@buistelectric

windemuller.us (800) 333-3641

AUTOMATION • COMMUNICATIONS & IT • ELECTRICAL OUTDOOR UTILITIES • RENEWABLE ENERGY TRAVERSE CITY PETOSKEY GRAND RAPIDS BIG RAPIDS MIDLAND KALAMAZOO WHITEHALL

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

@buistelectric

Buist Electric Kalamazoo 3201 Lake Street Kalamazoo, MI 49048 269-343-9191 Buist Electric HQ 2 - 84th Street SW Byron Center, MI 49315 616-878-3315 www.buistelectric.com

2020 EXCELLENCE IN CONSTRUCTION AWARDS  45


NEW CONSTRUCTION:

LESS THAN $1 MILLION NOMINEES

Pioneer Construction Wolverine Building Group

NEW CONSTRUCTION: LESS THAN $1 MILLION

NEW CONSTRUCTION: LESS THAN $1 MILLION

Wolverine Building Group

Pioneer Construction

PROJECT John Ball Zoo Meerkat Exhibit LOCATION Grand Rapids BUDGET $950,000 ARCHITECT Wolverine Building Group COMPLETION July 2019 TEAM Project Manager: David Paquet Superintendent: Mike Sherwood

PROJECT Studio Park The Listening Room LOCATION Grand Rapids BUDGET $750,000 ARCHITECT Integrated Architecture COMPLETION September 2019 TEAM Project Manager: Matt Larsen Superintendent: Harvey Kiel

Wolverine Building Group constructed the new Meerkat Exhibit at John Ball Zoo. The exhibit consists of a holding building with a viewing window and an outdoor exhibit space.

The 4,400 SF 200-seat Listening Room at Studio Park provides an intimate setting complete with in-seat drink service for an exceptional live music experience. The venue features a top of the line sound system and semi-circle seating allowing a more engaging evening for the artist and concertgoers alike.

46  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Complex Problems. Tailored Solutions. Electricians / Technicians / Engineers

,

.

BUILDING WEST MICHIGAN CONSTRUCTING CAREERS DEVELOPING A FUTURE FOR THE NEXT GENERATION

feyenzylstra.com

BURGESSCONCRETE.COM

CONGRATS

TO THE 2020 EXCELLENCE IN CONSTRUCTION NOMINEES & WINNERS!

616.877.0008

TO US, IT’S BIGGER THAN A BUILDING

Congratulations to all of the outstanding construction professionals on their accomplishments and recognition.

616.243.3131 | GodwinsGotIt.com Plumbing | Hardware | Heating & Cooling Water Treatment | Design Center ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

www.triangle-inc.com

616.453.3950 2020 EXCELLENCE IN CONSTRUCTION AWARDS  47


NEW CONSTRUCTION: CATEGORY $1-5 MILLION

Pioneer Construction

NEW CONSTRUCTION:

$1-5 MILLION NOMINEES

Dan Vos Construction Co.

PROJECT LOCATION BUDGET ARCHITECT COMPLETION TEAM

Black River Barn South Haven Confidential Interactive Studios November 2019 Project Manager: Jason Nyhuis Superintendent: Clinton Vanderkolk

Pioneer Construction

This unique event venue project was designed as a barn-style building with a semi-rustic exterior, mixing new and old features. The beautiful interior highlights 100-year-old barn wood elements on the stairs, tables, and bar. The new bride and groom suites were crafted with country-club style details.

NEW CONSTRUCTION: $1-5 MILLION

NEW CONSTRUCTION: $1-5 MILLION

Dan Vos Construction Co.

Lakewood Construction

PROJECT Gordon Food Service Square Roots Indoor Farm LOCATION Wyoming BUDGET $1,150,000 ARCHITECT Concept: Via Chicago Architects Architect of Record: Dan Vos Construction Company COMPLETION September 2019 TEAM Project Manager: Scott Walters Superintendent: Chris Barry

PROJECT Hope College Campus Ministries LOCATION Holland BUDGET $3,800,000 ARCHITECT AMDG Architects COMPLETION July 2019 TEAM Project Manager: Nick Duthler Superintendent: Steve Weatherwax

Lakewood Construction

Square Roots is an indoor urban farm at Gordon Food Service in Wyoming, Michigan. The idea behind this facility was to grow produce like mint, chives, and basil in West Michigan year-round in high-tech, climate-controlled shipping containers.

48  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Designed with every student in mind, the new Campus Ministries building allows students to study, grow, and connect in a place that feels like a piece of home. From the green roof to the fireplace, no detail was forgotten to make this a space where everyone feels welcome.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


CONSTRUCTION 6060 Fulton Street East, Ada, Michigan 49301

Your Project | Right from the start

Congratulations EIC 2020 Award Winners! 6060 Fulton St East Ada, Michigan | 616 676 1222 | Erhardtcc.com

Details, Details, Details. We’ve been getting them right for 80 years. AMI ENCLOSURE MANAGEMENT ®

YOUR ENCLOSURE MANAGEMENT SPECIALISTS

sobiecompany.com ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

Serving building owners’ building enclosure needs, AMI provides the experience and high performing product lines needed to successfully enclose the most challenging projects. 2020 EXCELLENCE IN CONSTRUCTION AWARDS  49


NEW CONSTRUCTION:

$5-10 MILLION NOMINEES

Pioneer Construction Wolverine Building Group

NEW CONSTRUCTION: $5-10 MILLION

NEW CONSTRUCTION: $5-10 MILLION

Wolverine Building Group

Pioneer Construction

PROJECT Harrison Park Apartments LOCATION Grand Rapids BUDGET $9,900,000 ARCHITECT Progressive AE COMPLETION March 2020 TEAM Project Manager: Brian Steinberg Superintendent: Chad Messer

PROJECT Whirlpool Corporation The Eddy Early Childhood Center LOCATION Benton Harbor BUDGET $7,200,000 ARCHITECT Integrated Architecture COMPLETION August 2019 TEAM Project Manager: Jim Fifarek Superintendent: Mike Klapmust

This four-story, 69,425 SF building houses 48 affordable housing units in addition to a community room and outdoor garden. The apartment community will aid families with children attending the adjacent Harrison Park Elementary School. Many of these children will benefit from the Grand Rapids Public Schools Challenge Scholars Program.

50  2020 EXCELLENCE IN CONSTRUCTION AWARDS

A collaboration between Third Coast Development, Whirlpool Corporation, and KinderCare, this state-of-the-art daycare facility exclusively serves Whirlpool employees. Designed and constructed with an emphasis on environmentally-friendly materials, the center features: an indoor terrarium; an indoor multipurpose room; and outdoor playgrounds with a soccer field, whimsical playhouse, tricycle paths, treehouse, and an outdoor stage. ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


RITSEMA ASSOCIATES INTERIOR CONTRACTOR

1955 - 2020 CONGRATULATIONS Excellence Award Winners!

JOHN BALL ZOO MEERKAT EXHIBIT GRAND RAPIDS, MI

616.538.0120 www.ritsema.com Grand Rapids • Kalamazoo • Traverse City

SEEK POSSIBILITIES

GENERAL CONTRACTOR · CONSTRUCTION MANAGEMENT · DESIGN BUILD

616-949-3360 · WOLVGROUP.COM

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

2020 EXCELLENCE IN CONSTRUCTION AWARDS  51


NEW CONSTRUCTION: $10-20 MILLION

Lakewood Construction

NEW CONSTRUCTION:

$10-20 MILLION NOMINEES

CSM Group Erhardt Construction

PROJECT Georgetown Township Library LOCATION Jenison BUDGET $12,400,000 ARCHITECT Progressive AE COMPLETION November 2019 TEAM Project Manager: Nick Duthler Superintendent: Matt Gergen, Steve Weatherwax, Chase Pattison

Rockford Construction

Under a design-build model, the Lakewood team worked collaboratively with Progressive AE to give Georgetown a library that feels innovative and inviting. Doubling in size, the new 31,000 SF, two-story library was designed to serve a multitude of purposes. The library includes study rooms, quiet reading areas, offices, circulation space, and state-of-the-art technology.

NEW CONSTRUCTION: $10-20 MILLION

NEW CONSTRUCTION: $10-20 MILLION

CSM Group

Erhardt Construction

PROJECT Pokagon Band of Potawatomi Justice Center LOCATION Dowagiac BUDGET $12,148,000 ARCHITECT Seven Generations COMPLETION October 2019 TEAM Project Manager: Jake Backler Superintendent: Dan Haney

PROJECT Roskam Baking Company Cold Storage Facility LOCATION Kentwood BUDGET $19,500,000 ARCHITECT Progressive AE COMPLETION January 2020 TEAM Project Manager: Jon Reimink Superintendent: Jon Reimink

First Companies, Inc. Lakewood Construction

The 30,000 SF Pokagon Band of Potawatomi Justice Center houses the Tribal Court and headquarters for the Tribal Police Department and features interior and exterior designs culturally appropriate for peacemaking and native justice proceedings. Those include an outdoor peacemaking circle, an indoor healing fire room, and a circular courtroom. The Pokagon Band provides community development initiatives such as housing, education, family services, medical care, and cultural preservation for its more than 5,700 citizens. Construction of the facility began in September 2018 and took about 15 months to finish.

52  2020 EXCELLENCE IN CONSTRUCTION AWARDS

Erhardt Construction provided general contracting and construction management services for Roskam Baking Company’s Cold Storage Facility. The project included an 85,000 SF freezer, office spaces, an ammonia refrigeration room, a 12-position dock, and 120 semitrailer parking spaces.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


NEW CONSTRUCTION: $10-20 MILLION

Rockford Construction PROJECT Stockbridge Apartments LOCATION Grand Rapids BUDGET $10,998,000 ARCHITECT Progressive AE COMPLETION March 2020 TEAM Project Manager: Mike Mattice Superintendent: Paul Towner

CONGRATULATIONS

to the 2020 ABC award nominees

Located in the heart of the West Side, Stockbridge Apartments offers a mix of 64 market-rate and affordable housing units, in addition to 11,000 SF of ground-floor commercial space. Exterior masonry was performed on the ground floor through the fourth floor, with siding installed on the fifth. Faced with a tax credit deadline, Rockford completed the 71,522 SF new build within a 13-month accelerated schedule. To ensure units were occupied by the end of the year, project teams endured low temperatures and winter conditions to complete concrete, masonry, and exterior work.

(616) 224-7030 | vdminc.com

BUILD SOMETHING

MORE

NEW CONSTRUCTION: $10-20 MILLION

First Companies, Inc. PROJECT Studio Park LOCATION Grand Rapids BUDGET $15,900,000 ARCHITECT Integrated Architecture COMPLETION October 2019 TEAM Project Manager: Craig Schroeder Superintendent: Keith Miller & Tim DeYoung First Companies constructed Studio Park’s five-story, mixeduse brick structures and piazza in downtown Grand Rapids, including 20,000 SF of commercial space, 106 apartments, and an outdoor piazza with an underground water detention system. The apartments feature exceptional finishes, outdoor balconies, and floor-to-ceiling glass walls overlooking the city. WWW.KENTCOMPANIES.COM

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER

MICHIGAN | TEXAS | OHIO | CAROLINAS | MISSOURI | Since 1957

2020 EXCELLENCE IN CONSTRUCTION AWARDS  53


NEW CONSTRUCTION: CATEGORY MORE THAN $20 MILLION

Pioneer Construction

NEW CONSTRUCTION:

MORE THAN $20 MILLION NOMINEES

First Companies, Inc. Owen-Ames-Kimball Co. Pioneer Construction

PROJECT Embassy Suites LOCATION Grand Rapids BUDGET $47,900,000 ARCHITECT Butler, Rosenbury & Partners, Inc. COMPLETION March 2019 TEAM Project Manager: Justin Bialik & Amy Bastian Superintendent: Phil Geurink This modern, seven-story hotel features 250 two-room suites with views of the Grand River and city, where 160 of the suites include a balcony. Amenities also include a sports bar, a Michigan-shaped indoor pool and lounge on the second level, and a cafe serving locally roasted coffee on the main floor.

NEW CONSTRUCTION: CATEGORY MORE THAN $20 MILLION

NEW CONSTRUCTION: CATEGORY MORE THAN $20 MILLION

Owen-Ames-Kimball Co.

First Companies, Inc.

PROJECT Portage North Middle School LOCATION Portage BUDGET $31,200,000 ARCHITECTS Stantec/C2AE COMPLETION September 2019 TEAM Project Manager: Dan Rathburn Superintendent: Cade Dammen

PROJECT Viking Corporate Headquarters LOCATION Caledonia BUDGET $21,800,000 ARCHITECT Byce & Associates COMPLETION July 2019 TEAM Project Manager: Bret Hoeks Superintendent: Scott Brower

This new $31 million, 160,000 SF middle school features a four-story design, 21st-century classrooms and laboratories, high-end finishes like polished concrete and custom wood ceilings, and advanced technology and security. The project is part of a $144 million bond program passed by Portage residents in 2015.

54  2020 EXCELLENCE IN CONSTRUCTION AWARDS

First Companies constructed Viking’s national headquarters - a 170,000 SF beautifully finished facility, including office, production, research and development, and training spaces, with an additional 67,000 SF to expand. The building features state-ofthe-art accommodations for product testing, manufacturing, and assembly, plus an onsite data center, catering, and kitchen space.

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Whirlpool’s The Eddy - Early Childhood Center Designed and constructed with an emphasis on environmentally-friendly materials and on making the most of natural light, the center features an indoor terrarium in the lobby, a multipurpose room, outdoor playgrounds, a whimsical playhouse, tricycle paths, a treehouse, and an outdoor stage.

Construction Management | General Contracting | Design-Build pioneerinc.com


We are construction.

We are the men and women who build temporary hospitals and drive-through testing facilities for our community. We are the men and women who build sneeze guards and touchless doors. We are professional problem solvers who work safely and courageously to ensure the places you go keep you healthy and safe. ABC Western Michigan recognizes and thanks the thousands of local professional tradespeople and construction leaders who are guiding our industry through the pandemic. This year’s Excellence in Construction Awards are about all of us, together. Thank you.

PEOPLE. PROJECTS. SAFETY.

56  2020 EXCELLENCE IN CONSTRUCTION AWARDS

ASSOCIATED BUILDERS & CONTRACTORS, INC. WESTERN MICHIGAN CHAPTER


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.