Transitioning Energy (and) Landscapes Exploring infrastructural, architectural + landscape symbiosis
Building | BT Drawing Set
A
Electro-aqueduct Structure
500
600
500
1600
600 x 600 x 8mm I-beam, used as electrical conduit. Welded to I-beam below
600 400
400mm deep I-beam, welded to stainless steel top plate
325
20mm thick stainless steel top plate, bolted to concrete
1040
500
1000 x 750 x 10mm thick stainless steel U beam, used as water conduit. Built with 10mm tolerance gap C45/55 grade reinforced concrete wall plate
3°
max 5000
solid Brora limestone masonary 16mm steel support post / earthing rod 300
300mm C45/55 grade reinforced concrete bond beam
max 5000
300
max 5000
500
300mm C45/55 grade reinforced concrete foundations. Foundation type and depth varies depending on ground conditions
Typical aqueduct column 1:100
3000|depending on ground conditions
3192
varies
4 typical electro-aqueduct column sections 1:50
3°
600
600 x 600 x 8mm I beam, used as electrical conduit. Welded to I-beam below
400
400mm deep I-beam, welded to stainless steel top plate
325
1040
500
10mm thick stainless steel channel opening
6° C45/55 grade reinforced concrete wall plate
max 5000
solid Brora limestone masonary 16mm steel support post / earthing rod 300
300mm C45/55 grade reinforced concrete bond beam
max 5000
300
max 5000
500
6585
Water delivery aqueduct column 1:100
300mm C45/55 grade reinforced concrete foundations. Foundation type and depth varies depending on ground conditions
varies
varies
water delivery electro-aqueduct column sections 1:50
5
802
2485
500
750
500
2485
802
382
600 x 600 x 8mm I-beam, used as electrical conduit electrical cable delivery
1868
1000 x 750 x 10mm thick stainless steel U beam, used as water conduit. Built with 10mm tolerance gap 475
C45/55 grade reinforced concrete wall plate
6°
solid Brora limestone masonary
2295
16mm steel support post / earthing rod 300mm C45/55 grade reinforced concrete bond beam opening for ventilation
2605
300
max 5000
300
1675
200
2382
6698
2378
3000
6.6kV / 415V step-down transformer electrical cable channel
6625
Inhabited sub-station column
300mm C45/55 grade reinforced concrete foundations. Foundation type and depth varies depending on ground conditions
1:100
inhabited electro-aqueduct column | step-down sub-station 1:50
6
600 x 600 x 8mm SHS beam, used as electrical conduit. Welded to I-beam cable tray
multicore 3-phase armoured cable in triad arrangement. earthing through steel armouring bolt fixing
Typical column head detail 1:10
7
typical electro-aqueduct conduit detail 1:5
8
B
Distillery Intervention Structure
9
726
726
689
689
689
689
726
153
existing rafter (250h x 150w assumed)
258
689
new 280h x 150w fair-faced exposed oak rafter attached onto existing structure new crittall W20 double-glazed facade slate roofing beyond
3340
glazing T-bar
300
glazing couple joint
3099
new 300h x 63w mm fair-faced oak beam fixed to existing structure
901
Crittall W20 double-glazed outward opening door with drip coulpe joint
Distillery visitor centre | glazed north facade section
temperierung piping
1:50
glazed door kick plate
newly planted grasses
existing 20mm timber floor boards 320
new waterproofing new underfloor heating system build up between existing floating joists existing sleeper wall existing ventilation gap
distillery vistor centre | glazed north facade section 1:20
10
300
existing timber roof structure existing gutter copper lining beyond
27
956
1859
existing stone wall
new Crittall W20 glazing
Distillery visitor centre | glazed north facade internal elevation 1:50
1158
refurbished existing windows with double-glazing
new copped clad water vat beyond new 40mm Brora limestone pavers, over min 50mm bedding layer, over 125mm permeable substrate
geotextile filtration layer new underfloor heating system build up between existing floating joists
distillery vistor centre | glazed north facade internal elevation 1:20
Distillery visitor centre | west + north facade | corner plan detail 1:20
12
2
13
Distillery visitor centre | west + north facade | corner plan detail 1:5 1 2 3 4 5 6 7
14
new 250 x 150 mm fair-faced oak column, fixed to existing masonry wall using exposed carraige bolts Crittall W20 double-glazed fixed light jamb profile, internally glazed. Fixed to timber DPM fair-faced oak blocking piece 15mm copper plate between existing masonry wall and timber column existing gutter above existing masonry wall
1 2 3 4 5 6 7
15
Distillery visitor centre | glazed north facade | head and coupling joint details 1:5 1 2 3 4 5 6 7 8 9 10 11 12 13
16
existing ridge cap existing roof slate tiles existing sarking board existing 250h x 150w rafter DPM 280h x 150w mm fair-faced oak rafter fixed, to existing structure using M10 wood screws roof tiles beyond drip detail Crittall W20 fixed light head steel profile, fixed to new rafter. Internally glazed 300h x 62w mm fair-faced oak plate fixed, to existing beam using M10 wood screws M10 wood screw 6mm thick steel T-bar, fixed to wood plate using M4 fixings Crittall W20 direct coupling joint, welded to T-bar. Internally glazed
1 2 3 4 5 6 7
8 9
10 11 12 13
17
Distillery visitor centre | glazed north facade | sill detail 1:5 1 2 3 4 5 6
18
Crittall W20 double door with insulated steel profile kick plate new timber sill, nominal size 44h x 150w mm. Fixed to timber joists with M6 wood screws 200mm rigid insulation between existing timber joists 12mm cement fibre boarding 16mm nophradrain capillary surface drainage membrane, or similar 200mm rigid insulation between existing timber joists
1 2 3 4 5
19
Distillery visitor centre | masonry west facade | wall/floor detail 1:5 1 2 3 4 5 6 7 8
20
temperierung ‘on-wall’ anti-condensation system existing Brora limestone masonry wall existing timber floor boards wet underfloor heating, installed from below. From top to bottom, consists of: 1mm polyethylene foam; 16mm pipework; and diffusion plates. cable tray, carrying pipework, electrical cables and comms to office and plant room existing floor joists 200mm rigid insulation 50 x 50 mm timber battens
1 2
3 4
5 6 7
8
21
22
C
Distillery Climate
23
Distillery visitor centre | climate strategy | winter 1:50
24
25
Distillery visitor centre | climate strategy | summer day 1:50
26
27
Distillery visitor centre | climate strategy | summer night 1:50
28
29
30