TU Delft_MSc3/4 Graduation Thesis_Transitioning Energy (and) Landscape: Appendix Sheet_2019

Page 1

Clyne Burn

cistern fed reed field | zone 1

main pathway to sub-station

water vessel | long-term storage

cistern fed reed field | zone 2

rainwater fed reed field

+30.00m

+28.00m

+26.00m

+24.50m

+22.00m

17,330m 3 3 months storage volume

Section 1 1:200

1째 fall

water vessel - long term storage

electricity delivery | 6.6kV/415V sub-station

electricity channel to Clynelish area

point of electrical delivery

whiskey making | cold water zone

short-term water storage for whiskey making

whiskey making | hot water zone

reed field delivery channel

aqueduct tower

overflow channel

delivery field boundary

Section 2 1:200

mash tuns plant room washbacks distillation

1째 fall

0.5째 fall 3-5 days purification

0.5째 fall 3-5 days purification

17,330m 3 3 months storage volume

short term storage | heat revocery mechanism

reed field delivery channel

horizontal flow reed bed water purification

reed bed water feed control chamber

point of resource delivery

water vessel - long term storage

+24.50m

+23.00m

+22.00m

Section 4 1:200

+24.50m

+23.00m

+22.00m

Section 3 1:200

+24.50m

+23.00m

+22.00m