Clyne Burn
cistern fed reed field | zone 1
main pathway to sub-station
water vessel | long-term storage
cistern fed reed field | zone 2
rainwater fed reed field
+30.00m
+28.00m
+26.00m
+24.50m
+22.00m
17,330m 3 3 months storage volume
Section 1 1:200
1째 fall
water vessel - long term storage
electricity delivery | 6.6kV/415V sub-station
electricity channel to Clynelish area
point of electrical delivery
whiskey making | cold water zone
short-term water storage for whiskey making
whiskey making | hot water zone
reed field delivery channel
aqueduct tower
overflow channel
delivery field boundary
Section 2 1:200
mash tuns plant room washbacks distillation
1째 fall
0.5째 fall 3-5 days purification
0.5째 fall 3-5 days purification
17,330m 3 3 months storage volume
short term storage | heat revocery mechanism
reed field delivery channel
horizontal flow reed bed water purification
reed bed water feed control chamber
point of resource delivery
water vessel - long term storage
+24.50m
+23.00m
+22.00m
Section 4 1:200
+24.50m
+23.00m
+22.00m
Section 3 1:200
+24.50m
+23.00m
+22.00m