1 minute read
Construction Brief (Mudchute Diary) Day 3 - Preparation & Testing Lamella Structure on site.
We started testing the structure on the site with an outstanding with on the Canary Wharf buildings. To begin with, we started testing the joint in our workshops. Not all of them were working. Nevertheless, after a few failures, we moved the structure to the site which has the level changes. That makes this task more demanding. We used professional safety equipment to make sure that the work on site is under safety requirements.
On-site, we realized that because there is a level change the structure gets more tension than before. Thankfully, different types of joints and additional wires on opposite sites make the construction safe. Felt proud and happy about our work we move on further.
Advertisement
We gather natural materials including timber and use them in our structure. We dig holes in the site and put them inside the wood to make extra support for the group. That day was a wind that bring additional challenge and experience to our diaries.