MICHELE DELOGU Architecture Design Architecture Portfolio Design Portfolio
EDUCATION
2019 2018
University of Architecture of Lisbon, Pólo Universitário do Alto da Ajuda, Lisbon (PT)
Exhibit and product Design workshop - Dipartimento di Architettura, Design e Urbanistica (DADU) - Prof. Marco Sironi, Prof. Nicolò Ceccarelli - Alghero (Italia)
Bachelor in Architecture - Thesis mark 110/110 with onors
8th International School on Awareness and Responsibility
High school diploma
A
- ITALIAN - Native speaker
Architectural travelling seminar organized by a team of selected Italians and foreign schools of architecture: the universities of Alghero, Ancona, Ascoli Piceno, Genoa, Milan, Naples, Palermo, Paris Malaquais, Patras, Pescara, Reggio Calabria, Rome, and Venice.
Summer school “Neo-Local Design km 5.8”
2013
LANGUAGES
VILLARD:19 Alcamo Marina: Reconstructing The Coastal Landscape
Erasmus+ in the Faculdade de Arquitetura da Universidade de Lisboa, Portugal
- date of birth: 12/02/1995 - adress: Via Tirso 1, Siamaggiore, Italy
Enrolled in the Architecture faculty of Alghero, Master in Architecture Portuguese language course - Portuguese language certificate A1.2
- gender: male - nationality: Italian
WORKSHOPS
2017
INFO i
STUDIES
2014
now
PROFILE
University of Architecture of Lisbon, Pólo Universitário do Alto da Ajuda, Lisbon (PT)
Department of Architecture, Design and Urban planning of Alghero, University of Sassari (IT)
Istituto Tecnico Tecnologico, Liceo delle Scienze Applicate “OTHOCA ”, Oristano, (IT)
English language school - English language certificate B1 (Cambridge) Anglo American Centre Oristano, Via de Castro 21, Oristano 1 OR
- ENGLISH - B1 Cambridge certificate
Resilient Places and Spaces held in Cluj-Napoca - Prof. Paola Rizzi, Arch.Da-niela Maier - Cluj-Napoca (Romania) Dipartimento di Architettura, Design e Urbanistica (DADU) Prof. Marco Sironi, Prof. Nicolò Ceccarelli - Alghero (Italia)
Summer school “Neo-Local Design 2”
Exhibit Design workshop - Dipartimento di Architettura, Design e Urbanistica (DADU) - Prof. Marco Sironi, Prof. Nicolò Ceccarelli - Alghero (Italia)
Summer school “Neo-Local Design 1”
Exhibit Design workshop - Dipartimento di Architettura, Design e Urbanistica (DADU) - Prof. Marco Sironi, Prof. Nicolò Ceccarelli - Alghero (Italia)
- SPANISH - B1 Erasmus+ Online Linguistic support
WORK EXPERIENCE
- PORTUGUESE - A1.2
TRAINEESHIP
?
mail: wimik@live.it phone: +39 3479179818 instagram: mighi_delg facebook: Michele Delogu
2017
CONTACT
Erasmus+ for traineeship - MiAS Architects MiAS Architects, Barcelona , Spain www.miasarquitectes.com
DIGITAL SKILLS basic
Adobe Illustrator Adobe Photoshop Adobe AfterEffects Autodesk Autocad Google Sketchup
1
advanced
WORK INDEX ARCHITECTURE Bairro Modular - CASCAIS
3-8
University erasmus project group exam, fifth year
Sculpture - CASCAIS
9-14
Calรงada da Ajuda square - LISBOA
15-16
Monserrato pubblic market - MONSERRATO
17-20
Le concerie di Bosa - BOSA
21-24
Las Plassas Castle - LAS PLASSAS
25-28
AM High Line - ALCAMO MARINA
29-30
University erasmus project group exam, fifth year University erasmus project individual exam, fifth year University project group exam, fourth year
University project individual exam, second year University project group exam, fourth year Workshop group project
Cloud & Playground project models - BARCELONA
31-32
HU-MIMETIC
33-34
MiAS Architects trainees group job, erasmus+ traineeship 24h ideas contest, group contest project
DESIGN Product Design
Univerisity design project individual exam, third year
Sardinia Castles
University design project group exam, fourth year
35-36 37-40
2
POTENTIAL PROBLEMS
POTENTIAL BAIRRO PROBLEMS MODULAR
POTENTIAL PROBLEMS
BAIRRO MODULAR BAIRRO MODULAR BAIRRO MODULAR
PALIMPSESTO - BAIRRO MARECHAL CARMONA, CASCAIS
Project: Urban planning and architecture group project for the municipality of Cascais Place: Cascais, Portugal
PALIMPSESTO MARECHAL CARMONA, PALIMPSESTO - BAIRRO- BAIRRO MARECHAL CARMONA, CASCAISCASCAIS Date: 2018-2019 MOBILITY
MOBILITY
ANALYSIS ANALYSIS ANALYSIS PROBLEMS
WALKABILITY LIVEABILITY
Potencial transform the problems in a new project starting point
Potencial transform the problems in a new project starting point
4. LIMITS
1. LIVEABILITY
BEFORE
4. SERVICELESS LIMITS 3.
5. ABANDONMENT 4. LIMITS
WALKABILITY
LIVEABILITY
CLEAR
CLEAR
CONNECTIONS
CONNECTIONS
CONNECTIONS
FILLING VOIDS
FILLING VOIDS
FILLING VOIDS
ORDER GRID
ORDER GRID
ORDER GRID
BEFORE
BEFORE
3. MOBILITY WALKABILITY 2.
3. WALKABILITY
POTENTIAL PROBLEMS 5. ABANDONMENT 5. ABANDONMENT
CLEAR
2. LIVEABILITY MOBILITY 1.
2. MOBILITY
WAL
Potencial transform the problems in a new project starting point
1. LIVEABILITY
3. VOIDS SERVICELESS 2.
3. SERVICELESS
LIVEABILITY
POTENCIAL POTENCIAL
1. STR(ICT)EETS 2. VOIDS 1. STR(ICT)EETS 2. VOIDS
PHASES PHASESPHASES
POTENCIAL
WALKABILITY
1. STR(ICT)EETS PROBLEMS PROBLEMS
MOBILITY
FACULDADE DE - UNI The aim of the project is to re-generate anARQUITECTURA old neighborhood inside the city of Cascais. After finding out SERRA | MICHELE DELOGU problems FRANCISCA and potencial of 20141200 the old neighborhood the 20188 FACULDADE DE ARQUITECTURA - UNI FACULDADE DE ARQUITECTURA - UNIVERSIDADE DE project design re-build the entire area using 5 strategies that FRANCISCA leads the new elements the project. SERRA 20141200 | for MICHELE DELOGU 20188 FRANCISCA SERRA to 20141200 | MICHELE DELOGU 20188175 | RITA FER
ORDER GRID
AFTER
ORDER GRID
Vauban, Frei GERMANY
ORDER GRID SUSTAINABLE NEI Rolf Disch
AFTER
Green neighborhood Less trafic - improves
3. WALKABILITY
POTENTIAL
POTENTIAL
PROBLEMS
PROBLEMS
STRATEGIES
CONNECTIONS
POTENTIAL PROBLEMS POTENTIAL PROBLEMSPOTENTIAL PROBLEMS
STRATEGIES
CONNECTIONS
STRATEGIES
PROJECT ELEMENTS
PROJECT ELEMENTS
MAIN
MAIN
GRID
GRID
GREEN
GREEN
WALK
WALK
HOUSING
HOUSING
EQUIPMENTS
EQUIPMENTS
CONNECTIONS
FILLING VOIDS
FILLING VOIDS
FILLING VOIDS
REPOPULATE
REPOPULATE
REPOPULATE
LINK
LINK
LINK
PROVIDE
PROVIDE
PROVIDE
MOBILITY MOBILITY
MOBILITY
HOUS
BRASÍLIA, B
PUBLIC CONTES HABITATION (CO
WALKABILITY WALKABILITY
Gustavo Panciera A Zanini, Daniel Zanin da Cruz Jung, Luzia Vinicius Farias, Uilian Luara Soares Maye Barbosa Filho Definition of the mod that provides space quality Results in lot morpho
LIVEABILITY LIVEABILITY
WALKABILITY Potencial transform the problems in a new project starting LIVEABILITY point Potencial transform the problems in a new project starting point
3
Potencial transform the problems in a new project starting point STR(ICT)EETS
STR(ICT)EETS
STR(ICT)EETS
MASTERPLAN
MASTERPLAN
THE PROJECT ELEMENTS
MASTERPLAN MAIN MAIN
GRID GRID
GREEN GREEN
HOUSING HOUSING
WALK WALK
EQUIPMENTS EQUIPMENTS
The project elements are the MAIN MASTERPLAN starting point of the new nei-
ghborhood project, they work as a guide for all the design process. The 6 elements shaped the new neighborhood in a GRID simple but clear way, the main MAIN routes gives the new principal movements of the area and the grid element give order to the minor movements inside GREEN the hosing and low-trafic areas. Another important element is GRID the green that gives to the neighborhood new public spaces that follow the liveability conHOUSING cept of the hosing project. The walk element guided the design of the low-trafic areas that GREEN are one of the main elements for the new liveability of the WALK neighborhood. The equipments element is has been developed in order to give new services to the neighborhood and EQUIPMENTS the surrounding areas that are not fully equipped. HOUSING
WALK
EQUIPMENTS
4
THE ELEMENTS COMBINED All the project elements overlapped created the new enviroment of the neighborhood. Each element is then developed in its details such as the streets lenght and composition, the public spaces and the car parkings. An important detail that the project developed are the green elements inside the neighborhood, designed in order to give a real importance to the public spaces.
GRID The grid creates order into the neighborhood introducing restricted car lanes (emergencies only) and pedestrian streets.
MAIN Main streets with two lanes and bus stops. The aim is to connect well the neighborhood with the rest of the city and to let the inhabitants reach their houses easily by car.
GREEN The green is composed by: -Pubblic parks -Tree-lined promenades -Green rooftops -The green organic line
PARKINGS
A C
Parking are located underground in order to avoid cars parked around the neighborhood. Another big outside parking is located near the pubblic school.
B
D
5
A
Parking spots: 41 Area: 1890m²
B
Parking spots: 158 Area: 6876m²
C
Parking spots: 133 Area: 5378m²
D
Parking spots: 70 Area: 3557m²
UNDERGROUND PARKINGS
THE GREEN ELEMENT The project elements are the starting point of the new neighborhood project, they work as a guide for all the design process. The 6 elements shaped the new neighborhood in a simple but clear way, the main routes gives the new principal movements of the area and the grid element give order to the minor movements inside the hosing and low-trafic areas. Another important element is the green that gives to the neighborhood new public spaces that follow the liveability concept of the hosing project. The walk element guided the design of the low-trafic areas that are one of the main elements for the new liveability of the neighborhood. The equipments element is has been developed in order to give new services to the neighborhood and the surrounding areas that are not fully equipped.
4
3 4
3 2 1 1
2
6
THE ORGANIC PATH The strongest element is the organic path that goes all across the neighborhood. This path work as a linking element that lead people through the public green spaces and the equipmets. The path is composed by a particular pavement designed to be modulable with public furniture and green spaces. This different path can also guide people trogh the modularity of the social housing.
THE ORGANIC PATH 1,20 m
5,60 m
1,20 m
0,50 m
PATH
Pavement detail
2,10 m 10 cm
4,60 m
0,90 m
1,70 m
1,50 m
2,50 m
8 cm
Pavement section 7
5
THE MODULAR HOUSING
HOUSING
Section AA’
The housing part of the project is designed starting from a 3x3 meters modular base, several modules were developed to create the different typologies. Every tipology in fact is composed moduling the 3x3 base. Typology T1 There can be 4 different tipologies of apartments for number of inhabitants.PHASES With this design the hosuing is shaped easily inside the grid element designed Division before.
PHASES
Typology T2
y T1
Division
Starting from a 3x3 meters modular base, several Starting from a 3x3 modules were Typology T2 meters modular developed to create base, several the different typoloHOUSINGHOUSING modules were gies: Starting from a 3x3 developed to Starting createfrom a 3x3 meters modular meters modular base, several the different typolobase, several modules were T1 developed to create gies: modules wereT1
HOUSING
Typology T1
3x3 Habitation module
Division
Typology T2 Typology T2
Typology T1
3x3 Habitation
Typology moduleT1
3x3 Habitation module
Typology T2
Typology T2
the different typolodeveloped to create the different typolo- gies: gies: T1 T1
T1 T1. Ground Floor
T2. Upper Floor
T2. Upper Floor
T1. Ground Floor
Scale 1:200
T2
T1
T2
T1. Ground Floor
T2. Upper Floor
T1
T1
T2 T2+1
T2+1
T2
T2+1
T2+1
T1. Upper Floor
T1. Ground Floor
T1. Upper Floor T1. Upper Floor Scale 1:200
T1. Ground Floor
T1. Upper Floor
Scale 1:200 Scale 1:200
Scale 1:200
MATERIALS
Scale 1:200 Scale 1:200
Scale 1:200
MATERIALS
Energy Production
Photovoltaic system
Scale 1:200
Scale 1:200
Scale 1:200 Section BB’
Scale 1:200
Scale 1:200
Scale 1:200 Scale 1:200
Thermal Insulation
Energy Production
Photovoltaic system
Cork MATERIALS
T1. Upper Floor
MATERIALS
Construction
Light Steel Frame
Thermal Insulation
Section BB’
Cork
Panel
3
Energy Production 8
Photovoltaic system Construction
Panel
SCULPTURE Project: Architecture individual project for the municipality of Cascais Place: Cascais, Portugal Date: 2018-2019
Development of a single building in the Bairro modular project. The project take place in the crossing point of the two main streets of the neighborhood, creating a public space composed by a market and a re-food center. It also creates an open square in the center of the new neighborhood.
A’
PROJECT PROCESS
N
LIMITS
SHAPE
CUT
SCULPTURE
A
9
Rooftop view scale 1:200 THE STAND OUT SIGN
Section AA’
0m
10m
20m
The main building itself will work as a landmark in the new urban space. The aim of this sculpure shape of the building is in facts to stand out in the density of the modular social hous-ing. The particular shape of the building will work as a refer-ence point and attractor.ces to the neighborhood and the surrounding areas that are not fully equipped. The new main square is projected looking at the of people Themain projectstreams take place in the intersection of the two main created by the main streets streets of the new neighborhood of Cascais. The intersecthat cross the place. The paop view vement the main square suggest tion of of those streets creates an open pubblic space 1:200 those streams with geometric that can that orientate peoplethe in the neigborhood. The main drawings emphathise intersection of those streams building itself will work as a landmark in the new urban in the center of the square. The space. The aim of this sculpure main square is surrounded by shape of the building is in the new building, in fact the facts to stand out in the density of the modular social housshape of the building is designed starting fromshape the limits ing. The particular of the building will work as a referRooftop view e in the made intersection the square. two main by theof main scale 1:200
50m
SCULPTURE
LPTURE
Rooftop view scale 1:100
Rooftop view scale 1:100
SCULPTURE
ence point and attractor. ghborhood Cascais. The intersecThe project takeofplace in the intersection of the two main streets of the new neighborhood of Cascais. The interseceets creates an open pubblic space tion of those main streets creates an open pubblic space ople in orientate the neigborhood. The main that can people in the neigborhood. The main SCULPTURE itself will work as a landmark in the new urban rk building as a landmark in the new urban space. The aim of this sculpure shape of the building is in The project take place in the intersection of the two main streets of the new neighborhood of Cascais. The intersecfacts to standshape out in the of density the modular social s sculpure theof building is inhoustion of those main streets creates an open pubblic space ing. The particular shape of the building will work as a referthat can orientate people in the neigborhood. The main e density of attractor. the modular social housPRIVATE PUBLIC building itself will work as a landmark in the new urban ence point and space. The aim of this sculpure shape of the building is in facts to stand out in the density of the modular social houspe of the building will work as a refering. The particular shape of the building will work as a reference point and attractor. or. The new main square is projected looking at the main streams of people created by the main streets that cross the PRIVATE PUBLIC PUBLIC place. The pavement of the square suggest those PRIVATE streams The new main square is projected looking at the main The new main is projected looking at the withsquare geometric drawings thatmainemphathise the intersection ofby the main streets that cross the streams of people created place. The pavement of the square suggest those streams streams of people created by the main streets that cross the with geometric drawings that emphathise the intersection of in suggest the center of the square. The main square place. The those pavementstreams of the square those streams those streams in the center of the square. The main square is surrounded by with geometric drawings that emphathise intersection of is surrounded by thethenew building, in fact the shape ofthe new thebuilding, in fact the shape of the building is designed starting from the limits made by the PUBLIC those streams in the center of the square. The main square main square. building designed is surrounded by the newisbuilding, in fact thestarting shape of thefrom the limits made by the building is main designedsquare. starting from the limits made by the e main is projected looking at the main square. ated by the main streets that cross the
Rooftop view scale 1:100
Panel Student: Michele Delogu (20188175)
4
Student: Michele Delogu 10 (20188175)
Pane
4
THE INSIDE
BUILDING SCHEMATICS
GROUND FLOOR
B
B A
A
B
A
THE DISTRICT MARKET The main hall of the building will be used as a district market. The market will be organized in modules of 3x3m that will be rented by private to sell food. Some modules will be reserved for the vegetables and fruits produced by the community garden located in the back part of the buildTHE DISTRICT MARKET ing. The other building’s function will be theTHE new DISTRICT re-food MARKET center of the neighborhood. The main hall of the building will be used as a district The main hall of the building will be used as a distrimarket. The market will be organized in modules of 3x3m ct market. The market bebyorganized in modules that will will be rented private to sell food. Some modules of 3x3m that will be rented byforprivate to and sellfruitsfood. Some will be reserved the vegetables produced by The will main be hallreserved of the building willvegetables be used as ofand athedistrict the community garden located in the back part buildmodules for the fruiing.community The functioninwill be the new market. The willother bebuilding’s organized modules of re-food 3x3m ts produced by market the garden located in the center ofMARKET the The neighborhood. back part of the building. other building’s function
A’
THE DISTRICT MARKET
A’ B’
that will be rented by private to sell food. Some modules
will bewillthe new re-food center ofand thefruits neighborhood. be reserved for the vegetables produced by Another of this building willin be as aofhomeless the hall community garden located the used back part the buildpeople canteen for the night time. In the upper level will COMMUNITY ing. The other building’s function will be the new re-food take place a terrace bar and a little fare trade shop. The center of the neighborhood. building will also have an underground MARKET parking for both eployers and GARDEN customers of the market. RE-FOOD
Plant ground floor scale 1:200 B’ Plant ground floor scale 1:200
COMMUNITY
B’
+9.5m
+3.5m
+0.6m 0.0m
Section AA’ scale 1:200
+9.5m
-3.2m +3.5m
11
+0.6m 0.0m
In Facts the old neighborhood re-food center will have a new entire building in the new negborhood project. This building is designed to storage the food for the homeless GARDEN RE-FOOD MARKET people. Also the food can be donated from the population in a specific place inside the building. Another source for the food will be the market that will donate the unsold food from the day market. This building will have a fully equiped In Factsfor thebikes old (used neighborhood re-food kitchen, a private parking by voluteers for thecenter will have a building the fridges new negborhood project. This food distribution) new and aentire storage roominwith for the is designed to used storage food for the homeless food. Another hallbuilding of this building will be as the a homeCOMMUNITY people. food canupper be donated from the population less people canteen for theAlso nightthe time. In the level will in a bar specific the building. take place a terrace and aplace little inside fare trade shop. TheAnother source for food be the market that will building will also the have anwill underground parking fordonate both the unsold food from the market. This building will have a fully equiped eployers and customers of day the market. (used by voluteers for the GARDENkitchen, a private parking for bikesRE-FOOD food distribution) and a storage room with fridges for the THE RE-FOOD PROCESS food. Another hall of this building will be used as a homeless people canteen for the night time. In the upper level will take place a terrace bar and a little fare trade shop. The
COMMUNITY
PLANTS GARDEN
FIRST FLOOR
RE-FOOD
A
In Facts the old neighborhood re-food center will have a new entire building in the new negborhood project. This building is designed to storage the food for the homeless people. Also the food can be donated from the population in a specific place inside the building. Another source for the food will be the market that will donate the unsold food from the day market. This building will have a fully equiped kitchen, a private parking for bikes (used by voluteers for the food distribution) and a storage room with fridges for the food. Another hall of this building will be used as a homeless people canteen for the night time. In the upper level will take place a terrace bar and a little fare trade shop. The building will also have an underground parking for both eployers and customers of the market.
+9.5m
+3.5m
+0.6m 0.0m
-3.2m
B
B
A
THE RE-FOOD PROCESS
EXCESS
VOLUNTEERS
NEED
A’ FUNCTIONAL SCHEME
Floor +1
Toilette Bar terrace
A’
Bar indoor
B’
Fair trade shop
Plant ground floor scale 1:200
Floor 0
B’
District Market Toilette
Plant ground floor scale 1:200
Re-food Kitchen Re-food Hall
SECTION BB’
Re-food Canteen
+12.2m
Community Garden +7.6m
Floor -1
Underground Parking
+5.1m +12.2m
0.0m +7.6m
Section BB’ scale 1:200
-3.5m
+5.1m
12
Panel Section BB’
0.0m
new entire building in the new negborhood project. This building is designed to storage the food for the homeless people. Also the food can be donated from the population in a specific place inside the building. Another source for the food will be the market that will donate the unsold food from the day market. This building will have a fully equiped kitchen, a private parking for bikes STRUCTURE (used by voluteersSCHEME for the food distribution) and a storage room with fridges for the food. Another hall of this building will be used as a homeRoof less people canteen for the night time. In the upper level will take place a terrace bar and a little fare trade shop. The building will also have an underground parking for both eployers and customers of the market.
+9.5m
THE STRUCTURE
THE CONSTRUCTION +3.5m
The structure of the building is designed to have much more space inside the building without using pilars. For this reason the sctructure is composed by thick (0,50m) Section AA’ portant scale 1:200walls made by reinforced concrete. Each perimetral works is portant and support the light structure roof. The first floor slab is supported by another core of portant walls that create the elevator shaft and the
stairs for the underground floor. Another important elementTheisstructure the main stair to the first floor that is supported of the building is designed to have much more space inside by the south por-tant wall. the portant walls are conthe building without using pilars. For thisAll reason the sctructure is composed nected making the perimeter the building, by thick (0,50m) portant walls made by of reinforced concrete. Eacheach wall works isshape portant andthat supportcreates the light structure The first has aperimetral different theroof. openngs of the floor slabthat is supported by another of portantcuts walls that the buildings seems likecore simple in create a bright white elevator shaft and the stairs for the underground floor. Another important shape. element is the main stair to the first floor that is supported by the south por-
+0.6m 0.0m
-3.2m
THE RE-FOOD PROCESS
tant wall. All the portant walls are connected making the perimeter of the building, each wall has a different shape that creates the openngs of the buildings that seems like simple cuts in a bright white shape. EXCESS
UNDERGROUP FLOOR
Total area: 1945 m² Parking spots: 51
VOLUNTEERS
Slab
NEED
FUNCTIONAL SCHEME
Floor +1
THE CONSTRUCTION
Load-bearing Core Toilette
Bar terrace Bar indoor The structure of the building is designed to have much more space Fair inside trade shop the building without using pilars. For this reason the sctructure is composed by thick (0,50m) portant walls made by reinforced concrete. Each perimetral works is portant and support the light structure roof. The first floor slab is supported by another core of portant walls that create the elevator shaft and the stairs for the underground floor. Another important element is the main stair to the first floor that is supported by the south portant wall. All the portant walls are connected making the perimeter of the District Market Floorbuilding, 0 each wall has a different shape that creates the openngs of the Load-bearing Walls buildings that seems like simple cuts in a bright white shape. Toilette
Re-food Kitchen Re-food Hall Re-food Canteen Community Garden
Floor -1
Underground Parking
Plant underground parking scale 1:200
Panel 13
Student: Michele Delogu (20188175)
5
Extended Façade scale 1:300
Section BB’ scale 1:200
-3.5m
THE OUTSIDE COOMUNITY GARDEN Extended Façade scale 1:300
STRUCTURE SCHEME Roof
THE OUTSIDE COOMUNITY GARDEN
Slab
Load-bearing Core
Load-bearing Walls
Panel Student: Michele Delogu (20188175)
6
14
scale 1:1000 scale 1:1000
Attraction
CALÇADA PAVILLION The Annual Pavillion
The Calçada Square
AJUDA
2019
The Annual Pavillion State of art
section AA’
section AA’ The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a pubblic space that stops andStudent attract The New HUBpeople to stay in the neighborhood. A new square opened in the actual The New Student HUB section AA’ military will be created peopleUrban be attracted Project by: Michele Delogu (20188175) | area Professor: Carlos Alhoto |letCourse: Rehabilitation by the pubblic space and let them explore the neighActivities borhood and its cultural spaces.
Project: Architecture individual project, fifth year erasmus+ universidade de Lisboa Activities Activities Place: Lisboa, Portugal Date: 2019
Locked
scale 1:1000
The New Student HUB
Unlocked
STUDENT HOUSING
The Calçada Square
EDITION
PUBBLIC SERVICES STUDENT HOUSING SPORT FACILITIES
PUBBLIC SERVICES
The Calçada annual pavillion is a new installation that will take place inside the new square. The installation follow the idea of the Serpentine Gallery Pavillion of London, the main idea is to involve population to participate and win in order to create the new pubblic space in the Calçada da Ajuda.
2019
EDITION
Opening
Locked
A
STUDENT HOUSING
Unlocked
SPORT FACILITIES
PUBBLIC SERVICES SPORT FACILITIES
The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a pubblic space that stops and attract people to stay in the neighborhood. A new square opened in the actual military area will be created to let people be attracted by the pubblic space and let them explore the neighborhood and its cultural spaces.
A’
COMMERCIAL ACTIVITIES
T ta id id to
COMMERCIAL ACTIVITIES The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a pubblic space that stops and attract people to stay in the neighborhood. A new square opened in the actual military Open space Attract Explore area will be created to let people be attracted by the pubblic space and let them explore the neighborhood and its cultural spaces.
The Calçada annual pavillion is a new installation that will take place inside the new square. The installation follow the idea of the Serpentine Gallery Pavillion of London, the main idea is to involve population to participate and win in order Participate! Win! Create! to create the new pubblic space in the Calçada da Ajuda.
2020
Participate!
Win!
Create!
Open space
2020
15
Activities
Attract
Recover
Community
The new student hub will take place in the old lanceiros area of Ajuda converting all the military buildings. It will be composed mainly by student housing that will take place in Convert Recover Community the old military building of the new square. The south part of Convert Recover the complex, composed by big industrialCommunity buildings, will be recovered in new sport facilities and commerical areas for students and hub citizens. new services willlanceiros bring newarea The new student will Those take place in the old young inhabitants inall theplace neighborhood and will create new be Theofnew student hub will take in the old buildings. lanceiros area Ajuda converting the military It awill ofmainly community. of composed Ajudasense converting allbythe military buildings. It will beplace in student housing that will take composed mainly bybuilding student of housing thatsquare. will takeThe place in part of the old military the new south the old military building of the new square. The south part of the complex, composed by big industrial buildings, will be the complex, composed by big industrial buildings, will be recovered in new facilities and commerical recovered in new sportsport facilities and commerical areas forareas for students citizens. new services willnew bring new students andand citizens. ThoseThose new services will bring young inhabitants the neighborhood willacreate young inhabitants in theinneighborhood and willand create new a new sense of community. sense of community.
Explore
BEFORE
EDITION As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and send ideas for the new pavillion. This creates a dynamic space that changes every yearAttraction and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized pubblic space. As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and send ideas for the new pavillion. This creates a dynamic space that changes every year and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized pubblic space.
Convert
BEFORE
EDITION
Ways
COMMERCIAL ACTIVITIES
MARKET
AFTER
scale 1:1000 MARKET
MARKET SPORT
AFTER scale 1:2000
2021
EDITION
section AA’ SPORT
The New Student HUB
The Annual Pavillion
SPORT
The Calçada Square
A li te s s a o y p
CALCADA DA AJUDA
2019
Cultural square
FACILITIES
FACILITIES
FACILITIES
Locked COMMERCIAL ACTIVITIES
THE ANNUAL PAVILLION
Unlocked
The new calçada square first aim is to change the actual
idea of the Serpentine Gallery Pavillion of London, the main idea is to involve population to participate and win in order to create the new pubblic space in the Calçada da Ajuda.
pubblic space that stops and attract people to stay in the neighborhood. A new square opened in the actual military area will be created to let people be attracted by the pubblic space and let them explore the neighborhood and its cultural spaces.
2019
State of art EDITION
The Calçada The annual Annualpavillion Pavillion is a new installation that will take The Calçada annual pavillion is a new installation that will place inside the take place inside the newnew square. Thesquare. installation follow the idea of the Serpentine Gallery Pavillion The installation follow theof London, ideathe main idea is to involve population to participate and win in order of the Serpentine Gallery Pavilto create the new pubblic space in the Calçada da Ajuda. lion of London, the main isthat will The Calçada annual pavillion is a newidea installation take place inside the new square. installation follow the to involve population toTheparticiidea ofwin the Serpentine Gallery Pavillion of London, the main 2019 pate and in order to create EDITION idea is to involve population to participate andOpening win in order the new pubblic in the to create the new pubblicspace space in the Calçada da Ajuda. Calçada da Ajuda. Participate!
Win!
Create!
The Calçada Square The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a Convert Recover Community pubblic spaceAthat stops and attract people to stay in the neighborhood. A new square opened in the actual military Unlocked area will be created toLocked let people be attracted by the pubblic huband willits take place in the old lanceiros area spacenew andcalçada let themsquare exploreThe thenew neighborhood cultural The first aimstudent is to change the actual of Ajuda converting all the military buildings. It will be spaces. stream of the street. Actually the street doesn’t have a pubblic space that stopscomposed and attractmainly peoplebytostudent stay inhousing the that will take place in the old military of military the new square. The south part of neighborhood. A new square opened in building the actual complex, composed big industrial buildings, will be area will be created to let the people be attracted by thebypubblic recovered in new sport facilities space and let them explore the neighborhood and its culturaland commerical areas for students and citizens. Those new services will bring new spaces. young inhabitants in theExplore neighborhood and will create a new Open space Attract sense of community.
The Annual Pavillion The Calçada annual pavillion is a new installation that will take place inside the new square. follow the Participate! Win! The installation Create! idea of the Serpentine Gallery Pavillion of London, the main idea is to involve population to participate and win in order to create the new pubblic space in the CalçadaWays da Ajuda.
2020
EDITION
2020 2019
Activities Participate! Win! Create! As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and send ideas for the new pavillion. This creates a dynamic space that changes every year and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized pubblic space.
Win!
Create!
Open space
Attract
2020
Explore
A’ BEFORE
EDITION
As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and send ideas for the new pavillion. This creates a dynamic space that changes every year and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized pubblic space.
BEFORE
EDITION
Participate! Win! Create! As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and Attraction send ideas for the new pavillion. Thisinstallation creates a dynamic The Calçada annual pavillion is a new that will space that inside changes year and a community of take place the every new square. Thecreate installation follow the architects produce ideaspavillion, continuously. The presetations ideathe of Serpentine thethat Serpentine Gallery Pavillionevery of London, thepavilmain As Galleries year the of the projects and the prizegiving will be organized every idea will is tobeinvolve population to participate and be winaninarchiorder lion changed. In fact annualy there will year in competition front of pubblic thewhere Ajuda palace the partecipate new to create the new space in theinCalçada da organized Ajuda.and tecture everybody can pubblic space. send ideas for the new pavillion. This creates a dynamic space that changes every year and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized pubblic space.
Participate!
The Calçada Square The new calçada square first aim is to change the actual stream of the street. Actually have a Open space Attractthe street doesn’t Explore BEFORE pubblic space that stops and attract people to stay in the neighborhood. A new square opened in the actual military Locked Unlocked area will be created to let people be attracted by the pubblic MARKET space and let them explore the neighborhood and its cultural spaces.
FACILITIES
2000
The Calçada annual pavillion is a new installation that will
Project by: take Michele (20188175) | Professor: Carlosstream Alhoof the | street. Course: place insideDelogu the new square. The installation follow the ActuallyUrban the streetRehabilitation doesn’t have a
EDITION
Open space
Attract
AFTER
Explore SPORT
2020
EDITION
AFTER The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a BEFORE pubblic space that stops and attract people to stay in the neighborhood.scale A new1:1000 square opened in the actual military area will be created to let people be attracted by the pubblic space and let them explore the neighborhood and itsAFTER cultural spaces.
2021
EDITION
section AA’
2021
EDITION
Open space
Attract
Explore
The New Student HUB
The Annual Pavillion
The Calçada Square
AFTER
2020 2021 EDITION
BEFORE
EDITION
Locked STUDENT HOUSING
Unlocked
2019
EDITION
PUBBLIC SERVICES SPORT FACILITIES
As the Serpentine Galleries pavillion, every year the pavillion will be changed. In fact annualy there will be an architecture competition where everybody can partecipate and send ideas for the new pavillion. This creates a dynamic space that changes every year and create a community of architects that produce ideas continuously. The presetations of the projects and the prizegiving will be organized every year in front of the Ajuda palace in the new organized
2021
EDITION
AFTER COMMERCIAL ACTIVITIES
The Calçada annual pavillion is a new installation that will take place inside the new square. The installation follow the idea of the Serpentine Gallery Pavillion of London, the main idea is to involve population to participate and win in order to create the new pubblic space in the Calçada da Ajuda.
The new calçada square first aim is to change the actual stream of the street. Actually the street doesn’t have a pubblic space that stops and attract people to stay in the neighborhood. A new square opened in the actual military 16 area will be created to let people be attracted by the pubblic space and let them explore the neighborhood and its cultural
MONSERRATO MARKET Project: Architecture group project, fifth year university of Sassari MERCATO
The project take place inside one of the most important street of the OVEST Monserrato town. In particular this new PROSPETTO market will re-built the old one that is closed and diScala 1:100 smissed in a very central area of the town.
PROSPETTO NORD Italy Place: Monserrato, Date: 2017
URBAN SCALE
N
FLUSSI
PROSPETTO NORD
PLANIVOLUMETRICO IMPIANTO
Vista da via del Redentore
Scala 1:500
Vista frontale da via del Redentore
Vis
PLAYGROUND
MERCATO
VIABILITA’
PIAZZA
PLAYGROUND
MERCATO
Vista da via del Redentore
Vis
N
URBAN SECTION
NIVOLUMETRICO IMPIANTO
17
SEZIONE VIA DEL REDENTORE
Scala 1:500
Scala 1:200
N
Scala 1:500
PLANIVOLUMETRICO IMPIANTO
THE MARKET CONCEPT The main concept of the market is to give a new movement in the main street stream. In order to do that the new market with its shape invites the stream of people to explore it, in facts the building works not only as a market but also as a square. The intention is not to let the building be closed into itself but letting the inside being part of the public space outside, giving a continuity beetween the street and the market.
VIABILITA’
VIABILITA’
VIABILITA’
PIAZZA
GROUND FLOOR
PIAZZA
PLAYGROUND
PIAZZA
SEZIONE VIA DEL REDENTORE
PLAYGROUND
PLAYGROU
MERCATO
WEST FAÇADE
B
Scala 1:200
SEZIONE VIA DEL REDENTORE
SEZIONE VIA DEL REDENTORE
C
A’
PROSPETTO OVEST PROSPETTO OVEST
Scala 1:100
PROSPET
Scala 1:100
PROSPETTO SUD
Scala 1:100
B
NORTH FAÇADE
PROSPETTO OVEST
Scala 1:100
PRO
SCHEMA FUNZIONALE
PIANO TERRAZZA - ORTO URBANO E VIEWPOINT
PIANO TE
PIANO PRIMO - AREA PICCOLO COMMERCIO E PRODUZIONE
PIANO PR
PIAZZA - AREA MERCATO CITTADINO A
PROSPETTO NORD
PIAZZA -
Scala 1:100
PROSPETTO NORD
PIAN
Scala 1:100
PIAN
PIAZ
C’
PROSPETTO NORD
Vista da via del Redentore
Vista frontale da via del Redentore
Scala 1:100
Vista ingresso principale
Vista da via Sant’Agostino
18
00
PROSPETTO NORD
Scala 1:100 C’
THE BUILDING’ SHAPE To let the building reveal its inside square the shape is designed starting from its entrances. Wide open carved apertures in the building’ shape gives a new perspective from the main street point of view. The final shape of the building takes life from a solid white concrete structure that the project needs shaped with the main openings in the streets. Another important element is the skylight that breaks into the building in order to let the light enter inside the market from the inside.
N
Scala 1:100
PIANTA PIANO TERRA CON CONTESTO
VistaVista da via del Redentore ingresso principale
VistaVista frontale daSant’Agostino via del Redentore da via 11.52
Vista ingresso principale
11.79 9.02
3.55
2.88 6.14
10.27
Vis 2.43
2.77
1.90
3.81 3.77
4.00
12.37
24.33
8.29
5.86 1.98
1.10
FIRST FLOOR PIANTA PRIMO PIANO 19
Scala 1:100
ROOFTOP PIANTA PIANO TERRAZZA
Scala 1:100
1.98
4.00 + 1.00
1.10 12.37
3D MODEL
SEZIONE A-A’ PIANTA PIANO TERRA CON CONTESTO
Scala 1:100
24.33
PIANTA PIANO TERRAZZA
Scala 1:100
11.52
11.79 9.02
3.55
6.14
8.29
1.90
3.81 + 5.50
+ 4.00
5.86
1.98
+ 9.00
+ 2.50
1.10
+ 1.00
SEZIONE B-B’ PIANTA PRIMO PIANO + 5.50
Scala 1:100
PIANTA PIANO TERRAZZA
Scala 1:100
12.37 Scala 1:100
24.33
+ 9.00
+ 9.00
+ 1.00
+ 5.50
SEZIONE C-C’
Scala 1:100
+ 1.00
+ 5.50 5.86
+ 1.00
Scala 1:100
SEZIONE A-A’
SEZIONE C-C’ PIANO PIANTA PRIMO Vista interna piano terra
Vista scale piano terra
Scala 1:100 Scala 1:100
Vista
+ 9.00
+ 5.50 + 5.50 + 4.00
+ 2.50
+ 1.00
SEZIONE B-B’
SPACCATO SEZIONE A-A’
+ 1.00
SPACCATO SEZIONE A-A’
Scala 1:100 SEZIONE A-A’
UNA NUOVA PROSPETTIVA PER MONSERRATO GRUPPO M3: Cossu Giacomo - Delogu Michele - Fadda Andrea
Scala 1:100
UNA NUOVA PROSPETTIVA PER MONSERRATO GRUPPO M3: Cossu Giacomo - Delogu Michele - Fadda Andrea
20 Partendo da una visione ampia di città metropolitana, il progetto di via del Redentore garantisce funzioni di collegamento e rilancio. Un percorso dotato di servizi d'informazione, spazi espositivi,
CONCERIE DI BOSA Project: Architecture individual project, second year university of Sassari Place: Bosa, Italy Date: 2016
OVERVIEW
SHAPE SYINTHESIS
Ossrvazione edifico
Ossrvazione edifico
SHAPE COMBINATION
Sintesi riflesso e forma Ossrvazione edifico
The project of re-generating an old building started creating a new roof from which the idea for the function to be attributed to the new building would then develop. The intuition of the cover was born from a direct overview of the project site, looking at the reflection of the roofs on the river give the intuition to summarize a useful geometry to conceive the new roof.
Unione delle forme
Sintesi riflesso e forma
Sintesi riflesso e forma
TEXTURE CONCEPT
Unione delle forme
Unione delle forme
Nascita texture Nascita texture
Nascita texture TEXTURE APPLICATION
ROOF CONCEPT
Applicazione GEOMETRY SYNTHESIS
Applicazione Applicazione
21
Creazione copertura
Sintesi geometria
Concerie di Bosa . progetto di una biblioteca e zona ristoro
A
THE RE-GENERATED LOOK
Concerie di Bosa . progetto di una biblioteca e zona ristoro
Starting from the old building shape the new roof gives not only a new look but also new functions that are related alos to the roof’s texture that modulates the space. The new roof in facts leads the light into the building thanks to its modularity. The new functions of restauration and pubblic library are modulated looking at the new roof’ skylights.
Fium e Te
A
Fium e Te
mo
B
12
mo 13
13 6 10
5
10
3 7
7
9
9
11
7
4 11 8
8 2
11
2
C
C’
1
Biblioteca
Verde progettuale
Legenda: 1.Entrata biblioteca
Ristorante/bar
Inquadramento urbano scala 1:500
Piano terra
Piano primo
Schema movimento persone
Schema suddivisione spazi interni
Biblioteca
A’
A
11 8
Pianta piano terra
2 B
Verde progettuale
11
Legenda: 1.Entrata biblioteca
Ristorante/bar
Piano primo
4
B’
3. Entrata Ristorante 4. Reception biblioteca 5. Area lounge biblioteca 6. Cucina ristorante 7. Sala ristorante con orto verticale 8. Reception ristorante 9. Servizi igienici 10. Sala computer 11. Sala lettura 12. Bar11veranda sul fiume 13. Accesso esterno al bar
Schema movimento persone Sezione AA’
A’ 11
A
C
Piano terra
Vie di
3. Entrata Ristorante 4. Reception biblioteca 5. Area lounge biblioteca 6. Cucina ristorante 7. Sala ristorante con orto verticale 8. Reception ristorante 9. Servizi igienici 10. Sala computer 11. Sala lettura accesso 12. Bar veranda sul fiume 13. Accesso esterno al bar
C’
Schema suddivisione spazi interni
Vie di accesso
C
Inquadramento urbano scala 1:500
Pianta primo piano
A’
11
Prospetto sud
Scienze dell’architettura e del progetto . Corso di progettazione architettonica
Docente: Joseph Mìas
Tutor: Salvatore Carta, Sabrina Scalas, Francesca Arras
Studente: Michele Delogu (50004736) A.A. 2015/2016
Progetto sulle concerie lungo il fiume Temo nella città di Bosa
Scala piante,prospetti e sezioni: 1:100
Sezione AA’ C
Prospetto nord
Tavola . 1
B’
Orientamento piante :
11
22
Sintesi geometria
Creazione copertura
Ossrvazione edifico
Sintesi riflesso e forma
Unione delle forme
Nascita texture
Sistema di funzionamento orto verticale con ric
THE MODULAR ROOF Ossrvazione edifico
Sintesi riflesso e forma
The modular5 concept give to the building a particular lightSintesi riflesso e forma nessOssrvazione in edifico the different enviroments. The types of modules are divided in 3 groups: open air 8 ones, covered ones and skylight lamelle copertura con e incastrate ones. Those different modules are placed in the roof’s textured wood structure.
Unione delle forme
Unione delle forme
Applicazione Tipologia lucernario A
6
Applicazione
Pianta coperture
14
Applicazione
Sintesi geometria Pianta coperture
o o lamellare n legno re-esistente o forate e unzione lucernario/lamelle arbonato trasparente a lucernario da
15
Sistema di funzionamento orto verticale con riciclo Pianta coperture
Creazione copertura
Nodo di giunzione tra muro pre esistente e la nuova copertura
5
Sintesi geometria
Tipologia lucernario B Sintesi geometria
Creazione copertura
5
11
5
Nodo di giunzione lamelle copertura con piastre inchiodate e incastrate
9
8
11
Tipologia lucernario A
10 Legenda
7 3
15
2
3
Tipologia lucernario B
Tipologia lucernario B
11 12
Sezione BB’
11
11 12
1
3
Sezione CC’
11
9
10
2
14
13
10 9
4 glio costruttivo A - Scala 1:20
Sezione BB’
Dett. A
4
10 Docente: Joseph Mìas
Dett. A
Tutor: Salvatore Carta, Sabrina Scalas, Francesca Arras
5
Studente: Michele Delogu (50004736) A.A. 2015/2016
8
15 7
Progetto sulle concerie lungo il fiume Temo nella città di Bosa
910
8
10 6 15 7
13
5
9
13
8
10 6 13
15 7
Sezione CC’
Sezione CC’
Dettaglio costruttivo - Scala 1:20 Dettaglio costruttivo A - ScalaA 1:20
23
Tavola . 2
Tavola . 2
Scala piante,prospetti e sezioni: 1:100
Dett. A
9 6
Esploso edificio
Sezione BB’
12
Scienze dell’architettura e del progetto . Corso di progettazione architettonica
5
Dett. A
Nodo di giunzione tra muro pre esistente e la nuova copertura 7 7 1. Lamina metallica continua 9 2. Membrana Gore-Tex Tipologia lucernario B 3. Isolante 10 15 4. Tavolato in legno 15 5. Struttura in legno lamellare 6. Trave portante in legno Nodo di giunzione tra muro pre esistente e la nuova copertura 7. Muro portante pre-esistente Nodo di giunzione tra muro pre esistente e la nuova copertura 8. Piastre di acciaio forate
11
1
Tipologia lucernario A
6
14
Legenda
Mantenimento del pre esistente e inserimento nuove funzioni
Tipologia lucernario A
6
9 14. Calcestruzzo 15. Piastra di collegamento con guida
4
8
Copertura componibile e versatile per ogni tipo di utilizzo
7
10. Elemento di giunzione lucernario/lamelle 11. Cupola in policarbonato trasparente9. Cornice isolante 10. Elemento di giunzione lucernario/lamelle 12. Telaio struttura lucernario 11. Cupola in policarbonato trasparente 13. Canale di gronda 11 14. Calcestruzzo 12. Telaio struttura lucernario 15. Piastra di collegamento con guida 13. Canale di gronda
15
Sezione BB’
14
8
Nodo di giunzione lamelle copertura con
Nodo di giunzione lamelle copertura conpiastre inchiodate e incastrate piastrecontinua inchiodate e incastrate 1. Lamina metallica
2. Membrana Gore-Tex 3. Isolante 4. Tavolato in legno 5. Struttura in legno lamellare 6. Trave portante in legno Legenda 7. Muro portante pre-esistente 8. Piastre di acciaio forate 1. Lamina metallica continua 2. Membrana Gore-Tex 9. Cornice isolante 3. giunzione Isolante 10. Elemento di lucernario/lamelle 8 4. Tavolato in legno 11. Cupola in policarbonato trasparente 5. Struttura in legno lamellare 12. Telaio struttura lucernario 6. Trave portante in legno 13. Canale di gronda 6 7. Muro portante pre-esistente 14. Calcestruzzo 8. Piastre di acciaio forate 9. Cornice isolante 15. Piastra di collegamento con guida
Mantenimento del pre esistente e inserimento nuove funzioni
Copertura componibile e versatile per ogni tipo di utilizzo 6
12
2
Sistema di funzionamento orto verticale con riciclo acque piovane Mantenimento del pre esistente e inserimento nuove funzioni
Copertura componibile e versatile per ogni tipo di utilizzo
gamento con guida
1
Mantenimento del pre esistente e inserimento nuove funzioni
Copertura componibile e versatile per ogni tipo di utilizzo
Nascita texture
7 Creazione copertura
a continua e-Tex
Nascita texture
Scienze dell’architettura e del progetto . Corso di progettazione architettonica
Scienze dell’architettura e del progetto . Corso di progettazione architettonica
Esploso edificio
Docente: Joseph Mìas
Tutor: Salvatore Carta, Sabrina Scalas, Francesca Arras
Docente: Joseph Mìas
Studente: Michele Delogu (50004736) A.A. 2015/2016
Tutor: Salvatore Carta, Sabrina Scalas, Francesca Arras
Sezione CC’
Progetto sulle concerie lungo il fiume Temo nella città di Bosa
Studente: Michele Delogu (50004736) A.A. 2015/2016
Scala piante,prospetti e sezioni: 1:100
Progetto sulle concerie lungo il fiume Temo nella città di Bosa
Esploso edificio
Orientamento piante :
Scala piante,prospetti e sezioni: 1:100
HANDCRAFTED MODEL
24
LAS PLASSAS CASTLE Project: Restauration group project, fifth year university of Sassari
The Castle of Las Plassas is an important cultural heritage, the project of restauration and accessibilty gives an opportunity for the town to re-discover the old construction. Also the museum of the city will be again connected with the monument with the project of the new route.
Place: Las Plassas, Italy Date: 2017-2018
5 4
6
7
1
B’ A’
2
C’ C
9
10 8
B
3 Sezione CC’
D’
A
Scala 1:50
D
8
7
6
5
4
3
2
CASTELLO 272m
one DD’ Scala 1:50
25
IL SENTIERO AL CASTELL
Il sentiero per la visita del castello era organizzato ins audioguidata del museo MUDA collocato nel centro Plassas. Lungo il percorso sono presenti dei cartelli c traccia audio da eseguire per ogni tappa della visita. Dura è la chiesa di S. Maria Maddalena collocata all’ingreso piedi del colle. Il sentiero è attualmente interdetto al p presenti delle transerre per sbarrare il percorso. Il pe impervio e disseminato di vegetazione infestante che
PROGETTO DI RESTAURO DEL CASTELLO DI LAS PLASSAS
TAV.
5.3
Progetto nei contesti storici (Laboratorio di progetto e restauro) Università degli studi di Sassari Dipartimento di Architettura, Design e Urbanistica Corso di laurea Magistrale in Architettura Studenti: Michele Delogu, Andrea Fadda, Nefeli Xourafi Anno Accademico 2017/2018 Professore: Prof. Arch. Bruno Billeci Tutor: Arch. Maria Dessì
B
D
C
CONTENUTI: Rilievo Planimetria generale,
Sezione AA’
Prospetti e sezioni, Analisi tecniche costruttive, Particolari significativi.
THE CASTLE STRUCTURE
A
A
A
DETTAGLIO scala 1:15
1,6 m
First step for the restauration project was the analysis of the existing building, taking measures and studing how the old structure was made in the past. Also a study of the materials was made in order to find the correct materials for the consolidation project of the destroyed parts of the walls. A simple 3D model was made to understand the structure and design the new accesibility.
2
1
1
2
2
2
2,26 m
2 0,85 m
1,82 m
1
1
0,42 m
2
1
2
0,62 m
0,38 m
0,11 m
0,54 m 2
1
D
m
0,31 m
0,24
0,13 m
2
0,43 m
0,11 m 1
2
C 0,68 m
0,07 m
0,21 m
0,45 m
0,09 m
0,37 m
B 0,11 m
1m 0,5
A DIMENSIONI
1
PROSPETTI E SEZIONI
PROGETTO DI RESTAURO DEL CASTELLO DI LAS PLASSAS
TAV. 7
1,08
0,6
0,57
7,72
Prospetti e sezioni, Analisi tecniche costruttive, Particolari significativi.
1,07
5,63
5.2
CONTENUTI: Rilievo Planimetria generale,
1,5
0,64
STUDIO DELLE TRASFORMAZIONI DELLA STRUTTURA, DELLE CAUSE E DELLE POSSIBILITA’
Progetto nei contesti storici (Laboratorio di progetto e restauro) Università degli studi di Sassari Dipartimento di Architettura, Design e Urbanistica Corso di laurea Magistrale in Architettura Studenti: Michele Delogu, Andrea Fadda, Nefeli Xourafi Anno Accademico 2017/2018 Professore: Prof. Arch. Bruno Billeci Tutor: Arch. Maria Dessì
8
3,1
1,6
5,43
4,13
6,48
4,44
4,51
1,65
2,28
5,94 4,15
1,37
2,77
5,88
PROGETTO DI RESTAURO DEL CASTELLO DI LAS PLASSAS
6
3,3
5
6,2
3
4,5
4,5
1,55
1,22
4,42
1,26
0,63
10,21
5,1
0,58
1,23
0,67
4,64
1,37
2,36
3,44
3,48
8
6,19
3,4
5,05
4,7
9
2,7
9
0,69
2,21
15,42
0,7
2,26
3,27
1,2
4,0 6
2
2,9
1,68
9,07
9,29
7,35
1,6
7,63
9,73
Progetto nei contesti storici (Laboratorio di progetto e restauro) Università degli studi di Sassari Dipartimento di Architettura, Design e Urbanistica Corso di laurea Magistrale in Architettura Studenti: Michele Delogu, Andrea Fadda, Nefeli Xourafi Anno Accademico 2017/2018 Professore: Prof. Arch. Bruno Billeci Tutor: Arch. Maria Dessì TAV. CONTENUTI: Degradi e dissesti Analisi dei1:50 degradi, Sezione AA’ Scala Analisi dei dissesti, Valutazioni quadro fessurativo, Interventi restauro conservativo, Master generale sulle problematiche.
7.1
Sezione CC’ Scala 1:50
1,6
10,6
5,79
4,75
1,74
1,5 4,47 2 ,1 2
5,91
7
5,0
2
4,1
2,72 3,42
3,27
0,75
4,13 0,5
0,75
4
0,5
8
1,6
11,05
7
0,11
2,2 0,31
2
1,4
2,49 6,03
2,12
3,36
4,1
3,15
3 2,9
8
7
0,2
4,81
0,81
7
1,6
2,2
Stato originario e stato attuale a confronto
Sezione DD’ Scala 1:50
Sezione BB’ Scala 1:50
26
THE CASTLE RESTAURATION + 6.10
Dettagli passerella nord
+ 5.98
Fasi progettuali
PROGETTO DI RESTAURO DEL CASTELLO DI LAS PLASSAS
+ 4.06 + 3.04 TAV.
+ 2.02
8.3
3.REVERSIBILITA’
Progetto nei contesti storici (Laboratorio di progetto e restauro) Università degli studi di Sassari Dipartimento di Architettura, Design e Urbanistica Corso di laurea Magistrale in Architettura Studenti: Michele Delogu, Andrea Fadda, Nefeli Xourafi Anno Accademico 2017/2018 Professore: Prof. Arch. Bruno Billeci Tutor: Arch. Maria Dessì
CONTENUTI: Interventi Masterplan generale interventi, Masterplan rifunzionalizzazione, Presentazione progetto restauro, Particolari costruttivi, Simulazione progetto eseguito.
2.REINTEGRAZIONE
The new light structure designed for the castle gives a new path to explore the enviroments. Giving new points of view of the surroundings it also re-discover the old path made by the soldiers up on the ancient defending walls. Also the schemes for the consolidation of the ancient walls was made to preserve the integrity of the structure. 6
Legenda dettagli costruttivi
1.................................................................................................... Conci in arenaria del muro pre esistente 2........................................................................................ Riempimento della muratura a sacco pre esistente 3.................................................................................................. Materiale per nuovo riempimento a sacco 4.............................................................................................................. Reintegrazioni con conci regolari 5..................................................................................................... Cordolo rifinito in malta a base di calce 6........................................................................................................... Corrimano in carpenteria metallica 7..................................................................................................... Piastra metallica di rivestimento esterno 8................................................................................................................................ Attacco con piastra 9............................................................................................................. Passerella in carpenteria metallica 10........................................................................................................... Scalinata in carpenteria metallica
+ 5.93 1.PREESISTENZA
+ 2.93
Sezione AA’ SCALA 1:50
+ 2.72 + 2.36 + 1.53
9
8 5
6
3
+ 0.00
4 7
1
2
2
9 1
Sezione BB’ SCALA 1:50
27Esploso assonometrico passerelle
Dettaglio costruttivo 1
Dettaglio costruttivo 2
Modello 3D stato di progetto
li passerella nord
Dettagli passerella nord
Prospetto Ovest
Prospetto Ovest
Prospetto Est
Prospetto Est
Modello 3D stato di progetto
Fotosimulazione
28
MASTERPLAN
SCALA 1:5000
Spazi propri della fiumara
Vegetazione della fiumara
Aree adibite ai nuovi servizi
Altri spazi pubblici da salvaguardare
MASTERPLAN
SCALA 1:5000
Spazi propri della fiumara
Vegetazione della fiumara
AM HIGH LINE
Aree adibite ai nuovi servizi
Altri spazi pubblici da salvaguardare
Ex Area industriale Magazzinazzi
Stazione ferroviaria Castellammare del Golfo
Ex Cantina
Chiesa di Santa Maria della Stella
Ex Area industriale Magazzinazzi
Stazione ferroviaria Castellammare del Golfo
Ex Cantina
Chiesa di Santa Maria della Stella
BUS
TRASPORTO
FB
Fiumara tombata per brevi o lunghi tratti
Aree destinate ai nuovi parcheggi
Fiumara in stato di blocco fisico/visivo da parte dell’ edificato
Fiumara tombata per brevi o lunghi tratti
Ex Tonnara
Fiumara con foce deviata dal suo naturale percorso
Fiumara con pericolo segnalato nel PAI
Fiumara con foce deviata dal suo naturale percorso
VILLARD:19 Alcamo Marina: Reconstructing The Coastal Landscape, the theme of the workshop takes place in the coastal town of Alcamo Marina. The aim of the project was to give a new direction for the future of the town, to preserve the natural coastal landscape too much compromised by the illegal constructions. 3
2
Ex Motel Beach
Bosco Calatubo
3
Date: 2017-2018 F2
F1
340m
780m
F2
F1
340m
1 - Alcamo 2 - Balestrate 3 - Castellamare del Golfo
1
FS SS187
616m
871m
1
LO SPAZIO INTERMEDIO
F6
F5
780m
1 - Alcamo 2 - Balestrate 3 - Castellamare del Golfo
616m
871m
F4
F3
450m
1 km 470m
F6
F5
F4
F3
450m
1 km 470m
2
INQUADRAMENTO
Bosco Calatubo
Place: Alcamo Marina, Italy
TRAMVIA
Fiumara con pericolo segnalato nel PAI
Ex Motel Beach
Ex Tonnara
Hotel La Battigia
BUS
FIUMARE
Fiumara in stato di blocco fisico/visivo da parte dell’ edificato
Project: Urban planning group project, workshop from the fifth year
TRAMVIA
TRASPORTO
Aree di espansione residenziale
Hotel La Battigia
LUOGHI
FB
Aree destinate ai nuovi parcheggi
INQUADRAMENTO
LUOGHI
FIUMARE
Aree di espansione residenziale
LO SPAZIO INTERMEDIO FS SS187
P Balestrate
E90
CONNESSIONI TRASVERSALI P P
P
Balestrate
E90
CONNESSIONI TRASVERSALI P P
P
P
P
P
P
P
P
P
Infrastrutture esistenti
Le connessioni nascono dall’esigenza di operare una selezione tra le aree residuali presenti sulle valli al fine di creare una nuova maglia di spazio pubblico nei percorsi di risalita che riscoprono la conformazione del territorio e allo stesso tempo, interesecando le infrastrutture esistenti, mettono in relazione la morfologia trasversalmente. Con “connessioni trasversali” si intendeno delle aree che fungano in primo luogo da aree di interconnessione tra spazi, comprendendo elementi di passaggio e di sosta, che si configurano cui interno si prevedono insediamenti di nuove Infrastrutture esistenticome spazio pubblico,Lealconnessioni nascono dall’esigenza di operare una attività commerciali e servizi. selezione tra le aree residuali presenti sulle valli al Letto della fiumara fine di creare una nuova maglia di spazio pubblico nei percorsi di risalita che riscoprono la conformaArea di pertinenza della fiumara zione del territorio e allo stesso tempo, interesecanConnessioni trasversali do le infrastrutture esistenti, mettono in relazione la morfologia trasversalmente. Con “connessioni trasversali” si intendeno delle aree che fungano in primo luogo da aree di interconnessione tra spazi, comprendendo elementi di passaggio e di sosta, che si configurano come spazio pubblico, al cui interno si prevedono insediamenti di nuove attività commerciali e servizi.
P P
Castellamare
Letto della fiumara
P
Area di pertinenza della fiumara Connessioni trasversali
P
P
P
P P
Castellamare
TRASPORTI
P
TRASPORTI Magazzinazzi
Battigia
Canalotto
Calatubo
Magazzinazzi B1
Battigia B2
Canalotto B3
Calatubo B4
P Palermo
Castellamare Palermo
La tramvia compie a velocità lenta il litorale di Alcamo Marina, con possibilità di ampliamento sino a Balestrate, collegando le quattro stazioni a distanza di 1,5km, realizzando una connessione veloce tra servizi. Essa si interseca con le fermate dei bus che consentono il facile spostamento ai servizi, alle nuove aree di parcheggio e alle zone residenziali e alle attività commerciali collo-
PB1ARCHEGGI
B2
B3
B4
La tramvia compie a velocità lenta il litorale di Alcamo Marina, con possibilità di ampliamento sino a Balestrate, collegando le quattro stazioni a distanza di 1,5km, realizzando una connessione veloce tra servizi. Essa si interseca con le fermate dei bus che consentono il facile spostamento ai servizi, alle nuove aree di parcheggio e alle zone residenziali e alle attività commerciali collo-
Castellamare
PARCHEGGI
Stato attuale
Stato di progetto
LITORALE Stato attuale
Stato di progetto
LITORALE Il nuovo litorale seleziona le poche aree residuali non colpite dalla massiccia edificazione al fine di salvaguardarle tramite la trasformazione in spazi pubblici rigorosamente all’aperto dotati di aree verdi, servizi e possibili insediamenti interni di piccole attività commerciali come chioschetti, noleggio Biciclette e altri veicoli non motorizzati. Tutto il litorale sarà collegato tramite la realizzazione di marciapiede e adiacente pista ciclabile, attuata mediante la rimozione di una fila di parcheggi nel lato interno della strada.
STRUTTURA ORDINATRICE Il nuovo litorale seleziona le poche aree residuali non colpite dalla massiccia edificazione al fine di salvaguardarle tramite la trasformazione in spazi pubblici rigorosamente all’aperto dotati di aree verdi, servizi e possibili insediamenti interni di piccole attività commerciali come chioschetti, noleggio Biciclette e altri veicoli non motorizzati. Tutto il litorale sarà collegato tramite la realizzazione di marciapiede e adiacente pista ciclabile, attuata mediante la rimozione di una fila di parcheggi nel lato interno della strada.
STRUTTURA ORDINATRICE
Alghero
1. Alghero
29
1.
Trapani
Alcamo
Alcamo
Alcamo
La struttura a monte si presenta come un principio ordinatore che gerarchizza e definisce i nuovi spazi, dando luogo ad una nuova urbanità. Tramite essa sono stati delineati quelli che sono gli spazi di espansione residenziale della città, collocati nelle intersezioni tra infrastrutture e nuove connessioni. La struttura si presenta anche come uno spazio intermedio a più livelli, intermedio tra fasi e nuovi processi, tra elementi fisici, tra percorsi e anche tra la normativa, perchè frutto di una previsione.
Trapani
Alcamo
Alcamo
Alcamo
La struttura a monte si presenta come un principio ordinatore che gerarchizza e definisce i nuovi spazi, dando luogo ad una nuova urbanità. Tramite essa sono stati delineati quelli che sono gli spazi di espansione residenziale della città, collocati nelle intersezioni tra infrastrutture e nuove connessioni. La struttura si presenta anche come uno spazio intermedio a più livelli, intermedio tra fasi e nuovi processi, tra elementi fisici, tra percorsi e anche tra la normativa, perchè frutto di una previsione.
studenti: Andrea Fadda Michele Delogu
studenti: Andrea Fadda Michele Delogu
APPROFONDIMENTO
SCALA 1:1000
Aree picnic
Mercato pubblico
Fermata tram
Fermata bus
Servizio bar
Servizio di ristoro
Impianti sportivi
Noleggio bici
INTERVENTI PROGETTUALI
PRESENTATION VIDEO
STATO ATTUALE
LITORALE
CONNESSIONI TRASVERSALI
TRASPORTI
STRUTTURA ORDINATRICE
STATO DI PROGETTO
LITORALE E VIABILITA’
STATO ATTUALE
STATO DI PROGETTO
ELEMENTI PROGETTUALI STRUTTURA ORDINATRICE
SPAZI PUBBLICI E SERVIZI
AREE DI ESPANSIONE
PROSPETTIVE FUTURE
SVILUPPO ZONE DI ESPANSIONE
ALCAMO
SVILUPPO SERVIZI COLLEGATI
STRUTTURA ORDINATRICE
STATO ATTUALE
ALCAMO
Alghero
1.
studenti: Andrea Fadda Michele Delogu
30
CLOUD & PLAYGROUND MODELS Work: MiAS Architects trainees group job, erasmus+ traineeship Place: Barcelona, Spain Date: 2017
31
The two models were made for the MiAS Architetcs studio in Barcelona. Both of them were built entirely by hand during the traineeship in the studio with a group of 4 people. The Cloud model was made of wood sticks meanwhile the PlayGround project was made of assembled methacrylate 3D printed material.
32
HU-MIMETIC Work: 24h ideas contest, group contest project Date: 2017 https://www.if-ideasforward.com/biomimetic
What does nature have to teach us? Do we need to perceive it better by copying it in search of perfection, or simply to understand the rules that govern it? Nature is multidisciplinary and everything seems to work effortlessly, because it is not designed to be perfect, but functional, non-toxic, adaptable and “alive� in form or function. Biomimetic is a new movement created by spontaneity and perpetuated by the need to create sustainability solutions. It is up to the human being to discover the powers and, with the right dose of utopia, to make it the best way to respect the nature of which we are all a part. Making it happen is the master key of these new doors ahead ... All living forms present in nature carry mathematical formulas and quantifications. The interpretation of these forms can be the great achievement for architecture that, intelligently, should translate them into solutions and needs in a sustainable and functional strategy. Natural examples are biological inspirations of efficiency and aesthetic / functional balance. The way of looking at forms can finally awaken to the simplicity of what more complex exists on the face of the earth: life itself. from: https://www.if-ideasforward.com/biomimetic 33
34
contatto, spaziosa e adatta per lunghe pause, non adatta per tavoli alti o comunque da lavoro.
PRODUCT DESIGN
Sedia da giardino
Project: Design individual project from the third year
unti di tavoli alti o
The analysis of an old chair and a new project of itself Autore. ignoto adding a new Produttore. EMUelement to give a new value of it. The deMateriale. ferro tubolare piegato a e plastica sign idea started from new movement finded analyTecnica. piegatura, saldatura, stampaggio. zing the chair’s shape and materials. Drawing the moUso. seduta per ambienti esterni. vements through hands helped to con design and imagene Apparenza. la sedia si presenta più bassa della norma dei the final idea. bracioli esili e abbastanza alti
Date: 2017-2018 L’oggetto si colloca tra la natura e il costruito, luogo ideale è quindi il giardino di casa. l’habitat per cui la seduta è stata concepita è esterno dalle mura casalinghe, ciò si deduce dai materiali impiegati.
PRIMA
>>>
Comodità. molto accogliente anche se fredda al tatto in alcuni punti di contatto, spaziosa e adatta per lunghe pause, non adatta per tavoli alti o comunque da lavoro.
DOPO
dino di casa. nghe, ciò si
1 1 1
2
3
L’oggetto si colloca tra la natura e il costruito, luogo ideale è quindi il giardino di casa. l’habitat per cui la seduta è stata concepita è esterno dalle mura casalinghe, ciò si deduce dai materiali impiegati. 1,0cm
PRIMA
>>>
DOPO
1,0cm
2 2 1,8cm
1,8cm 1,8cm
Saldatura
1,8cm
Saldatura 2,0cm
2,0cm
1 1
35
2,5cm
2,0cm
2,0cm
2 2
2,5cm
Saldatura Saldatura
3 3
36
TAV.
1
Corso: Rappresentazione del patrimonio culturale Professore: Enrico Ciccalo’ Anno: 2017/18 Architettura ad Alghero Università degli studi di Sassari
Studenti: Andrea Fadda Michele Delogu Nefeli Xourafi
TAV.
1
Studenti: Andrea Fadda Michele Delogu Nefeli Xourafi
Corso: Rappresentazione del patrimonio culturale Professore: Enrico Ciccalo’ Anno: 2017/18 Architettura ad Alghero Università degli studi di Sassari
SARDINIA CASTLES
SARDINIA CASTLES Sardinia Castles is a project for the fruition of the sardinian cultural heritage, in particular the castles that can be founded around Sardinia territory. The project studied all the graphic design part such as website graphic, mobile app, paper and6 panels. Even the route 4 5 7 of castels were designedBosa,for AC CLas ESPlassas, S I BCastello I LI T AMarmilla ’ design D I G I T A LEforAles,the della Castello difruition Barumele Cuglieri, Casteddu Ezzu Castello the di Serravalle castle of Las Plassas.
Project: Design group project from the fourth year Date: 2017-2018 2
1 Siliqua, Castello d’Acquafredda
3
Silius, Castello Orguglioso (di Sassài)
P R OG ETTO GR AF I C O Sardara, Castello di Monreale
E
S I T O W EB
L A RE TE IMMAGINE COORDINATA Il logo
2 Il logo nasce dalla forma stilizzata in pianta di un castello con (di quattro torri. AccentuanSilius, Castello Orguglioso Sassài) do la forma delle torri, ruotando il logo e dandogli spessore nasce il marchio di sardinia OLBIA castles.
1
12
Siliqua, Castello d’Acquafredda 11 10
10-11
3
SCELTA DEL FONT 9-10
Sardara, Castello di Monreale
9
SASSARI
11
Sans Serif REGULAR
9
7
CHILIVANI
12
8
8
COLORI
11 6 4
MACOMER 5
14
SCELTA DEL 10 FONT
4-5
4 SEE
DO
LEARN
2-4
SHOP
LEGENDA: SASSARI
32
ALGHERO 2
4
TOUR >> CASTEDDU TOUR ARBOREA TOUR TATTARI TOUR other activities
Stazione dei treni
1
7
32
5
8
8
casteddu tour
5
Stazione degli autobus
4
COLORI
2
SAN GAVINO
Nuraghe
2
1
4
2
3 SAN GAVINO
7
6
MACOMER 5 1
CAGLIARI
4 1
6 CAGLIARI
3 SARDINIA CASTLES BUY NOW YOUR TICKETS!
Castello di Acquafredda (Siliqua), Castello Orguglioso (Silius), Castello di Monreale (Sardara), Castello della Marmilla (Las Plassas).
2
3
Torre costiera
’ ’
C = 0% M = 20% L O G O DE SI G N Y = 58% Il logo nasce dalla K =forma 0%stilizzata in pianta di un castello con quattro
K = 100% GO TO THE GALLERY
LEARN MORE
1
14
torri. Accentuando la forma delle torri, ruotando il logo e dandogli spessore nasce il marchio di sardinia castles. S CESEE LTA
C = 14% M = 10% Y = 11% D E L F ON T K = 0%
DO
LEARN
SHOP
Prime Time REGULAR A B C D E F G ACCESSORIES H I J K L M N O P Q R S T U V W X Y Z Sans Serif REGULAR
37
3
31
ORISTANO
7h½
1
1
ORISTANO 5
31
Il Casteddu Tour dà la possibilità di visitare tutti i Castelli a Cagliari e nell’Hinterland e grazie alla partenza dall’aereoporto di Cagliari, si apre a qualsiasi turista senza alcuna difficoltà di spostamento.
Castello medievale
3
11
2 Aereoporto 3 Porto CHILIVANI
32 32
10
24,8 km - 23 min
Monteleone Rocca Doria, Castello di Monteleone
Chiaramonti, Castello di Chiaramonti
Santa Maria Coghinas Casteldoria
CASTEDDU TOUR
5
NUMERI
4
Ales, Castello di Barumele 2
3
P R OG E T T O
DURATA: 7 h ½
G R AFIC O E AC C E S S IB ILIT A’ ACCESSIBILITA’:
W EB
NUMERI
C = 14% 8 M = 10% Y = 11% K = 0%
12
4
1
Nuraghe di Santa Sarbana
6
Nuraghe Nuraddeo
7
Nuraghe Appiu
8
Nuraghe Oes e Antine
9-11 CASTELLI: Casteddu Etzu (Cuglieri), Castello di Serravalle (Bosa), Castello di Monteleone 11(Roccadoria).
9
Nuraghe Corvos AUTO
10
Nuraghe Palmavera
DURATA: 5 h
11
Nuraghe Majori
12
Nuraghe la Prisgiona AUTO
13
Nuraghe Albucciu
14
Nuraghe Mannu AUTO
8-9
8-11
7-8
ACCESSIBILITA’:
GU EST CARD E APP
DO
LEARN
TOUR >> CASTEDDU TOUR ARBOREA TOUR TATTARI TOUR other activities
AUTO
5
3
2
4
SAN GAVINO
1
CAGLIARI
32
4
SARDINIA CASTLES
3
2
GO TO THE GALLERY LEARN MORE
1
C = 73% M = 63% Y = 5% K =75%
2
3
Il Casteddu Tour dà la possibilità di visitare tutti i Castelli a Cagliari
e nell’Hinterland e grazie alla partenza dall’aereoporto di Cagliari, si Scarica subito l’Applicazione free per apre a qualsiasi turista senza alcuna difficoltà di spostamento. Ios 4e Android Sardinia Castles per di Acquafredda (Siliqua), Castello Orguglioso (Silius), prenotare subito la tua Sardinia GuestCastello Castello di Monreale (Sardara), Castello della Marmilla (Las 2 Plassas). Card, scoprire tutti i vantaggi della 7h½ carta, le guide e i consigli, tutte le località che puoi visitare e i servizi annessi. Programma il tuo prossimo viaggio in Sardegna decidendo tappe e spostamenti. ’
1
SARDINIA CASTLES BUY NOW YOUR TICKETS!
4-5Card ti permette L’App Sardinia Guest anche di emettere i biglietti per fruire gratuitamente del trasporto pubblico nel corso della tua vacanza, a partire dalla data di inizio validità 2-4della tua Guest Card.
AUTO
3-4
AUTO
3-5
SEE
DO
ACCESSORIES
LEARN
117 km
75,7 km
148 km
35 km
30 km
SHOP
Un’altra scheda imp la voce DO (nel sito nella versione italia quale sono presenti organizzate compre questi ultimi vi è un tutte le informazioni a descrizione del pe si va a scoprire, le d di essi con la possi nel dettaglio ogni si i collegamenti con t servizi che si trovan Anche qua è sempre alla Sardinia Castle ospite che offre tant sconti sino al 20% trasporto, impianti m altre attrazioni.
95 km
AUTO
5-6
’
5
Il sito web www.sar dall’esigenza di gara facilità di gestione d Sardinia Castles, co eventuale visitatore mente vedere, scop la sua prossima vis principali si trova so sito in versione ingl italiana “VEDERE”), possibilità di viaggi il patrimonio cultura scoprendo servizi, d arrivo e di partenza, attuale e originario si vuole sapere di p mento alla Galleria LEARN in cui si trov storiche e racconti s patrimonio. E’ inoltr rimando alla Sardin Card, carta ospite c servizi tra cui scont ingressi, mezzi di tr museali e tantissim
ORISTANO
K = 100%
CAGLIARI
SHOP
casteddu tour
COL OR I
1
25 km
AUTO Le torri costiere della Sardegnasono un complesso di strutture fortificate che dall'alto medioevo sino alla metà del diciannovesimo AUTO secolo, hanno costituito il sistema difensivo, di avvistamento e di comunicazione della fascia costiera dell'isola. In totale sono 105.
SARDINIA CASTLES APP
Un mondo di opportunità e vantaggi. Libera circolazione su tutti i trasporti pubblici locali, treni compresi, per tutta la tua vacanza ed un ingresso (gratuito o APPL IC AZIONE scontato) per ognuno dei 300 servizi che aderiscono all’iniziativa. Presenta Sardinia Guest Card presso le biglietterie per accedere ai servizi.
“”
LE TORRI
6-8
CASTELLI: Castello di Monteleone (Roccadoria), Castello di Chiaramonti (Chiaramonti), CastelDoria (Santa Maria Coghinas).6-7
L’esperienza del Virtual Reality consente allo spettatore di ammirare come un 8 DIFFICOLTA’: tempo era e funzionava il castello di Las Plassas, ma soprattutto, da l’immensa possibilità apprezzare la stessa esperienza sia all’interno del Castello stessoSEE SARDINIA CASTLES che al museo Muda, ai piedi della collina. Per la prima volta, un museo trasmetterebbe la stessa sensazione anche a delle persone diversamente abili che non hanno la possibilità di affrontare il percorso o a qualsiasi visitatore che decida di non incamminarsi.
5
1
2
CASTLE OF LAS PLASSAS
INFORMAZIONI: Il Tattari Tour è il tour con le distanze maggiori da percorrere, ma i suoi bellissimi castelli caratterizzati dalla presenza di alte torri, ne farà assolutamente valere la pena.
SARDINIA GUEST CARD
L’ultima scheda principale si trova sottoMC ==0% 20% 58% la voce SHOP (nel sito in versione KY == 0% inglese, nella versione italiana “NEGOZIO”), nella quale sono presenti una grandissima varietà di articoli persona-MC ==14% 10% I numeri utilizzati derivano dallizzati rimaY = 11% SARDINIA CASTLES, dagli neggiamento del font impact accessori, che si ai vestiti, agli oggetti di K = 0% adatta perfettamente LEGENDA: all’internoarredamento. di un quadrato. Così facendo i numeri si la possibilità di comprare i Vi è anche adattano per stare all’interno del in anticipo consentendo al biglietti marchio e delle strutture interpretative cliente di saltare tutta la fila all’ingresso Aereoporto del Castello. Il prezzo del ticket varia a
14
ORISTANO
5
DURATA: 7 h
Nuraghe di Tumuli
3
INFORMAZIONI: L’Arborea Tour è il percorso più legato al mare, infatti percorre la bellissima strada costiera del Nord ovest Sardegna, in assoluto una delle strade più affascinanti dell’isola. La partenza è da Oristano, a cui si arriva in macchina, in treno o in bus.
DIFFICOLTA’:
9
68 km - 1,10 h
MACOMER 5
SARDINIA CASTLES
10
53 km - 45 min
CHILIVANI
8
8
6
4
TATTARI TOUR
36 km - 30 min
9
6
2
6
29 km - 25 min
OLBIA
9
SASSARI
5
ACCESSIBILITA’:
3-5 scheda importante si trova AUTOsotto Un’altra la voce inglese, 3-4 DO (nel sito in versioneAUTO nella versione italiana “FARE”), nella 7 quale sono presenti tutte le attività organizzate compresi i tour. Proprio su questi ultimi vi è una sezione intera con tutte1-3 le informazioni necessarieAUTO riguardo a descrizione del percorso, quali castelli si va a scoprire, le distanze tra ciascuno di essi con la possibilità di analizzare nel dettaglio ogni6singola tratta e inoltre 1-2 AUTOe i i collegamenti con tutte le attrazioni servizi che si trovano nel cammino. Anche qua è sempre presente il rimando alla Sardinia Castles Guest Card, carta ospite che offre tantissimi servizi tra cui sconti sino al 20% su ingressi, mezzi di trasporto, impianti museali e tantissime altre attrazioni.
13
11
10
PORTO TORRES
10
3
I numeri utilizzati derivano VIRTUAL RE AL ITY dal rimaneggiamento del C = 73% M = 63%impact che si adatta font Y = 5% K =75% perfettamente all’interno di un quadrato. Così facendo i numeri si adattano per stare all’interno del marchio e delle strutture interpretative
50 km - 55 min
Nuraghe Losa
SAN GAVINO
7
AUTO
Complesso Nuragico Barumini
3
ALGHERO
DIFFICOLTA’:
K = 100%
25 km - 30 min
Nuraghe arrubiu
2
4
8
AUTO
1
7
30 km - 35 min
C = 73% M = 63% Y = 5% K =75%
I numeri utilizzati derivano dal rimaneggiamento del font impact che si adatta perfettamente all’interno di D IG IT ALE PERCORSI MEZZI un quadrato. Così facendo i KM- TE numeri si adattano per stare 10-11 all’interno delAUTOmarchio e 138 km delle strutture interpretative 24,8 km AUTO 9-10 7
ARBOREA TOUR
95 km - 1,20 h
Università degli s
Il progetto cartaceo d’ingresso persona 7 pez Il nuraghe è un tipo di costrusemplciemente zione in pietra rappresentativo fine della visita, ma della civiltà nuragica, costruiti utilizzati come segn Bosa, di S nel II millennio a.C e ritenuti di diCastello Sardinia Castles funzione militare o religiosa. tutti i castelli della
CASTELLI: Castello di Acquafredda (Siliqua), Castello Orguglioso (Silius), Castello di Monreale (Sardara), Castello della Marmilla (Las Plassas).
75,7 km - 1,8 h 148 km - 1,54 h
Corso: Rappresen 11 Professore: Enric Anno: 2017/18
Architettura ad Alg Posada, Castello della Fa
I NURAGHI
INFORMAZIONI: Il Casteddu Tour dà la possibilità di visitare6tutti i Castelli a Cagliari e nell’Hinterland e grazie alla partenza dall’aereoporto di Cagliari, si apre a qualsiasi turista senza alcuna difficoltà di Cuglieri, Casteddu Ezzu spostamento.
5
117 km - 1,28 h
6
LE ALTRE FORTIFICAZ ION I
I TOU R ORGAN IZ Z ATI
IMMAGINE IMMAGINE COORDINATA IMMAGINE COORDINATA IMMAGINE COORDINATA COORDINATA Il logo Il logoIl logo Il logo
5
9
Sans Serif REGULAR 9
AUTO
10
Il logo Ilnasce logo Il dalla logo nasceforma nasce Ildalla logodalla forma nasceforma dalla forma stilizzata instilizzata piantastilizzata diinun pianta castelinstilizzata pianta di un casteldiinunpianta casteldi un castello con quattro lo con torri. lo quattro con Accentuanquattro torri. lo con Accentuantorri. quattro Accentuantorri. Accentuando la forma dodelle la forma dotorri, la forma delle ruotando torri, delle la forma ruotantorri, delle ruotantorri, ruotando il logo do e dandogli il logo do ile logo spessore dandogli edodandogli il spessore logo espessore dandogli spessore nasce il marchio nasce nasce il dimarchio sardinia il marchio nasce di sardinia il dimarchio sardiniadi sardinia castles. castles.castles. castles.
PORTO TORRES
ORISTANO
138 km - 1,40 h
M = 20% Y = 58% K = 0%
3
SARDINIA CASTLES
AUTO
Il sito web www.sardiniacastles.it nasce 9-11 AUTO dall’esigenza di garantire una notevole facilità di gestione del sistema di Sardinia ad un 8-9 Castles, consentendoAUTO eventuale visitatore di poter comodamente vedere, scoprire, programmare, 8-11 AUTO la sua prossima visita. Una delle schede principali si trova sotto la voce SEE (nel sito in versione inglese, nella versione 7-8 “VEDERE”), in cui si haAUTO italiana la possibilità di viaggiare virtualmente per il patrimonio culturale della Sardegna, scoprendo 6-8 servizi, distanze, luoghi AUTOdi arrivo e di partenza, osservare stato attuale e originario di ogni castello. Se si vuole sapere di più, vi è il collegamento 6-7alla Galleria ed alla pagina AUTO LEARN in cui si trovano nozioni storiche e racconti sulle strutture patrimonio. E’ inoltre sempre presente il rimando alla Sardinia Castles Guest 9 Card, carta ospite che offre tantissimi servizi tra cui sconti sino al 20% su ingressi, mezzi di trasporto, impianti = 0%altre attrazioni. 5-6 e C AUTO museali tantissime
NUMERI
OLBIA
Prime Time REGULAR
6
4
9
13
6
7
KM- TEMPO
35 km - 45 min SI TO L A R E TE D E I CASTELLI 1025 km - 35 min
11
ALGHERO
MEZZI
Las Plassas, Castello della Marmilla
Prime Time REGULAR
8
9
7
PERCORSI
TAV.
8
PROGE TTO C ARTACE O
10
13
PORTO TORRES
10
DE I CA STE L L I
SARDINIA CASTLES
25 km
AUTO
50 km
AUTO
29 km 36 km
L’ultima scheda prin
i
6
A’
1
P 7
5 10
A
8
4
P
3
11 9 2
ava
Scala 1:1000
Legenda
Pineta
Area ristoro
P Bar
Servizi wc
Museo
Chiesa
Castello
Gift Shop
Percorso
Numero traccia
120 m.
i
Parcheggi
2
Info point
Castello di Las Plassas
Chiesa di S. Maria Maddalena Museo MUDA 0 m. 15 min.
0 min.
4 min.
3
Scala 1:333
Tipologia pannelo 1
Tipologia pannelo 2
Percorso transitabile con ringhiera
Aree di sosta
Mura del castello
38
PANNELLI TIPO 2
SEDUTA
Lato lun
45° e allo stesso tempo, inquadra come in una foto il paesaggio retrostante (frontestante al visitatore) descrivendone tutti gli elementi in un altro blocco corredato di rappresentazione e indicazioni sullo stesso “frame” di circondario inquadrato. La terza struttura prende la forma di una seduta, collocata dopo i tratti più faticosi del percorso, per consentire pausa e riposo ai visitatori. Tutte e tre le tipologie sono studiate con lo stesso tipo di montaggio, a incastro, e possono essere montate in situ e fissate al terreno in brevissimo tempo.
INFORMATION PANELS D E TT A G L I C O S T R U T T I V I PANNELLO TIPO 1
STR UTTUR E IN P IA N TA E P R O SP E TTO
PANNELLO TIPO 1/2
A Numero light structure is designed traccia audioguida for the castle panels that helps people interpretating the history and the castle’s structunel sentiero re.Schema Isposizione a simple and clear type of panel, easy to implement in the walking path to the castIl progetto delle strutture interpretative è dettato dai tre fattori di vista, localizzazione, e movimento. Sono state pensate tre tipologia di pannelli. Il primo, è un pannello con poche maare in light le.Ideogramma Allsnello, the servizio instructure loco importanti informazioni, che indica numero di traccia, avanzamento nel percorso e servizi nell’area ed è una struttura studiata per esser letta in movimento nel percorso di risalita, creareparts are steel and thesenza written P nessun impedimento alla vista. La seconda tipologia, è una integrazione della prima che, con una struttura più larga, da spazio a lettura delle informazioni selezionate in undirectly blocco inclinato di imetallic printed on the panel boards. There are 2 type 45° e allo stesso tempo, inquadra come in una foto il paesaggio retrostante (frontestante al visitatore) descrivendone tutti gli elementi in un altro blocco corredato di rappresentazione e of panels, foraispecific info indicazioni sullo stesso “frame” di circondario inquadrato. La terza struttura prende la forma di una seduta, collocata dopo i tratti più faticosi del percorso, per consentire pausaone e riposo of the castle and other ones for visitatori. Tutte e tre le tipologie sono studiate con lo stesso tipo di montaggio, a incastro, e possono essere montate in situ e fissate al terreno in brevissimo tempo. the audio guide numbers and map that let the people know where are they located in the castle’s route. SCALA 1:10
SCALA 1:10
0,06
SCALA 1:20
0,0
0,04
0,15
4
D E L L E S T R U TTU RE I NTERP RETATI V E 0,0
4
1,47
1,70
1,94
P RO G ETTO
0,23
0,5
0,15
0,8
1,30
0,15
PANNELLO TIPO 2 SCALA 1:10
0,04
0,04
40 cm
1,94
0,04
4
0,06
0,9
0,04
Pianta + 0,10 m
DETTAGLI DI CONNESSIONE
27
0,0
SCALA 1:5
0,87 0,15
0,04
0,0
SCALA 1:20
0,30
0,75
0,0 0,0
4
0,83
ST RUTTU RE IN PIANTA E PROS PE T T O
0,83
2
0,06
0,4
Numero traccia audioguida Pianta + 2,00 m
Pianta + 1,50 m
Pianta + 1,00 m
0,23
4
0,0
0,04
ME SSA IN LO C O
05 0,0
0,15 SEDUTA
SCALA 1:10
Schema posizione nel sentiero
1,70 SCALA 1:10
4 0,0 4 0,0
39
i
P 0,05
1,30
0,15
DETTAGLIO SEDUTA
0,8
0,4
1,47
2 0,0
1,94
0,4
4 0,0
Ideogramma servizio in loco 0,15
ngo
scala 1:5
Lato corto
Infrastruttura interpretativa lungo il sentiero
scala 1:5
Esempi di pannelli informativi
scala 1:2 75 cm
Lato lungo
scala 1:5
Lato corto
scala 1:5
40 cm
40
Architecture Design Portfolio Architecture Design Portfolio