Mihali Mahairas Portfolio + Queensland University of Technology | Gardens Point Bachelor of Design Major | Architectural Design Minor | Landscape Architecture Minor | Collaborative Digital Design
[2010 – Present]
CONTENTS MIHALI MAHAIRAS - PORTFOLIO
Featured Assesment: MINOR - LANDSCAPE ARCHITECTURE
01/01
DLB 130 - Landscape Design 1 - Assignment Task 2B
01/02
DLB 330 - Landscape Ecology - Report MAJOR - ARCHITECTURE
02/01
DAB 210 - Architectural Design 2 - Design Projects 2 + 3
02/02 - 04
DAB 410 - Architectural Design 4 - Design Projects 1 - 3
02/05
DAB 435 - Architectural Technologies 1 - Assignment 2
02/06
DAB 530 - Integrated Technologies 2 - Assignment 2
02/07
DAB 525 - Architecture and the City - Assignment 2
02/08
DEB 601 - Collaborative Design - Assignments 1 - 4
01/0 Minor - Landscape Architecture
01/01 Landscape Design 1 BRIEF Assessment Task 2B – International Measured Drawing Value in the Semester: 20% Produce a model that describes an exemplary international project. Historically, architect and landscape architects learnt how to draw by observing and redrawing the work of others. By seeing how the designers work with proportion, organise different spaces and develop a fully worked through proposition, we can learn from the work of other designers. By looking closely at photographs, and then using this evidence, we can extrapolate the answers we do not know, you hone our ability to harvest information and design strategies from publications. For this project each tutorial is given a different designer to examine the work of and tutors have chosen a series of projects that will be allocated to students, with 5 students doing each project.
Mark: [ 5+ ]
VP-Bank Triesen
Liechtenstein Böge + Lindner- Böge Hamburg
01/02 Landscape Ecology Mapping and Deconstruction of the Landscape Structure of the Rochedale region, Queensland, Australia Value in the Semester: 50% Coordinator – Dr Gill Lawson Tutor – Mrs. Bleuenn Marchand Word Count – 4545 Date submitted – Wednesday, 30 May 2012
Mark: [7]
BRIEF This report is intended to develop your ability to critically analyse the landscape structure of your study area from above and make recommendations as to whether proposed landscape development(s) will help to protect green spaces in the future.
EXECUTIVE SUMMARY This report provides a critical analysis and evaluation of the current landscape structure of a selected region within the Rochdale suburb. By achieving this, recommendations will be documented to whether proposed urban developments will protect green space in the future. Methods of analysis include an evaluation of landscape dynamics, landscape structure, ZPTWSL [YLUK HUHS`ZPZ HUK H ZP[L ]PZP[ [V YLPUMVYJL Ă„UKPUNZ \ZPUN -VYTHUÂťZ 7H[JO *VYYPKVY 4H[YP_ TVKLS (SS Ă„UKPUNZ JHU IL MV\UK PU [OL YLZ\S[Z HUK KPZJ\ZZPVUZ ZLJ[PVU VM the report. Results of the analysis depict that over the past 45- year period, it is evident, that an increase of built environment encroachment on surrounding riparian vegetation is occurring. This has resulted in poor water quality and the overall degradation of natural habitat. ;OL YLWVY[ Ă„UKZ [OH[ [OL J\YYLU[ Z[H[L VM NYLLU ZWHJL PZ SV^ PU JVUULJ[P]P[` ;V PTWSLTLU[ further construction major features regarding the surrounding vegetation must be considered. Recommendations discussed include: eradication of weeds in the riparian habitat and other natural corridors, regeneration of indigenous plant species, layering of indigenous plant species and the endorsement of natural corridors. ;OL YLWVY[ HSZV PU]LZ[PNH[LZ [OL SPTP[H[PVUZ Z\YYV\UKPUN [OL \ZL VM -VYTHUÂťZ 7 * 4 TVKLS VM [OL HUHS`ZPZ JVUK\J[LK ;OLZL SPTP[H[PVUZ PUJS\KL! [OL V]LY ZPTWSPĂ„JH[PVU VM landscape units and scale dependency of the analysis and how landscape processes vary on scale.
FOR FULL REPORT: [ O[[W! PZZ\\ JVT TPOHSP T KVJZ KSIF FYLWVY[F Ă„UHS ]
Selected study site. From top to bottom, 1946, 2007, 2011 (BCC, 2011).
02/0 Major - Architecture
02/01 Architectural Design 2
CONCEPT
BACKGROUND
1. 2. 3.
(Z HSYLHK` ZWLJPĂ„LK [OL [HZR ^HZ [V PUZLY[ H ZWHJL ^P[OPU H ZWHJL ;OL abiding concept for the design was electronica. The buildings form is erratic emphasised by the array of angled shapes, however within the void space beneath the ground level are three symphonic spaces embedded in the sides of the cavity.
EXTERIOR VIEW INTERIOR VIEW INTERIOR SKETCHES
To date you have designed two of the spaces within the Museum of Music. You have produced a range of drawings, models, collages, research, and ^OH[L]LY LSZL MVY [OLZL Ă„YZ[ [^V ZWHJLZ
TASK
Your task is to insert the Hall into the Chamber is such a way that the spatial qualities of the two spaces are retained, or even enhanced, while some exciting new spaces are also added to the ensemble. This will mean changing the physical spaces of the two, but keeping the ideas, and the qualities that you have already developed. You must be very careful to dispose of the container but retain the content. This should allow for some very exciting contrasts to be established; contrasts between heroic and humble spaces, materials, scale, surfaces and textures, sound, light and shadow. The client has offered the following description of the new relationship.
2
Mark:
[6] 1
2
2
3
3
2
2
2
02/02 Architectural Design 4
02/03 Architectural Design 4
Stagnancy - DAB410 Architectural Design Film Project
FOR FULL VIEWING: [ http://www.youtube.com/watch?v=WMTHkxQdQug ]
BRIEF
BRIEF
The goal of Project 2 is to produce a 1:200 model of your urban and architectural concept design through a process of L_WLYPTLU[H[PVU [V^HYK HU HIZ[YHJ[ THZZPUN TVKLS VM [OL ÄST Z[\KPV JPULTH PU P[Z ZP[L HUK [V WYVK\JL H ÄUHS WOV[V TVU[HNL [OH[ KLYP]LZ MYVT WOV[VNYHWOZ VM `V\Y TVKLS J\[ [VNL[OLY ^P[O ÄST stills depicting the site.
As a tutorial group, you may also vote on another compeling inner-urban site in consultation with your tutor such as the interesting industrial sites in Fortitude Valley or the dramatic views in Paddington, the Powerhouse,etc. This will ensure [OH[ ^L OH]L H KP]LYZL YHUNL VM ÄSTZ MVY [OL JVTWL[P[PVU 5V[L [OL ZP[L `V\ WPJR T\Z[ IL HLZ[OL[PJHSS` JOVZLU HZ H WSHJL MVY PUKLWLUKLU[ ÄSTTHRPUN HUK M\Y[OLY HWWYVWYPH[L MVY [OL ZP[PUN VM H ÄST Z[\KPV MVY 7YVQLJ[ 7YVQLJ[ 5V^ \ZPUN 5VY[OIHUR HZ HU L_HTWSL MVY 7YVQLJ[ `V\ TH` ÄST ^P[OPU `V\Y ZP[L I\[ TVYL broadly in Brisbane City, if you have an aesthetic reason to do so that is integral to your urban concept – but you must include your smaller allocated strip (1-12) – this smaller site will become your site for the architectural project.
CONCEPT
;OL ÄSTZ JVUJLW[ ^HZ THPUS` KLYP]LK from the contrast of the two adjacent sides of the Brisbane River, West End and the CBD.
TRACE OVERLAY - DERIVE CONCEPT
Mark: [7]
CONCEPT
The projects concept was built upon the basis VM [OL ÄST ILPUN [OL JVU[YHZ[ IL[^LLU IV[O West End and the CBD. This was implemented within the design by splitting the building, with one half embodying the chaotic nature of the CBD by using a varying louver system, and the other half, displaying simplistic exterior walls resembling West Ends industrial side.
CHAOTIC CENTRAL BRISBANE DISTRICT
;OL ÄSTZ JVUJLW[ ^HZ THPUS` KLYP]LK from the contrast of the two adjacent sides of the Brisbane River, West End and the CBD. Mark: [7]
STAGNANT WEST END
02/04 Architecture Design 4 To create a dynamic cinema design that not only accommodates the necessary facilities, but also has a connection to the surrounding urban fabric. Mark: [6]
02/04 Architecture Design 4 DAB410 - FILM STUDIO//ARCHITECTURAL STUDIES 4 DAB410 - FILM STUDIO//ARCHITECTURAL STUDIES 4 NAME: MIHALI MAHAIRAS LECTURER: SIMONE BROTT TUTOR: TEO CAVALLO N7537409 urban vérité SCALE: 1 :400
T H E CONCEPT WAS MAINLY DERIVED FROM THE POSITIONING OF SURROUNDING CULTURAL PRECINTS. THESE PRECINTS WERE HIGHLIGHTED AND STRUCTURED TO BECOME THE FORM.
@&B&"!!0.$,&!"%& 1$.C-0./4&/-6& 2/-/7$2$-1&,1/!!&&
ALTERING OF MILK FACTORY TO CORRESPOND WITH ADJACENT BUILING FORM
D=(&2@F
PROPOSED DESIGN
=&"-),01$&./%&+/%;0-7& ,+/.$,&!"%&,1560"& ,1/!!
SURROUNDING CULTURAL PERCINTS
MOLDING THE CONCEIVED FORM TO SITE VEHICLE MOVEMENT
SPATIAL
CONNECTIONS
ARRANGEMENT
ADJACENT CULTURAL PRECINCTS
SURROUNDING - FIGURE-GROUND MAP
4"/60-7& 6".;
' E
DE2&A06$&B&E2& C07CF&
%$."%60-7&,1560"&A01C&/& 7%$$-&,.%$$-&HH&&G06$"&/-6& ,"5-6&0-,1/44/10"-&,+/.$&&
D>((2@F
FIRE STAIR ACCORDING TO REGULATIONS
1 EXIT = 20m 2 EXIT > 20m :/.;&,.%$$-& /%$/
K
J
ANALYSIS
CONCEPT
+",1),"5-6& $6010-7&,501$&
DE(&2@F
,$."-6/%#&."%%06"%,&>?@2&A06$&B& @?=2&C07C
.0-$2/&1"&,$/1&3((& +$%,"-,&0-.4560-78& ,.%$$-&/%$/9&:/.;&"!& ,.%$$-&/%$/9& +%"<$.10"-&%""2
> DE2&A06$&B&E2& C07CF&
VIEWS FROM THE SITE
:/%
2/4$&I&!$2/4$& 1"04$1,
3
D3(&2@F
=
*
D@(&2@F
!"#$%&'()*(–+$%,"-& ./+/.01#&
;01.C$-
D@(&2@F
DISSECTING FORM IN CORRELATION TO FLOW
SITE
+",1)G06$"&$6010-7& ,501$&–&+",1)+%"65.) 10"-&&&
D@E&2@F
%$.$+10"-
ADMINISTRATION SPACES STUDIO SPACES CIRCULATION SPACES PEDESTRIAN MOVEMENT
,1560"& ."%%06"%,& @?=2&B&@?J2
@
"516""% .0-$2/
>=
02/05 Architectural Technologies 1 CB DOWNPIPE 75mm
!"#$%&'()*$('+#$&'+,$-& ./0&1&./022 5)(6$'+#7
BOTTOM PLATE 90 X 45
NOTES:
BRIEF
Provide a working drawing section (CAD or hand drafted drawing at scale 1:50) of the above house but on a concrete slab-on-ground with the ground having a slope of 3º which requires one to show cut and fill. The studs to be increase from 75 mm to 90 mm , other timber sizes will be given later and the roof pitch to be 15º.
This drawing is only for refernce purposes. Following drawing will depict design discussed with client and consultant team.
3,""(&-,)4 54&3,)-!+#7
5"#'(",,$% 3+,,
(""3&4)''$#-&.0&1&<0 -)#%&4$%&0/22
RELIEF GULLY
5$+,+#7&4)''$#<0&1&<022
54&(""3+#7
'"6&5!"(%&:;/&1&.0
*)6"(&4)((+$(
#)+,&6,)'$ 8$4&9/&1&.0
5$+,+#7&6,)-'$(4")(% :/22
'"6&6,)'$&=/&1&<0
A
B
SLAB DETAIL
;>=/&1&<0&,+#'$, ),?@+#?@&8+#%"8
ROOF DETAIL SCALE - 1 : 10
SCALE - 1 : 10
ISSUE: A
CB FLASHING TOP CHORD 120 X 35
DESCRIPTION:
BY:
CONCEPT
MM
CLIENT APPROVAL
MM
CONSTRUCTION
MM
A&3,)-!+#7&?#%$( -+,,
B WEB 70 X 35
ROOF BATTENS 35 X 45
DATE: 19/08/12
$1'$(#),&5,)%%+#7 9C022&)5&-!$$'+#7
CB ROOFING
A R C H I T E C T O N I C
-)(B+#7&4$!+#% 5,)%%+#7
BOTTOM CHORD 120 X 35 ROOF SARKING
D FASCIA 190 X 35 GUTTERING
C
15° PITCH
C
SOFFIT LINING 7.5 AC SHEETING
CEILING PLASTERBOARD 10mm CEILING BATTENS 45 X 45mm
CORNICE
SOFFIT BATTEN
WC
HALL
HONED TRAVERTINE TILES 305 X 305mm
TOP PLATE 90 X 45 2/90 X 45 LINTEL
PROJECT:
ALUMINUM WINDOW
PATIO
143 Home st Fairfield 4103
Z FLASHING UNDER SILL
A
BOTTOM PLATE 90 X 45
BATHROOM
DISH DRAIN
SARKING BEHIND CLADDING
RELIEF GULLY
SCALE - 1 : 10
;<0/
CB DOWNPIPE 75mm
Unit 1 / 10 Southside Lane, Paddington Brisbane, QLD, 4064 P: [07 3344 5566] F: [07 3355 4477] M: [0415 609 777] E: [info@architectonic.net.au] www.architectonic.net.au
WINDOW DETAIL
3° SLOPE
54&(""3+#7
0/
EXTERNAL CLADDING 7.5mm AC SHEETING
(""3&4)''$#&.0&1&<0
;0/
(?#"33 7,
30° SLOPE
3)-5+)&:=/&1&.0
-"33+'&,+#+#7 9C0&)5&-!$$'+#7
54&%"8#6+6$&9022 COMPACTED FILL .//
VAPOR BARRIER SAND BED 50mm
BEN PARKER University of
Queensland Technology
SITE:
7?''$(+#7 -"33+'&4)''$#
CONTROLLED FILL
CLIENT:
SKIRTING BOARD
143 Home st Fairfield 4103
DRAWING TITLE: Detailed Section NORTH:
CARPETING
SCALE: REFER TO DRAWING
D 01
HOUSE DETAILED SECTION SCALE - 1 : 50
ROOF + GUTTER DETAIL SCALE - 1 : 10
DRAWN:
DRAWING NO:
M.M.
DS-001
All rights reserved. This work is copyright and cannot be reproduced in any form or by any means (graphic, electrical or mechanical, including photocopying) without the written permission from architectonic, any licence, express or implied, to use this document for any purpose whatsoever is restricted to the terms of agreement or implied agreement between architectonic and the instructing party.
$
02/06 Integrated Technologies 2
%
NOTES:
BRIEF
TASK
Your task for this assignment is to experiment, test and if necessary change your proposal for its structural stability and constructibility by investigating various structural solutions in consultation with the structural engineers.
You are working as a student-architect for a medium sized architectural practice that specialises in smallscale public building projects. The lead architect is heading out of town for a few days and he wants you to develop your design and explore some ideas about the building’s structural and construction systems.
This drawing is only for refernce purposes. Following drawing will depict design discussed with client and consultant team.
-
7;<<.'=(+>.*'&&).3)$'& 1.D#.+)&9(*
&
6/9&6&0'.:/(0'
678.-/)' !#<<.*'&&) @//C.6&6-@$0& ?#<<.@(A(%.(0*4)B 1.7#.*'&&).@/% ,('=.'=@&$% +/0+@&'&.%&+> *'&&).3)$'& 7#<<.*'(CC&0&@*
$
%&'$() *+$)&
!"!#
ISSUE: A
DATE:
DESCRIPTION:
BY:
19/08/12
CONCEPT
MM
CLIENT APPROVAL
MM
CONSTRUCTION
MM
1.2##.*'&&).3(3&
+
,&-.+)&$'.+/00&+'(/0 2##.4-.(5-&$6 678.-/)'
A R C H I T E C T O N I C
-
Unit 1 / 10 Southside Lane, Paddington Brisbane, QLD, 4064 P: [07 3344 5566] F: [07 3355 4477] M: [0415 609 777] E: [info@architectonic.net.au] www.architectonic.net.au
%&'$() *+$)&
!"!#
PROJECT
#!
FERRY TERMINAL
)/0A('4%(0$).*&+'(/0 *+$)&
!";# 25 THK BASE PLATE 1.7#.*'&&).@/%.@/%.,('= '=@&$% 678.-/)'
NON-SHRINNK GROUT Ø 20 STEEL ROD AND THREAD
250 TK REINFORCED CONCRETE SLAB, N16 BARS @ 600 CRS
Ø 80 CLEVIS
STEEL FOLDED PLATE
6/9&6&0'.:/(0'
3@&5C$-.4-.(.5.-&$6 '$33&@&%.!7#<<
+/0+@&'&.%&+>
M24 BOLT
5mm SPOT WELD
+-.A4''&@(0A 678.-/)'
300 UB I-BEAM
M20 BOLT
1.D#.+)&9(*
STEEL PLATE
1.7#.*'&&).@/% $0%.'=@&$%
CLIENT:
MICHAEL MURRAY - Queensland University of Technology
SITE:
143 Home st Fairfield 4103
DRAWING TITLE: Detailed Section NORTH:
8 M24 S/4.6 HD BOLTS
SCALE: REFER TO DRAWING
STEEL STIFFENERS NON-SHRINKING GROUT
&
%&'$() *+$)&
!"!#
%
%&'$() *+$)&
!"!#
+
%&'$() *+$)&
!"!#
DRAWN:
DRAWING NO:
M.M.
D-001
All rights reserved. This work is copyright and cannot be reproduced in any form or by any means (graphic, electrical or mechanical, including photocopying) without the written permission from architectonic, any licence, express or implied, to use this document for any purpose whatsoever is restricted to the terms of agreement or implied agreement between architectonic and the instructing party.
ILLINOIS & MICHIGAN CANAL + DES PLAINES RIVER JOLLIET, ILLINOIS, USA
DAB 525 - ARCHITECTURE AND THE CITY
02/07
Architecture and the City
ANNUAL RAINFALL
MIHALI MAHAIRAS - n7537409
INTRODUCTION
SURFACE RUNOFF
The aim of the assignment is to provid an opportunity to apply in a real context, the theoretical knowledge presented in the lectures and in the reference bibliography. The requirement will be to identify and enquire one architectural element in an urban environment applying the main techniques and tools presented during the semester.
The Illinois and Michigan Canal (I&M Canal) was the final link in a national plan to connect different regions of the vast North American continent via waterways. Its construction played a fundamental role in the growth of many cities along its path (Conzen, 2004). The focus of this essay will be, on the both, I&M Canal and Des Plaines River and developing an understanding of the urban environment. In order to achieve this, an investigation into the watercourses origins and general background was undertaken. This information provided a platform of differing perspectives, by utilising theories of urban environments a reinforced understanding of the relationship between the city and the watercourse will be obtained. This will be achieved by utilising a range of visual methods and an investigation of the urban forms in a range scales.
A diagram showing the effects of increased built environment with regards to runoff entering the watercourse.
CITY OUTLINE URBAN SPRAWL NATURAL TRIBUTARIES MAJOR ROADWAYS I&M CANAL STEEL WORKS
CONTRASTING SIDES OF THE CANAL
LIMESTONE QUARRIES Map detailing the proximity of limestone quarries in regards to the watercourse (Landmarks Preservation Council of Illinois, 1988).
Conceptual diagram depicting the watercourse as an edge
PLACES OF WORSHIP EDUCATION INDUSTRY
Conceptual diagram depicting the varying districts within Joliet
LEGEND
A canal is defined as an “artificial channel for navigation” (Calvert, 2000). The distinguishable aspect between natural watercourses and canals are of course the manmade aspect, which is associated with canals (Calvert, 2000). Due to this canals are containers of slack or, stagnant water, meaning water with no observable current. In many cases canals were solely built for navigational purposes, this was to be the case for the I&M canal. The I&M Canal stretches 96 miles, connecting Lake Michigan to the Mississippi River via the Illinois and Des Plaines River (Canal Corridor Association, 2009).
ILLINOIS & MICHIGAN CANAL.
LEGEND
AIM
LOCAL INDUSTRY SURROUNDING THE WATERCOURSE
2012 1873 INITIAL SETTLEMENT
Simple trend analysis of watercourse, 1873 2012 (Combination Atlas Map of Will County Illinois, 1873) (Google Maps, 2012).
LEGEND
Jolliet, Illinois, USA
SURROUNDING LANDSCAPE CITY OUTLINE URBAN SPRAWL NATURAL TRIBUTARIES I&M CANAL
Figure 7: Map detailing the link provided by the I&M Canal (Canal Corridor Association, 2009).
LEGEND
RESIDENTIAL RAILROAD
MAJOR ROADWAY
INDUSTRIAL MEDIUM DENSITY RESIDENTIAL OPEN/GREEN SPACE EDUCATION PLACES OF WORSHIP TRANSPORT
COMMERCIAL The Ruby St. Bridge and surrounding development
NATURAL TRIBUTARIES CLEARED LAND COMMERCIAL MAJOR ROADWAYS MAJOR ROADWAYS
LEGEND
Diagram depicting land usage surrounding the watercourse (Google Maps, 2012).
CITY OUTLINE URBAN SPRAWL NATURAL TRIBUTARIES MAJOR ROADWAYS MAJOR ROADWAYS
City pattern showing the influence the watercourse has had towards the gridiron pattern.
City pattern of Joliet, detailing major and minor roadways in regard to the watercourse (Mahairas. Wright. Thompson. Watts, 2012).
OBJECTIVE The core objective of this unit is to develop your skills in collaborative practice in design, research and presentation. The Woodfordia Performers' Precinct project allows you to give your favorite performers the spaces you think they deserve. It is an exploration of residential design on a small but unique scale. The performers at Woodfordia, site for Splendor in the Grass and the Woodford Folk Festival, previously had to stay in a collection of old caravans. These are to be replaced and you are invited to redesign the entire Performer's Precinct. The brief involves internal and external spaces they occupy in a way that suits the inhabitants and the site. Gotye, Coldplay and Kanye West all performed here last year - what would be their dream cabin? This is a real brief - Woodfordia organisers have actually sought your design input into their redesigned Performer's Precinct. The best designs will be presented to them in the hope that they might construct your design in the future (this would be dependant on your consent and an ongoing commitment on your part outside of QUT and this unit).
02/08
Collaborative Design // Jim Woolley â&#x20AC;&#x2DC;Design for Environmentâ&#x20AC;&#x2122; Award 2012 Entry Assignment 1 D1: Research (10%) Assignment 1 D2: Concept Design (20%) Assignment 1 D3: Final Design (20%) Assignment 3: Exhibition Poster (10%)
!"##$%&
'(")*+
WOODFORDIA PREFORMERS’ PRECINCT
CONCEPT MASTER PLAN
PROJECT BRIEF
CABIN
CONCEPT Eco Village - Riga
MATERIAL FOUND ON SITE
iotti + pavarani
Physical - Usage -
Physical usage takes into consideration surrounding infrastructure and environmental elements.
>PSS H[[LTW[ [V H]VPK ZPNUPÄJHU[ HS[LYH[PVUZ [V [OL J\YYLU[ H[[YPI\[LZ of the land, while retaining and improving the current land condition, such as avoiding over-paving the surrounding habitat and minimal excavating within the site
-
Consider viable cleaner options in regards to abluting and agri cultural services, including innovative design that involves trees and other natural elements.
LAND USAGE THE CABIN DESIGN WAS SOLELY DERIVED FROM THE SURROUNDING MATERIALS FOUND ON THE SITE. THIS, IN TURN, WOULD MEAN NO NEED FOR TRANSPORTATION OF MATERIALS AND A LESSENED CARBON FOOTPRINT.
HOUSES COMMERCIAL + OFFICE PRIVATE GARDENS PUBLIC GARDENS EQUIPPED AREAS
ORIGINAL LANDSCAPE CONTOURS
ALTERATIONS TO LANDSCAPE
MINIMAL LANDSCAPE CHANGE
Physical - Climate + seneses -
The design of the cabin and its surrounding environment will adhere to the sites existing geographical and weather conditions, attempting to optimise sustainable and passive design principles e.g. integrating water capturing strategies, ventilation + limiting/optimising sunlight
-
Highest levels of rainfall in the Woodford precinct occurs during December + January, therefore the design must respond [V ZPNUPÄJHU[ SL]LSZ VM YHPUMHSS
CLIMATE RESPONSIVE
ORIGINAL CONCEPT
RECONFIGURED CONCEPT
Physical - Topography -
Analysing the topography of the site will help to assist the design and layout for optimal arrangement of the cabins
The design should take into consideration the existing natural LSLTLU[Z ^P[OPU [OL ZP[L PUJS\KPUN [OL ZL]LYHS WVUKZ HUK ZPNUPÄJHU[ trees.
An opportunity to plant further vegetation will be explored and can HSZV HZZPZ[ PU [OL SH`V\[ HUK TV]LTLU[ VM O\THU [YHMÄJ
OPTIMAL USE OF TOPOGRAPHY
SITE - WOODFORD Tectonics - Materials + Construction -
Materials used in the cabin design should be sustainable, and if possible, locally sourced. Organic materials that are reminiscent of the surrounding environment will ensure a smooth installation within the context of the site
-
Use of innovative construction techniques should also be implemented e.g. minimal use of fuel powered tools in the erection of the cabins, possible pre-fabricated portions of wood that snap together
CONTEMPORARY SOCIETY RELIES TOO HEAVILY ON THE CONSTRAINTS OF HUMAN DEVELOPMENT TO DETERMINE ADJACENT LAND AND LAYOUT THE ECO VILLAGE DESIGNED BY IOTTI + PAVARANI INCORPORATES THIS IDEAL, HOWEVER, TAKING THE SURROUNDING ENVIRONMENT SOMEWHAT IN MIND
MATERIALITY
THE SITE WAS CHOSEN USING A LIST OF CRITERIA PROIXIMITY TO ADJACENT FACILITIES. RELATIVELY LEVEL GROUND. SEVERAL ACCESS POINTS. LAND CURRENTLY CLEARED.
‘‘
Residential architecture can be condensed into a minimal shelter, reducing the need for materials and permitting us to more freely take pleasure in and experience our surroundings
VIEWS INTO THE SITE
PARAMETERS OF THE SITE
‘‘
OVERALL AERIAL VIEW OF THE SITE
Spatial Experience - Internal -
An option of implementing thick walls, for example the use of mudbricks in Egypt, will help to increase thermal mass, thus reducing the interior temperatures during hot summer days.
-
Adequate and innovative ventilation instalments within internal spaces will be implemented to relieve humid, stagnant air from the cabins.
Timber construction within internal spaces is cost effective and HSSV^Z MVY ÅL_PISL KLZPNU VW[PVUZ ;OL \ZL VM [PTILY PUZPKL [OL cabins will also help connect with the existing site surrounding the Woodford precinct.
PASSIVE DESIGN
!"##$%&
MASTER PLAN
'(")*+
THREE LEVELS OF INTIMACY 1. Communal Level 2. Cabin Pocket Level 3. Cabin Level
HERB GARDEN HERB VARIETY CHIVES
MINT RED PEPPERS OREGANO BASIL
RELATIVELY FLAT SURFACE, MEANING MINIMAL EXCAVATION OF LAND
MAIN WIND FLOW THROUGH THE SITE
ROSEMARY TARRAGON PARSLEY
PEPPER
THE HYDROLOGY OF THE SITE AND DIRECTION OF RUNOFF
‘‘
SITE CONDITIONS
‘‘
GENERAL CABIN LAYOUT - PLAN // 1:1000
CENTRE ACTIVITY/UTILITY SPACE
UTILISING THE LANDSCAPE TO CREATE PUBLIC AND PRIVATE SPACES, RATHER THAN THE BUILT ENVIRONMENT.
HERB GARDENS CABIN ARRANGEMENT
CAR PARKING CURRENT TREE ARRANGEMENT ON SITE ACCESS POINT
SITE CONTOURS
OVERALL WOODFORD CONTOURS MASTER PLAN/ CABIN LAYOUT DIAGRAM
!"##$%&
'(")*+
CABIN DESIGN
NIGHT - EXTERIOR PERSPECTIVE RENDER
NIGHT - INTERIOR RENDER
B - B SECTION - SCALE 1 : 50
FRONT ELEVATION - SCALE 1 : 50
DUE TO THE METALLIC EXTERIOR WILL CONDUCT HEAT, DUE TO THIS MILK CRATES CONTAINING HERBS WILL BE INSERTED WITHIN THE RIBBING OF THE CABIN. THIS WILL COUNTERACT THE HEAT EMITTING FROM THE OUTER SHELL AND CREATE INCREASED AMOUNTS OF OXYGEN.
THE MATERIALS USED ON THE CABIN ARE DERIVED FROM BOTH THE PALETTE MATERIAL AND CABIN EXTERIOR. WITH THE RIBBING OF THE BEING THE ONLY ELEMENT NEEDED TO BE PREFABRICATED.
RECYCLED CABIN EXTERIORS
METHOD OF INSULATION A - A SECTION - SCALE: 1 : 50
RAIN WATER GETS COLLECTED BY THE ROOF AND STORED IN WATER TANK LOCATED BENEATH CABIN FLOOR
B
PALETTE MATERIAL
DEPENDING ON ORIENTATION OF THE CABIN WINDOWS CAN BE INTERCHANGED TO DECREASE THE PENETRATION OF UNWANTED SUNLIGHT.
A
A SOLAR POWERED WATER PUMP LOCATED BEHIND EACH OF THE CABINS THEN SUPPLIES WATER TO: - SHOWER - KITCHEN - HOSE
SUMMER
B
POSSIBLE LATITUDINAL CROSS VENTILATION
WINTER
FLOOR PLAN - SCALE: 1 : 50 MORE WINDOWS AND CROSS VENTILATION LESS OPENINGS AND CROSS VENTILATION
WINDOW PLACEMENT DIAGRAM
WATER + POWER DIAGRAM
POSSIBLE LONGITUDINAL CROSS VENTILATION
!"##$%&
'(")*+
SCALE MODEL IMAGES CABIN SCALE MODEL SCALE - 1 : 20
INTERNAL PERSPECTIVE VIEW (WITHOUT OUTER SHELL)
INTERNAL KITCHEN SPACE
FRONT PERSPECTIVE VIEW
EXTERIOR OUTER SHELL ELEVATION