Case study chp salford hospital 1

Page 1

SALFORD HOSPITAL - THE CHRISTIE UNIT - CASE STUDY

Low Carbon Energy Solutions for Building Services

LoadTracker combined heat and power (CHP)

The Project

The Challenge

The Christie at Salford Royal is part of a unique network of Christie radiotherapy centres and has been created so that local cancer patients from Salford, Bolton and Wigan can access first class radiotherapy treatment closer to home.

The extremely high energy demands of this building meant that, to comply with mandatory building regulations, a highly energy efficient means of producing heat and power was required to supply site demand.

Summary of Site Demand

The Solution

Annual electricity demand......................430,578 kWh

Supplied and installed one 15kWe/ 30kWth LoadTracker CHP units able to supplying 92% of site heating and hot water demand and 20% of electrical demand.

Electricity price for 88% of site electricity consumption.......................11.5667 p/kWh Electricity price for 12% of site electricity consumption.......................10.3362 p/kWh Heat demand.........................................186,071 kWh Gas consumption...................................232,589 kWh Gas price for 88% of site gas consumption..................................3.1208 p/kWh Gas price for 12% of site gas consumption.............................

2.7888 p/kWh


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.