ALFS / Public Meeting #2 BOARDS FA1

Page 1

Focus Area #1 400

Morrison Lake

Georgia 400 Center Hayn

es B

ridge

360 Tech Village (Proposed) Rd

Lakevie

400

w Pkwy

l P it

m m

Su

Northwinds

Northwinds Summit

Existing Conditions Haynes Bridge Rd and GA 400 Southbound (looking west)

Summit Dr near the iATL (looking west)

Morrison Lake at the Georgia 400 Center (looking west)

Morrison Lake at the Georgia 400 Center (looking west)


Focus Area #1 w1

ie ev Lak

Morrison Lake Loop in

la p d o lo

F r a e 00-Y

w1

1

Planned Artisan Connection

w

360 Tech Village

A Proposed Crosswalk

Haynes Bridge Rd

Morrison Pkwy Spur

Legend

w1 Off-Trail Wayfinding Signage w2 On-Trail Wayfinding Signage

Lakeview Pkwy Alternative

Pk wy

Gateways

G

C

Comfort Station

B

Bike Repair Kiosk

S

Seating

H Water Refill

w1 A

360 Tech Village Spur

Alpha Loop Alpha Loop Connection

Morrison Lake

Haynes Bridge

Artisan

w2

G2

w2 H S B C

w2

G1

A

rth No

Tunnel Crossing Alternative

w1

w

in ds P

kwy

Northwinds Summit

400

Preserve Monument Entry Feature

Elevated Walk

400 0’

Inspiration Imagery

Mirror Lake

Mirror Lake

Katy Trail

Big Creek Greenway

600’

N


Focus Area #1 At-Grade Crossing Notes • Channelized Right-Turn onto SB400 On-Ramp Accommodates a WB-67. • No Right On Red & Right Only Signal Phased Separately From Crosswalk Signal. • If There Are Issues With Yielding Compliance At Raised Crossing, Rectangular Rapid Flashing Beacons Or Right-Turn Signal Control Could Be Added For The Southbound Channelized RightTurn. • Signage: A R1-5 Mod With W1716p Should Be Placed At The Yield Lines At Southbound Channelized Right-Turn.

Where is the bridge? After much exploration, a bridge crossing was considered too costly and complex an option to pursue further due to the height required for clearance over Haynes Bridge Rd, the resulting length of ramp structure, and potential private property impacts required to meet existing grade.

d a Ro

e g rid Pkwy)

B s ew i v e e n k a y L a (To H

Alpha Loop (12’)

Truck Apron To r No w th in ds Su m it

m

Alpha Loop (12’)

d a Ro

M y ap e K

e ) g e g d i d i r

Haynes Bridge @ Northwinds Summit

e A G n ay (To

Raised Crossing

L

ak evie w Pkwy

No

H

ke i B

r

W th

Slip Lane (11’)

s ind Pk

Ha yn es

y

Tunnel Crossing Working Assumptions • Deepest Utility: 36” (16” Water Main) • Min. Clearance From Utility: 36” • Tunnel Width: 15’ • Tunnel Height: 10’ • Depth Of Top Of Tunnel Structure: 2’

d a o R e g )

Non-ADA Compliant Tunnel Entrance

d y i w r k s B iew P

v e e n k a y Ha (To L

Alpha Loop (12’)

Tunnel Entrance

To s

d in hw

rt

No m

m Su

Alpha Loop (12’)

it

Stairwell Conditions • Width: 16’ Total (12’ Trail + 2’ Clearance For Bike Channels, Both Directions) • 12’ Trail: 4’ Bikeways (Both Directions) And 4’ Center Walkway • Riser Height: 6” ; Tread Depth: 12” • Landings Every 5-7.5’ Of Rise (12’ Maximum Rise Per Building Code) • Retaining Wall Depth: 18”

Stairs to Tun n i e v nel o o r G

s to mp Ra 400 GA

B ri dge Road

w

400

r B B s 400

d a o R

e ) g e rid idg

B s 40

e A G n ay (To

H

r B 0

to ps Ram 00 4 GA

Tunnel 10’H x 15’W x 221’L


Focus Area #1

Go to www.menti.com & use the code 71 32 87 to share your thoughts!

Write your thoughts on a sticky note and place it on the board

How comfortable are you using each option? At-Grade Share your thoughts!

Haynes Bridge Xing Place a dot nearest how you feel!

At-Grade

Tunnel

Love it! It’s perfect. I can’t wait to visit!

Like it! It’s good, but it could be better.

Leave it! It doesn’t align with my vision.

General Comments Share your thoughts!

Tunnel Share your thoughts!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.