Northwest Indiana TDD - Ogden Dunes Public Presentation 1 (Virtual)

Page 1

TRANSIT DEVELOPMENT DISTRICT PROPOSED DRAFT BOUNDARY live polling

+ moderated Q+A +

Ogden Dunes public engagement session

website how you can interact during this meeting

12/03/2020


TRANSIT DEVELOPMENT DISTRICT PROPOSED DRAFT BOUNDARY

December 3, 2020

Ogden Dunes public engagement session


3

PLANNING ENTITIES

City of East Chicago City of Gary City of Hammond City of Michigan City City of Portage

Northern Indiana Commuter Transportation District

City of South Bend Town of Beverly Shores Town of Chesterton Town of Dyer Town of Munster

Regional Development Authority

Town of Ogden Dunes Town of Porter

CONSULTANT TEAM


4

Role of the RDA ( Northwest Indiana Regional Development Authority )

Leading the Project

Overall Project Steering

Policy and Planning Guidance

Key steps that RDA will take working closely with each community

• Meet with communities to understand their goals and preferences for growth and development • Engage with the public through meetings and hearings • Collaborate with NICTD on parking and development topics • Conduct community analysis to prepare preliminary and final transit development district (TDD) boundary • Identify potential development and infrastructure opportunities • Shepherd the TDD boundary through the state approval process


5

Burns Par

kw ay


6

THE REGIONAL SIGNIFICANCE A catalyst for growth and economic development

9,460,000 819,537

Chicago MSA Population (3rd Largest in USA)

NW Indiana MSA Population (2nd Largest in Indiana)

Chicago MICHIGAN INDIANA

SOUTH SHORE DOUBLE TRACK

WEST LAKE EXTENSION

Michigan City

$2.3 BILLION* 6,000* $3+ BILLION* Private Investment

* Projected

ILLINOIS

INDIANA

South Bend

New Jobs

Economic Impact by 2046


7

THE LINES AND STATIONS South Shore Double Track Project

25 MILES 16 MILES

Lake Michigan

Project Area

90

MICHIGAN

New Second Track

South Shore Line Double Track Project Estimated cost: $455 million Status: Design and engineering work Funding: January of 2021.

MICHIGAN CITY

BEVERLY SHORES

20 35

EAST CHICAGO

94

90

HAMMOND

41

MUNSTER

DYER

ILLINOIS

OGDEN DUNES

INDIANA

BURNS HARBOR PORTAGE

GARY 95 65

94

PORTER CHESTERTON

80


8

THE LINES AND STATIONS West Lake Corridor Project Lake Michigan

MICHIGAN

90

MICHIGAN CITY

BEVERLY SHORES

20 35

EAST CHICAGO

94

OGDEN DUNES

90

HAMMOND

BURNS HARBOR PORTAGE

GARY

94

PORTER CHESTERTON

95

41

65

MUNSTER

West Lake Corridor Project DYER

9 MILES Rail Extension

ILLINOIS

INDIANA

Estimated cost: $852 million Status: Under construction and full funding grant agreement in place Funding: Fall of 2020 ($100M FTA Grant awarded in May 2020)

80


9

THE LINES AND STATIONS West Lake Corridor & South Shore Double Track Projects

25 MILES 16 MILES

Lake Michigan

Project Area

90

MICHIGAN

New Second Track

South Shore Line Double Track Project Estimated cost: $455 million Status: Design and engineering work Funding: January of 2021.

MICHIGAN CITY

BEVERLY SHORES

20 35

EAST CHICAGO

94

OGDEN DUNES

90

HAMMOND

BURNS HARBOR PORTAGE

GARY

94

PORTER CHESTERTON

95

41

65

MUNSTER

West Lake Corridor Project DYER

9 MILES Rail Extension

ILLINOIS

INDIANA

Estimated cost: $852 million Status: Under construction and full funding grant agreement in place Funding: Fall of 2020 ($100M FTA Grant awarded in May 2020)

80


Transit and Community Growth 3 Highland Park Metra Station

Elmhurst Metra Station

2

6 Maywood Metra Station

The transit development districts around various suburban train stations in the Chicagoland area have seen significant improvement in real estate development activity since the development/ redevelopment of the station…

Berywn Metra Station (BNSF Line) – 2008

1 2 3

120K SF

+37%

Population Growth

Total New Construction

Real Estate Value Change

Elmhurst Metra Station (UP-W Line) – 2006

+11%

640K SF

+40%

Population Growth

Total New Construction

Real Estate Value Change

0%

640K SF

+43%

Population Growth

Total New Construction

Real Estate Value Change

Orland Park Metra Station (SWS Line) – 2007

CHICAGO

4 MICHIGAN CITY

Romeoville Metra Station

+5%

Highland Park Metra Station (UP-N Line) – 2009

1 Berywn Metra Station

5

10

4 Orland Park Metra Station

5

DYER [1] Population growth in the 1 mile radius between 2000 and 2020 (estimate). New construction and Real Estate value change are measured in a 1 mile radius between time of TOD reinvestment or construction to August 2020. [2] KPMG note the Romeoville Metra Station new construction data is measured by a 3-mile radius, unlike the other stations 1-mile radius measure due to its more rural location. Sources: ESRI, CoStar Analytics, and other publicly available databases.

1.2M SF

+37%

Population Growth

Total New Construction

Real Estate Value Change

Romeoville Metra Station (HC Line) – 2018

GARY

MUNSTER

+17%

0%

316K SF

+3%

Population Growth

Total New Construction

Real Estate Value Change

Maywood Metra Station (UP-W Line) – 2017

6

0%

415K SF

+5%

Population Growth

Total New Construction

Real Estate Value Change


Agenda What we will discuss

1 Transit development district boundary basics 2 Transit development district boundary process 3 Ogden Dunes Goals, unique qualities and current conditions 4 Ogden Dunes Station DRAFT TDD boundary

11


12

Agenda How we will obtain public input

live polling

website - www.nwitdd.com targeted questions during the presentation

moderated Q+A video recording of this meeting Q+A throughout questions answered at and Q+A answers, gallery materials (also located at Ogden Dunes Fire the end of the meeting House), additional polling, and ability to contact us


1

TRANSIT DEVELOPMENT DISTRICT BOUNDARY BASICS

what you should know


What is a TDD? Transit Development District

The main focus is on promoting Transit-Oriented Development. Transit development districts provide economic tools and strategies to support local communities to implement high-quality transit-oriented development. The goal is to create a boundary calibrated specifically for each community based on analysis, areas of opportunity and the goals and visions of the community.

14


15

This isn't just a boundary. It complements the economic growth path of communities.


16

Clarifying the TDD

TDD IS...

TDD IS NOT...

A 1/2 mile (320 acre) special economic development district approved by the State Budget Committee

Zoning or comprehensive planning

An effort to realize economic development in Northwest Indiana communities Formed by an analysis process that includes community-wide input, best practices and market analysis

A city or town-sponsored planning process Eminent domain A partnership with developer or realtor A project designed to gentrify or to create low-income housing NICTD South Shore Double Track or West Lake rail projects


Statutory Requirements

Transit development districts are contiguous boundaries drawn around station areas, and must be no more than 0.5 square miles (320 Acres) in area.

17


Boundary Parameters and Geographic areas Illustrative Example - Not an actual proposed boundary

18


Statutory Requirements

Transit development districts capture the incremental growth in local income and property tax revenue, for use in public investment related to the station area.

19


TDD Revenue Parameters

Revenue collected from the district – is spent in the district. Local community retains land use and zoning control.

20


TIF AND TDD TOGETHER TDD Function A TDD permits the capture of incremental property tax and local income tax revenues for the development of the area around the transit station The incremental revenue that is captured can only be used within the same district (e.g. increment captured in Munster will be spent in Munster) After the TDD expires, all of the TDD increment is transferred to the tax base If a TDD and a TIF overlap, the split of the incremental revenues between the TDD and TIF are negotiated by the RDA and the RDC

21


Statutory Requirements

After consultation with local communities, two public hearings must be held before the RDA approves the TDD boundaries for review and approval by the State Budget Committee.

22


2

TRANSIT DEVELOPMENT BOUNDARY PROCESS

how we’re arriving at the study area


24

TDD Boundary Process Visiting station areas

1 2

BECOMING FAMILIAR WITH THE STATION AREA

Preparing an initial market understanding/analysis Summarizing the community profile/demographics

Station area mapping

Research previous & ongoing community planning efforts

COMMUNITY LEADERSHIP WORKSHOPS Listening to needs, preferences and development opportunities Presenting our reconnaissance and community impressions Learning of planning and real estate projects in the pipeline Touring the community and station areas

Work sessions to discuss and better understand issues that are specific to each station/community


25

TDD Boundary Process Where we are

3

DRAFTING THE BOUNDARY

Collaboration with NICTD on station requirements and optimization Identifying and integrating community preferences Understanding the market forces that influence economic development Understanding potential and suitability of surrounding sites Understanding supporting infrastructure

Mapping and preparing documents to share out findings and study area


26

TDD Boundary Process Next Stage in the process

4

REVISING THE BOUNDARY

Collecting and integrating community input

Update and create TDD draft boundary

Conduct first and second RDA public hearing


27

Defining the TDD Boundary The criteria we are using

Quantitative

Qualitative

Station context | Utilities | Walkability/connectivity

Redevelopment potential | Community desires

Cultural or civic assets | Barriers to redevelopment

Previous planning findings | Community vision

Buffers | Zoning restrictions

Future/planned projects

Area Specific Site analysis | Location analysis | Legal analysis Zoning/future land use | Potential property tax yield Existing public debt obligations | Impact


28

Area Development Opportunity Criteria Our area development opportunity criteria included the following... Current use

Proximity to station

Acreage

Ownership

Vacancy status

(Developable acreage)

(Public vs private, single vs. multiple)

(Occupied vs vacant lot/ building and notable condition)

Future land use or planned use

Zoning / allowable density / parking

Access / location / walkability

Conditions

TIF district / Opportunity Zone status

Comprehensive impact

(Utilities, infrastructure, flood/ wetland, slope, brownfield issues, other)


Places within and adjacent to the Boundary

ADAPTIVE REUSE

PRESERVE

INFILL

STRENGTHEN

REDEVELOP

29


3

OGDEN DUNES GOALS, UNIQUE QUALITIES AND CURRENT CONDITIONS

understanding your community


Collaboration with the Community Understanding Ogden Dunes

31


OGDEN DUNES ECONOMIC DEVELOPMENT GOALS 1

Protect the character and stability of residential, commercial and recreational areas

2

Promote orderly development

3

Preserve the natural beauty within the Town of Ogden Dunes

4

Guide and regulate future growth and development of the town for the benefit of its citizens

32


OGDEN DUNES ZONING ORDINANCE ZONING DISTRICTS IMPACTED PWU - Public Water Utility District

The PWU - Public Water Utility District is intended to be used exclusively for the purpose of providing a water intake from Lake Michigan through a pumping station and to a filtration and distribution plant.

R - Residential District The R - Residential District is intended to provide a stable environment for dwelling uses. Permitted uses include: single-family dwellings; accessory buildings or uses; public utility buildings; semi-public uses; essential services; special exception uses permitted by this Zoning Code.

PP - Parks and Public Places District

The PP - Parks and Public Places District is intended to provide space for the recreational;, civic, and administrative needs of the community. Permitted uses include: public and private parks and playgrounds; other public uses; essential services.

C - Commercial District

The C - Commercial District is intended to provide provisions for highwayoriented commercial uses and that the primary traffic-carrying function of major highways shall be maintained. Permitted uses include: automobile service station; car wash; eating establishment; drive-in bank; greenhouses, retail or wholesale; retail food and drug sales; personal and professional service; accessory use; essential service; public utility building.

33


34

Understanding Existing Conditions Qualitative and Quantitative Analysis GARY

24

une

PORTAGE City of Portage

y nes Hw DuRedevelopment

United States of America Long Lake 343.3 Acres

D Harbor

Sammie L. Maletta Public Capital LLC Marina

e riv

49.4 Acres Crisman Road

Long Lake

9

IN

City of Portage Dept of Redevelopment 6.6 Acres City of Portage 20.8 Acres

OGDEN DUNES PORTAGE

Crisman Road

GARY

PORTAGE

Crisman Road

GARY

PORTAGE

D Harbor

Marina Shores At Dune Harbor

Ogden Dunes Community Church 3.0 Acres

United States of America 57.1 Acres

United States Steel Corp 323.5 Acres

Marina Shores At Dune Harbor

2.7 Acres

Midwest Steel Hwy

Hwy

Sammie L. Maletta Public Marina

Little Calumet River

Dunes

United States of America 128.8 Acres

D

une

PORTAGE

Ogden Dunes Parks d & Recreation 6.56 Acres

t Road Old Hillcres

24

Sequa Coatings LLC 17.0 Acres

oa tR

9

IN

e riv

City of Portage Dept of Redevelopment 20.0 Acres

Hillcres

Long Lake

OGDEN DUNES

Town of Ogden Dunes 13.3 Acres Gary Hobart Water Corp 18.9 Acres

Midwest Steel Hwy

Marina Shores At Dune Harbor

Major Ownership

Little Calumet River

Sammie L. Maletta Public Marina

D

D Harbor

t Road Old Hillcres

Hwy

d

Midwest Steel Hwy

D

une

PORTAGE

e riv

oa tR

t Road Old Hillcres

OGDEN DUNES

Hillcres

oa tR

d

Dunes

Land Use

Little Calumet River

Hillcres

FEMA

9

IN

24

Port Authority of Portage IN 6.5 Acres

Little Calumet River

Catalyst Lifestyles Sport Resort LLC 57.6 Acres

Little Calumet River

Marina Property Trust 9.5 Acres

First National Bank 26.8 Acres

Little Calumet River

United States of America 658.0 Acres

Pa rk

Willowcreek Road

County Line Road

Pa rk

GARY

PORTAGE

Crisman Road

GARY

PORTAGE

Crisman Road

Sammie L. Maletta Public Marina

Marina Shores At Dune Harbor

9

IN

24

Little Calumet River

Pa rk

Pa rk

Willowcreek Road

d

rive

Me

I-94

ad

I-94

North

0

10 minute walking time 800’

US 20

d

5 minute walking time

d

800’

am D

ort Ro

Southp

US 20

oa nR

lto

0

er Riv

tl

Lit

I-94

ad

ort Ro

Southp

I-94

North

et

lum

a eC

Willowcreek Road

Pa rk

County Line Road

rive

ay w

s

h rn

County Line Road

Burn

Daniel Bu

am D

d Roa

Drive

er Riv

ch oa ec

t Waypoin

a eC

s

Stag

Drive

t me

US 20

oa nR

lto

Me

Hwy

ive Dr

Long Lake

tl

Lit

Willowcreek Road

GARY

Dunes

Harbor

Midwest Steel Hwy

D

rive

I-94

ad

Portage Sanitary Board I-94 23.4 Acres

800’

t Road

Burn

ay w

h rn

County Line Road

Old Hillcres une

PORTAGE

d Roa

lu

ort Ro

Southp

0

Little Calumet River

oa tR

ch oa ec

Daniel Bu

am D

Stag

tl

Lit

24

t Waypoin

City of Portage Department of Redevelopment 93.5 Acres

h rn

lu

a eC

OGDEN DUNES 9

IN

Little Calumet River

Drive

er Riv

s

ay w

Daniel Bu

Burn

t me

Sammie L. Maletta Public Marina

Long Lake

North

Hillcres

d Roa

ive Dr

Marina Shores At Dune Harbor

Hw Dunes

US 20

a Ro

Catalyst Lifestyles Sport Resort LLC (being acquired by City of Portage) 45.4 Acres

Catalyst Lifestyles Sport Resort LLC (being acquired by City of Portage) 61.3 Acres

t Waypoin

Shirley Heinze Land Trust 66.1 Acres

ch oa ec

y

Harbor

Little Calumet River

United States of America 658.0 Acres

Stag

24

I-94

Construction Advancement Foundation of Northwest Indiana Inc 3.5 Acres

d

Midwest Steel Hwy

Catalyst Lifestyles Sport Resort LLC (being acquired by City of Portage) 57.6 Acres

State of Indiana Department of Natural Resources 7.8 Acres

9

IN

une

D

Marina Shores At Dune Harbor

OGDEN DUNES PORTAGE

rive

Pawlicki Enterprises Lnc 21.1 Acres

Me

800’

Walkshed

Little Calumet River

City of Portage Dept of Redevelopment 6.6 Acres

0

t Road

ive Dr

Cho Clement Dongsoo 15.2 Acres

n lto

North

d

Midwest Steel Hwy

D

City of Portage y nes Hw DuRedevelopment 2.7 Acres

Harbor

Portage Sanitary Board I-94 23.4 Acres

am D

d

Old Hillcres

t Road

une

Steel Technologies 20.9 Acres

a Ro

Me

Vacant Property 800’

City of Portage 20.8 Acres

PORTAGE

NIPSCO 58.7 Acres

n lto

TIF

Sammie L. Maletta Public Marina

ad

ort Ro

Southp

Shirley Heinze Land Trust 23.8 Acres

oa tR

Old Hillcres

United States of America 57.1 Acres

L

US 20

Hillcres

oa tR

Little Calumet River

Hillcres

City of Portage Dept of Redevelopment 20.0 Acres

0

C

Crisman Road

North

Ogden Dunes Parks d & Recreation 6.6 Acres

United States of America 343.3 Acres

Willowcreek Road

Willowcreek Road Me

US Steel Corp 10.3 Acres

d

Commercial

OGDEN DUNES PORTAGE

Single Family Residential

a Ro

er Riv

h rn

n lto

I-94

Multi Family Residential

d

0.2% Annual Chance Flood Hazard

e ittl

City of Portage Department of Redevelopment 93.5 Acres

Drive

Exempt - Public

et

m alu

ay w

s

t Waypoin

Park - District Owned

US 20

h rn

I-94

Ewen Family 233.4 Acres

I-94

ad

ort Ro

Southp

d Roa

Burn

Shirley Heinze Land Trust 66.1 Acres

I-94

Regulatory Floodway

United States of America 128.8 Acres

C

Utility and ROW

1% Annual Chance Flood Hazard

Public Ownership

er Riv

ch oa ec

rive

L

Industrial ad

Area with Reduced Risk Due to Levee

m alu

am D

Stag

State of Indiana Department of Natural Resources 7.8 Acres

Drive

e ittl

ort Ro

Long Lake

rive

C

Southp

ay w

s Burn

et

L

Town of Ogden Dunes 13.3 Acres

d Roa

t Waypoin

h rn

er Riv

ch oa ec

Drive

e ittl

t Waypoin

et

m alu

am D

Stag

Catalyst Lifestyles Sport Resort LLC 45.4 Acres

Catalyst Lifestyles Sport Resort LLC 61.3 Acres

Daniel Bu

ay w

s Burn

County Line Road

d Roa Pa rk

ch oa ec

Daniel Bu

Stag

Daniel Bu

County Line Road

NIPSCO Easement 58.7 Acres

oa nR

lto

Me

North

0

800’


4

OGDEN DUNES STATION DRAFT BOUNDARY

for community consideration


Portage Ogden Dunes Context

Burns Par

kw ay

36


Station Area Context

37


NICTD Station Planning PLANNED SPACES

Opening day

540 standard spaces 12 ADA accessible spaces 8 Kiss-n-Ride spaces

Current Parking 199 standard spaces

Parking Lot Planning Enlargement

38


39


40


41


42


43


44


45 Ogden Dunes: 18 acres


46 Ogden Dunes: 18 acres


47


Complementary Community Growth North of US 12

48


Complementary Community Growth South of US 12

49


Places within and adjacent to the Boundary

ADAPTIVE REUSE

PRESERVE

INFILL

STRENGTHEN

REDEVELOP

50


51

This isn't just a boundary. It complements the economic growth path of communities.


VISIT THE TDD WEBSITE

also linked on the RDA’s main website

learn more and follow this process


Next Steps

1 VISIT GALLERY (AT OGDEN DUNES FIRE HOUSE) 2 VISIT WEBSITE (www.NWITDD.com) 3 PORTAGE VIRTUAL PUBLIC PRESENTATION TBD 4 REFINING BOUNDARY WITH OGDEN DUNES AND PORTAGE LEADERSHIP

5 RDA BOARD PUBLIC HEARINGS 6 STATE BUDGET COMMITTEE REVIEW AND APPROVAL

53


Q&A

we appreciate your time and comments


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.