Architecture Graduate Portfolio_2021

Page 1

Architecture Portfolio...


Resume

AR. MOHAMMED FAISAL MOMIN

Hello, I am Momin Mohammed Faisal ,graduate from Rizvi College of Architecture, Mumbai. Architecture design is my passion and gives me opportunity to learn and explore. I have always been a keen learner and a hard working student who tries to deliver the best performance in all cases. I have always tried to improve myself from my mistake and believe in learning from others which improved my skills. Team work and communication are my strong skills that drives my work process. I Believe that an Architecture has the ability to make a difference in the reality and transforms human emotions, I have tried to stand on these concepts for the projects that I have worked upon.

Email: faisalmomin2101@gmail.com Phone: #9892339558 Address: Mazgaon, Mumbai Linkeden: https://www.linkedin.com/in/mohammed-faisal-momin-855016196


Experience November 2019 -April 2020 • • • •

Internship done at Ingrain Architects and Associates Mumbai. Projects Worked: Residential High rise at Goregaon by Chandak Builders. Residential Project at Kalina Mumbai. Commercial Project at Andheri by Jogani Group of companies. Residential Project at Worli by Jogani Group of companies.

February 2020

Participation in Architectural competition APIC organised by Rizvi college of architecture.

October 2021

Freelance Work for lighting showroom at Dombivali, Mumbai

January 2021

Freelance work for Interior design project at Nerul, Navi Mumbai.

Competition & Workshops

NARI GANDHI TROPHY, NASA 2017 ( Selected in top10)

ANDC TROPHY, NASA 2018 ( Selected as head of the team)

NARI GANDHI TROPHY, NASA 2018

APIC design Competition organized by Rizvi college of Architecture ( Selected in top10)

L.B.C exposure program (Laurie Baker center, Trivandrum)

ICHH 2016,2017,2018 (International conference for humane habitat)

HOLY CROSS HIGH SCHOOL, Mumbai

KISHANCHAND CHELARAM COLLEGE, Mumbai

RIZVI COLLEGE OF ARCHITECTURE, Mumbai

Travel

Food

Sports

Graphic design & Software skills

( Selected as head of the team)

Education S.S.C

(Percentage:87.40)

H.S.C

(Percentage:82.17) Science stream

B.ARCH

(CGPI:8.61)

Skills Auto cad Photoshop Corel draw Indesign Revit Sketchup V-Ray Enscape M.S Office

Interest


Design Dissertation

sharan

-An Abode for Warriors

Over the years human civilization has faced many form of illnesses that have created a major impact on the life of people. With respect to growth and development in research and technology many have found a cure to overcome this illness. Terminal illness or end-stage disease is a disease that cannot be cured or adequately treated and is reasonably expected to result in death of the patient Like Aids, Cancers, Luke mania, Covid19, trauma etc. Now being exposed to these illness one lose hope towards living with respect to the Negative impact that is been seen or heard by the people. This Mental health act as a silent killer. There is a constant mental pressure which is developed on the minds of patients which resist treatment of it. This negatively impact the emotions,mind,loved ones & the society. Consequence of these leads to indirect imbalance between the person and the society. The dissertation explores these concepts of mental illness caused dues to illness by scoping itself to cancer and its impact. The ideology is to creating a holistic healing environment for cancer patients .The centre marks a place of refuge for cancer patients by easing out the difficulties faced by cancer patient and a point of spreading awareness for cancer.


The above abstract depicts the stable human mind which helps him to think positive direction. (Author)


The above abstract depicts the distortion in human mind due to development of uncertainties which resist it to think in positive direction. (Author)


Cancer care centre (Primary programme)

The centre act as an extention to the hopital taking care of the salutogenic (Health creation) aspects

Psychological care

Mental

Physical

Social

Rehabilitation

Cancer patients

Accessible to

Accessible to Economical aspect

Cancer patients living in the center accommodation

Treated cancer but facing financial difficulty

For patients /Relative work on the daily basis

Family member who has lost the patient and facing financial difficulty

Accommodation

Going for treatment to Cancer patients & a relative

Cancer Hospital (Tata memorial)



sharan

-An Abode for Warriors


Private space Accommodation floor 3rd -9th

Psychological care

Hospital

First floor

Semi public space

Ground floor

Public space Reserved for future expansion Rehabilitation

Zoning And Massing

TRANSISTION SPACE Zone 01

ACTIVITY SPACE

Zone 02

N

SILENT ZONE

ACTIVITY SPACE

Movement pattern for rehabilitation The Site fall under the region of Mumbai, Maharashtra. Is has a well connected transport connectivity and a good developed social infrastructure, The site is the propert of Tata group of companies, In the northern portion a 12 storeys building is under construction. This provides opportunity to of dividing the site in two zones of which zone two is the proposal for the project.

ACTIVITY AND SILENT BOTH


ROAD

10

13

7

14

6

4

5

11

8

3

1

7

9

2

+/ -0

.0 0

M

29

EX IT

EN TR Y

EX IT

EN TR Y

G.M B

R ADKE

30 17 16 15

20

22

+0 .6 0M

25

21

6

18 24

19

XP AN

BAD KER G.M

RE

SE

RV E

D

27

FO

ROA

RF

D

UT

UR

EE

28

24

SIO

N

26

24

23

24

27 1: Entrance 2: Admin 3: Service area 4: lobby 5: Waiting area 6: courtyard(open) 7: Rehabilitation workshop 8: Meeting Room 9: Store Room 10: Service Drop/Pickup/ Rehabilitation Entrance 11: Refreshment 12: lobby 13: Seminar hall 14: Store(Medical/ Kiosk) 15: Cafeteria 16: Kitchen And store 17: Service drop 18: Cafretaria spill over and green Space 19: Green Space 20: Double height amphitheatre 21: Classroom 22: Double Height Transition space 23: Water body( Artificial pond) 24: Therapy Space 25: Refreshment/ Reception 26 Spritual Space 27: Outdoor Therapy space 28: Consultation space 29: Parking 30: Hospital Building

N 0M

12M

24M

36M

GROUND FLOOR PLAN


1: Bridge Towards Hospital 2: Recreation Space 3: Refreshment 4: lobby 5: Central amenity Space 6: Cafeteria 7: Kitchen and store room 8: Courtyard 9: Cebtral Transition Space 10: Double Height Transition Space 11: Therapy Room 12: Refreshment/ Equipment Room 13: Green Roof 14: Library 15: laundary/ Medical Supply storage

8 11

13

11

13

10

14

8

12

11

16

9

8

4

5

6

4

4

7

8

2

3

1

N 0M

12M

24M

36M

FIRST FLOOR PLAN (Amenity


15 1

12

14

5

10

8

7

1

5

9

11

13

4

2

1

3

5 6 1: Lobby 2: Central Green Courtyard(Closed) 3: Nursing Station 4: Doctors cabin 5: Refreshment(Toilets) 6: Male Accommodation 7: Double Height Recreation Space 8: Amenity Area 9: First Floor central Courtyard 10: Solar panel Station 11: Female Accommodation 12: Female and Children Accommodation 13: Staff Room 14: Green Psychological block roof 15: Roof of Bridge Towards Hospital

N 0M

12M

24M

36M

ACCOMODATION FLOOR PLAN (3rd-9th Floor)


A

A

Section M-M: Cutting Across Psychological care space showing back elevation

0M

2.70M

8.10M

M.S Facia 6mm thk Bamboo mat roofing sheet Cavity acting as insulation medium

M.S planar space frame with Bracing

12 mm thk translucent glass

230 mm thk M.S stub column M.S Box framing with insulation 230 mm thk R.C.C beam

Bersped ut labor sus eiunt id quam facerna tquaectet eos perchilibus doluptibus modipiendae se pre pla sant alibus molupta doles eossed ut laborrovid erum ipiet, suntus sunt quos expedis eium dolum natis aliquiat. Itat ex eum adi volestio. Et lis ut eatusanti corectu ritatem aborrovid qui temolor molut faccat mod quo temperc hicias rem harchitinus eos ulpa vitatur? Andandu ndelibus nim facestiunt. Xeribuscia apedipicti omniaec totatur as idus, quo expe pa nobist qui cus sequam illorit occusam endione mporem facea dempe volorro remqui que occabor solore es a idit rest, con cusamus serum ipsum, ut volorro vidignatus intis eris sit por sit quis quaspienit a ex eaquas eictio dolorerum quatia ipsanto blame nis si ut aut illanda sunte plant pliquidel id modi blaudiciis ma venimintem voles ipsamus.

North light liiumance


M.S Facia overing on all sides 6mm thk Bamboo mat roofing

Heavy roof

75 x 75mm purlin M.S box purlin

12 mm thk translucent glass

M.S Box framing with insulation

Light roof

230 mm thk M.S stub column

10 mm thk M.S base plate

M.S planar space frame with Bracing 230 mm thk R.C.C beam


+/ -0 .0 0m

Rehabilitation Zone ...

S Ro tore om

ks h Se m

W or

in ar H

ks h

al

l

op

Sp

ac e

+0 .

45

m

Co ur ty a

rd

Re fre M sh al m e en tr oo m

+0 .

60

m

Re fre Fe sh ma m le en tr oo m

W or M e Ro etin om g

En tra nc e

Re ce p W tio ai n tin A g nd

Ad m

op

in

Sp a

ce

Re ha en bil tra ita nc tio e n

A

A

N

E

Rehabilitation Floor Plan

Easy loading/ unloading of goods for rehabilitation

Ex

te

rn

al

ro a

d

Green space

Connecting to themain centre Central passage connecting spaces for easy circulation

Entrance

Register

Movement pattern for rehabilitation

Changing room

Workshop space spill over the green space for transition and act as a buffer element

Workstation

Transition / buffer spaces


External view of Rehabilitation Block

Internal view of workshop area


Psychological Care Zone ....

Psychological therapies

Relation between architectural spaces and psycho

Spatial modification with respect

Section H-H Cutting Longitudinal section over entire site

O.H.T +35.75

Accommodation

+32.75m 9th floor +31.35 8th floor +28.20m

Terrace

7th floor +25.05m

Female

accommodation

6th floor +21.90m

Passage

Female

5th floor +18.75m

4th floor +15.60m

accommodation

Passage

Female

Passage

accommodation

Passage

3rd floor +12.45m

Psychological Care Double Height amenity space

2st floor +9.30m

Passage

Ce

Spiral Staircase 1st floor +4.30

Plinth level +0.6m Pond level -1.8m

Passage Courtyard Passage

Spiritual Space Pond

S


Architectural

Spaces

ological therapy can be explored for spatial experience

H

H

t o therapy incorporation

Staircase

Passage

Passage

Passage

Passage

Passage

entral Amenity Courtyard

Seminar hall

Rehabilitation Passage

G.M BADKER ROAD

Courtyard Passage

Workshop area

Internal Road

0M

2.50M

5.00M

7.50M


.6 0

u Tr ble an H Sp siti eig ac on ht e

+0

Do

Therapy space -1 Pon .8 d 0m

Therapy space

Sp sp iritu ac al e

Green Space

Th O er utd ap o y S or pa ce

m

D

Reception and toilet

Therapy space

Consultation room

Th O er utd ap o y S or pa ce G re en +0 S .0 pa 0m ce

D

Therapy space

Spiritual space placed near water body edge creating a veiw towards pond

N Psychological care First Floor Plan

0M

4.5M

9.0M

13.5M

Plants Growing medium(soil) Sand layer Geotextile fabric layer polyethylene drainage mesh 30 mm pavers as water proof layer 19 mm sand layer

Double height undrground spiritual space generating view underwater and creating experiential space

Bituminous water proof membrane Translucent skylight

10 mm sand layer

Green Roof edge detail

150 mm R.C.C Slab

Aggregate layer

Sand layer Stairs leading down

Pebble

Towards Muncipal drain or Rainwater harvesting tank

150 mm thk Brick bund wall with openeings

Generating interanal natural light luminance with placing sky light towards sun light

Bio step water filteration bed

Green Roof +9.30m

Therapy Space

Equipment Room

Info desk +4.30m

Therapy Space Outdoor Therapy Space

Reception/ Registration

Double Height Transition space

+/-0.00m

Section E-E From therpy space and double height transition space

0M

1.0M

2.0M

3.0M


View of water body towards over looking balcony

View of water body towards spiritual space

External view of therapy space and outdoor therapy space.


Accommodation Block ....

Double Height space for courtyard ventilation

Rigid mass of accommodation block

Articulation blo hierarchy and ac spa

Section K-K: Cutting Across the courtyards within the accommodation block O.H.T +35.75 +34.75m

+32.75m Terrace

9th floor +31.35

Terrace

Accommodation Passage

8th floor +28.20m

Nursing station

Passage

Accommodation 7th floor +25.05m

Passage

6th floor +21.90m

Passage

Passage

Passage

Double Height recreation space

5th floor +18.75m

Passage

Passage

Passage

Passage

Accommodation 4th floor +15.60m Accommodation Passage

Passage

3rd floor +12.45m

Nursing station

Nursing station

Nursing station

Nursing station

Nursing station

Central Courtyard

Accommodation Passage

Passage

Nursing station

2st floor +9.30m Cooking Area Storage

Cafeteria

Passage

Central Courtyard

Passage

Seminar Hall

1st floor +4.30 Cooking Area Storage Plinth level +0.6m

Cafeteria

Shop


Male block

Central closed courtyard

Female Block Female And Children block

Space allocation for accommodation as per age and gender

ock with volume ccessible green ace

K

K

Terrace

Amenity area

Amenity area

Amenity area

Passage

Passage

Accommodation

Accommodation

Passage Accommodation

Electronic Library Library

Passage

Classroom Reserved For Future Expansion

0M

2.50M

5.00M

7.50M


View from start of bridge from care centre towards hospital

View of central court of amenity space

View of terrace farming


2.

40

m

wi

de

pa

ss

e

lo bb y

N ur at sing io n st D o ca ct o bi rs n

40

m

wi

de

pa

ss

ag

e

Providing communal spaces/amenity spaces for increasing interaction

St a

F co loor ur A +4 tyar me d nit .3 y 0

2. 40

Central courtyard for buffer space and circulation

w

pa

4

2.

D ou re ble cr h ea ei tio gh n t

lo bb

y

Fi rs t

Fe m al Ro e a om cco m

e

id

0m

e

ag

ss

m

ff Ro om

ss pa wi de

G

St ro ore om

ag

e

re en co +9 ur ty .3 ar 0 d

M

2.

lo bb y

ag e pa ss wi de 2. 40

m

al e Ro ac om com

ag

Room

m

wi de

pa

ss

ag

Am

Room Passage

e

en ity

Solar panel +8.40

Room

Room

ac

+9

.3

0

Fe m co chi ale m ldr an m en d od at io n

2. 40

Courtyard

N

Toilet Block

3rd floor Accommodation Plan

Accessible Terrace

0M

1.5M

3.0M

Indulging community Activity

External view for all the room for natural light and ventilation 4.50M

Step towards self sustenance

Terrace farming pods

Accessible Terrace

Terrace act as an important space that has potential for increasing the utility

Providing terrace a communal function to indulge participation and increase usability of space


12 mm memb

12 mm thk translucent double glass member with air cavity

M.S roo

M.S Ra

M.S Bo

M.S Bo

Facia c M.S Horizontal member

framing

230 m

8mm th

10 mm M.S Rafter member

as

a

stiffner

100 mm

230 mm

Pitched Roof Edge detail Principal heap beam and rafter connection R.C.C Coloumn

M.

Alu ga

M.S Box Channel periphery beam

12 me

as

Ca

R.C.C coloumn 230 mm thk R.C.C Beam

230 mm Coloumn

Thk

M.S

12 me

Stub

M.

M.

Exploded pitched roof detail

External Facade view of Accommodation Block

Pitched Roof ridge/ hip detail


.0

+4 .3 0m

0m

m thk translucent glass ber +/ -0

of rafter member

after and M.S box channel fixing member +3 .6 0m

ox Channel as periphery beam

ox channel window frame

Pi tc +3 hed 4. ro 75 o m f

T +3 err 2. ace 75 m

mm Thk M.S Stub Coloumn

+0 .1 5m

covering entire length

Pi tc h +3 ed 1. ro 35 of

hk R.C.C glass louvre

m thk base plate

Re c

re a +2 tion 5. 05 ter m rac e

+8 .4 0m

mB.B.C layer protection

Te r

ra ce F +1 arm 8. 75 ing m

m thk R.C.C Slab

0m

.3

+9

0m

-1

.8

0m

.S Ridge and rafter cap detail

+/

-0

.0

uminium glass frame with asket closure

2 mm thk translucent glass ember

avity as insulation

2 mm thk translucent glass ember

N

.S roof rafter member

450

2100

600

.S Hip Beam

0M

1.5M

3.0M

4.50M

Roof plan for the complex Aluminium Frame sliding window frame

150 mm thk R.C.C Slab

Bio filter substrate

150 mm thk R.C.C Cill

150 mm thk R.C.C flower bed projection

150 mm thk R.C.C Slab

Aluminium Frame sliding window frame

Planter

100 mm thk P.C.C projection Growing medium / soil

Aluminium fixed glass frame 150 mm thk window cill with granite finish

Sand and gravel mix layer

150 mm thk R.C.C Slab

150 mm thk R.C.C Chajja Excess water drain

Accommodation Window detail

Chajja detail


“Above all, what matters is not to loose the joy


sharan

y of living in the fear of dying”

-Maggie keswick jeneck

-An Abode for Warriors


Internship

@ Ingrain Architects

Project Type:Residential Highrise

Project By :Chandak Group @ Goregaon West


Pic Credit: Chandak Group


TYPICAL FLOOR PLAN

TOWER –A

FACADE DESIGN.... TERRACE +221.22 LVL.

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

34rd FLOOR +218.27 M LVL.

33rd FLOOR +215.32 M LVL.

DN

UP

UP

Key Features • 4 Apartments per floor - 2 Flats of 2 BHK - 2 Flats of 3 BHK • 4 Lifts per floor. • 2 Staircase • 2 BHK have Jodi Possibility • 3 BHK units are designed with TO WER Darshan living concept giving a great view

DN

32ND FLOOR +212.37 M LVL.

31ST FLOOR +209.42 M LVL.

30TH FL REFUGE +206.47 M LVL.

29TH FLOOR +203.52 M LVL.

TYPICAL FLOOR PLAN

28TH FLOOR +200.57 M LVL.

W4

–B

N

27TH FLOOR +197.62 M LVL.

0M

1.5M

3.0M

26TH FLOOR +194.67 M LVL.

4.50M

Tower A floor plan

25TH FLOOR +191.72 M LVL.

24TH FLOOR +188.77 M LVL.

23RD FL REFUGE +185.82 M LVL.

Floor plans are generated on design principles such as minimizing negative spaces and maximizing openness and views. Key Features • 14 Apartments per floor - 11 flats of 1 BHK - 2 flats of compact 2 BHK - 1 flat of 2 BHK • 8 Lifts per floor with 2 fire staircase • Well segregated lobbies • All 1bhk flat have vastu orientated east west entry TOWER –C • 1bhk garden facing flats have Jodi possibility W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

W4

W13

W16

W14

W14

22ND FLOOR +182.87 M LVL.

21ST FLOOR +179.92 M LVL.

20TH FLOOR +176.97 M LVL.

19TH FLOOR +174.02 M LVL.

18TH FLOOR +171.07 M LVL.

17TH FLOOR +168.12 M LVL.

16TH FLOOR REFUGE +165.17 M LVL.

15TH FLOOR +162.22 M LVL.

N

0M

14TH FLOOR +159.27 M LVL.

T 1.5M Y P I3.0M CAL FLOOR PLAN

13TH FLOOR +156.32 M LVL.

4.50M

Tower B floor plan

12TH FLOOR +153.37 M LVL.

11TH FLOOR +150.42 M LVL.

10TH FLOOR +147.47 M LVL.

9TH FLOOR REFUGE +144.52 M LVL.

UP DN

8TH FLOOR +141.57 LVL.

UP DN

Key Features • 8 Apartments per floor - 4 Flats of 1 BHK - 4 Flats of 2 BHK • 5 Lifts per floor. • 2 Staircase 7TH FLOOR +138.62 M LVL.

6TH FLOOR +135.67 M LVL.

5TH FLOOR +132.72 M LVL.

4TH FLOOR +129.77 M LVL.

3RD FLOOR +126.82 M LVL.

2ND FL REFUGE +123.87 M LVL.

N 1ST FLOOR +120.92 M LVL.

0M

1.5M

3.0M

4.50M

ECO-DECK LEVEL +117.92 M LVL.

Tower C floor plan PODIUM 2

A N

Key Plan

PODIUM 1

B

C

110.82 M LVL.

106.52 M LVL.

D GROUND LVL +102.07 LVL

STILT FLR

+102.22 M LVL.

Tower C F


TERRACE +221.22 LVL. W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W16

W13

W4

W4

W13

W16

W14

W14

W16

W13

W4

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

34rd FLOOR +218.27 M LVL.

33rd FLOOR +215.32 M LVL.

32ND FLOOR +212.37 M LVL.

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

31ST FLOOR +209.42 M LVL.

30TH FL REFUGE +206.47 M LVL.

29TH FLOOR +203.52 M LVL.

28TH FLOOR +200.57 M LVL.

27TH FLOOR +197.62 M LVL.

26TH FLOOR +194.67 M LVL.

25TH FLOOR +191.72 M LVL.

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

24TH FLOOR +188.77 M LVL.

23RD FL REFUGE +185.82 M LVL.

22ND FLOOR +182.87 M LVL.

21ST FLOOR +179.92 M LVL.

20TH FLOOR +176.97 M LVL.

19TH FLOOR +174.02 M LVL.

18TH FLOOR +171.07 M LVL.

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

17TH FLOOR +168.12 M LVL.

16TH FLOOR REFUGE +165.17 M LVL.

15TH FLOOR +162.22 M LVL.

14TH FLOOR +159.27 M LVL.

13TH FLOOR +156.32 M LVL.

12TH FLOOR +153.37 M LVL.

11TH FLOOR +150.42 M LVL.

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

10TH FLOOR +147.47 M LVL.

9TH FLOOR REFUGE +144.52 M LVL.

8TH FLOOR +141.57 LVL.

7TH FLOOR +138.62 M LVL.

6TH FLOOR +135.67 M LVL.

5TH FLOOR +132.72 M LVL.

4TH FLOOR +129.77 M LVL.

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W2

W1

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

W3

W4

W4

W4

W4

W3

W1

W2

3RD FLOOR +126.82 M LVL.

2ND FL REFUGE +123.87 M LVL.

Front Elevation

W2

W1

1ST FLOOR +120.92 M LVL.

ECO-DECK LEVEL +117.92 M LVL.

PODIUM 2

PODIUM 1

GROUND LVL +102.07 LVL

STILT FLR

110.82 M LVL.

106.52 M LVL.

GROUN +102.0

+102.22 M LVL.

Tower A Front Elevation

0M

1.5M

3.0M

4.50M


TECHNICAL DRAWING....

Parking Tower B Longitudinal section

Parking Tower C Longitudinal section


2950

2950

2950

2950

2950

2950

2950

2950

2950

2950

10TH FLOOR +147.47 M LVL.

2950

2950

2950

2950

2950

2950

2950

2950

3000

3000

8TH FLOOR +141.57 LVL.

8TH FLOOR +141.57 LVL.

7TH FLOOR +138.62 M LVL.

7TH FLOOR +138.62 M LVL.

6TH FLOOR +135.67 M LVL.

6TH FLOOR +135.67 M LVL.

5TH FLOOR +132.72 M LVL.

5TH FLOOR +132.72 M LVL.

4TH FLOOR +129.77 M LVL.

4TH FLOOR +129.77 M LVL.

2ND FL +123.87 M LVL.

2ND FL +123.87 M LVL.

1ST FLOOR +120.92 M LVL.

1ST FLOOR +120.92 M LVL.

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIVING

LIVING

2.00M WIDE LOBBY

2.00M WIDE LOBBY

2.00M WIDE LOBBY

2.00M WIDE LOBBY

2.00M WIDE LOBBY

LIFTSHAFT 2.00M WIDE LOBBY

AMENITY

AMENITY

7100

7100

PODIUM 2

LIFTSHAFT

4300

4300

PODIUM 1

2.00M WIDE LOBBY

2.00M WIDE LOBBY

2.00M WIDE LOBBY

2.00M WIDE LOBBY

4300

106.52 M LVL. 106.52 M LVL.

STILT FLR GROUND LVL +102.22 +102.07 LVL

STILT FLR

M LVL.+102.22 M LVL.

4200

4300

LIVING

ECO-DECK LEVEL +117.92 M LVL.

110.82 M LVL. 110.82 M LVL.

PODIUM 1

4200

LIVING

3RD FLOOR REFUGE 3RD FLOOR REFUGE +126.82 M LVL. +126.82 M LVL.

PODIUM 2

PIT LVL +102.07 LVL

LIVING

9TH FLOOR REFUGE 9TH FLOOR REFUGE +144.52 M LVL. +144.52 M LVL.

ECO-DECK LEVEL +117.92 M LVL.

GROUND LVL +102.07 LVL

10TH FLOOR +147.47 M LVL.

PIT LVL +102.07 LVL

Parking Tower A Cross section

GROUND LVL +102.07 LVL

GROUND LVL +102.07 LVL


COMMON TOILET SLAB SUNK BY 150 MM

2M +2.6

(TS)

1200

300

1200 305

TRAVETINE CLASSIC 1200X1200TILE

300

6 MM TILE LINE

1080

WALL HUNG W.C AS PER APPROVED

300

400

150 mm THK LEDGE WALL

WASH BASIN OF APPROVED QUALITY

780

800

WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE

250 250

(TS)

100 MM WALL TRAVETINE CLASSIC 600X1200TILE

2950

100 MM WALL

305

BAL bal 900 600

15 MM PLASTER LINE

(TS)

V

1200

2950

1200

BAL

15 MM PLASTER LINE

2950

1200

SLAB

2M +2.6

300

SLAB SUNK BY 150 MM

600X600 BOSTON MATT TILE AS PER APPROVED

600X600 BOSTONE MATT TILE AS PER APPROVED

SLAB SUNK BY 150 MM

SLAB SUNK BY 150 MM

ELEVATION-A

SLAB

ELEVATION-B

ELE

1070 235

395

600

(TS)

600

150

625

NA

WALL MIXER AS / APPROVED SAMPLE

DUCT

-6mm 625

600

W A

SUNK 150 MM.

W.C. AS/APPROVED SAMPLE

600

BAL

625

-6mm

19 MM THK INDIAN MARBLE FRAME AS/ SPECIFICATION

600

DUCT

SUNK 150 MM.

675

WASH BASIN AS / APPROVED QUALITY

610

615

625

675

1070

150

600

PLAN COMMON TOILET

600(TS)

600

19 FR

W

BAL

W A

PLAN MASTER TOILET

MASTER TOILET SLAB SUNK BY 150 MM

SLAB SUNK BY 150 MM 2M +2.6

2M +2.6

15 MM PLASTER LINE

15 MM PLASTER LINE (TS)

100 MM WALL TRAVETINE CLASSIC 600X600TILE

300

SLAB SUNK BY 150 MM

ELEVATION-A

600

6 MM TILE LINE 150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED

780

BAL

250 250

900

600

WALL HUNG W.C AS PER APPROVED

BAL

1200

400

1200 600

2950

600

350

1200 1200

600

V 2950

600

600

600

(TS)

100 MM WALL TRAVETINE CLASSIC 600X1200TILE WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE 150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED

SLAB SUNK BY 150 MM

ELEVATION-B

EL


ADVANCE COPY SLAB SUNK BY 150 MM

B SUNK BY 150 MM

2M +2.6

2M +2.6

1200

15 MM PLASTER LINE

15 MM PLASTER LINE

(TS)

2950

2950

1200

1200

100 MM WALL

NOTES 100 MM WALL

615

755

TRAVETINE CLASSIC 1200X1200TILE

TRAVETINE CLASSIC 1200X1200TILE

1080

BAL

WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE

6 MM TILE LINE

-6mm

600X600 BOSTON MATT TILE AS PER APPROVED

SLAB SUNK BY 150 MM

B SUNK BY 150 MM

EVATION-C

WALL HUNG W.C AS PER APPROVED

400

150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED

1. ALL DIMENSIONS ARE IN MILIMETERS UNLESS OTHERWISE SPECIFIED. 2. DRAWING MUST BE READ IN CONJUNCTION WITH STRUCTURAL DRAWINGS. 3. THE SIZES OF ALL THE STRUCTURAL MEMBERS TO BE REFERED FROM DRAWINGS OF STRUCTURAL CONSULTANT. 4. DRAWING NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 5. CONTRACTOR TO STUDY DRAWING & REVERT BACK IN CASE OF ANY DISCREPANCIES BEFORE EXECUTION. 6. ALL CENTRE LINE DIMENSIONS ARE WITH REFERENCE TO (0,0). 7. THE LEVELS SPECIFIED IN ALL THE DRAWINGS ARE UNFINISHED FLOOR LEVELS UNLESS OTHERWISE SPECIFIED. 8. ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED SURFACES UNLESS OTHERWISE SPECIFIED.

ELEVATION-D 15 MM THK CEMENT MORTOR 2MM THK EPOXY GROUTING 32MM X 32MM X 125 (HEAVY) SS HINGES 35MMX25MM TEAKWOOD FRAMING AT ENDS 35MM THK FLUSH DOOR 1.5MM THK LAMINATE ON BOTH SIDES

(INSIDE)

(OUTSIDE)

50MM LONG SCREW WITH PVC PLUG 19MM THK GRANITE CHAMFERED AT OUTER EDGE

DETAIL A

5MMX5MM GROVE

WASH BASIN AS / APPROVED QUALITY

SCALE 1:15

15 MM THK GYPSUM PLASTER PUNNING

AHANI TRAP (A.P.A)

100 MM THK INTERNAL WALL

9 MM THK INDIAN MARBLE RAME AS/ SPECIFICATION

6 MM THK DADO TILE

OVEN

W.C. AS/APPROVED SAMPLE

WALL MIXER AS / APPROVED SAMPLE

15 MM THK CEMENT MORTOR 2MM THK EPOXY GROUTING

AQUA

35MMX25MM TEAKWOOD FRAMING AT ENDS 35MM THK FLUSH DOOR

MIXER

1.5MM THK LAMINATE ON BOTH SIDES (INSIDE)

GODREJ CYLINDRICAL KEYLESS LOCK

(OUTSIDE)

RF

1MM THK ARALDITE GLUE 19MM THK GRANITE CHAMFERED AT OUTER EDGE

DETAIL B SCALE 1:15

5MMX5MM GROVE 15 MM THK GYPSUM PLASTER PUNNING

SLAB SUNK BY 150 MM

SLAB SUNK BY 150 MM

2M +2.6

2M +2.6

600 2950

WASH BASIN OF APPROVED QUALITY

SLAB SUNK BY 150 MM

LEVATION-C

100 MM WALL TRAVETINE CLASSIC 600X600TILE

NORTH

SCALE

DATE 13/03/2020

1 : 50 CLIENT :-

DRN. BY

CHKD. BY

13/03/2020 13/03/2020 13/03/2020 SHAILESH

ISSUE

TAHER

13/03/2020

Chandak Group Chandak Group

6 MM TILE LINE WALL HUNG W.C AS PER APPROVED

400

DONE BY

MASTER & COMMAN TOILET DETAIL

150 MM WALL

6 MM TILE LINE

600X600 BOSTON MATT TILE AS PER APPROVED

460

600

600 600

1200

TRAVETINE CLASSIC 600X1200TILE 150 mm THK LEDGE WALL

450 600

460

DESCRIPTION

DRAWING TITLE

STRUCTURAL CONSULTANT PUNE OFFICE

LLP IDENTITY NO.: AAA-2650 PARTNERSHIP WITH LIMITED LIABILITY

SAI RADHE,OFFICE NO 201,2ND FL.,100 KENNEDY ROAD, BEHIND HOTEL LE MERIDIEN, PUNE 411001 Tel.

6 MM TILE DROP

BAL

600

15 MM PLASTER LINE

bal

2950

15 MM PLASTER LINE

(TS)

100 MM WALL

DATE

Porposed Residential Project for Chandak Group at Teen Dongri, Goregaon, Mumbai

EQ

EQ

BAL

(TS)

NO.

PROJECT NAME

SLAB SUNK BY 150 MM

600X600 BOSTONE MATT TILE AS PER APPROVED

FAX: +91 20 66449299

314, 3RD FLOOR, PRABHADEVI INDUSTRIAL ESTATE, VEER SAVARKAR MARG, PRABHADEVI, MUMBAI-400025

www.jwconsultants.in design@jwconsultants.in

-6mm

+91 20 66449100

MUMBAI OFFICE Formerly Y S Sane Associates

JW CONSULTANTS LLP

Tel. +91 22 66322845/46 FAX: +91 22 66322850

SERVICES CONSULTANT Integrated Technical Services 1073, Ruparel Iris, Senapati Bapat Marg, Matunga (W), Mumbai -400 016 Tel; 022 2421 0050 / 2438 8333. Email : mumbai@itsce.co.in Web: www.its-mep.in FOR INFO.

FOR APPRL.

FOR CO-ORDI.

FOR CONST.

CONSULTANT ARCHITECT

ELEVATION-D

5th Floor,ITTS House,Kala Ghoda,Fort ,Mumbai -400001. Website :www.ingrainarchitects.com , Board Line: +9122 66355760

DWG. NO.

SR.NO.

ING18123-WD-ST-101

R0




Competition APIC 2020 ASDC2020170

PARADIGM ON WHEELS -LEARNING BEYOND BOUNDRIES Learning can never be confined in a single it occurs at ones owns willingness and choice .In today’ scenario children learns for sake of marks rather forcefully learning which have a negative impact on children growth. it creates dependency of children towards learning new things and deprived from joy of learning. PARADIGM ON WHEELS, aims at breaking the stereotypical methods of learning by providing multipurpose and flexible spaces which can transform and allowing multiple users to cater to the same space at different time periods with the concept of play and learn and explore.


Education is the most important part of a person's life which determines the future and personality of a person. Over the years the method of teaching and learning have evolved. Education can take place in formal or informal settings and any experience that has a formative effect on the way one thinks, feels, or acts may be considered educational. Architecture reflects the type of educational systems and have been evolved over the years. From the past where people started learning in the cave till learning on digital technology. learning have always transfered through a medium from generations to generations.

Children from age 1-15 have a developming mind. whatever thought in this age reflects in their personality. The childhood gives the children the opportunity to develop compentencies, Interest and a healthy sense of confidence that they can master and control their words capture the bulk of basic compulsory education in most of the countries.

To create an interface for children to learn and explore which maximize interaction between each other and promotes knowledge sharing.

Providin a platform for underpriviledge children to learn and explore and interact with each other.

DESIGN PARAMETERS TO BE CONSIDERED:

MOBILITY

CONTEXT

MODULATION

ADAPTABILITY

PRIVACY

SUSTAINABILITY

DURABILITY


Celebrating freedom by creating activity spaces for children to play learn and explore. The spaces have the ability to be flexible and transformable as per the context and requirements

N

Mezzanine layout

1.5M

0M

3.0M

4.50M

N

Ground floor layout

0M

1.5M

3.0M

4.50M


Creating activity space by providing in between partition. It act as a buffer space as well as maintains privacy between spaces

Transforming spaces into another to generate openess within the space. The context act as a spilover to the module and hence blend with each other

Flexibility in expansion as per occupant need and context. It act as one.also providing the oppotunity of welcoming others within and creating a community space

Using levels to create activity space above. To create hierarchy in volume The module itself act as a space transformation element which enhance experience while using it


ACADEMICS SEM IX

INTER-STATE BUS TERMINAL @ THANE-MULUND OCTROI NAKA


ISBT BUSES

PROGRAM Primary

Secondary

Bus terminal

Exhibition Space

Intra-State Bus Service

Inter-State Bus Service

• • • • • • • •

Total bus capacity: 1808 buses/day Flow: Peak Hours120 buses/hr Layover time: 20 minutes Total Transit bays: 42 bays(Including 2 future commute increase bays)

MAINTENANCE & IDLE PARKING

Nashik Pune Ahmednagar Nagpur Satara Sangli Kolhapur Ratnagiri

• • • •

Indore Hyderabad Bengaluru Panjim

Idle parking bays: 8 bays Maintenance bays: 8 bays Fuelling bays: 2 bays Inspection bays :3 bays Washing bays: 3 bays

Deco-Saracenic

Structural Mood-board Along with designing an inter state bus terminal, the Vision of the project is also to provide a platform to Exhibit the artwork and to small scale business which help in cultural interactions and increase their Professional reach.

Interior : Art Deco

Structural Mood-board

Grand entrances

Cafetaria & Public Plaza

Intricacy in details and patterns

Admin

Decorative appearance

Exterior : Indo Sarcenic

Play of light and shadow

Maintainence and Bus Parking

Passenger circulation & Buffer Bus Entry Exhibition space

Bus concourese and Bus Bay

Entry Exit Bus Exit

Massing and zoning


Staff Parking

Admin Cafeteria

Admin

Ticket Counter

Section Across ticket counter

Bus Maintenance

Petrol Station

Section Across concourse

Staff Parking

Concour

Bus Entry

Cafeteria

Side elevation Highway Buffer

Reserved for Future

Staff E

ntrance

Staff P arking Bus En try y

Staff E

ntry

Exhib itio (Mov n space able)

Food Shops

Vehicu lar Entr y

21X14M

Info D

Water Fou

ntain

Exhibit

ion sp ace +0.45m

12m w

Vehicu lar Exi t

Ticket in Queu g e

ide Dri veway

Four W heeler Parkin g 12m w ide Dri veway Two W heeler Parkin g +0.45

+0.30m

9m wid Buffer

Entry

Securi ty

Ideal B u parkin s g

Toilet Bus co ncours e

Exit

Exit

Toilet

Drop /P up Po ick int

9m wid

e Drive

way

+0.45m

+/-0.0m 9m wid

e Drive

Feeder

way

+/-0.0m

+0.45m

+0.45m

Entry +0.15m

e Drive

27X54M

esk

11X15M

A sta ir fil tio lin n g

Toilet

12X9M

Service

+/-0.0m

way

+0.45m

Eastern Ex pre

ss Highway

N

+0.4 Pedestr ian Entry

m

Toilet

Workshop Office

Washing Area

14X36M

Admin

Toilet

34X36M

.15

+0

Staff Refresh Area ment

Cafeter ia +0.45m

5m

+/-0.0m

Bus driver’s Cafeteria & Dormitory

M

e Entr

Ticket in Coun g 14X9 ter

Servic

Maintenance Bays

Scale

0M

20M

40M

60M

Ground Floor Plan

Bus Exit


Drop Point

Parking Zone

Feeder Service Point

+7.00m

+/-0.00m

rse & waiting area

Bus Exit

Scale

0M

20M

40M

60M

20M

40M

60M

+4.50m

+/-0.00m Scale

Exhibition

Vehicular Entry

Vehicular Exit Parking Zone

0M

+13.65m

+/-0.00m

Scale

0M

20M

Highway Buffer

Reserved for Future

Staff E

ntrance

Bus En try Servic

e Entr

Bus driver’s Cafeteria & Dormitory

y

Cafeter ia +4.65m

+/-0.0m

Staff Refresh Area ment

Toilet

Admin Cafe Kitchen

Admin Cafeter ia +3.45 m

Toilet

14X18M

Food Shops

Genera Office l 8X15M

12X20M

9m wid

e Drive

34X36M

way

Confer Room ence

Pedestr ian Entry Vehicu lar Entr y

12m w

ide Dri veway

Vehicu lar Exi t

9m wid

e Drive

way

+/-0.0m

ide Dri veway

9m wid

e Drive

way

Eastern Ex press High way

N

12m w

Scale

0M

20M

40M

60M

First Floor Plan

Bus Exit

40M

60M


Buffer

Admin

Ticket Que

Longitudinal section across

Entrance Plaza

Front Facade


eue

Cafeteria

Exhibition

+13.65m

+/-0.00m

Scale

0M

20M

40M

Glass Fitting M.S. Framing Brick work Bund R.C.C Slab Detail at ‘P’ Single Monolithic form

Purlin M.S. Space Frame Louver Covering R.C.C Detail at ‘Q’

Tensile Fabric Roof A bold slope of roof towards concourse area form cafeteria

M.S. Space Frame Hollow M.S Column for Rainwater drainage Detail at ‘R’

Tensile Fabric Roof Sheet M.S Space Frame The slope of roof attends spatial hierarchy and differentiate experiential quality

M.S Column Detail at ‘S’

60M


Front Fa

Exhibition Space


acade

Bus Bays and Waiting area

Cafeteria


-

Thank you :)

Email: faisalmomin2101@gmail.com Phone: #9892339558 Address: Mazgaon, Mumbai Linkeden: https://www.linkedin.com/in/mohammed-faisal-momin-855016196


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.