Architecture Portfolio...
Resume
AR. MOHAMMED FAISAL MOMIN
Hello, I am Momin Mohammed Faisal ,graduate from Rizvi College of Architecture, Mumbai. Architecture design is my passion and gives me opportunity to learn and explore. I have always been a keen learner and a hard working student who tries to deliver the best performance in all cases. I have always tried to improve myself from my mistake and believe in learning from others which improved my skills. Team work and communication are my strong skills that drives my work process. I Believe that an Architecture has the ability to make a difference in the reality and transforms human emotions, I have tried to stand on these concepts for the projects that I have worked upon.
Email: faisalmomin2101@gmail.com Phone: #9892339558 Address: Mazgaon, Mumbai Linkeden: https://www.linkedin.com/in/mohammed-faisal-momin-855016196
Experience November 2019 -April 2020 • • • •
Internship done at Ingrain Architects and Associates Mumbai. Projects Worked: Residential High rise at Goregaon by Chandak Builders. Residential Project at Kalina Mumbai. Commercial Project at Andheri by Jogani Group of companies. Residential Project at Worli by Jogani Group of companies.
February 2020
Participation in Architectural competition APIC organised by Rizvi college of architecture.
October 2021
Freelance Work for lighting showroom at Dombivali, Mumbai
January 2021
Freelance work for Interior design project at Nerul, Navi Mumbai.
Competition & Workshops
•
NARI GANDHI TROPHY, NASA 2017 ( Selected in top10)
•
ANDC TROPHY, NASA 2018 ( Selected as head of the team)
•
NARI GANDHI TROPHY, NASA 2018
•
APIC design Competition organized by Rizvi college of Architecture ( Selected in top10)
•
L.B.C exposure program (Laurie Baker center, Trivandrum)
•
ICHH 2016,2017,2018 (International conference for humane habitat)
•
HOLY CROSS HIGH SCHOOL, Mumbai
•
KISHANCHAND CHELARAM COLLEGE, Mumbai
•
RIZVI COLLEGE OF ARCHITECTURE, Mumbai
•
Travel
•
Food
•
Sports
•
Graphic design & Software skills
( Selected as head of the team)
Education S.S.C
(Percentage:87.40)
H.S.C
(Percentage:82.17) Science stream
B.ARCH
(CGPI:8.61)
Skills Auto cad Photoshop Corel draw Indesign Revit Sketchup V-Ray Enscape M.S Office
Interest
Design Dissertation
sharan
-An Abode for Warriors
Over the years human civilization has faced many form of illnesses that have created a major impact on the life of people. With respect to growth and development in research and technology many have found a cure to overcome this illness. Terminal illness or end-stage disease is a disease that cannot be cured or adequately treated and is reasonably expected to result in death of the patient Like Aids, Cancers, Luke mania, Covid19, trauma etc. Now being exposed to these illness one lose hope towards living with respect to the Negative impact that is been seen or heard by the people. This Mental health act as a silent killer. There is a constant mental pressure which is developed on the minds of patients which resist treatment of it. This negatively impact the emotions,mind,loved ones & the society. Consequence of these leads to indirect imbalance between the person and the society. The dissertation explores these concepts of mental illness caused dues to illness by scoping itself to cancer and its impact. The ideology is to creating a holistic healing environment for cancer patients .The centre marks a place of refuge for cancer patients by easing out the difficulties faced by cancer patient and a point of spreading awareness for cancer.
The above abstract depicts the stable human mind which helps him to think positive direction. (Author)
The above abstract depicts the distortion in human mind due to development of uncertainties which resist it to think in positive direction. (Author)
Cancer care centre (Primary programme)
The centre act as an extention to the hopital taking care of the salutogenic (Health creation) aspects
Psychological care
Mental
Physical
Social
Rehabilitation
Cancer patients
Accessible to
Accessible to Economical aspect
Cancer patients living in the center accommodation
Treated cancer but facing financial difficulty
For patients /Relative work on the daily basis
Family member who has lost the patient and facing financial difficulty
Accommodation
Going for treatment to Cancer patients & a relative
Cancer Hospital (Tata memorial)
sharan
-An Abode for Warriors
Private space Accommodation floor 3rd -9th
Psychological care
Hospital
First floor
Semi public space
Ground floor
Public space Reserved for future expansion Rehabilitation
Zoning And Massing
TRANSISTION SPACE Zone 01
ACTIVITY SPACE
Zone 02
N
SILENT ZONE
ACTIVITY SPACE
Movement pattern for rehabilitation The Site fall under the region of Mumbai, Maharashtra. Is has a well connected transport connectivity and a good developed social infrastructure, The site is the propert of Tata group of companies, In the northern portion a 12 storeys building is under construction. This provides opportunity to of dividing the site in two zones of which zone two is the proposal for the project.
ACTIVITY AND SILENT BOTH
ROAD
10
13
7
14
6
4
5
11
8
3
1
7
9
2
+/ -0
.0 0
M
29
EX IT
EN TR Y
EX IT
EN TR Y
G.M B
R ADKE
30 17 16 15
20
22
+0 .6 0M
25
21
6
18 24
19
XP AN
BAD KER G.M
RE
SE
RV E
D
27
FO
ROA
RF
D
UT
UR
EE
28
24
SIO
N
26
24
23
24
27 1: Entrance 2: Admin 3: Service area 4: lobby 5: Waiting area 6: courtyard(open) 7: Rehabilitation workshop 8: Meeting Room 9: Store Room 10: Service Drop/Pickup/ Rehabilitation Entrance 11: Refreshment 12: lobby 13: Seminar hall 14: Store(Medical/ Kiosk) 15: Cafeteria 16: Kitchen And store 17: Service drop 18: Cafretaria spill over and green Space 19: Green Space 20: Double height amphitheatre 21: Classroom 22: Double Height Transition space 23: Water body( Artificial pond) 24: Therapy Space 25: Refreshment/ Reception 26 Spritual Space 27: Outdoor Therapy space 28: Consultation space 29: Parking 30: Hospital Building
N 0M
12M
24M
36M
GROUND FLOOR PLAN
1: Bridge Towards Hospital 2: Recreation Space 3: Refreshment 4: lobby 5: Central amenity Space 6: Cafeteria 7: Kitchen and store room 8: Courtyard 9: Cebtral Transition Space 10: Double Height Transition Space 11: Therapy Room 12: Refreshment/ Equipment Room 13: Green Roof 14: Library 15: laundary/ Medical Supply storage
8 11
13
11
13
10
14
8
12
11
16
9
8
4
5
6
4
4
7
8
2
3
1
N 0M
12M
24M
36M
FIRST FLOOR PLAN (Amenity
15 1
12
14
5
10
8
7
1
5
9
11
13
4
2
1
3
5 6 1: Lobby 2: Central Green Courtyard(Closed) 3: Nursing Station 4: Doctors cabin 5: Refreshment(Toilets) 6: Male Accommodation 7: Double Height Recreation Space 8: Amenity Area 9: First Floor central Courtyard 10: Solar panel Station 11: Female Accommodation 12: Female and Children Accommodation 13: Staff Room 14: Green Psychological block roof 15: Roof of Bridge Towards Hospital
N 0M
12M
24M
36M
ACCOMODATION FLOOR PLAN (3rd-9th Floor)
A
A
Section M-M: Cutting Across Psychological care space showing back elevation
0M
2.70M
8.10M
M.S Facia 6mm thk Bamboo mat roofing sheet Cavity acting as insulation medium
M.S planar space frame with Bracing
12 mm thk translucent glass
230 mm thk M.S stub column M.S Box framing with insulation 230 mm thk R.C.C beam
Bersped ut labor sus eiunt id quam facerna tquaectet eos perchilibus doluptibus modipiendae se pre pla sant alibus molupta doles eossed ut laborrovid erum ipiet, suntus sunt quos expedis eium dolum natis aliquiat. Itat ex eum adi volestio. Et lis ut eatusanti corectu ritatem aborrovid qui temolor molut faccat mod quo temperc hicias rem harchitinus eos ulpa vitatur? Andandu ndelibus nim facestiunt. Xeribuscia apedipicti omniaec totatur as idus, quo expe pa nobist qui cus sequam illorit occusam endione mporem facea dempe volorro remqui que occabor solore es a idit rest, con cusamus serum ipsum, ut volorro vidignatus intis eris sit por sit quis quaspienit a ex eaquas eictio dolorerum quatia ipsanto blame nis si ut aut illanda sunte plant pliquidel id modi blaudiciis ma venimintem voles ipsamus.
North light liiumance
M.S Facia overing on all sides 6mm thk Bamboo mat roofing
Heavy roof
75 x 75mm purlin M.S box purlin
12 mm thk translucent glass
M.S Box framing with insulation
Light roof
230 mm thk M.S stub column
10 mm thk M.S base plate
M.S planar space frame with Bracing 230 mm thk R.C.C beam
+/ -0 .0 0m
Rehabilitation Zone ...
S Ro tore om
ks h Se m
W or
in ar H
ks h
al
l
op
Sp
ac e
+0 .
45
m
Co ur ty a
rd
Re fre M sh al m e en tr oo m
+0 .
60
m
Re fre Fe sh ma m le en tr oo m
W or M e Ro etin om g
En tra nc e
Re ce p W tio ai n tin A g nd
Ad m
op
in
Sp a
ce
Re ha en bil tra ita nc tio e n
A
A
N
E
Rehabilitation Floor Plan
Easy loading/ unloading of goods for rehabilitation
Ex
te
rn
al
ro a
d
Green space
Connecting to themain centre Central passage connecting spaces for easy circulation
Entrance
Register
Movement pattern for rehabilitation
Changing room
Workshop space spill over the green space for transition and act as a buffer element
Workstation
Transition / buffer spaces
External view of Rehabilitation Block
Internal view of workshop area
Psychological Care Zone ....
Psychological therapies
Relation between architectural spaces and psycho
Spatial modification with respect
Section H-H Cutting Longitudinal section over entire site
O.H.T +35.75
Accommodation
+32.75m 9th floor +31.35 8th floor +28.20m
Terrace
7th floor +25.05m
Female
accommodation
6th floor +21.90m
Passage
Female
5th floor +18.75m
4th floor +15.60m
accommodation
Passage
Female
Passage
accommodation
Passage
3rd floor +12.45m
Psychological Care Double Height amenity space
2st floor +9.30m
Passage
Ce
Spiral Staircase 1st floor +4.30
Plinth level +0.6m Pond level -1.8m
Passage Courtyard Passage
Spiritual Space Pond
S
Architectural
Spaces
ological therapy can be explored for spatial experience
H
H
t o therapy incorporation
Staircase
Passage
Passage
Passage
Passage
Passage
entral Amenity Courtyard
Seminar hall
Rehabilitation Passage
G.M BADKER ROAD
Courtyard Passage
Workshop area
Internal Road
0M
2.50M
5.00M
7.50M
.6 0
u Tr ble an H Sp siti eig ac on ht e
+0
Do
Therapy space -1 Pon .8 d 0m
Therapy space
Sp sp iritu ac al e
Green Space
Th O er utd ap o y S or pa ce
m
D
Reception and toilet
Therapy space
Consultation room
Th O er utd ap o y S or pa ce G re en +0 S .0 pa 0m ce
D
Therapy space
Spiritual space placed near water body edge creating a veiw towards pond
N Psychological care First Floor Plan
0M
4.5M
9.0M
13.5M
Plants Growing medium(soil) Sand layer Geotextile fabric layer polyethylene drainage mesh 30 mm pavers as water proof layer 19 mm sand layer
Double height undrground spiritual space generating view underwater and creating experiential space
Bituminous water proof membrane Translucent skylight
10 mm sand layer
Green Roof edge detail
150 mm R.C.C Slab
Aggregate layer
Sand layer Stairs leading down
Pebble
Towards Muncipal drain or Rainwater harvesting tank
150 mm thk Brick bund wall with openeings
Generating interanal natural light luminance with placing sky light towards sun light
Bio step water filteration bed
Green Roof +9.30m
Therapy Space
Equipment Room
Info desk +4.30m
Therapy Space Outdoor Therapy Space
Reception/ Registration
Double Height Transition space
+/-0.00m
Section E-E From therpy space and double height transition space
0M
1.0M
2.0M
3.0M
View of water body towards over looking balcony
View of water body towards spiritual space
External view of therapy space and outdoor therapy space.
Accommodation Block ....
Double Height space for courtyard ventilation
Rigid mass of accommodation block
Articulation blo hierarchy and ac spa
Section K-K: Cutting Across the courtyards within the accommodation block O.H.T +35.75 +34.75m
+32.75m Terrace
9th floor +31.35
Terrace
Accommodation Passage
8th floor +28.20m
Nursing station
Passage
Accommodation 7th floor +25.05m
Passage
6th floor +21.90m
Passage
Passage
Passage
Double Height recreation space
5th floor +18.75m
Passage
Passage
Passage
Passage
Accommodation 4th floor +15.60m Accommodation Passage
Passage
3rd floor +12.45m
Nursing station
Nursing station
Nursing station
Nursing station
Nursing station
Central Courtyard
Accommodation Passage
Passage
Nursing station
2st floor +9.30m Cooking Area Storage
Cafeteria
Passage
Central Courtyard
Passage
Seminar Hall
1st floor +4.30 Cooking Area Storage Plinth level +0.6m
Cafeteria
Shop
Male block
Central closed courtyard
Female Block Female And Children block
Space allocation for accommodation as per age and gender
ock with volume ccessible green ace
K
K
Terrace
Amenity area
Amenity area
Amenity area
Passage
Passage
Accommodation
Accommodation
Passage Accommodation
Electronic Library Library
Passage
Classroom Reserved For Future Expansion
0M
2.50M
5.00M
7.50M
View from start of bridge from care centre towards hospital
View of central court of amenity space
View of terrace farming
2.
40
m
wi
de
pa
ss
e
lo bb y
N ur at sing io n st D o ca ct o bi rs n
40
m
wi
de
pa
ss
ag
e
Providing communal spaces/amenity spaces for increasing interaction
St a
F co loor ur A +4 tyar me d nit .3 y 0
2. 40
Central courtyard for buffer space and circulation
w
pa
4
2.
D ou re ble cr h ea ei tio gh n t
lo bb
y
Fi rs t
Fe m al Ro e a om cco m
e
id
0m
e
ag
ss
m
ff Ro om
ss pa wi de
G
St ro ore om
ag
e
re en co +9 ur ty .3 ar 0 d
M
2.
lo bb y
ag e pa ss wi de 2. 40
m
al e Ro ac om com
ag
Room
m
wi de
pa
ss
ag
Am
Room Passage
e
en ity
Solar panel +8.40
Room
Room
ac
+9
.3
0
Fe m co chi ale m ldr an m en d od at io n
2. 40
Courtyard
N
Toilet Block
3rd floor Accommodation Plan
Accessible Terrace
0M
1.5M
3.0M
Indulging community Activity
External view for all the room for natural light and ventilation 4.50M
Step towards self sustenance
Terrace farming pods
Accessible Terrace
Terrace act as an important space that has potential for increasing the utility
Providing terrace a communal function to indulge participation and increase usability of space
12 mm memb
12 mm thk translucent double glass member with air cavity
M.S roo
M.S Ra
M.S Bo
M.S Bo
Facia c M.S Horizontal member
framing
230 m
8mm th
10 mm M.S Rafter member
as
a
stiffner
100 mm
230 mm
Pitched Roof Edge detail Principal heap beam and rafter connection R.C.C Coloumn
M.
Alu ga
M.S Box Channel periphery beam
12 me
as
Ca
R.C.C coloumn 230 mm thk R.C.C Beam
230 mm Coloumn
Thk
M.S
12 me
Stub
M.
M.
Exploded pitched roof detail
External Facade view of Accommodation Block
Pitched Roof ridge/ hip detail
.0
+4 .3 0m
0m
m thk translucent glass ber +/ -0
of rafter member
after and M.S box channel fixing member +3 .6 0m
ox Channel as periphery beam
ox channel window frame
Pi tc +3 hed 4. ro 75 o m f
T +3 err 2. ace 75 m
mm Thk M.S Stub Coloumn
+0 .1 5m
covering entire length
Pi tc h +3 ed 1. ro 35 of
hk R.C.C glass louvre
m thk base plate
Re c
re a +2 tion 5. 05 ter m rac e
+8 .4 0m
mB.B.C layer protection
Te r
ra ce F +1 arm 8. 75 ing m
m thk R.C.C Slab
0m
.3
+9
0m
-1
.8
0m
.S Ridge and rafter cap detail
+/
-0
.0
uminium glass frame with asket closure
2 mm thk translucent glass ember
avity as insulation
2 mm thk translucent glass ember
N
.S roof rafter member
450
2100
600
.S Hip Beam
0M
1.5M
3.0M
4.50M
Roof plan for the complex Aluminium Frame sliding window frame
150 mm thk R.C.C Slab
Bio filter substrate
150 mm thk R.C.C Cill
150 mm thk R.C.C flower bed projection
150 mm thk R.C.C Slab
Aluminium Frame sliding window frame
Planter
100 mm thk P.C.C projection Growing medium / soil
Aluminium fixed glass frame 150 mm thk window cill with granite finish
Sand and gravel mix layer
150 mm thk R.C.C Slab
150 mm thk R.C.C Chajja Excess water drain
Accommodation Window detail
Chajja detail
“Above all, what matters is not to loose the joy
sharan
y of living in the fear of dying”
-Maggie keswick jeneck
-An Abode for Warriors
Internship
@ Ingrain Architects
Project Type:Residential Highrise
Project By :Chandak Group @ Goregaon West
Pic Credit: Chandak Group
TYPICAL FLOOR PLAN
TOWER –A
FACADE DESIGN.... TERRACE +221.22 LVL.
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
34rd FLOOR +218.27 M LVL.
33rd FLOOR +215.32 M LVL.
DN
UP
UP
Key Features • 4 Apartments per floor - 2 Flats of 2 BHK - 2 Flats of 3 BHK • 4 Lifts per floor. • 2 Staircase • 2 BHK have Jodi Possibility • 3 BHK units are designed with TO WER Darshan living concept giving a great view
DN
32ND FLOOR +212.37 M LVL.
31ST FLOOR +209.42 M LVL.
30TH FL REFUGE +206.47 M LVL.
29TH FLOOR +203.52 M LVL.
TYPICAL FLOOR PLAN
28TH FLOOR +200.57 M LVL.
W4
–B
N
27TH FLOOR +197.62 M LVL.
0M
1.5M
3.0M
26TH FLOOR +194.67 M LVL.
4.50M
Tower A floor plan
25TH FLOOR +191.72 M LVL.
24TH FLOOR +188.77 M LVL.
23RD FL REFUGE +185.82 M LVL.
Floor plans are generated on design principles such as minimizing negative spaces and maximizing openness and views. Key Features • 14 Apartments per floor - 11 flats of 1 BHK - 2 flats of compact 2 BHK - 1 flat of 2 BHK • 8 Lifts per floor with 2 fire staircase • Well segregated lobbies • All 1bhk flat have vastu orientated east west entry TOWER –C • 1bhk garden facing flats have Jodi possibility W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
W4
W13
W16
W14
W14
22ND FLOOR +182.87 M LVL.
21ST FLOOR +179.92 M LVL.
20TH FLOOR +176.97 M LVL.
19TH FLOOR +174.02 M LVL.
18TH FLOOR +171.07 M LVL.
17TH FLOOR +168.12 M LVL.
16TH FLOOR REFUGE +165.17 M LVL.
15TH FLOOR +162.22 M LVL.
N
0M
14TH FLOOR +159.27 M LVL.
T 1.5M Y P I3.0M CAL FLOOR PLAN
13TH FLOOR +156.32 M LVL.
4.50M
Tower B floor plan
12TH FLOOR +153.37 M LVL.
11TH FLOOR +150.42 M LVL.
10TH FLOOR +147.47 M LVL.
9TH FLOOR REFUGE +144.52 M LVL.
UP DN
8TH FLOOR +141.57 LVL.
UP DN
Key Features • 8 Apartments per floor - 4 Flats of 1 BHK - 4 Flats of 2 BHK • 5 Lifts per floor. • 2 Staircase 7TH FLOOR +138.62 M LVL.
6TH FLOOR +135.67 M LVL.
5TH FLOOR +132.72 M LVL.
4TH FLOOR +129.77 M LVL.
3RD FLOOR +126.82 M LVL.
2ND FL REFUGE +123.87 M LVL.
N 1ST FLOOR +120.92 M LVL.
0M
1.5M
3.0M
4.50M
ECO-DECK LEVEL +117.92 M LVL.
Tower C floor plan PODIUM 2
A N
Key Plan
PODIUM 1
B
C
110.82 M LVL.
106.52 M LVL.
D GROUND LVL +102.07 LVL
STILT FLR
+102.22 M LVL.
Tower C F
TERRACE +221.22 LVL. W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W16
W13
W4
W4
W13
W16
W14
W14
W16
W13
W4
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
34rd FLOOR +218.27 M LVL.
33rd FLOOR +215.32 M LVL.
32ND FLOOR +212.37 M LVL.
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
31ST FLOOR +209.42 M LVL.
30TH FL REFUGE +206.47 M LVL.
29TH FLOOR +203.52 M LVL.
28TH FLOOR +200.57 M LVL.
27TH FLOOR +197.62 M LVL.
26TH FLOOR +194.67 M LVL.
25TH FLOOR +191.72 M LVL.
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
24TH FLOOR +188.77 M LVL.
23RD FL REFUGE +185.82 M LVL.
22ND FLOOR +182.87 M LVL.
21ST FLOOR +179.92 M LVL.
20TH FLOOR +176.97 M LVL.
19TH FLOOR +174.02 M LVL.
18TH FLOOR +171.07 M LVL.
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
17TH FLOOR +168.12 M LVL.
16TH FLOOR REFUGE +165.17 M LVL.
15TH FLOOR +162.22 M LVL.
14TH FLOOR +159.27 M LVL.
13TH FLOOR +156.32 M LVL.
12TH FLOOR +153.37 M LVL.
11TH FLOOR +150.42 M LVL.
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
10TH FLOOR +147.47 M LVL.
9TH FLOOR REFUGE +144.52 M LVL.
8TH FLOOR +141.57 LVL.
7TH FLOOR +138.62 M LVL.
6TH FLOOR +135.67 M LVL.
5TH FLOOR +132.72 M LVL.
4TH FLOOR +129.77 M LVL.
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W2
W1
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
W3
W4
W4
W4
W4
W3
W1
W2
3RD FLOOR +126.82 M LVL.
2ND FL REFUGE +123.87 M LVL.
Front Elevation
W2
W1
1ST FLOOR +120.92 M LVL.
ECO-DECK LEVEL +117.92 M LVL.
PODIUM 2
PODIUM 1
GROUND LVL +102.07 LVL
STILT FLR
110.82 M LVL.
106.52 M LVL.
GROUN +102.0
+102.22 M LVL.
Tower A Front Elevation
0M
1.5M
3.0M
4.50M
TECHNICAL DRAWING....
Parking Tower B Longitudinal section
Parking Tower C Longitudinal section
2950
2950
2950
2950
2950
2950
2950
2950
2950
2950
10TH FLOOR +147.47 M LVL.
2950
2950
2950
2950
2950
2950
2950
2950
3000
3000
8TH FLOOR +141.57 LVL.
8TH FLOOR +141.57 LVL.
7TH FLOOR +138.62 M LVL.
7TH FLOOR +138.62 M LVL.
6TH FLOOR +135.67 M LVL.
6TH FLOOR +135.67 M LVL.
5TH FLOOR +132.72 M LVL.
5TH FLOOR +132.72 M LVL.
4TH FLOOR +129.77 M LVL.
4TH FLOOR +129.77 M LVL.
2ND FL +123.87 M LVL.
2ND FL +123.87 M LVL.
1ST FLOOR +120.92 M LVL.
1ST FLOOR +120.92 M LVL.
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIVING
LIVING
2.00M WIDE LOBBY
2.00M WIDE LOBBY
2.00M WIDE LOBBY
2.00M WIDE LOBBY
2.00M WIDE LOBBY
LIFTSHAFT 2.00M WIDE LOBBY
AMENITY
AMENITY
7100
7100
PODIUM 2
LIFTSHAFT
4300
4300
PODIUM 1
2.00M WIDE LOBBY
2.00M WIDE LOBBY
2.00M WIDE LOBBY
2.00M WIDE LOBBY
4300
106.52 M LVL. 106.52 M LVL.
STILT FLR GROUND LVL +102.22 +102.07 LVL
STILT FLR
M LVL.+102.22 M LVL.
4200
4300
LIVING
ECO-DECK LEVEL +117.92 M LVL.
110.82 M LVL. 110.82 M LVL.
PODIUM 1
4200
LIVING
3RD FLOOR REFUGE 3RD FLOOR REFUGE +126.82 M LVL. +126.82 M LVL.
PODIUM 2
PIT LVL +102.07 LVL
LIVING
9TH FLOOR REFUGE 9TH FLOOR REFUGE +144.52 M LVL. +144.52 M LVL.
ECO-DECK LEVEL +117.92 M LVL.
GROUND LVL +102.07 LVL
10TH FLOOR +147.47 M LVL.
PIT LVL +102.07 LVL
Parking Tower A Cross section
GROUND LVL +102.07 LVL
GROUND LVL +102.07 LVL
COMMON TOILET SLAB SUNK BY 150 MM
2M +2.6
(TS)
1200
300
1200 305
TRAVETINE CLASSIC 1200X1200TILE
300
6 MM TILE LINE
1080
WALL HUNG W.C AS PER APPROVED
300
400
150 mm THK LEDGE WALL
WASH BASIN OF APPROVED QUALITY
780
800
WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE
250 250
(TS)
100 MM WALL TRAVETINE CLASSIC 600X1200TILE
2950
100 MM WALL
305
BAL bal 900 600
15 MM PLASTER LINE
(TS)
V
1200
2950
1200
BAL
15 MM PLASTER LINE
2950
1200
SLAB
2M +2.6
300
SLAB SUNK BY 150 MM
600X600 BOSTON MATT TILE AS PER APPROVED
600X600 BOSTONE MATT TILE AS PER APPROVED
SLAB SUNK BY 150 MM
SLAB SUNK BY 150 MM
ELEVATION-A
SLAB
ELEVATION-B
ELE
1070 235
395
600
(TS)
600
150
625
NA
WALL MIXER AS / APPROVED SAMPLE
DUCT
-6mm 625
600
W A
SUNK 150 MM.
W.C. AS/APPROVED SAMPLE
600
BAL
625
-6mm
19 MM THK INDIAN MARBLE FRAME AS/ SPECIFICATION
600
DUCT
SUNK 150 MM.
675
WASH BASIN AS / APPROVED QUALITY
610
615
625
675
1070
150
600
PLAN COMMON TOILET
600(TS)
600
19 FR
W
BAL
W A
PLAN MASTER TOILET
MASTER TOILET SLAB SUNK BY 150 MM
SLAB SUNK BY 150 MM 2M +2.6
2M +2.6
15 MM PLASTER LINE
15 MM PLASTER LINE (TS)
100 MM WALL TRAVETINE CLASSIC 600X600TILE
300
SLAB SUNK BY 150 MM
ELEVATION-A
600
6 MM TILE LINE 150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED
780
BAL
250 250
900
600
WALL HUNG W.C AS PER APPROVED
BAL
1200
400
1200 600
2950
600
350
1200 1200
600
V 2950
600
600
600
(TS)
100 MM WALL TRAVETINE CLASSIC 600X1200TILE WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE 150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED
SLAB SUNK BY 150 MM
ELEVATION-B
EL
ADVANCE COPY SLAB SUNK BY 150 MM
B SUNK BY 150 MM
2M +2.6
2M +2.6
1200
15 MM PLASTER LINE
15 MM PLASTER LINE
(TS)
2950
2950
1200
1200
100 MM WALL
NOTES 100 MM WALL
615
755
TRAVETINE CLASSIC 1200X1200TILE
TRAVETINE CLASSIC 1200X1200TILE
1080
BAL
WASH BASIN OF APPROVED QUALITY 6 MM TILE LINE
6 MM TILE LINE
-6mm
600X600 BOSTON MATT TILE AS PER APPROVED
SLAB SUNK BY 150 MM
B SUNK BY 150 MM
EVATION-C
WALL HUNG W.C AS PER APPROVED
400
150 mm THK LEDGE WALL 600X600 BOSTON MATT TILE AS PER APPROVED
1. ALL DIMENSIONS ARE IN MILIMETERS UNLESS OTHERWISE SPECIFIED. 2. DRAWING MUST BE READ IN CONJUNCTION WITH STRUCTURAL DRAWINGS. 3. THE SIZES OF ALL THE STRUCTURAL MEMBERS TO BE REFERED FROM DRAWINGS OF STRUCTURAL CONSULTANT. 4. DRAWING NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 5. CONTRACTOR TO STUDY DRAWING & REVERT BACK IN CASE OF ANY DISCREPANCIES BEFORE EXECUTION. 6. ALL CENTRE LINE DIMENSIONS ARE WITH REFERENCE TO (0,0). 7. THE LEVELS SPECIFIED IN ALL THE DRAWINGS ARE UNFINISHED FLOOR LEVELS UNLESS OTHERWISE SPECIFIED. 8. ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED SURFACES UNLESS OTHERWISE SPECIFIED.
ELEVATION-D 15 MM THK CEMENT MORTOR 2MM THK EPOXY GROUTING 32MM X 32MM X 125 (HEAVY) SS HINGES 35MMX25MM TEAKWOOD FRAMING AT ENDS 35MM THK FLUSH DOOR 1.5MM THK LAMINATE ON BOTH SIDES
(INSIDE)
(OUTSIDE)
50MM LONG SCREW WITH PVC PLUG 19MM THK GRANITE CHAMFERED AT OUTER EDGE
DETAIL A
5MMX5MM GROVE
WASH BASIN AS / APPROVED QUALITY
SCALE 1:15
15 MM THK GYPSUM PLASTER PUNNING
AHANI TRAP (A.P.A)
100 MM THK INTERNAL WALL
9 MM THK INDIAN MARBLE RAME AS/ SPECIFICATION
6 MM THK DADO TILE
OVEN
W.C. AS/APPROVED SAMPLE
WALL MIXER AS / APPROVED SAMPLE
15 MM THK CEMENT MORTOR 2MM THK EPOXY GROUTING
AQUA
35MMX25MM TEAKWOOD FRAMING AT ENDS 35MM THK FLUSH DOOR
MIXER
1.5MM THK LAMINATE ON BOTH SIDES (INSIDE)
GODREJ CYLINDRICAL KEYLESS LOCK
(OUTSIDE)
RF
1MM THK ARALDITE GLUE 19MM THK GRANITE CHAMFERED AT OUTER EDGE
DETAIL B SCALE 1:15
5MMX5MM GROVE 15 MM THK GYPSUM PLASTER PUNNING
SLAB SUNK BY 150 MM
SLAB SUNK BY 150 MM
2M +2.6
2M +2.6
600 2950
WASH BASIN OF APPROVED QUALITY
SLAB SUNK BY 150 MM
LEVATION-C
100 MM WALL TRAVETINE CLASSIC 600X600TILE
NORTH
SCALE
DATE 13/03/2020
1 : 50 CLIENT :-
DRN. BY
CHKD. BY
13/03/2020 13/03/2020 13/03/2020 SHAILESH
ISSUE
TAHER
13/03/2020
Chandak Group Chandak Group
6 MM TILE LINE WALL HUNG W.C AS PER APPROVED
400
DONE BY
MASTER & COMMAN TOILET DETAIL
150 MM WALL
6 MM TILE LINE
600X600 BOSTON MATT TILE AS PER APPROVED
460
600
600 600
1200
TRAVETINE CLASSIC 600X1200TILE 150 mm THK LEDGE WALL
450 600
460
DESCRIPTION
DRAWING TITLE
STRUCTURAL CONSULTANT PUNE OFFICE
LLP IDENTITY NO.: AAA-2650 PARTNERSHIP WITH LIMITED LIABILITY
SAI RADHE,OFFICE NO 201,2ND FL.,100 KENNEDY ROAD, BEHIND HOTEL LE MERIDIEN, PUNE 411001 Tel.
6 MM TILE DROP
BAL
600
15 MM PLASTER LINE
bal
2950
15 MM PLASTER LINE
(TS)
100 MM WALL
DATE
Porposed Residential Project for Chandak Group at Teen Dongri, Goregaon, Mumbai
EQ
EQ
BAL
(TS)
NO.
PROJECT NAME
SLAB SUNK BY 150 MM
600X600 BOSTONE MATT TILE AS PER APPROVED
FAX: +91 20 66449299
314, 3RD FLOOR, PRABHADEVI INDUSTRIAL ESTATE, VEER SAVARKAR MARG, PRABHADEVI, MUMBAI-400025
www.jwconsultants.in design@jwconsultants.in
-6mm
+91 20 66449100
MUMBAI OFFICE Formerly Y S Sane Associates
JW CONSULTANTS LLP
Tel. +91 22 66322845/46 FAX: +91 22 66322850
SERVICES CONSULTANT Integrated Technical Services 1073, Ruparel Iris, Senapati Bapat Marg, Matunga (W), Mumbai -400 016 Tel; 022 2421 0050 / 2438 8333. Email : mumbai@itsce.co.in Web: www.its-mep.in FOR INFO.
FOR APPRL.
FOR CO-ORDI.
FOR CONST.
CONSULTANT ARCHITECT
ELEVATION-D
5th Floor,ITTS House,Kala Ghoda,Fort ,Mumbai -400001. Website :www.ingrainarchitects.com , Board Line: +9122 66355760
DWG. NO.
SR.NO.
ING18123-WD-ST-101
R0
Competition APIC 2020 ASDC2020170
PARADIGM ON WHEELS -LEARNING BEYOND BOUNDRIES Learning can never be confined in a single it occurs at ones owns willingness and choice .In today’ scenario children learns for sake of marks rather forcefully learning which have a negative impact on children growth. it creates dependency of children towards learning new things and deprived from joy of learning. PARADIGM ON WHEELS, aims at breaking the stereotypical methods of learning by providing multipurpose and flexible spaces which can transform and allowing multiple users to cater to the same space at different time periods with the concept of play and learn and explore.
Education is the most important part of a person's life which determines the future and personality of a person. Over the years the method of teaching and learning have evolved. Education can take place in formal or informal settings and any experience that has a formative effect on the way one thinks, feels, or acts may be considered educational. Architecture reflects the type of educational systems and have been evolved over the years. From the past where people started learning in the cave till learning on digital technology. learning have always transfered through a medium from generations to generations.
Children from age 1-15 have a developming mind. whatever thought in this age reflects in their personality. The childhood gives the children the opportunity to develop compentencies, Interest and a healthy sense of confidence that they can master and control their words capture the bulk of basic compulsory education in most of the countries.
To create an interface for children to learn and explore which maximize interaction between each other and promotes knowledge sharing.
Providin a platform for underpriviledge children to learn and explore and interact with each other.
DESIGN PARAMETERS TO BE CONSIDERED:
MOBILITY
CONTEXT
MODULATION
ADAPTABILITY
PRIVACY
SUSTAINABILITY
DURABILITY
Celebrating freedom by creating activity spaces for children to play learn and explore. The spaces have the ability to be flexible and transformable as per the context and requirements
N
Mezzanine layout
1.5M
0M
3.0M
4.50M
N
Ground floor layout
0M
1.5M
3.0M
4.50M
Creating activity space by providing in between partition. It act as a buffer space as well as maintains privacy between spaces
Transforming spaces into another to generate openess within the space. The context act as a spilover to the module and hence blend with each other
Flexibility in expansion as per occupant need and context. It act as one.also providing the oppotunity of welcoming others within and creating a community space
Using levels to create activity space above. To create hierarchy in volume The module itself act as a space transformation element which enhance experience while using it
ACADEMICS SEM IX
INTER-STATE BUS TERMINAL @ THANE-MULUND OCTROI NAKA
ISBT BUSES
PROGRAM Primary
Secondary
Bus terminal
Exhibition Space
Intra-State Bus Service
Inter-State Bus Service
• • • • • • • •
Total bus capacity: 1808 buses/day Flow: Peak Hours120 buses/hr Layover time: 20 minutes Total Transit bays: 42 bays(Including 2 future commute increase bays)
MAINTENANCE & IDLE PARKING
Nashik Pune Ahmednagar Nagpur Satara Sangli Kolhapur Ratnagiri
• • • •
Indore Hyderabad Bengaluru Panjim
Idle parking bays: 8 bays Maintenance bays: 8 bays Fuelling bays: 2 bays Inspection bays :3 bays Washing bays: 3 bays
Deco-Saracenic
Structural Mood-board Along with designing an inter state bus terminal, the Vision of the project is also to provide a platform to Exhibit the artwork and to small scale business which help in cultural interactions and increase their Professional reach.
Interior : Art Deco
Structural Mood-board
Grand entrances
Cafetaria & Public Plaza
Intricacy in details and patterns
Admin
Decorative appearance
Exterior : Indo Sarcenic
Play of light and shadow
Maintainence and Bus Parking
Passenger circulation & Buffer Bus Entry Exhibition space
Bus concourese and Bus Bay
Entry Exit Bus Exit
Massing and zoning
Staff Parking
Admin Cafeteria
Admin
Ticket Counter
Section Across ticket counter
Bus Maintenance
Petrol Station
Section Across concourse
Staff Parking
Concour
Bus Entry
Cafeteria
Side elevation Highway Buffer
Reserved for Future
Staff E
ntrance
Staff P arking Bus En try y
Staff E
ntry
Exhib itio (Mov n space able)
Food Shops
Vehicu lar Entr y
21X14M
Info D
Water Fou
ntain
Exhibit
ion sp ace +0.45m
12m w
Vehicu lar Exi t
Ticket in Queu g e
ide Dri veway
Four W heeler Parkin g 12m w ide Dri veway Two W heeler Parkin g +0.45
+0.30m
9m wid Buffer
Entry
Securi ty
Ideal B u parkin s g
Toilet Bus co ncours e
Exit
Exit
Toilet
Drop /P up Po ick int
9m wid
e Drive
way
+0.45m
+/-0.0m 9m wid
e Drive
Feeder
way
+/-0.0m
+0.45m
+0.45m
Entry +0.15m
e Drive
27X54M
esk
11X15M
A sta ir fil tio lin n g
Toilet
12X9M
Service
+/-0.0m
way
+0.45m
Eastern Ex pre
ss Highway
N
+0.4 Pedestr ian Entry
m
Toilet
Workshop Office
Washing Area
14X36M
Admin
Toilet
34X36M
.15
+0
Staff Refresh Area ment
Cafeter ia +0.45m
5m
+/-0.0m
Bus driver’s Cafeteria & Dormitory
M
e Entr
Ticket in Coun g 14X9 ter
Servic
Maintenance Bays
Scale
0M
20M
40M
60M
Ground Floor Plan
Bus Exit
Drop Point
Parking Zone
Feeder Service Point
+7.00m
+/-0.00m
rse & waiting area
Bus Exit
Scale
0M
20M
40M
60M
20M
40M
60M
+4.50m
+/-0.00m Scale
Exhibition
Vehicular Entry
Vehicular Exit Parking Zone
0M
+13.65m
+/-0.00m
Scale
0M
20M
Highway Buffer
Reserved for Future
Staff E
ntrance
Bus En try Servic
e Entr
Bus driver’s Cafeteria & Dormitory
y
Cafeter ia +4.65m
+/-0.0m
Staff Refresh Area ment
Toilet
Admin Cafe Kitchen
Admin Cafeter ia +3.45 m
Toilet
14X18M
Food Shops
Genera Office l 8X15M
12X20M
9m wid
e Drive
34X36M
way
Confer Room ence
Pedestr ian Entry Vehicu lar Entr y
12m w
ide Dri veway
Vehicu lar Exi t
9m wid
e Drive
way
+/-0.0m
ide Dri veway
9m wid
e Drive
way
Eastern Ex press High way
N
12m w
Scale
0M
20M
40M
60M
First Floor Plan
Bus Exit
40M
60M
Buffer
Admin
Ticket Que
Longitudinal section across
Entrance Plaza
Front Facade
eue
Cafeteria
Exhibition
+13.65m
+/-0.00m
Scale
0M
20M
40M
Glass Fitting M.S. Framing Brick work Bund R.C.C Slab Detail at ‘P’ Single Monolithic form
Purlin M.S. Space Frame Louver Covering R.C.C Detail at ‘Q’
Tensile Fabric Roof A bold slope of roof towards concourse area form cafeteria
M.S. Space Frame Hollow M.S Column for Rainwater drainage Detail at ‘R’
Tensile Fabric Roof Sheet M.S Space Frame The slope of roof attends spatial hierarchy and differentiate experiential quality
M.S Column Detail at ‘S’
60M
Front Fa
Exhibition Space
acade
Bus Bays and Waiting area
Cafeteria
-
Thank you :)
Email: faisalmomin2101@gmail.com Phone: #9892339558 Address: Mazgaon, Mumbai Linkeden: https://www.linkedin.com/in/mohammed-faisal-momin-855016196