PORTFOLIO
MONA BOUZARDA
Lightslots I Beams
C
A
D
B C
A
B
A
A D
A
E
B
D D
E
C
C
Lozenge Truss
D
E
Arc Structure from rammed Concrete
C
D
A
E
Concrete Cast around one Arc
1,25
1,25 2,5
19
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
1,25
1,25 2,5
Perspective Concrete Casting
_INHABITED BRIDGE / LINEAR PARK
_HOUSING ALONG RIO SECO CLIFF
_WINE HOTEL CARCAVELOS BEACH
_EXPERIMENTAL ELABORATION OF HUMAN SPACE
Section 1/200
09
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
NW View onto Deck
09
LINEAR PARK CABO RUIVO/INHABITED BRIDGE I MASTER THESIS I FAU LISBOA I PROF.NUNO MATEUS (ARX ARQUITECTOS) I 2017/18 The project consolidates the formation of the area of Olivais, in the north eastern part of Lisbon. It deals with the requalification of the obsolete industrial areas in the city of Lisbon due to the course of urban expansion planning and zoning. The aim is to revitalize, restructure and repair the urban mesh by restiching the separated territory. By first understanding the evolution of the urban context the focus later on is put on the industrial areas of Lisbon Ě s eastern zone. This infrastructural conquering was essential for industrial settlements mainly starting in the 1940s, transforming the neighbourhood of Olivais immensely followed by further big scale planed urban interventions, infrastructure as well as habitation. This big scale urban operations lack a linking member at a human scale and a sense for the origin of the area of Olivais (olive groves). An intervention through greenery and accessible infrastructure allows a regeneration. The place of intervention is a linear void next to the train tracks entailed by their cut through the area from Oriente to Braco de Prata, it stands out in its unemployment. The presence of verdant areas in the city is presented as connective utilities and public space. The implantation of interlocked functions and open knowledge networks contributes to the urban linking. The stimulation of all generations is an essential factor to revive the obsolete city parts. The research on connecting infrastructural platforms crystallize out the typology of the inhabited bridge and the programm of intergenerational learning. The topic of rethinking abandoned industrial spaces in Lisbon was given by the Project VI class ( 2016/17) of FAUL.
_PARK ACCOMPANYING THE TRAIN LINE BETWEEN BRACO DE PRATA AND ORIENTE
_INDUSTRIAL SETTLEMENTS ALONG INFRASTRUCTURE NETWORKS _ROADNETWORK _TRAINLINE _WATERWAY
_WATERLINES _PARKS /LISBOA
Final Master´s Project
strelitzia reginae Mona Bouzarda 20161358
agave ellemeetiana
Prof. Nuno Mateus
yucca gloriosa
persea americana
citrus limon
eucalyptus citriodora
punica granatum
passiflora
02
RELINKING PARA-SITE Linear Park Cabo Ruivo
Infrastructure Linear Park
1/1000
abandoned Factories 1/2000
05
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
unemployed Industries Olivais
1/1000
05
Portline Maritime Transport Sintimex Import Export
CIN
Gunnebo
Pedrogal Garagem, Oficinas, Armazem
Prosegur Kone Elevadores Janz Contadores de Energia
Centrum Fomento Tecnico Industrial Xerox
Fabrica de Parafusos
Sacor Sumos e Frutos S.A.R.L.
Canteen
Light Film Service
Fabrica do Gas Matinha
Jardim Cabeco das Rolas
_LINEAR PARK /CABO RUIVO _RECONNECTING PEDESTRIAN BRIDGES ABOVE
aloe arborescenas
02
Section 1/200
1/1000
09 _PROPOSAL OF AN INHABITED BRIDGE ON ABANDONED REFINERY PLANT DOCKING ONTO THE OLD FIRM CANTEEN
1.
2.
3.
4.
2.
1.
Community Centers 1. Café I Reading I Knitting etc. 2. Workshop I Bicycle Repair 3. Multi-Media Space 4. Physical Movement
4.
Floor Plans
3.
Roof Plant Rods
Roof Plans
Deck Lightholes
Longitudinal Sections
Front Elevations
Side Elevations
Transversal Sections
Slabs 0.2 x 0.3 Beams I Lightslots 0.4 x 0.3
Perspectives
12
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
Learning Centers
1/200
_COMMUNITY CENTRES UNDER WALKEABLE ROOFS 1/200
Workshops Ramp Accesses
Canteen
Arc Structure
_VIEW UNDERNEATH TRUSS AND LIGHTSLOTS 13 I 14
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
Layers of Structure
15
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
View underneath Truss and Lightslots
_CEILING-SCAPE 1/200
+12.1
+7.7
+7.0
+3.9
+3.5
+/-0.0
_CEILING I SECTION 1/50
+12.1
+10.0
+8.9
+7.7
+7.0
+5.1
+3.9
+3.5
_SECTION PERSPECTIVE I ENTRANCE LOWER LEVEL +/-0.0
17
_DECK I ELEVATION 1/50
1
2%
2
1 Accessible Roof Deck
2 Glas Facade
5 Deck Outside
Floor Lamp d 100mm Concrete Paving (C30) 60mm Drainage Layer rounded Gravel 40mm Fleece Sheet Layer Waterproofing Bitumen Layer 20mm XPS thermal and sound Insulation 80cm Vapour Barrier Bitumen 10mm PE-Foil Leveling Layer Lean Concrete min. 2% Roof Pitch 30-60mm Loadbearing (exposed reinforced) Concrete Ceiling 300mm
Folding Glas Door Aluminium, Solarlux 67mm
Concrete Paving (C30) 70mm Fleece Sheet Layer Drainage Layer rounded Gravel 50mm Fleece Sheet Layer Waterproofing Bitumen Layer 20mm Loadbearing reinforced Concrete 300mm lowest Layer: partly pigmented Concrete poured in marbleizing
3 Columns Loadbearing exposed reinforced Concrete d 300mm
4 Flooring Inside Polished Screed 50mm with Floor Heating Tubes d 20mm Separating PE-Foil Thermal and sound Insulation 50mm Waterproofing Bitumen Layer 20mm Loadbearing reinforced Concrete Ceiling 300mm
3
5
4
3
2
21
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
Detail Section Elevation
22
1/20
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
_DETAIL SECTION I ELEVATION 1/20
Detail Center upper Level
1/5
_DETAIL CENTRE UPPER LEVEL 1/5 2
2
1
Pigments
Gravel
Day 08 3
Day 07 Day 06 Deck Skylight Slot Truss
Day 05
Day 04
4
Day 03 7.0
7.0
6.1
Day 02
6.3
4.9
4.2 3.7
Day 01 2.5
1.6
0.4
9.2
5
0.4
10.0
20
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
Detail Concrete Layers
1/20
_LAYERED CONCRETE SCHEDULE /CEMENT/GRAVEL/PIGMENT ADDINGS
23
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
1 Deck Roof
2 Lightslots
3 Ceiling
5 Flooring Inside
Concrete Paving (C30) 70mm Fleece Sheet Layer Drainage Layer rounded Gravel 20mm Fleece Sheet Layer Waterproofing Bitumen Layer 10mm XPS thermal and sound Insulation 30cm Vapour Barrier Bitumen 10mm PE-Foil Loadbearing (exposed reinforced) Concrete Ceiling 300mm
Metal Grid 5mm I 400x30mm Steel Profile 7mm I 400x720mm with Openings 45x300mm Outside Light Tubes d 30mm Skylight Metal 25mm I h 300mm
Concrete Lozenge Slabs 200x300mm Inside Light Tubes d 25mm
Polished Screed 50mm with Floor Heating Tubes d 20mm Separating PE-Foil Thermal and sound Insulation 50mm Waterproofing Bitumen Layer 20mm Loadbearing reinforced Concrete Ceiling 300mm
RELINKING PARA-SITE Linear Park Cabo Ruivo
4 Facade Workshops Rammed Concrete Arc 400x7000mm Arc Windows Metal 65mm
Detail Workshop lower Level
1/5
_DETAIL WORKSHOPS LOWER LEVEL 1/5
24
Final Master´s Project
Mona Bouzarda 20161358
Prof. Nuno Mateus
RELINKING PARA-SITE Linear Park Cabo Ruivo
View from under the Bridge into the Park
RIO SECO VALLEY_LISBOA I HOUSING ALONG A PARK CLIFF I FAU LISBOA I PROF. NUNO MATEUS I 2015 RIO SECO : A WATERLINE RUNNING DOWN INTO RIVER TEJO IS LOCATED AT ELEVATED AREA OF THE CITY THE VIEW FOLLOWS DOWN ALL THE WAY TO THE RIVER AND THE BRIDGE 25TH DE ABRIL GREENERY WILL ACCOMPANY THE RIVERBED ALONGSIDE AND SPAN UP A PARK AREA AS IT SPREADS IT´S WAY BETWEEN THE APPROACHING BULDINGS PERFORATING THE DENSE CITY THE NATURAL STONE CLIFFS WITH IT´S FORNOS DE CAL ENRICH THE RIVERBED THESE LIMITS BETWEEN BUILT AND GREENERY SHOULD FUNCTION AS SEMI-PERMEABLE MEMBRANE TO OPEN UP THE PARK TOWARDS THE CITY AND ENLAGREN IT´S VITALIZING PRESENCE, ENVITING PASSENGERS THE NATURAL STONE EDGES ARE A HARD IRREGULAR TEXTURE IN THE SOFT PARK SURROUNDING WHICH CAN BE EXTENDED AND USED AS STARTING POINT FOR A NEW BUILDING APPROACH
MONSANTO_`HEART OF THE CITY´ RIO SECO_`ATERY´
SEMI-PUBLIC COURTYARDS
retaining wall natural stone cliff
PARK ACCESSES
demolition outline / foundation near new retaining wall
UPPER PARK LOWER PARK
VIEWS PARK SPREADING INTO BUILT EXISTING DEMOLITION
_DEMOLITION
_RIO SECO VALLEY
_VIEWS
_PARK SPREADING
_PARK ZONING
_RIO SECO VALLEY
_HOUSING RUA CRUZEIRO I ALTERNATING TERRACE FACADES
Lookout
_CLIFF I FACADE TEXTURES
_CLIMBING SURFACES
Cafe
Equipment Rental I Storage Ramp Access
Climbing I Boulder Facade E
D
2,5
C
B
A
C
A
D
2,5
E C
1,25
Ramp Access
0,8
Climbing Surfaces
1,25
1,25
1,25
1,25
D
A
E
D
B A
A
E
C
D
A D
C
B
Seats I Benches
_HOUSING
6
_URBAN PARK I 3D
_SECTION
2,5 1,25 2,5
1,25
1,25
_D.1 I RETAINING WALL D .2
D .1 5°ANO I PROJECTO DE RIO SECO I 2015/16 I ORIENTADOR_NUNO MATEUS
CLIFF TRANSITION I 1:20 I MONA BOUZARDA I 20148131 I .5
_D .2 I HOUSING FACADE
_COLLAGE
CARCAVELOS BEACH_PORTUGAL I WINE HOTEL / SURF COTTAGES I FAU LISBOA I PROF. SILVA PINTO I 2015 THE BUILDING SITE IS LOCATED FIRST ROW BEHIND CARCAVELOS BEACH. AN AREA VERY WELL CONNECTED TO THE CITY OF LISBON( TRAIN I AV. MARGINAL ). WHERE ALSO SURFING IS VERY PRESENT FACTOR. THIS IS WHY THE NORTH I OFFSHORE WINDS SHOULD NOT BE BLOCKED BY TOO HIGH BUILDINGS FROM THE SEA, SINCE IT IS ESSENTIAL TO CREATE SURFABLE WAVES. THEREFORE SEPARATED COTTAGES ARE LET INTO THE SLIGHTLY RISING TERRITORY FACING SOUTH. THE AREA IS PROTECTED BY A SLENDER MAIN HOTEL BUILDING WITH GENERAL FUNCTIONS AS RESTAURANT I BARS I CONVENTION AREAS AND SURF SHOP. A SPA IN BETWEEN WINE PLANTATIONS SERVES AS RECREATIONAL AREA. VINEYARDS WILL COVER THE AREA INSIDE AND OUTSIDE OF THE HOTEL. A VINERY WITH A BAR WILL BE LOCATED WEST OF THE HOTEL WITH THE OPPORTUNITY OF VISITING THE PRODUCTION PROCESS ACCOMPANIED BY WINE TASTINGS.
for public
13.29
16.33 22.15 12.94
22.24
14.67 23.23 21.31 17.16
19.39
14.37
10.87 14.22 19.79
23.23
15.16
20.46
20.86
17.47
16.53
21.80
20.43
18.71
18.31
16.43
11.82 18.29
20.96
21.07
15.02
16.49
Kiosks 20.47
22.09
15.32
20.02
15.18
19.64
15
20.27
Park easy to access >Av. melts into green
11.86
21.82
>
22.36 16.80
16.66
Wine I Snack Bar
20.77
19.61 20.46
21.72
22.76
16.72
20.77 24.36
Onloading Area for Grapes
19.12
21.44
17.27
22.24
19.77 16.70
21.43
21.72
20.10
20.57
18.08
13.25
19.92
10.61
631.2138
15.17
22.90
19.61
10.74 16.62
22.05 20
CafĂŠs
20.40
21.58
10.63 20.62
22.28
21.14
10
>
19.94
21.07
19.72
21.10 22.31
19.69
19.47
19.72 9.94
19.47
17.34 12.73
Saint Julian s School
20.51
19.73 19.73
19.11
19.39 19.77
20.07
10
18.55
10
School Kids + Parents >integrate
20
228.3045
20.37
16.47
21.41
Shops
17.85 17.93
14.61
20
20.29
18.52
19.62
15
20.14
15
18.52
18.52
9.39 12.09
19.61
20
20.11
16.35
18.37
19.92
10.24
18.40
Communal Playground Area
369.8566
Bancadas
19.92 18.52
Bars Tourist Info Plaza
21.56
10.69
19.42 19.15
20
19.28
16.25
Restaurants
17.17
19.49
18.27
19.62
19.06
19.59
10
13.57
19.44 16.77
19.28 19.15
20.55
16.77
20
Parking
141.5099
15.77
Multifunction Room
16.88
19.12
7.99
15.40 16.20 16.55
Convention I Function Rooms
Hotel Area
19.72
12.30
Buildings partly stuck in earth max. 2floors --> offshore wind for surfing
18.20 17.33
16.11
9.50
SPA
14.69
19.48
7.63
19.31
17.47
6.79
7.08
18.66
8.62
15.65
10.86
27 89 9.
282
.4822
15.06 16.33 17.82 17.29
6.41
Reception 6.30 16.67
11.94
6.31 16.23
5.27
10
10.88
easy beach access Terrasse I Lounge Winebar
5
16.76
15
10.71
Lodges
Recreational Area Trails I Forest
9.78
Hotel Underground Parking 12.66
10.57
17.29
15.06
12.67
13.36
22
(for bad waves)
18.43
18.20
8.41
13.38
Skatepark 10.57
10.84
19.02
17.45 15.35
8.48 8.50 13.44
18.42
17.45
10.99
Hotel
10
Vineyard2
18.42
10.70
5.13
8.20
16.67
14.93
12.12
16.67
10.86
10.69
10.48
13.77 6.70 11.26
Tunnel for cars
14.35
15.49
15.49 11.48
Surf Supply I School 6.18
15
14.09 13.03
14.47
Tasting I Winebar
11.30
14.35
17.35 14.09
Beach Showers 6.31
16.01
15.88
--> filter system Winery
11.11
5
15.49
15.28
makes use of open water
8.13 11.09 6.25
13.29
Winery Production
7.76 10
8.49
Auditorium I Stage Summerstage (public) Open Air cinema
13.28
17.65 17.69
7.95 16.18 15
12.81
20.0177
12.50
14.56
13.88
11.06
17.42
13.49 13.39
11.18 12.78
6.33 11.33
14.81
Parking
14.24 13.47
18.21 14.37
14.71
_CARCAVELOS MARGINAL
_ HOTEL
BARREL STORAGE UNDERGROUND
COOLING ROOM
STORAGE WINEBAR
BARREL STORAGE UNDERGROUND
LAB
TANKS
PRODUCTION
FERMENTATION
TERRACE
COOLING ROOM
OFF LOADING FACE
VEHICLE ENTRANCE WINERY
WORK AREA
STORAGE WINEBAR LAB
TANKS
STAFF ROOMS CHANGING SHOWER_WC PRODUCTION
FERMENTATION
TERRACE
+ 11,00
OFF LOADING FACE
VEHICLE ENTRANCE WINERY
WORK AREA
WATER BASINS
STAFF ROOMS CHANGING SHOWER_WC
ROOM SERVICE CLEANING LAUNDRY ROOM STAFF ROOMS CHANGING LOCKERS SHOWER_WC
COTTAGES
ROOM SERVICE CLEANING LAUNDRY ROOM
CAR ENTRANCE
BATHROOM
STAFF ROOMS CHANGING LOCKERS SHOWER_WC
TECHNICAL ROOM
LIVING ROOM TERRACE
CAR ENTRANCE
BACK OFFICE
TECHNICAL ROOM
VINEYARDS
+ 9,00
BACK OFFICE
RECEPTION
VINEYARDS
RECEPTION
PRIVATE PARKING LOT
SNACK BAR
PRIVATE PARKING LOT
KITCHENETTE
SNACK BAR
SURFRAKS
GALERIE SLEEPING
TERRACE
BATHROOM KITCHENETTE
VINEYARDS
SURFRAKS
GALERIE SLEEPING
TERRACE
LIVING ROOM TERRACE
VINEYARDS
CONVENTION FUNCTION ROOMS CHANGING CABINES SAUNA
+ 4,00
FITNESS ROOM
TECHNICAL ROOM
SPA
SAUNA
CONVENTION FUNCTION ROOMS
COLD WATER BASIN
VINEYARDS
JUICE BAR
OUTSIDE POOL
TECHNICAL ROOM
FITNESS ROOM
SPA
SAUNA VINEYARDS
9659
JUICE BAR
OUTSIDE POOL
TERRACE
TERRACE
18754
GOODS OFF LOAD VEHICLE ACCESS
FOOD STORAGE
TERRACE
COOLING ROOM
TERRACE
KITCHEN RESTAURANT
DISH WASHING 58678
GOODS OFF LOAD VEHICLE ACCESS
STAFF ROOM LOCKER_CHANGING_SHOWER BEVERAGE STORAGE
BAR2 BAR1 RESTAURANT
7821 2620.2695
LOUNGE
STAFF TECHNICAL ROOMS
LOUNGE
3707 INFO DESK SURF SHOP
TERRACE
BEACH ACCESS
+/- 0,00
TERRACE
57964
42386
VINEYARDS
BEACH ACCESS
BEACH ACCESS
PLANTA BAIXA I SURFSHOP_BEACH ENT
PLANTA BAIXA I HOTEL _ SPA + 4,00 I WINERY + 11,00
_ 1°
+/- 0,00
_ 2°
_ COTTAGES
_ VINERY
-"…das Herz schlägt immer gleich, sonst wäre Sense, wenn das Herz kreativ schlagen würde, gäbe es Totalprobleme."(J.Meese,
, metabolismós „Stoffwechsel“, mit lat. Endung versehen) ist die
Vorstellungen der Metabolisten in einem dynamischen Prozess durch flexible, erweiterbare Großstrukturen gestaltet werden. Es wurde der Gedanke verfolgt, den Lebenszyklus von Geburt und Wachstum/Aufbau auf Städtebau und Architektur zu übertragen.
METABOLISCHES THEATER I OSMOSISTAN_AM ARSCH DER WELT
HULLS AND LAYERS I METABOLIC THEATER I LFU INNSBRUCK_studio3./ I PROF. VOLKER GIENCKEI I2013_2014 2013/ 2014 ./studio3 für experimentelle Architektur I LFU INNSBRUCK I PROF.GIENCKE ELABORATION OF HUMAN SPACE +ist es zum Beispielspiel zu heiß, weil EXPERIMENTAL die Sonne scheint, wegen dem Global Warming oder weil Helgä S. kocht können sich +Der Wind kann kanalisiert und in (Latex-, Leder-)Luftkissen aufgefangen werden, um weiche Schlafzellen zu generieren, welche
“AND SO, FROM HOUR TO HOUR, WE RIPE AND RIPE, AND THEN, FROM HOUR TO HOUR WE ROT AND ROT, AND THEREBY HANGS A TALE. ALL THE WORLD´S A STAGE, ALL THE MEN AND WOMEN MERELY PLAYERS; THEY HAVE THEIR EXITS AND THEIR ENTRANCES;” (W. SHAKESPEAR, AS YOU LIKE IT )
liche sie orientiert sich an der funktionierenden Natur, vorallem dem Körper, da es sich ja um menschliche Behausung handelt und den Latex, Leder, Hartz, Knorpelheißkleber, Bimetalle, Knochengips/Beton, Glasfaserschalungen, Schläuche etc. und sich gegenseitig ergänzen, aufeinander schichten, übereinander stabilisieren, ineinander fließen und somit metabolische Räume und Außenräume,
_ MODEL STUDIES I GIPSUM I LEATHER I LATEX I METAL
+7
,7
4
+4
4
+3,8
±0,00
,3
9
+3 ,
+5
,1
57
3
,2 +1 ,02
+4
_LONGITUDINAL SECTION
Maske Menschi.lein (z.B. Helgae) mach nicht so ein Theater !
Spiel
Tierbäbi schläft so süß wie möglich
Bühne : die Architektur ist KEIN Problem !
Ego.n ±00Schneider
die Sache an sich guil, (ei muss zum ui werden!)
Latex / Kautschuk
Metabolismuss mal ! aka
Muscelwire Nitinol Flexinol
Knorpel / Thermoplaste
Leder
Schläuche
Metallstaub
Elektromagnetisches Netz / Spulen einzeln ansteuerbar
Zu-,Abfuhr : Luft+Wasser
Bimetall
Textilpartikel
Knochenplatten
„Komm mal wieder runter !“ AngsthaseTschüss
absolute Hingabe
Körper
Mund
Profis
Karacho Antrieb
liebevollstt BauarbeiterPROFI
Melatonin Herz
bewusst kein (dein) Geschmack
Serotonin Dopamin Endorphin
GFK / Gips
Eisenkern
Formgedächtnislegierung Spannung
Kupferdraht Draht
Spannungsinduzierung
Aluminium Kupfer
_3D MODEL
Die Natur(en) weiß noch was sie tut, oder eben nicht. Sie kennt kein Wissen. Sie | Es macht. Die Natur ist kein Geschmack, den gibt es hier nicht. Die Natur kennt keinen Geschmack Sie | Es funktioniert. ...1+1+1+1+1+1+1+1+1+1+1……+1+1+1+1+1……………..+1………………………… Überlagerung Schichtung hart-weich weich-hart auf zu pump pump e Bewegung Berührung (zzzhhht)... nijcht Luft
puh
Wind kommt. Wind geht GegenWind Widerstand wird aufgebaut --> Körper eingesaugt Körper Huelle Zelle Zelle auf Zelle zu Zelle auf auf Zelle zu Zelle auf Zelle zu Zelle auf
Zelle pumpump
zu
Zelle
Zelle zu
Zelle auf Zelle zu Zelle auf Zelle zu Zelle
auf Zelle zu
Zelle auf
Zelle zu Mehrzeller
Zelle auf
Einzeller
auf
zu
Zeller
Körper
aus
auf Zeller zu Zelle auf Zelle drückt
Zelle
wächst Zelle an
Zelle
Zelle trennt
ab Zelle von
Zeller
für
Zelle
stützt
Zeller
weg Zelle zu Zelle auf Zelle
+ Huelle hält
Zeller
und
Zelle n
oben von außen
Halt hart -
er
Boden
Zellkern in Zelle Zellen bilden Körper Körper in (Wohn)Zelle. (Wohn)Zellen bilden (Wohn)Körper Die Zelle formt der Zellkern | Benutzer wie er will und | oder braucht. Wohnzellen bilden Körper | Mehrzeller, an Umgebung und Lebenssymbiosen der Bewohner angepasst; auch Einzeller. Die Zellen überlagern, schichten, reihen sich aneinander ---> stützen sich gegenseitig; im Modell durch Harz, Latex und Lederschichten. Ein Schlauchsystem leitet Luft (durch Wind, Druck etc.) in Luftkissen in den Zellwänden, diese bilden weiche (Aufenthalts)Räume, wie "Bett" etc. der Luftdruck trägt somit auch zur Aussteifung der Zellen bei. Die Öffnungsschlitze der Zellen sind ebenfalls von Luftkissen gesäumt und können sich somit durch Luftzu- oder abfuhr schließen und öffnen; auch den Menschen einquetschen. Dennoch, das Fleisch ist schwach; ein Exoskelett schalt die Zelleinheiten, mehrere oder auch nur eine; im Modell durch Gips und E.Harz. Es sorgt für harten Boden unter den Füßen, außerdem bildet es die Erschließung und Außenräume, ermöglicht harte Räume, wie Bad, Küche etc.
_ CELL.UNWINDING
_ SECTIONS
_ CELL.AGGLOMERATION
_ CELL.OPENINGS I ENTRANCE
Latex / Kautschuk
Muscelwire Nitinol Flexinol
Knorpel / Thermoplaste
Leder
Schläuche
Elektromagnetisches Netz / Spulen einzeln ansteuerbar
Metallstaub
Zu-,Abfuhr : Luft+Wasser
Bimetall
Eisenkern
Formgedächtnislegierung Kupferdraht Draht
_METAL CHIPPINGS DRIED INTO LATEX MILK MAGNETS IN OTHER LATEX SHET
Textilpartikel
Knochenplatten
GFK / Gips Spannungsinduzierung
Aluminium Kupfer
PORTFOLIO
MONA BOUZARDA