REVI TALI ZATI ONOFMAHARAJBADA, GWALI OR.
•Co ns e r v a t i o na ndAda pt i v eRe us eo fHe r i t a g eBui l di ngi nt oTo ur i s tI nf o r ma t i o nCe nt r e( TI C) •Fa c a deI mpr o v e me nto fHe r i t a g eBui l di nga tMa ha r a jBa da . •He r i t a g eNe t wo r kTr a i la tMa ha r a jBa da .
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
ACTI VI TI ESMAPOF MAHARAJBADA
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
2 4 0 1 2 0 1 8
Mr a g a nkGu pt a
2 4 0 1 2 0 1 8
Mr a g a nkGu pt a
2 4 0 1 2 0 1 8
Mr a g a nkGu pt a
2 4 0 1 2 0 1 8
Mr a g a nkGu pt a
115 12.
1065
1100 1995
600
815
9.
500
1630
TOILET & STORE AREA
1630
10.
700
930
1030
2165
BROKEN DESIGN ELEMENT TO BE REFURBISHED AND PAINTED AS PER PROPOSED DESIGN BROKEN STONE EAVES TO BE REPLACED AND POLISHED AS PER PROPOSED DESIGN
11.
1000 500
200
980
8.
+4215 Level
8.
3.
750
3.
WALL TO BE REPAINTED AS PER PROPOSED DESIGN
2800
ADMIN & RETAIL AREA
BROKEN BRACKETS TO BE REPLACED AND REPAINTED AS PER PROPOSED DESIGN
EXTERNALWINDOW TO BE RETAINED AND PAINTED WINDOW SILL TO BE RETAINED AND REPAINTED AS PER PROPOSED DESIGN
7. 3.
+1430 Level
2030
9950
3.
6.
6.
1785
750
+490 Level INTERPRETATION AREA
3.
3.
Ground Level
FRONT ELEVATION
4660 5.
1500
428
5.
4.
1785
750
4.
INFORMATION AREA
3.
3.
500
2. 4.
550
570
750
540
600
1.
300
1100 5920
540
300
600
600
560
3.
750
570
550
600
1. ENTRANCE 2. INFORMATION DESK 3. DISPLAY SHELF 4. WALL MOUNTED DISPLAY 5. HANGING DIPLAY 6. DIGITAL DISPLAY SCREEN 7. SALES AND ADMIN COUNTER 8. ENCLOSED DISPLAY SHELF 9. PANTRY COUNTER 10. STAFF TOILET 11. LOCKERS 12. CHANGING AREA
PLAN
Notes 1.
All dimensions in mm unless otherwise specified.
SITE PLAN(1:250)
Consultant
Client Project Name GWALIOR CONSERVATION & SMART CITY DEVELOPMENT ADAPTIVE RE-USE OF PROPOSED TOURIST CORPORATION INFORMATION LIMITED CENTRE (GSDCL) GWALIOR
Drawing name:
Key Plan
TENDER DRAWING Date:
TIC
Revision Date:
30/01/2018
Furniture Layout & Front Elevation
Drawn by:
Checked by:
Mragank Gupta
Neeraj Bhagat
Drawing no: 1:50
+4215 Level
WALL TO BE REPAINTED AS PER PROPOSED DESIGN
+1430 Level
DISPLAY SHELF RESTORED AND TO BE PAINTED AS PER DESIGN PANTRY CABINET
DISPLAY SHELF PROPOSED WITH PLY BACKING AND ENCLOSING THE WINDOW INTERNALLY
PANTRY COUNTER
INFORMATION DESK
TOILET DOOR TO IN THE SAME FINISH AS EXTERNAL WINDOWS
+490 Level Ground Level
SECTION AA'
+4125 Level
DISPLAY SHELF WITH PLY BACKING DIGITAL DISPLAY SCREEN EXTERNAL WINDOW TO BE RETAINED AND PAINTED AS PER DESIGN WINDOW SILL TO BE RETAINED AND REPAINTED AS PER PROPOSED DESIGN
+1430 Level
+490 Level
SECTION BB'
A
A'
B
Ground Level
B'
WALL TO BE REPAINTED AS PER PROPOSED DESIGN
SITE PLAN(1:250)
Notes 1.
All dimensions in mm unless otherwise specified.
Consultant
Client Project Name GWALIOR CONSERVATION & SMART CITY ADAPTIVE RE-USE OF DEVELOPMENT PROPOSED TOURIST CORPORATION INFORMATION LIMITED CENTRE (GSDCL) GWALIOR
Drawing name:
Key Plan
TENDER DRAWING Date:
TIC
Revision Date:
30/01/2018
Sections
Drawn by:
Checked by:
Mragank Gupta
Neeraj Bhagat
Drawing no: 1:50
BROKEN RAILING/DESIGN ELEMENTS TO BE REFURBISHED AND REPAINTED AS PER PROPOSED DESIGN BROKEN STONE EAVES TO BE REPLACED AND POLISHED AS PER PROPOSED DESIGN BROKEN BRACKETS TO BE REPLACED AND REPAINTED AS PER PROPOSED DESIGN
+4215 Level
WINDOW TO BE ADDED WITH LOUVERED EXHAUST FAN AND FROSTED GLASS PANEL
WALL TO BE REPAINTED AS PER PROPOSED DESIGN EXTERNALWINDOW TO BE RETAINED AND PAINTED WINDOW SILL TO BE RETAINED AND REPAINTED AS PER PROPOSED DESIGN
+1430 Level
+490 Level Ground Level
EAST ELEVATION
BROKEN RAILING/DESIGN ELEMENTS TO BE REFURBISHED AND REPAINTED AS PER PROPOSED DESIGN BROKEN STONE EAVES TO BE REPLACED AND POLISHED AS PER PROPOSED DESIGN BROKEN BRACKETS TO BE REPLACED AND REPAINTED AS PER PROPOSED DESIGN
+4215 Level
WALL TO BE REPAINTED AS PER PROPOSED DESIGN EXTERNAL WINDOW TO BE RETAINED AND PAINTED WINDOW SILL TO BE RETAINED AND REPAINTED AS PER PROPOSED DESIGN
+1430 Level
+490 Level Ground Level
Notes 1.
All dimensions in mm unless otherwise specified.
WEST ELEVATION
Consultant
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSDCL) GWALIOR
Project Name CONSERVATION & ADAPTIVE RE-USE OF PROPOSED TOURIST INFORMATION CENTRE
Drawing name:
Key Plan
TENDER DRAWING Date:
TIC
Revision Date:
30/01/2018
Drawing name: 1:50
Side Elevations
Drawn by:
Checked by:
Mragank Gupta
Neeraj Bhagat
Drawing no:
7
Rear boundary wall/railing
2 wheeler parking covered with sheet roofing
CENTRAL LIBRARY BUILDING
8
9
2 wheeler parking covered with sheet roofing
Generator with fencing around and covered with sheet roofing (Modern addition)
6 10
BRICK/TILE PAVING
5
Hazrat Mir Badshah Dargah
Transformer Boundary wall with metal mesh fencing (Modern addition) SBI MAIN BRANCH BUILDING
Image 8: Temporary structures and AC units resulting in blockage of access to rear of building to be removed. Vegetation growth at proximity to building to be addressed.
Image 9: Support structures erected on existing boundary wall to be removed.
4 BRICK PAVING
Metal mesh fencing (Modern addition)
AC units
Temple shrine (modern addition)
Metal grill at opening
STONE FLOORING
1
Existing drain
BRICK PAVED FOOTPATH
Paid 2 wheeler parking (Municipal) No Parking signboard
Metal grill at opening
PLAN
2
Boundary wall with metal railing (Modern addition)
Drinking water facility 3
Image 6: Service cabling and outdoor units to be reorganized. Makeshift parking to be addressed.
Image 7: Parking and make-shift roofing to be addressed.
Image 10: Building edging and its maintenance to be addressed. Notes
E3
Image 1: Existing shrine is a modern addition. Trees at close proximity to building to be pruned.
Image 2: Existing paid parking beside a No Parking signboard. Existing drainage to be upgraded. Utility of boundary wall to be discussed with owner.
Image 3: Existing drinking water Image 4: Trees at close proximity to facility to be upgraded. Paved building to be addressed. footpath to be upgraded.
Image 5: Utility of fencing around building to be discussed with owner. Relocation of transformers and make-shift sheds to be addressed.
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
E1
E2
Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI Main Branch - Site Conditions
Scale: 1:350
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI-MB/01
CENTRAL LIBRARY BUILDING
8
2 wheeler parking covered with sheet roofing
7 BRICK/TILE PAVING
Image 8: Service cabling and outdoor units to be reorganized. Sunshades to be upgraded.
Image 7: Service cabling and outdoor units to be reorganized. Makeshift parking with sheet roof to be addressed.
SBI MAIN BRANCH BUILDING
9
10
6
3
1
4 2 5
Image 10: Leakage from broken pipes resulting in damp patches, algal growth and salt deposits on stone surface to be addressed. Posters to be removed.
Image 9: Incompatible grill gate requires improvement. Streamlining of external plumbing and electrical lines and units. Vegetation growth through masonry to be addressed. Notes
E3
Image 6: Deteriorating stucco panels to be replaced. Ventilators with infill to be addressed.
PLAN
Image 1: Outdoor units to be reorganized. White paint on stone to be removed. Algae deposit and water seepage stains on stone surface to be addressed.
Image 2: Make-shift materials over Image 3: Rusted metal grills to original fenestration to be removed or be improved. Water seepage upgraded. stains on stone surface to be addressed. Facade lighting to be reorganized.
Image 4: Bird nests and bee hives Image 5: Signs painted on stone, to be on ceiling, resulting in surface removed and alternate solutions provided. stains and droppings to be addressed. Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
E1
E2
Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI Main Branch - Building Condition
Scale: 1:350
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI-MB/02
FRONT ELEVATION - E1 (East) [as seen from main market square]
Painted directly on stone surface (to be cleaned)
Transformers
Street level/ Human eye level obstructions
Legend for condition mapping
E3
E1
E2
Client
Water stains
Efflorescence
Electrical conduits/ wires/ Pipes
High Vegetation Growth In Masonry
Broken/ Missing Masonry
Graffiti/ Posters
Dry algae stain
Soot/ Dirt/ Grime/ Bird dropping/ Bee hive
Lights
Peeling/ Flaking Lime wash/ Paint
Missing/ Broken glass
Dish antenna
Modern intervention/ Later additions
Masonry infill/ alteration
Rusted Metal
Dampness
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI Main Branch - Building Condition
Scale: 1:200
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI-MB/03
Dry algae and water seepage stains along mouldings
Damp patches due to water accumulation on terrace level
Metal grill over window
Vegetation growth through masonry
Water seepage stains due to water accumulation at terrace level
Window AC units
Peeling paint over degrading decorative stucco panel
Water seepage stains under electrical wiring
+13690 Level
Dangling electric cables
+12090 Level
Peeling paint over degrading decorative stucco panel Exhaust fan fixed with make-shift materials Window A/C units and fixtures
+5134 Level
Broken metal pipe +2090 Level
Green paint on stone window grill
Ground Level
Damp patches due to leakage from broken pipes Later addition: Dargah abutting historic structure
Rusted metal grill at window opening
Salt deposit on stone surface due to leakage from broken pipes Metal grill at door opening
Peeling paint over stone surface
Dry algae and water seepage stains on stone surface and mouldings
Exhaust fan fixed Metal grill at with make-shift door opening materials
Facade lighting Masonry infill with cement plaster at plinth level
Metal mesh nailed onto original window frame
Water seepage stains due to leakage from broken pipes
Damp patches due to water seepage from make-shift roof
Metal grill at opening
Metal grill at door opening Roofing made of make-shift materials
SIDE ELEVATION - E3 (North) [as seen from Chawri Bazaar]
SIDE ELEVATION - E2 (South) [as seen from Post Office side]
Transformers
Street level/ Human eye level obstructions
Unorganized vendor/hawker zone
Legend for Condition Mapping
E3
Client
Water stains
Efflorescence
Electrical conduits/ wires/ Pipes
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
High Vegetation Growth In Masonry
Broken/ Missing Masonry
Graffiti/ Posters
Project Name
Dry algae stain
Soot/ Dirt/ Grime/ Bird dropping/ Bee hive
Lights
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Peeling/ Flaking Lime wash/ Paint
Missing/ Broken glass
Dish antenna
Drawn by: Mragank Gupta
Drawing name: SBI Main Branch - Building Condition
Modern intervention/ Later additions
Masonry infill/ alteration
Date: 12.02.2018
Rusted Metal
Dampness
Scale: 1:200
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI-MB/04
E1
E2
FRONT ELEVATION - E1 (East) [as seen from main market square]
+13690 Level +12090 Level
+5134 Level
+2090 Level
Ground Level
SIDE ELEVATION - E2 (South) [as seen from Post Office side]
MAIN ITEMS OF WORK
E3
E1
E2
SIDE ELEVATION - E3 (North) [as seen from Chawri Bazaar]
1. Improvement/ Upgradation of building edging all around 2. Fenestration to be repaired, provision of sunshades in appropriate materials and organized provision of AC units. 3. Stone surface cleaning 4. Terracing and drainage 5. Streamlining all plumbing pipes, electrical cables, antennas, etc. 6. Building signage to be standardized 7. Vegetation removal from masonry and pruning trees at close proximity to building. 8. Overhead water tanks at terrace level 9. Facade lighting recommendations.
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI Main Branch - Proposal Drawing
Scale: 1:200
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI-MB/05
8
9
E 7
Public toilet
E
6
Drinking water facility with overhead tank (Modern addition)
Ad-hoc structure abutting historic building (modern addition)
5
10
SBI ATM GROUP BUILDING
Image 7: Ad-hoc structures within boundary to be addressed. Relocation of transformers and electric posts with dangling cables to be addressed.
Generator with fencing around and covered with sheet roofing (Modern addition)
Public toilet (Modern addition)
Image 6: Existing drinking water facility to be upgraded.
11 4 12
3
Metal mesh fencing (Modern addition)
AC units
Transformer 1
2 wheeler parking 2 E
BRICK PAVED E
PART PLAN No Parking signboard
Electric post
Existing drain
No Parking signboard
Image 5: Relocation of transformers to be addressed. Fencing around building to be to be redesigned. Trees at close proximity to structure to be pruned.
Image 8: Dangling cables to be addressed. Stone surface to be cleaned and replastered.
Image 9: Streamlining Image 10: Public toilet to Image 11: Make-shift of external plumbing be upgraded. Surface materials over original drainage to be addressed. fenestration to be removed and electrical lines. Posters and paint on or upgraded. stone to be removed. Notes
Image 12: Outdoor units to be reorganized.
Image 1: Incompatible grill gate Image 2: Parking and requires improvement. make-shift roofing to be addressed.
Image 3: Plinth protection to be redone. Exposed stone surface to be re-plastered.
Image 4: Existing drainage to be upgraded.
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF BUILDINGS AT MAHARAJ BADA, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI ATM Group - Site Condition
Scale: 1:350
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI/01
Broken mouldings Broken railings
Flaking lime wash Dry algae stains along moulding
+12985 Level
Vegetation growth along moulding due to improper drainage
Plaster cracks
Dry algae stains along mouldings
Broken mouldings
Water seepage stains
Cracks on mouldings
+8960 Level
Deteriorating plaster under balcony
Incompatible & ad-hoc placement of drain pipe Metal Grill (modern addition)
Posters Metal grill at opening fixed into the columns on either side
+2060 Level
Granite tiled steps (modern addition)
Graffiti Loss of plaster Exposed masonry
Ground Level
Broken stone steps
Flaking paint on stone steps
FRONT ELEVATION - E1 (South-West) [as seen from SBI Main Branch Office]
Broken/missing railings
Posters and hoardings Metal grills at openings Street level/ Human eye level obstructions
Legend for Condition Mapping E1
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
E2
Dry algae stain
Broken/ Missing Decorative element
Electrical conduits/ wires/ Pipes
Project Name
Vegetation growth in masonry
Missing Plaster
Graffiti/ Posters
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Water stains
Flaking/ Pulverized/ Decayed Plaster
Dish antenna
Modern intervention/ Later additions
Peeling/ Flaking Lime wash/ Paint
AC unit
Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI ATM Group - Building Condition
Cracks
Dampness
Scale: 1:150
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI/02
Dry algae stains along moulding
Deteriorating plaster under balcony
Metal grill at window opening
+12985 Level
Broken/missing railings
Water seepage stains Broken mouldings +8960 Level
Flaking lime wash Metal grill at opening fixed into the columns on either side Painted poster
Drinking water facility abutting historic structure (modern addition) Broken PVC pipe
+2060 Level
Ground Level
Stone tiled steps (modern addition)
Deteriorating plaster
Loss of plaster Exposed masonry
AC unit
Dampness due to leaking pipes
Metal handrails (modern addition)
Dangling electric cables Generator with fencing around and covered with sheet roofing (Modern addition)
SIDE ELEVATION - E2 (South) [as seen from Sarafa Bazaar Road]
Trees at close proximity to building
Transformers
Ad-hoc structures (Generator) Street level/ Human eye level obstructions Legend for Condition Mapping E1
E2
Client
Dry algae stain
Broken/ Missing Decorative element
Electrical conduits/ wires/ Pipes
Vegetation growth in masonry
Missing Plaster
Graffiti/ Posters
Water stains
Flaking/ Pulverized/ Decayed Plaster
Dish antenna
Modern intervention/ Later additions
Peeling/ Flaking Lime wash/ Paint
AC unit
Cracks
Dampness
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI ATM Group - Building Condition
Scale: 1:150
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI/03
+12985 Level
Repair/reinstallation of broken/missing railings
+8960 Level
Removal of all hoardings, posters, incompatible layers
1400
2700
Removal & clearance of all incompatible modern additions on and around the building structure
+2060 Level
Ground Level
FRONT ELEVATION - E1 (South-West) [as seen from SBI Main Branch Office]
+12985 Level
Facade surface plaster to be repaired/redone including providing a lime was finish as/specification +8960 Level
Repair of moulding & other decorative elements Pruning of existing trees Removal/relocation of all exposed cables, wires and other utility cables etc.
+2060 Level
Removal & clearance of all incompatible modern additions on and around the building structure
Ground Level SIDE ELEVATION - E2 (South) [as seen from Sarafa Bazaar Road]
BROAD ITEMS OF WORK E1
E2
1. Improvement/ Upgradation of building edging all around 2. Fenestration to be repaired, and organized provision of AC units. 3. Removal of damaged plaster. Replastering and lime wash finish. 4. Terracing and drainage 5. Streamlining all plumbing pipes, electrical cables, antennas, etc. 6. Building signage to be standardized 7. Vegetation removal from masonry and pruning trees at close proximity to building. 8. Facade lighting recommendations.
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 12.02.2018
Drawn by: Mragank Gupta
Drawing name: SBI ATM Group - Proposal Drawing
Scale: 1:200
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/FI/SBI/04
19460
Vegetation growth
Missing masonry and plaster
Shop hoardings and signage
Modern/later addition of jaali and collapsible door
FRONT ELEVATION: EXISTING
Repair of existing wall surface, railings elements, doors & windows Installation of framed glass panel on the internal face of the columns as per specification
FRONT ELEVATION: PROPOSED
10340
5320
19460
Legend for condition mapping
E3
E1
E2
5320
10340
Client
Water stains
Efflorescence
Electrical conduits/ wires/ Pipes
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
High Vegetation Growth In Masonry
Broken/ Missing Masonry
Graffiti/ Posters
Project Name
Dry algae stain
Soot/ Dirt/ Grime/ Bird dropping/ Bee hive
Lights
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Peeling/ Flaking Lime wash/ Paint
Missing/ Broken glass
Dish antenna
Drawn by: Mragank Gupta
Drawing name: POST OFFICE - Proposal Drawing
Modern intervention/ Later additions
Masonry infill/ alteration
Date: 15/02/18
Rusted Metal
Dampness
Scale: 1:100
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/PO/01
N
Masonry Infill
Missing masonry and plaster
Modern/later addition of Public Toilet
SIDE ELEVATION 2: EXISTING
Proposal to remove/relocate Public toilet and restoration of original facade SIDE ELEVATION 2: PROPOSED
10340
3675
19150
Legend for condition mapping
E3
E1
E2
13515
Client
Water stains
Efflorescence
Electrical conduits/ wires/ Pipes
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
High Vegetation Growth In Masonry
Broken/ Missing Masonry
Graffiti/ Posters
Project Name
Dry algae stain
Soot/ Dirt/ Grime/ Bird dropping/ Bee hive
Lights
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Peeling/ Flaking Lime wash/ Paint
Missing/ Broken glass
Dish antenna
Drawn by: Mragank Gupta
Drawing name: POST OFFICE - Proposal Drawing
Modern intervention/ Later additions
Masonry infill/ alteration
Date: 15/02/18
Rusted Metal
Dampness
Scale: 1:100
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/PO/02
N
Missing elements
Modern/Later additions
Water seepage and vegetation growth
Modern/Later additions Shop hoardings and signage
Metal collapsible door Metal railing in front SIDE ELEVATION 3: EXISTING
Repair/reinstallation of Missing elements
Wall surface repair, plaster and finish
Reorganising existing signage system
18140
19165
13515
SIDE ELEVATION 3: PROPOSED
Legend for condition mapping
E3
E1
E2
Client
Water stains
Efflorescence
Electrical conduits/ wires/ Pipes
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
High Vegetation Growth In Masonry
Broken/ Missing Masonry
Graffiti/ Posters
Project Name
Dry algae stain
Soot/ Dirt/ Grime/ Bird dropping/ Bee hive
Lights
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Peeling/ Flaking Lime wash/ Paint
Missing/ Broken glass
Dish antenna
Drawn by: Mragank Gupta
Drawing name: POST OFFICE - Proposal Drawing
Modern intervention/ Later additions
Masonry infill/ alteration
Date: 15/02/18
Rusted Metal
Dampness
Scale: 1:100
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/PO/03
N
Modern/later addition.
Modern addition of steel railing. Infill walls/ windows/rolling shutters addedover original historic wall openings & niches. Shop hoardings & signages. Historic columns & arches at ground floorhave been greatly altered over the years toaccomodate existing shop.
FRONT ELEVATION (EXISTING)
FRONT ELEVATION (SUPERIMPOSITION OF PROPOSED OVER EXISTING)
Original historic fenestration to be reintroduced
Introduction of replica of original railing design on the first floor Organised signage sysytem 2000
5100
5100
5100
10250
5100
5100
5100
5100
2000
10250
FRONT ELEVATION (PROPOSED)
Legend
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Rolling shutter Metal Railing
E1
Modern addition Existing signage/hoarding
Project Name FACADE IMPROVEMENT OF BUILDINGS AT MAHARAJ BADA, GWALIOR Date: 15.02.2018
Drawn by: Mragank Gupta
Drawing name: COMMERCIAL BLOCK 2
Scale: 1:250
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/CB2/01
N
Modern addition of new building storey
4420
Modern parapet wall replacing the original parapet (later addition) Broken/missing historic chajja stone
3010
Metal grill/railing over historic arch openings or niches (later addition) Existing shop signage or hoarding Rolling shutter gates of existing shops Variable flooring in front of shops
3170
5420
3900
4140
3920
5380
3425
Original columns still in place. Were replaced with wider spaced/wider sized columns to accomodate existing shop frontages
3170
FRONT ELEVATION (EXISTING) 29608
Superimposed elevation shows the feasibility of recreating the historic facade over the existing modified heritage building
26833
8670
MOHANLAL AND SONS
200
ITRA BHANDAR
SHIVAJI MEDICAL STORE
MAHESH MEDICAL
JAIN STORES
GURJARILAL AND SONS
GURJARILAL AND SONS
26530 2600
FRONT ELEVATION (SUPERIMPOSITION OF PROPOSED DESIGN (BASED ON HISTORIC EVIDENCE) OVER EXISTING FACADE)
Recommended dismantling of the top storey based on historic evidence
32830
Provision of the original stone railing Installation of new stone chajja stone matching the original Removal/reinstallation of existing metal grill over historic arch openings MOHANLAL AND SONS
ITRA BHANDAR
SHIVAJI MEDICAL STORE
MAHESH MEDICAL
JAIN STORES
GURJARILAL AND SONS
GURJARILAL AND SONS
Organising the shop signage in order as per detail Installation of natural local stone flooring in front of the shops
FRONT ELEVATION (PROPOSED)
Legend for condition mapping
E1
Metal grill
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name
Rolling shutter
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Collapsible door Modern addition Existing signage/hoarding
Date: 15/02/18
Drawn by: Mragank Gupta
Drawing name: COMMERCIAL BLOCK 1
Scale: 1:150
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/CB1/01
N
FRONT ELEVATION (EXISTING)
FRONT ELEVATION (PROPOSED) Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) E1
NO. 13
14
02
03
04
05
06
07
08
NO.
Owner Name
NO.
01
Shashi prabha Shukla
07
Mohit Kukreja
13
02
Vinod Shukla
08
Shiv prakash Shukla
14
03
Sheela Shukla
09
Anup Arya
10
Mahesh Arya
Owner Name
Project Name
Sheela Shukla
15
04 01
Owner Name
09
10
11
12
Anand Shukla
05
Pramod Shukla
11
Sunil Jain
06
Balmukund Agarwal
12
Gopal das Agarwal
15
Venugopal Agarwal
FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR
Sunil Jain
Date: 15/02/18
Drawn by: Mragank Gupta
Drawing name: COMMERCIAL BLOCK 1
Scale: NTS
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/CB1/02
N
GORKHI GATE ( KRISHNA TEMPLE )
FRONT ELEVATION: TOWN HALL (EXISTING) FRONT ELEVATION- GORKHI GATE ( KRISHNA TEMPLE )
TOWN HALL
FRONT ELEVATION- GORKHI GATE ( SCHOOL )
GORKHI GATE ( SCHOOL )
Notes: 1. The major items of work include exterior surface cleaning, raking out joints, etc. 2. In case of Town hall the main item is stone surface cleaning by gentle sandblasting. 3. In case of Gorkhi school gate the main item of work is the lime plaster & khamira wash.
TOWN HALL PLAN
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name FACADE IMPROVEMENT OF MAHARAJ BADA BUILDINGS, GWALIOR Date: 05/05/18
Drawn by: Mragank Gupta
Drawing name: Town Hall & Gorkhi Gate
Scale:
Checked by: Neeraj Bhagat
Drawing no: GSCDCL/MB/ TH-GG/01
N
List of structures A1-Sitole ka bada A2-Ramabai Mandir A3-Residence A4-Jadhav Palace A5-Vitthal Mandir A6-Halrilaal ki Haveli A7-Nathuram Shinde Mandir
LEGEND A2-Ramabai Mandir FOOD &BEVERAGES
A5-Vitthal Mandir
A3-Residence
A5
A7-Nathuram Shinde Mandir
A2
A4 A3
KEY PLAN
A7-Nathuram Shinde Mandir
A7 A4-Jadhav Palace
A1-Sitole ka bada
Sheet Title
A6 A6-Halrilaal ki Haveli
HARITAGE TRAIL: DARJI OLI Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR Drawn by:
Checked by: Neeraj Bhagat
Scale: 1:2000
Date:
Drawing no: GSCDCL/MB/
List of structures M1-Residence M2-Residence M3-Residence M4-Jain Mandir M5-Residence M6-Residence M7-Residence Key Plan
LEGEND M5-Residence
FOOD &BEVERAGES
M7-Residence
M7
M6
M4 M5 M3-Residence
Sheet Title HERITAGE TRAIL : MADHAVGANJ Client GWALIOR SMART CITY DEVELOPMENT CORPORATIONDate: LIMITED (GSCDCL) Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR Drawn by:
Checked by: Neeraj Bhagat
Scale: 1:1250
M6-Residence
M4-Jain Mandir
M2-Residence
M1-Residence
Drawing no: GSCDCL/MB/
List of structure
S1-Mixed use
S3-Mixed use
S2-Mixed use
S8-Residence
S7-Residence
S4-Mixed use
S5-Mixed use
S9-Mixed use
S6-Mixed use
S1-Mixed use S2-Mixed use S3-Mixed use S4-Mixed use S5-Mixed use S6-Mixed use S7-Mixed use S8-Mixed use S9-Mixed use S10-Mixed use S11-Commercial S12-Mixed use S13-Siddharth modern school S14-Babri ka bada S15-Mixed use S16-Mixed use S17-Shrinath ji ki haveli S18-Mixed use S19-Mixed use S20-Mixed use
LEGEND
S1
S2
S3
S4
S5
S6
S10 S16
S15
FOOD &BEVERAGES
S13 S12 S10-Mixed use
Key Plan
Sheet Title S11-Commercial
HERITAGE TRAIL: SARAFA BAZAR Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name
S17-Mixed use
S20-Mixed use
S19-Mixed use
S16-Mixed use
S18-Mixed use
S15-Mixed use
REVITALIZATION OF MAHARAJ BADA, GWALIOR Drawn by:
Checked by: Neeraj Bhagat
Scale: 1:2000
Date:
D:\SECTIONCC\niti pd 20180215\HERITAGE BUILDING DOCUMENTATION SARAFA BAZAR\cad file\images associated with cad file\6.jpg
S12-Siddharth Modern School
S13-Mixed use
S14-Babri ka bada
Drawing no: GSCDCL/MB/
HERI TAGENETWORKTRAI LMAP
He r i t a g eS t r u c t u r e s Di r e c t i onFl o w Foc a l Poi nt FoodJ oi nt S t a r tPoi nt
Mr a g a nkGu pt a 0 4 0 1 2 0 1 8
D1 D1 Residence
D2 Residence
D4 Residence
D8 Imam Bada
D5 Residence
D2 D6 Residence
D7 Residence
D8 D3 Residence
D9 Residence
D3
D11 Residence D10 Harilal Pyau
D9
D14
D4
D10
Daulatganj
D15
D7
List of structures D1-Residence D2-Residence D3-Residence D4-Residence D5-Residence D6-Residence D7-Residence D8-Imam Bada D9-Residence D10-Harilal Pyau D11-Residence D12-Residence D13-Residence D14-Residence D15-Residence D16-Residence D17-Rami Bai ki Dharamshala D18-Residence D19-Residence D20-Residence D21-Residence D22-Residence D23-Daud Market D24-Institution (Madhav Lib.) D25-Residence Key Plan
D5
D6
D12 Residence
LEGEND FOOD &BEVERAGES SHEET TITLE HERITAGE TRAIL : DAULATGANJ
D24 Madhav Lib. (Institution)
D23 Daud Market
D20 Residence
D19 Residence
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
D15 Residence
Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR
D25 Residence
D22 Residence
D21 Residence
D18 Residence
D17 Ramibai Dharamshala D16 Residence
D14 Residence
Drawn by:
Checked by: Neeraj Bhagat
Scale: 1:2000
Date:
Drawing no: GSCDCL/MB/
Note
Tangling wire over the carriage way.
Lvl
Lvl Hoardings on the streetpoles.
Lvl
Street vendors occupy Footpath or parking space at some places
Open Transformer on road side.
Lvl S A M S U N G
Lvl
Lvl
SAREE
S A M S U N G
Ground Level
Ground Level
SECTION M-M
1500
8000
FOOTPATH
CARRIAGE WAY
1500 FOOTPATH
Lvl
SECTION O-O
2500
9500
2500
FOOTPATH
CARRIAGE WAY
FOOTPATH
Footpath is being used as Parking at most places.
Lvl
Sheet Title Lvl
Lvl
HERITAGE TRAIL STREET SECTION Legend
Lvl
Lvl
Ground Level
Ground Level
SECTION N-N
3000
9000
FOOTPATH
PARKING
9000 CARRIAGE WAY
SECTION P-P
2000
6000
2000
FOOTPATH CARRIAGE WAY FOOTPATH
Client
Lvl
500 mm wide open Drain on both edges of carriage way.
GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL)
Lvl
Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR
Lvl
M
Ground Level
1000 SECTION R-R FOOTPATH
6000 CARRIAGE WAY
2000 PARKING
KEY PLAN
Drawn by:
Checked by: Neeraj Bhagat
Scale: 1:150
Date:
Drawing no: GSCDCL/MB/
Main Stages of Work:
TYPICAL TRADITIONAL SHOP FRONT FACADE IMPROVEMENT
1. Removal of all incompatible modern additions and layers. 2. Removal of unplanned signage/hoarding. 3. Revealing and showcasing the original building facade through conservation works and repairs.
Parapet Repair
TERRACE
1m
4. Installation of new signage system/doors windows
Repair/Installation of water spouts
Terrace
Showcase/accentutate traditional building elements
BALCONY/ UPPER FLOOR
4m
A typical shop building front elevation Key Plan
First Floor
PROJECTED BRACKETS/CHAJJA
GWALIOR GOTA FACTORY
SHOP SIGN
Installation of new shop signage Installation of motorized awning Sheet Title BUILDING ELEVATION SARAFA BAZAR
4m
GROUND FLOOR
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED
Repair/upgradation of existing doors/windows
Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR
PLINTH
.75m Ground Lvl
8.5m TYPICAL FRONT ELEVATION
Improvement of existing access/repair or improvement of existing stepped entrance
Drawn by: Mragank Gupta
Checked by: Neeraj Bhagat
Scale: 1:75
Date: 21.05.2018
Drawing no:
GSCDCL/MB/HNT/SB/
NOTES
S1
S2
S3
STREET ELEVATION "A"
S4
S5
Key Plan
S6
STREET ELEVATION "B"
SHEET TITLE SARAFA BAZAR STREET ELEVATION- NORTH S7
S8
S9
S10
STREET ELEVATION "C"
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR Checked by: Drawn by: Mragank Gupta Neeraj Bhagat
A SARAFA BAZAR STREET ELEVATION- NORTH
B
C
Scale:
Date:
Drawing no: GSCDCL/MB/HNT/SB
NOTES
S12
S13
STREET ELEVATION "A"
S14
S15 ( SINCE DEMOLISHED)
Key Plan
S16
STREET ELEVATION "B"
SHEET TITLE STREET ELEVATIONSARAFA BAZAR S17
S18
S19
STREET ELEVATION "C"
S20
Client GWALIOR SMART CITY DEVELOPMENT CORPORATION LIMITED (GSCDCL) Project Name REVITALIZATION OF MAHARAJ BADA, GWALIOR Checked by: Drawn by: Mragank Gupta Neeraj Bhagat
A SARAFA BAZAR STREET ELEVATION- SOUTH
B
C
Scale:
Date:
Drawing no: GSCDCL/MB/HNT/SB