160927 work sample muso z fan

Page 1

WORK SAMPLE 09'-16' MUSO ZHE FAN Associate AIA, LEED AP BD+C Board Member, Digital Architectural Design Association, Architecture Society of China Experience Designer, Creative Technologist http://www.mfworkgroup.com http://www.linkedin.com/in/musofan

MOBILE +1 (917) 794 9609 EMAIL

z.fan@columbia.edu

ADDRESS

600W 113TH ST, 7A1 NEW YORK, NY 10025 USA


PLACE MAKING 09'-15' ATKINS 12'-15' NBBJ 11' HPP 14' Archiplein 13' Coop Himmelb(l)au 09'-10' YS Groundwork 09'-10'


3


Dalian International Conference Center

TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Cultural Dalian, Liaoning, China 117,650 200906 Completed

Developed construction drawings, did research on local construction materials and followed up with suppliers, translated meeting minutes, participated in daily meeting and construction site visit as the translator for Austrian project architect

4


Hong Kong Boundary Crossing Facilities International Design Ideas Competition TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Civil+Transportation Hongkong, China 34,000 201007 Competition

Making 3D model, physical model, technical drawing and diagrams

5


Grasshopper Parametric Design Simulation Landscape Product Design 6


Suning Nanjing Gulou Mixed Use Development

TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Mixed Use Nanjing, Jiangsu,China 385,000 201108 Commission

Generated parametric facade models, developed scripts for external wall building components and paneling patterns

7


8


Shenzhen Tencent Seafront Headquarter TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Office Shenzhen,Guangzhou,China 270,000 201111 Under Construction

On-site collaboration with NBBJ Los Angeles team producing construction drawings, participated in meeting with LDI, client and consultants 9


Shenzhen Tencent Seafront Headquarter Revit BIM Model Revit + Rhino Grasshopper Collaboration

10


Chongqing Suning City Plaza

TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Mixed Use Chongqing, Sichuan, China 165,648 201109 Competition

Generated 3D model and technical drawings, made physical models, helped team coordination through parametric tools

11


Changshu Wanda Center Shopping Mall+Retail Street Facade Design TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Commercial Changshu, Jiangsu, China 201407 Under Construction

12


GLP I-Park Office Building Facade Design TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Office Xi'an Shanxi, China 201209 Completed

13


总平面分析

MLP Analysis Rendered Finish

300 RMB/sqm

涂料

300 元/平方米 立面设计方案

Facade Options

Glass Curtain Walling 1200 RMB/sqm 玻璃幕墙

1200元/平方米

Terracotta panels

750 RMB/sqm

陶板贴面

750元/平方米

Rendered Finish

300 RMB/sqm

涂料

300 元/平方米

Stone panels

450 RMB/sqm

石材贴面

450 元/平方米

Xi An GLP I-Park Office Building Facade Design TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Office Xi'an Shanxi, China 201209 Completed 14


Powerlong Qingpu City Plaza Mixed Use Development TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office Transportation) Shanghai, China 240,000 201309 Under Construction

Project coordinator & lead designer, prepared Chinese regulation and legal documents, coordinated with rendering/ physical model company, collaborated with client, government officials, suppliers,consultant, made 3D model, construction drawing, diagrams and prepared booklet 15


16


Powerlong Qingpu City Plaza Mixed Use Development TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office Transportation) Shanghai, China 240,000 201309 Under Construction 17


Powerlong Qingpu City Plaza Mixed Use Individual Proposal TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office Transportation) Shanghai, China 240,000 201309 Under Construction

18


Shanghai Qibao Eco-Business Park Urban Design

TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office) Shanghai, China 250,672 sqm 201310 Commission SD

19


Shanghai Qibao Eco-Business Park Urban Design TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office) Shanghai, China 250,672 sqm 201310 Commission SD

20


Karamay K-12 International School Planning+Architecture TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Education Karamay, Xinjiang, China 205,702 sqm 201410 Competition 2nd Priz

21


Karamay K-12 International School Planning+Architecture TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Education Karamay, Xinjiang, China 205,702 sqm 201410 Competition 2nd Priz 22


Fengtai Industrial Park Master Plan International Design Competition TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Planning Beijing, China 688,245 sqm 201405 Competition 1st Prize

23


Jinhai Panzhihua City MixedUse Development TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Residential Office) Panzhihua, Sichuan, China 248,300 201408 Competition

24


Qingdao TBD Complex Center Design TYPE LOCATION STATUS

TOD(Transit Oriented Design) Qingdao, Shandong Competition

25


Shanghai Zhangjiang High-tech Business Park

TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Corporate Office Shanghai, China 100,380 201212 Competition

26


Dongyang Woodcarving City TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Cultural Exhibition Commercial Dongyang, Zhejiang,China 876,000 201301 Competition 27


Dehua Porcelain City TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Planning Dehua, Fujian, China 1,007,400 201302 Competition 1st Prize

28


Xuhui Waterfront International Urban Design Competition TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Office Residential TOD) Shanghai, China 596,045 sqm 201304 Compeititon 29


Xuhui Waterfront International Urban Design Competition TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Urban Design(Commercial Office Residential TOD) Shanghai, China 596,045 sqm 201304 Compeititon 30


TYPE LOCATION PROJECT AREA(sqm) YEAR STATUS

Transportation(TOD) Shanghai, China 52,950 sqm 201412 Compeititon

Chongming Chenjiazhen Transportation Terminal International Design Competition 31


V

DIGITAL PRACTICE 12'-16' Columbia University GSAPP MS.AAD 15'-16' Dalian University of Technology B.Arch 07'-12'


Building Information Sound Simulation and Optimization Using Autodesk Ecotect software to do the sound simulation analysis for the phsical environment and change the interior decoration & material to achieve a better indoor sound environment

33


Building Information Lighting Simulation and Optimization Using Autodesk Ecotect software to do the lighting simulation analysis for the phsical environment 34


[Virtual Reality] Unreal Engine Graphical Programming Blueprint Unreal Engine Blueprint Graphical Programming Platform to realize a virtual reality environment, built with HTC VIVE 35


[BOUNCING SPACE]

[HOME BASE NIGHT]

[FALLING SOUND]

[HOME BASE]

[INVERTED WORLD]

[ATTRACTION/JUNKFOOD SPACE]

[VR] Immersive Experience Design Museum of Physics This project explores the possibility of "architecture" or "experience" design in future fully immersive VR environment. Architects and artists would truly control the Physics Law of the new world and design fascinating experience for the users, which is exactly like the world in the film Inception. 36


Unity 3D Virtual Reality Environment with C# Programming Using Monograph C# Programming to realize different physical environment in Unity 3D 37


[IoT] Graphical Internet of Things Physical Programming Platform Intel & IBM Bluemix Watson Designer: Muso Z. Fan Hardware:Intel Gateway, Grove IoT Commercial Developmer Kit Software:IBM Bluemix Cloud Platform, Node-RED

38


[Web Development] City Vision Data Visualization &Â Analysis Platform(WIP) UI UX Design: Muso Z. Fan Front End: d3.js, leaflet.js(JavaScript) Back End: Flask(Python) Database: OrientDB Machine Learning: Scikit-learn(Python) 39


This project was granted by UCI, a joint initiative whose research is led by Columbia University, Tsinghua University, and McKinsey & Company.

40


[iOS AR App] "AveRy" Augmented Reality Architecture&Urban Design Apps GSAPP Appitecture - iOS software Development Professor: Toru Hasegawa, Mark L. Collins Designer: Muso Zhe Fan, Guangyue Cao Platform: Xcode, Unity3D, Vuforia SDK 41


[Web Development] Yellow Detective China Grey Economy Data Visualization Project GSAPP Datamining the City Professor: Danil Nagy Team Lead: Muso Z. Fan Front End: d3.js, leaflet.js(JavaScript) Back End: Flask(Python) Database: OrientDB Machine Learning: Scikit-learn(Python) 42


RESEARCH 07'-16' Columbia University GSAPP MS.AAD 15'-16' Dalian University of Technology B.Arch 07'-12'


TRADITIONAL CONGLOMERATE THE DOWNLOAD/UPLOAD SPEED AND BANDWIDTH AFFECTS THE CO-CORKING EXPERIENCE, IN TERMS OF THE SPECIFIC PROJECT, IT WILL SLOW DOWN THE CONSTRUCTION TIME

NOWADAYS TASK BASED FAST COMPANY

THEY ARE BECOMING.... 1.TINY AND MORE TARGETED 2.EPHEMERAL 3.FLAT ORGANIZATION 4.MORE ABOUT IMMATERIAL PRODUCTION

THEY WANT TO BE.... 1.BIGGER, MORE BRANCHES 2.LONGER LASTING IN THE INDUSTRY 3.STRICT HIEARCHY 4.MORE ABOUT MATERIAL PRODUCTION

BRYANT PARK FILE SIZE 51.1 DOWNLOAD 11161.6 TIME 0.07813455657

FORDISM

DYNAMIC EQUILIBRIUM COWORKING ENVIRONMENT

42ND ST FILE SIZE 51.1 DOWNLOAD 470 TIME 1.855546099

DEDICATED OFFICE

CHELSEA

PROCESS 1

FILE SIZE 51.1 DOWNLOAD 566 TIME 1.540824499

PROCESS 2

Encourage Communication & Discussion

PROCESS 3

Assemble Line // Discussion is forbidden to increase efficiency

SOHO WEST FILE SIZE 51.1 DOWNLOAD 2016 TIME 0.4325925926

BORN

ADOLESCENCE

Free individuals with different talents organized by projects \tasks\ideas

MATURITY

OPEN COWORKING ENVIRONMENT WEWORK PHYSICAL & NETWORK SERVICES MAKE ONE CONSTRUCTION DISTRIBUTED BY DIFFERENT COUNTRY / PERSON AVAILABLE

A Temporary Company with a group of people sharing the same goal, which is good for keep group privacy and keep away competitiors.

Mentored by different groups of specialists, to help realise their goal.

DEDICATED OFFICE

DECEASE

When this goal is achieved, company will die, talents will redistribute and reorganize into another network of relationship.

OPEN COWORKING ENVIRONMENT

VENTURE CAPITAL

100%

11%

31%

85%

100%

100%

0%

24%

86%

100%

100%

20%

40%

72%

88%

100%

12%

35%

47%

100%

100%

11%

30%

70%

97%

SCHOOL (INCUBATOR)

WORKGROUP (COMPANY)

THE FUTURE OF WORKING Columbia GSAPP Summer 2015 Designer: Muso Z. Fan Studio Phu Hoang: future working environment design based on deep research into Wework and other sharing economy company 44


BRYANT PARK 2 FLOOR ON THE GROUND

MADISON 2 FLOOR IN THE MIDDLE

NOMAD 2 FLOOR IN THE MIDDLE

3763359 sqm

42ND ST 5 FLOOR 3 FLOORS FROM 15-17 2 FLOORS FROM 19-20

CHELSEA 2 FLOOR 2ND AND 3RD

BRYANT PARK

MADISON

42ND ST

BLOCK SERVICE>>BUILDING SERVICE>>WEWORK SERVICES

NOMAD PARK SOUTH CHELSEA GRAMERCY 500m BUILDING SERVICE BE ARRANGED AND RE-ALLOCATED BY NETWORK SERVICES

500m PEDESTRIAN WALKABLE SERVICE RING

VIRTUAL/PHYSICAL

TASKS: LOOKING FOR ONE CONFERENCE ROOM

ALL THE WEWORK SPACES IN MANHATTEN MIDTOWN CREATE A NETWORK WHICH EXPANDS THE SERVICE AREA FOR WEWORK

45


DAY 15. PROTOTYPING Team moved to LIBRARY (Data Center) for Project Research & Prototyping DAY 90. INCUBATOR EDUCATION WEEK

DAY 30. LAUNCH A COMPANY Moved to closed dedicated office for the purpose of confidentiality.

DAY 1. CONCEPT

DAY 120. MEETING WITH VENTURE CAPTIAL SEED ROUND, ANGEL ROUND, SERIES A, B.....

Idea starts from discussion with other members in coworking space, then they decide to realize this idea. DAY 10. BUILD UP TEAM Recruiting people from different backgrounds(Design\IT\Finance).

DAY 365. IPO\BUY IN BUY OUT Product or Service getting mature, team realize their original dream

DAY 380. RETURN TO OPEN COWORKING Team split, some stay at the company, othe team, get shareholding and then return to c looking for the next opportunity

46


THE FUTURE OF BUILDING SERVICE Columbia GSAPP Summer 2015 Researcher: Muso Z. Fan Studio Phu Hoang


THE FUTURE OF MOBILITY

Columbia GSAPP Fall 2015 Researcher: Muso Z. Fan Studio Michael Bell: future of mobility research supported by Tesla, joint studio with Stanford University & Tongji University

48


THE FUTURE OF MANUFACTORING & SPACE COLONIZATION Columbia GSAPP Spring 2016 Researcher: Muso Z. Fan Studio Benjamin Aranda: future of manufactory research supported by Intel Chip Factory center in Phoenix 49


50


THANK YOU MORE INFORMATION http://www.mfworkgroup.com http://www.linkedin.com/in/musofan https://github.com/musofan


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.