C 201
Renderings / Exterior
T001 Index of Drawings
LANDSCAPE / SITE
L 101 Climate Analysis L 102 Sunlight Analysis L 103 Site Analysis MNW
CONCEPT
C 101 Generative Massing Diagram C 102 Facade Assembly Diagram C 103 Arrangement Diagram C 104 Landscape Design Diagram C 201 Renderings / Exterior C 202 Renderings / Exterior C 203 Renderings / Exterior C 204 Renderings / Interior
ARCHITECTURE
A 101 Site Plan A 102 Roof Plan A 103 Level 6 Plan A 104 Level 5 Plan A 105 Level 4 Plan A 106 Level 3 Plan A 107 Level 2 Plan A 108 Level 1 Plan A 201 Section AA’ A 202 Section BB’ A 203 Section CC’ A 301 Wall Section A 302 Detail Section A 303 Detail Section / Cliff A 401 Elevation
STRUCTURE
Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Context
S 101 Structure Axon Diagram S 102 Structure Section Diagram
MEP
M 101 Vertical Mechinical Distribution Diagram M 102 Section Mechinical Distribution M 201 Horizontal Mechinical Distribution / Roof Top M 202 Horizontal Mechinical Distribution / Level 3 / Air Room M 203 Horizontal Mechinical Distribution / Level 1
N
Drawing No./ Title
T 001
INDEX OF DRAWINGS
CLIMATE CRITERIA
DIURNAL
Temperture
Psychrometric Chart
PSYCHROMETRIC CHART DIURNAL
TEMPERTURE
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Temperture Range
25% 71% 4% 0%
RECORDED HIGH DESIGN HIGH <AVERGE 32F HIGH MEAN 32F - 69F AVERAGE LOW 69F - 81F SEDIGN LOW 81F 100F RECORDED LOW
SUMMER COMFORT ZONE WINTER COMFORT ZONE
Dry BULB Temperture
Monthly Diurnal Averages
DRY BULB (all hours)
LIGHTING / SHADOW ANALYSIS SUNLIGHT / SHADOW ANALYSIS
06:00 AM
09:00 AM
12:00 PM
DIURNAL 09:00 AM
06:00 PM
Monthly Averages ComfortDiurnal Zone (4.5% / 392 hrs)
DRY BULB MEAN COMFORTABLE SUMMER COMFORT 4% ZONE WET BULB MEAN NOT COMFORTABLE WINTER COMFORT 96% ZONE DRY BULB (all hours) GLOBAL HORIZ DIRECT NORMAL DIFFUSE
GLOBAL HORIZ DIRECT NORMAL DIFFUSE
PROBABILITY OF PRECIPITATION RAIN
SUNLIGHT / SHADOW ANALYSIS 06:00 AM
09:00 AM
12:00 PM
03:00 PM
JUNE 22 summer sols ce
12:00 PM
03:00 PM
Comfort Zone (4.5% / 392 hrs) Site Internal Heat Gain (21.4% / 1847 hrs)
Finnboda, Nacka, Sweden(74.1% / 6488 hrs) Heating/ Humidification Dehumidification (0.1% / 7 hrs)
Consultants Design Alexandra Barker
THERMAL RADIANT
Mechanical Stuart Bridgett
06:00 PM
Rain RAIN
Diurnal
0 AM
DRY BULB MEAN
PSYCHROMETRIC CHART WET BULB MEAN
25% < 32F 71% 32F - 69F SUMMER COMFORT ZONE 4% 69F - 81F 0% 81F - 100F WINTER COMFORT ZONE
Facade Kate Kulpa
06:00 PM
Landscape/ Site Nick Koster
JUNE 22
Structural Paul Laroque DEC 22 winter sols ce
COMFORTABLE 4% NOT COMFORTABLE 96%
Comfort Zone (4.5% / 392 hrs) DEC 22
PSYCHROMETRIC CHART MAR 22 equinox
Monthly Diurnal Averages
PROBABILITY OF PRECIPITATION DRY BULB MEAN WET BULB MEAN DRY BULB (all hours)
06:00 PM
FOLDING Comfort Zone (4.5% / 392 hrs)
100% 0%
Digital Assistance Comfort Zone (4.5% / 392 hrs) Christina Ostermier
Internal Heat Gain (21.4% / 1847 hrs)
Context
SUMMER COMFORT ZONE WINTER COMFORT ZONE
19” YEAR 2009
GLOBAL HORIZ DIRECT NORMAL DIFFUSE
THERMAL RADIANT
16.5” YEAR 2012
LIGHTING STUDY RAIN 03:00 PM
COMFORTABLE NOT COMFORTABLE
SNOW DEPTH THERMAL RADIANT
MAR 22
2F 32F - 69F 69F - 81F 81F - 100F
Comfort Zone (4.5% / 392 hrs) Internal Heat Gain (21.4% / 1847 hrs) Heating/ Humidification (74.1% / 6488 hrs) Dehumidification (0.1% / 7 hrs)
Hall PENERTRATING Concert PUBLIC SPACE (less insulation)
GREDIENT STRUCTURE COMFORTABLE 4% NOT COMFORTABLE 96%
Comfort Zone (4.5% / 392 hrs) Internal Heat Gain (21.4% / 1847 hrs) Heating/ Humidification (74.1% / 6488 hrs) Dehumidification (0.1% / 7 hrs)
SNOW DEPTH
N
MATERIAL DIFFERENCE COMFORTABLE NOT COMFORTABLE
100% 0%
Drawing No./ Title Comfort Zone (4.5% / 392 hrs) Internal Heat Gain (21.4% / 1847 hrs)
PLAZA
COMFORTABLE NOT COMFORTABLE
26% 74%
RIVER
L 101
Climate Analysis
LIGHTING / SHADOW ANALYSIS SUNLIGHT / SHADOW ANALYSIS
06:00 AM
09:00 AM
12:00 PM
06:00 PM
SUNLIGHT / SHADOW ANALYSIS
MNW Michael Lu Nai-Hua Chen YuWei Wu
JUNE 22 summer sols ce SUMMER SOLSTICE
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
JUNE 22
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa
DEC 22 WINTER sols SOLSTICE winter ce
Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance
DEC 22 Ostermier Christina
Context
MAR 22 equinox EQUINOX N
MAR 22 Drawing No./ Title
L 102
Sunlight Analysis
Finnboda Varvsvag 16, 131 72, Nacka, Sweden
SALTSJON MNW
Finnboda - Saltsjoqvarn
Michael Lu Nai-Hua Chen YuWei Wu
11
Project Name
Finnboda - Kvarnholmen
Stockholm Concert Hall
Site
37
Finnboda, Nacka, Sweden
55
17 STUDIO
Finnboda Hamn STORE RESTAURANT
Consultants
40
Design Alexandra Barker
SHIP PARKING
20
62
Mechanical Stuart Bridgett
60
SHIP PARKING
60
100
113
88
Landscape/ Site Nick Koster Structural Paul Laroque
78
ICA (MARKET)
N59 18’54”
STORE
67
Facade Kate Kulpa
Digital Assistance Christina Ostermier
100 131
Scale 145
1" = 128' HOTEL
Context
N
Drawing No./ Title
L 103
Site Analysis
GENERATIVE MASSING ELEVATE UP TO HILL LEVEL
CONNECT TO THE HILL ELEVATE UP TO HILL LEVEL
SITE AREA
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett
SHAPE
Facade Kate Kulpa
CONNECT TO THE HILL
Landscape/ Site Nick Koster
CONNECT TO THE HILL ELEVATE UP TO HILL LEVEL
Structural Paul Laroque Digital Assistance Christina Ostermier
Context
N
Drawing No./ Title
C 101
Generative Massing
MESH
MNW
STEEL FRAME INSULATED GLASS
CEMENT PANEL STEEL FRAME
CEMENT PANEL
STEEL CABLE
TRUSS
Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Context
N
Drawing No./ Title
C 102
Facade Assembly Diagram
APERTURE
DOUBLE SKIN
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker
Aperture
Hall Arrangement / Double Skin
Main Hall Reheaesal Hall
Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Context
N
Backstage / Public Circulation
Backstage
Drawing No./ Title
C 103
Arrangement Diagram
Bike Lane
Detention Pond
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Context
N
Drawing No./ Title
C 104
Landscape Design Diagram
Drawing No./ Title
C 202
Renderings / Exterior
Drawing No./ Title
C 203
Renderings / Exterior
Drawing No./ Title
C 204
Renderings / Interior
BB'
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall CC'
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa AA'
Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Scale 3" = 64'
Context
N
Drawing No./ Title
A 101
Site Plan
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Cooling
Facade Kate Kulpa
Boiler
Landscape/ Site Nick Koster
Chiller
UP DN DN DN
DN
DN
Structural Paul Laroque Digital Assistance Christina Ostermier
Scale 3" = 64'
Context
N
Drawing No./ Title
A 102
Roof Plan
COATROOM
DN DN DN
BOX OFFICE
MNW
DN
Michael Lu Nai-Hua Chen YuWei Wu
UP
Project Name
DN
Stockholm Concert Hall
CONTROL ROOM DN
DN
DN
STORAGE
Site Finnboda, Nacka, Sweden
Consultants
OFFICE
Design Alexandra Barker
1
Mechanical Stuart Bridgett
OFFICE
Facade Kate Kulpa Landscape/ Site Nick Koster
STORAGE STORAGE
Structural Paul Laroque
MEETING ROOM
Digital Assistance Christina Ostermier 2
Scale 3" = 64' PERFORMER ACCOMMODATION ZONE
Context
DINNING SPACE PERFORMER’S SUITE CONDUCTOR’S SUITE OFFICE
N
Drawing No./ Title
A 103
Level 6 Plan A
B
UP
DN
MNW Michael Lu Nai-Hua Chen YuWei Wu
CAFE
DN DN
Project Name
OPEN TO BELOW
Stockholm Concert Hall
OPEN TO BELOW
DN DN DN
Site
UP
Finnboda, Nacka, Sweden OPEN TO BELOW
Consultants Design Alexandra Barker
1
Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier 2
Scale 3" = 64'
Context OPEN TO BELOW
N
Drawing No./ Title
A 104
Level 5 Plan A
B
MNW PERFORMERS / STAFFS LOUNGE
Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site
UP
Finnboda, Nacka, Sweden UP
Consultants Design Alexandra Barker
1
Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier 2
Scale 3" = 64'
BACKSTAGE
Context
DN DN
N
Drawing No./ Title
A 105
Level 4 Plan A
B
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden PUBLIC LOUNGE
Consultants Design Alexandra Barker
AIR ROOM 1
Supply Air
Mechanical Stuart Bridgett Return Air
Facade Kate Kulpa Landscape/ Site Nick Koster
1 DN
Structural Paul Laroque
DN
Digital Assistance Christina Ostermier DN
DN
DN
Scale 3" = 64'
Context Supply Air
AIR ROOM 2
Return Air
2
UP UP
N
Drawing No./ Title
A 106
Level 3 Plan
DN
MNW Michael Lu Nai-Hua Chen YuWei Wu DN
Project Name
DN
Stockholm Concert Hall UP
Site Finnboda, Nacka, Sweden DN
DN
DN
Consultants
DN
Design Alexandra Barker
DN
DN
Mechanical Stuart Bridgett Facade Kate Kulpa REHEARSAL HALL SEAT LEVEL UP
DN
UP
Landscape/ Site Nick Koster
UP
1
Structural Paul Laroque Digital Assistance Christina Ostermier DN
Scale 3" = 64'
Context
2 BACKSTAGE / PERFORMER ACCOMMODATION FOR REHEARSAL HALL
N
Drawing No./ Title
A 107
Level 2 Plan
UP
MNW Michael Lu Nai-Hua Chen YuWei Wu
UP
UP
Project Name
DN
Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
DN
1
Consultants
2
Design Alexandra Barker
ELECTRICAL ROOM
DN
Mechanical Stuart Bridgett
3
Facade Kate Kulpa 4
Landscape/ Site Nick Koster
TRUCK LOADING AREA
DN
DATA / TELECOM ROOM
5
Structural Paul Laroque Digital Assistance Christina Ostermier
6
DN FIRE PROTECTION WATER / FIRE PUMP ROOM
Scale
GAS SERVICE
REHEARSAL HALL STAGE LEVEL
3" = 64'
DN
7
WATER ROOM
Context
8
ELECTRICAL ROOM
WASTE WATER
N
Drawing No./ Title
A 108
Level 1 Plan
MNW A
B
Michael Lu Nai-Hua Chen YuWei Wu
C
Project Name Stockholm Concert Hall
ROOFTOP 125' - 0"
Site Finnboda, Nacka, Sweden
Consultants LOBBY LEVEL / BALCONY 76' - 0"
5TH FLOOR 61' - 2"
4TH FLOOR 52' - 10"
3RD FLOOR 27' - 0"
2ND FLOOR 16' - 0"
TRUCK LOADING AREA
1ST FLOOR 3' - 6" GROUND LEVEL 0' - 0"
Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
WATER TABLE - 10' - 0"
Scale 1" = 8'
Context D
E
N
Drawing No./ Title
A 201
Section AA'
MNW Michael Lu Nai-Hua Chen YuWei Wu
B
A
Project Name Stockholm Concert Hall ROOFTOP 125' - 0"
Site Finnboda, Nacka, Sweden
LOBBY 80' - 0"
LEVEL 5 61' - 2"
LEVEL 4 52' - 10"
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa
LEVEL 3 27' - 0"
LEVEL 2 16' - 0"
CRAWL SPACE
LEVEL 1 3' - 6" GROUND LEVEL 0' - 0"
WATER TABLE - 8' - 0"
Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Scale 1" = 8' C
D
Context
N
Drawing No./ Title
A 202
Section BB'
ROOFTOP 125' - 0"
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall LOBBY LEVEL / BALCONY 76' - 0"
Site Finnboda, Nacka, Sweden
LEVEL 5 61' - 2"
LEVEL 4 52' - 10"
Consultants Design Alexandra Barker Mechanical Stuart Bridgett
LEVEL 3 27' - 0"
Facade Kate Kulpa Landscape/ Site Nick Koster
GROUND ENTRANCE LEVEL 6' - 0"
GROUND LEVEL 0' - 0"
WATER TABLE - 8' - 0"
Structural Paul Laroque Digital Assistance Christina Ostermier
Scale 1" = 16'
Context Car Lane
Detention Pond
Sidewalk
Bike Lane
Entrance Plaza
Entrance
N
Drawing No./ Title
A 203
Section CC'
1/2"=1'-0"
SECTION DETAIL
4
1/2"=1'-0"
SECTION DETAIL
IZONTAL AT EVERY JOINT
OVEMENT CONNECTION
1/2"=1'-0"
SECTION DETAIL
ALUM. PAN
ER SEALANT
SHEATHING
PACER TAPE ER SEALANT
3
ANCHOR
1/2"=1'-0"
SECTION DETAIL
INSULATED GLASS
2
1
STEEL BEND PLATE
ANCHOR
HAT CHANNEL
SHEET PAN
6” INSULATION
IR VAPOR BARRIER STEEL FRAME
CEMENT PANEL
MESH
DED ALUM. PLATE
CEILING
FLOOR FINISH
FLASHING
4” STEEL CABLE
1
0’-0”
LEVEL 0
3’-6”
LEVEL 1
16’-0”
LEVEL 2
27’-0”
LEVEL 3
52’-10”
LEVEL 4
61’-2”
LEVEL 5
80’-0”
LOBBY
2
A-100
ROOFTOP 125’-0”
A-100
3
A-100
4
A-100
MNW
Michael Lu Nai-Hua Chen YuWei Wu
Project Name
Stockholm Concert Hall
Site
Finnboda, Nacka, Sweden
Consultants
Design Alexandra Barker
Mechanical Stuart Bridgett
Facade Kate Kulpa
Landscape/ Site Nick Koster
Structural Paul Laroque
Digital Assistance Christina Ostermier
Scale
1/2" = 1'
Context
N
Drawing No./ Title
A 301
Wall Section
A-100
1/2"=1'-0"
LEVEL 5
1
61’-2”
A-100ROOFTOP 125’-0”
EXTRUDED ALUM. PLATE MESH CEMENT PANEL
ROOFTOP 125’-0”
AIR VAPOR BARRIER STEEL FRAME EXTRUDED ALUM. PLATE 6” INSULATION MESH SHEET PAN CEMENT PANEL
6” CONCRETE SLAB
INSULATED WEATHER SEALANT GLASS
TOPPING SLOPED SLAB
6” INSULATION
SPACER TAPE WEATHER SEALANT
RIGID INSULATION ADJUSTABLE PEDESTAL 2” CONCRETE PRECAST PAVER 6” SLAB
SHEET PAN HAT CHANNEL
SPACER TAPE WEATHER SEALANT SHEATHING
ADJUSTABLE PEDESTAL
AIR VAPOR BARRIER STEEL FRAME
INSULATED GLASS
SHEATHING ALUM. PAN
TOPPING SLOPED SLAB
FIRESAVING AND SMOKE SEAL AT SLAB EDGE FLOOR FINISH
FLASHING
MNW
FIRESAVING AND SMOKE SEAL AT SLAB EDGE
Michael Lu Nai-Hua Chen YuWei Wu
3
FLOOR FINISH
WEATHER SEALANT
RIGID INSULATION
ANCHOR HAT CHANNEL
FLASHING
A-100
2” PRECAST PAVER
Project Name
STEEL BEND PLATE
Stockholm Concert Hall
ALUM. PAN
3
CEILING
ANCHOR
A-100 Site
STEEL BEND PLATE
Finnboda, Nacka, Sweden CEILING
1
3
SECTION DETAIL
Consultants
SECTION DETAIL
Design Alexandra Barker
1/2"=1'-0"
1/2"=1'-0"
Mechanical Stuart Bridgett
1
SECTION DETAIL
2
1/2"=1'-0"
3
SECTION DETAIL 1/2"=1'-0"
LEVEL 3
A-100
27’-0”
2
LEVEL 3
A-100
27’-0”
Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Scale
4” STEEL CABLE
1 1/2" = 1'
LOBBY 80’-0”
Context
MOVEMENT CONNECTION
CONNECTION PLATE 4” STEEL CABLE
LOBBY
ANCHOR
80’-0” CONNECTION PLATE
MOVEMENT CONNECTION HORIZONTAL AT EVERY JOINT
16’-0”
ANCHOR
HORIZONTAL AT EVERY JOINT
2
4
SECTION DETAIL 1/2"=1'-0"
SECTION DETAIL
SECTION DETAIL
61’-2”
1/2"=1'-0"
LEVEL 5 61’-2”
4
LEVEL 2
N
16’-0”
1/2"=1'-0"
LEVEL 5
2
LEVEL 2
SECTION DETAIL 1/2"=1'-0"
LEVEL 1
Drawing No./ Title
3’-6”
A 302
Detail Section LEVEL 0 LEVEL 1 0’-0”
2” PRECAST CONCRETE PAVER RIGID INSULATION PROTECTION COURSE
MNW 6" EXPANSION JOINT 3/4" SHIM
Michael Lu Nai-Hua Chen YuWei Wu
FLASHING 8" CONCRETE SLAB
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden W18x60 BEAM MEMBRANE
Consultants GROUT
Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa
ROCK ANCHOR INSULATION
STEEL BASE PLATE
Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Scale TEFLON PAD
1" = 1'
EXTENSION JOINT
Context
FACADE SYSTEM
N
Drawing No./ Title
A 303
Detail Section / Cliff
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
ELEVATION B 1/16"=1'-0"
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Scale 1" = 16'
Context
N
Drawing No./ Title
A 401
Elevation
STRUCTURE DIAGRAM
1
MNW Michael Lu Nai-Hua Chen YuWei Wu
1
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden 2
Consultants Design Alexandra Barker
2
Mechanical Stuart Bridgett 1
1
2
2
Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
3
3
3
4
3
4
Context
N
4
Drawing No./ Title
S 101 4
Structure Axon Diagram
MNW
BOUNDARY TRUSSES
Michael Lu Nai-Hua Chen YuWei Wu
COLUMNS
Project Name Stockholm Concert Hall
SECONDARY TRUSSES
Site
MAIN TURSSES
Consultants
STEEL CABLE
Finnboda, Nacka, Sweden
Design Alexandra Barker Mechanical Stuart Bridgett
CONCRETE FLOOR SLAB W. STEEL BEAMS W18x60
HALL TRUSSES
Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
CORE Context
FACADE STEEL FRAME
COLUMNS
N
Drawing No./ Title
S 102
Structure Section Diagram
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Restroom
Consultants
Chiller Boiler
Design Alexandra Barker
Cooling
Mechanical Stuart Bridgett Waste Water Room Air Room 2 (for both concert halls)
Water Service Room
Air Room 1 (for other space) Fire Protection Room Data Room
Water Service
Facade Kate Kulpa Landscape/ Site Nick Koster Structural Paul Laroque Digital Assistance Christina Ostermier
Air Service Context
N
Drawing No./ Title
M 101
Vertical Mechinical Diagram
MAIN ENTRANCE
WASTE WATER ROOM FIRE PROTECTION / GAS SERVICE WATER SERVICE ROOM WASTE WATER ROOM
AV/IT CLOSETS
SECTION A-A' 1” = 16’ SECTION A-A' 1” = 16’
A
B
C
A
B
C
ROOFTOP 125' - 0"
ROOFTOP 125' - 0"
MNW
LOBBY LEVEL / BALCONY 76' - 0"
Michael Lu Nai-Hua Chen YuWei Wu
LEVEL 5 61' - 2"
LOBBY LEVEL / BALCONY LEVEL 76' - 0" 4 52' - 10"
LEVEL 5 61' - 2"
Project Name
LEVEL 4 52' - 10"
Stockholm Concert Hall
LEVEL 3 27' - 0"
LEVEL 2 16' - 0"
Site
LEVEL 3
TRUCK LOADING AREA
27' - 0" LEVEL1 3' - 6" GROUND LEVEL 0' - 0" LEVEL 2 16' - 0" WATER TABLE - 8' - 0"
TRUCK LOADING AREA
LEVEL1 3' - 6" GROUND LEVEL 0' - 0"
WATER TABLE - 8' - 0"
D
E
D
E
SPACE FOR AHU
Finnboda, Nacka, Sweden
FIRE PROTECTION / GAS SERVICE ROOM AirSPACE Room 2FOR AHU AIR ROOM 2 Consultants SPACE FOR AHU FIRE PROTECTION / GAS SERVICE ROOM Design TRUCK LOADING AREA Alexandra Barker FireAIR Protection ROOM 2 / Gas Truck Loading AreaAREA Mechanical TRUCK LOADING Stuart Bridgett
SECTION B-B' 1” = 16’
Facade Kate Kulpa
SECTION B-B' 1” = 16’
A
B
Landscape/ Site Nick Koster
A
B
Structural Paul Laroque ROOFTOP 125' - 0"
Digital Assistance Christina Ostermier
ROOFTOP 125' - 0"
Scale 1" = 16'
LOBBY 80' - 0"
Context
LEVEL 5 61' - 2" LOBBY 80' - 0" LEVEL 4 52' - 10"
LEVEL 5 61' - 2"
LEVEL 4 52' - 10" LEVEL 3 27' - 0"
LEVEL 2 16' - 0"
LEVEL 3 27' - 0" 1 LEVEL 3' - 6" GROUND FLOOR 0' - 0"
CRAWL SPACE
LEVEL 2 16' - 0" WATER TABLE - 8' - 0"
CRAWL SPACE
LEVEL 1 3' - 6" GROUND FLOOR 0' - 0"
WATER TABLE - 8' - 0"
C
C
D
D
AirSPACE Room 1FOR AHU AirAIR Room 2 1 ROOM FOR AHU AirSPACE Supply Direction AIR ROOM 2 Main Hall - From below AIR 1 DIRECTION Rehearsal Hall - From Above AIR ROOM SUPPLY Main - From AIR Hall ROOM 2 below SPACE FORHall AHU Rehearsal - From Above AIR SUPPLY DIRECTION Main Hall - From below Rehearsal Hall - From Above
N
Drawing No./ Title
M 102
Section Mechinical Distribution
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
Consultants Design Alexandra Barker Mechanical Stuart Bridgett Cooling
Facade Kate Kulpa
Boiler
Landscape/ Site Nick Koster
Chiller
UP
Structural Paul Laroque
DN DN DN
Digital Assistance Christina Ostermier
DN
Scale
DN
3" = 64'
Context
Boiler Cooling / Chiller Main Entrance
N
Drawing No./ Title
M 201
Horizontal Distribution / Roof Top
MNW Michael Lu Nai-Hua Chen YuWei Wu
Project Name Stockholm Concert Hall
Site Finnboda, Nacka, Sweden PUBLIC LOUNGE
Consultants AIR ROOM 1
Design Alexandra Barker
AV/IT
Supply Air
Mechanical Stuart Bridgett Return Air
Facade Kate Kulpa Landscape/ Site Nick Koster
1 DN
Structural Paul Laroque
DN
Digital Assistance Christina Ostermier DN
DN
DN
Scale 3" = 64'
Context Supply Air
AIR ROOM 2
Return Air
2
AV/IT
UP UP
Air Room 1 Air Room 2 AV/IT Balcony
N
Drawing No./ Title
M 202
Horizontal Distribution / Level 3
UP
MNW Michael Lu Nai-Hua Chen YuWei Wu
UP
UP
Project Name
DN
Stockholm Concert Hall
Site Finnboda, Nacka, Sweden
DN
1
Consultants
2
Design Alexandra Barker
ELECTRICAL ROOM
DN
Mechanical Stuart Bridgett
3
Facade Kate Kulpa 4
Landscape/ Site Nick Koster
TRUCK LOADING AREA
DN
DATA / TELECOM ROOM
5
Structural Paul Laroque Digital Assistance Christina Ostermier
6
DN FIRE PROTECTION WATER / FIRE PUMP ROOM
GAS SERVICE
Scale
REHEARSAL HALL STAGE LEVEL
3" = 64'
DN
7
WATER ROOM
Context
8
ELECTRICAL ROOM
WASTE WATER
Date / Telecom Fire Protection/Gas Service Water Service Electrical Room Waste Water Room
N
Drawing No./ Title
M 203
Horizontal Distribution / Level 1