The Critical Path - Winter 2020

Page 24

FPD

Administrative Support Community Spotlight The Administrative Support Community Spotlight seeks to recognize and connect members of the administrative community across the Flight Projects Directorate. Additionally, resources and relevant information will be highlighted in each Critical Path publication. The Critical Path team looks forward to connecting with and highlighting the administrative support community.

How can we support you? Contact FPD Administrative Support website for general information. Admin Space Station (AdSS) for Goddard Space Flight Center (GSFC) https://fpdsp13.gsfc.nasa.gov/ sites/100/SitePages/Admin_Portal. aspx Flight Projects Directorate Project Support https://fpd400.gsfc.nasa.gov/ sites/400/FPD_Internal/SitePages/ ProjectSupport.aspx jacqueline.seymore@nasa.gov (301) 286-6307 sarah.a.harnish@nasa.gov (301) 286-6567 24

NASA/GSFC THE CRITICAL PATH

Ayanna Roberts Exploration and In-Space Services Projects Division (NExIS) Project Support Specialist

Ayanna Roberts, a project support specialist in the Exploration and In-Space Services Projects Division (NExIS), has worked at Goddard Space Flight Center for 4 years. She joined the Goddard community after working at NASA Headquarters for 2 years. In her current position, Ayanna coordinates domestic and international travel for the NExIS division and multiple projects including the Mars Organic Molecule Analyzer (MOMA) and the Mars Sample Return-Capture, Containment, and Return System (MSR-CCRS). She has extensive knowledge of Goddard’s travel processes and shares her experience planning travel across the directorate. The dynamic role of coordinating domestic and international travel is critical and there is always something new to learn, Ayanna says, “There is never a dull moment in my role, that’s what makes it exciting and challenging at the same time.” Outside of work, Ayanna enjoys watching college basketball and football with her family. Sarah Harnish / Code 400


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.